{{#Wiki_filter:ES-301, Rev. 9 Control Room/In
{{#Wiki_filter:ES-301, Rev. 9                     Control Room/In-Plant Systems Outline                             Form ES-301-2 Facility:         Perry                                               Date of Examination:           Feb. 2013 Examination Level:         RO                                         Operating Test Number:           01 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
-Plant Systems Outline Form ES-301-2 FENOC Facsimile Rev 0 Facility:   Perry Date of Examination:
System / JPM Title                                       Type Code*         Safety Function
Feb. 20 13  Examination Level:
: a. OT-3701-C11_513         Withdraw Control Rods                                     D, S, A, L           1
RO Operating Test Number:
: b. OT-3701-E51_006         Lineup RCIC to control RPV level per EOP-                 N, S, L             2 SPI 6.6
01 Control Room Systems
: c. OT-3701-B21_009         Open MSIVs                                                  N, S               3
@ (8 for RO); (7 for SRO
: d. OT-3701-E12_506         Re-establish Shutdown Cooling                             D, S, A, L           4
-I); (2 or 3 for SRO
: e. OT-3701-R43_501         Shutdown Div 2 Diesel Generator                           D, S, A             6
-U, including 1 ESF)
: f. OT-3701-D17_001         Startup DW Airborne. Rad Monitor                           N, C               7
System / JPM Title Type Code*
: g. OT-3701-P41_001         Shift Service Water Pumps (normal)                           N, S               8
Safety Function a. OT-3701-C11_513 Withdraw Control Rods D , S, A , L 1 b. OT-3701-E51_006 Lineup RCIC to control RPV level per EOP
: h. OT-3701-M25_501 Shift CR Ventilation to ER                                       N, S, A, EN           9
-SPI 6.6 N, S , L 2 c. OT-3701-B21_009 Open MSIV's N, S 3 d. OT-3701-E12_506 Re-establish Shutdown Cooling D , S, A , L 4 e. OT-3701-R43_501 Shutdown Div 2 Diesel Generator D, S, A 6 f. OT-3701-D17_001 Startup DW Airborne. Rad Monitor N, C 7 g. OT-3701-P41_001 Shift Service Water Pumps (normal)
                    @
N, S 8 h. OT-3701-M25_50 1 Shift CR Ventilation to ER N, S, A, EN 9 In-Plant Systems
In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
@ (3 for RO); (3 for SRO
: i. OT-3701-P54_502           Emergency run of motor fire pump                         D, A, E             8
-I); (3 or 2 for SRO
: j. OT-3701-T23_004           Containment Closure                                     D, R, E             5
-U) i. OT-3701-P54_502 Emergency run of motor fire pump D, A , E 8 j. OT-3701-T23_004 Containment Closure D, R , E 5 k. OT-3701-R10_303 Shed non-essential Divisional bus loads D , E 6 @ All RO and SRO
: k. OT-3701-R10_303           Shed non-essential Divisional bus loads                   D, E               6
-I control room (and in
  @       All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
-plant) systems must be different and serve different safety functions; all 5 SRO
* Type Codes                                       Criteria for RO / SRO-I / SRO-U (A)lternate path                                                     4-6 / 4-6 / 2-3 (C)ontrol room                                                       ---------------
-U systems must serve different safety functions; in
(D)irect from bank                                                   9 / 8 / 4 (E)mergency or abnormal in-plant                                     1 / 1 / 1 (EN)gineered safety feature                                             - / -        /  1(control room system)
-plant systems and functions may overlap those tested in the control room.
(L)ow-Power / Shutdown                                                 1 / 1        / 1 (N)ew or (M)odified from bank including 1(A)                         2 / 2 / 1 (P)revious 2 exams                                                     3 /  3 /  2 (randomly selected)
* Type Codes Criteria for RO / SRO
(R)CA                                                                 1 / 1 / 1 (S)imulator                                                           ---------------
-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in
FENOC Facsimile Rev 0
-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)   (P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-- - - - - - - - - - - - - - -    9 / 8 /  4  1 /  1 /  1      -     /    -   /  1(control room system) 1 / 1 /  1   2 /  2 /  1  3 /  3 /  2 (randomly selected) 1 /  1 /  1  - - - - - - - - - - - - - - -
 
ES-301, Rev. 9 Control Room/In
ES-301, Rev. 9                     Control Room/In-Plant Systems Outline                            Form ES-301-2 Facility:          Perry                                              Date of Examination:          Feb 2013 Examination Level:        SRO-I                                      Operating Test Number:          01 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
-Plant Systems Outline Form ES-301-2  FENOC Facsimile Rev 0 Facility:  Perry  Date of Examination:
System / JPM Title                                      Type Code*          Safety Function
Feb 2013  Examination Level:
: a. OT-3701-C11_513          Withdraw Control Rods                                    D, S, A, L            1
SRO-I  Operating Test Number:
: b. OT-3701-E51_006          Lineup RCIC to control RPV level per EOP-                  N, S, L            2 SPI 6.6
01  Control Room Systems
: c. OT-3701-B21_009          Open MSIVs                                                N, S              3
@ (8 for RO); (7 for SRO
: d.                                                                                                            4
-I); (2 or 3 for SRO
: e. OT-3701-R43_501          Shutdown Div 2 Diesel Generator                            D, S, A            6
-U, including 1 ESF)
: f. OT-3701-D17_001          Startup DW Airborne. Rad Monitor                            N, C              7
System / JPM Title Type Code*
: g. OT-3701-P41_001          Shift Service Water Pumps (normal)                          N, S              8
Safety Function a. OT-3701-C11_5 13 Withdraw Control Rods D, S, A, L 1 b. OT-3701-E51_006  Lineup RCIC to control RPV level per EOP
: h. OT-3701-M25_501 Shift CR Ventilation to ER                                      N, S, A, EN            9
-SPI 6.6 N, S , L 2 c. OT-3701-B21_009 Open MSIV's N, S 3 d. 4 e. OT-3701-R43_501 Shutdown Div 2 Diesel Generator D, S, A 6 f. OT-3701-D17_001 Startup DW Airborne. Rad Monitor N, C 7 g. OT-3701-P41_001 Shift Service Water Pumps (normal)
                    @
N, S  8 h. OT-3701-M25_501 Shift CR Ventilation to ER N, S, A, EN 9 In-Plant Systems
In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
@ (3 for RO); (3 for SRO
: i. OT-3701-P54_502            Emergency run of motor fire pump                        D, A, E            8
-I); (3 or 2 for SRO
: j. OT-3701-T23_004            Containment Closure                                    D, R, E              5
-U) i. OT-3701-P54_502 Emergency run of motor fire pump D, A, E 8 j. OT-3701-T23_004 Containment Closure D, R, E 5 k. OT-3701-R10_303 Shed non-essential Divisional loads D, E 6  @ All RO and SRO
: k. OT-3701-R10_303            Shed non-essential Divisional loads                      D, E              6
-I control room (and in
  @      All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in
* Type Codes                                    Criteria for RO / SRO-I / SRO-U (A)lternate path                                                      4-6 / 4-6 / 2-3 (C)ontrol room                                                        ---------------
-plant systems and functions may overlap those tested in the control room.
(D)irect from bank                                                    9 / 8 / 4 (E)mergency or abnormal in-plant                                     1 / 1 / 1 (EN)gineered safety feature                                              - / -       /  1(control room system)
* Type Codes Criteria for  RO / SRO
(L)ow-Power / Shutdown                                                1 / 1        / 1 (N)ew or (M)odified from bank including 1(A)                         2 / 2 / 1 (P)revious 2 exams                                                    3 /  3 / 2 (randomly selected)
-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(R)CA 1 / 1 / 1 (S)imulator
(P)revious 2 exams (R)CA  (S)imulator 4-6 / 4-6 / 2-3  - - - - - - - - - - - - - - -    9 / 8 /  4  1 /  1 /  1      -     /    -   /  1(control room system) 1 /  1 /  1  2 /  2 /  1  3 /  3 /  2 (randomly selected) 1 /  1 /  1  - - - - - - - - - - - - - - -
                                                                      ---------------
ES-301, Rev. 9 Control Room/In
FENOC Facsimile Rev 0
-Plant Systems Outline Form ES-301-2  FENOC Facsimile Rev 0 Facility:  Perry  Date of Examination:
 
Feb 2013  Examination Level:
ES-301, Rev. 9                     Control Room/In-Plant Systems Outline                          Form ES-301-2 Facility:          Perry                                              Date of Examination:        Feb 2013 Examination Level:        SRO-U                                      Operating Test Number:          01 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
SRO-U  Operating Test Number:
System / JPM Title                                      Type Code*          Safety Function
01  Control Room Systems
: a. OT-3701-C11_513          Withdraw Control Rods                                    D, S, A, L          1 b.
@ (8 for RO); (7 for SRO
: c. OT-3701-B21_009          Open MSIVs                                                N, S              3 d.
-I); (2 or 3 for SRO
e.
-U, including 1 ESF)
f.
System / JPM Title Type Code*
g.
Safety Function a. OT-3701-C11_5 13 Withdraw Control Rods D, S, A, L 1 b. c. OT-3701-B21_009 Open MSIV's N, S 3 d. e. f. g. h. OT-3701-M25_501 Shift CR Ventilation to ER N, S, A, EN 9 In-Plant Systems
: h. OT-3701-M25_501 Shift CR Ventilation to ER                                      N, S, A, EN          9
@ (3 for RO); (3 for SRO
                    @
-I); (3 or 2 for SRO
In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) i.
-U) i. j. OT-3701-T23_004 Containment Closure D, R, E 5 k. OT-3701-R10_303 Shed non-essential Divisional loads D, E 6 @ All RO and SRO
: j. OT-3701-T23_004            Containment Closure                                    D, R, E            5
-I control room (and in
: k. OT-3701-R10_303            Shed non-essential Divisional loads                      D, E              6
-plant) systems must be different and serve different safety functions; all 5 SRO
  @      All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
-U systems must serve different safety functions; in
* Type Codes                                    Criteria for RO / SRO-I / SRO-U (A)lternate path                                                      4-6 / 4-6 / 2-3 (C)ontrol room                                                        ---------------
-plant systems and functions may overlap those tested in the control room.
(D)irect from bank                                                    9 / 8 / 4 (E)mergency or abnormal in-plant                                     1 / 1 / 1 (EN)gineered safety feature                                             - / -        /  1(control room system)
* Type Codes Criteria for  RO / SRO
(L)ow-Power / Shutdown                                                 1 / 1        / 1 (N)ew or (M)odified from bank including 1(A)                         2 / 2 / 1 (P)revious 2 exams                                                     3 / 3 /  2 (randomly selected)
-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank  (E)mergency or abnormal in
(R)CA                                                                1 / 1 / 1 (S)imulator
-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
                                                                      ---------------
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3  - - - - - - - - - - - - - - -    9 /  8 /  4  1 /  1 /  1      -    /    -  /  1(control room system) 1 /  1 /  1  2 /  2 /  1  3 /  3 /  2 (randomly selected) 1 /  1 /  1  - - - - - - - - - - - - - - -}}
FENOC Facsimile Rev 0}}

Revision as of 16:32, 4 November 2019

2013 Perry Nuclear Power Plant Initial License Examination Outline RO and SRO ES-301-2
ML13178A373
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 02/25/2013
From:
NRC/RGN-III
To:
FirstEnergy Nuclear Operating Co
Shared Package
ML11354A273 List:
References
Download: ML13178A373 (3)


Text

ES-301, Rev. 9 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Perry Date of Examination: Feb. 2013 Examination Level: RO Operating Test Number: 01 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code* Safety Function

a. OT-3701-C11_513 Withdraw Control Rods D, S, A, L 1
b. OT-3701-E51_006 Lineup RCIC to control RPV level per EOP- N, S, L 2 SPI 6.6
c. OT-3701-B21_009 Open MSIVs N, S 3
d. OT-3701-E12_506 Re-establish Shutdown Cooling D, S, A, L 4
e. OT-3701-R43_501 Shutdown Div 2 Diesel Generator D, S, A 6
f. OT-3701-D17_001 Startup DW Airborne. Rad Monitor N, C 7
g. OT-3701-P41_001 Shift Service Water Pumps (normal) N, S 8
h. OT-3701-M25_501 Shift CR Ventilation to ER N, S, A, EN 9

@

In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

i. OT-3701-P54_502 Emergency run of motor fire pump D, A, E 8
j. OT-3701-T23_004 Containment Closure D, R, E 5
k. OT-3701-R10_303 Shed non-essential Divisional bus loads D, E 6

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room ---------------

(D)irect from bank 9 / 8 / 4 (E)mergency or abnormal in-plant 1 / 1 / 1 (EN)gineered safety feature - / - / 1(control room system)

(L)ow-Power / Shutdown 1 / 1 / 1 (N)ew or (M)odified from bank including 1(A) 2 / 2 / 1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)

(R)CA 1 / 1 / 1 (S)imulator ---------------

FENOC Facsimile Rev 0

ES-301, Rev. 9 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Perry Date of Examination: Feb 2013 Examination Level: SRO-I Operating Test Number: 01 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code* Safety Function

a. OT-3701-C11_513 Withdraw Control Rods D, S, A, L 1
b. OT-3701-E51_006 Lineup RCIC to control RPV level per EOP- N, S, L 2 SPI 6.6
c. OT-3701-B21_009 Open MSIVs N, S 3
d. 4
e. OT-3701-R43_501 Shutdown Div 2 Diesel Generator D, S, A 6
f. OT-3701-D17_001 Startup DW Airborne. Rad Monitor N, C 7
g. OT-3701-P41_001 Shift Service Water Pumps (normal) N, S 8
h. OT-3701-M25_501 Shift CR Ventilation to ER N, S, A, EN 9

@

In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

i. OT-3701-P54_502 Emergency run of motor fire pump D, A, E 8
j. OT-3701-T23_004 Containment Closure D, R, E 5
k. OT-3701-R10_303 Shed non-essential Divisional loads D, E 6

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room ---------------

(D)irect from bank 9 / 8 / 4 (E)mergency or abnormal in-plant 1 / 1 / 1 (EN)gineered safety feature - / - / 1(control room system)

(L)ow-Power / Shutdown 1 / 1 / 1 (N)ew or (M)odified from bank including 1(A) 2 / 2 / 1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)

(R)CA 1 / 1 / 1 (S)imulator


FENOC Facsimile Rev 0

ES-301, Rev. 9 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Perry Date of Examination: Feb 2013 Examination Level: SRO-U Operating Test Number: 01 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code* Safety Function

a. OT-3701-C11_513 Withdraw Control Rods D, S, A, L 1 b.
c. OT-3701-B21_009 Open MSIVs N, S 3 d.

e.

f.

g.

h. OT-3701-M25_501 Shift CR Ventilation to ER N, S, A, EN 9

@

In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) i.

j. OT-3701-T23_004 Containment Closure D, R, E 5
k. OT-3701-R10_303 Shed non-essential Divisional loads D, E 6

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room ---------------

(D)irect from bank 9 / 8 / 4 (E)mergency or abnormal in-plant 1 / 1 / 1 (EN)gineered safety feature - / - / 1(control room system)

(L)ow-Power / Shutdown 1 / 1 / 1 (N)ew or (M)odified from bank including 1(A) 2 / 2 / 1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)

(R)CA 1 / 1 / 1 (S)imulator


FENOC Facsimile Rev 0