ML13232A134: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 14: Line 14:
| document type = Report, Technical
| document type = Report, Technical
| page count = 77
| page count = 77
| project =
| stage = Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page 0174 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 4 Status: YZ NEI ULI Seismic Walkdown Checklist (SWC) SWELl- 049 Equipment ID No. MO1400-24B Equip. Class, Motor-Operated  
{{#Wiki_filter:Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page 0174 of C413 ATTACHMENT 9.6                                                                   SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 4 Status: YZ NEI     ULI Seismic Walkdown Checklist (SWC)                   SWELl-       049 Equipment ID No.       MO1400-24B               Equip. Class, Motor-Operated& Solenoid-Operated Valves (08)
& Solenoid-Operated Valves (08)Equipment Description Core Spray B Injection Valve Location:
Equipment Description Core Spray B Injection Valve Location: Bldg. RB                 Floor El. 51             R oom, Area NORTH SIDE Manufacturer, Model, Etc. (optional but recommended)
Bldg. RB Floor El. 51 R Manufacturer, Model, Etc. (optional but recommended) oom, Area NORTH SIDE Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one   Y[-] NE of the 50% of SWEL items requiring such verification)?
Inline component, no anchorage.
Inline component, no anchorage.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?             Y[-I NEi  U[iE  N/A[D
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Y[-] NE Y[-I NEi U[iE N/A[D YE! NE! UEl N/A[YEI NE-I Ur N/A[' Enter the equipment class name from Appendix B: Classes of Equipment.
: 3. Is the anchorage free of corrosion that is more than mild surface             YE! NE! UEl N/A[
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-O0001, Rev. 1 Attachment C Page C175 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ NF-Z U--Seismic Walkdown Checklist (SWC) SWELl- 049 Equipment ID No. M01400-24B Equip. Class Motor-Operated  
oxidation?
& Solenoid-Operated Valves (08)Equipment Description Core Spray B Injection Valve 5. Is the anchorage configuration consistent with plant documentation?
: 4. Is the anchorage free of visible cracks in the concrete near the               YEI NE-I Ur     N/A[
YEI NE] U-] N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
anchors?
: 6. Based on the above anchorage evaluations, is the anchorage free of YZ N[] UE potentially adverse seismic conditions?
' Enter the equipment class name from Appendix B: Classes of Equipment.
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
EN-DC-168 REV 0
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
 
Engineering Report No. PNPS-CS-12-O0001, Rev. 1 Attachment C Page C175 of C413 ATTACHMENT   9.6                                                           SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ NF-Z U--
Seismic Walkdown Checklist (SWC)               SWELl-     049 Equipment ID No.     M01400-24B             Equip. Class Motor-Operated& Solenoid-OperatedValves (08)
Equipment Description Core Spray B Injection Valve
: 5. Is the anchorage configuration consistent with plant documentation?         YEI NE] U-] N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of         YZ N[] UE potentially adverse seismic conditions?
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       YZ NEJ uE1 N/AD-
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   YZ NE- uEr      N/A[-]
and masonry block walls not likely to collapse onto the equipment?
Masonry wall 64.4 (C942Sh 1, EO) is safety related, therefore seismically qualified and acceptable.
Masonry wall 64.4 (C942Sh 1, EO) is safety related, therefore seismically qualified and acceptable.
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Scaffolding is currently being erected below to the valves to allow access to them. This is a work in progress and is tagged appropriately.
: 9. Do attached lines have adequate flexibility to avoid damage?               YZ NEl U[-fl N/AED
All extra equipment in the area is properly secured and cart wheels are choked.YZ NEJ uE1 N/AD-YZ NE- uEr N/A[-]YZ NEl U[-fl N/AED YZ NEI UE-EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page 0176 of C413 AT'rACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: YZ NEI UM-Seismic Walkdown Checklist (SWC) SWELl- 049 Equipment ID No. M01400-24B Equip. Class Motor-Operated  
: 10. Based on the above seismic interaction evaluations, is equipment free       YZ NEI    UE-of potentially adverse seismic interaction effects?
& Solenoid-Operated Valves (08)Equipment Description Core Spray B Iniection Valve Other Adverse Conditions
Scaffolding is currently being erected below to the valves to allow access to them. This is a work in progress and is tagged appropriately.
: 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
All extra equipment in the areais properly secured and cart wheels are choked.
YZ NUEI 1 Comments (Additional pages may be added as necessary)
EN-DC-168 REV 0
Area walk-by is AWC-019.4oj"Wacha Evaluated by: Laura Maclay V I (J Date: 10-15-12 10-15-12 QA, .A 1,hk , -A Garv Sweder EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C177 of C413 SEISMIC WALKDOWN CHECKLIST FORM ATTACHMEI Sheet 4 of T 9.6 4 Status: YZ N[- ULI Seismic Walkdown Checklist (SWC) SWELl- 049 Equipment ID No. M01400-24B Equip. Class Motor-Operated  
 
& Solenoid-Operated Valves (08)Equipment Description Core Spray B Injection Valve Photographs EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page 0 178 of 0413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: Y[ NE] U-III Seismic Walkdown Checklist (SWC) SWELl- 050 Equipment ID No. MO1400-25B Equip. Classi Motor-Operated  
Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page 0176 of C413 AT'rACHMENT 9.6                                                             SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: YZ NEI     UM-Seismic Walkdown Checklist (SWC)                   SWELl-   049 Equipment ID No. M01400-24B                 Equip. Class Motor-Operated& Solenoid-OperatedValves (08)
& Solenoid-Operated Valves (08)Equipment Description Core Spray B Injection Valve Location:
Equipment Description Core Spray B Iniection Valve Other Adverse Conditions
Bldg. RB Floor El. 51 Ri Manufacturer, Model, Etc. (optional but recommended) oom, Area NORTH SIDE Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
: 11. Have you looked for and found no other seismic conditions that could     YZ NUEI    1 adversely affect the safety functions of the equipment?
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Comments (Additional pages may be added as necessary)
Area walk-by is AWC-019.
Evaluated by: Laura Maclay       4oj"Wacha                                        Date: 10-15-12 VI (J
Garv Sweder              QA,.A 1,hk     , -   A                           10-15-12 EN-DC-168 REV 0
 
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C177 of C413 ATTACHMEI T  9.6                                                    SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YZ   N[- ULI Seismic Walkdown Checklist (SWC)         SWELl-     049 Equipment ID No. M01400-24B           Equip. Class Motor-Operated& Solenoid-OperatedValves (08)
Equipment Description Core Spray B Injection Valve Photographs EN-DC-168 REV 0
 
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page 0 178 of 0413 ATTACHMENT 9.6                                                                   SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: Y[     NE] U-III Seismic Walkdown Checklist (SWC)                     SWELl-       050 Equipment ID No.         MO1400-25B               Equip. Classi Motor-Operated& Solenoid-OperatedValves (08)
Equipment Description Core Spray B Injection Valve Location: Bldg. RB                   Floor El. 51             Rioom, Area NORTH SIDE Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one   Y[-] NZ of the 50% of SWEL items requiring such verification)?
Inline component, no anchorage.
Inline component, no anchorage.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?             Y[E] N[-] U-I N/AS
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Y[-] NZ Y[E] N[-] U-I N/AS Y[E] NEi ULE- NWAS YEI NEI UL-- N/A[I Enter the equipment class name from Appendix B: Classes of Equipment.
: 3. Is the anchorage free of corrosion that is more than mild surface             Y[E] NEi ULE- NWAS oxidation?
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C179 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YN N-] Ur Seismic Walkdown Checklist (SWC) SWELl- 050 Equipment ID No. M01400-25B Equip. Class Motor-Operated  
: 4. Is the anchorage free of visible cracks in the concrete near the               YEI NEI   UL-- N/A[
& Solenoid-Operated Valves (08)Equipment Description Core Spray B Injection Valve 5. Is the anchorage configuration consistent with plant documentation?
anchors?
Y[-] N[-] UF- N/A[(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
I Enter the equipment class name from Appendix B: Classes of Equipment.
: 6. Based on the above anchorage evaluations, is the anchorage free of Y] Nr] UiE]potentially adverse seismic conditions?
EN-DC-168 REV 0
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
 
Noted a hanging light next to the valve is property restrained against lateral movement, therefore not a seismic hazard.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C179 of C413 ATTACHMENT     9.6                                                           SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YN N-] Ur Seismic Walkdown Checklist (SWC)               SWELl-     050 Equipment ID No.       M01400-25B             Equip. Class Motor-Operated& Solenoid-OperatedValves (08)
Equipment Description Core Spray B Injection Valve
: 5. Is the anchorage configuration consistent with plant documentation?         Y[-] N[-] UF- N/A[
(Note: This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of           Y] Nr] UiE]
potentially adverse seismic conditions?
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       YZ NEI    U[E] N/AE]
Noted a hanging light next to the valve is property restrainedagainst lateralmovement, therefore not a seismic hazard.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y0 NE'] u[-] NIAE]
and masonry block walls not likely to collapse onto the equipment?
Masonry wall 64.4 (C942Sh 1, EO) is safety related, therefore seismically qualified and acceptable.
Masonry wall 64.4 (C942Sh 1, EO) is safety related, therefore seismically qualified and acceptable.
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Scaffolding is currently being erected below to the valves to allow access to them. This is a work in progress and is tagged appropriately.
: 9. Do attached lines have adequate flexibility to avoid damage?               YZ NE] uE] NIAE]
All extra equipment in the area is properly secured and cart wheels are choked.YZ NEI U[E] N/AE]Y0 NE'] u[-] NIAE]YZ NE] uE] NIAE]Y NE-I U-]EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C 180 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: Y[ NF U-I Seismic Walkdown Checklist (SWC) SWELl- 050 Equipment ID No. M01400-25B Equip. Class Motor-Operated  
: 10. Based on the above seismic interaction evaluations, is equipment free       Y    NE-I U-]
& Solenoid-Operated Valves (08)Equipment Description Core Spray B Injection Valve Other Adverse Conditions
of potentially adverse seismic interaction effects?
: 11. Have you looked for and found no other seismic conditions that could YZ NEJ UL-I adversely affect the safety functions of the equipment?
Scaffolding is currently being erected below to the valves to allow access to them. This is a work in progress and is taggedappropriately.
All extra equipment in the area is properly secured and cartwheels are choked.
EN-DC-168 REV 0
 
Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C180 of C413 ATTACHMENT 9.6                                                           SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: Y[     NF U-I Seismic Walkdown Checklist (SWC)             SWELl-     050 Equipment ID No.       M01400-25B           Equip. Class Motor-Operated& Solenoid-OperatedValves (08)
Equipment Description Core Spray B Injection Valve Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could     YZ NEJ UL-I adversely affect the safety functions of the equipment?
Comments .(Additional pages may be added as necessary)
Comments .(Additional pages may be added as necessary)
Area walk-by is AWC-019.TSG" ." "k. ý, Evaluated by: Gary Sweder Date: 10-15-12 0 I Ltqd/qv 10-15-12 I aura MaClav %-kW 0,-ý ac -0(11 j VW ci EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page 0 181 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ NE] U[--Seismic Walkdown Checklist (SWC) SWELl- 050 Equipment ID No. M01400-25B Equip. Class Motor-Operated  
Area walk-by is AWC-019.
& Solenoid-Operated Valves (08)Equipment Description Core Spray B Injection Valve Note: Equipment tag 1400-25B Note: Overall view of valve from side EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C182 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: Y[ NFI U-Seismic Walkdown Checklist (SWC) SWELl- 050 Equipment ID No. M01400-25B Equip. Class Motor-Operated  
Evaluated by: Gary Sweder          TSG" .       " "k.ý,                       Date: 10-15-12 0
& Solenoid-Operated Valves (08)Equipment Description Core Spray B Injection Valve Note: Scaffold erection in progress Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C183 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 4 Status: Y[ NFl UL-Seismic Walkdown Checklist (SWC) SWELl- 051 Equipment ID No. M01400-3A Equip. Class, Motor-Operated  
I .qur*q Ltqd/qv
& Solenoid-Operated Valves (08)Equipment Description Core SprayA Supp Pool Suction Location:
                                  %-kW       0,-ý ac -0(11j                            10-15-12 IauraMaClav        VW ci EN-DC-168 REV 0
Bldg. RB Floor El. -17.5 Room, Area SE QD Manufacturer, Model, Etc. (optional but recommended)
 
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page 0181 of C413 ATTACHMENT   9.6                                                     SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ NE] U[--
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Seismic Walkdown Checklist (SWC)         SWELl-     050 Equipment ID No. M01400-25B           Equip. Class Motor-Operated & Solenoid-Operated Valves (08)
Equipment Description Core Spray B Injection Valve Note: Equipment tag 1400-25B                         Note: Overall view of valve from side EN-DC-168 REV 0
 
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C182 of C413 ATTACHMENT 9.6                                                       SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: Y[   NFI U-Seismic Walkdown Checklist (SWC)         SWELl-     050 Equipment IDNo. M01400-25B           Equip. Class Motor-Operated& Solenoid-Operated Valves (08)
Equipment Description Core Spray B Injection Valve Note: Scaffold erection in progress                   Note:
EN-DC-168 REV 0
 
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C183 of C413 ATTACHMENT 9.6                                                                 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 4 Status: Y[   NFl UL-Seismic Walkdown Checklist (SWC)                   SWELl-       051 Equipment ID No.       M01400-3A                 Equip. Class, Motor-Operated& Solenoid-OperatedValves (08)
Equipment Description Core SprayA Supp Pool Suction Location: Bldg. RB                 Floor El. -17.5         Room, Area SE QD Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one   YLI NZ of the 50% of SWEL items requiring such verification)?
Inline component, no anchorage.
Inline component, no anchorage.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?             YE-] N[-] UI-- N/AN
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?YLI NZ YE-] N[-] UI-- N/AN YE] NE] U[-] N/AE YEr NE] U[:] N/A I Enter the equipment class name from Appendix B: Classes of Equipment.
: 3. Is the anchorage free of corrosion that is more than mild surface             YE] NE] U[-] N/AE oxidation?
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-O0O01, Rev. 1 Attachment C Page C 184 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YN NEI U[--Seismic Walkdown Checklist (SWC) SWELl- 051 Equipment ID No. M01400-3A Equip. Class Motor-Operated  
: 4. Is the anchorage free of visible cracks in the concrete near the             YEr   NE] U[:] N/A anchors?
& Solenoid-Operated Valves (08)Equipment Description Core Spray A Supp Pool Suction 5. Is the anchorage configuration consistent with plant documentation?
IEnter the equipment class name from Appendix B: Classes of Equipment.
Y[-I NEi Ur1 N/A0 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
EN-DC-168 REV 0
: 6. Based on the above anchorage evaluations, is the anchorage free of YE NE] U[]potentially adverse seismic conditions?
 
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Engineering Report No. PNPS-CS-12-O0O01, Rev. 1 Attachment C Page C 184 of C413 ATTACHMENT 9.6                                                               SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YN NEI U[--
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Seismic Walkdown Checklist (SWC)               SWELl-     051 Equipment ID No.     M01400-3A               Equip. Class Motor-Operated& Solenoid-Operated Valves (08)
Overhead lighting adequately mounted at an angle over the valve, therefore not a seismic hazard.9. Do attached lines have adequate flexibility to avoid damage?Y[ NEI uEr N/AE-YZ NEI UE- N/A[-]Y[I NEI U[-] N/A[--10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C185 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: YN NEO UEI Seismic Walkdown Checklist (SWC) SWELl- 051 Equipment ID No. M01400-3A Equip. Class Motor-Operated  
Equipment Description Core Spray A Supp Pool Suction
& Solenoid-Operated Valves (08)Equipment Description Core Sorav A Suaw Pool Suction Other Adverse Conditions
: 5. Is the anchorage configuration consistent with plant documentation?         Y[-I NEi   Ur1 N/A0 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
: 6. Based on the above anchorage evaluations, is the anchorage free of         YE NE] U[]
YNNEI UEJ Comments (Additional pages may be added as necessary)
potentially adverse seismic conditions?
Area walk-by is on AWC-032.Evaluated by: Gary Sweder Date: 10-9-12 qv""-Wac-Qý Laura Maclay 10-9-12 LauraMacla EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C 186 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YE NEI UD Seismic Walkdown Checklist (SWC) SWELl- 051 Equipment ID No. M01400-3A Equip. Class Motor-Operated
Interaction Effects
& Solenoid-Operated Valves (08)Equipment Description Core Spray A Supp Pool Suction Photographs Note: Equipment Tag EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OO001, Rev. 1 Attachment C Page 0 187 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YZ NF Ur-]Seismic Walkdown Checklist (SWC) SWELl- 052 Equipment ID No. VAC-202A Equip. Class' Fans (9), Air Handlers (10), Temp. Sensors (19)Equipment Description EAC RCIC Rm Cooling Location:
: 7. Are soft targets free from impact by nearby equipment or structures?       Y[  NEI  uEr  N/AE-
Bldg. RB Floor El. 2.75 Room, Area SW QD Manufacturer, Model, Etc. (optional but recommended)
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   YZ NEI    UE- N/A[-]
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
and masonry block walls not likely to collapse onto the equipment?
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Overhead lighting adequately mounted at an angle over the valve, therefore not a seismic hazard.
Reference C359Sh 1, E1 (Detail 8)2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 9. Do attached lines have adequate flexibility to avoid damage?               Y[I NEI U[-] N/A[--
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?YE NFI Y[ NEI U[I N/AZ-Y; NEI ULI N/AZ" Y[ NEI UIE- N/AE-I Enter the equipment class name from Appendix B: Classes of Equipment.
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page 0188 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ NE-] uIIL Seismic Walkdown Checklist (SWC) SWELl- 052 Equipment ID No. VAC-202A Equip. Class Fans (9), Air Handlers (10). Temp. Sensors (19)Equipment Description EAC RCIC Rm Coolinq 5. Is the anchorage configuration consistent with plant documentation?
EN-DC-1 68 REV 0
YZ NEI UD- N/A[-](Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
 
Reference drawing C359 SHI, detail 8. Anchorage for the steel frame on which VAC-202A is mounted was verified.6. Based on the above anchorage evaluations, is the anchorage free of YZ ND"] UD]potentially adverse seismic conditions?
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C185 of C413 ATTACHMENT 9.6                                                           SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: YN NEO   UEI Seismic Walkdown Checklist (SWC)             SWELl-     051 Equipment ID No. M01400-3A               Equip. Class Motor-Operated& Solenoid-OperatedValves (08)
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Equipment Description Core Sorav A Suaw Pool Suction Other Adverse Conditions
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 11. Have you looked for and found no other seismic conditions that could       YNNEI UEJ adversely affect the safety functions of the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ N[D] UD- N/AD-]YZ ND] U[-] N/AD-YZ NDl UD-- N/AD-YZ NF-D Ur EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C0189 of 0413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: Y[ NO Ur-I Seismic Walkdown Checklist (SWC) SWELl- 052 Equipment ID No. VAC-202A Equip. Class Fans (9). Air Handlers (10). Temp. Sensors (19)Equipment Description EAC RCIC Rm Cooling Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could YO N[: U-]adversely affect the safety functions of the equipment?
Mild surface oxidation on the frame due to lack of paint after work was completed (See Picture).
Facilities Request 9477 has been made to request painting of frame.Comments (Additional pages may be added as necessary)
SEWs package for VAC-202A indicates neoprene vibration isolators need to be addressed to prevent unacceptable horizontal or vertical displacements during a seismic event. FRN 98-01-33 provides details for the installation of limit stop devices. The walkdown verified the installation of the limit stop devices per the FRN documentation.
Area Walk-By Checklist is A WC-006.Evaluated by: Gary Sweder )AdAO 4 N k .Date: 10/3/12 I-cu r,, (3 I RI~rR MAklv~I 10/3/12 Laura Maclav t/ .QJ EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C 190 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: Y[ Nr ] U--Seismic Walkdown Checklist (SWC) SWELl- 052 Equipment ID No. VAC-202A Equip. Class Fans (9). Air Handlers (10), Temp. Sensors (19)Equipment Description EAC RCIC Rm Cooling Photographs Note: Note: overall view of equipment EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C191 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ Nr-1 U--i Seismic Walkdown Checklist (SWC) SWELl- 052 Equipment ID No. VAC-202A Equip. Class Fans (9), Air Handlers (10), Temp. Sensors (19)Equipment Description EAC RCIC Rm Cooling Note: Limit stop device and lack of paint at locations of work area EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-O0001, Rev. 1 Attachment C Page 0192 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 4 Status: YZ NF UD-'Seismic Walkdown Checklist (SWC) SWELl- 053 Equipment ID No. VAC-202B Equip. Classi Fans (9), Air Handlers (10), Temp. Sensors (19)Equipment Description EAC RCIC Rm Coolinq Location:
Bldg. RB Floor El. 2.75 R Manufacturer, Model, Etc. (optional but recommended) oom, Area SWQD Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
C91, E2 Detail I used to verify anchorage 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?YN N[-]YN NEl U[D] N/AD-Y[ ND U[-] N/ADl Y] NDI UED N/AD IEnter the equipment class name from Appendix B: Classes of Equipment.
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C193 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ NEi UrL Seismic Walkdown Checklist (SWC) SWELl- 053 Equipment ID No. VAC-202B Equip. Class Fans (9), Air Handlers (10), Temp. Sensors (19)Equipment Description EAC RCIC Rm Cooling 5. Is the anchorage configuration consistent with plant documentation?
YZ ND] UF] N/AD](Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Dimensions were spot checked using C91, E2 and verified to be accurate.6. Based on the above anchorage evaluations, is the anchorage free of YZ ND- Ur-potentially adverse seismic conditions?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
VAC-202A overhead 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ NDI uED N/AD]YN NDI uD-] N/AD-]YN N[D] UD- N/AD-YZ NDJ UD-EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C194 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: Y[ N[- UI-Seismic Walkdown Checklist (SWC) SWELl- 053 Equipment ID No. VAC-202B Equip. Class Fans (9). Air Handlers (10). Temp. Sensors (19)Equipment Description EAC RCIC Rm Cooling Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could Y0 N[E] U[]adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
SEWs package for VAC-202B indicates neoprene vibration isolators need to be addressed to prevent unacceptable horizontal or vertical displacements during a seismic event. FRN 98-01-33 provides details for the installation of limit stop devices. The walkdown verified the installation of the limit stop devices per the FRN documentation.
Area walk-by is on AWC-032.
Area Walk-By Checklist is A WC-006.Evaluated by: Gary Sweder ,dQ, ..o G Date: 10-03-12 Ym=7JAffa?~o aj Laura Maclav 10-03-12 Laura Maclav I (J EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C195 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YZ NIF U-Seismic Walkdown Checklist (SWC) SWELl- 053 Equipment ID No. VAC-202B Equip. Class Fans (9), Air Handlers (10), Temp. Sensors (19)Equipment Description EAC RCIC Rm Cooling Photographs EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C196 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YE NF-] Ur-D Seismic Walkdown Checklist (SWC) SWELl- 054 Equipment ID No. P208C Equip. Class' Vertical Pumps (06)Equipment Description SSW Pump C Location:
Evaluated by: Gary Sweder         J.Q*_.                                       Date: 10-9-12 Laura Maclay LauraMacla qv""-Wac-Qý                                          10-9-12 EN-DC-168 REV 0
Bldg. IS Floor El. 25.5 Room, Area C COMP Manufacturer, Model, Etc. (optional but recommended)
 
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C 186 of C413 ATTACHMENT 9.6                                                   SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YE NEI UD Seismic Walkdown Checklist (SWC)       SWELl-     051 Equipment ID No. M01400-3A          Equip. Class Motor-Operated& Solenoid-Operated Valves (08)
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Equipment Description Core Spray A Supp Pool Suction Photographs Note: Equipment Tag EN-DC-168 REV 0
YE Nil 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
 
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?YZ NEI UiZ N/AZ--YZ N[-] Uil N/AZl YZ NEI U N/ARl Tight vertical crack (less than 1/8') on northwest comer of pedestal.Judged to be insignificant; therefore, it presents no seismic hazard. See attached photo.1 Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. PNPS-CS-12-OO001, Rev. 1 Attachment C Page 0 187 of C413 ATTACHMENT     9.6                                                             SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YZ NF Ur-]
EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C197 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YM NE] Ur--Seismic Walkdown Checklist (SWC) SWELl- 054 Equipment ID No. P208C Equip. Class Vertical Pumps (06)Equipment Description SSWPump C 5. Is the anchorage configuration consistent with plant documentation?
Seismic Walkdown Checklist (SWC)                   SWELl-       052 Equipment ID No.       VAC-202A                  Equip. Class' Fans (9), Air Handlers (10), Temp. Sensors (19)
YZ NEi UrI N/AE-(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Equipment Description EAC RCIC Rm Cooling Location: Bldg. RB                  Floor El. 2.75          Room, Area SW QD Manufacturer, Model, Etc. (optional but recommended)
Reference Calculation C15.0.2901, Rev. 1, and Drawing C-45, Rev.E18.6. Based on the above anchorage evaluations, is the anchorage free of YZ N-] Ur-]potentially adverse seismic conditions?
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Anchorage
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 1. Is the anchorage configuration verification required (i.e., is the item one   YE NFI of the 50% of SWEL items requiring such verification)?
Masonry block wall 45.2 is seismically qualified.
Reference C359Sh 1, E1 (Detail8)
See drawing C-939 SH 1, Rev. EO.Fluorescent light fixture above the west side of the P208C cubicle is suspended by an open S-hook. The fixture does not pose a credible threat to P208C; however, it could possibly damage other instruments within the room if it were to swing/fall during a seismic event. See AWC-031 for details.9. Do attached lines have adequate flexibility to avoid damage?YZ NE] uiE] N/A[-]YZ N-] UE] N/AE]YN NE] u[-] N/AE]10. Based on the above seismic interaction evaluations, is equipment free YN NE]i UIE of potentially adverse seismic interaction effects?EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C198 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: Yo NE] Ur-]Seismic Walkdown Checklist (SWC) SWELl- 054 Equipment ID No. P208C Equip. Class Vertical Pumos (06)Equipment Description SSW Pump C Other Adverse Conditions
: 2. Is the anchorage free of bent, broken, missing or loose hardware?             Y[    NEI  U[I N/AZ-
: 11. Have you looked for and found no other seismic conditions that could YN NE] U[]adversely affect the safety functions of the equipment?
: 3. Is the anchorage free of corrosion that is more than mild surface             Y; NEI    ULI N/AZ" oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the               Y[    NEI UIE- N/AE-anchors?
IEnter the equipment class name from Appendix B: Classes of Equipment.
EN-DC-168 REV 0
 
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page 0188 of C413 ATTACHMENT   9.6                                                           SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ NE-] uIIL Seismic Walkdown Checklist (SWC)               SWELl-     052 Equipment ID No.     VAC-202A              Equip. Class Fans (9), Air Handlers (10). Temp. Sensors (19)
Equipment Description EAC RCIC Rm Coolinq
: 5. Is the anchorage configuration consistent with plant documentation?         YZ NEI    UD- N/A[-]
(Note: This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)
Reference drawing C359 SHI, detail 8. Anchorage for the steel frame on which VAC-202A is mounted was verified.
: 6. Based on the above anchorage evaluations, is the anchorage free of         YZ ND"] UD]
potentially adverse seismic conditions?
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       YZ N[D] UD- N/AD-]
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ ND] U[-] N/AD-and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?               YZ NDl UD-- N/AD-
: 10. Based on the above seismic interaction evaluations, is equipment free       YZ NF-D Ur of potentially adverse seismic interaction effects?
EN-DC-168 REV 0
 
Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C0189 of 0413 ATTACHMENT 9.6                                                               SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: Y[      NO Ur-I Seismic Walkdown Checklist (SWC)                   SWELl-   052 Equipment ID No.     VAC-202A                  Equip. Class Fans (9). Air Handlers (10). Temp. Sensors (19)
Equipment Description EAC RCIC Rm Cooling Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could         YO N[: U-]
adversely affect the safety functions of the equipment?
Mild surface oxidation on the frame due to lack of paint after work was completed (See Picture). Facilities Request 9477 has been made to requestpaintingof frame.
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
P208C was out of service at the time of inspection.
SEWs package for VAC-202A indicatesneoprene vibration isolators need to be addressed to prevent unacceptablehorizontal or vertical displacements during a seismic event. FRN 98-01-33 provides details for the installationof limit stop devices. The walkdown verified the installationof the limit stop devices per the FRN documentation.
The motor was decoupled from the pump and the top cover was removed from the motor. This was not noted as a concern, as the opening had the appropriate FME cover (see attached photo).SWEL 1-054 is on AWC-031.dn 2-P ii Evaluated by: David Small Date: 10/03/2012 Halie Aroz d 1!)10/03/2012
Area Walk-By Checklist is A WC-006.
%</- I EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C199 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: Y[ NMJ U'Seismic Walkdown Checklist (SWC) SWELl- 054 Equipment ID No. P208C Equip. Class Vertical Pumps (06)Equipment Description SSWPump C Photographs EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C200 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ NI-] UD-Seismic Walkdown Checklist (SWC) SWELl- 054 Equipment ID No. P208C Equip. Class Vertical Pumps (06)Equipment Description SSWPump C Note: Typical anchor bolts.Note: Tight vertical crack in pedestal.EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C201 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YE NFj UDl Seismic Walkdown Checklist (SWC) SWELl- 055 Equipment ID No. P208D Equip. Class, Vertical Pumps (06)Equipment Description SSWPump D Location:
Evaluated by: Gary Sweder          )AdAO4          Nk .                            Date: 10/3/12 I RI~rR MAklv~I        I-cu    r,,                (3                        10/3/12 Laura Maclav        t/ .
Bldg. IS Floor El. 25.5 Room, Area B COMP Manufacturer, Model, Etc. (optional but recommended)
QJ EN-DC-168 REV 0
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
 
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C 190 of C413 ATTACHMENT 9.6                                                   SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: Y[     Nr ] U--
Y[ NEi 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Seismic Walkdown Checklist (SWC)       SWELl-   052 Equipment ID No. VAC-202A          Equip. Class Fans (9). Air Handlers (10), Temp. Sensors (19)
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?YE NEi U[-] N/A[-]YE NEi U[L N/A'-YE NE] Ur- N/A[-]I Enter the equipment class name from Appendix B: Classes of Equipment.
Equipment Description EAC RCIC Rm Cooling Photographs Note:                                            Note: overall view of equipment EN-DC-168 REV 0
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C202 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ NIT U[]Seismic Walkdown Checklist (SWC) SWELl- 055 Equipment ID No. P208D Equip. Class Vertical Pumps (06)Equipment Description SSWPump D 5. Is the anchorage configuration consistent with plant documentation?
 
Y[ NF] Ur- N/AR (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C191 of C413 ATTACHMENT 9.6                                                       SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ Nr-1    U--i Seismic Walkdown Checklist (SWC)         SWELl-     052 Equipment ID No. VAC-202A            Equip. Class Fans (9), Air Handlers (10), Temp. Sensors (19)
Reference Calculation C15.0.1869, Rev. 1, and Drawing C-45, Rev.E18.6. Based on the above anchorage evaluations, is the anchorage free of YM NEI U[potentially adverse seismic conditions?
Equipment Description EAC RCIC Rm Cooling Note: Limit stop device and lack of paint at locations of work area EN-DC-168 REV 0
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
 
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Engineering Report No. PNPS-CS-12-O0001, Rev. 1 Attachment C Page 0192 of C413 ATTACHMENT     9.6                                                             SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 4 Status: YZ NF UD-'
Masonry walls 45.2 and 45.3 are seismically qualified.
Seismic Walkdown Checklist (SWC)                   SWELl-       053 Equipment ID No.       VAC-202B                  Equip. Classi Fans (9), Air Handlers (10), Temp. Sensors (19)
See drawing C-939 SH 1, Rev. EO.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y] N[D] Ul-- N/AD--Y[ NDJ U-- N/AD-]YO ND:] UDJ N/AD-]YZ ND:] ur EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C203 of C413 Ar"ACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YE NE] UF]Seismic Walkdown Checklist (SWC) SWELl- 055 Equipment ID No. P208D Equip. Class Vertical Pumps (06)Equipment Description SSWPump D Other Adverse Conditions
Equipment Description EAC RCIC Rm Coolinq Location: Bldg. RB                  Floor El. 2.75          R oom, Area SWQD Manufacturer, Model, Etc. (optional but recommended)
: 11. Have you looked for and found no other seismic conditions that could Y[D NE] U[-I adversely affect the safety functions of the equipment?
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one   YN N[-]
of the 50% of SWEL items requiring such verification)?
C91, E2 Detail I used to verify anchorage
: 2. Is the anchorage free of bent, broken, missing or loose hardware?             YN NEl U[D] N/AD-
: 3. Is the anchorage free of corrosion that is more than mild surface             Y[    ND U[-] N/ADl oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the               Y] NDI    UED N/AD anchors?
IEnter the equipment class name from Appendix B: Classes of Equipment.
EN-DC-168 REV 0
 
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C193 of C413 ATTACHMENT 9.6                                                             SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ   NEi UrL Seismic Walkdown Checklist (SWC)               SWELl-     053 Equipment ID No.     VAC-202B              Equip. Class Fans (9), Air Handlers (10), Temp. Sensors (19)
Equipment Description EAC RCIC Rm Cooling
: 5. Is the anchorage configuration consistent with plant documentation?       YZ ND] UF] N/AD]
(Note: This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)
Dimensions were spot checked using C91, E2 and verified to be accurate.
: 6. Based on the above anchorage evaluations, is the anchorage free of         YZ ND- Ur-potentially adverse seismic conditions?
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       YZ NDI    uED N/AD]
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN NDI uD-] N/AD-]
and masonry block walls not likely to collapse onto the equipment?
VAC-202A overhead
: 9. Do attached lines have adequate flexibility to avoid damage?               YN N[D] UD- N/AD-
: 10. Based on the above seismic interaction evaluations, is equipment free     YZ NDJ    UD-of potentially adverse seismic interaction effects?
EN-DC-168 REV 0
 
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C194 of C413 ATTACHMENT  9.6                                                             SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: Y[      N[-    UI-Seismic Walkdown Checklist (SWC)                 SWELl-     053 Equipment ID No.     VAC-202B                  Equip. Class Fans (9). Air Handlers (10). Temp. Sensors (19)
Equipment Description EAC RCIC Rm Cooling Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could           Y0 N[E]   U[]
adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
SWEL 1-055 is on AWC-005.Evaluated by: David Small 2 9J AA44 Halie Aroz Date: 10/03/2012 10/03/2012 L.)EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C204 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ No- Ufi Seismic Walkdown Checklist (SWC) SWELl- 055 Equipment ID No. P208D Equip. Class Vertical Pumps (06)Equipment Description SSWPump D Photographs Note: Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C205 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ No UF']Seismic Walkdown Checklist (SWC) SWELl- 055 Equipment ID No. P208D Equip. Class Vertical Pumps (06)Equipment Description SSWPump D EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. I Attachment C Page C206 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 4 Status: YZ NE] UD--Seismic Walkdown Checklist (SWC) SWELl- 056 Equipment ID No. P208E Equip. Class, Vertical Pumps (06)Equipment Description SSWPump E Location:
SEWs package for VAC-202B indicates neoprene vibration isolators need to be addressed to prevent unacceptablehorizontal or vertical displacements during a seismic event. FRN 98-01-33 provides details for the installationof limit stop devices. The walkdown verified the installationof the limit stop devices per the FRN documentation.
Bldg. IS Floor El. 25.5 Room, Area B COMP Manufacturer, Model, Etc. (optional but recommended)
Area Walk-By Checklist is A WC-006.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Evaluated by: Gary Sweder          ,dQ,      .  . o                            Date: 10-03-12 G
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Laura Maclav Laura Maclav Ym=7JAffa?~o                  aj                          10-03-12 (J
YZ N[-]2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
I EN-DC-168 REV 0
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Pedestal is cut on southeast comer to accommodate piping. This looks deliberate and is not close to the bolt, so it is therefore not considered a seismic hazard.YO NE]I U11 N/AL]YE N[] ULI N/A[--YZ NF-] U-] N/A[I Enter the equipment class name from Appendix B: Classes of Equipment.
 
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C207 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ NE U--Seismic Walkdown Checklist (SWC) SWELl- 056 Equipment ID No. P208E Equip. Class Vertical Pumps (06)Equipment Description SSWPump E 5. Is the anchorage configuration consistent with plant documentation?
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C195 of C413 ATTACHMENT 9.6                                                   SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YZ NIF U-Seismic Walkdown Checklist (SWC)       SWELl-   053 Equipment ID No. VAC-202B          Equip. Class Fans (9), Air Handlers (10), Temp. Sensors (19)
YM NEI UI-- N/A--(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Equipment Description EAC RCIC Rm Cooling Photographs EN-DC-1 68 REV 0
Reference Calculation C15.0.1869, Rev. 1, and Drawing C-45, Rev.E18.6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI UI-potentially adverse seismic conditions?
 
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C196 of C413 ATTACHMENT       9.6                                                           SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YE NF-] Ur-D Seismic Walkdown Checklist (SWC)                   SWELl-       054 Equipment IDNo.         P208C                    Equip. Class' Vertical Pumps (06)
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Equipment Description SSW Pump C Location: Bldg. IS                   Floor El. 25.5           Room, Area C COMP Manufacturer, Model, Etc. (optional but recommended)
Masonry walls 45.2 and 45.3 are seismically qualified.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
See drawing C-939 SH 1, Rev. EO.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ NEI UE- N/A[--YZ NEi UI- N/AE--YN NR U[-- N/AE1 YZ NEI UEr EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C208 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: Y[ NZ UEZ Seismic Walkdown Checklist (SWC) SWELl- 056 Equipment ID No. P208E Equip. Class Vertical Pumps (06)Equipment Description SSW Pump E Other Adverse Conditions
Anchorage
: 11. Have you looked for and found no other seismic conditions that could Y0 NEI uEF adversely affect the safety functions of the equipment?
: 1. Is the anchorage configuration verification required (i.e., is the item one   YE Nil of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?             YZ NEI    UiZ N/AZ--
: 3. Is the anchorage free of corrosion that is more than mild surface             YZ N[-] Uil N/AZl oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the               YZ NEI U      N/ARl anchors?
Tight vertical crack (less than 1/8') on northwest comer of pedestal.
Judged to be insignificant;therefore, it presents no seismic hazard. See attachedphoto.
1 Enter the equipment class name from Appendix B: Classes of Equipment.
EN-DC-1 68 REV 0
 
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C197 of C413 ATTACHMENT 9.6                                                               SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YM NE] Ur--
Seismic Walkdown Checklist (SWC)               SWELl-     054 Equipment IDNo.       P208C                    Equip. Class Vertical Pumps (06)
Equipment Description SSWPump C
: 5. Is the anchorage configuration consistent with plant documentation?         YZ NEi    UrI N/AE-(Note: This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)
Reference Calculation C15.0.2901, Rev. 1, and Drawing C-45, Rev.
E18.
: 6. Based on the above anchorage evaluations, is the anchorage free of         YZ N-] Ur-]
potentially adverse seismic conditions?
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       YZ NE] uiE] N/A[-]
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   YZ N-]    UE]  N/AE]
and masonry block walls not likely to collapse onto the equipment?
Masonry block wall 45.2 is seismically qualified. See drawing C-939 SH 1, Rev. EO.
Fluorescentlight fixture above the west side of the P208C cubicle is suspended by an open S-hook. The fixture does not pose a credible threat to P208C; however, it could possibly damage other instruments within the room if it were to swing/fall during a seismic event. See AWC-031 for details.
: 9. Do attached lines have adequate flexibility to avoid damage?               YN NE]    u[-] N/AE]
: 10. Based on the above seismic interaction evaluations, is equipment free       YN NE]i    UIE of potentially adverse seismic interaction effects?
EN-DC-168 REV 0
 
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C198 of C413 ATTACHMENT 9.6                                                           SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: Yo NE]    Ur-]
Seismic Walkdown Checklist (SWC)             SWELl-     054 Equipment ID No. P208C                    Equip. Class Vertical Pumos (06)
Equipment Description SSW Pump C Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could     YN NE] U[]
adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
SWEL 1-056 is on A WC-005.D ,=J Li?Evaluated by: David Small Halie Aroz Date: 10/03/2012 10/03/2012 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C209 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YZ NRI UrL Seismic Walkdown Checklist (SWC) SWELl- 056 Equipment ID No. P208E Equip. Class Vertical Pumps (06)Equipment Description SSWPump E Photographs Note: Note: Typical anchor bolt.EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C210 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: Y[ NF Ul-'Seismic Walkdown Checklist (SWC) SWELl- 057 Equipment ID No. P202D Equip. Class' Horizontal Pumps (05)Equipment Description RBCCWPump D Loop B Location:
P208Cwas out of service at the time of inspection. The motor was decoupled from the pump and the top cover was removed from the motor. This was not noted as a concern, as the opening had the appropriateFME cover (see attachedphoto).
Bldg. AXBAY Floor El. 3 Room, Area B COMP Manufacturer, Model, Etc. (optional but recommended)
SWEL 1-054 is on AWC-031.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Evaluated by: David Small         dn2-P          ii                            Date: 10/03/2012 Halie Aroz            d          1!)                                  10/03/2012
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
                                  %</-            I EN-DC-168 REV 0
YZ Nr-1 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
 
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?YZ NEIl UEI N/A[-YZ NEil U[] N/Ar-Y[ N[] UEI N/AD IEnter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C199 of C413 ATTACHMENT 9.6                                               SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: Y[  NMJ U' Seismic Walkdown Checklist (SWC)  SWELl-    054 Equipment ID No. P208C        Equip. Class Vertical Pumps (06)
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C211 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YN NE] U--Seismic Walkdown Checklist (SWC) SWELl- 057 Equipment ID No. P202D Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPump D Loop B 5. Is the anchorage configuration consistent with plant documentation?
Equipment Description SSWPump C Photographs EN-DC-168 REV 0
Y[E N[-] U[-I N/AD-(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
 
Reference Drawings C-185, Rev. E7 and C-186, Rev. E3.6. Based on the above anchorage evaluations, is the anchorage free of YN ND] U[-D potentially adverse seismic conditions?
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C200 of C413 ATTACHMENT 9.6                                                SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ NI-] UD-Seismic Walkdown Checklist (SWC) SWELl-     054 Equipment ID No. P208C        Equip. Class Vertical Pumps (06)
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Equipment Description SSWPump C Note: Typical anchorbolts.                    Note: Tight vertical crack in pedestal.
There is some loose foam insulation secured with duct tape on the discharge valve for P202D. As the mass for the insulation is very low, it does not present an adverse seismic interaction.
EN-DC-168 REV 0
CR-PNP-2012-04405 was written to address this as a general plant housekeeping concern, and WR 286056 was initiated for repair.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
 
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ NDl UD- N/AD-]YZ NDI UD- N/AD-YZ NDI UD- N/AD]YM N[-- Ur EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C212 of C413 ATTACHMENT 9.6 SEISMIC WALKOOWN CHECKLIST FORM Sheet 3 of 5 Status: YZ NEI UEI Seismic Walkdown Checklist (SWC) SWELl- 057 Equipment ID No. P202D Equip. Class Horizontal Pumps (05)Equipment Description RBCCW Pump D Loop B Other Adverse Conditions
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C201 of C413 ATTACHMENT 9.6                                                                   SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YE NFj UDl Seismic Walkdown Checklist (SWC)                     SWELl-       055 Equipment ID No.       P208D                    Equip. Class, Vertical Pumps (06)
: 11. Have you looked for and found no other seismic conditions that could YE NEI Ur-adversely affect the safety functions of the equipment?
Equipment Description SSWPump D Location: Bldg. IS                  Floor El. 25.5          Room, Area B COMP Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one   Y[  NEi of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?             YE NEi    U[-] N/A[-]
: 3. Is the anchorage free of corrosion that is more than mild surface             YE NEi U[L N/A'-
oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the               YE NE] Ur-      N/A[-]
anchors?
I Enter the equipment class name from Appendix B: Classes of Equipment.
EN-DC-168 REV 0
 
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C202 of C413 ATTACHMENT 9.6                                                             SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ NIT    U[]
Seismic Walkdown Checklist (SWC)               SWELl-     055 Equipment IDNo.       P208D                  Equip. Class Vertical Pumps (06)
Equipment Description SSWPump D
: 5. Is the anchorage configuration consistent with plant documentation?       Y[   NF] Ur- N/AR (Note: This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)
Reference Calculation C15.0.1869, Rev. 1, and Drawing C-45, Rev.
E18.
: 6. Based on the above anchorage evaluations, is the anchorage free of         YM NEI U[
potentially adverse seismic conditions?
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       Y] N[D] Ul-- N/AD--
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[  NDJ U-- N/AD-]
and masonry block walls not likely to collapse onto the equipment?
Masonry walls 45.2 and 45.3 are seismically qualified. See drawing C-939 SH 1, Rev. EO.
: 9. Do attached lines have adequate flexibility to avoid damage?               YO ND:] UDJ N/AD-]
: 10. Based on the above seismic interaction evaluations, is equipment free     YZ ND:] ur of potentially adverse seismic interaction effects?
EN-DC-168 REV 0
 
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C203 of C413 Ar"ACHMENT 9.6                                                           SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YE NE]    UF]
Seismic Walkdown Checklist (SWC)               SWELl-     055 Equipment ID No. P208D                    Equip. Class Vertical Pumps (06)
Equipment Description SSWPump D Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could     Y[D NE]    U[-I adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
SWEL1-057 is on AWC-003.00,w L4A Evaluated by: David Small Date: 10/04/2012 Halie Aroz Ite0 10/04/2012 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C213 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ NR Ur Seismic Walkdown Checklist (SWC) SWELl- 057 Equipment ID No. P202D Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPump D Loop B Photographs Note: Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C214 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ NE] UD-Seismic Walkdown Checklist (SWC) SWELl- 057 Equipment ID No. P202D Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPump D Loop B Note: Typical anchor bolt.Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C215 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: Y[ NI]I ULI Seismic Walkdown Checklist (SWC) SWELl- 058 Equipment ID No. P202E Equip. Classi Horizontal Pumps (05)Equipment Description RBCCWPump E Loop B Location:
SWEL 1-055 is on AWC-005.
Bldg. AXBAY Floor El. 3 Room, Area B COMP Manufacturer, Model, Etc. (optional but recommended)
Evaluated by: David Small       2      9J  AA44                                Date: 10/03/2012 Halie Aroz                                                               10/03/2012 L.)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
EN-DC-1 68 REV 0
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
 
Y[ NEIl 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C204 of C413 ATTACHMENT 9.6                                               SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ No- Ufi Seismic Walkdown Checklist (SWC) SWELl-     055 Equipment ID No. P208D        Equip. Class Vertical Pumps (06)
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?YZ NElI UL N/A[--Y[ Nj3 IEu N/AZ]Y[ NEJ Ur] N/AD-]I Enter the equipment class name from Appendix B: Classes of Equipment.
Equipment Description SSWPump D Photographs Note:                                         Note:
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C216 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: Y[ NE] UW--Seismic Walkdown Checklist (SWC) SWELl- 058 Equipment ID No. P202E -Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPump E Loop B 5. Is the anchorage configuration consistent with plant documentation?
EN-DC-168 REV 0
YZ NEI Ur-] N/A[--(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
 
Reference Drawings C-185, Rev. E7 and C-186, Rev. E3.6. Based on the above anchorage evaluations, is the anchorage free of YJZ NW UW-potentially adverse seismic conditions?
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C205 of C413 ATTACHMENT   9.6                                             SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ No    UF']
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Seismic Walkdown Checklist (SWC) SWELl-     055 Equipment ID No. P208D        Equip. Class Vertical Pumps (06)
There is some loose foam insulation secured with duct tape on the discharge valve for P202E. As the mass for the insulation is very low, it does not present an adverse seismic interaction.
Equipment Description SSWPump D EN-DC-168 REV 0
CR-PNP-2012-04405 was written to address this as a general plant housekeeping concern, and WR 286056 was initiated for repair.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
 
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y[ NW1 UW1 N/AE-]YN NW UW N/A--YM NW U-] N/A EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C217 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YZ NE] Ur]Seismic Walkdown Checklist (SWC) SWELl- 058 Equipment ID No. P202E Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPump E Loop B Other Adverse Conditions
Engineering Report No. PNPS-CS-12-00001, Rev. I Attachment C Page C206 of C413 ATTACHMENT 9.6                                                                   SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 4 Status: YZ NE]   UD--
: 11. Have you looked for and found no other seismic conditions that could YN NEI Ur-W adversely affect the safety functions of the equipment?
Seismic Walkdown Checklist (SWC)                     SWELl-       056 Equipment ID No.         P208E                    Equip. Class, Vertical Pumps (06)
One alignment (jacking) bolt on the southeast corner of P202E was missing from the motor. This screw has no function in the operation of the equipment after installation, so this is not considered an adverse seismic condition.
Equipment Description SSWPump E Location: Bldg. IS                  Floor El. 25.5          Room, Area B COMP Manufacturer, Model, Etc. (optional but recommended)
Three alignment (jacking) bolts were observed to be in contact with the motor housing which is contrary to standard practice of backing out the alignment bolts after alignment is achieved and primary mounting hardware is secured. This condition was previously identified by CR-PNP-2011-3626.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Work Order 286700 is scheduled to correct this condition.
Anchorage
See attached photo.Comments .(Additional pages may be added as necessary)
: 1. Is the anchorage configuration verification required (i.e., is the item one     YZ N[-]
The tag number on P202E was missing. Operations was notified, and an ESOMS label request was initiated.
of the 50% of SWEL items requiring such verification)?
See CR-PNP-2012-044
: 2. Is the anchorage free of bent, broken, missing or loose hardware?               YO NE]I U11 N/AL]
: 11. The equipment was verified for the walkdown using auxiliary equipment tags (see attached photo).SWEL 1-058 is on A WC-003.[99 JL1 Evaluated by: David Small Date: 10/04/2012 Ha Aryi7 U 10/04/2012 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C218 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: Y[ NEI U--Seismic Walkdown Checklist (SWC) SWELl- 058 Equipment ID No. P202E Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPump E Loop B Photographs Note: Tag number of auxiliary equipment that also identifies P202E.Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C219 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ NI] U--Seismic Walkdown Checklist (SWC) SWELl- 058 Equipment ID No. P202E Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPumj E Loo) B Note: Typical anchor bolt.Note: Alignment bolt in contact with motor housing.EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C220 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: YM NF] UI Seismic Walkdown Checklist (SWC) SWELl- 059 Equipment ID No. P202F Equip. Class' Horizontal Pumps (05)Equipment Description RBCCWPump F Loop B Location:
: 3. Is the anchorage free of corrosion that is more than mild surface               YE N[] ULI N/A[--
Bldg. AXBAY Floor El. 3 Room, Area B COMP Manufacturer, Model, Etc. (optional but recommended)
oxidation?
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
: 4. Is the anchorage free of visible cracks in the concrete near the                 YZ NF-] U-] N/A[
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
anchors?
YN NE]2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Pedestalis cut on southeast comer to accommodate piping. This looks deliberate and is not close to the bolt, so it is therefore not considered a seismic hazard.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?There is a small chip out of the east end of the pedestal that is judged to be insignificant.
I Enter the equipment class name from Appendix B: Classes of Equipment.
YZ N[] U-I N/AI3 YE N] U[-I] N/A-]YZ N[] U-] N/A[-]I Enter the equipment class name from Appendix B: Classes of Equipment.
EN-DC-168 REV 0
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C221 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ NR UD-Seismic Walkdown Checklist (SWC) SWELl- 059 Equipment ID No. P202F Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPump F Loop B 5. Is the anchorage configuration consistent with plant documentation?
 
YZ N[l UiD N/A[-](Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C207 of C413 ATTACHMENT 9.6                                                             SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ NE U--
Reference Drawings C-185, Rev. E7 and C-186, Rev. E3.6. Based on the above anchorage evaluations, is the anchorage free of YZ NDI UD-potentially adverse seismic conditions?
Seismic Walkdown Checklist (SWC)               SWELl-     056 Equipment ID No.     P208E                  Equip. Class Vertical Pumps (06)
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Equipment Description SSWPump E
YZ NDI UD] N/AD-There is some partially detached foam insulation on the discharge valve for P202F. As the mass for the insulation is very low, it does not present an adverse seismic interaction.
: 5. Is the anchorage configuration consistent with plant documentation?         YM NEI UI-- N/A--
CR-PNP-2012-04405 was written to address this as a general plant housekeeping concern, and WR 286056 was initiated for repair.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NDl UD-- N/AD and masonry block walls not likely to collapse onto the equipment?
(Note: This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)
: 9. Do attached lines have adequate flexibility to avoid damage?Y[ NDI UD1 N/AD-10. Based on the above seismic interaction evaluations, is equipment free YZ NDl UDl of potentially adverse seismic interaction effects?EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C222 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: Y0I NEI Ur-Seismic Walkdown Checklist (SWC) SWELl- 059 Equipment ID No. P202F Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPump F Loop B Other Adverse Conditions
Reference Calculation C15.0.1869, Rev. 1, and Drawing C-45, Rev.
: 11. Have you looked for and found no other seismic conditions that could Y0 NE] U[]adversely affect the safety functions of the equipment?
E18.
: 6. Based on the above anchorage evaluations, is the anchorage free of         YZ NEI UI-potentially adverse seismic conditions?
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       YZ NEI UE- N/A[--
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEi    UI- N/AE--
and masonry block walls not likely to collapse onto the equipment?
Masonry walls 45.2 and 45.3 are seismically qualified. See drawing C-939 SH 1, Rev. EO.
: 9. Do attached lines have adequate flexibility to avoid damage?               YN NR      U[-- N/AE1
: 10. Based on the above seismic interaction evaluations, is equipment free     YZ NEI UEr of potentially adverse seismic interaction effects?
EN-DC-168 REV 0
 
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C208 of C413 ATTACHMENT 9.6                                                           SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: Y[    NZ UEZ Seismic Walkdown Checklist (SWC)               SWELl-     056 Equipment IDNo. P208E                    Equip. Class Vertical Pumps (06)
Equipment Description SSW Pump E Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could     Y0 NEI uEF adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
SWEL1-059 is on AWC-003.Evaluated by: David Small .A /, e /d Halie Aroz jI Date: 10/04/2012 10/04/2012 C)EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C223 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ NF Ur-Seismic Walkdown Checklist (SWC) SWELl- 059 Equipment ID No. P202F Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPump F Loop B Photographs EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C224 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: Y[ N[-I U[III Seismic Walkdown Checklist (SWC) SWELl- 059 Equipment ID No. P202F Equip. Class Horizontal Pumps (05)Equipment Description RBCCWPump F Loop B Note: Typical anchor bolt.Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C225 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 6 Status: Y[ NE] U-D Seismic Walkdown Checklist (SWC) SWELl- 060 Equipment ID No. E209B Equip. Class, Tanks and Heat Exchangers (21)Equipment Description RBCCW Loop B Heat Exchanger Location:
SWEL 1-056 is on AWC-005.
Bldg. AXBAY Floor El. 3 Room, Area B COMP Manufacturer, Model, Etc. (optional but recommended)
Evaluated by: David Small       D,=JLi?                                        Date: 10/03/2012 HalieAroz                                                                10/03/2012 EN-DC-168 REV 0
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
 
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one Y[ NOI of the 50% of SWEL items requiring such verification)?
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C209 of C413 ATTACHMENT 9.6                                               SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YZ NRI    UrL Seismic Walkdown Checklist (SWC) SWELl-     056 Equipment ID No. P208E        Equip. Class Vertical Pumps (06)
: 2. Is the anchorage free of bent, broken, missing or loose hardware?Both anchors in the south pedestal and the east anchor in the north pedestal are slightly skewed, and the west anchor in the north pedestal is not engaged by a small amount (approx. Y2 thread). These conditions are judged to be acceptable, and are not considered a seismic hazard.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Equipment Description SSWPump E Photographs Note:                                         Note: Typical anchor bolt.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Y[ N[-] Ur-] N/Ar-YE ND] ul- N/AD-'YN NDI uF- N/ADI I Enter the equipment class name from Appendix B: Classes of Equipment.
EN-DC-168 REV 0
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C226 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 6 Status: YZ NE] U-Seismic Walkdown Checklist (SWC) SWELl- 060 Equipment ID No. E209B Equip. Class Tanks and Heat Exchangers (21)Equipment Description RBCCW Loop B Heat Exchanger 5. Is the anchorage configuration consistent with plant documentation?
 
YZ NEi Ur- N/AF-](Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C210 of C413 ATTACHMENT 9.6                                                                 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: Y[   NF Ul-'
Reference Drawing C-185, Rev. E7, FRN 98-01-78, and FRN 95-01-60.6. Based on the above anchorage evaluations, is the anchorage free of YZ NE] UI-'potentially adverse seismic conditions?
Seismic Walkdown Checklist (SWC)                   SWELl-       057 Equipment ID No.       P202D                    Equip. Class' HorizontalPumps (05)
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Equipment Description RBCCWPump D Loop B Location: Bldg. AXBAY             Floor El. 3             Room, Area B COMP Manufacturer, Model, Etc. (optional but recommended)
There is scaffolding very close to E209B that has a seismic evaluation tag, so it is acceptable for interaction effects.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
The Marinite board separating cable trays in the southwest corner of the room has some pieces missing. There are currently no pieces that are hanging off or look ready to fall, so it does not present a seismic interaction hazard.9. Do attached lines have adequate flexibility to avoid damage?YZ NE] UE-- N/AE-YZ NE] UEr] N/AE]Y[ NE[] U[] N/AE1 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C227 of C413 ATrACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 6 Status: YZ NO UMI Seismic Walkdown Checklist (SWC) SWELl- 060 Equipment ID No. E209B Equip. Class Tanks and Heat Exchangers (21)Equipment Description RBCCW Loop B Heat Exchanger Other Adverse Conditions
Anchorage
: 11. Have you looked for and found no other seismic conditions that could Y0 Nr-I UM adversely affect the safety functions of the equipment?
: 1. Is the anchorage configuration verification required (i.e., is the item one   YZ Nr-1 of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?             YZ NEIl UEI N/A[-
: 3. Is the anchorage free of corrosion that is more than mild surface             YZ NEil U[] N/Ar-oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the               Y[   N[] UEI N/AD anchors?
IEnter the equipment class name from Appendix B: Classes of Equipment.
EN-DC-168 REV 0
 
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C211 of C413 ATTACHMENT 9.6                                                             SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YN NE] U--
Seismic Walkdown Checklist (SWC)               SWELl-     057 Equipment ID No.     P202D                  Equip. Class HorizontalPumps (05)
Equipment Description RBCCWPump D Loop B
: 5. Is the anchorage configuration consistent with plant documentation?       Y[E N[-] U[-I N/AD-(Note: This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)
Reference Drawings C-185, Rev. E7 and C-186, Rev. E3.
: 6. Based on the above anchorage evaluations, is the anchorage free of         YN ND] U[-D potentially adverse seismic conditions?
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       YZ NDl UD- N/AD-]
There is some loose foam insulation secured with duct tape on the discharge valve for P202D.As the mass for the insulation is very low, it does not present an adverse seismic interaction. CR-PNP-2012-04405 was written to address this as a generalplant housekeeping concern, and WR 286056 was initiatedfor repair.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NDI UD- N/AD-and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?               YZ NDI UD- N/AD]
: 10. Based on the above seismic interaction evaluations, is equipment free     YM N[-- Ur of potentially adverse seismic interaction effects?
EN-DC-168 REV 0
 
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C212 of C413 ATTACHMENT 9.6                                                           SEISMIC WALKOOWN CHECKLIST FORM Sheet 3 of 5 Status: YZ NEI    UEI Seismic Walkdown Checklist (SWC)               SWELl-     057 Equipment IDNo. P202D                    Equip. Class HorizontalPumps (05)
Equipment Description RBCCW PumpD Loop B Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could     YE NEI Ur-adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
A loose label for equipment
SWEL1-057 is on AWC-003.
# 29-HO-3840 was found on the west side of E209B on the north pedestal.
Evaluated by: David Small        00,w L4A                                      Date: 10/04/2012 Halie Aroz   Ite0                                                      10/04/2012 EN-DC-168 REV 0
This was reported to Operations and an ESOMS request has been initiated.
 
See CR-PNP-2012-04411.
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C213 of C413 ATTACHMENT 9.6                                                 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ NR Ur Seismic Walkdown Checklist (SWC)   SWELl-     057 Equipment ID No. P202D          Equip. Class Horizontal Pumps (05)
SWEL 1-060 is on AWC-003.Evaluated by: David Small 2 2 Date: 10/04/2012 Halie Aroz a 10/04/2012 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C228 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 6 Status: YZ NF UF Seismic Walkdown Checklist (SWC) SWELl- 060 Equipment ID No. E209B Equip. Class Tanks and Heat Exchangers (21)Equipment Description RBCCWLooo B Heat Exchanger Photographs Note: Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C229 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 6 Status: YE NE] UD--Seismic Walkdown Checklist (SWC) SWELl- 060 Equipment ID No. E209B Equip. Class Tanks and Heat Exchangers (21)Equipment Description RBCCWLooo B Heat Exchanqer Note: Typical south pedestal anchor bolt.Note: Typical north pedestal anchor bolt.EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C230 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 6 of 6 Status: Y[ NEI UIr Seismic Walkdown Checklist (SWC) SWELl- 060 Equipment ID No. E209B Equip. Class Tanks and Heat Exchangers (21)Equipment Description RBCCW Loop B Heat Exchanger Note: North pedestal modification.
Equipment Description RBCCWPump D Loop B Photographs Note:                                           Note:
Note: North pedestal modification.
EN-DC-168 REV 0
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C231 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YZ NIF UI-I Seismic Walkdown Checklist (SWC) SWELl- 061 Equipment ID No. C2205A Equip. Class, Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Location:
 
Bldg. RB Floor El. 51 Room, Area East Manufacturer, Model, Etc. (optional but recommended)
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C214 of C413 ATTACHMENT 9.6                                                 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ NE]   UD-Seismic Walkdown Checklist (SWC)   SWELl-     057 Equipment ID No. P202D          Equip. Class Horizontal Pumps (05)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Equipment Description RBCCWPump D Loop B Note: Typical anchorbolt.                       Note:
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
EN-DC-168 REV 0
The SEWs package for this component conservatively evaluates one of four various instrument rack anchorages.
 
This rack was not evaluated, and therefore configuration can not be verified by the package. All bolts are visible, so the remainder of this section is applicable.
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C215 of C413 ATTACHMENT 9.6                                                                 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: Y[   NI]I ULI Seismic Walkdown Checklist (SWC)                   SWELl-       058 Equipment ID No.       P202E                    Equip. Classi Horizontal Pumps (05)
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Equipment Description RBCCWPump E Loop B Location: Bldg. AXBAY              Floor El. 3              Room, Area B COMP Manufacturer, Model, Etc. (optional but recommended)
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Y[-] YN NDJ UEI N/AL:]Y[ NDJ U-- N/AD YN NDI U-- N/AD1 Enter the equipment class name from Appendix B: Classes of Equipment.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C232 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YE NEI UD Seismic Walkdown Checklist (SWC) SWELl- 061 Equipment ID No. C2205A Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack 5. Is the anchorage configuration consistent with plant documentation?
Anchorage
Y[-- NO UI- N/AE (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is the anchorage configuration verification required (i.e., is the item one  Y[  NEIl of the 50% of SWEL items requiring such verification)?
Refer to response to question #1.6. Based on the above anchorage evaluations, is the anchorage free of YZ ND UD potentially adverse seismic conditions?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?            YZ NElI UL N/A[--
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 3. Is the anchorage free of corrosion that is more than mild surface            Y[  Nj3 IEu N/AZ]
C2205A is bolted to C2205B, so this is not a seismic interaction concern. C2205A is also adjacent to but not bolted to A TWS rack 2275;however, there is sufficient clearance ( > 2") between the racks.Therefore, this is not considered a potentially adverse seismic interaction.
oxidation?
One set screw is missing on the fence enclosing the racks. This is not a seismic hazard since the fence is judged to still be securely mounted to the floor, but CR-PNP-2012-04659 was written and WR 287549 initiated to address the concern. See attached photo.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 4. Is the anchorage free of visible cracks in the concrete near the             Y[  NEJ Ur] N/AD-]
: 9. Do attached lines have adequate flexibility to avoid damage?YN NW UW N/A[D]YN ND u[:] N/AD-I YS NW UD:] N/AD-I 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C233 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YoI NEI ur]Seismic Walkdown Checklist (SWC) SWELl- 061 Equipment ID No. C2205A Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Other Adverse Conditions
anchors?
: 11. Have you looked for and found no other seismic conditions that could Y[ NE] UI-adversely affect the safety functions of the equipment?
IEnter the equipment class name from Appendix B: Classes of Equipment.
EN-DC-168 REV 0
 
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C216 of C413 ATTACHMENT 9.6                                                              SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: Y[    NE] UW--
Seismic Walkdown Checklist (SWC)              SWELl-      058 Equipment ID No.      P202E                - Equip. Class HorizontalPumps (05)
Equipment Description RBCCWPump E Loop B
: 5. Is the anchorage configuration consistent with plant documentation?        YZ NEI Ur-] N/A[--
(Note: This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)
Reference Drawings C-185, Rev. E7 and C-186, Rev. E3.
: 6. Based on the above anchorage evaluations, is the anchorage free of         YJZ NW UW-potentially adverse seismic conditions?
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       Y[   NW1 UW1 N/AE-]
There is some loose foam insulation secured with duct tape on the discharge valve for P202E. As the mass for the insulation is very low, it does not present an adverse seismic interaction. CR-PNP-2012-04405 was written to address this as a general plant housekeeping concern, and WR 286056 was initiatedfor repair.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,  YN NW UW N/A--
and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?                YM NW U-] N/A
: 10. Based on the above seismic interaction evaluations, is equipment free      YI*N[-]ur-of potentially adverse seismic interaction effects?
EN-DC-168 REV 0
 
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C217 of C413 ATTACHMENT 9.6                                                           SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YZ NE] Ur]
Seismic Walkdown Checklist (SWC)              SWELl-      058 Equipment ID No. P202E                    Equip. Class Horizontal Pumps (05)
Equipment Description RBCCWPump E Loop B Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could    YN NEI    Ur-W adversely affect the safety functions of the equipment?
One alignment (jacking) bolt on the southeastcornerof P202E was missing from the motor. This screw has no function in the operation of the equipment after installation,so this is not consideredan adverse seismic condition.
Three alignment (jacking)bolts were observed to be in contact with the motor housing which is contraryto standardpractice of backing out the alignment bolts after alignment is achieved and primary mounting hardwareis secured. This condition was previously identified by CR-PNP-2011-3626.Work Order 286700 is scheduled to correct this condition. See attachedphoto.
Comments .(Additional pages may be added as necessary)
The tag number on P202E was missing. Operationswas notified, and an ESOMS label request was initiated.See CR-PNP-2012-044 11. The equipment was verified for the walkdown using auxiliary equipment tags (see attachedphoto).
SWEL 1-058 is on A WC-003.
Evaluated by: David Small        [99JL1                                        Date: 10/04/2012 Ha  Aryi7                                                            10/04/2012 U
EN-DC-168 REV 0
 
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C218 of C413 ATTACHMENT 9.6                                                  SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: Y[    NEI U--
Seismic Walkdown Checklist (SWC)      SWELl-    058 Equipment ID No. P202E            Equip. Class Horizontal Pumps (05)
Equipment Description RBCCWPump E Loop B Photographs Note: Tag number of auxiliary equipment that      Note:
also identifies P202E.
EN-DC-168 REV 0
 
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C219 of C413 ATTACHMENT 9.6                                                SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ    NI] U--
Seismic Walkdown Checklist (SWC)    SWELl-    058 Equipment ID No. P202E          Equip. Class Horizontal Pumps (05)
Equipment Description RBCCWPumj E Loo) B Note: Typical anchorbolt.                      Note: Alignment bolt in contact with motor housing.
EN-DC-168 REV 0
 
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C220 of C413 ATTACHMENT 9.6                                                                  SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: YM NF] UI Seismic Walkdown Checklist (SWC)                    SWELl-      059 Equipment ID No.        P202F                    Equip. Class' HorizontalPumps (05)
Equipment Description RBCCWPump F Loop B Location: Bldg. AXBAY                Floor El. 3              Room, Area B COMP Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one  YN NE]
of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?              YZ N[] U-I N/AI3
: 3. Is the anchorage free of corrosion that is more than mild surface              YE N] U[-I] N/A-]
oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the              YZ N[] U-] N/A[-]
anchors?
There is a small chip out of the east end of the pedestal that is judged to be insignificant.
I Enter the equipment class name from Appendix B: Classes of Equipment.
EN-DC-168 REV 0
 
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C221 of C413 ATTACHMENT 9.6                                                              SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ NR UD-Seismic Walkdown Checklist (SWC)              SWELl-      059 Equipment ID No.      P202F                  Equip. Class HorizontalPumps (05)
Equipment Description RBCCWPump F Loop B
: 5. Is the anchorage configuration consistent with plant documentation?        YZ N[l UiD N/A[-]
(Note: This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)
Reference Drawings C-185, Rev. E7 and C-186, Rev. E3.
: 6. Based on the above anchorage evaluations, is the anchorage free of        YZ NDI    UD-potentially adverse seismic conditions?
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?      YZ NDI UD] N/AD-There is some partially detached foam insulation on the dischargevalve for P202F.As the mass for the insulation is very low, it does not present an adverse seismic interaction.CR-PNP-2012-04405 was written to address this as a generalplant housekeeping concern, and WR 286056 was initiatedfor repair.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NDl UD-- N/AD and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?              Y[  NDI  UD1 N/AD-
: 10. Based on the above seismic interaction evaluations, is equipment free      YZ NDl UDl of potentially adverse seismic interaction effects?
EN-DC-168 REV 0
 
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C222 of C413 ATTACHMENT 9.6                                                          SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: Y0I  NEI Ur-Seismic Walkdown Checklist (SWC)              SWELl-      059 Equipment IDNo. P202F                    Equip. Class Horizontal Pumps (05)
Equipment Description RBCCWPump F Loop B Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could    Y0 NE] U[]
adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
SWEL1-059 is on AWC-003.
Evaluated by: David Small . A          /,  e      /d                          Date: 10/04/2012 Halie Aroz      jI                                                    10/04/2012 C)
EN-DC-168 REV 0
 
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C223 of C413 ATTACHMENT 9.6                                                SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ NF Ur-Seismic Walkdown Checklist (SWC)    SWELl-    059 Equipment ID No. P202F          Equip. Class Horizontal Pumps (05)
Equipment Description RBCCWPump F Loop B Photographs EN-DC-168 REV 0
 
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C224 of C413 ATTACHMENT 9.6                                                SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: Y[    N[-I U[III Seismic Walkdown Checklist (SWC)    SWELl-    059 Equipment ID No. P202F          Equip. Class Horizontal Pumps (05)
Equipment Description RBCCWPump F Loop B Note: Typical anchor bolt.                      Note:
EN-DC-168 REV 0
 
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C225 of C413 ATTACHMENT 9.6                                                                  SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 6 Status: Y[    NE] U-D Seismic Walkdown Checklist (SWC)                    SWELl-      060 Equipment ID No.        E209B                    Equip. Class, Tanks and Heat Exchangers (21)
Equipment Description RBCCW Loop B Heat Exchanger Location: Bldg. AXBAY                Floor El. 3              Room, Area B COMP Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one  Y[  NOI of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?              Y[  N[-] Ur-] N/Ar-Both anchors in the south pedestal and the east anchorin the north pedestal are slightly skewed, and the west anchor in the north pedestal is not engaged by a small amount (approx. Y2 thread). These conditions are judged to be acceptable, and are not considered a seismic hazard.
: 3. Is the anchorage free of corrosion that is more than mild surface              YE ND] ul-      N/AD-'
oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the              YN NDI uF- N/ADI anchors?
I Enter the equipment class name from Appendix B: Classes of Equipment.
EN-DC-168 REV 0
 
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C226 of C413 ATTACHMENT 9.6                                                                SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 6 Status: YZ NE] U-Seismic Walkdown Checklist (SWC)                SWELl-      060 Equipment ID No.      E209B                    Equip. Class Tanks and Heat Exchangers (21)
Equipment Description RBCCW Loop B Heat Exchanger
: 5. Is the anchorage configuration consistent with plant documentation?          YZ NEi    Ur- N/AF-]
(Note: This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)
Reference Drawing C-185, Rev. E7, FRN 98-01-78, and FRN 95-01-60.
: 6. Based on the above anchorage evaluations, is the anchorage free of          YZ NE] UI-'
potentially adverse seismic conditions?
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?        YZ NE] UE--    N/AE-There is scaffolding very close to E209B that has a seismic evaluation tag, so it is acceptable for interaction effects.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,    YZ NE] UEr] N/AE]
and masonry block walls not likely to collapse onto the equipment?
The Marinite boardseparatingcable trays in the southwest corner of the room has some pieces missing. There are currently no pieces that are hanging off or look ready to fall, so it does not present a seismic interactionhazard.
: 9. Do attached lines have adequate flexibility to avoid damage?                Y[  NE[] U[] N/AE1
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
EN-DC-168 REV 0
 
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C227 of C413 ATrACHMENT 9.6                                                            SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 6 Status: YZ NO UMI Seismic Walkdown Checklist (SWC)              SWELl-    060 Equipment ID No. E209B                    Equip. Class Tanks and Heat Exchangers (21)
Equipment Description RBCCW Loop B Heat Exchanger Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could    Y0 Nr-I UM adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
A loose label for equipment # 29-HO-3840 was found on the west side of E209B on the north pedestal. This was reportedto Operationsand an ESOMS request has been initiated. See CR-PNP-2012-04411.
SWEL 1-060 is on AWC-003.
Evaluated by: David Small        2    2                                        Date: 10/04/2012 Halie Aroz          a                                                  10/04/2012 EN-DC-168 REV 0
 
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C228 of C413 ATTACHMENT  9.6                                                SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 6 Status: YZ NF UF Seismic Walkdown Checklist (SWC)    SWELl-    060 Equipment ID No. E209B            Equip. Class Tanks and Heat Exchangers (21)
Equipment Description RBCCWLooo B Heat Exchanger Photographs Note:                                            Note:
EN-DC-168 REV 0
 
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C229 of C413 ATTACHMENT  9.6                                                SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 6 Status: YE NE] UD--
Seismic Walkdown Checklist (SWC)      SWELl-    060 Equipment ID No. E209B            Equip. Class Tanks and Heat Exchangers (21)
Equipment Description RBCCWLooo B Heat Exchanqer Note: Typical south pedestal anchorbolt.          Note: Typical north pedestal anchorbolt.
EN-DC-168 REV 0
 
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C230 of C413 ATTACHMENT 9.6                                                  SEISMIC WALKDOWN CHECKLIST FORM Sheet 6 of 6 Status: Y[    NEI UIr Seismic Walkdown Checklist (SWC)      SWELl-    060 Equipment IDNo. E209B            Equip. Class Tanks and Heat Exchangers (21)
Equipment Description RBCCW Loop B Heat Exchanger Note: North pedestal modification.                Note: North pedestal modification.
EN-DC-168 REV 0
 
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C231 of C413 ATTACHMENT 9.6                                                                  SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YZ NIF UI-I Seismic Walkdown Checklist (SWC)                    SWELl-      061 Equipment ID No.        C2205A                    Equip. Class, Instrument Racks (18)
Equipment Description ReactorProt &NSS Instr Rack Location: Bldg. RB                  Floor El. 51            Room, Area East Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one  Y[-] NO*
of the 50% of SWEL items requiring such verification)?
The SEWs package for this component conservatively evaluates one of four various instrumentrack anchorages. This rack was not evaluated, and therefore configurationcan not be verified by the package. All bolts are visible, so the remainder of this section is applicable.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?              YN NDJ UEI N/AL:]
: 3. Is the anchorage free of corrosion that is more than mild surface            Y[    NDJ U-- N/AD oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the              YN NDI    U-- N/AD1 anchors?
Enter the equipment class name from Appendix B: Classes of Equipment.
EN-DC-1 68 REV 0
 
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C232 of C413 ATTACHMENT 9.6                                                              SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YE NEI  UD Seismic Walkdown Checklist (SWC)                SWELl-      061 Equipment ID No.      C2205A                Equip. Class Instrument Racks (18)
Equipment Description Reactor Prot &NSS Instr Rack
: 5. Is the anchorage configuration consistent with plant documentation?        Y[-- NO UI- N/AE (Note: This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)
Refer to response to question #1.
: 6. Based on the above anchorage evaluations, is the anchorage free of          YZ ND UD potentially adverse seismic conditions?
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?        YN NW UW N/A[D]
C2205A is bolted to C2205B, so this is not a seismic interaction concern. C2205A is also adjacent to but not bolted to A TWS rack 2275; however, there is sufficient clearance( > 2") between the racks.
Therefore, this is not considered a potentiallyadverse seismic interaction.
One set screw is missing on the fence enclosing the racks. This is not a seismic hazard since the fence is judged to still be securely mounted to the floor, but CR-PNP-2012-04659was written and WR 287549 initiated to address the concern. See attachedphoto.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,  YN ND u[:] N/AD-I and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?              YS NW UD:] N/AD-I
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
EN-DC-168 REV 0
 
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C233 of C413 ATTACHMENT 9.6                                                          SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YoI NEI ur]
Seismic Walkdown Checklist (SWC)              SWELl-    061 Equipment ID No. C2205A                  Equip. Class Instrument Racks (18)
Equipment Description Reactor Prot &NSS Instr Rack Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could    Y[  NE] UI-adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
SWEL 1-061 is on AWC-021.
Evaluated by: Laura Maclay    & AQL-2& "                                      Date: 10/17/2012 Halie Aroz          11 K                                                10/17/2012 EN-DC-168 REV 0
 
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C234 of C413 ATnACHMENT 9.6                                                    SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: Y] NF-    UD--
Seismic Walkdown Checklist (SWC)      SWELl-    061 Equipment ID No. C2205A            Equip. Class Instrument Racks (18)
Equipment Description ReactorProt &NSS Instr Rack Photographs Note:                                              Note:
EN-DC-168 REV 0
 
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C235 of C413 AT-IACHMENT  9.6                                                  SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: Y[    NE] U[--
Seismic Walkdown Checklist (SWC)        SWELl-    061 Equipment ID No. C2205A              Equip. Class Instrument Racks (18)
Equipment Description Reactor Prot &NSS Instr Rack Note: Missing set screw on fence.                  Note:
EN-DC-168 REV 0
 
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C236 of C413 ATTACHMENT 9.6                                                                  SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 4 Status: YZ NR- U[--
Seismic Walkdown Checklist (SWC)                    SWELl-      062 Equipment ID No.        C2205B                    Equip. Class, Instrument Racks (18)
Equipment Description ReactorProt &NSS Instr Rack Location: Bldg. RB                  Floor El. 51            Room, Area East Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one  Y[--] NO:
of the 50% of SWEL items requiring such verification)?
The SEWs package for this component conservatively evaluates one of four various instrument rack anchorages. This rack was not evaluated, and therefore configuration can not be verified by the package. All bolts are visible, so the remainderof this section is applicable.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?            YEE NEJ URL N/AD--
: 3. Is the anchorage free of corrosion that is more than mild surface              YO NE] U[] N/AL]
oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the              YN N[] U-- N/Ar-anchors?
' Enter the equipment class name from Appendix B: Classes of Equipment.
EN-DC-1 68 REV 0
 
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C237 of C413 ATTACHMENT 9.6                                                              SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ NIEj U[-']
Seismic Walkdown Checklist (SWC)              SWELl-      062 Equipment IDNo.      C2205B                  Equip. Class Instrument Racks (18)
Equipment Description ReactorProt & NSS Instr Rack
: 5. Is the anchorage configuration consistent with plant documentation?        YrI NR] U[I N/AZ (Note: This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)
Refer to response to question #1.
: 6. Based on the above anchorage evaluations, is the anchorage free of          YE NEI UrI potentially adverse seismic conditions?
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?        YN NI] u[-] N/A[-]
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,  YN NE] U-I] N/A--
and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?                Y[  NEI UL-] N/Ar]
: 10. Based on the above seismic interaction evaluations, is equipment free      Y[  NE]  U[-
of potentially adverse seismic interaction effects?
EN-DC-168 REV 0
 
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C238 of C413 ATTACHMENT   9.6                                                         SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: YO] NnZur  U]
Seismic Walkdown Checklist (SWC)               SWELl-     062 Equipment ID No. C2205B                      Equip. Class Instrument Racks (18)
Equipment Description Reactor Prot & NSS Instr Rack Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could     Y0 NEI    U[:]
adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
SWEL 1-061 is on AWC-021.Evaluated by: Laura Maclay & AQL-2& " Halie Aroz 11 K Date: 10/17/2012 10/17/2012 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C234 of C413 ATnACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: Y] NF- UD--Seismic Walkdown Checklist (SWC) SWELl- 061 Equipment ID No. C2205A Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Photographs Note: Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C235 of C413 AT-IACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: Y[ NE] U[--Seismic Walkdown Checklist (SWC) SWELl- 061 Equipment ID No. C2205A Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Note: Missing set screw on fence.Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C236 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 4 Status: YZ NR- U[--Seismic Walkdown Checklist (SWC) SWELl- 062 Equipment ID No. C2205B Equip. Class, Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Location:
SWEL1-062 is on AWC-021.
Bldg. RB Floor El. 51 Room, Area East Manufacturer, Model, Etc. (optional but recommended)
Evaluated                                                                       Date: 10/17/2012 10/17/2012 EN-DC-168 REV 0
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
 
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C239 of C413 ATTACHMENT 9.6                                                     SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: Y[    NF- U--
The SEWs package for this component conservatively evaluates one of four various instrument rack anchorages.
Seismic Walkdown Checklist (SWC)       SWELl-     062 Equipment ID No. C2205B              Equip. Class Instrument Racks (18)
This rack was not evaluated, and therefore configuration can not be verified by the package. All bolts are visible, so the remainder of this section is applicable.
Equipment Description Reactor Prot &NSS Instr Rack Photographs Note: Equipment tag                                Note: Overall view of instrumentrack from outside of fencing.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
EN-DC-168 REV 0
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Y[--] NO: YEE NEJ URL N/AD--YO NE] U[] N/AL]YN N[] U-- N/Ar-' Enter the equipment class name from Appendix B: Classes of Equipment.
 
EN-DC-1 68 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C237 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ NIEj U[-']Seismic Walkdown Checklist (SWC) SWELl- 062 Equipment ID No. C2205B Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack 5. Is the anchorage configuration consistent with plant documentation?
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C240 of C413 ATTACHMENT 9.6                                                                   SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 6 Status: YE NDI U-Seismic Walkdown Checklist (SWC)                     SWELl-       063 Equipment ID No.         C2206A                    Equip. Class, Instrument Racks (18)
YrI NR] U[I N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Equipment Description ReactorProt & NSS Instr Rack Location: Bldg. RB                   Floor El. 51             Room, Area West Manufacturer, Model, Etc. (optional but recommended)
Refer to response to question #1.6. Based on the above anchorage evaluations, is the anchorage free of YE NEI UrI potentially adverse seismic conditions?
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Anchorage
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 1. Is the anchorage configuration verification required (i.e., is the item one   Y[-] NZ of the 50% of SWEL items requiring such verification)?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YN NI] u[-] N/A[-]YN NE] U-I] N/A--Y[ NEI UL-] N/Ar]Y[ NE] U[-EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C238 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: YO] NnZur U]Seismic Walkdown Checklist (SWC) SWELl- 062 Equipment ID No. C2205B Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Other Adverse Conditions
The SEWs package conservatively evaluates similar rack C2206B, which has only six anchors, and comparatively accepts the eight anchorageconfigurationfor rack C2206A. Therefore, since a drawing does not specify the eight bolt configuration, this component was not chosen for the 50% verification.
: 11. Have you looked for and found no other seismic conditions that could Y0 NEI U[:]adversely affect the safety functions of the equipment?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?             YE NI      UE-I N/A[--
: 3. Is the anchorage free of corrosion that is more than mild surface             YE ND UD N/AD oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the               YE NDI    U'  N/AD anchors?
' Enter the equipment class name from Appendix B: Classes of Equipment.
EN-DC-168 REV 0
 
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C241 of C413 ATTACHMENT 9.6                                                               SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 6 Status: YZ NIF U-Seismic Walkdown Checklist (SWC)               SWELl-     063 Equipment ID No.     C2206A                  Equip. Class Instrument Racks (18)
Equipment Description Reactor Prot &NSS Instr Rack
: 5. Is the anchorage configuration consistent with plant documentation?         YrI NR UI- N/AZ (Note: This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)
Refer to response to question #1.
: 6. Based on the above anchorage evaluations, is the anchorage free of         YZ NEi    UIZ potentially adverse seismic conditions?
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       YZ NDI UD- N/AD-]
Racks C2206A and C2206B are bolted together and therefore do not pose a seismic risk to each other.
The robust barrierfence aroundRacks C2206A & C2206B has set screws missing from the base brackets of three of the verticalposts.
The fence consists of an interconnectedframework of light support members and wire mesh. The weight and mass of the assembly is relatively low. The remainingposts (approx 5) have the set screws installed. The base brackets with the missing set screws still function to resist lateralloads. Since vertical seismic accelerationsare less than Ig (Ref Spec C114ERQ), there is no expected uplift at the post locations.
Based on these considerations,the identified condition does not representa potential adverse seismic interaction. CR-PNP-2012-04627 was written to replace missing screws.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NDl UD- N/AD-'
and masonry block walls not likely to collapse onto the equipment?
The west masonry block walls next to the rack, 65.9 and 65.10 are safety related.
: 9. Do attached lines have adequate flexibility to avoid damage?               YZ NDI    Ur- N/AD-
: 10. Based on the above seismic interaction evaluations, is equipment free       Y[  NDl UD1 of potentially adverse seismic interaction effects?
EN-DC-168 REV 0
 
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C242 of C413 ATTACHMENT 9.6                                                             SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 6 Status: YZ NE] ULI Seismic Walkdown Checklist (SWC)             SWELl-       063 Equipment ID No.     C2206A                Equip. Class Instrument Racks (18)
Equipment Description Reactor Prot &NSS Instr Rack Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could     YZ N[-] Ur-adversely affect the safety functions of the equipment?
The cover for pressure transmitter36-PT-654 is missing one of four bolts which keep the cover secured to the equipment. This is not a seismic concern due the redundancy of the other three bolts. CR-PNP-2012-04629 was written to address this item and calls for replacement of the missing fastener.
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
SWEL1-062 is on AWC-021.Evaluated Date: 10/17/2012 10/17/2012 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C239 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: Y[ NF- U--Seismic Walkdown Checklist (SWC) SWELl- 062 Equipment ID No. C2205B Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Photographs Note: Equipment tag Note: Overall view of instrument rack from outside of fencing.EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C240 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 6 Status: YE NDI U-Seismic Walkdown Checklist (SWC) SWELl- 063 Equipment ID No. C2206A Equip. Class, Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Location:
Area walk-by is A WC-020.
Bldg. RB Floor El. 51 Room, Area West Manufacturer, Model, Etc. (optional but recommended)
Evaluated by. Laura Ma .        ~&]flAcA~~?fYJ~ic ~      Oam                  Date: 10-16-12
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
                                ,&#xfd;"ma-Wac IJUI V !dUSwg'Jg Aq
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
                                    '.1A.4 I  %-1LJ Aj A. -                           10-16-12 EN-DC-168 REV 0
The SEWs package conservatively evaluates similar rack C2206B, which has only six anchors, and comparatively accepts the eight anchorage configuration for rack C2206A. Therefore, since a drawing does not specify the eight bolt configuration, this component was not chosen for the 50% verification.
 
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C243 of C413 ATTACHMENT 9.6                                                    SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 6 Status: YZ NR      UD Seismic Walkdown Checklist (SWC)        SWELl-     063 Equipment IDNo. C2206A              Equip. Class Instrument Racks (18)
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Y[-] NZ YE NI UE-I N/A[--YE ND UD N/AD YE NDI U' N/AD' Enter the equipment class name from Appendix B: Classes of Equipment.
Equipment Description Reactor Prot &NSS Instr Rack Photographs Note: Equipment tag                                Note: Overall view of rack outside of fencing EN-DC-168 REV 0
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C241 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 6 Status: YZ NIF U-Seismic Walkdown Checklist (SWC) SWELl- 063 Equipment ID No. C2206A Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack 5. Is the anchorage configuration consistent with plant documentation?
 
YrI NR UI- N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C244 of C413 ATTACHMENT 9.6                                                      SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 6 Status: Y[    NI I U[--
Refer to response to question #1.6. Based on the above anchorage evaluations, is the anchorage free of YZ NEi UIZ potentially adverse seismic conditions?
Seismic Walkdown Checklist (SWC)        SWELl-      063 Equipment ID No. C2206A              Equip. Class Instrument Racks (18)
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Equipment Description ReactorProt & NSS Instr Rack Note: Typical anchors                                Note: Back of cover for pressure transmitteris missing a bolt (CR-PNP-2012-04629).
Racks C2206A and C2206B are bolted together and therefore do not pose a seismic risk to each other.The robust barrier fence around Racks C2206A & C2206B has set screws missing from the base brackets of three of the vertical posts.The fence consists of an interconnected framework of light support members and wire mesh. The weight and mass of the assembly is relatively low. The remaining posts (approx 5) have the set screws installed.
EN-DC-168 REV 0
The base brackets with the missing set screws still function to resist lateral loads. Since vertical seismic accelerations are less than Ig (Ref Spec C114ERQ), there is no expected uplift at the post locations.
 
Based on these considerations, the identified condition does not represent a potential adverse seismic interaction.
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C245 of C413 ATTACHMENT 9.6                                                    SEISMIC WALKDOWN CHECKLIST FORM Sheet 6 of 6 Status: Y[    NI  U-Seismic Walkdown Checklist (SWC)      SWELl-    063 Equipment ID No. C2206A            Equip. Class Instrument Racks (18)
CR-PNP-2012-04627 was written to replace missing screws.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Equipment Description ReactorProt &NSS Instr Rack Note: Missing screw in fence base bracket          Note:
The west masonry block walls next to the rack, 65.9 and 65.10 are safety related.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZ NDI UD- N/AD-]YZ NDl UD- N/AD-'YZ NDI Ur- N/AD-Y[ NDl UD1 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C242 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 6 Status: YZ NE] ULI Seismic Walkdown Checklist (SWC) SWELl- 063 Equipment ID No. C2206A Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Other Adverse Conditions
(CR-PNP-2012-04627).
: 11. Have you looked for and found no other seismic conditions that could YZ N[-] Ur-adversely affect the safety functions of the equipment?
EN-DC-168 REV 0
The cover for pressure transmitter 36-PT-654 is missing one of four bolts which keep the cover secured to the equipment.
 
This is not a seismic concern due the redundancy of the other three bolts. CR-PNP-2012-04629 was written to address this item and calls for replacement of the missing fastener.Comments (Additional pages may be added as necessary)
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C246 of C413 ATTACHMENT 9.6                                                                  SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: YZ NE] U--
Area walk-by is A WC-020.~&]flAcA~~?fYJ~ic
Seismic Walkdown Checklist (SWC)                    SWELl-       064 Equipment IDNo.          C2206B                    Equip. Class, Instrument Racks (18)
~Evaluated by. Laura Ma .Date: 10-16-12 ,&#xfd;"ma-Wac Oam Aq I A. 16-12 IJUI V !dUSwg'Jg
Equipment Description ReactorProt & NSS Instr Rack Location: Bldg. RB                  Floor El. 51            Room, Area West Manufacturer, Model, Etc. (optional but recommended)
'.1A.4 %-1LJ Aj EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C243 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 6 Status: YZ NR UD Seismic Walkdown Checklist (SWC) SWELl- 063 Equipment ID No. C2206A Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Photographs Note: Equipment tag Note: Overall view of rack outside of fencing EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C244 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 6 Status: Y[ NI I U[--Seismic Walkdown Checklist (SWC) SWELl- 063 Equipment ID No. C2206A Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Note: Typical anchors Note: Back of cover for pressure transmitter is missing a bolt (CR-PNP-2012-04629).
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C245 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 6 of 6 Status: Y[ NI U-Seismic Walkdown Checklist (SWC) SWELl- 063 Equipment ID No. C2206A Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Note: Missing screw in fence base bracket (CR-PNP-2012-04627).
Anchorage
Note: EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C246 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: YZ NE] U--Seismic Walkdown Checklist (SWC) SWELl- 064 Equipment ID No. C2206B Equip. Class, Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Location:
: 1. Is the anchorage configuration verification required (i.e., is the item one   Y[  NE]
Bldg. RB Floor El. 51 Room, Area West Manufacturer, Model, Etc. (optional but recommended)
of the 50% of SWEL items requiring such verification)?
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?             YE NE] ULI    N/AEl
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 3. Is the anchorage free of corrosion that is more than mild surface            YE NE] UE] N/AE]
Y[ NE]2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?YE NE] ULI N/AEl YE NE] UE] N/AE]YE NE] UE] N/Ar-I Enter the equipment class name from Appendix B: Classes of Equipment.
: 4. Is the anchorage free of visible cracks in the concrete near the               YE NE] UE] N/Ar-anchors?
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C247 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YN NE] U--Seismic Walkdown Checklist (SWC) SWELl- 064 Equipment ID No. C2206B Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack 5. Is the anchorage configuration consistent with plant documentation?
I Enter the equipment class name from Appendix B: Classes of Equipment.
YN NEI U[r] N/A[-(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
EN-DC-168 REV 0
Refer to SEWs package dated 6/19/95 for anchorage configuration.
 
: 6. Based on the above anchorage evaluations, is the anchorage free of YO NEI ULI potentially adverse seismic conditions?
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C247 of C413 ATTACHMENT 9.6                                                              SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YN NE] U--
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Seismic Walkdown Checklist (SWC)               SWELl-      064 Equipment ID No.      C2206B                  Equip. Class Instrument Racks (18)
Racks C2206A and C2206B are bolted together and therefore do not pose a seismic risk to each other.There is a 3" gap between C2276 and C2206B. However, both racks are well anchored.The robust barrier fence around Racks C2206A & C2206B has set screws missing from the base brackets of three of the vertical posts.The fence consists of an interconnected framework of light support members and wire mesh. The weight and mass of the assembly is relatively low. The remaining posts (approx 5) have the set screws installed.
Equipment Description ReactorProt & NSS Instr Rack
The base brackets with the missing set screws still function to resist lateral loads. Since vertical seismic accelerations are less than Ig (Ref Spec C1 14ERQ), there is no expected uplift at the post locations.
: 5. Is the anchorage configuration consistent with plant documentation?        YN NEI    U[r] N/A[-
Based on these considerations, the identified condition does not represent a potential adverse seismic interaction.
(Note: This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)
CR-PNP-2012-04627 was written to replace missing screws.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Refer to SEWs package dated 6/19/95 for anchorageconfiguration.
The west masonry block walls next to the rack, 65.9 and 65.10 are safety related.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YN NEI UE- N/A[-]YZ NEI U[-] N/A[-]YN NEI UE] N/AE-YN NE ]UE]EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C248 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YZ NEI UD&#xfd;Seismic Walkdown Checklist (SWC) SWELl- 064 Equipment ID No. C2206B Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Other Adverse Conditions
: 6. Based on the above anchorage evaluations, is the anchorage free of          YO NEI ULI potentially adverse seismic conditions?
: 11. Have you looked for and found no other seismic conditions that could YZ NE]i Ur]adversely affect the safety functions of the equipment?
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       YN NEI UE- N/A[-]
Racks C2206A and C2206B are bolted together and therefore do not pose a seismic risk to each other.
There is a 3" gap between C2276 and C2206B. However, both racks are well anchored.
The robust barrierfence aroundRacks C2206A & C2206B has set screws missing from the base brackets of three of the verticalposts.
The fence consists of an interconnectedframework of light support members and wire mesh. The weight and mass of the assembly is relatively low. The remainingposts (approx 5) have the set screws installed. The base brackets with the missing set screws still function to resist lateralloads. Since vertical seismic accelerationsare less than Ig (Ref Spec C1 14ERQ), there is no expected uplift at the post locations.
Based on these considerations,the identified condition does not representa potentialadverse seismic interaction. CR-PNP-2012-04627 was written to replace missing screws.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI U[-] N/A[-]
and masonry block walls not likely to collapse onto the equipment?
The west masonry block walls next to the rack, 65.9 and 65.10 are safety related.
: 9. Do attached lines have adequate flexibility to avoid damage?                YN NEI    UE]  N/AE-
: 10. Based on the above seismic interaction evaluations, is equipment free      YN NE ]UE]
of potentially adverse seismic interaction effects?
EN-DC-168 REV 0
 
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C248 of C413 ATTACHMENT  9.6                                                          SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YZ NEI    UD&#xfd; Seismic Walkdown Checklist (SWC)             SWELl-     064 Equipment ID No. C2206B                  Equip. Class Instrument Racks (18)
Equipment Description ReactorProt & NSS Instr Rack Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could    YZ NE]i Ur]
adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Area walk-by is A WC-020.Evaluated by: Laura Maly '~aA A kCkQVL Gary Sweder Aal~ \~.tL.o_(3 -Date: 10-16-12 10-16-12 EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C249 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YN Nn--I UI-Seismic Walkdown Checklist (SWC) SWELl- 064 Equipment ID No. C2206B Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Photographs Note: Equipment tag Note: Overall view of both racks C2206A and C2206B.EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C250 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: Y[ NR Ur Seismic Walkdown Checklist (SWC) SWELl- 064 Equipment ID No. C2206B Equip. Class Instrument Racks (18)Equipment Description Reactor Prot & NSS Instr Rack Note: Missing set screw in surrounding fencing (CR-PNP-2012-04627)
Area walk-by is A WC-020.
Note: EN-DC-168 REV 0}}
Evaluated by: Laura Maly       '~aA A kCkQVL                                   Date: 10-16-12 Gary Sweder         Aal~         \~.tL.o_                               10-16-12 (3 -
EN-DC-168 REV 0
 
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C249 of C413 ATTACHMENT 9.6                                                     SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YN Nn--I UI-Seismic Walkdown Checklist (SWC)       SWELl-     064 Equipment ID No. C2206B             Equip. Class Instrument Racks (18)
Equipment Description ReactorProt & NSS Instr Rack Photographs Note: Equipment tag                                 Note: Overall view of both racks C2206A and C2206B.
EN-DC-168 REV 0
 
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C250 of C413 ATTACHMENT 9.6                                                   SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: Y[   NR Ur Seismic Walkdown Checklist (SWC)       SWELl-     064 Equipment ID No. C2206B             Equip. Class Instrument Racks (18)
Equipment Description ReactorProt &NSS Instr Rack Note: Missing set screw in surrounding             Note:
fencing (CR-PNP-2012-04627)
EN-DC-168 REV 0}}

Latest revision as of 13:24, 11 November 2019

PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment C, Page C174 of C413 Through Page C250 of C413
ML13232A134
Person / Time
Site: Pilgrim
Issue date: 06/17/2013
From: Maclay L
Entergy Nuclear Operations
To:
Office of Nuclear Reactor Regulation
References
2.13.056 PNPS-CS-12-00001, Rev 1
Download: ML13232A134 (77)


Text

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page 0174 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 4 Status: YZ NEI ULI Seismic Walkdown Checklist (SWC) SWELl- 049 Equipment ID No. MO1400-24B Equip. Class, Motor-Operated& Solenoid-Operated Valves (08)

Equipment Description Core Spray B Injection Valve Location: Bldg. RB Floor El. 51 R oom, Area NORTH SIDE Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y[-] NE of the 50% of SWEL items requiring such verification)?

Inline component, no anchorage.

2. Is the anchorage free of bent, broken, missing or loose hardware? Y[-I NEi U[iE N/A[D
3. Is the anchorage free of corrosion that is more than mild surface YE! NE! UEl N/A[

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the YEI NE-I Ur N/A[

anchors?

' Enter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-O0001, Rev. 1 Attachment C Page C175 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ NF-Z U--

Seismic Walkdown Checklist (SWC) SWELl- 049 Equipment ID No. M01400-24B Equip. Class Motor-Operated& Solenoid-OperatedValves (08)

Equipment Description Core Spray B Injection Valve

5. Is the anchorage configuration consistent with plant documentation? YEI NE] U-] N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YZ N[] UE potentially adverse seismic conditions?

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NEJ uE1 N/AD-
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NE- uEr N/A[-]

and masonry block walls not likely to collapse onto the equipment?

Masonry wall 64.4 (C942Sh 1, EO) is safety related, therefore seismically qualified and acceptable.

9. Do attached lines have adequate flexibility to avoid damage? YZ NEl U[-fl N/AED
10. Based on the above seismic interaction evaluations, is equipment free YZ NEI UE-of potentially adverse seismic interaction effects?

Scaffolding is currently being erected below to the valves to allow access to them. This is a work in progress and is tagged appropriately.

All extra equipment in the areais properly secured and cart wheels are choked.

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page 0176 of C413 AT'rACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: YZ NEI UM-Seismic Walkdown Checklist (SWC) SWELl- 049 Equipment ID No. M01400-24B Equip. Class Motor-Operated& Solenoid-OperatedValves (08)

Equipment Description Core Spray B Iniection Valve Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NUEI 1 adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Area walk-by is AWC-019.

Evaluated by: Laura Maclay 4oj"Wacha Date: 10-15-12 VI (J

Garv Sweder QA,.A 1,hk , - A 10-15-12 EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C177 of C413 ATTACHMEI T 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YZ N[- ULI Seismic Walkdown Checklist (SWC) SWELl- 049 Equipment ID No. M01400-24B Equip. Class Motor-Operated& Solenoid-OperatedValves (08)

Equipment Description Core Spray B Injection Valve Photographs EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page 0 178 of 0413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: Y[ NE] U-III Seismic Walkdown Checklist (SWC) SWELl- 050 Equipment ID No. MO1400-25B Equip. Classi Motor-Operated& Solenoid-OperatedValves (08)

Equipment Description Core Spray B Injection Valve Location: Bldg. RB Floor El. 51 Rioom, Area NORTH SIDE Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y[-] NZ of the 50% of SWEL items requiring such verification)?

Inline component, no anchorage.

2. Is the anchorage free of bent, broken, missing or loose hardware? Y[E] N[-] U-I N/AS
3. Is the anchorage free of corrosion that is more than mild surface Y[E] NEi ULE- NWAS oxidation?
4. Is the anchorage free of visible cracks in the concrete near the YEI NEI UL-- N/A[

anchors?

I Enter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C179 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YN N-] Ur Seismic Walkdown Checklist (SWC) SWELl- 050 Equipment ID No. M01400-25B Equip. Class Motor-Operated& Solenoid-OperatedValves (08)

Equipment Description Core Spray B Injection Valve

5. Is the anchorage configuration consistent with plant documentation? Y[-] N[-] UF- N/A[

(Note: This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Y] Nr] UiE]

potentially adverse seismic conditions?

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NEI U[E] N/AE]

Noted a hanging light next to the valve is property restrainedagainst lateralmovement, therefore not a seismic hazard.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y0 NE'] u[-] NIAE]

and masonry block walls not likely to collapse onto the equipment?

Masonry wall 64.4 (C942Sh 1, EO) is safety related, therefore seismically qualified and acceptable.

9. Do attached lines have adequate flexibility to avoid damage? YZ NE] uE] NIAE]
10. Based on the above seismic interaction evaluations, is equipment free Y NE-I U-]

of potentially adverse seismic interaction effects?

Scaffolding is currently being erected below to the valves to allow access to them. This is a work in progress and is taggedappropriately.

All extra equipment in the area is properly secured and cartwheels are choked.

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C180 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: Y[ NF U-I Seismic Walkdown Checklist (SWC) SWELl- 050 Equipment ID No. M01400-25B Equip. Class Motor-Operated& Solenoid-OperatedValves (08)

Equipment Description Core Spray B Injection Valve Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NEJ UL-I adversely affect the safety functions of the equipment?

Comments .(Additional pages may be added as necessary)

Area walk-by is AWC-019.

Evaluated by: Gary Sweder TSG" . " "k.ý, Date: 10-15-12 0

I .qur*q Ltqd/qv

%-kW 0,-ý ac -0(11j 10-15-12 IauraMaClav VW ci EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page 0181 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ NE] U[--

Seismic Walkdown Checklist (SWC) SWELl- 050 Equipment ID No. M01400-25B Equip. Class Motor-Operated & Solenoid-Operated Valves (08)

Equipment Description Core Spray B Injection Valve Note: Equipment tag 1400-25B Note: Overall view of valve from side EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C182 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: Y[ NFI U-Seismic Walkdown Checklist (SWC) SWELl- 050 Equipment IDNo. M01400-25B Equip. Class Motor-Operated& Solenoid-Operated Valves (08)

Equipment Description Core Spray B Injection Valve Note: Scaffold erection in progress Note:

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C183 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 4 Status: Y[ NFl UL-Seismic Walkdown Checklist (SWC) SWELl- 051 Equipment ID No. M01400-3A Equip. Class, Motor-Operated& Solenoid-OperatedValves (08)

Equipment Description Core SprayA Supp Pool Suction Location: Bldg. RB Floor El. -17.5 Room, Area SE QD Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YLI NZ of the 50% of SWEL items requiring such verification)?

Inline component, no anchorage.

2. Is the anchorage free of bent, broken, missing or loose hardware? YE-] N[-] UI-- N/AN
3. Is the anchorage free of corrosion that is more than mild surface YE] NE] U[-] N/AE oxidation?
4. Is the anchorage free of visible cracks in the concrete near the YEr NE] U[:] N/A anchors?

IEnter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-O0O01, Rev. 1 Attachment C Page C 184 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YN NEI U[--

Seismic Walkdown Checklist (SWC) SWELl- 051 Equipment ID No. M01400-3A Equip. Class Motor-Operated& Solenoid-Operated Valves (08)

Equipment Description Core Spray A Supp Pool Suction

5. Is the anchorage configuration consistent with plant documentation? Y[-I NEi Ur1 N/A0 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YE NE] U[]

potentially adverse seismic conditions?

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y[ NEI uEr N/AE-
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI UE- N/A[-]

and masonry block walls not likely to collapse onto the equipment?

Overhead lighting adequately mounted at an angle over the valve, therefore not a seismic hazard.

9. Do attached lines have adequate flexibility to avoid damage? Y[I NEI U[-] N/A[--
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

EN-DC-1 68 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C185 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: YN NEO UEI Seismic Walkdown Checklist (SWC) SWELl- 051 Equipment ID No. M01400-3A Equip. Class Motor-Operated& Solenoid-OperatedValves (08)

Equipment Description Core Sorav A Suaw Pool Suction Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YNNEI UEJ adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Area walk-by is on AWC-032.

Evaluated by: Gary Sweder J.Q*_. Date: 10-9-12 Laura Maclay LauraMacla qv""-Wac-Qý 10-9-12 EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C 186 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YE NEI UD Seismic Walkdown Checklist (SWC) SWELl- 051 Equipment ID No. M01400-3A Equip. Class Motor-Operated& Solenoid-Operated Valves (08)

Equipment Description Core Spray A Supp Pool Suction Photographs Note: Equipment Tag EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-OO001, Rev. 1 Attachment C Page 0 187 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YZ NF Ur-]

Seismic Walkdown Checklist (SWC) SWELl- 052 Equipment ID No. VAC-202A Equip. Class' Fans (9), Air Handlers (10), Temp. Sensors (19)

Equipment Description EAC RCIC Rm Cooling Location: Bldg. RB Floor El. 2.75 Room, Area SW QD Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE NFI of the 50% of SWEL items requiring such verification)?

Reference C359Sh 1, E1 (Detail8)

2. Is the anchorage free of bent, broken, missing or loose hardware? Y[ NEI U[I N/AZ-
3. Is the anchorage free of corrosion that is more than mild surface Y; NEI ULI N/AZ" oxidation?
4. Is the anchorage free of visible cracks in the concrete near the Y[ NEI UIE- N/AE-anchors?

IEnter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page 0188 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ NE-] uIIL Seismic Walkdown Checklist (SWC) SWELl- 052 Equipment ID No. VAC-202A Equip. Class Fans (9), Air Handlers (10). Temp. Sensors (19)

Equipment Description EAC RCIC Rm Coolinq

5. Is the anchorage configuration consistent with plant documentation? YZ NEI UD- N/A[-]

(Note: This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)

Reference drawing C359 SHI, detail 8. Anchorage for the steel frame on which VAC-202A is mounted was verified.

6. Based on the above anchorage evaluations, is the anchorage free of YZ ND"] UD]

potentially adverse seismic conditions?

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ N[D] UD- N/AD-]
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ ND] U[-] N/AD-and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YZ NDl UD-- N/AD-
10. Based on the above seismic interaction evaluations, is equipment free YZ NF-D Ur of potentially adverse seismic interaction effects?

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C0189 of 0413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: Y[ NO Ur-I Seismic Walkdown Checklist (SWC) SWELl- 052 Equipment ID No. VAC-202A Equip. Class Fans (9). Air Handlers (10). Temp. Sensors (19)

Equipment Description EAC RCIC Rm Cooling Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO N[: U-]

adversely affect the safety functions of the equipment?

Mild surface oxidation on the frame due to lack of paint after work was completed (See Picture). Facilities Request 9477 has been made to requestpaintingof frame.

Comments (Additional pages may be added as necessary)

SEWs package for VAC-202A indicatesneoprene vibration isolators need to be addressed to prevent unacceptablehorizontal or vertical displacements during a seismic event. FRN 98-01-33 provides details for the installationof limit stop devices. The walkdown verified the installationof the limit stop devices per the FRN documentation.

Area Walk-By Checklist is A WC-006.

Evaluated by: Gary Sweder )AdAO4 Nk . Date: 10/3/12 I RI~rR MAklv~I I-cu r,, (3 10/3/12 Laura Maclav t/ .

QJ EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C 190 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: Y[ Nr ] U--

Seismic Walkdown Checklist (SWC) SWELl- 052 Equipment ID No. VAC-202A Equip. Class Fans (9). Air Handlers (10), Temp. Sensors (19)

Equipment Description EAC RCIC Rm Cooling Photographs Note: Note: overall view of equipment EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C191 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ Nr-1 U--i Seismic Walkdown Checklist (SWC) SWELl- 052 Equipment ID No. VAC-202A Equip. Class Fans (9), Air Handlers (10), Temp. Sensors (19)

Equipment Description EAC RCIC Rm Cooling Note: Limit stop device and lack of paint at locations of work area EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-O0001, Rev. 1 Attachment C Page 0192 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 4 Status: YZ NF UD-'

Seismic Walkdown Checklist (SWC) SWELl- 053 Equipment ID No. VAC-202B Equip. Classi Fans (9), Air Handlers (10), Temp. Sensors (19)

Equipment Description EAC RCIC Rm Coolinq Location: Bldg. RB Floor El. 2.75 R oom, Area SWQD Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YN N[-]

of the 50% of SWEL items requiring such verification)?

C91, E2 Detail I used to verify anchorage

2. Is the anchorage free of bent, broken, missing or loose hardware? YN NEl U[D] N/AD-
3. Is the anchorage free of corrosion that is more than mild surface Y[ ND U[-] N/ADl oxidation?
4. Is the anchorage free of visible cracks in the concrete near the Y] NDI UED N/AD anchors?

IEnter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C193 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ NEi UrL Seismic Walkdown Checklist (SWC) SWELl- 053 Equipment ID No. VAC-202B Equip. Class Fans (9), Air Handlers (10), Temp. Sensors (19)

Equipment Description EAC RCIC Rm Cooling

5. Is the anchorage configuration consistent with plant documentation? YZ ND] UF] N/AD]

(Note: This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)

Dimensions were spot checked using C91, E2 and verified to be accurate.

6. Based on the above anchorage evaluations, is the anchorage free of YZ ND- Ur-potentially adverse seismic conditions?

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NDI uED N/AD]
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN NDI uD-] N/AD-]

and masonry block walls not likely to collapse onto the equipment?

VAC-202A overhead

9. Do attached lines have adequate flexibility to avoid damage? YN N[D] UD- N/AD-
10. Based on the above seismic interaction evaluations, is equipment free YZ NDJ UD-of potentially adverse seismic interaction effects?

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C194 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: Y[ N[- UI-Seismic Walkdown Checklist (SWC) SWELl- 053 Equipment ID No. VAC-202B Equip. Class Fans (9). Air Handlers (10). Temp. Sensors (19)

Equipment Description EAC RCIC Rm Cooling Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y0 N[E] U[]

adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

SEWs package for VAC-202B indicates neoprene vibration isolators need to be addressed to prevent unacceptablehorizontal or vertical displacements during a seismic event. FRN 98-01-33 provides details for the installationof limit stop devices. The walkdown verified the installationof the limit stop devices per the FRN documentation.

Area Walk-By Checklist is A WC-006.

Evaluated by: Gary Sweder ,dQ, . . o Date: 10-03-12 G

Laura Maclav Laura Maclav Ym=7JAffa?~o aj 10-03-12 (J

I EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C195 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YZ NIF U-Seismic Walkdown Checklist (SWC) SWELl- 053 Equipment ID No. VAC-202B Equip. Class Fans (9), Air Handlers (10), Temp. Sensors (19)

Equipment Description EAC RCIC Rm Cooling Photographs EN-DC-1 68 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C196 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YE NF-] Ur-D Seismic Walkdown Checklist (SWC) SWELl- 054 Equipment IDNo. P208C Equip. Class' Vertical Pumps (06)

Equipment Description SSW Pump C Location: Bldg. IS Floor El. 25.5 Room, Area C COMP Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE Nil of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NEI UiZ N/AZ--
3. Is the anchorage free of corrosion that is more than mild surface YZ N[-] Uil N/AZl oxidation?
4. Is the anchorage free of visible cracks in the concrete near the YZ NEI U N/ARl anchors?

Tight vertical crack (less than 1/8') on northwest comer of pedestal.

Judged to be insignificant;therefore, it presents no seismic hazard. See attachedphoto.

1 Enter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-1 68 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C197 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YM NE] Ur--

Seismic Walkdown Checklist (SWC) SWELl- 054 Equipment IDNo. P208C Equip. Class Vertical Pumps (06)

Equipment Description SSWPump C

5. Is the anchorage configuration consistent with plant documentation? YZ NEi UrI N/AE-(Note: This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)

Reference Calculation C15.0.2901, Rev. 1, and Drawing C-45, Rev.

E18.

6. Based on the above anchorage evaluations, is the anchorage free of YZ N-] Ur-]

potentially adverse seismic conditions?

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NE] uiE] N/A[-]
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ N-] UE] N/AE]

and masonry block walls not likely to collapse onto the equipment?

Masonry block wall 45.2 is seismically qualified. See drawing C-939 SH 1, Rev. EO.

Fluorescentlight fixture above the west side of the P208C cubicle is suspended by an open S-hook. The fixture does not pose a credible threat to P208C; however, it could possibly damage other instruments within the room if it were to swing/fall during a seismic event. See AWC-031 for details.

9. Do attached lines have adequate flexibility to avoid damage? YN NE] u[-] N/AE]
10. Based on the above seismic interaction evaluations, is equipment free YN NE]i UIE of potentially adverse seismic interaction effects?

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C198 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: Yo NE] Ur-]

Seismic Walkdown Checklist (SWC) SWELl- 054 Equipment ID No. P208C Equip. Class Vertical Pumos (06)

Equipment Description SSW Pump C Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN NE] U[]

adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

P208Cwas out of service at the time of inspection. The motor was decoupled from the pump and the top cover was removed from the motor. This was not noted as a concern, as the opening had the appropriateFME cover (see attachedphoto).

SWEL 1-054 is on AWC-031.

Evaluated by: David Small dn2-P ii Date: 10/03/2012 Halie Aroz d 1!) 10/03/2012

%</- I EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C199 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: Y[ NMJ U' Seismic Walkdown Checklist (SWC) SWELl- 054 Equipment ID No. P208C Equip. Class Vertical Pumps (06)

Equipment Description SSWPump C Photographs EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C200 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ NI-] UD-Seismic Walkdown Checklist (SWC) SWELl- 054 Equipment ID No. P208C Equip. Class Vertical Pumps (06)

Equipment Description SSWPump C Note: Typical anchorbolts. Note: Tight vertical crack in pedestal.

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C201 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YE NFj UDl Seismic Walkdown Checklist (SWC) SWELl- 055 Equipment ID No. P208D Equip. Class, Vertical Pumps (06)

Equipment Description SSWPump D Location: Bldg. IS Floor El. 25.5 Room, Area B COMP Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y[ NEi of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YE NEi U[-] N/A[-]
3. Is the anchorage free of corrosion that is more than mild surface YE NEi U[L N/A'-

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the YE NE] Ur- N/A[-]

anchors?

I Enter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C202 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ NIT U[]

Seismic Walkdown Checklist (SWC) SWELl- 055 Equipment IDNo. P208D Equip. Class Vertical Pumps (06)

Equipment Description SSWPump D

5. Is the anchorage configuration consistent with plant documentation? Y[ NF] Ur- N/AR (Note: This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)

Reference Calculation C15.0.1869, Rev. 1, and Drawing C-45, Rev.

E18.

6. Based on the above anchorage evaluations, is the anchorage free of YM NEI U[

potentially adverse seismic conditions?

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y] N[D] Ul-- N/AD--
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[ NDJ U-- N/AD-]

and masonry block walls not likely to collapse onto the equipment?

Masonry walls 45.2 and 45.3 are seismically qualified. See drawing C-939 SH 1, Rev. EO.

9. Do attached lines have adequate flexibility to avoid damage? YO ND:] UDJ N/AD-]
10. Based on the above seismic interaction evaluations, is equipment free YZ ND:] ur of potentially adverse seismic interaction effects?

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C203 of C413 Ar"ACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YE NE] UF]

Seismic Walkdown Checklist (SWC) SWELl- 055 Equipment ID No. P208D Equip. Class Vertical Pumps (06)

Equipment Description SSWPump D Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[D NE] U[-I adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

SWEL 1-055 is on AWC-005.

Evaluated by: David Small 2 9J AA44 Date: 10/03/2012 Halie Aroz 10/03/2012 L.)

EN-DC-1 68 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C204 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ No- Ufi Seismic Walkdown Checklist (SWC) SWELl- 055 Equipment ID No. P208D Equip. Class Vertical Pumps (06)

Equipment Description SSWPump D Photographs Note: Note:

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C205 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ No UF']

Seismic Walkdown Checklist (SWC) SWELl- 055 Equipment ID No. P208D Equip. Class Vertical Pumps (06)

Equipment Description SSWPump D EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. I Attachment C Page C206 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 4 Status: YZ NE] UD--

Seismic Walkdown Checklist (SWC) SWELl- 056 Equipment ID No. P208E Equip. Class, Vertical Pumps (06)

Equipment Description SSWPump E Location: Bldg. IS Floor El. 25.5 Room, Area B COMP Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YZ N[-]

of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware? YO NE]I U11 N/AL]
3. Is the anchorage free of corrosion that is more than mild surface YE N[] ULI N/A[--

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the YZ NF-] U-] N/A[

anchors?

Pedestalis cut on southeast comer to accommodate piping. This looks deliberate and is not close to the bolt, so it is therefore not considered a seismic hazard.

I Enter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C207 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ NE U--

Seismic Walkdown Checklist (SWC) SWELl- 056 Equipment ID No. P208E Equip. Class Vertical Pumps (06)

Equipment Description SSWPump E

5. Is the anchorage configuration consistent with plant documentation? YM NEI UI-- N/A--

(Note: This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)

Reference Calculation C15.0.1869, Rev. 1, and Drawing C-45, Rev.

E18.

6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI UI-potentially adverse seismic conditions?

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NEI UE- N/A[--
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEi UI- N/AE--

and masonry block walls not likely to collapse onto the equipment?

Masonry walls 45.2 and 45.3 are seismically qualified. See drawing C-939 SH 1, Rev. EO.

9. Do attached lines have adequate flexibility to avoid damage? YN NR U[-- N/AE1
10. Based on the above seismic interaction evaluations, is equipment free YZ NEI UEr of potentially adverse seismic interaction effects?

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C208 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: Y[ NZ UEZ Seismic Walkdown Checklist (SWC) SWELl- 056 Equipment IDNo. P208E Equip. Class Vertical Pumps (06)

Equipment Description SSW Pump E Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y0 NEI uEF adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

SWEL 1-056 is on AWC-005.

Evaluated by: David Small D,=JLi? Date: 10/03/2012 HalieAroz 10/03/2012 EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C209 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: YZ NRI UrL Seismic Walkdown Checklist (SWC) SWELl- 056 Equipment ID No. P208E Equip. Class Vertical Pumps (06)

Equipment Description SSWPump E Photographs Note: Note: Typical anchor bolt.

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C210 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: Y[ NF Ul-'

Seismic Walkdown Checklist (SWC) SWELl- 057 Equipment ID No. P202D Equip. Class' HorizontalPumps (05)

Equipment Description RBCCWPump D Loop B Location: Bldg. AXBAY Floor El. 3 Room, Area B COMP Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YZ Nr-1 of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NEIl UEI N/A[-
3. Is the anchorage free of corrosion that is more than mild surface YZ NEil U[] N/Ar-oxidation?
4. Is the anchorage free of visible cracks in the concrete near the Y[ N[] UEI N/AD anchors?

IEnter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C211 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YN NE] U--

Seismic Walkdown Checklist (SWC) SWELl- 057 Equipment ID No. P202D Equip. Class HorizontalPumps (05)

Equipment Description RBCCWPump D Loop B

5. Is the anchorage configuration consistent with plant documentation? Y[E N[-] U[-I N/AD-(Note: This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)

Reference Drawings C-185, Rev. E7 and C-186, Rev. E3.

6. Based on the above anchorage evaluations, is the anchorage free of YN ND] U[-D potentially adverse seismic conditions?

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NDl UD- N/AD-]

There is some loose foam insulation secured with duct tape on the discharge valve for P202D.As the mass for the insulation is very low, it does not present an adverse seismic interaction. CR-PNP-2012-04405 was written to address this as a generalplant housekeeping concern, and WR 286056 was initiatedfor repair.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NDI UD- N/AD-and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YZ NDI UD- N/AD]
10. Based on the above seismic interaction evaluations, is equipment free YM N[-- Ur of potentially adverse seismic interaction effects?

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C212 of C413 ATTACHMENT 9.6 SEISMIC WALKOOWN CHECKLIST FORM Sheet 3 of 5 Status: YZ NEI UEI Seismic Walkdown Checklist (SWC) SWELl- 057 Equipment IDNo. P202D Equip. Class HorizontalPumps (05)

Equipment Description RBCCW PumpD Loop B Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YE NEI Ur-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

SWEL1-057 is on AWC-003.

Evaluated by: David Small 00,w L4A Date: 10/04/2012 Halie Aroz Ite0 10/04/2012 EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C213 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ NR Ur Seismic Walkdown Checklist (SWC) SWELl- 057 Equipment ID No. P202D Equip. Class Horizontal Pumps (05)

Equipment Description RBCCWPump D Loop B Photographs Note: Note:

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C214 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ NE] UD-Seismic Walkdown Checklist (SWC) SWELl- 057 Equipment ID No. P202D Equip. Class Horizontal Pumps (05)

Equipment Description RBCCWPump D Loop B Note: Typical anchorbolt. Note:

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C215 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: Y[ NI]I ULI Seismic Walkdown Checklist (SWC) SWELl- 058 Equipment ID No. P202E Equip. Classi Horizontal Pumps (05)

Equipment Description RBCCWPump E Loop B Location: Bldg. AXBAY Floor El. 3 Room, Area B COMP Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y[ NEIl of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NElI UL N/A[--
3. Is the anchorage free of corrosion that is more than mild surface Y[ Nj3 IEu N/AZ]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the Y[ NEJ Ur] N/AD-]

anchors?

IEnter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C216 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: Y[ NE] UW--

Seismic Walkdown Checklist (SWC) SWELl- 058 Equipment ID No. P202E - Equip. Class HorizontalPumps (05)

Equipment Description RBCCWPump E Loop B

5. Is the anchorage configuration consistent with plant documentation? YZ NEI Ur-] N/A[--

(Note: This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)

Reference Drawings C-185, Rev. E7 and C-186, Rev. E3.

6. Based on the above anchorage evaluations, is the anchorage free of YJZ NW UW-potentially adverse seismic conditions?

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y[ NW1 UW1 N/AE-]

There is some loose foam insulation secured with duct tape on the discharge valve for P202E. As the mass for the insulation is very low, it does not present an adverse seismic interaction. CR-PNP-2012-04405 was written to address this as a general plant housekeeping concern, and WR 286056 was initiatedfor repair.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN NW UW N/A--

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? YM NW U-] N/A
10. Based on the above seismic interaction evaluations, is equipment free YI*N[-]ur-of potentially adverse seismic interaction effects?

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C217 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YZ NE] Ur]

Seismic Walkdown Checklist (SWC) SWELl- 058 Equipment ID No. P202E Equip. Class Horizontal Pumps (05)

Equipment Description RBCCWPump E Loop B Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN NEI Ur-W adversely affect the safety functions of the equipment?

One alignment (jacking) bolt on the southeastcornerof P202E was missing from the motor. This screw has no function in the operation of the equipment after installation,so this is not consideredan adverse seismic condition.

Three alignment (jacking)bolts were observed to be in contact with the motor housing which is contraryto standardpractice of backing out the alignment bolts after alignment is achieved and primary mounting hardwareis secured. This condition was previously identified by CR-PNP-2011-3626.Work Order 286700 is scheduled to correct this condition. See attachedphoto.

Comments .(Additional pages may be added as necessary)

The tag number on P202E was missing. Operationswas notified, and an ESOMS label request was initiated.See CR-PNP-2012-044 11. The equipment was verified for the walkdown using auxiliary equipment tags (see attachedphoto).

SWEL 1-058 is on A WC-003.

Evaluated by: David Small [99JL1 Date: 10/04/2012 Ha Aryi7 10/04/2012 U

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C218 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: Y[ NEI U--

Seismic Walkdown Checklist (SWC) SWELl- 058 Equipment ID No. P202E Equip. Class Horizontal Pumps (05)

Equipment Description RBCCWPump E Loop B Photographs Note: Tag number of auxiliary equipment that Note:

also identifies P202E.

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C219 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ NI] U--

Seismic Walkdown Checklist (SWC) SWELl- 058 Equipment ID No. P202E Equip. Class Horizontal Pumps (05)

Equipment Description RBCCWPumj E Loo) B Note: Typical anchorbolt. Note: Alignment bolt in contact with motor housing.

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C220 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: YM NF] UI Seismic Walkdown Checklist (SWC) SWELl- 059 Equipment ID No. P202F Equip. Class' HorizontalPumps (05)

Equipment Description RBCCWPump F Loop B Location: Bldg. AXBAY Floor El. 3 Room, Area B COMP Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YN NE]

of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware? YZ N[] U-I N/AI3
3. Is the anchorage free of corrosion that is more than mild surface YE N] U[-I] N/A-]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the YZ N[] U-] N/A[-]

anchors?

There is a small chip out of the east end of the pedestal that is judged to be insignificant.

I Enter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C221 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ NR UD-Seismic Walkdown Checklist (SWC) SWELl- 059 Equipment ID No. P202F Equip. Class HorizontalPumps (05)

Equipment Description RBCCWPump F Loop B

5. Is the anchorage configuration consistent with plant documentation? YZ N[l UiD N/A[-]

(Note: This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)

Reference Drawings C-185, Rev. E7 and C-186, Rev. E3.

6. Based on the above anchorage evaluations, is the anchorage free of YZ NDI UD-potentially adverse seismic conditions?

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NDI UD] N/AD-There is some partially detached foam insulation on the dischargevalve for P202F.As the mass for the insulation is very low, it does not present an adverse seismic interaction.CR-PNP-2012-04405 was written to address this as a generalplant housekeeping concern, and WR 286056 was initiatedfor repair.
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NDl UD-- N/AD and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Y[ NDI UD1 N/AD-
10. Based on the above seismic interaction evaluations, is equipment free YZ NDl UDl of potentially adverse seismic interaction effects?

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C222 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: Y0I NEI Ur-Seismic Walkdown Checklist (SWC) SWELl- 059 Equipment IDNo. P202F Equip. Class Horizontal Pumps (05)

Equipment Description RBCCWPump F Loop B Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y0 NE] U[]

adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

SWEL1-059 is on AWC-003.

Evaluated by: David Small . A /, e /d Date: 10/04/2012 Halie Aroz jI 10/04/2012 C)

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C223 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ NF Ur-Seismic Walkdown Checklist (SWC) SWELl- 059 Equipment ID No. P202F Equip. Class Horizontal Pumps (05)

Equipment Description RBCCWPump F Loop B Photographs EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C224 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: Y[ N[-I U[III Seismic Walkdown Checklist (SWC) SWELl- 059 Equipment ID No. P202F Equip. Class Horizontal Pumps (05)

Equipment Description RBCCWPump F Loop B Note: Typical anchor bolt. Note:

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C225 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 6 Status: Y[ NE] U-D Seismic Walkdown Checklist (SWC) SWELl- 060 Equipment ID No. E209B Equip. Class, Tanks and Heat Exchangers (21)

Equipment Description RBCCW Loop B Heat Exchanger Location: Bldg. AXBAY Floor El. 3 Room, Area B COMP Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y[ NOI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Y[ N[-] Ur-] N/Ar-Both anchors in the south pedestal and the east anchorin the north pedestal are slightly skewed, and the west anchor in the north pedestal is not engaged by a small amount (approx. Y2 thread). These conditions are judged to be acceptable, and are not considered a seismic hazard.
3. Is the anchorage free of corrosion that is more than mild surface YE ND] ul- N/AD-'

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the YN NDI uF- N/ADI anchors?

I Enter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C226 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 6 Status: YZ NE] U-Seismic Walkdown Checklist (SWC) SWELl- 060 Equipment ID No. E209B Equip. Class Tanks and Heat Exchangers (21)

Equipment Description RBCCW Loop B Heat Exchanger

5. Is the anchorage configuration consistent with plant documentation? YZ NEi Ur- N/AF-]

(Note: This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)

Reference Drawing C-185, Rev. E7, FRN 98-01-78, and FRN 95-01-60.

6. Based on the above anchorage evaluations, is the anchorage free of YZ NE] UI-'

potentially adverse seismic conditions?

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NE] UE-- N/AE-There is scaffolding very close to E209B that has a seismic evaluation tag, so it is acceptable for interaction effects.
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NE] UEr] N/AE]

and masonry block walls not likely to collapse onto the equipment?

The Marinite boardseparatingcable trays in the southwest corner of the room has some pieces missing. There are currently no pieces that are hanging off or look ready to fall, so it does not present a seismic interactionhazard.

9. Do attached lines have adequate flexibility to avoid damage? Y[ NE[] U[] N/AE1
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C227 of C413 ATrACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 6 Status: YZ NO UMI Seismic Walkdown Checklist (SWC) SWELl- 060 Equipment ID No. E209B Equip. Class Tanks and Heat Exchangers (21)

Equipment Description RBCCW Loop B Heat Exchanger Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y0 Nr-I UM adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

A loose label for equipment # 29-HO-3840 was found on the west side of E209B on the north pedestal. This was reportedto Operationsand an ESOMS request has been initiated. See CR-PNP-2012-04411.

SWEL 1-060 is on AWC-003.

Evaluated by: David Small 2 2 Date: 10/04/2012 Halie Aroz a 10/04/2012 EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C228 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 6 Status: YZ NF UF Seismic Walkdown Checklist (SWC) SWELl- 060 Equipment ID No. E209B Equip. Class Tanks and Heat Exchangers (21)

Equipment Description RBCCWLooo B Heat Exchanger Photographs Note: Note:

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C229 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 6 Status: YE NE] UD--

Seismic Walkdown Checklist (SWC) SWELl- 060 Equipment ID No. E209B Equip. Class Tanks and Heat Exchangers (21)

Equipment Description RBCCWLooo B Heat Exchanqer Note: Typical south pedestal anchorbolt. Note: Typical north pedestal anchorbolt.

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C230 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 6 of 6 Status: Y[ NEI UIr Seismic Walkdown Checklist (SWC) SWELl- 060 Equipment IDNo. E209B Equip. Class Tanks and Heat Exchangers (21)

Equipment Description RBCCW Loop B Heat Exchanger Note: North pedestal modification. Note: North pedestal modification.

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C231 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YZ NIF UI-I Seismic Walkdown Checklist (SWC) SWELl- 061 Equipment ID No. C2205A Equip. Class, Instrument Racks (18)

Equipment Description ReactorProt &NSS Instr Rack Location: Bldg. RB Floor El. 51 Room, Area East Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y[-] NO*

of the 50% of SWEL items requiring such verification)?

The SEWs package for this component conservatively evaluates one of four various instrumentrack anchorages. This rack was not evaluated, and therefore configurationcan not be verified by the package. All bolts are visible, so the remainder of this section is applicable.

2. Is the anchorage free of bent, broken, missing or loose hardware? YN NDJ UEI N/AL:]
3. Is the anchorage free of corrosion that is more than mild surface Y[ NDJ U-- N/AD oxidation?
4. Is the anchorage free of visible cracks in the concrete near the YN NDI U-- N/AD1 anchors?

Enter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-1 68 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C232 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YE NEI UD Seismic Walkdown Checklist (SWC) SWELl- 061 Equipment ID No. C2205A Equip. Class Instrument Racks (18)

Equipment Description Reactor Prot &NSS Instr Rack

5. Is the anchorage configuration consistent with plant documentation? Y[-- NO UI- N/AE (Note: This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)

Refer to response to question #1.

6. Based on the above anchorage evaluations, is the anchorage free of YZ ND UD potentially adverse seismic conditions?

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NW UW N/A[D]

C2205A is bolted to C2205B, so this is not a seismic interaction concern. C2205A is also adjacent to but not bolted to A TWS rack 2275; however, there is sufficient clearance( > 2") between the racks.

Therefore, this is not considered a potentiallyadverse seismic interaction.

One set screw is missing on the fence enclosing the racks. This is not a seismic hazard since the fence is judged to still be securely mounted to the floor, but CR-PNP-2012-04659was written and WR 287549 initiated to address the concern. See attachedphoto.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN ND u[:] N/AD-I and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YS NW UD:] N/AD-I
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C233 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YoI NEI ur]

Seismic Walkdown Checklist (SWC) SWELl- 061 Equipment ID No. C2205A Equip. Class Instrument Racks (18)

Equipment Description Reactor Prot &NSS Instr Rack Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[ NE] UI-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

SWEL 1-061 is on AWC-021.

Evaluated by: Laura Maclay & AQL-2& " Date: 10/17/2012 Halie Aroz 11 K 10/17/2012 EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C234 of C413 ATnACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: Y] NF- UD--

Seismic Walkdown Checklist (SWC) SWELl- 061 Equipment ID No. C2205A Equip. Class Instrument Racks (18)

Equipment Description ReactorProt &NSS Instr Rack Photographs Note: Note:

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C235 of C413 AT-IACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: Y[ NE] U[--

Seismic Walkdown Checklist (SWC) SWELl- 061 Equipment ID No. C2205A Equip. Class Instrument Racks (18)

Equipment Description Reactor Prot &NSS Instr Rack Note: Missing set screw on fence. Note:

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C236 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 4 Status: YZ NR- U[--

Seismic Walkdown Checklist (SWC) SWELl- 062 Equipment ID No. C2205B Equip. Class, Instrument Racks (18)

Equipment Description ReactorProt &NSS Instr Rack Location: Bldg. RB Floor El. 51 Room, Area East Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y[--] NO:

of the 50% of SWEL items requiring such verification)?

The SEWs package for this component conservatively evaluates one of four various instrument rack anchorages. This rack was not evaluated, and therefore configuration can not be verified by the package. All bolts are visible, so the remainderof this section is applicable.

2. Is the anchorage free of bent, broken, missing or loose hardware? YEE NEJ URL N/AD--
3. Is the anchorage free of corrosion that is more than mild surface YO NE] U[] N/AL]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the YN N[] U-- N/Ar-anchors?

' Enter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-1 68 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C237 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 Status: YZ NIEj U[-']

Seismic Walkdown Checklist (SWC) SWELl- 062 Equipment IDNo. C2205B Equip. Class Instrument Racks (18)

Equipment Description ReactorProt & NSS Instr Rack

5. Is the anchorage configuration consistent with plant documentation? YrI NR] U[I N/AZ (Note: This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)

Refer to response to question #1.

6. Based on the above anchorage evaluations, is the anchorage free of YE NEI UrI potentially adverse seismic conditions?

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NI] u[-] N/A[-]
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN NE] U-I] N/A--

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? Y[ NEI UL-] N/Ar]
10. Based on the above seismic interaction evaluations, is equipment free Y[ NE] U[-

of potentially adverse seismic interaction effects?

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C238 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4 Status: YO] NnZur U]

Seismic Walkdown Checklist (SWC) SWELl- 062 Equipment ID No. C2205B Equip. Class Instrument Racks (18)

Equipment Description Reactor Prot & NSS Instr Rack Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y0 NEI U[:]

adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

SWEL1-062 is on AWC-021.

Evaluated Date: 10/17/2012 10/17/2012 EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C239 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 4 Status: Y[ NF- U--

Seismic Walkdown Checklist (SWC) SWELl- 062 Equipment ID No. C2205B Equip. Class Instrument Racks (18)

Equipment Description Reactor Prot &NSS Instr Rack Photographs Note: Equipment tag Note: Overall view of instrumentrack from outside of fencing.

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C240 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 6 Status: YE NDI U-Seismic Walkdown Checklist (SWC) SWELl- 063 Equipment ID No. C2206A Equip. Class, Instrument Racks (18)

Equipment Description ReactorProt & NSS Instr Rack Location: Bldg. RB Floor El. 51 Room, Area West Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y[-] NZ of the 50% of SWEL items requiring such verification)?

The SEWs package conservatively evaluates similar rack C2206B, which has only six anchors, and comparatively accepts the eight anchorageconfigurationfor rack C2206A. Therefore, since a drawing does not specify the eight bolt configuration, this component was not chosen for the 50% verification.

2. Is the anchorage free of bent, broken, missing or loose hardware? YE NI UE-I N/A[--
3. Is the anchorage free of corrosion that is more than mild surface YE ND UD N/AD oxidation?
4. Is the anchorage free of visible cracks in the concrete near the YE NDI U' N/AD anchors?

' Enter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C241 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 6 Status: YZ NIF U-Seismic Walkdown Checklist (SWC) SWELl- 063 Equipment ID No. C2206A Equip. Class Instrument Racks (18)

Equipment Description Reactor Prot &NSS Instr Rack

5. Is the anchorage configuration consistent with plant documentation? YrI NR UI- N/AZ (Note: This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)

Refer to response to question #1.

6. Based on the above anchorage evaluations, is the anchorage free of YZ NEi UIZ potentially adverse seismic conditions?

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NDI UD- N/AD-]

Racks C2206A and C2206B are bolted together and therefore do not pose a seismic risk to each other.

The robust barrierfence aroundRacks C2206A & C2206B has set screws missing from the base brackets of three of the verticalposts.

The fence consists of an interconnectedframework of light support members and wire mesh. The weight and mass of the assembly is relatively low. The remainingposts (approx 5) have the set screws installed. The base brackets with the missing set screws still function to resist lateralloads. Since vertical seismic accelerationsare less than Ig (Ref Spec C114ERQ), there is no expected uplift at the post locations.

Based on these considerations,the identified condition does not representa potential adverse seismic interaction. CR-PNP-2012-04627 was written to replace missing screws.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NDl UD- N/AD-'

and masonry block walls not likely to collapse onto the equipment?

The west masonry block walls next to the rack, 65.9 and 65.10 are safety related.

9. Do attached lines have adequate flexibility to avoid damage? YZ NDI Ur- N/AD-
10. Based on the above seismic interaction evaluations, is equipment free Y[ NDl UD1 of potentially adverse seismic interaction effects?

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C242 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 6 Status: YZ NE] ULI Seismic Walkdown Checklist (SWC) SWELl- 063 Equipment ID No. C2206A Equip. Class Instrument Racks (18)

Equipment Description Reactor Prot &NSS Instr Rack Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ N[-] Ur-adversely affect the safety functions of the equipment?

The cover for pressure transmitter36-PT-654 is missing one of four bolts which keep the cover secured to the equipment. This is not a seismic concern due the redundancy of the other three bolts. CR-PNP-2012-04629 was written to address this item and calls for replacement of the missing fastener.

Comments (Additional pages may be added as necessary)

Area walk-by is A WC-020.

Evaluated by. Laura Ma . ~&]flAcA~~?fYJ~ic ~ Oam Date: 10-16-12

,ý"ma-Wac IJUI V !dUSwg'Jg Aq

'.1A.4 I  %-1LJ Aj A. - 10-16-12 EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C243 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 6 Status: YZ NR UD Seismic Walkdown Checklist (SWC) SWELl- 063 Equipment IDNo. C2206A Equip. Class Instrument Racks (18)

Equipment Description Reactor Prot &NSS Instr Rack Photographs Note: Equipment tag Note: Overall view of rack outside of fencing EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-OOOO1, Rev. 1 Attachment C Page C244 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 6 Status: Y[ NI I U[--

Seismic Walkdown Checklist (SWC) SWELl- 063 Equipment ID No. C2206A Equip. Class Instrument Racks (18)

Equipment Description ReactorProt & NSS Instr Rack Note: Typical anchors Note: Back of cover for pressure transmitteris missing a bolt (CR-PNP-2012-04629).

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C245 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 6 of 6 Status: Y[ NI U-Seismic Walkdown Checklist (SWC) SWELl- 063 Equipment ID No. C2206A Equip. Class Instrument Racks (18)

Equipment Description ReactorProt &NSS Instr Rack Note: Missing screw in fence base bracket Note:

(CR-PNP-2012-04627).

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C246 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: YZ NE] U--

Seismic Walkdown Checklist (SWC) SWELl- 064 Equipment IDNo. C2206B Equip. Class, Instrument Racks (18)

Equipment Description ReactorProt & NSS Instr Rack Location: Bldg. RB Floor El. 51 Room, Area West Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y[ NE]

of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware? YE NE] ULI N/AEl
3. Is the anchorage free of corrosion that is more than mild surface YE NE] UE] N/AE]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the YE NE] UE] N/Ar-anchors?

I Enter the equipment class name from Appendix B: Classes of Equipment.

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C247 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YN NE] U--

Seismic Walkdown Checklist (SWC) SWELl- 064 Equipment ID No. C2206B Equip. Class Instrument Racks (18)

Equipment Description ReactorProt & NSS Instr Rack

5. Is the anchorage configuration consistent with plant documentation? YN NEI U[r] N/A[-

(Note: This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)

Refer to SEWs package dated 6/19/95 for anchorageconfiguration.

6. Based on the above anchorage evaluations, is the anchorage free of YO NEI ULI potentially adverse seismic conditions?

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NEI UE- N/A[-]

Racks C2206A and C2206B are bolted together and therefore do not pose a seismic risk to each other.

There is a 3" gap between C2276 and C2206B. However, both racks are well anchored.

The robust barrierfence aroundRacks C2206A & C2206B has set screws missing from the base brackets of three of the verticalposts.

The fence consists of an interconnectedframework of light support members and wire mesh. The weight and mass of the assembly is relatively low. The remainingposts (approx 5) have the set screws installed. The base brackets with the missing set screws still function to resist lateralloads. Since vertical seismic accelerationsare less than Ig (Ref Spec C1 14ERQ), there is no expected uplift at the post locations.

Based on these considerations,the identified condition does not representa potentialadverse seismic interaction. CR-PNP-2012-04627 was written to replace missing screws.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI U[-] N/A[-]

and masonry block walls not likely to collapse onto the equipment?

The west masonry block walls next to the rack, 65.9 and 65.10 are safety related.

9. Do attached lines have adequate flexibility to avoid damage? YN NEI UE] N/AE-
10. Based on the above seismic interaction evaluations, is equipment free YN NE ]UE]

of potentially adverse seismic interaction effects?

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C248 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YZ NEI UDý Seismic Walkdown Checklist (SWC) SWELl- 064 Equipment ID No. C2206B Equip. Class Instrument Racks (18)

Equipment Description ReactorProt & NSS Instr Rack Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NE]i Ur]

adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Area walk-by is A WC-020.

Evaluated by: Laura Maly '~aA A kCkQVL Date: 10-16-12 Gary Sweder Aal~ \~.tL.o_ 10-16-12 (3 -

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C249 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YN Nn--I UI-Seismic Walkdown Checklist (SWC) SWELl- 064 Equipment ID No. C2206B Equip. Class Instrument Racks (18)

Equipment Description ReactorProt & NSS Instr Rack Photographs Note: Equipment tag Note: Overall view of both racks C2206A and C2206B.

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment C Page C250 of C413 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: Y[ NR Ur Seismic Walkdown Checklist (SWC) SWELl- 064 Equipment ID No. C2206B Equip. Class Instrument Racks (18)

Equipment Description ReactorProt &NSS Instr Rack Note: Missing set screw in surrounding Note:

fencing (CR-PNP-2012-04627)

EN-DC-168 REV 0