ML13242A252: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 08/30/2013
| issue date = 08/30/2013
| title = 11-2013401 Non-SGI Cover ltr-JRL
| title = 11-2013401 Non-SGI Cover ltr-JRL
| author name = Haire M S
| author name = Haire M
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| addressee name = Ronningen E T
| addressee name = Ronningen E
| addressee affiliation = Sacramento Municipal Utility District (SMUD)
| addressee affiliation = Sacramento Municipal Utility District (SMUD)
| docket = 05000312, 07200011
| docket = 05000312, 07200011
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:OFFICIAL USE ONLY  
{{#Wiki_filter:OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION UNITE D S TATE S NUC LEAR REGULATOR Y C OMMI S SI ON R E G IO N I V 1600 EAST LAMAR BLVD AR L INGTON , TEXAS 76011- 4511 August 30, 2013 Mr. Einar T. Ronningen, Superintendent Rancho Seco Assets Sacramento Municipal Utility District 14440 Twin Cities Road, MS N493 Herald, CA 95638
- SECURITY-RELATED INFORMATION "Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this transmittal document is decontrolled."
OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION August 30, 2013  
 
Mr. Einar T. Ronningen, Superintendent  
 
Rancho Seco Assets Sacramento Municipal Utility District 14440 Twin Cities Road, MS N493 Herald, CA 95638  


==SUBJECT:==
==SUBJECT:==
RANCHO SECO INDEPENDENT SPENT FUEL STORAGE INSTALLATION, PHYSICAL SECURITY REQUIREMENTS FOR INDEPENDENT SPENT FUEL STORAGE INSTALLATIONS INSPECTION REPORT 072-11/2013401  
RANCHO SECO INDEPENDENT SPENT FUEL STORAGE INSTALLATION, PHYSICAL SECURITY REQUIREMENTS FOR INDEPENDENT SPENT FUEL STORAGE INSTALLATIONS INSPECTION REPORT 072-11/2013401


==Dear Mr. Ronningen:==
==Dear Mr. Ronningen:==


On August 1, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an Independent Spent Fuel Storage Installation Security Inspection at your Rancho Seco facility. The enclosed inspection report documents the inspection results, which were discussed on August 1, 2013, with Mr. S. Flake, Manager, Power Generation, and other members of your staff.  
On August 1, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an Independent Spent Fuel Storage Installation Security Inspection at your Rancho Seco facility. The enclosed inspection report documents the inspection results, which were discussed on August 1, 2013, with Mr. S. Flake, Manager, Power Generation, and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection, the NRC identified two Severity Level IV violations of the NRC requirements. These violations were determined to be of low security significance and circumstances surrounding the violations are discussed in the enclosed report. Furthermore, because of the low security significance and because they were entered into your site corrective action program, the NRC is treating these violations as non-cited violations (NCV), consistent with Section VI. A. 1 of the Enforcement Policy. If you contest these violations or the severity level of the NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U. S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with a copy to the Regional Administrator, Region IV and the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this transmittal document is decontrolled.
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION


The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel. 
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION E. Ronningen                                In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Based on the results of this inspection, the NRC identified two Severity Level IV violations of the NRC requirements. These violations were determ ined to be of low security significance and circumstances surrounding the violations are discussed in the enclosed report. Furthermore, because of the low security significance and because they were entered into your site corrective action program, the NRC is treating these violations as non-cited violations (NCV), consistent with Section VI. A. 1 of the Enforcement Policy. If you contest these violations or the severity level of the NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U. S. Nuclear Regulatory Commission, ATTN:  Document Control Desk, Washington, DC 20555-0001, with a copy to the Regional Administrator, Region IV and the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511 OFFICIAL USE ONLY  
- SECURITY-RELATED INFORMATION
 
OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely,
Sincerely,
  /RA/
                                                /RA/
Mark S. Haire, Chief Plant Support Branch-1 Division of Reactor Safety  
Mark S. Haire, Chief Plant Support Branch-1 Division of Reactor Safety Docket Nos.: 050-312; 72-00011 License Nos.: DPR-54; SNM-2510 cc w/o enclosure:
 
Electronic Distribution for Rancho Seco Independent Spent Fuel Storage Installation OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
Docket Nos.: 050-312; 72-00011 License Nos.: DPR-54; SNM-2510
 
cc w/o enclosure:   Electronic Distribution for Rancho Seco     Independent Spent Fuel Storage Installation  
 
OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION T. Ronningen 3 OFFICIAL USE ONLY  
- SECURITY-RELATED INFORMATION Electronic Distribution by RIV w/o enclosure
: Acting Regional Administrator (Steven.Reynolds@nrc.gov)


OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION T. Ronningen                                    3 Electronic Distribution by RIV w/o enclosure:
Acting Regional Administrator (Steven.Reynolds@nrc.gov)
Acting Deputy Regional Administrator (Thomas.Bergman@nrc.gov)
Acting Deputy Regional Administrator (Thomas.Bergman@nrc.gov)
Chief, Response Coordination Branch (Linda.Howell@nrc.gov) DNMS Director (Anton.Vegel@nrc.gov) DNMS Deputy Director (Vivian Campbell@nrc.gov)
Chief, Response Coordination Branch (Linda.Howell@nrc.gov)
DNMS Director (Anton.Vegel@nrc.gov)
DNMS Deputy Director (Vivian Campbell@nrc.gov)
Branch Chief (Blair Spitzberg@nrc.gov)
Branch Chief (Blair Spitzberg@nrc.gov)
RSFS Inspector (Lee.Brookhart@nrc.gov)
RSFS Inspector (Lee.Brookhart@nrc.gov)
SFST RIV Project Manager (William.Allen@nrc.gov)  
SFST RIV Project Manager (William.Allen@nrc.gov)
 
Hard Copy:
Hard Copy: RIV DNMS File - 5th Floor
RIV DNMS File - 5th Floor ML13242A252 Cover Letter Only                       Non Sensitive           Publicly Available: JRL SUNSI Review Complete: JRL           Sensitive               Non-Publicly Available SPSI:PSB1               C:PSB-1               C:FCDB                 C:PSB-1 JLarsen                 DHolman               BSpitzberg             MHaire
 
/RA/                   /RA/                 /RA/                   /RA/
ML13242A252 Cover Letter Only   Non Sensitive   Publicly Available: JRL SUNSI Review Complete: JRL Sensitive           Non-Publicly Available SPSI:PSB1 C:PSB-1 C:FCDB C:PSB-1 JLarsen DHolman BSpitzberg MHaire /RA/ /RA/ /RA/ /RA/ 8/23/13 8/23/13 8/28/13 8/30/13 OFFICIAL RECORD COPY           T=Telephone           E=E-mail       F=Fax}}
8/23/13                 8/23/13               8/28/13                 8/30/13 OFFICIAL RECORD COPY               T=Telephone         E=E-mail     F=Fax OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION}}

Latest revision as of 14:03, 4 November 2019

11-2013401 Non-SGI Cover ltr-JRL
ML13242A252
Person / Time
Site: Rancho Seco, 07200011
Issue date: 08/30/2013
From: Mark Haire
Plant Support Branch-1
To: Ronningen E
Sacramento Municipal Utility District (SMUD)
References
IR-13-401
Download: ML13242A252 (3)


Text

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION UNITE D S TATE S NUC LEAR REGULATOR Y C OMMI S SI ON R E G IO N I V 1600 EAST LAMAR BLVD AR L INGTON , TEXAS 76011- 4511 August 30, 2013 Mr. Einar T. Ronningen, Superintendent Rancho Seco Assets Sacramento Municipal Utility District 14440 Twin Cities Road, MS N493 Herald, CA 95638

SUBJECT:

RANCHO SECO INDEPENDENT SPENT FUEL STORAGE INSTALLATION, PHYSICAL SECURITY REQUIREMENTS FOR INDEPENDENT SPENT FUEL STORAGE INSTALLATIONS INSPECTION REPORT 072-11/2013401

Dear Mr. Ronningen:

On August 1, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an Independent Spent Fuel Storage Installation Security Inspection at your Rancho Seco facility. The enclosed inspection report documents the inspection results, which were discussed on August 1, 2013, with Mr. S. Flake, Manager, Power Generation, and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, the NRC identified two Severity Level IV violations of the NRC requirements. These violations were determined to be of low security significance and circumstances surrounding the violations are discussed in the enclosed report. Furthermore, because of the low security significance and because they were entered into your site corrective action program, the NRC is treating these violations as non-cited violations (NCV), consistent with Section VI. A. 1 of the Enforcement Policy. If you contest these violations or the severity level of the NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U. S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with a copy to the Regional Administrator, Region IV and the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.

Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this transmittal document is decontrolled.

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION E. Ronningen In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Mark S. Haire, Chief Plant Support Branch-1 Division of Reactor Safety Docket Nos.: 050-312; 72-00011 License Nos.: DPR-54; SNM-2510 cc w/o enclosure:

Electronic Distribution for Rancho Seco Independent Spent Fuel Storage Installation OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION T. Ronningen 3 Electronic Distribution by RIV w/o enclosure:

Acting Regional Administrator (Steven.Reynolds@nrc.gov)

Acting Deputy Regional Administrator (Thomas.Bergman@nrc.gov)

Chief, Response Coordination Branch (Linda.Howell@nrc.gov)

DNMS Director (Anton.Vegel@nrc.gov)

DNMS Deputy Director (Vivian Campbell@nrc.gov)

Branch Chief (Blair Spitzberg@nrc.gov)

RSFS Inspector (Lee.Brookhart@nrc.gov)

SFST RIV Project Manager (William.Allen@nrc.gov)

Hard Copy:

RIV DNMS File - 5th Floor ML13242A252 Cover Letter Only Non Sensitive Publicly Available: JRL SUNSI Review Complete: JRL Sensitive Non-Publicly Available SPSI:PSB1 C:PSB-1 C:FCDB C:PSB-1 JLarsen DHolman BSpitzberg MHaire

/RA/ /RA/ /RA/ /RA/

8/23/13 8/23/13 8/28/13 8/30/13 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION