ML12065A349: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:"v-R REGu<.q UNITED STATES ! "0." NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001  
{{#Wiki_filter:"v-R REGu<.q                                 UNITED STATES
<t 0 I>> : r; March 14, 2012 "'., "!>o Tennessee Valley Authority Watts Bar Nuclear Power Plant, Unit 2  
  +~"            "0."                 NUCLEAR REGULATORY COMMISSION
!
<t
                      ~
0 WASHINGTON, D.C. 20555-0001 I>>                     :
~                    r;                           March 14, 2012
  ~                ~
    "'.,         "!>o
        ****~
LICENSEE:        Tennessee Valley Authority FACILITY:        Watts Bar Nuclear Power Plant, Unit 2
 
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF MAY 2011, PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING WAITS BAR NUCLEAR PLANT, UNIT 2 FINAL SAFETY ANALYSIS REPORT SUBMITTALS On May 10 through 12, 2011, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Tennessee Valley Authority (TVA) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland.
OF MAY 2011, PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING WAITS BAR NUCLEAR PLANT, UNIT 2 FINAL SAFETY ANALYSIS REPORT SUBMITTALS On May 10 through 12, 2011, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Tennessee Valley Authority (TVA) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss outstanding issues relating to TVA's Final Safety Analysis Report (FSAR) submittals.
The purpose of the meeting was to discuss outstanding issues relating to TVA's Final Safety Analysis Report (FSAR) submittals.
The NRC staff and TVA discussed proposed requests for additional information regarding the review of the Fire Protection Report, Technical Specifications, and outstanding issues in FSAR Sections 7, 11, 12, and 13 (Instrumentation and Controls, Radioactive Waste Management, Radiation Protection, and Conduct of Operations, respectively). A list of participants is enclosed.
The NRC staff and TVA discussed proposed requests for additional information regarding the review of the Fire Protection Report, Technical Specifications, and outstanding issues in FSAR Sections 7, 11, 12, and 13 (Instrumentation and Controls, Radioactive Waste Management, Radiation Protection, and Conduct of Operations, respectively).
Members of the public did not partiCipate in the meeting.
A list of participants is enclosed.
Please direct any inquiries to me at 301-415-2048 or Justin.Poole@nrc.gov.
Members of the public did not partiCipate in the meeting. Please direct any inquiries to me at 301-415-2048 or Justin.Poole@nrc.gov.
Justin C. Poole, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391
Justin C. Poole, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391  


==Enclosure:==
==Enclosure:==


List of Participants cc w/encl: Distribution via Listserv LIST OF MAY 10-12, 2011, PUBLIC MEETING TENNESSEE VALLEY REGARDING WAITS BAR NUCLEAR PLANT, UNIT FINAL SAFETY ANALYSIS REPORT Name Steve Campbell Rags Raghavan Patrick Milano Justin Poole Carl Schulten Perry Pederson Ralph Costello Joe Green Roger Pedersen Andy Imboden Dennis Beissel Leta Brown Eva Hickey Becky Krieg Bob Schmidt Bob Bryce PositionlTitle Branch Chief Sr. Project Manager Sr. Project Manager Sr. Project Manager Sr. Reactor Engineer Security Specialist Sr. Security Specialist Security Specialist Sr. Health Physicist Branch Chief Hydrologist Physical Scientist Contractor Contractor Contractor Hydrologist Watts Bar Special Projects Branch Division of Operating Reactor Technical Specifications Branch/Division Inspection  
List of Participants cc w/encl: Distribution via Listserv
& Regional Support Office of Nuclear Security and Response Environmental Review & Guide Branch Division of License Renewal Accident Dose Branch/Division of Assessment Pacific Northwest National Laboratory Enclosure
 
-2 Positionrritle Organization Ray Gallucci Sr. PRA Engineer PRA licensing BranchlDRA Alex Klein Branch Chief Fire Protection Branch (AFPB}/DRA Daniel Frumkin Team Leader AFPB/DRA Charles Moulton Fire Protection Engineer AFPB/DRA Gary Cooper Fire Protection Engineer AFPB/DRA Bob Haag Branch Chief RII Tennessee Valley Authority (TVA) Participants:
LIST OF PARTICIPANTS MAY 10-12, 2011, PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING WAITS BAR NUCLEAR PLANT, UNIT 2 FINAL SAFETY ANALYSIS REPORT SUBMIITALS Name           PositionlTitle          Organization Steve Campbell Branch Chief            Watts Bar Special Projects Branch (LPWB)/
Gordon Arent licensing Manager TVA Watts Bar Unit 2 William Crouch Engineering TV A Watts Bar Unit 2 Pete Gaillard Licensing Manager TVA Lee Miller Corporate Licensing TVA Program Manger Tommy Elton Licensing TVA Pat Asendorf Sr. Manager Security TVA Regulation Jan Hersperger Sr. Manager Computer TVA Engineering Laura Snyder Manager, Cyber Security TVA Steve Hilmes Electricalll&C Manager TVA Jeff Kepler Engineer Bechtel Kenneth Wastrack Meteorologist TVA Bob Bryan TV A Consultant Westinghouse Eddie Woods Health Physicist TVA Jay Maisler Contractor Intercon Don Wakefield Consultant ABS
Division of Operating Reactor Licensing (DORL)
-PositionlTitie Organization Daniel Reny Consultant ABS Carla Borrelli PRA Manager TVA Frank Koontz Sr. Engineer Specialist TVA Brenda Simril Corporate Fire Protection TVA Manger Charles Brush Electrical Engineer EPM Warren Odess-Gillett WEC Fellow Engineer Michael Heibel WEC Fellow Engineer Harch 14, 2012 Tennessee Valley Authority Watts Bar Nuclear Power Plant, Unit 2  
Rags Raghavan   Sr. Project Manager     LPWB/DORL Patrick Milano  Sr. Project Manager     LPWB/DORL Justin Poole    Sr. Project Manager     LPWB/DORL Carl Schulten  Sr. Reactor Engineer     Technical Specifications Branch/Division of Inspection & Regional Support (DIRS)
Perry Pederson  Security Specialist      Office of Nuclear Security and Incident Response (NSIR)
Ralph Costello  Sr. Security Specialist  NSIR Joe Green      Security Specialist      NSIR Roger Pedersen  Sr. Health Physicist    DIRS Andy Imboden    Branch Chief            Environmental Review & Guide Branch (RERB)
Division of License Renewal (DLR)
Dennis Beissel  Hydrologist              RERBIDLR Leta Brown      Physical Scientist      Accident Dose Branch/Division of Risk Assessment (DRA)
Eva Hickey      Contractor              Pacific Northwest National Laboratory (PNNL)
Becky Krieg    Contractor              PNNL Bob Schmidt    Contractor              PNNL Bob Bryce      Hydrologist              PNNL Enclosure
 
Positionrritle             Organization Ray Gallucci       Sr. PRA Engineer           PRA licensing BranchlDRA Alex Klein         Branch Chief               Fire Protection Branch (AFPB}/DRA Daniel Frumkin     Team Leader               AFPB/DRA Charles Moulton     Fire Protection Engineer AFPB/DRA Gary Cooper         Fire Protection Engineer AFPB/DRA Bob Haag           Branch Chief               RII Tennessee Valley Authority (TVA) Participants:
Gordon Arent       licensing Manager         TVA Watts Bar Unit 2 William Crouch     Engineering               TVA Watts Bar Unit 2 Pete Gaillard       Licensing Manager         TVA Lee Miller         Corporate Licensing       TVA Program Manger Tommy Elton         Licensing                 TVA Pat Asendorf       Sr. Manager Security       TVA Regulation Jan Hersperger     Sr. Manager Computer       TVA Engineering Laura Snyder       Manager, Cyber Security TVA Steve Hilmes       Electricalll&C Manager     TVA Jeff Kepler         Engineer                   Bechtel Kenneth Wastrack   Meteorologist             TVA Bob Bryan           TVA Consultant             Westinghouse Eddie Woods         Health Physicist           TVA Jay Maisler         Contractor                 Intercon Don Wakefield       Consultant                 ABS
 
                                            - 3 PositionlTitie           Organization Daniel Reny         Consultant               ABS Carla Borrelli       PRA Manager               TVA Frank Koontz         Sr. Engineer Specialist   TVA Brenda Simril       Corporate Fire Protection TVA Manger Charles Brush       Electrical Engineer       EPM Warren Odess-Gillett WEC Fellow Engineer       Westinghouse Michael Heibel       WEC Fellow Engineer       Westinghouse
 
Harch 14, 2012 LICENSEE:      Tennessee Valley Authority FACILITY:      Watts Bar Nuclear Power Plant, Unit 2
 
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF MAY 2011, PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING WAITS BAR NUCLEAR PLANT, UNIT 2 FINAL SAFETY ANALYSIS REPORT SUBMIITALS On May 10 through 12,2011, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Tennessee Valley Authority (TVA) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland.
OF MAY 2011, PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING WAITS BAR NUCLEAR PLANT, UNIT 2 FINAL SAFETY ANALYSIS REPORT SUBMIITALS On May 10 through 12,2011, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Tennessee Valley Authority (TVA) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss outstanding issues relating to TVA's Final Safety Analysis Report (FSAR) submittals.
The purpose of the meeting was to discuss outstanding issues relating to TVA's Final Safety Analysis Report (FSAR) submittals.
The NRC staff and TVA discussed proposed requests for additional information regarding the review of the Fire Protection Report, Technical Specifications, and outstanding issues in FSAR Sections 7, 11! 12, and 13 (Instrumentation and Controls, Radioactive Waste Management, Radiation Protection, and Conduct of Operations, respectively). A list of participants is enclosed.
The NRC staff and TVA discussed proposed requests for additional information regarding the review of the Fire Protection Report, Technical Specifications, and outstanding issues in FSAR Sections 7, 11! 12, and 13 (Instrumentation and Controls, Radioactive Waste Management, Radiation Protection, and Conduct of Operations, respectively).
Members of the public did not participate in the meeting.
A list of participants is enclosed.
Please direct any inquiries to me at 301-415-2048 or Justin.Poole@nrc.gov.
Members of the public did not participate in the meeting. Please direct any inquiries to me at 301-415-2048 or Justin.Poole@nrc.gov.
IRAJ Justin C. Poole, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391
IRAJ Justin C. Poole, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391  


==Enclosure:==
==Enclosure:==


List of Participants cc w/encl: Distribution via Listserv DISTRIBUTION:
List of Participants cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsRgn2MailCenter Resource LPWB RtF RidsNrrlLABClayton (Hard copy) RidsOpaMaii Resource RidsNrrDorl Resource RidsNrrPMWattsBar2 Resource RidsAcrsAcnw_MailCTR Resource MKotzalas, EDO RidsNrrDorlLp_WB Resource RidsOgcMailCenter Resource RidsNrrOd Resource CSteger, NRR CSchulten, NRR PPederson, NSIR RCostello, NSIR JGreen, NSIR RPedersen, NRR RidsNrrDraAfbp Resource RidsNrrDlrRerb Resource LBrown, NRR RGallucci, NRR DFrumkin, NRR CMoulton, NRR GCooper, NRR RHaag, RII ADAMS Accession No' ML12065A349
PUBLIC                                 RidsRgn2MailCenter Resource         LPWB RtF RidsNrrlLABClayton (Hard copy)         RidsOpaMaii Resource                 RidsNrrDorl Resource RidsNrrPMWattsBar2 Resource             RidsAcrsAcnw_MailCTR Resource       MKotzalas, EDO RidsNrrDorlLp_WB Resource               RidsOgcMailCenter Resource           RidsNrrOd Resource CSteger, NRR                           CSchulten, NRR                       PPederson, NSIR RCostello, NSIR                         JGreen, NSIR                         RPedersen, NRR RidsNrrDraAfbp Resource                 RidsNrrDlrRerb Resource             LBrown, NRR RGallucci, NRR                         DFrumkin, NRR                       CMoulton, NRR GCooper, NRR                           RHaag, RII ADAMS Accession No'.. ML12065A349 OFFICE         LPWB\PM             LPWB\LA             LPWB\BC NAME           JPoole             BClayton           SCampbell DATE           3/08/12             3/08/12             3/14/12 OFFICIAL RECORD COpy}}
.. OFFICE LPWB\PM LPWB\LA LPWB\BC NAME JPoole BClayton SCampbell DATE 3/08/12 3/08/12 3/14/12 OFFICIAL RECORD COpy}}

Revision as of 07:11, 12 November 2019

05/10/2011 - 05/12/2011 Summary of Category 1 Public Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 2 Final Safety Analysis Report Submittals
ML12065A349
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 03/14/2012
From: Justin Poole
Watts Bar Special Projects Branch
To:
Bruce Bavol
References
Download: ML12065A349 (5)


Text

"v-R REGu<.q UNITED STATES

+~" "0." NUCLEAR REGULATORY COMMISSION

!

<t

~

0 WASHINGTON, D.C. 20555-0001 I>>  :

~ r; March 14, 2012

~ ~

"'., "!>o

        • ~

LICENSEE: Tennessee Valley Authority FACILITY: Watts Bar Nuclear Power Plant, Unit 2

SUBJECT:

SUMMARY

OF MAY 2011, PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING WAITS BAR NUCLEAR PLANT, UNIT 2 FINAL SAFETY ANALYSIS REPORT SUBMITTALS On May 10 through 12, 2011, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Tennessee Valley Authority (TVA) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss outstanding issues relating to TVA's Final Safety Analysis Report (FSAR) submittals.

The NRC staff and TVA discussed proposed requests for additional information regarding the review of the Fire Protection Report, Technical Specifications, and outstanding issues in FSAR Sections 7, 11, 12, and 13 (Instrumentation and Controls, Radioactive Waste Management, Radiation Protection, and Conduct of Operations, respectively). A list of participants is enclosed.

Members of the public did not partiCipate in the meeting.

Please direct any inquiries to me at 301-415-2048 or Justin.Poole@nrc.gov.

Justin C. Poole, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391

Enclosure:

List of Participants cc w/encl: Distribution via Listserv

LIST OF PARTICIPANTS MAY 10-12, 2011, PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING WAITS BAR NUCLEAR PLANT, UNIT 2 FINAL SAFETY ANALYSIS REPORT SUBMIITALS Name PositionlTitle Organization Steve Campbell Branch Chief Watts Bar Special Projects Branch (LPWB)/

Division of Operating Reactor Licensing (DORL)

Rags Raghavan Sr. Project Manager LPWB/DORL Patrick Milano Sr. Project Manager LPWB/DORL Justin Poole Sr. Project Manager LPWB/DORL Carl Schulten Sr. Reactor Engineer Technical Specifications Branch/Division of Inspection & Regional Support (DIRS)

Perry Pederson Security Specialist Office of Nuclear Security and Incident Response (NSIR)

Ralph Costello Sr. Security Specialist NSIR Joe Green Security Specialist NSIR Roger Pedersen Sr. Health Physicist DIRS Andy Imboden Branch Chief Environmental Review & Guide Branch (RERB)

Division of License Renewal (DLR)

Dennis Beissel Hydrologist RERBIDLR Leta Brown Physical Scientist Accident Dose Branch/Division of Risk Assessment (DRA)

Eva Hickey Contractor Pacific Northwest National Laboratory (PNNL)

Becky Krieg Contractor PNNL Bob Schmidt Contractor PNNL Bob Bryce Hydrologist PNNL Enclosure

Positionrritle Organization Ray Gallucci Sr. PRA Engineer PRA licensing BranchlDRA Alex Klein Branch Chief Fire Protection Branch (AFPB}/DRA Daniel Frumkin Team Leader AFPB/DRA Charles Moulton Fire Protection Engineer AFPB/DRA Gary Cooper Fire Protection Engineer AFPB/DRA Bob Haag Branch Chief RII Tennessee Valley Authority (TVA) Participants:

Gordon Arent licensing Manager TVA Watts Bar Unit 2 William Crouch Engineering TVA Watts Bar Unit 2 Pete Gaillard Licensing Manager TVA Lee Miller Corporate Licensing TVA Program Manger Tommy Elton Licensing TVA Pat Asendorf Sr. Manager Security TVA Regulation Jan Hersperger Sr. Manager Computer TVA Engineering Laura Snyder Manager, Cyber Security TVA Steve Hilmes Electricalll&C Manager TVA Jeff Kepler Engineer Bechtel Kenneth Wastrack Meteorologist TVA Bob Bryan TVA Consultant Westinghouse Eddie Woods Health Physicist TVA Jay Maisler Contractor Intercon Don Wakefield Consultant ABS

- 3 PositionlTitie Organization Daniel Reny Consultant ABS Carla Borrelli PRA Manager TVA Frank Koontz Sr. Engineer Specialist TVA Brenda Simril Corporate Fire Protection TVA Manger Charles Brush Electrical Engineer EPM Warren Odess-Gillett WEC Fellow Engineer Westinghouse Michael Heibel WEC Fellow Engineer Westinghouse

Harch 14, 2012 LICENSEE: Tennessee Valley Authority FACILITY: Watts Bar Nuclear Power Plant, Unit 2

SUBJECT:

SUMMARY

OF MAY 2011, PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING WAITS BAR NUCLEAR PLANT, UNIT 2 FINAL SAFETY ANALYSIS REPORT SUBMIITALS On May 10 through 12,2011, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Tennessee Valley Authority (TVA) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss outstanding issues relating to TVA's Final Safety Analysis Report (FSAR) submittals.

The NRC staff and TVA discussed proposed requests for additional information regarding the review of the Fire Protection Report, Technical Specifications, and outstanding issues in FSAR Sections 7, 11! 12, and 13 (Instrumentation and Controls, Radioactive Waste Management, Radiation Protection, and Conduct of Operations, respectively). A list of participants is enclosed.

Members of the public did not participate in the meeting.

Please direct any inquiries to me at 301-415-2048 or Justin.Poole@nrc.gov.

IRAJ Justin C. Poole, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391

Enclosure:

List of Participants cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsRgn2MailCenter Resource LPWB RtF RidsNrrlLABClayton (Hard copy) RidsOpaMaii Resource RidsNrrDorl Resource RidsNrrPMWattsBar2 Resource RidsAcrsAcnw_MailCTR Resource MKotzalas, EDO RidsNrrDorlLp_WB Resource RidsOgcMailCenter Resource RidsNrrOd Resource CSteger, NRR CSchulten, NRR PPederson, NSIR RCostello, NSIR JGreen, NSIR RPedersen, NRR RidsNrrDraAfbp Resource RidsNrrDlrRerb Resource LBrown, NRR RGallucci, NRR DFrumkin, NRR CMoulton, NRR GCooper, NRR RHaag, RII ADAMS Accession No'.. ML12065A349 OFFICE LPWB\PM LPWB\LA LPWB\BC NAME JPoole BClayton SCampbell DATE 3/08/12 3/08/12 3/14/12 OFFICIAL RECORD COpy