ML18206A462: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 07/16/2018
| issue date = 07/16/2018
| title = Annual Summary of Changes, Tests and Experiments at Aerotest Radiography and Research Reactor (Arrr), Docket No. 50-228, for the Period of 1 July 2017 to 30 June 2018
| title = Annual Summary of Changes, Tests and Experiments at Aerotest Radiography and Research Reactor (Arrr), Docket No. 50-228, for the Period of 1 July 2017 to 30 June 2018
| author name = Meren A W
| author name = Meren A
| author affiliation = Aerotest Operations, Inc
| author affiliation = Aerotest Operations, Inc
| addressee name =  
| addressee name =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:AEROTEST OPERATIONS, INC. 3455 FOSTORIA WAY
{{#Wiki_filter:AEROTEST OPERATIONS, INC.
3455 FOSTORIA WAY
* SAN RAMON, CA 94583 * (925) 866-1212
* SAN RAMON, CA 94583 * (925) 866-1212
* FAX (925) 866-1716 16 July 2018 Director of Inspection and Enforcement U.S. Nuclear Reg~latory Commission Washington, D.C.120555  
* FAX (925) 866-1716 16 July 2018 Director of Inspection and Enforcement U.S. Nuclear Reg~latory Commission Washington, D.C.120555


==Subject:==
==Subject:==
Annual Summary of Changes, Tests and Experiments at Aerotest Radiography and Research Reactor (ARRR), Docket no. 50-228, for the period of 1 July 2017 to 30 June 2018.
Gentlemen:
Gentlemen:
Annual Summary of Changes, Tests and Experiments at Aerotest Radiography and Research Reactor (ARRR), Docket no. 50-228, for the period of 1 July 2017 to 30 June 2018. The enclosed report summarizes the ARRR operations from July 1, 2017 through June 30, 2018. This submittal complies with the requirements set forth in 1 O CFR 50.59, "Authorization of Changes, Tests and Experiments." In order to comply with NRC requirements to resolve foreign ownership issues, Aerotest Operations voluntarily ceased reactor operations on Oct. 15, 2010 and remained shutdown pending transfer of ownership to a U.S. company. On July 17, 2017 the ownership of Aerotest Operations, Inc. was transferred from Autoliv, Inc. to Nuclear Labyrinth, LLC. As a result of the ownership transfer the NRC withdrew the orders which prohibited Aerotest from operating its reactor as well as its denial of the license renewal application for the ARRR. The NRC staff will resume its review of the license renewal application which has been updated. The NRC will not deem the existing license to have expired in 2005 because the ARRR license renewal application was filed at least 30 days before the expiration of the existing license. The ARRR has been defueled since 2012. As such, summary forms of monthly operations and unscheduled power reductions are not applicable and are therefore not included in this report. Sincerely,  
The enclosed report summarizes the ARRR operations from July 1, 2017 through June 30, 2018. This submittal complies with the requirements set forth in 10 CFR 50.59, "Authorization of Changes, Tests and Experiments."
~;eVaw. ~eren Reactor Supervisor Aerotest Operations, Inc.
In order to comply with NRC requirements to resolve foreign ownership issues, Aerotest Operations voluntarily ceased reactor operations on Oct. 15, 2010 and remained shutdown pending transfer of ownership to a U.S. company. On July 17, 2017 the ownership of Aerotest Operations, Inc. was transferred from Autoliv, Inc. to Nuclear Labyrinth, LLC. As a result of the ownership transfer the NRC withdrew the orders which prohibited Aerotest from operating its reactor as well as its denial of the license renewal application for the ARRR. The NRC staff will resume its review of the license renewal application which has been updated. The NRC will not deem the existing license to have expired in 2005 because the ARRR license renewal application was filed at least 30 days before the expiration of the existing license.
The ARRR has been defueled since 2012. As such, summary forms of monthly operations and unscheduled power reductions are not applicable and are therefore not included in this report.
Sincerely,
                                                    ~~N.~
                                                  ~;eVaw. ~eren Reactor Supervisor Aerotest Operations, Inc.
 
ANNUAL  
ANNUAL  


==SUMMARY==
==SUMMARY==
OF CHANGES, TESTS AND EXPERIMENTS PERFORMED AT THE AEROTEST RADIOGRAPHY AND RESEARCH REACTOR (ARRR) DOCKET NO. 50-228 FOR THE PERIOD ENDING JUNE 30, 2018 BY ~W-~ ~~RE~~OW.
OF CHANGES, TESTS AND EXPERIMENTS PERFORMED AT THE AEROTEST RADIOGRAPHY AND RESEARCH REACTOR (ARRR)
MEREN REACTOR SUPERVISOR APPROVED BY DAVID MICHAEL SLAUGHTER PRESIDENT AND REACTOR ADMINISTRATOR AEROTEST OPERATIONS, INC.
DOCKET NO. 50-228 FOR THE PERIOD ENDING JUNE 30, 2018 BY
SECTION I Part 1 -Changes (none) Part 2 -Experiments (none)}}
          ~W-~
          ~~RE~~OW. MEREN REACTOR SUPERVISOR APPROVED BY DAVID MICHAEL SLAUGHTER PRESIDENT AND REACTOR ADMINISTRATOR AEROTEST OPERATIONS, INC.
 
SECTION I Part 1 - Changes (none)
Part 2 - Experiments (none)}}

Latest revision as of 12:44, 6 November 2019

Annual Summary of Changes, Tests and Experiments at Aerotest Radiography and Research Reactor (Arrr), Docket No. 50-228, for the Period of 1 July 2017 to 30 June 2018
ML18206A462
Person / Time
Site: Aerotest
Issue date: 07/16/2018
From: Meren A
Aerotest
To:
Office of Nuclear Reactor Regulation, NRC/OE
References
Download: ML18206A462 (3)


Text

AEROTEST OPERATIONS, INC.

3455 FOSTORIA WAY

  • SAN RAMON, CA 94583 * (925) 866-1212
  • FAX (925) 866-1716 16 July 2018 Director of Inspection and Enforcement U.S. Nuclear Reg~latory Commission Washington, D.C.120555

Subject:

Annual Summary of Changes, Tests and Experiments at Aerotest Radiography and Research Reactor (ARRR), Docket no. 50-228, for the period of 1 July 2017 to 30 June 2018.

Gentlemen:

The enclosed report summarizes the ARRR operations from July 1, 2017 through June 30, 2018. This submittal complies with the requirements set forth in 10 CFR 50.59, "Authorization of Changes, Tests and Experiments."

In order to comply with NRC requirements to resolve foreign ownership issues, Aerotest Operations voluntarily ceased reactor operations on Oct. 15, 2010 and remained shutdown pending transfer of ownership to a U.S. company. On July 17, 2017 the ownership of Aerotest Operations, Inc. was transferred from Autoliv, Inc. to Nuclear Labyrinth, LLC. As a result of the ownership transfer the NRC withdrew the orders which prohibited Aerotest from operating its reactor as well as its denial of the license renewal application for the ARRR. The NRC staff will resume its review of the license renewal application which has been updated. The NRC will not deem the existing license to have expired in 2005 because the ARRR license renewal application was filed at least 30 days before the expiration of the existing license.

The ARRR has been defueled since 2012. As such, summary forms of monthly operations and unscheduled power reductions are not applicable and are therefore not included in this report.

Sincerely,

~~N.~

~;eVaw. ~eren Reactor Supervisor Aerotest Operations, Inc.

ANNUAL

SUMMARY

OF CHANGES, TESTS AND EXPERIMENTS PERFORMED AT THE AEROTEST RADIOGRAPHY AND RESEARCH REACTOR (ARRR)

DOCKET NO. 50-228 FOR THE PERIOD ENDING JUNE 30, 2018 BY

~W-~

~~RE~~OW. MEREN REACTOR SUPERVISOR APPROVED BY DAVID MICHAEL SLAUGHTER PRESIDENT AND REACTOR ADMINISTRATOR AEROTEST OPERATIONS, INC.

SECTION I Part 1 - Changes (none)

Part 2 - Experiments (none)