|
|
(8 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML18093A387 | | | number = ML18093A387 |
| | issue date = 03/28/2018 | | | issue date = 03/28/2018 |
| | title = Surry, Units 1 and 2, Submittal of Annual Changes, Tests, an Experiments Report Regulatory Commitment Evaluation Report | | | title = Submittal of Annual Changes, Tests, an Experiments Report Regulatory Commitment Evaluation Report |
| | author name = Garver R M | | | author name = Garver R |
| | author affiliation = Virginia Electric & Power Co (VEPCO) | | | author affiliation = Virginia Electric & Power Co (VEPCO) |
| | addressee name = | | | addressee name = |
Line 15: |
Line 15: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 MAR 2 8 2018 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 ANNUAL CHANGES, TESTS, AND EXPERIMENTS REPORT REGULATORY COMMITMENT EVALUATION REPORT | | {{#Wiki_filter:VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 MAR 2 8 2018 U.S. Nuclear Regulatory Commission Serial No. 18-071 Attn: Document Control Desk SPS/TSC: RO Washington, DC 20555-0001 Docket Nos. . 50-280 50-281 License Nos. DPR-32 DPR-37 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 ANNUAL CHANGES, TESTS, AND EXPERIMENTS REPORT REGULATORY COMMITMENT EVALUATION REPORT |
|
| |
|
| ==Dear Sir or Madam,== | | ==Dear Sir or Madam,== |
| Serial No. SPS/TSC: Docket Nos. License Nos. 18-071 RO . 50-280 50-281 DPR-32 DPR-37 Virginia Electric and Power Company hereby submits the annual report of Changes, Tests, and Experiments pursuant to 1 OCFR50.59(d)(2) implemented at Surry Power Station. Attachment 1 provides the descriptions and summaries of two Regulatory Evaluations completed in 2016 and one completed in 2017. There were no Regulatory Commitment Change Evaluations completed in 2017. Should you have any questions regarding this report, please contact Barry Garber at (757) 365-2725. Very truly yours, Robert M. Garver II Director Nuclear Safety & Licensing Surry Power Station Attachment Commitments made in this letter: None cc: United States Nuclear Regulatory Commission, Region II Marquis One Tower, Suite 12QO 245 Peachtree Center Avenue, NE Atlanta, Georgia 30303-1257 NRC Senior Resident Inspector Surry Power Station Surry Units 1 & 2 Serial No. 18-071 10 CFR 50.59 Report Page 1 of 4 10 CFR 50.59 Changes, Tests, and Experiments SPS-EVAL-2016-0006 Regulatory Evaluation 06/02/2016
| |
|
| |
|
| == Description:==
| | Virginia Electric and Power Company hereby submits the annual report of Changes, Tests, and Experiments pursuant to 10CFR50.59(d)(2) implemented at Surry Power Station. provides the descriptions and summaries of two Regulatory Evaluations completed in 2016 and one completed in 2017. There were no Regulatory Commitment Change Evaluations completed in 2017. |
| This evaluation reviewed the installation of digital temperature controllers for Unit 1 and Unit 2 Refueling Water Storage Tank (RWST) level instrumentation. The RWST level instruments provide RWST level signals to the Engineered Safeguards actuation system. The RWST level instruments are not physically connected to the temperature controllers but depend on them to ensure functionality in freezing weather. The replacement nuclear qualified RWST level freeze protection controllers provide sensing, indication, and relay operation that emulate the original controllers. Power supply schemes are maintained. The new controllers were evaluated to be equally reliable to the currently installed controllers. The change requires a regulatory evaluation due to the use of digital heat trace temperature controllers. Summary: The evaluation determined the following: 1. The equipment affected by the modification is designed for accident mitigation and cannot initiate an accident. Therefore the frequency of occurrence of an accident due to the modification is not increased. 2. This evaluation reviews the installation of Safety Related (SR), seismically qualified instrumentation with demonstrated reliability and no connectivity that could trigger a common cause failure. There is no change in redundancy, diversity, or separation between trains. Software quality has been validated. The failure modes of the digital controllers are the same as those of the existing analog controllers. The SR electrical supply breaker will continue to protect the vital bus from downstream faults. Therefore: a. an increase in the likelihood of a malfunction of an System, Structure or Component (SSC) is less than minimal. b. the increase in consequences of an accident is less than minimal. c. the increase in consequences of a malfunction of an SSC important to safety is less than minimal. d. there is no plausible possibility of a malfunction of an SSC important to safety with a different result than previously evaluated in the SAR. 3. The modification does not involve a design basis limit for a fission product barrier or a method of evaluation. Surry Units 1 & 2 Serial No. 18-071 10 CFR 50.59 Report Page 2 of 4 10 CFR 50.59 Changes, Tests, and Experiments SPSO-EVAL-2016-0010 Regulatory Evaluation 10/27/2016
| | Should you have any questions regarding this report, please contact Barry Garber at (757) 365-2725. |
| | Very truly yours, Robert M. Garver II Director Nuclear Safety & Licensing Surry Power Station Attachment Commitments made in this letter: None cc: United States Nuclear Regulatory Commission, Region II Marquis One Tower, Suite 12QO 245 Peachtree Center Avenue, NE Atlanta, Georgia 30303-1257 NRC Senior Resident Inspector Surry Power Station |
|
| |
|
| == Description:==
| | Serial No. 18-071 10 CFR 50.59 Report Page 1 of 4 Attachment 1 Surry Units 1 & 2 10 CFR 50.59 Changes, Tests, and Experiments SPS-EVAL-2016-0006 Regulatory Evaluation 06/02/2016 |
| This evaluation reviewed a modification that defeats the UFSAR described automatic rod withdrawal (ARW) function of the Rod Assembly Control system. Automatic rod insertion, manual rod operation, and protective tripping functions are not affected. The modification was performed on Units 1 and 2 in order to prevent undesired rod withdrawal (positive reactivity addition) due to process noise or control system malfunction. Defeat of the ARW function prevents automatic rod withdrawal control system response to load increases. Manual action is now required to position the control rods in response to an increase in load. This constitutes substitution of manual control for automatic control and therefore this activity required a 1 OCFR50.59 evaluation. Note that the automatic control function has not typically been used at Surry; unit loading is performed manually. Summary: 1. Rod assembly control does not interface with the Reactor Protection System (RPS) or the Engineered Safety Feature Actuation System (ESFAS). Existing UFSAR Chapter 14, Safety Analysis, sections concerning control rod assemblies remain bounding. Plant response to operational transients described in UFSAR Chapter 7, Instrumentation and Control, remains stable. Therefore, the increase in frequency of occurrence of an accident described in the Safety Analysis Report (SAR) is less than minimal. 2. The modification to the automatic rod assembly control system disables ARW by disconnecting leads that transmit the ARW signal from the Reactor Control system to the Rod Control system. No additional equipment is installed, and no new failure modes are introduced. The increase in likelihood of malfunction of a plant SSC (rod assemblies, rod control and protection functions) due to operational effects of defeating ARW is less than minimal. 3. Automatic rod assembly withdrawal is not credited for accident mitigation. The presence or absence of ARW does not impact the consequences of any previously evaluated accident. 4. No new failure modes have been introduced. UFSAR Chapter 14 events have been evaluated for the impact of this activity on control rod assembly function in automatic and in manual control. Defeat of ARW does not affect automatic control rod insertion or manual rod control. There is no possibility of a failure of an SSC important to safety with a different result than previously evaluated. There is no change to RPS or ESFAS set points, instrument uncertainty, or safety analysis limits. Therefore, the modification does not create the possibility of an accident of a different type than previously evaluated.
| |
| Serial No. 18-071 10 CFR 50.59 Report Page 3 of 4 5. No design basis limit for a fission product barrier is exceeded or altered. 6. The transients were analyzed using the existing LOFTRAN computer code with Surry input parameters. Therefore, this activity does not result in a departure from a method of evaluation described in the SAR. Surry Units 1 & 2 10 CFR 50.59 Changes, Tests, and Experiments SPSO-EVAL-2017-0005 Regulatory Evaluation | |
|
| |
|
| == Description:== | | == |
| Serial No. 18-071 10 CFR 50.59 Report Page 4 of 4 12/19/2017 This evaluation reviewed a licensing basis change for Surry Units 1 and 2 which incorporates a minor revision (Minor Revision 2) of NRC approved Topical Report FRD-42-A, "Reload Nuclear Design Methodology," Revision 2. This activity added a new core physics methodology, CMS5, as described in NRC approved Topical Report SSP-14-P01/028-TR-P-A, "Generic Application of the Studsvik Scandpower Core Management System to Pressurized Water Reactors." The core physics analytical model, CMS5, was found to be acceptable for core reload design. This Evaluation also reviewed and found acceptable the removal of references to and descriptions of the now obsolete PDQ Two Zone/NOMAD analytical model. A 1 OCFR50.59 evaluation was required because the changes described above were to methods of evaluation described in the UFSAR that were outside the limitations identified in topical report, VEP-FRD-42-A, and were therefore considered adverse. Evaluation: The justification for making these changes without submitting a license amendment relies on the provisions under 1 OCFR50.59 for licensees to change from one method of evaluation to another. The USA 50.59 Resource Manual provides guidance concerning when a change is not considered a departure from a method of evaluation described in the UFSAR. The change is not a departure if it involves the " ... Use of a new NRG-approved methodology (e.g., new or upgraded computer code) to reduce uncertainty, provide more precise results, or other reason, provided such use is: a. Based on sound engineering practice b. Appropriate for the intended application c. | | Description:== |
| * Within the limitations of the applicable SER" Based upon the conclusions of a GL 83-11, Supplement 1 evaluation, as directed by the USA 50.59 Resource Manual, incorporating CMS5 into the list of VEP-FRD-42-A analytical models meets these three criteria. Therefore, the inclusion of the CMS5 methodology as a new analytical model to VEP-FRD-42-A is fully consistent with the provisions of 1 OCFR50.59.}} | | |
| | This evaluation reviewed the installation of digital temperature controllers for Unit 1 and Unit 2 Refueling Water Storage Tank (RWST) level instrumentation. The RWST level instruments provide RWST level signals to the Engineered Safeguards actuation system. |
| | The RWST level instruments are not physically connected to the temperature controllers but depend on them to ensure functionality in freezing weather. The replacement nuclear qualified RWST level freeze protection controllers provide sensing, indication, and relay operation that emulate the original controllers. Power supply schemes are maintained. |
| | The new controllers were evaluated to be equally reliable to the currently installed controllers. The change requires a regulatory evaluation due to the use of digital heat trace temperature controllers. |
| | Summary: |
| | The evaluation determined the following: |
| | : 1. The equipment affected by the modification is designed for accident mitigation and cannot initiate an accident. Therefore the frequency of occurrence of an accident due to the modification is not increased. |
| | : 2. This evaluation reviews the installation of Safety Related (SR), seismically qualified instrumentation with demonstrated reliability and no connectivity that could trigger a common cause failure. There is no change in redundancy, diversity, or separation between trains. Software quality has been validated. The failure modes of the digital controllers are the same as those of the existing analog controllers. The SR electrical supply breaker will continue to protect the vital bus from downstream faults. Therefore: |
| | : a. an increase in the likelihood of a malfunction of an System, Structure or Component (SSC) is less than minimal. |
| | : b. the increase in consequences of an accident is less than minimal. |
| | : c. the increase in consequences of a malfunction of an SSC important to safety is less than minimal. |
| | : d. there is no plausible possibility of a malfunction of an SSC important to safety with a different result than previously evaluated in the SAR. |
| | : 3. The modification does not involve a design basis limit for a fission product barrier or a method of evaluation. |
| | |
| | Serial No. 18-071 10 CFR 50.59 Report Page 2 of 4 Attachment 1 Surry Units 1 & 2 10 CFR 50.59 Changes, Tests, and Experiments SPSO-EVAL-2016-0010 Regulatory Evaluation 10/27/2016 |
| | |
| | == |
| | Description:== |
| | |
| | This evaluation reviewed a modification that defeats the UFSAR described automatic rod withdrawal (ARW) function of the Rod Assembly Control system. Automatic rod insertion, manual rod operation, and protective tripping functions are not affected. The modification was performed on Units 1 and 2 in order to prevent undesired rod withdrawal (positive reactivity addition) due to process noise or control system malfunction. Defeat of the ARW function prevents automatic rod withdrawal control system response to load increases. |
| | Manual action is now required to position the control rods in response to an increase in load. This constitutes substitution of manual control for automatic control and therefore this activity required a 10CFR50.59 evaluation. Note that the automatic control function has not typically been used at Surry; unit loading is performed manually. |
| | Summary: |
| | : 1. Rod assembly control does not interface with the Reactor Protection System (RPS) or the Engineered Safety Feature Actuation System (ESFAS). Existing UFSAR Chapter 14, Safety Analysis, sections concerning control rod assemblies remain bounding. Plant response to operational transients described in UFSAR Chapter 7, Instrumentation and Control, remains stable. Therefore, the increase in frequency of occurrence of an accident described in the Safety Analysis Report (SAR) is less than minimal. |
| | : 2. The modification to the automatic rod assembly control system disables ARW by disconnecting leads that transmit the ARW signal from the Reactor Control system to the Rod Control system. No additional equipment is installed, and no new failure modes are introduced. The increase in likelihood of malfunction of a plant SSC (rod assemblies, rod control and protection functions) due to operational effects of defeating ARW is less than minimal. |
| | : 3. Automatic rod assembly withdrawal is not credited for accident mitigation. The presence or absence of ARW does not impact the consequences of any previously evaluated accident. |
| | : 4. No new failure modes have been introduced. UFSAR Chapter 14 events have been evaluated for the impact of this activity on control rod assembly function in automatic and in manual control. Defeat of ARW does not affect automatic control rod insertion or manual rod control. There is no possibility of a failure of an SSC important to safety with a different result than previously evaluated. There is no change to RPS or ESFAS set points, instrument uncertainty, or safety analysis limits. Therefore, the modification does not create the possibility of an accident of a different type than previously evaluated. |
| | |
| | Serial No. 18-071 10 CFR 50.59 Report Page 3 of 4 |
| | : 5. No design basis limit for a fission product barrier is exceeded or altered. |
| | : 6. The transients were analyzed using the existing LOFTRAN computer code with Surry input parameters. Therefore, this activity does not result in a departure from a method of evaluation described in the SAR. |
| | |
| | Serial No. 18-071 10 CFR 50.59 Report Page 4 of 4 Attachment 1 Surry Units 1 & 2 10 CFR 50.59 Changes, Tests, and Experiments SPSO-EVAL-2017-0005 Regulatory Evaluation 12/19/2017 |
| | |
| | == |
| | Description:== |
| | |
| | This evaluation reviewed a licensing basis change for Surry Units 1 and 2 which incorporates a minor revision (Minor Revision 2) of NRC approved Topical Report VEP-FRD-42-A, "Reload Nuclear Design Methodology," Revision 2. This activity added a new core physics methodology, CMS5, as described in NRC approved Topical Report SSP P01/028-TR-P-A, "Generic Application of the Studsvik Scandpower Core Management System to Pressurized Water Reactors." The core physics analytical model, CMS5, was found to be acceptable for core reload design. This Evaluation also reviewed and found acceptable the removal of references to and descriptions of the now obsolete PDQ Two Zone/NOMAD analytical model. |
| | A 10CFR50.59 evaluation was required because the changes described above were to methods of evaluation described in the UFSAR that were outside the limitations identified in topical report, VEP-FRD-42-A, and were therefore considered adverse. |
| | Evaluation: |
| | The justification for making these changes without submitting a license amendment relies on the provisions under 10CFR50.59 for licensees to change from one method of evaluation to another. The USA 50.59 Resource Manual provides guidance concerning when a change is not considered a departure from a method of evaluation described in the UFSAR. The change is not a departure if it involves the " ... Use of a new NRG-approved methodology (e.g., new or upgraded computer code) to reduce uncertainty, provide more precise results, or other reason, provided such use is: |
| | : a. Based on sound engineering practice |
| | : b. Appropriate for the intended application |
| | : c. |
| | * Within the limitations of the applicable SER" Based upon the conclusions of a GL 83-11, Supplement 1 evaluation, as directed by the USA 50.59 Resource Manual, incorporating CMS5 into the list of VEP-FRD-42-A analytical models meets these three criteria. |
| | Therefore, the inclusion of the CMS5 methodology as a new analytical model to VEP-FRD-42-A is fully consistent with the provisions of 10CFR50.59.}} |
Similar Documents at Surry |
---|
Category:Annual Operating Report
MONTHYEARML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23118A2512023-04-28028 April 2023 Submittal of 2022 Annual Radiological Environmental Operating Report ML23118A2652023-04-28028 April 2023 Submittal of 2022 Annual Radiological Effluent Release Report ML22179A3102022-06-22022 June 2022 Connecticut, Inc - 2021 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirement of 10 CFR 50.46 ML22118A3462022-04-28028 April 2022 Annual Radioactive Effluent Release Report ML22126A1022022-04-25025 April 2022 Annual Radiological Environmental Operating Report ML21120A3252021-04-30030 April 2021 Submittal of Annual Radioactive Effluent Release Report ML21119A2262021-04-28028 April 2021 Independent Spent Fuel Storage Installation Annual Radiological Environmental Operating Report ML21116A0192021-04-23023 April 2021 Annual Changes, Tests, and Experiments Report Regulatory Commitment Evaluation Report ML20181A5392020-06-29029 June 2020 Submittal of 2019 Annual Report of Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML19179A1472019-06-21021 June 2019 2018 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML19093A4922019-04-0303 April 2019 Submit Semiannual Operating Report for July 1 Through December 31, 1975, Volume 2 ML19098A1642019-04-0101 April 2019 Submittal of Annual Changes, Tests, and Experiments Report - Regulatory Commitment Evaluation Report ML18184A3462018-06-28028 June 2018 2017 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML18130A5922018-04-30030 April 2018 Independent Spent Fuel Storage Installation 2017 Annual Radiological Environmental Operating Report ML18130A5902018-04-30030 April 2018 Independent Spent Fuel Storage Installation Annual Radiological Environmental Operating Report ML18093A3872018-03-28028 March 2018 Submittal of Annual Changes, Tests, an Experiments Report Regulatory Commitment Evaluation Report ML17184A1462017-06-27027 June 2017 Transmittal of 2016 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML17139B4442017-04-27027 April 2017 ISFSI - Annual Radiological Environmental Operating Report ML17094A4092017-03-30030 March 2017 Submittal of 2016 Annual Changes, Tests and Experiments Report ML16179A2052016-06-21021 June 2016 2015 Annual Report of Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML16141A3722016-05-0202 May 2016 Annual Radioactive Effluent Release Report ML14188C0562014-06-27027 June 2014 Annual Report of Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML14122A2522014-04-26026 April 2014 Independent Spent Fuel Storage Installation, Submittal of Annual Radiological Environmental Operating Report ML13183A0682013-06-26026 June 2013 2012 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML13141A5832013-04-26026 April 2013 Independent Spent Fuel Storage Installation - Annual Radiological Environmental Operating Report ML13128A0702013-04-26026 April 2013 2012 Annual Radioactive Effluent Release Report ML13100A1182013-04-0101 April 2013 Annual Changes, Tests, and Experiments Report Regulatory Commitment Evaluation Report ML1219103392012-06-28028 June 2012 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML12130A2132012-04-25025 April 2012 Independent Spent Fuel Storage Installation - Annual Whole Body Exposure Report Annual Reactor Coolant Specific Activity Report ML1118004992011-06-27027 June 2011 2010 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46, Kewaunee, Millstone, North Anna, Surry ML11130A0232011-04-29029 April 2011 Submittal of Annual Radioactive Effluent Release Report ML11129A0732011-04-29029 April 2011 Independent Spent Fuel Storage Installation Annual Radiological Environmental Operating Report ML1105405372011-02-16016 February 2011 Independent Spent Fuel Storage Installation Annual Changes, Tests, and Experiments Report for January-December 2010 ML1023006522010-08-10010 August 2010 Retransmittal of Annual Changes, Tests & Experiments Report and Regulatory Commitment Evaluation Report for 2009 ML1018104352010-06-29029 June 2010 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML11237A0012010-04-30030 April 2010 Annual Radioactive Effluent Release Report for 2009 ML1013202292010-04-30030 April 2010 Independent Spent Fuel Storage Installation - Annual Radiological Environmental Operating Report ML1006805212010-02-25025 February 2010 Independent Spent Fuel Storage Installation (Isfsi), Submittal of Annual Radioactive Effluent Release Report for January 1, 2009 Through December 31, 2009 ML0918202722009-06-30030 June 2009 Submittal of 2008 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML0912501862009-04-24024 April 2009 Independent Spent Fuel Storage Installation, Annual Radiological Environmental Operating Report for 2008 ML0912405752009-04-24024 April 2009 2008 Annual Radioactive Effluent Release Report ML0909702862009-03-30030 March 2009 Submittal of Report of Facility Changes, Tests and Experiments, and Regulatory Commitment Changes for 2008 ML0829004942008-10-0202 October 2008 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J ML0817904372008-06-26026 June 2008 Annual Report of Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML0712401342007-04-30030 April 2007 Annual Radioactive Effluent Release Report for the Period January Through December 2006 ML0712307172007-04-30030 April 2007 Independent Spent Fuel Storage Installation - 2006 Annual Radiological Environmental Operating Report ML0518603972005-06-30030 June 2005 Annual Report of Emergency Core Cooling System Model Changes ML0413104842004-04-30030 April 2004 2003 Independent Spent Fuel Storage Installation Annual Radiological Environmental Operating Report 2024-06-25
[Table view] Category:Letter
MONTHYEARML24318C4622024-11-13013 November 2024 Emergency Plan Revision - Relocation of the Technical Support Center (TSC) - License Amendment Nos. 315 and 315 Updated Information Regarding TSC Ventilation Design IR 05000280/20240032024-11-12012 November 2024 Integrated Inspection Report 05000280-2024003 and 05000281-2024003 ML24302A1762024-10-22022 October 2024 Core Operating Limits Report Surry 2 Cycle 33 Pattern Hot Revision 0 ML24283A0702024-10-0707 October 2024 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J IR 05000280/20240102024-10-0202 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000280/2024010 and 05000281/2024010 ML24270A0022024-09-25025 September 2024 Inservice Inspection Owners Activity Report (OAR) ML24248A1712024-09-0303 September 2024 Proposed License Amendment Request - Temporary Service Water Supply to the Component Cooling Heat Exchangers IR 05000280/20240052024-08-26026 August 2024 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2024005 and 05000281-2024005), Rev 1 ML24219A2372024-08-23023 August 2024 Issuance of Amendment Nos. 319 and 319, Adoption of TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspection, ML24207A0402024-08-21021 August 2024 Summary of July 17, 2024, Public Meeting - TS 3.7/3.14 AOT for SW Piping Maintenance ML24164A0012024-08-12012 August 2024 Proposed Alternative Relief Request V-1 Inservice Testing of Pressure Isolation Valves (EPID l-2023-LLR-0060) IR 05000280/20240022024-08-0101 August 2024 Integrated Inspection Report 05000280/2024002 and 05000281/2024002 05000280/LER-2024-001, Troubleshooting Initiated Unknown Turbine Trip Feature in Control System2024-07-30030 July 2024 Troubleshooting Initiated Unknown Turbine Trip Feature in Control System ML24165A1232024-07-17017 July 2024 Proposed Alternative Relief Request P-1, P-2 Inservice Testing of Residual Heat and Containment Spray Pumps (EPID l-2023-LLR-0058) ML24165A2782024-07-17017 July 2024 Issuance of Amendment Nos. 318 and 318, Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection ML24190A4192024-07-0808 July 2024 Inservice Testing (IST) Program for Pumps and Valves Revised Sixth IST Interval Start Date and Updated Technical Specifications References for Alternative Request V-1 ML24179A2932024-07-0101 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24166A0622024-06-18018 June 2024 – Proposed Alternative Relief Request P-3, P-4 Inservice Testing of Boric Acid, Component Cooling Water Pumps ML24157A0542024-06-13013 June 2024 Audit Summary in Support of License Amendment Request for Proposed Reclassification of Low Head Safety Injection Flow Instrumentation Related to Regulatory Guide 1.97 ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24141A2862024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 IR 05000280/20244032024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 ML24141A2512024-05-20020 May 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable - Supplemental Information ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2302024-05-13013 May 2024 Core 1 Cycle 33 Pattern Mdr Revision 0 ML24130A2032024-05-0909 May 2024 Proposed License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections Supplemental Information ML24130A2492024-05-0909 May 2024 Submittal of Information in Support of Surry Power Station Unit 1 Thermal Shield Flexure Replacement Campaign ML24130A1192024-05-0707 May 2024 Inservice Test Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests - Response to Request for Additional Information Regarding Alternative Request V-1 ML24122C6522024-04-30030 April 2024 Annual Radiological Environmental Operating Report IR 05000280/20240012024-04-30030 April 2024 Integrated Inspection Report 05000280-2024001 and 05000281-2024001 ML24142A3852024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report IR 05000280/20244022024-04-29029 April 2024 Security Baseline Inspection Report 05000280/2024402 and 05000281/2024402 ML24122B3032024-04-29029 April 2024 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change IR 05000280/20240112024-04-24024 April 2024 Notification of Surry Power Station Comprehensive Engineering Team Inspection - U.S. NRC Inspection Report 05000280/2024011 and 05000281/2024011 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24108A1812024-04-15015 April 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable Supplemental Information ML24095A2172024-04-12012 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report ML24088A2482024-03-26026 March 2024 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests- Response to Request for Additional Information ML24087A2082024-03-22022 March 2024 Proposed License Amendment Request Addition of Containment Limiting Condition for Operation and Surveillance Requirements ML24078A2642024-03-21021 March 2024 – Regulatory Audit in Support of License Amendment Request to Proposed Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML24087A1522024-03-18018 March 2024 Annual Changes, Tests, and Experiments Report Regulatory Commitment Evaluation Report ML24023A5762024-03-0808 March 2024 Correction to Issuance of Amendment Nos. 315 and 315, Regarding Revised Emergency Plan for Relocation of the Technical Support Center IR 05000280/20230062024-02-28028 February 2024 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2023006 and 05000281/2023006 ML24032A4712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24057A0612024-02-19019 February 2024 And Virgil C. Summer Power Nuclear Stations - Nuclear Property Insurance Coverage ML24051A1782024-02-19019 February 2024 Proposed License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections IR 05000280/20230042024-02-0909 February 2024 Integrated Inspection Report 05000280/2023004 and 05000281/2023004 2024-09-03
[Table view] |
Text
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 MAR 2 8 2018 U.S. Nuclear Regulatory Commission Serial No.18-071 Attn: Document Control Desk SPS/TSC: RO Washington, DC 20555-0001 Docket Nos. . 50-280 50-281 License Nos. DPR-32 DPR-37 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 ANNUAL CHANGES, TESTS, AND EXPERIMENTS REPORT REGULATORY COMMITMENT EVALUATION REPORT
Dear Sir or Madam,
Virginia Electric and Power Company hereby submits the annual report of Changes, Tests, and Experiments pursuant to 10CFR50.59(d)(2) implemented at Surry Power Station. provides the descriptions and summaries of two Regulatory Evaluations completed in 2016 and one completed in 2017. There were no Regulatory Commitment Change Evaluations completed in 2017.
Should you have any questions regarding this report, please contact Barry Garber at (757) 365-2725.
Very truly yours, Robert M. Garver II Director Nuclear Safety & Licensing Surry Power Station Attachment Commitments made in this letter: None cc: United States Nuclear Regulatory Commission, Region II Marquis One Tower, Suite 12QO 245 Peachtree Center Avenue, NE Atlanta, Georgia 30303-1257 NRC Senior Resident Inspector Surry Power Station
Serial No.18-071 10 CFR 50.59 Report Page 1 of 4 Attachment 1 Surry Units 1 & 2 10 CFR 50.59 Changes, Tests, and Experiments SPS-EVAL-2016-0006 Regulatory Evaluation 06/02/2016
==
Description:==
This evaluation reviewed the installation of digital temperature controllers for Unit 1 and Unit 2 Refueling Water Storage Tank (RWST) level instrumentation. The RWST level instruments provide RWST level signals to the Engineered Safeguards actuation system.
The RWST level instruments are not physically connected to the temperature controllers but depend on them to ensure functionality in freezing weather. The replacement nuclear qualified RWST level freeze protection controllers provide sensing, indication, and relay operation that emulate the original controllers. Power supply schemes are maintained.
The new controllers were evaluated to be equally reliable to the currently installed controllers. The change requires a regulatory evaluation due to the use of digital heat trace temperature controllers.
Summary:
The evaluation determined the following:
- 1. The equipment affected by the modification is designed for accident mitigation and cannot initiate an accident. Therefore the frequency of occurrence of an accident due to the modification is not increased.
- 2. This evaluation reviews the installation of Safety Related (SR), seismically qualified instrumentation with demonstrated reliability and no connectivity that could trigger a common cause failure. There is no change in redundancy, diversity, or separation between trains. Software quality has been validated. The failure modes of the digital controllers are the same as those of the existing analog controllers. The SR electrical supply breaker will continue to protect the vital bus from downstream faults. Therefore:
- a. an increase in the likelihood of a malfunction of an System, Structure or Component (SSC) is less than minimal.
- b. the increase in consequences of an accident is less than minimal.
- c. the increase in consequences of a malfunction of an SSC important to safety is less than minimal.
- d. there is no plausible possibility of a malfunction of an SSC important to safety with a different result than previously evaluated in the SAR.
- 3. The modification does not involve a design basis limit for a fission product barrier or a method of evaluation.
Serial No.18-071 10 CFR 50.59 Report Page 2 of 4 Attachment 1 Surry Units 1 & 2 10 CFR 50.59 Changes, Tests, and Experiments SPSO-EVAL-2016-0010 Regulatory Evaluation 10/27/2016
==
Description:==
This evaluation reviewed a modification that defeats the UFSAR described automatic rod withdrawal (ARW) function of the Rod Assembly Control system. Automatic rod insertion, manual rod operation, and protective tripping functions are not affected. The modification was performed on Units 1 and 2 in order to prevent undesired rod withdrawal (positive reactivity addition) due to process noise or control system malfunction. Defeat of the ARW function prevents automatic rod withdrawal control system response to load increases.
Manual action is now required to position the control rods in response to an increase in load. This constitutes substitution of manual control for automatic control and therefore this activity required a 10CFR50.59 evaluation. Note that the automatic control function has not typically been used at Surry; unit loading is performed manually.
Summary:
- 1. Rod assembly control does not interface with the Reactor Protection System (RPS) or the Engineered Safety Feature Actuation System (ESFAS). Existing UFSAR Chapter 14, Safety Analysis, sections concerning control rod assemblies remain bounding. Plant response to operational transients described in UFSAR Chapter 7, Instrumentation and Control, remains stable. Therefore, the increase in frequency of occurrence of an accident described in the Safety Analysis Report (SAR) is less than minimal.
- 2. The modification to the automatic rod assembly control system disables ARW by disconnecting leads that transmit the ARW signal from the Reactor Control system to the Rod Control system. No additional equipment is installed, and no new failure modes are introduced. The increase in likelihood of malfunction of a plant SSC (rod assemblies, rod control and protection functions) due to operational effects of defeating ARW is less than minimal.
- 3. Automatic rod assembly withdrawal is not credited for accident mitigation. The presence or absence of ARW does not impact the consequences of any previously evaluated accident.
- 4. No new failure modes have been introduced. UFSAR Chapter 14 events have been evaluated for the impact of this activity on control rod assembly function in automatic and in manual control. Defeat of ARW does not affect automatic control rod insertion or manual rod control. There is no possibility of a failure of an SSC important to safety with a different result than previously evaluated. There is no change to RPS or ESFAS set points, instrument uncertainty, or safety analysis limits. Therefore, the modification does not create the possibility of an accident of a different type than previously evaluated.
Serial No.18-071 10 CFR 50.59 Report Page 3 of 4
- 5. No design basis limit for a fission product barrier is exceeded or altered.
- 6. The transients were analyzed using the existing LOFTRAN computer code with Surry input parameters. Therefore, this activity does not result in a departure from a method of evaluation described in the SAR.
Serial No.18-071 10 CFR 50.59 Report Page 4 of 4 Attachment 1 Surry Units 1 & 2 10 CFR 50.59 Changes, Tests, and Experiments SPSO-EVAL-2017-0005 Regulatory Evaluation 12/19/2017
==
Description:==
This evaluation reviewed a licensing basis change for Surry Units 1 and 2 which incorporates a minor revision (Minor Revision 2) of NRC approved Topical Report VEP-FRD-42-A, "Reload Nuclear Design Methodology," Revision 2. This activity added a new core physics methodology, CMS5, as described in NRC approved Topical Report SSP P01/028-TR-P-A, "Generic Application of the Studsvik Scandpower Core Management System to Pressurized Water Reactors." The core physics analytical model, CMS5, was found to be acceptable for core reload design. This Evaluation also reviewed and found acceptable the removal of references to and descriptions of the now obsolete PDQ Two Zone/NOMAD analytical model.
A 10CFR50.59 evaluation was required because the changes described above were to methods of evaluation described in the UFSAR that were outside the limitations identified in topical report, VEP-FRD-42-A, and were therefore considered adverse.
Evaluation:
The justification for making these changes without submitting a license amendment relies on the provisions under 10CFR50.59 for licensees to change from one method of evaluation to another. The USA 50.59 Resource Manual provides guidance concerning when a change is not considered a departure from a method of evaluation described in the UFSAR. The change is not a departure if it involves the " ... Use of a new NRG-approved methodology (e.g., new or upgraded computer code) to reduce uncertainty, provide more precise results, or other reason, provided such use is:
- a. Based on sound engineering practice
- b. Appropriate for the intended application
- c.
- Within the limitations of the applicable SER" Based upon the conclusions of a GL 83-11, Supplement 1 evaluation, as directed by the USA 50.59 Resource Manual, incorporating CMS5 into the list of VEP-FRD-42-A analytical models meets these three criteria.
Therefore, the inclusion of the CMS5 methodology as a new analytical model to VEP-FRD-42-A is fully consistent with the provisions of 10CFR50.59.