IR 05000346/2013503: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(8 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 10/01/2013
| issue date = 10/01/2013
| title = Errata to Davis-Besse Nuclear Power Station Baseline Emergency Preparedness Biennial Exercise Inspection Report 05000346-13-503
| title = Errata to Davis-Besse Nuclear Power Station Baseline Emergency Preparedness Biennial Exercise Inspection Report 05000346-13-503
| author name = Skokowski R A
| author name = Skokowski R
| author affiliation = NRC/RGN-III/DRS/PSB
| author affiliation = NRC/RGN-III/DRS/PSB
| addressee name = Lieb R
| addressee name = Lieb R
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532
{{#Wiki_filter:ober 1, 2013
-4352 October 1, 2013 Mr. Raymond Lieb Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A
-DB-3080 Oak Harbor, OH 43449
-9760


SUBJECT: ERRATA TO DAVIS-BESSE NUCLEAR POWER STATION BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 050003 46/2013503
==SUBJECT:==
ERRATA TO DAVIS-BESSE NUCLEAR POWER STATION BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000346/2013503


==Dear Mr. Lieb:==
==Dear Mr. Lieb:==
On June 12, 2013, the U.S. Nuclear Regulatory Commission (NRC) issued Inspection Report (IR) 05000 346/201 3503 (ML13164A125). The inspection report did not include documentation for an inspection sample that was completed under Inspection Procedure (IP)
On June 12, 2013, the U.S. Nuclear Regulatory Commission (NRC) issued Inspection Report (IR) 05000346/2013503 (ML13164A125). The inspection report did not include documentation for an inspection sample that was completed under Inspection Procedure (IP) 71114.08, Exercise Evaluation - Scenario Review. Please add Section 1EP8 to the April 24, 2013, report with the 1EP8 section which is enclosed.
71114.08, Exercise Evaluation  
- Scenario Review. Please add Section 1 EP8 to the April 24, 201 3, report with the 1 EP8 section which is enclosed. We apologize for any inconvenience to you and your staff.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
We apologize for any inconvenience to you and your staff.
-rm/adams.html (the Public Electronic Reading Room).


Sincerely,/RA/
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket No. 50
-346 License No. NPF-3


===Enclosure:===
Sincerely,
Errata to Integrated Inspection Report 05000 346/20 1 3 5 03 cc w/encl:
/RA/
Distribution via ListServ
Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 Enclosure: Errata to Integrated Inspection Report 05000346/2013503 cc w/encl: Distribution via ListServ'
Ž Enclosure ERRATA TO INTEGRATED INSPECTION REPORT 05000 461/201 3 5 03 1 EP8 Exercise Evaluation
- Scenario Review (71114.08)
a. Inspection Scope Prior to the inspection activity, the inspectors conducted an in
-office review of the exercise objectives and scenario submitted to the NRC using Inspection Procedure (IP) 71114.08, "Exercise Evaluation
- Scenario Review," to determine whether the exercise would test major elements of the Emergency Plan , as required by 10 CFR 50.47(b)(14). The inspectors reviewed various documents
, which are listed in the Attachment to this report.


This review of the exercise objectives and scenario constituted one sample as defined in IP 71114.08
ERRATA TO INTEGRATED INSPECTION REPORT 05000461/2013503 1EP8 Exercise Evaluation - Scenario Review (71114.08)
-06. b. Findings No findings were identified.
a. Inspection Scope Prior to the inspection activity, the inspectors conducted an in-office review of the exercise objectives and scenario submitted to the NRC using Inspection Procedure (IP) 71114.08, Exercise Evaluation - Scenario Review, to determine whether the exercise would test major elements of the Emergency Plan, as required by 10 CFR 50.47(b)(14). The inspectors reviewed various documents, which are listed in the Attachment to this report.


Mr. Raymond Lieb Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A
This review of the exercise objectives and scenario constituted one sample as defined in IP 71114.08-06.
-DB-3080 Oak Harbor, OH 43449
-9760


SUBJECT: ERRATA TO DAVIS
b. Findings No findings were identified.
-BESSE NUCLEAR POWER STATION BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 050003 46/2013503 Dear M
 
==SUBJECT:==
ERRATA TO DAVIS-BESSE NUCLEAR POWER STATION BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000346/2013503
 
Dear M
}}
}}

Latest revision as of 12:57, 4 November 2019

Errata to Davis-Besse Nuclear Power Station Baseline Emergency Preparedness Biennial Exercise Inspection Report 05000346-13-503
ML13275A120
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/01/2013
From: Richard Skokowski
Plant Support Branch II
To: Lieb R
FirstEnergy Nuclear Operating Co
Robert Jickling
References
IR-13-503
Download: ML13275A120 (2)


Text

ober 1, 2013

SUBJECT:

ERRATA TO DAVIS-BESSE NUCLEAR POWER STATION BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000346/2013503

Dear Mr. Lieb:

On June 12, 2013, the U.S. Nuclear Regulatory Commission (NRC) issued Inspection Report (IR) 05000346/2013503 (ML13164A125). The inspection report did not include documentation for an inspection sample that was completed under Inspection Procedure (IP) 71114.08, Exercise Evaluation - Scenario Review. Please add Section 1EP8 to the April 24, 2013, report with the 1EP8 section which is enclosed.

We apologize for any inconvenience to you and your staff.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 Enclosure: Errata to Integrated Inspection Report 05000346/2013503 cc w/encl: Distribution via ListServ'

ERRATA TO INTEGRATED INSPECTION REPORT 05000461/2013503 1EP8 Exercise Evaluation - Scenario Review (71114.08)

a. Inspection Scope Prior to the inspection activity, the inspectors conducted an in-office review of the exercise objectives and scenario submitted to the NRC using Inspection Procedure (IP) 71114.08, Exercise Evaluation - Scenario Review, to determine whether the exercise would test major elements of the Emergency Plan, as required by 10 CFR 50.47(b)(14). The inspectors reviewed various documents, which are listed in the Attachment to this report.

This review of the exercise objectives and scenario constituted one sample as defined in IP 71114.08-06.

b. Findings No findings were identified.

SUBJECT:

ERRATA TO DAVIS-BESSE NUCLEAR POWER STATION BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000346/2013503

Dear M