ML13070A055: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 5: Line 5:
| author name = Mulligan M
| author name = Mulligan M
| author affiliation = - No Known Affiliation
| author affiliation = - No Known Affiliation
| addressee name = Macfarlane A M
| addressee name = Macfarlane A
| addressee affiliation = NRC/Chairman
| addressee affiliation = NRC/Chairman
| docket = 05000293
| docket = 05000293
| license number = DPR-035
| license number = DPR-035
| contact person = Guzman R V
| contact person = Guzman R
| case reference number = 2.206, G20130174
| case reference number = 2.206, G20130174
| document type = 2.206 Petition, E-Mail
| document type = 2.206 Petition, E-Mail
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ETS.U.S.NRC Proterting Peoph and the Fnvironent Ticket No: G20130174 2105-,;,eea Inom to Assigned Office: NRR Other Assignees:
{{#Wiki_filter:ETS                                                       .U.S.NRC                               Ticket No: G20130174 ProtertingPeoph and the Fnvironent 2105 Inom
OEDO Due Date: 04/08/2013 SECY Due Date: Date Response Requested by Originator:
            -,;,eea             to Assigned Office: NRR                                                                         OEDO Due Date: 04/08/2013 Other Assignees:                                                                              SECY Due Date:
Date Response Requested by Originator:
Other Parties: Tanya.Mensah@nrc.gov
Other Parties: Tanya.Mensah@nrc.gov


==Subject:==
==Subject:==
2.206 -Pilgrim Nuclear Plant
2.206 - Pilgrim Nuclear Plant


== Description:==
== Description:==


CC Routing: OGC, Regionl ADAMS Accession Numbers -Incoming: Response / Package: he infrmaio Cross Reference No: SRM\Other:
CC Routing: OGC, Regionl ADAMS Accession Numbers - Incoming:                                                   Response / Package:
No IN oes Inforatio Action Type: 2.206 Review Signature Level: NRR Special Instructions:
he infrmaio Cross Reference No:                                                                                         SRM\Other: No IN   oes           Inforatio Action Type: 2.206 Review                                                         OEDO Concurrence: No Signature Level: NRR                                                                         OCM Concurrence: No Special Instructions:                                                                                 OCA Concurrence: No S.                   Inomto
OEDO Concurrence:
                              .cmn Originator Name: Michale Mulligan                                                               Date of Incoming: 03/07/2013 Originator Org: Citizens                                            Document Received by OEDO Date: 03/07/2013 Addressee: NRC Allegation Incoming Task: E-mail                                                                           OEDO POC: Dan Merzke MP f(& E2 i.-                           ....                                                           e bS E
No OCM Concurrence:
                                                                                                            ....                 -6
No OCA Concurrence:
 
No S. .cmn Inomto Originator Name: Originator Org: Michale Mulligan Citizens Date of Incoming:
From: Michael Mulligan [mailto:steamshovel2002@yahoo.com]
03/07/2013 Document Received by OEDO Date: 03/07/2013 Addressee:
NRC Allegation Incoming Task: E-mail MP f( & E2 i.- ....OEDO POC: Dan Merzke....e bS E -6 From: Michael Mulligan [mailto:steamshovel2002@yahoo.com]
Sent: Thursday, March 07, 2013 12:33 PM To: newstip~globe.com; NRC Allegation
Sent: Thursday, March 07, 2013 12:33 PM To: newstip~globe.com; NRC Allegation


==Subject:==
==Subject:==
2.206: Pilgrim Nuclear Plant SRV Request for Emergency Shutdown  
2.206: Pilgrim Nuclear Plant SRV Request for Emergency Shutdown


==Dear sir,==
==Dear sir,==
I called this into your hotline by telephone and left a message to a reporter an hour or so ago. This is just a follow-up.
I called this into your hotline by telephone and left a message to a reporter an hour or so ago. This is just a follow-up.
I'd like to get Gov Patrick to demand an immediate Pilgrim shutdown and demand a special investigation of these events.Mike So the below is my 2.206 request to the NRC. You'd do me a favor if the BG calls our region I public relation people.. .Neil Shaheen.March 7, 2013 Bill Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
I'd like to get Gov Patrick to demand an immediate Pilgrim shutdown and demand a special investigation of these events.
Mike So the below is my 2.206 request to the NRC. You'd do me a favor if the BG calls our region I public relation people.. .Neil Shaheen.
March 7, 2013 Bill Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001


==Dear Mr. Bochardt,==
==Dear Mr. Bochardt,==
Request an emergency and for a exigent bases, that the Pilgrim Nuclear plant be immediately shut down.Don't tell me just before Nor'easter Nimo struck the Pilgrim plant with a leaking safety relief valve and down at 80%, Entergy was intending to operate that plant with a defective leaking safety relief valve till the next refuel outage. Tell it ain't so. It certainly looks like with the current leaktoday that are intending to operate till next month.Is the game plan today to incrementally increase reactor power from 94% by 1%to see if a new SRV leak is getting worse?Timeline: 1) New three stage safety relief valves installed in the plant around May 2011.2) First leak and shut down on Dec, 26. 2011 (SRV RV-203-3D).
 
Request an emergency and for a exigent bases, that the Pilgrim Nuclear plant be immediately shut down.
Don't tell me just before Nor'easter Nimo struck the Pilgrim plant with a leaking safety relief valve and down at 80%, Entergy was intending to operate that plant with a defective leaking safety relief valve till the next refuel outage. Tell it ain't so. It certainly looks like with the current leaktoday that are intending to operate till next month.
Is the game plan today to incrementally increase reactor power from 94% by 1%
to see if a new SRV leak is getting worse?
Timeline:
: 1) New three stage safety relief valves installed in the plant around May 2011.
: 2) First leak and shut down on Dec, 26. 2011 (SRV RV-203-3D).
: 3) Second leak and shut down on Jan 20, 2013 (SRV RV-203-3B).
: 3) Second leak and shut down on Jan 20, 2013 (SRV RV-203-3B).
: 4) Third leak occurred a few weeks later and the Nemo blizzard tripped the plant.. .the NRC promised these valves would be fixed. (SRV RV-203-3B).
: 4) Third leak occurred a few weeks later and the Nemo blizzard tripped the plant.. .the NRC promised these valves would be fixed. (SRV RV-203-3B).
: 5) Basically they operated for 20 days at 100% power operation post shutdown, then reported on Feb 27 the plant is operating at 94% power with no explained reason until today. The reason for the down power was kept secret from the public.EDO --G20130174 Don't forget the repetitive nature of the recently broken scram discharge volume vent and drain valves.. .implies Entergy is incapable of maintaining safety components of a nuclear plant.The repeated nature of the failure of the safety relief valves means Entergy doesn't know the mechanism of the failure.. .it is a common mode failure. The design and manufacture of these valves are defective and it is extremely unsafe to operate a nuclear plant with all safety relief valves being INOP. A condition adverse to quality...
: 5) Basically they operated for 20 days at 100% power operation post shutdown, then reported on Feb 27 the plant is operating at 94% power with no explained reason until today. The reason for the down power was kept secret from the public.
The NRC should have made a public comment about the new leaking safety relief when they first became aware of th leak. The implication is the agency was going to allow the plant to operate with unsafe SRVs until the refueling outage next month. The NRC is involved in a serious cover-up of an extremely unsafe operation of a nuclear power.1) Request an immediate shutdown the Pilgrim Plant.2) The is the second time I requested a special NRC inspection concerning the defective SRV valves.3) Not allow the plant to restart Pilgrim until they fully understand the past failure mechanisms of the four bad new three stage safety relief valves.4) Request the OIG investigate this cover-up to keep an unsafe nuclear plant at power.
EDO     -- G20130174
 
Don't forget the repetitive nature of the recently broken scram discharge volume vent and drain valves.. .implies Entergy is incapable of maintaining safety components of a nuclear plant.
The repeated nature of the failure of the safety relief valves means Entergy doesn't know the mechanism of the failure.. .it is a common mode failure. The design and manufacture of these valves are defective and it is extremely unsafe to operate a nuclear plant with all safety relief valves being INOP. A condition adverse to quality...
The NRC should have made a public comment about the new leaking safety relief when they first became aware of th leak. The implication is the agency was going to allow the plant to operate with unsafe SRVs until the refueling outage next month. The NRC is involved in a serious cover-up of an extremely unsafe operation of a nuclear power.
: 1) Request an immediate shutdown the Pilgrim Plant.
: 2) The is the second time I requested a special NRC inspection concerning the defective SRV valves.
: 3) Not allow the plant to restart Pilgrim until they fully understand the past failure mechanisms of the four bad new three stage safety relief valves.
: 4) Request the OIG investigate this cover-up to keep an unsafe nuclear plant at power.


==References:==
==References:==


The Popperville Town Hall (my blog): http://steamshovel2002.
The Popperville Town Hall (my blog):
blogspot.com/"Pilgrim's Safety Relief Valve Leaking Boondoggle" http: //steamshovel2002.blogspot.com/2013/02/pilgrims-safety-relief-valve-leaking.html Sincerely, Michael Mulligan PO Box 161 Hinsdale, NH 03541 16033368320 steamshovel2002@vahoo.com}}
http://steamshovel2002. blogspot.com/
              "Pilgrim's Safety Relief Valve Leaking Boondoggle" http: //steamshovel2002.blogspot.com/2013/02/pilgrims-safety-relief-valve-leaking.html Sincerely, Michael Mulligan PO Box 161 Hinsdale, NH 03541 16033368320 steamshovel2002@vahoo.com}}

Latest revision as of 22:01, 4 November 2019

G20130174 - Michael Mulligan E-mail 2.206: Pilgrim Nuclear Plant SRV Request for Emergency Shutdown
ML13070A055
Person / Time
Site: Pilgrim
Issue date: 03/07/2013
From: Mulligan M
- No Known Affiliation
To: Macfarlane A
NRC/Chairman
Guzman R
References
2.206, G20130174
Download: ML13070A055 (3)


Text

ETS .U.S.NRC Ticket No: G20130174 ProtertingPeoph and the Fnvironent 2105 Inom

-,;,eea to Assigned Office: NRR OEDO Due Date: 04/08/2013 Other Assignees: SECY Due Date:

Date Response Requested by Originator:

Other Parties: Tanya.Mensah@nrc.gov

Subject:

2.206 - Pilgrim Nuclear Plant

Description:

CC Routing: OGC, Regionl ADAMS Accession Numbers - Incoming: Response / Package:

he infrmaio Cross Reference No: SRM\Other: No IN oes Inforatio Action Type: 2.206 Review OEDO Concurrence: No Signature Level: NRR OCM Concurrence: No Special Instructions: OCA Concurrence: No S. Inomto

.cmn Originator Name: Michale Mulligan Date of Incoming: 03/07/2013 Originator Org: Citizens Document Received by OEDO Date: 03/07/2013 Addressee: NRC Allegation Incoming Task: E-mail OEDO POC: Dan Merzke MP f(& E2 i.- .... e bS E

.... -6

From: Michael Mulligan [1]

Sent: Thursday, March 07, 2013 12:33 PM To: newstip~globe.com; NRC Allegation

Subject:

2.206: Pilgrim Nuclear Plant SRV Request for Emergency Shutdown

Dear sir,

I called this into your hotline by telephone and left a message to a reporter an hour or so ago. This is just a follow-up.

I'd like to get Gov Patrick to demand an immediate Pilgrim shutdown and demand a special investigation of these events.

Mike So the below is my 2.206 request to the NRC. You'd do me a favor if the BG calls our region I public relation people.. .Neil Shaheen.

March 7, 2013 Bill Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Dear Mr. Bochardt,

Request an emergency and for a exigent bases, that the Pilgrim Nuclear plant be immediately shut down.

Don't tell me just before Nor'easter Nimo struck the Pilgrim plant with a leaking safety relief valve and down at 80%, Entergy was intending to operate that plant with a defective leaking safety relief valve till the next refuel outage. Tell it ain't so. It certainly looks like with the current leaktoday that are intending to operate till next month.

Is the game plan today to incrementally increase reactor power from 94% by 1%

to see if a new SRV leak is getting worse?

Timeline:

1) New three stage safety relief valves installed in the plant around May 2011.
2) First leak and shut down on Dec, 26. 2011 (SRV RV-203-3D).
3) Second leak and shut down on Jan 20, 2013 (SRV RV-203-3B).
4) Third leak occurred a few weeks later and the Nemo blizzard tripped the plant.. .the NRC promised these valves would be fixed. (SRV RV-203-3B).
5) Basically they operated for 20 days at 100% power operation post shutdown, then reported on Feb 27 the plant is operating at 94% power with no explained reason until today. The reason for the down power was kept secret from the public.

EDO -- G20130174

Don't forget the repetitive nature of the recently broken scram discharge volume vent and drain valves.. .implies Entergy is incapable of maintaining safety components of a nuclear plant.

The repeated nature of the failure of the safety relief valves means Entergy doesn't know the mechanism of the failure.. .it is a common mode failure. The design and manufacture of these valves are defective and it is extremely unsafe to operate a nuclear plant with all safety relief valves being INOP. A condition adverse to quality...

The NRC should have made a public comment about the new leaking safety relief when they first became aware of th leak. The implication is the agency was going to allow the plant to operate with unsafe SRVs until the refueling outage next month. The NRC is involved in a serious cover-up of an extremely unsafe operation of a nuclear power.

1) Request an immediate shutdown the Pilgrim Plant.
2) The is the second time I requested a special NRC inspection concerning the defective SRV valves.
3) Not allow the plant to restart Pilgrim until they fully understand the past failure mechanisms of the four bad new three stage safety relief valves.
4) Request the OIG investigate this cover-up to keep an unsafe nuclear plant at power.

References:

The Popperville Town Hall (my blog):

http://steamshovel2002. blogspot.com/

"Pilgrim's Safety Relief Valve Leaking Boondoggle" http: //steamshovel2002.blogspot.com/2013/02/pilgrims-safety-relief-valve-leaking.html Sincerely, Michael Mulligan PO Box 161 Hinsdale, NH 03541 16033368320 steamshovel2002@vahoo.com