| number = ML13081A752
| number = ML13081A752
| issue date = 03/22/2013
| issue date = 03/22/2013
| title = Vermont Yankee Nuclear Power Station - Email from R.Guzman to P.Couture Request for Additional Information for License Amendment Request to Change 10 CFR 50.63 Licensing Basis (TAC No. MF0422)
| title = Email from R.Guzman to P.Couture Request for Additional Information for License Amendment Request to Change 10 CFR 50.63 Licensing Basis
| author name = Guzman R V
| author name = Guzman R
| author affiliation = NRC/NRR/DORL/LPLI-1
| author affiliation = NRC/NRR/DORL/LPLI-1
| addressee name = Couture P
| addressee name = Couture P
Line 9: Line 9:
| docket = 05000271
| docket = 05000271
| license number = DPR-028
| license number = DPR-028
| contact person = Guzman R V
| contact person = Guzman R
| case reference number = TAC MF0422
| case reference number = TAC MF0422
| document type = E-Mail, Request for Additional Information (RAI)
| document type = E-Mail, Request for Additional Information (RAI)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:From:Guzman, RichardTo:"Couture III, Philip"Subject:Vermont Yankee - REQUEST FOR ADDITIONAL INFORMATION Re: License Amendment Request to Change 10CFR 50.63 Licensing Basis (TAC No. MF0422)Date:Friday, March 22, 2013 6:52:47 PMPhil,
{{#Wiki_filter:From:           Guzman, Richard To:             "Couture III, Philip"


The NRC staff has reviewed the information provided in the subject license amendmentrequest dated December 21, 2012 (Agencywide Documents Access and ManagementSystem Accession No. ML12362A041), and has determined that additional information isneeded to complete it's review of the proposed licensing basis change. Shown below arethe request for additional information (RAI) questions from the NRC's ComponentPerformance and Testing Branch (EPTB). To support the timely review and licensee'srequest date for approval of this application, we request that you provide a formalresponse by April 30, 2013. Please contact me if you have any questions.
==Subject:==
Thanks, Rich GuzmanSr. Project Manager NRR/DORL/LPL1-1US NRC301-415-1030 REQUEST FOR ADDITIONAL INFORMATIONREGARDING LICENSE AMENDMENT REQUEST TO CHANGETHE LICENSING BASIS FOR SATISFYING 10 CFR 50.63ENTERGY NUCLEAR OPERATIONS. INC.VERMONT YANKEE NUCLEAR POWER STATIONDOCKET NO. 50-271LICENSE NO. DPR-28 RAI-EPTB-1 Please confirm that the Station Blackout (SBO) diesel generator (DG) does nothave and does not require a fuel oil day tank.
Vermont Yankee - REQUEST FOR ADDITIONAL INFORMATION Re: License Amendment Request to Change 10 CFR 50.63 Licensing Basis (TAC No. MF0422)
RAI-EPTB-2 Describe how the fuel oil is transferred from the SBO DG fuel oil storage tank to theSBO DG.
Date:            Friday, March 22, 2013 6:52:47 PM
RAI-EPTB-3 In section B.8(c) of the Reference, it is stated that: Capability to refill the SBO DG fuel oil storage tank from the onsite EDG fueloil storage tank will be available using a portable tank or a temporaryconnection between the tanks, but there will be no permanent connectionsbetween the two storage tanks.If a portable tank is used, describe how fuel oil is transferred from the emergencydiesel generator (EDG) fuel oil storage tank to the portable tank and from theportable tank to the SBO DG fuel oil storage tank. If pumps are required, describehow they are powered. If a temporary connection between the storage tanks isused, provide a piping schematic showing where the connection is located in theexisting fuel oil piping.
: Phil, The NRC staff has reviewed the information provided in the subject license amendment request dated December 21, 2012 (Agencywide Documents Access and Management System Accession No. ML12362A041), and has determined that additional information is needed to complete its review of the proposed licensing basis change. Shown below are the request for additional information (RAI) questions from the NRCs Component Performance and Testing Branch (EPTB). To support the timely review and licensees request date for approval of this application, we request that you provide a formal response by April 30, 2013. Please contact me if you have any questions.
}}
: Thanks, Rich Guzman Sr. Project Manager NRR/DORL/LPL1-1 US NRC 301-415-1030 REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST TO CHANGE THE LICENSING BASIS FOR SATISFYING 10 CFR 50.63 ENTERGY NUCLEAR OPERATIONS. INC.
VERMONT YANKEE NUCLEAR POWER STATION DOCKET NO. 50-271 LICENSE NO. DPR-28 RAI-EPTB-1 Please confirm that the Station Blackout (SBO) diesel generator (DG) does not have and does not require a fuel oil day tank.
RAI-EPTB-2 Describe how the fuel oil is transferred from the SBO DG fuel oil storage tank to the SBO DG.
RAI-EPTB-3
 
In section B.8(c) of the Reference, it is stated that:
Capability to refill the SBO DG fuel oil storage tank from the onsite EDG fuel oil storage tank will be available using a portable tank or a temporary connection between the tanks, but there will be no permanent connections between the two storage tanks.
If a portable tank is used, describe how fuel oil is transferred from the emergency diesel generator (EDG) fuel oil storage tank to the portable tank and from the portable tank to the SBO DG fuel oil storage tank. If pumps are required, describe how they are powered. If a temporary connection between the storage tanks is used, provide a piping schematic showing where the connection is located in the existing fuel oil piping.}}

Latest revision as of 21:24, 4 November 2019

Email from R.Guzman to P.Couture Request for Additional Information for License Amendment Request to Change 10 CFR 50.63 Licensing Basis
ML13081A752
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 03/22/2013
From: Richard Guzman
Plant Licensing Branch 1
To: Couture P
Entergy Nuclear Operations
Guzman R
References
TAC MF0422
Download: ML13081A752 (2)


Text

From: Guzman, Richard To: "Couture III, Philip"

Subject:

Vermont Yankee - REQUEST FOR ADDITIONAL INFORMATION Re: License Amendment Request to Change 10 CFR 50.63 Licensing Basis (TAC No. MF0422)

Date: Friday, March 22, 2013 6:52:47 PM

Phil, The NRC staff has reviewed the information provided in the subject license amendment request dated December 21, 2012 (Agencywide Documents Access and Management System Accession No. ML12362A041), and has determined that additional information is needed to complete its review of the proposed licensing basis change. Shown below are the request for additional information (RAI) questions from the NRCs Component Performance and Testing Branch (EPTB). To support the timely review and licensees request date for approval of this application, we request that you provide a formal response by April 30, 2013. Please contact me if you have any questions.
Thanks, Rich Guzman Sr. Project Manager NRR/DORL/LPL1-1 US NRC 301-415-1030 REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST TO CHANGE THE LICENSING BASIS FOR SATISFYING 10 CFR 50.63 ENTERGY NUCLEAR OPERATIONS. INC.

VERMONT YANKEE NUCLEAR POWER STATION DOCKET NO. 50-271 LICENSE NO. DPR-28 RAI-EPTB-1 Please confirm that the Station Blackout (SBO) diesel generator (DG) does not have and does not require a fuel oil day tank.

RAI-EPTB-2 Describe how the fuel oil is transferred from the SBO DG fuel oil storage tank to the SBO DG.

RAI-EPTB-3

In section B.8(c) of the Reference, it is stated that:

Capability to refill the SBO DG fuel oil storage tank from the onsite EDG fuel oil storage tank will be available using a portable tank or a temporary connection between the tanks, but there will be no permanent connections between the two storage tanks.

If a portable tank is used, describe how fuel oil is transferred from the emergency diesel generator (EDG) fuel oil storage tank to the portable tank and from the portable tank to the SBO DG fuel oil storage tank. If pumps are required, describe how they are powered. If a temporary connection between the storage tanks is used, provide a piping schematic showing where the connection is located in the existing fuel oil piping.