Request for Additional Information Change to Licensing Basis for Station Blackout Diesel Generator
ML13050A469
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 02/21/2013
From: Richard Guzman
Plant Licensing Branch 1
To:
Entergy Nuclear Vermont Yankee
Guzman R
References
TAC MF0422
Download: ML13050A469 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 21,2013 Site Vice President Entergy Nuclear Operations, Inc.

Vermont Yankee Nuclear Power Station P.O. Box 250 Governor Hunt Road Vernon, VT 05354

SUBJECT:

VERMONT YANKEE NUCLEAR POWER STATION - REQUEST FOR ADDITIONAL INFORMATION REGARDING CHANGE TO LICENSING BASIS FOR STATION BLACKOUT DIESEL GENERATOR (TAC NO. MF0422)

Dear Sir or Madam:

By letter dated December 21, 2012 (Agencywide Document Access and Management System Accession No. ML12362A041), Entergy Nuclear Operations, Inc. submitted a license amendment request to revise the licensing basis relative to how Vermont Yankee Nuclear Power Station (VYNPS) satisfies the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.63, "Loss of all alternating current power." Entergy proposes to replace the Vernon Hydroelectric Station with an onsite diesel generator as the alternate alternating current power source providing acceptable capability to withstand a station blackout under 10 CFR 50.63(c)(2). The proposed change would involve revisions to the VYNPS facility and procedures described in the Updated Final Safety Analysis Report.

The Nuclear Regulatory Commission staff is reviewing the information provided in your letter and has determined that additional information is needed to support its review. Enclosed is the NRC staff's request for additional information (RAI). The RAI was discussed with your staff on February 14, 2013, and it was agreed that your response would be provided within 30 days of the date of this letter.

Sincerely, Richard V. Guzman, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-271

Enclosure:

As stated cc w/encl: Distribution via Listserv

REQUEST FOR ADDITIONAL INFORMATION FOR LICENSE AMENDMENT REQUEST RE: REVISION TO LICENSING BASIS FOR REPLACING THE VERNON HYDROELECTRIC STATION WITH A STATION BLACKOUT ONSITE EMERGENCY DIESEL GENERATOR ENTERGY NUCLEAR OPERATIONS, INC.

VERMONT YANKEE NUCLEAR POWER STATION DOCKET NO. 50-271 By letter dated December 21, 2012 (Agencywide Documents Access and Management System Accession No. ML12362A041), Entergy Nuclear Operations, Inc. (Entergy or the licensee) submitted a license amendment request (LAR) to revise the licensing basis relative to how Vermont Yankee Nuclear Power Station (VYNPS) satisfies the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.63, "Loss of all alternating current power."

Entergy proposes to replace the Vernon Hydroelectric Station with an onsite emergency diesel generator (EDG) as the alternate alternating current (MC) power source providing acceptable capability to withstand a station blackout (SBO) under 10 CFR 50.63(c)(2). The proposed change would involve revisions to the VYNPS facility and procedures described in the Updated Final Safety Analysis Report. The NRC staff is reviewing the LAR and has determined that additional information as requested below will be needed to support its review.

In the LAR, the licensee stated:

In Reference 7.a, the NRC accepted the determination that VY is categorized as an 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> coping plant with a target EDG reliability of 0.95. No changes to the station coping duration or credited EDG reliability are proposed in the amendment.

Based on the proposed design change, provide a summary of your detailed Regulatory Guide (RG) 1.155, "Station Blackout," analysis, considering the most up-to-date data (e.g.,

current grid reliability, loss of offsite power events, EDG reliability, etc.), showing the minimum specified duration that Vermont Yankee should be required to mitigate the consequences of an SBO event.

In the LAR, the licensee stated that:

Once every refueling outage, a timed start will be performed to demonstrate that the MC power source can be started and aligned to either safety Bus 3 or safety Bus 4 within one (1) hour...

Enclosure

- 2 Once the MC power source is energized up to 3V4 [the feeder circuit breaker for the Vernon Hydroelectric Station tie line], it takes very little time to align loads from the control room (less than 10 minutes).

The regulatory guidance in Section B.12, Appendix B, of NUMARC 87-00 Revision 1 as endorsed by RG 1.155, states that: "Unless otherwise governed by technical specifications, the MC system shall be demonstrated by initial test to be capable of powering required shutdown equipment within one hour of a station blackout event." Given the above, explain how the licensee demonstrates that the MC system can power required shutdown equipment within one-hour of a station blackout event (not just be aligned).

February 21. 2013 Site Vice President Entergy Nuclear Operations, Inc.

Vermont Yankee Nuclear Power Station P.O. Box 250 Governor Hunt Road Vernon, VT 05354

SUBJECT:

VERMONT YANKEE NUCLEAR POWER STATION - REQUEST FOR ADDITIONAL INFORMATION REGARDING CHANGE TO LICENSING BASIS FOR STATION BLACKOUT DIESEL GENERATOR (TAC NO. MF0422)

Dear Sir or Madam:

By letter dated December 21. 2012 (Agencywide Document Access and Management System Accession No. ML12362A041). Entergy Nuclear Operations. Inc. submitted a license amendment request to revise the licensing basis relative to how Vermont Yankee Nuclear Power Station (VYNPS) satisfies the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.63, "Loss of all alternating current power." Entergy proposes to replace the Vernon Hydroelectric Station with an onsite diesel generator as the alternate alternating current power source providing acceptable capability to withstand a station blackout under 10 CFR 50.63{c)(2). The proposed change would involve revisions to the VYNPS facility and procedures described in the Updated Final Safety Analysis Report.

The Nuclear Regulatory Commission staff is reviewing the information provided in your letter and has determined that additional information is needed to support its review. Enclosed is the NRC staff's request for additional information (RAI). The RAI was discussed with your staff on February 14. 2013. and it was agreed that your response would be provided within 30 days of the date of this letter.

Sincerely,

/ra!

Richard V. Guzman, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-271

Enclosure:

As stated cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsNrrPMVermontYankee RidsNrrLAKGoldstein RidsNrrDorlLpl1-1 LPLI-1 RtF RidsOGCRp RidsRgn1MailCenter RidsNrrDeEeeb M. McConnell. NRR RidsNrrAcrsAcnw&mMailCenter ADAMS Accession No'.. ML13050A469 *Concurrence via e-mail NRR-088 OFFICE LPL1*1/PM LPL1*1/LA EEEB/BC(A)* LPL1*lIBC NAME RGuzman KGoldstein MRoy GWilson IDATE 2/19/13 2/20/13 02/19113 2121113 OFFICIAL RECORD COpy