Letter Sequence RAI |
---|
EPID:L-2017-EPR-0001, Amendment to Change the Emergency Plan and Emergency Action Level Scheme to Reflect ISFSI-only Configuration (License DPR-28, Docket No. 50-271) (Approved, Closed) |
|
|
|
---|
Category:Letter
MONTHYEARBVY 24-005, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-30030 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-004, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-23023 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-003, Nuclear Onsite Property Damage Insurance2024-01-0404 January 2024 Nuclear Onsite Property Damage Insurance BVY 24-001, Pre-Notice of Disbursement from Decommissioning Trust2024-01-0202 January 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-030, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-12-20020 December 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-029, Proof of Financial Protection2023-12-12012 December 2023 Proof of Financial Protection BVY 23-028, Pre-Notice of Disbursement from Decommissioning Trust2023-11-28028 November 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-027, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-21021 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-026, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-13013 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-025, Pre-Notice of Disbursement from Decommissioning Trust2023-11-0202 November 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-023, License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 3172023-10-10010 October 2023 License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 317 IR 07200059/20234012023-10-0505 October 2023 Independent Spent Fuel Storage Installation Security Inspection Report 07200059/2023401 BVY 23-022, Pre-Notice of Disbursement from Decommissioning Trust2023-08-23023 August 2023 Pre-Notice of Disbursement from Decommissioning Trust IR 05000271/20230012023-08-15015 August 2023 Northstar Nuclear Decommissioning Company, Llc., Vermont Yankee Nuclear Power Station, - NRC Inspection Report 05000271/2023001 BVY 23-021, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-08-0202 August 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-020, Pre-Notice of Disbursement from Decommissioning Trust2023-08-0202 August 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-019, Update to 2022 Radiological Effluent Release Report2023-07-24024 July 2023 Update to 2022 Radiological Effluent Release Report BVY 23-018, Update to Nuclear Onsite Property Damage Insurance2023-07-12012 July 2023 Update to Nuclear Onsite Property Damage Insurance BVY 23-017, Pre-Notice of Disbursement from Decommissioning Trust2023-06-29029 June 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-015, Report of Investigation Pursuant to 1O CFR 20, Appendix G2023-06-0505 June 2023 Report of Investigation Pursuant to 1O CFR 20, Appendix G BVY 23-016, 10 CFR 72.48 Report2023-06-0505 June 2023 10 CFR 72.48 Report BVY 23-014, Pre-Notice of Disbursement from Decommissioning Trust2023-05-31031 May 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-013, 2022 Radiological Environmental Operating Report2023-05-10010 May 2023 2022 Radiological Environmental Operating Report BVY 23-011, 2022 Radiological Effluent Release Report2023-05-10010 May 2023 2022 Radiological Effluent Release Report BVY 23-012, Pre-Notice of Disbursement from Decommissioning Trust2023-05-0202 May 2023 Pre-Notice of Disbursement from Decommissioning Trust ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment BVY 23-009, 2022 Individual Monitoring NRC Form 5 Report2023-04-24024 April 2023 2022 Individual Monitoring NRC Form 5 Report BVY 23-008, Pre-Notice of Disbursement from Decommissioning Trust2023-04-0606 April 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-007, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-03-29029 March 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-006, Status of Decommissioning and Spent Fuel Management Fund for Year Ending 20222023-03-29029 March 2023 Status of Decommissioning and Spent Fuel Management Fund for Year Ending 2022 BVY 23-005, Nuclear Onsite Property Damage Insurance2023-03-13013 March 2023 Nuclear Onsite Property Damage Insurance BVY 23-004, Pre-Notice of Disbursement from Decommissioning Trust2023-03-0202 March 2023 Pre-Notice of Disbursement from Decommissioning Trust ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000271/20220022023-02-22022 February 2023 Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station - NRC Inspection Report No. 05000271/2022002 BVY 23-003, Pre-Notice of Disbursement from Decommissioning Trust2023-01-31031 January 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-030, Documentary Evidence of Performance Bond2022-12-30030 December 2022 Documentary Evidence of Performance Bond ML22347A2792022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 IR 05000271/20224012022-12-15015 December 2022 NRC Inspection Report No. 05000271/2022401, Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station, Vernon, Vermont (Letter Only) BVY 22-028, Re Proof of Financial Protection2022-11-28028 November 2022 Re Proof of Financial Protection BVY 22-027, Bvy 22-027; Pre-Notice of Disbursement from Decommissioning Trust for Vermont Yankee Nuclear Power Station2022-11-11011 November 2022 Bvy 22-027; Pre-Notice of Disbursement from Decommissioning Trust for Vermont Yankee Nuclear Power Station BVY 22-026, Pre-Notice of Disbursement from Decommissioning Trust2022-10-31031 October 2022 Pre-Notice of Disbursement from Decommissioning Trust ML22273A1492022-10-0404 October 2022 Review of Decommissioning Funding Status 2022 BVY 22-025, Pre-Notice of Disbursement from Decommissioning Trust2022-10-0404 October 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-023, Pre-Notice of Disbursement from Decommissioning Trust2022-09-0101 September 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-022, Report of Investigation Pursuant to 10 CFR 20, Appendix G2022-08-22022 August 2022 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 22-021, Report of Investigation Pursuant to 10 CFR 20, Appendix G2022-08-16016 August 2022 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 22-020, Pre-Notice of Disbursement from Decommissioning Trust2022-08-0101 August 2022 Pre-Notice of Disbursement from Decommissioning Trust IR 05000271/20220012022-08-0101 August 2022 NRC Inspection Report No. 05000271/2022001, Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station, Vernon, Vermont BVY 22-019, Pre-Notice of Disbursement from Decommissioning Trust2022-07-0606 July 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-013, Notification of Revised Decommissioning Cost Estimate2022-06-17017 June 2022 Notification of Revised Decommissioning Cost Estimate 2024-01-04
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML19224A4722019-08-26026 August 2019 VY Report on Status of Decommissioning Funding for Shutdown Reactors Enclosure ML18094B0922018-04-0505 April 2018 Enclosurequest for Additional Information (Letter to B. S. Ford RAI Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update for ISFSI Docket Nos.: 72-43, 72-51, 72-1044, 72-07, 72-12, and 72-59) ML18045A8172018-04-0505 April 2018 Request for Additional Information on Vermont Yankee License Transfer Request (License DPR-28, Docket No. 50-271) ML17341A3842017-12-14014 December 2017 Request for Additional Information Regarding License Amendment Request to Change Physical Security Plan to Reflect an ISFSI-Only Configuration ML17313A4312017-11-0303 November 2017 NRC Request for Additional Information Regarding the Request for Direct and Indirect License Transfers from Entergy to Northstar ML17279B1452017-10-24024 October 2017 Request for Additional Information Regarding the License Amendment Request to Change the Emergency Plan and Emergency Action Level Scheme to Reflect an ISFSI-Only Configuration ML17244A0982017-10-12012 October 2017 NRC Request for Additional Information Regarding the Request for Direct and Indirect License Transfers from Entergy to Northstar ML17229B4842017-08-16016 August 2017 Request for Supplemental Documentation to Support Review of the Physical Security Plan ML16090A0292016-04-0505 April 2016 Request for Additional Information Related to Proposed Changes to Quality Assurance Program Manual, Vermont Yankee Nuclear Power Station ML16077A3452016-03-22022 March 2016 Request for Additional Information Related to 10 CFR 20.2002 Alternate Waste Disposal Request For Vermont Yankee Nuclear Power Station (CAC No. L53116) ML16069A0952016-03-0303 March 2016 Request for 20.2002 Disposal, Request for Additional Information CNRO-2015-00008, Responses to NRC Request for Additional Information Regarding Change in Corporate Form of Entergy Nuclear Holding Company2015-02-18018 February 2015 Responses to NRC Request for Additional Information Regarding Change in Corporate Form of Entergy Nuclear Holding Company ML14318A4002014-12-17017 December 2014 Vermont Yankee Nuclear and Big Rock Point - Request for Additional Information Regarding Change in Corporate Form of Entergy Nuclear Holding Company (Tac Nos. MF3218 - MF3221) ML14289A3942014-11-21021 November 2014 Redacted, Request for Additional Information, Review of Revision 14 to the Physical Security Plan, Safeguards Contingency Plan, and Training and Qualification Plan Pursuant to 10 CFR 50.54(p)(2) BVY 14-069, Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR 50, Appendix E - Supplement 22014-10-21021 October 2014 Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR 50, Appendix E - Supplement 2 ML14192A8352014-08-19019 August 2014 Request for Additional Information, Exemption from 10 CFR 50.47 and Appendix E to Allow Reduced Emergency Plan Requirements and Revise Radiological Emergency Response Plan Consistent with Permanently Defueled Reactor ML14231A0172014-08-13013 August 2014 Technical Specifications Proposed Change No. 309, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition - Supplement 4 ML14163A5902014-07-0101 July 2014 Request for Additional Information, Round 2, Amendment Request to Revise Site Emergency Plan for Permanently Defueled Condition to Reflect Change in On-Shift Staffing and Emergency Response Staffing ML14115A0292014-05-0505 May 2014 Request for Additional Information Regarding License Amendment Request for Emergency Plan Change ML14024A0412014-01-29029 January 2014 Request for Additional Information Regarding Entergy Request for Rescission of and Scheduler Relief from Order EA-13-109 on Reliable Hardened Containment Vents ML13311B0772013-11-26026 November 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation ML13304B4182013-11-0101 November 2013 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns ML13218A0122013-08-0606 August 2013 E-mail from R.Guzman to P.Couture, Request for Additional Information - Relief Requests ISI-04 Dated March 27, 2013 - Bvy 13-018 ML13205A1762013-07-24024 July 2013 Supplemental Request for Additional Information - Relief Request ISI-03 ML13179A4622013-07-0505 July 2013 Entergy Nuclear Operations, Inc., Decommissioning Funding Status Report Request for Additional Information Regarding the Decommissioning Funding Status Report ML13186A1142013-07-0505 July 2013 Email from R. Guzman to P.Couture Request for Additional Information - Relief Request ISI-02, Application of Code Case N-716 ML13165A2792013-06-20020 June 2013 Request for Additional Information Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (NRC Order EA-12-051) ML13163A2582013-06-17017 June 2013 Request for Additional Information - Response to March 12, 2012, Commission Order EA-12-049 to Modify Licenses Requirements for Mitigating Strategies for Beyond Design Basis External Events ML13149A2652013-05-28028 May 2013 Email from R. Guzman to P. Couture - Request for Additional Information Relief Request ISI-05 (TAC No. MF1194) -Updated RAI-2 (Revision 2) ML13130A0562013-05-0909 May 2013 E-mail from R.Guzman to P.Couture Request for Additional Information - Relief Request RR-P02 Dated February 1, 2013 - Bvy 13-008 ML13130A0472013-05-0808 May 2013 Email from R.Guzman to P.Couture Request for Additional Information - Relief Requests ISI-01 and ISI-03 Dated March 27, 2013 - Bvy 13-018 (TAC Nos. MF1196/1198) ML13119A2462013-04-29029 April 2013 Request for Additional Information, E-mail from R. Guzman to P. Couture Relief Request ISI-05 ML13097A0032013-04-0808 April 2013 Request for Additional Information Change to 10 CFR 50.63 Licensing Basis - SBO EDG ML13087A3922013-04-0202 April 2013 Request for Additional Information to Support the Review of Relief Request RR-P-01 ML13081A7522013-03-22022 March 2013 Email from R.Guzman to P.Couture Request for Additional Information for License Amendment Request to Change 10 CFR 50.63 Licensing Basis ML13077A2062013-03-20020 March 2013 Request for Additional Information Regarding 10 CFR 50.33 Financial Qualification Review ML13067A0912013-03-0808 March 2013 Request for Additional Information Change to TS 3.3.B Inoperable Control Rods ML13050A4692013-02-21021 February 2013 Request for Additional Information Change to Licensing Basis for Station Blackout Diesel Generator ML13018A4592013-01-15015 January 2013 Request for Additional Information - E-mail from R.Guzman to P.Couture Relief Request ISI-PT-02 Alternative to the System Leakage Test for Rv Head Flange Leakoff Lines ML1228403332012-10-10010 October 2012 Request for Additional Information - E-mail from R. Guzman to P. Couture License Amendment Request to Revise License Condition 3.P and 3.Q ML12278A3862012-10-0404 October 2012 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2, and 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford, Request for Additional Information, Round 2, Amendment Request to Revise QA Program Manual and Staff Qualification TSs ML13070A2032012-09-17017 September 2012 Email from R. Guzman to R. Wanczyk and P. Outure Draft Request for Additional Information - LAR to Revise License Renewal Commitments One Time Inspection Program ML13070A1742012-09-10010 September 2012 Email from R. Guzman to R. Wanczyk Draft Request for Additional Information - LAR to Revise License Renewal Commitments Selective Leaching Program ML12122A8072012-05-0707 May 2012 Request for Additional Information Regarding Physical Security, Safeguards Contingency and Training and Qualification Plan, Revision 11 ML1300902982012-04-10010 April 2012 E-mail from J. Kim to J. Devincentis Request for Additional Information - Rod Worth Minimizer Bypass Allowance Amendment ML1209604492012-04-0505 April 2012 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2 & 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Request for Additional Information, Revise Quality Assurance Program Manual and Staff Qualification Technical Specificat ML12056A0482012-03-12012 March 2012 Enclosure 2 - Recommendation 2.1: Flooding ML12056A0502012-03-12012 March 2012 Enclosure 4 - Recommendation 2.3: Flooding ML12056A0512012-03-12012 March 2012 Enclosure 5 - Recommendation 9.3: Emergency Preparedness ML12056A0492012-03-12012 March 2012 Enclosure 3 - Recommendation 2.3: Seismic 2019-08-26
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 24, 2017 Mr. John W. Boyle Director, Nuclear Decommissioning Entergy Nuclear Operations, Inc.
Vermont Yankee Nuclear Power Station 320 Governor Hunt Rd Vernon, VT 05354
SUBJECT:
VERMONT YANKEE NUCLEAR POWER STATION - REQUEST FOR ADDITIONAL INFORMATION REGARDING THE LICENSE AMENDMENT REQUEST TO CHANGE THE EMERGENCY PLAN AND EMERGENCY ACTION LEVEL SCHEME TO REFLECT AN ISFSI-ONLY CONFIGURATION (EPID NO. L-2017-EPR-0001)
Dear Mr. Boyle:
By letter dated May 15, 2017 (Agencywide Documents Access and Management System Package Accession No. ML17139D261), Entergy Nuclear Operations, Inc. (ENO) submitted a license amendment request to the Vermont Yankee Nuclear Power Station Permanently Defueled Emergency Plan (PDEP) for U.S. Nuclear Regulatory Commission (NRC) approval prior to implementation, as required under Paragraph 50.54(q)(4) of Title 10 of the Code of Federal Regulations (10 CFR). ENO is proposing to replace the PDEP and its associated Permanently Defueled Emergency Action Level (EAL) Technical Bases Document with an Independent Spent Fuel Storage Installation (ISFSI) Only Emergency Plan and its associated ISFSI EAL Technical Bases Document.
The proposed changes would more fully reflect the permanently shutdown status of the facility, as well as the reduced scope of potential radiological accidents once all spent fuel has been moved to dry cask storage within the onsite ISFSI, an activity which is currently scheduled for completion by the end of 2018.
In order to complete its review, the NRC staff requests additional information as specified in the Enclosure. In order to continue the review of the subject license amendment request, please respond to this request for additional information within 30 days of the date of this letter.
If you have any questions, please contact me at (301) 415-6634 or via e-mail at Jack.Parrott@nrc.gov.
Sincerely,
/RA/
Jack D. Parrott, Senior Project Manager Reactor Decommissioning Branch Division of Decommissioning, Uranium Recovery, and Waste Programs Office of Nuclear Material Safety and Safeguards Docket No. 50-271
Enclosure:
Request for Additional Information cc: Distribution via Listserv
ML17279B145 *by e-mail OFFICE NMSS/RDB/PM NMSS/DUWP/LA NSIR/DPR/RLB/BC NMSS/RDB/BC NMSS/RDB/PM NAME JParrott CHolston JDAnderson* BWatson JParrott DATE 10/11/2017 10/12/2017 10/12/2017 10/13/2017 10/16/2017 REQUEST FOR ADDITIONAL INFORMATION RELATED TO LICENSE AMENDMENT REQUEST FOR INDEPENDENT SPENT FUEL STORAGE INSTALLATION EMERGENCY PLAN AND EAL SCHEME ENTERGY NUCLEAR OPERATIONS, INC VERMONT YANKEE NUCLEAR POWER STATION DOCKET NO. 50-271 By application dated May 15, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17139D261), Entergy Nuclear Operations, Inc. (ENO) submitted changes to the Vermont Yankee Nuclear Power Station (VY), Permanently Defueled Emergency Plan (PDEP) for Commission review and prior approval pursuant to Section 50.54(q) of Title 10 of the Code of Federal Regulations (10 CFR). The proposed changes would replace the VY PDEP and associated Emergency Action Level (EAL) Technical Bases Document (hereafter referred to as the EAL scheme) with an Independent Spent Fuel Storage Installation (ISFSI)
Emergency Plan and associated ISFSI EAL scheme.
The NRC staff has reviewed the licensee's submittal and determined that additional information is required to enable the NRC staff to make an independent assessment regarding the acceptability of the proposed VY ISFSI Emergency Plan and EAL scheme.
RAI-VY-1 Section 1.0, Introduction, of the NRC-approved PDEP states, in part:
The analysis of the potential radiological impact of design basis accidents in a permanently defueled condition indicates that any releases beyond the Site Boundary are below the Environmental Protection Agency (EPA) Protective Action Guide (PAG) exposure levels, as detailed in the EPA's Protective Action Guide and Planning Guidance for Radiological Incidents, Draft for Interim Use and Public Comment dated March 2013 (PAG Manual). Exposure levels, which warrant pre-planned response measures, are limited to onsite areas. For this reason, radiological emergency planning is focused onsite.
Section 1.0, Introduction, of the proposed VY ISFSI Emergency Plan states, in part:
As provided in the Holtec FSAR [Final Safety Analysis Report], the analyses of the potential radiological impacts of postulated off-normal, natural phenomena, and accident events involving the ISFSI indicate that any releases would result in a dose to the public below the radiation limits established in 10 CFR 72.106(b). Exposure levels, which warrant pre-planned response measures are limited to the ISFSI and immediate vicinity, and for this reason, radiological emergency planning is focused on this area.
1
Provide technical basis for removal of reference to EPA PAGs in the ISFSI EP with respect to design basis accidents. Also consider updating the reference to the recently updated EPA PAG Manual (EPA-400/R-17/001, January 2017).
RAI-VY-2 Section 11.1, Emergency Notification, of the NRC-approved PDEP states, in part:
The format and contents of the initial message between the plant and State/Commonwealth authorities are specified in notification procedures and have been established with the review and agreement of responsible state authorities.
The Department of Public Health of Vermont, New Hampshire and Massachusetts may request the following information from VY:
- 1. Date and time of the incident;
- 2. Emergency classification;
- 3. Status of the facility;
- 4. Whether a release has occurred, is occurring, or is anticipated to occur;
- 5. Actual or projected dose rates at the Site boundary; Section 9.2, Emergency Messages, of the proposed VY ISFSI Emergency Plan states, in part:
The format and content of the initial message between VY and Vermont, New Hampshire, and Massachusetts are specified in EPIPs and have been established with the review and agreement of responsible state authorities. The initial notification contains the following information, as available:
- Identification of the facility
- Identification of the message sender
- Date and Time of the emergency declaration
- Emergency classification, including EAL Provide basis for not including any information related to a potential radiological release (per PDEP items 4 and 5, above) as part of the initial notification, or reinsert into proposed VY ISFSI Emergency Plan.
RAI-VY-3 Section 7.4, Mobile UHF Radio System, of the NRC-approved PDEP states, in part:
Security also has the capability to contact the primary local law enforcement agency patrol vehicle(s), as defined in the VY Physical Security Plan, that are located in close proximity to the plant via radio.
Table 10-1, Communications Systems of the proposed VY ISFSI Emergency Plan identifies portable radios as a communication system in use.
Clarify whether these portable radios have this same capability to contact the primary local law enforcement agency patrol vehicle(s), as defined in the VY Physical Security Plan.
2
RAI-VY-4 NUREG-0654,Section II, Evaluation Criterion N.2.b states, Fire drills shall be conducted in accordance with the plant (nuclear facility) technical specifications.
Section 12.1.4, Fire Drills, of the NRC-approved PDEP states, in part:
To test and evaluate the response and training of the plant's fire brigade, fire drills are conducted in accordance with the Vermont Yankee Fire Protection Program.
However, a provision for fire drills is not included in Section 18.0, Exercises and Drills, of the proposed VY ISFSI Emergency Plan.
Clarify whether the Vermont Yankee Fire Protection Program will continue to include fire drills on some routine frequency and, as applicable, provide basis for removal or reinsert into the proposed VY ISFSI Emergency Plan.
RAI-VY-5 NUREG-0654,Section II, Evaluation Criterion N.1.a states, The [exercise] scenario should be varied from year to year such that all major elements of the plans and preparedness organizations are tested.
Section 18.0, Exercises and Drills, of the proposed VY ISFSI Emergency Plan does not provide a statement indicating whether scenarios will vary from year to year and what elements of the plan are tested.
Provide justification for removal of this statement from the proposed VY ISFSI Emergency Plan, or reinsert as appropriate.
RAI-VY-6 NUREG-0654,Section II, Evaluation Criterion P.3 states, Each licensee shall designate an Emergency Planning Coordinator with responsibility for the development and updating of emergency plans and coordination of these plans with other response organizations.
However, Section 20.1.2, Emergency Preparedness Responsibilities, of the proposed VY ISFSI Emergency Plan states, in part:
A VY ISFSI position is designated the responsibility for maintaining an adequate knowledge of emergency preparedness regulations, emergency planning techniques, and the latest applications of emergency equipment and supplies.
Clarify, by title, which VY ISFSI position is in charge of maintaining the emergency plan and reviews, and coordination of these plans with other response organizations.
3
RAI-VY-7 EAL E-HU1.1, Damage to a loaded cask CONFINEMENT BOUNDARY, of the VY proposed ISFSI Emergency Plan states:
Two times the ISFSI Technical Specification allowable levels equate to:
- 14.80 mR/hr on the top of the overpack or
- 16.62 mR/hr on the side of the overpack, excluding inlet and outlet ducts This is not consistent with the NRC-approved Permanently Defueled EAL Scheme.
- a. Provide the basis for the change to these values; and
- b. Verify whether these values (as stated in one hundredths of a unit) can be accurately read by VY radiation instruments. If required, revise values appropriate to ensure they can be accurately read on radiation instruments.
4