(13 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML15191A360 | | | number = ML15191A360 |
| | issue date = 09/01/2015 | | | issue date = 09/01/2015 |
| | title = Columbia Generating Station - Request for Withholding Information from Public Disclosure - 2/20/15 Affiidavit Executed by L. Schichlein, GE-Hitachi Jet Pump 17/18 Riser Evaluation Dated February 2015 (TAC No. MF6208) | | | title = Request for Withholding Information from Public Disclosure - 2/20/15 Affiidavit Executed by L. Schichlein, GE-Hitachi Jet Pump 17/18 Riser Evaluation Dated February 2015 |
| | author name = Singal B K | | | author name = Singal B |
| | author affiliation = NRC/NRR/DORL/LPLIV-1 | | | author affiliation = NRC/NRR/DORL/LPLIV-1 |
| | addressee name = Reddemann M E | | | addressee name = Reddemann M |
| | addressee affiliation = Energy Northwest | | | addressee affiliation = Energy Northwest |
| | docket = 05000397 | | | docket = 05000397 |
| | license number = NPF-021 | | | license number = NPF-021 |
| | contact person = Singal B K | | | contact person = Singal B |
| | case reference number = TAC MF6208 | | | case reference number = TAC MF6208 |
| | document type = Letter, Proprietary Information Review | | | document type = Letter, Proprietary Information Review |
| | page count = 3 | | | page count = 3 |
| | project = TAC:MF6208 | | | project = TAC:MF6208 |
| | | stage = Withholding Request Acceptance |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter: Mr. Mark Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023) Richland, WA 99352-0968 September 1, 2015 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 1, 2015 Mr. Mark E. Reddemann Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023) |
| | Richland, WA 99352-0968 |
|
| |
|
| SUBJECT: COLUMBIA GENERATING STATION -REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. MF6208) | | ==SUBJECT:== |
| | COLUMBIA GENERATING STATION - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. MF6208) |
|
| |
|
| ==Dear Mr. Reddemann:== | | ==Dear Mr. Reddemann:== |
| By letter dated August 13, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15238A773), Energy Northwest submitted an affidavit executed by Ms. Lisa K. Schichlein, Senior Project Manager, GE-Hitachi Nuclear Energy Americas LLC (GEH), dated August 7, 2015, requesting that information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2. Section 2.390: GEH Report No. 001 N6043.5, "Energy Northwest Columbia Generating Station Jet Pump 17/18 Rise Evaluation at 106% [percent] Rate Core Flow (115 Mlbs/hr [Million Pounds per Hour])," Revision 2, dated August 2015 The information is included in Enclosure 1 to Energy Northwest's letter dated August 13, 2015. A nonproprietary version of Report No. 001 N6043.5, designated as Enclosure 2, to Energy Northwest's letter dated August 13, 2015, has been placed in the U.S. Nuclear Regulatory Commission's (NRC's) Public Document Room and added to ADAMS in the NRC Library at Accession No. ML 15238A745. The affidavit stated that the information sought to be withheld is considered to be proprietary for the reasons below: a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEH's competitors without license from GEH constitutes a competitive economic advantage over other companies; b. Information that, if used by a competitor, would reduce his expenditure of resources or improve his competitive position 1n the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product. We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavits, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the versions of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 1 O CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. If you have any questions regarding this matter, I may be reached at (301) 415-3016 or via e-mail at Balwant.Singal@nrc.gov. Docket No. 50-397 cc: Lisa K. Schichlein
| |
|
| |
|
| Sincerely,Balwant K. Singal, Senior Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Senior Project Manager, NPP/Services Licensing Regulatory Affairs GE-Hitachi Nuclear Energy Americas, LLC 3901 Castle Hayne Road, MIC A-65 Wilmington, NC 28401 Additional distribution via Listserv submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the versions of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. If you have any questions regarding this matter, I may be reached at (301) 415-3016 or via e-mail at Balwant.Singal@nrc.gov.
| | By letter dated August 13, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15238A773), Energy Northwest submitted an affidavit executed by Ms. Lisa K. Schichlein, Senior Project Manager, GE-Hitachi Nuclear Energy Americas LLC (GEH), dated August 7, 2015, requesting that information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2. Section 2.390: |
| | GEH Report No. 001 N6043.5, "Energy Northwest Columbia Generating Station Jet Pump 17/18 Rise Evaluation at 106% [percent] Rate Core Flow (115 Mlbs/hr |
| | [Million Pounds per Hour])," Revision 2, dated August 2015 The information is included in Enclosure 1 to Energy Northwest's letter dated August 13, 2015. |
| | A nonproprietary version of Report No. 001 N6043.5, designated as Enclosure 2, to Energy Northwest's letter dated August 13, 2015, has been placed in the U.S. Nuclear Regulatory Commission's (NRC's) Public Document Room and added to ADAMS in the NRC Library at Accession No. ML15238A745. |
| | The affidavit stated that the information sought to be withheld is considered to be proprietary for the reasons below: |
| | : a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEH's competitors without license from GEH constitutes a competitive economic advantage over other companies; |
| | : b. Information that, if used by a competitor, would reduce his expenditure of resources or improve his competitive position 1n the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product. |
| | We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavits, have determined that the |
|
| |
|
| Sincerely,IRA/ Balwant K. Singal, Senior Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-397 cc: Lisa K. Schichlein Senior Project Manager, NPP/Services Licensing Regulatory Affairs GE-Hitachi Nuclear Energy Americas, LLC 3901 Castle Hayne Road, MIC A-65 Wilmington, NC 28401 Additional distribution via Listserv DISTRIBUTION: PUBLIC LPL4-1 Reading RidsAcrsAcnw_MailCTR Resource RidsNrrPMColumbia Resource RidsNrrLAJBurkhardt Resource RidsRgn4MailCenter Resource RidsNrrDeEvib Resource RidsNrrDorlLpl4-1 Resource ADAMS Accession No. ML 15191 A360 OFFICE NRR/DORL/LPL4-1 /PM NRR/DORL/LPL4-1/LA NRR/DE/EVIB/BC NAME BSingal JBurkhardt JMcHale DATE 7/13/15 7/13/15 8/27/15 OFFICIAL RECORD COPY JPoehler, NRR/DE/EVIB GCheruvenki, NRR/DE/EVIB N RR/DORL/LPL4-1 /BC NRR/DORL/LPL4-1 /PM MMarkley BSingal 9/1/15 9/1/15}} | | M. Reddemann submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. |
| | Therefore, the versions of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. |
| | Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. |
| | If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. |
| | If you have any questions regarding this matter, I may be reached at (301) 415-3016 or via e-mail at Balwant.Singal@nrc.gov. |
| | Sincerely, B~r\ c~1 ~~ |
| | Balwant K. Singal, Senior Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-397 cc: Lisa K. Schichlein Senior Project Manager, NPP/Services Licensing Regulatory Affairs GE-Hitachi Nuclear Energy Americas, LLC 3901 Castle Hayne Road, MIC A-65 Wilmington, NC 28401 Additional distribution via Listserv |
| | |
| | ML15191A360 OFFICE NRR/DORL/LPL4-1 /PM NRR/DORL/LPL4-1/LA NRR/DE/EVIB/BC N RR/DORL/LPL4-1 /BC NRR/DORL/LPL4-1 /PM NAME BSingal JBurkhardt JMcHale MMarkley BSingal DATE 7/13/15 7/13/15 8/27/15 9/1/15 9/1/15}} |
Letter Sequence Withholding Request Acceptance |
---|
|
|
|
|
---|
Category:Letter
MONTHYEARGO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan IR 05000397/20230042024-01-29029 January 2024 Integrated Inspection and Independent Spent Fuel Storage Installation Report 05000397/2023004 and 07200035/2023001 GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing2024-01-29029 January 2024 Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing ML24011A1522024-01-10010 January 2024 March 2024 Emergency Preparedness Exercise Inspection-Request for Information GO2-24-005, Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-1702024-01-0808 January 2024 Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-170 GO2-23-136, Guarantee of Payment of Deferred Premium2023-12-20020 December 2023 Guarantee of Payment of Deferred Premium GO2-23-135, Notice of Readiness for Supplemental Inspection2023-12-14014 December 2023 Notice of Readiness for Supplemental Inspection GO2-23-130, Reply to a Notice of Violation; EA-23-0542023-12-14014 December 2023 Reply to a Notice of Violation; EA-23-054 GO2-23-105, Licensing Basis Document Update and Biennial Commitment Change Report2023-12-12012 December 2023 Licensing Basis Document Update and Biennial Commitment Change Report ML23288A0002023-12-0707 December 2023 Issuance of Amendment No. 272 to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position GO2-23-107, Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation2023-12-0505 December 2023 Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-23-126, Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-012023-11-28028 November 2023 Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-01 GO2-23-121, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-27027 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000397/20230122023-11-20020 November 2023 Commercial Grade Dedication Inspection Report 05000397/2023012 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000397/20230102023-11-0909 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000397/2023010 IR 05000397/20230932023-11-0101 November 2023 Final Significance Determination of a White Finding, Notice of Violation and Follow-Up Assessment Letter; NRC Inspection Report 05000397/2023093 ML23299A2072023-10-26026 October 2023 Biennial Requalification Inspection Request for Information IR 05000397/20230032023-10-25025 October 2023 Integrated Inspection Report 05000397/2023003 IR 05000397/20230112023-10-0404 October 2023 License Renewal Phase 2 Report 05000397/2023011 IR 05000397/20234012023-09-11011 September 2023 Security Baseline Inspection Report 05000397/2023401 GO2-23-097, In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26)2023-09-0606 September 2023 In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26) ML24032A2182023-09-0101 September 2023 Information Request, Security IR 2024401 GO2-23-100, Technical Specification Section 5.6.4 Post Accident Monitoring Instrumentation 14-Day Report for Inoperable Suppression Pool Level Indication2023-08-31031 August 2023 Technical Specification Section 5.6.4 Post Accident Monitoring Instrumentation 14-Day Report for Inoperable Suppression Pool Level Indication GO2-23-056, Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2023-08-29029 August 2023 Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling IR 05000397/20230052023-08-22022 August 2023 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2023005) - Mid Year Letter IR 05000397/20230022023-08-0101 August 2023 Integrated Inspection Report 05000397/2023002 GO2-23-093, Supplement to Reply to a Notice of Violation: EA-21-1702023-07-27027 July 2023 Supplement to Reply to a Notice of Violation: EA-21-170 ML23206A2442023-07-25025 July 2023 Energy Northwest Columbia Generating Station, Response to Apparent Violation in NRC Inspection Report 05000397/2023092; EA-23-054 GO2-23-068, Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation2023-07-19019 July 2023 Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation GO2-23-090, Reply to a Notice of Violation2023-07-12012 July 2023 Reply to a Notice of Violation ML23143A1202023-06-27027 June 2023 Request Number 4ISI-11 to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Regarding Alternate Examination of Reactor Vessel Welds GO2-23-073, Notification of NPDES Permit Issuance2023-06-26026 June 2023 Notification of NPDES Permit Issuance ML23163A2502023-06-12012 June 2023 Summary of Changes and Analysis for Revision 41 of Plant Procedures Manual 13.8.1 Emergency Dose Projection System Operations GO2-23-072, Cycle 27 Core Operating Limits Report2023-06-0505 June 2023 Cycle 27 Core Operating Limits Report ML23157A2702023-06-0101 June 2023 4-2022-011 -022 Letter - OI Closure to Licensee IR 05000397/20230922023-06-0101 June 2023 NRC Inspection Report 05000397/2023092 and Preliminary White Finding IR 05000397/20230902023-06-0101 June 2023 Final Significance Determination of a White Finding, Notice of Violation and Follow-Up Assessment Letter; NRC Inspection Report 05000397/2023090 GO2-23-055, Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report IR 05000397/20230012023-05-0505 May 2023 Integrated Inspection Report 05000397/2023001 - April 26, 2023 GO2-23-006, License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications2023-05-0101 May 2023 License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications IR 05000397/20233012023-05-0101 May 2023 NRC Examination Report 05000397/2023301 GO2-23-053, 2022 Annual Environmental Operating Report2023-04-26026 April 2023 2022 Annual Environmental Operating Report GO2-23-057, 2022 Annual Radioactive Effluent Release Report2023-04-25025 April 2023 2022 Annual Radioactive Effluent Release Report ML23110A2642023-04-20020 April 2023 Request for Information License Renewal Phase 2 Inspection GO2-23-012, Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2023-03-27027 March 2023 Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position GO2-23-041, Generation Station - Level of Financial Protection - Annual Reporting Requirement2023-03-15015 March 2023 Generation Station - Level of Financial Protection - Annual Reporting Requirement GO2-23-038, Plant Decommissioning Fund Status Report2023-03-15015 March 2023 Plant Decommissioning Fund Status Report ML23013A0812023-03-15015 March 2023 Issuance of Amendment No. 270 Revision to Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times-RITSTF Initiative 4B GO2-23-034, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462023-03-13013 March 2023 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 2024-01-08
[Table view] Category:Proprietary Information Review
MONTHYEARML22200A2612022-08-0909 August 2022 Request for Withholding Information from Public Disclosure ML22048C2142022-02-22022 February 2022 Request for Withholding Information from Public Disclosure ML20336A0612021-01-0707 January 2021 Request for Withholding Information from Public Disclosure ML17087A5692017-04-12012 April 2017 Request for Withholding Information from Public Disclosure for Columbia Generating Station ML16207A0332016-09-14014 September 2016 Request for Withholding from Public Disclosure - 5/18/16 Affidavit Executed by E. Hauser, Caldon Ultrasonics Technology Center, Cameron Engineering Report ER-1049, Revision 3 ML16207A0162016-09-14014 September 2016 Request for Withholding from Public Disclosure - 5/18/16 Affidavit Executed by E. Hauser, Caldon Ultrasonics Technology Center, Cameron Engineering Report ER-1074, Revision 0 ML16246A2812016-09-14014 September 2016 Request for Withholding Information from Public Disclosure, 6/9/16 Affidavit Executed by J. Harrison, GE-Hitachi and 6/14/16 Affidavit Executed by N. Wilmshurst, EPRI, Related to NEDC-33853P, Revision 0 ML15191A3602015-09-0101 September 2015 Request for Withholding Information from Public Disclosure - 2/20/15 Affiidavit Executed by L. Schichlein, GE-Hitachi Jet Pump 17/18 Riser Evaluation Dated February 2015 ML15086A0562015-04-14014 April 2015 Request for Withholding Information from Public Disclosure, 3/13/15 Affidavit Executed by L. Trosman, General Electric-Hitachi Nuclear Energy Americas, GNF-001N8896-R2-P ML15040A1382015-02-26026 February 2015 Request for Withholding Information from Public Disclosure, 10/21/14 Affidavit Executed by J. Harrison, General Electric-Hitachi Nuclear Energy Americas, GNF-001N8896-R2-P ML14056A1202014-03-0505 March 2014 Request for Withholding Information from Public Disclosure ML13235A0032013-08-23023 August 2013 Request for Withholding Information from Public Disclosure - 7/25/13 Affidavit Executed by L. Dolan, GEH; Enclosures 1 of Geh'S Response to Request for Additional Information Round 4 ML13109A1632013-04-26026 April 2013 Request for Withholding Information from Public Disclosure - 4/2/13 and 4/10/13 Affidavits Executed by L. Dolan, GEH; Enclosures 1 and 3 of Geh'S Request for Additional Information Responses ML13025A3512013-02-21021 February 2013 Request for Withholding Information from Public Disclosure, Affidavit Dated 12/12/12, Executed by L. Dolan, GE Hitachi Americas LLC, NEDC-33685P, Revision 2 ML13025A3612013-02-21021 February 2013 Request for Withholding Information from Public Disclosure, Affidavit Dated 12/12/12, Executed by L. Dolan, GE Hitachi Americas LLC, NEDC-33698P, Revision 2 ML12345A3662012-12-18018 December 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 11/1/12 Executed by E. Schrull, GEH-Hitachi, NEDC-33789P, Revision 0 ML12345A3582012-12-18018 December 2012 Request for Withholding Information from Public Disclosure, 9/26/12 Affidavit Executed by E.Schrull, GEH-Hitachi, GEH 10/5/12 Responses to Nrc/De/Eicb 9/5/12 Request for Additional Information ML12229A4712012-12-18018 December 2012 Request for Withholding Information from Public Disclosure, 6/29/12 and 10/22/12 Affidavits Executed by E. Schrull, GEH-Hitachi, NEDC-33751P, Revisions 2 and 3 ML12192A4812012-11-13013 November 2012 Request for Withholding Information from Public Disclosure, Affidavits Dated 11/16/11 and 7/26/12, Executed by E. Schrull, GE Hitachi Americas LLC, NEDC-33696P, Revisions 0 and 1 ML12229A4902012-11-13013 November 2012 Request for Withholding Information from Public Disclosure, 6/12/12 Affidavit Executed by E. Schrull, GEH-Hitachi, Letter GE-MS-CT-106244-JC14 ML12229A4682012-11-13013 November 2012 Request for Withholding Information from Public Disclosure, 6/4/12 Affidavit Executed by E. Schrull, GEH-Hitachi, NEDC-33750P, Revision 0 ML12229A4762012-11-13013 November 2012 Request for Withholding Information from Public Disclosure, 6/7/12 Affidavit Executed by E. Schrull, GEH-Hitachi, NEDC-33753P, Revision 0 ML12229A4802012-11-13013 November 2012 Request for Withholding Information from Public Disclosure, 6/7/12 Affidavit Executed by E. Schrull, GEH-Hitachi, NEDC-33754P, Revision 0 ML12229A4822012-11-13013 November 2012 Request for Withholding Information from Public Disclosure, 6/27/12 Affidavit Executed by E. Schrull, GEH-Hitachi, NEDC-33756P, Revision 0 ML12229A4832012-11-13013 November 2012 Request for Withholding Information from Public Disclosure, 6/7/12 Affidavit Executed by E. Schrull, GEH-Hitachi, NEDC-33758P, Revision 0 ML12193A1092012-07-30030 July 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 1/27/12, Executed by E. Schrull, GE Hitachi Americas LLC, NEDC-33507P, Revision 1 ML12192A5892012-07-30030 July 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 1/5/12, Executed by E. Schrull, GE Hitachi Americas LLC, NEDC-33698P, Revision 1 ML12192A5352012-07-30030 July 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 1/5/12, Executed by E. Schrull, GE Hitachi Americas LLC, NEDC-33697P, Revision 1 ML12192A4542012-07-30030 July 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 1/5/12, Executed by E. Schrull, GE Hitachi Americas LLC, NEDC-33694P, Revision 1 ML12192A4332012-07-30030 July 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 11/1/11, Executed by E. Schrull, GE Hitachi Americas LLC, NEDC-33690P, Revision 0 ML12192A3612012-07-30030 July 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 1/5/12 Executed by E. Schrull, GE Hitachi Americas LLC, NEDC-33685P, Revision 1 ML12192A3252012-07-30030 July 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 10/31/11 Executed by E. Schrull, GE Hitachi Americas LLC, 0000-0101-7647-R3 Plant-Specific Responses Required by NEDC-32410P-P-A ML0900602232009-01-0808 January 2009 Request for Withholding Information from Public Disclosure ML0820504672008-09-0303 September 2008 Request for Withholding Information from Public Disclosure ML0422304932004-08-10010 August 2004 Withholding from Public Disclosure, NEDC-33144P, Pressure-Temperature Curves for Energy Northwest Columbia 2022-08-09
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 1, 2015 Mr. Mark E. Reddemann Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023)
Richland, WA 99352-0968
SUBJECT:
COLUMBIA GENERATING STATION - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. MF6208)
Dear Mr. Reddemann:
By letter dated August 13, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15238A773), Energy Northwest submitted an affidavit executed by Ms. Lisa K. Schichlein, Senior Project Manager, GE-Hitachi Nuclear Energy Americas LLC (GEH), dated August 7, 2015, requesting that information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2. Section 2.390:
GEH Report No. 001 N6043.5, "Energy Northwest Columbia Generating Station Jet Pump 17/18 Rise Evaluation at 106% [percent] Rate Core Flow (115 Mlbs/hr
[Million Pounds per Hour])," Revision 2, dated August 2015 The information is included in Enclosure 1 to Energy Northwest's letter dated August 13, 2015.
A nonproprietary version of Report No. 001 N6043.5, designated as Enclosure 2, to Energy Northwest's letter dated August 13, 2015, has been placed in the U.S. Nuclear Regulatory Commission's (NRC's) Public Document Room and added to ADAMS in the NRC Library at Accession No. ML15238A745.
The affidavit stated that the information sought to be withheld is considered to be proprietary for the reasons below:
- a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEH's competitors without license from GEH constitutes a competitive economic advantage over other companies;
- b. Information that, if used by a competitor, would reduce his expenditure of resources or improve his competitive position 1n the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavits, have determined that the
M. Reddemann submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the versions of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at (301) 415-3016 or via e-mail at Balwant.Singal@nrc.gov.
Sincerely, B~r\ c~1 ~~
Balwant K. Singal, Senior Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-397 cc: Lisa K. Schichlein Senior Project Manager, NPP/Services Licensing Regulatory Affairs GE-Hitachi Nuclear Energy Americas, LLC 3901 Castle Hayne Road, MIC A-65 Wilmington, NC 28401 Additional distribution via Listserv
ML15191A360 OFFICE NRR/DORL/LPL4-1 /PM NRR/DORL/LPL4-1/LA NRR/DE/EVIB/BC N RR/DORL/LPL4-1 /BC NRR/DORL/LPL4-1 /PM NAME BSingal JBurkhardt JMcHale MMarkley BSingal DATE 7/13/15 7/13/15 8/27/15 9/1/15 9/1/15