| {{#Wiki_filter:1 NRR-PMDAPEm Resource From: Saba, Farideh Sent: Tuesday, December 24, 2013 1:43 PM To: Hess, Thomas A (tahess@tva.gov); Willia ms, Gordon Robert (grwilliams1@tva.gov) | | {{#Wiki_filter:NRR-PMDAPEm Resource From: Saba, Farideh Sent: Tuesday, December 24, 2013 1:43 PM To: Hess, Thomas A (tahess@tva.gov); Williams, Gordon Robert (grwilliams1@tva.gov) |
| Cc:Klett, Audrey; Quichocho, Jessie | | Cc: Klett, Audrey; Quichocho, Jessie |
|
| |
|
| ==Subject:== | | ==Subject:== |
| BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3 - ACCEPTANCE OF REQUESTED LICENSING ACTION RE: AM ENDMENT (TAC NOS. MF3124, M3125, AND MF3126)By letter dated November 22, 2013, Tennessee Valley Authority (TVA), submitted a lice nse amendment request for Browns Ferry Nuclear Plant (BFN) Units 1, 2, and 3. The proposed license amendment would change Technical Specification (TS) 3.6.1.3, "Primary Containment Isolation Valves (PCIVs)" to reduce the individual and total leakage rate through main steam isolation valves (MSIVs)." This proposed change would make the current passive Secondary Alternative Leakage Treatment (ALT) Pathway be the primary pathway and decrease the leakage rates from 100 standard cubic feet per hour (scfh) per valve to 60scfh for individual MSIVs and combined leakage rates for all four main steam lines from 150scfh to 85scfh. | | BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3 - ACCEPTANCE OF REQUESTED LICENSING ACTION RE: AMENDMENT (TAC NOS. MF3124, M3125, AND MF3126) |
| | | By letter dated November 22, 2013, Tennessee Valley Authority (TVA), submitted a license amendment request for Browns Ferry Nuclear Plant (BFN) Units 1, 2, and 3. The proposed license amendment would change Technical Specification (TS) 3.6.1.3, Primary Containment Isolation Valves (PCIVs) to reduce the individual and total leakage rate through main steam isolation valves (MSIVs). This proposed change would make the current passive Secondary Alternative Leakage Treatment (ALT) Pathway be the primary pathway and decrease the leakage rates from 100 standard cubic feet per hour (scfh) per valve to 60scfh for individual MSIVs and combined leakage rates for all four main steam lines from 150scfh to 85scfh. |
| Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. | | Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. |
| | | The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. |
| The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. | | The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence. |
| The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence. | |
| | |
| If you have any questions, please contact me at (301) 415-1447. | | If you have any questions, please contact me at (301) 415-1447. |
| Docket Nos. 50-259, 50-260, and 50-296 | | Docket Nos. 50-259, 50-260, and 50-296 Farideh E. Saba, P.E. |
| | Senior Project Manager NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8G9A Farideh.Saba@NRC.GOV 1 |
|
| |
|
| Farideh E. Saba, P.E. Senior Project Manager NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8G9A Farideh.Saba@NRC.GOV
| | Hearing Identifier: NRR_PMDA Email Number: 1028 Mail Envelope Properties (Farideh.Saba@nrc.gov20131224134300) |
| | |
| Hearing Identifier: NRR_PMDA Email Number: 1028 Mail Envelope Properties (Farideh.Saba@nrc.gov20131224134300) | |
|
| |
|
| ==Subject:== | | ==Subject:== |
| BROWNS FERRY NUCLEAR PLANT, UNI TS 1, 2, AND 3 - ACCEPTANCE OF REQUESTED LICENSING ACTION RE: AMENDMENT (TAC NOS. MF3124, M3125, AND MF3126) Sent Date: 12/24/2013 1:43:20 PM Received Date: 12/24/2013 1:43:00 PM From: Saba, Farideh Created By: Farideh.Saba@nrc.gov Recipients: "Klett, Audrey" <Audrey.Klett@nrc.gov> Tracking Status: None "Quichocho, Jessie" <Jessie.Quichocho@nrc.gov> Tracking Status: None "Hess, Thomas A (tahess@tva.gov)" <tahess@tva.gov> Tracking Status: None "Williams, Gordon Robert (grwilliams1@tva.gov)" <grwilliams1@tva.gov> Tracking Status: None | | BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3 - ACCEPTANCE OF REQUESTED LICENSING ACTION RE: AMENDMENT (TAC NOS. MF3124, M3125, AND MF3126) |
| | | Sent Date: 12/24/2013 1:43:20 PM Received Date: 12/24/2013 1:43:00 PM From: Saba, Farideh Created By: Farideh.Saba@nrc.gov Recipients: |
| Post Office: Files Size Date & Time MESSAGE 2906 12/24/2013 1:43:00 PM Options Priority: Standard Return Notification: No Reply Requested: Yes Sensitivity: Normal Expiration Date: Recipients Received:}} | | "Klett, Audrey" <Audrey.Klett@nrc.gov> |
| | Tracking Status: None "Quichocho, Jessie" <Jessie.Quichocho@nrc.gov> |
| | Tracking Status: None "Hess, Thomas A (tahess@tva.gov)" <tahess@tva.gov> |
| | Tracking Status: None "Williams, Gordon Robert (grwilliams1@tva.gov)" <grwilliams1@tva.gov> |
| | Tracking Status: None Post Office: |
| | Files Size Date & Time MESSAGE 2906 12/24/2013 1:43:00 PM Options Priority: Standard Return Notification: No Reply Requested: Yes Sensitivity: Normal Expiration Date: |
| | Recipients Received:}} |
Letter Sequence Acceptance Review |
---|
|
|
MONTHYEARCNL-13-126, Proposed Technical Specification Change to Revise the Leakage Rate Through MSIVs-TS-4852013-11-22022 November 2013 Proposed Technical Specification Change to Revise the Leakage Rate Through MSIVs-TS-485 Project stage: Other ML14017A0782013-12-24024 December 2013 NRR E-mail Capture - Browns Ferry Nuclear Plant, Units 1, 2, and 3 Acceptance of Requested Licensing Action Amendment (TAC Nos. MF3124, M3125, and MF3126) Project stage: Acceptance Review CNL-14-037, Response to NRC Request for Additional Information Regarding Proposed Technical Specification Change to Revise the Leakage Rate Through Main Steam Isolation Valves - TS-4852014-04-0404 April 2014 Response to NRC Request for Additional Information Regarding Proposed Technical Specification Change to Revise the Leakage Rate Through Main Steam Isolation Valves - TS-485 Project stage: Response to RAI ML14171A2882014-06-19019 June 2014 NRR E-mail Capture - RAIs Regarding Proposed Technical Specification Change to Revise the Leakage Rate Through Msivs TS-485, TAC Nos. MF3124, MF3125, and MF3126 Project stage: RAI ML14183A0082014-07-0101 July 2014 NRR E-mail Capture - RAI for TACs MF8124, MF8125, and MF8126 for Browns Ferry Project stage: RAI CNL-14-106, Response to NRC Request for Additional Information Regarding Proposed Technical Specification Change to Revise the Leakage Rate Through MSIVs - TS-4852014-08-15015 August 2014 Response to NRC Request for Additional Information Regarding Proposed Technical Specification Change to Revise the Leakage Rate Through MSIVs - TS-485 Project stage: Response to RAI 2014-04-04
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24255A5802024-09-10010 September 2024 SLRA - Requests for Additional Information - Set 1 - Email from Jessica Hammock to James Barstow ML24170A6392024-06-17017 June 2024 Notification of Inspection and Request for Information ML24123A0882024-05-0202 May 2024 NRR E-mail Capture - Correction Acceptance Review Results for the Browns Ferry, Sequoyah, and Watts Bar License Amendment Request to Revise TS 5.4.1 or 5.7.1 (L-2024-LLA-0039) ML24122B4872024-04-30030 April 2024 NRR E-mail Capture - Acceptance Review Results for the Browns Ferry, Sequoyah, and Watts Bar License Amendment Request to Revise TS 5.4.1 or 5.7.1 (L-2024-LLA-0039) ML24116A2012024-04-17017 April 2024 Nrctva ISFSI CBS (RFI) ML24047A2792024-02-15015 February 2024 RAI Related to the Exemption Request for 10 CFR 37.11 ML24045A0272024-02-14014 February 2024 NRR E-mail Capture - Request for Additional Information Related to the Exemption Request for the 10 CFR Part 73 Enhanced Weapons Rule ML23355A2202023-12-21021 December 2023 Radiation Protection Inspection - Inspection Report 2024-01 ML23332A0042023-11-27027 November 2023 NRR E-mail Capture - Request for Additional Information Related to Proposed Revised Alternative 0-ISI-47 ML23319A1662023-11-0202 November 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant, Exemption Request Related to 10 CFR 37.11(c)(2) ML24074A4172023-10-12012 October 2023 2024 EP Inspections RFI Email Confirmations: Redacted ML23243A9892023-08-29029 August 2023 Inspection Information Request ML23208A0872023-07-26026 July 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry 1, 2, and 3, Alternative Request 0-ISI-47 to Use an Alternative to ASME Code, Section XI, Examination Requirements for Examination Categories B-N-1 and B-N-2 ML23124A0082023-05-0303 May 2023 NRR E-mail Capture - Request for Additional Information Related to Proposed Alternative Requests for the 5th 10-Year Inservice Testing Interval for Browns Ferry Nuclear Plant, Units 1, 2, and 3 ML23117A0702023-04-26026 April 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry, 1, 2, and 3, License Amendment Request to Revise Tech Specs Surveillance Requirements 3.4.3.2 and 3.5.1.11 Safety Relief Valves (BFN TS-540) ML23097A0172023-04-0606 April 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry, Units 1, 2, and 3, License Amendment Request to Adopt TSTF-566-A and TSTF-580-A, Revision 1 ML23073A2082023-03-10010 March 2023 TVA Intentions on EA-22-122 - Choice Letter Response Email Message ML23073A2072023-03-10010 March 2023 TVA Intentions on EA-22-122 - Choice Letter Response Email Message - NRC Acknowledgement ML23075A0502023-03-10010 March 2023 TVA Intentions on EA-22-122 - Choice Letter Response Email Message and TVA Intentions on EA-22-122 - Choice Letter Response Email Message -- NRC Acknowledgement ML23052A0792023-02-21021 February 2023 NRR E-mail Capture - Acceptance Review for Browns Ferry and Sequoyah License Amendment Request to Adopt TSTF-541 ML23041A0022023-02-0909 February 2023 NRR E-mail Capture - Request for Additional Information Related to TVA Alternative Request BFN-0-ISI-32 (CNL-22-025) ML23013A1512023-01-13013 January 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Units 1, 2, and 3, Request to Use Later ASME OM Code Edition and Alternative Requests BFN-IST-01 Through BFN-IST-05 ML23017A0062023-01-12012 January 2023 Initial Information Request Inspection Report: 2023001 ML23013A0362023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML23013A0382023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML23004A0352023-01-0404 January 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry, Units 1, 2, and 3, License Amendment Request to Delete TS 3.6.3.1 by Adopting TSTF-478 ML22348A0972022-12-14014 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML22348A0442022-12-13013 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML22304A1852022-10-31031 October 2022 NRR E-mail Capture - Acceptance Review Results for Browns Ferry, Units 1, 2, and 3, License Amendment Request to Remove Site Acreage Description from TS 4.1 ML22299A0292022-10-26026 October 2022 NRR E-mail Capture - Request for Additional Information for Relief Request BFN-2-ISI-003 Re Weld Examination Coverage ML22292A2722022-10-19019 October 2022 NRR E-mail Capture - Request for Additional Information Related to Tva'S Request to Adopt TSTF-505 and TSTF-439 for Browns Ferry Nuclear Plant, Units 1, 2, and 3 ML22265A1492022-09-21021 September 2022 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Units 1, 2, and 3, Alternative Request BFN-0-ISI-32 ML22259A0382022-09-14014 September 2022 NRR E-mail Capture - Browns Ferry TSTF-505 Audit Questions - Part 4 ML22259A0392022-09-14014 September 2022 NRR E-mail Capture - Browns Ferry TSTF-505 Audit Questions - Part 5 ML22259A0372022-09-13013 September 2022 NRR E-mail Capture - Browns Ferry TSTF-505 Audit Questions - Part 3 ML22238A0672022-08-24024 August 2022 NRR E-mail Capture - Browns Ferry TSTF-505 Audit Questions - Part 2 ML22238A0652022-08-19019 August 2022 NRR E-mail Capture - Browns Ferry TSTF-505 Audit Questions ML22215A2752022-08-0303 August 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-554 ML22208A2172022-07-15015 July 2022 NRR E-mail Capture - Request for Additional Information Related to TVA Relief Request BFN-21-ISI-02 (CNL-21-081) ML22194A8762022-07-13013 July 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-529 ML22173A1682022-06-21021 June 2022 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Unit 2, Relief Request BFN-2-ISI-003 ML22168A0802022-06-17017 June 2022 NRR E-mail Capture - Request for Confirmation of Information and Additional Information Related to Tva'S Request to Use Control Bay Chiller Cross-Tie ML22160A4742022-06-0303 June 2022 NRR E-mail Capture - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Additional Information Re LAR to Use Advanced Framatome Methodologies in Support of Atrium 11 Fuel ML22146A3342022-05-25025 May 2022 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Units 1, 2, and 3, Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Relief Requests (EPID L-2022-LLR-0045 - 0047) ML22168A0392022-05-13013 May 2022 NRR E-mail Capture - Draft Request for Confirmation of Information and Additional Information Related to Tva'S Request to Use Control Bay Chiller Cross-Tie ML22144A1002022-05-12012 May 2022 NRR E-mail Capture - Request for Additional Information Related to Tva'S Request to Revised the TVA Plants' Radiological Emergency Plans ML22131A1692022-05-0303 May 2022 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Units 1, 2, and 3, License Amendment Request to Adopt TSTF-505 and TSTF-439 ML22091A1942022-03-0808 March 2022 2022 BFN POV Inspection Information Request ML22055A0772022-02-22022 February 2022 NRR E-mail Capture - Results of NRC SUNSI Review of Browns Ferry Nuclear Plant, Units 1, 2, and 3, Updated Final Safety Analysis Report, Amendment 29 ML22047A1612022-02-16016 February 2022 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Expand the SFP Criticality Safety Analysis for Browns Ferry Nuclear Plant, Units 1, 2, and 3 2024-09-10
[Table view] |
Text
NRR-PMDAPEm Resource From: Saba, Farideh Sent: Tuesday, December 24, 2013 1:43 PM To: Hess, Thomas A (tahess@tva.gov); Williams, Gordon Robert (grwilliams1@tva.gov)
Cc: Klett, Audrey; Quichocho, Jessie
Subject:
BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3 - ACCEPTANCE OF REQUESTED LICENSING ACTION RE: AMENDMENT (TAC NOS. MF3124, M3125, AND MF3126)
By letter dated November 22, 2013, Tennessee Valley Authority (TVA), submitted a license amendment request for Browns Ferry Nuclear Plant (BFN) Units 1, 2, and 3. The proposed license amendment would change Technical Specification (TS) 3.6.1.3, Primary Containment Isolation Valves (PCIVs) to reduce the individual and total leakage rate through main steam isolation valves (MSIVs). This proposed change would make the current passive Secondary Alternative Leakage Treatment (ALT) Pathway be the primary pathway and decrease the leakage rates from 100 standard cubic feet per hour (scfh) per valve to 60scfh for individual MSIVs and combined leakage rates for all four main steam lines from 150scfh to 85scfh.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence.
If you have any questions, please contact me at (301) 415-1447.
Docket Nos. 50-259, 50-260, and 50-296 Farideh E. Saba, P.E.
Senior Project Manager NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8G9A Farideh.Saba@NRC.GOV 1
Hearing Identifier: NRR_PMDA Email Number: 1028 Mail Envelope Properties (Farideh.Saba@nrc.gov20131224134300)
Subject:
BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3 - ACCEPTANCE OF REQUESTED LICENSING ACTION RE: AMENDMENT (TAC NOS. MF3124, M3125, AND MF3126)
Sent Date: 12/24/2013 1:43:20 PM Received Date: 12/24/2013 1:43:00 PM From: Saba, Farideh Created By: Farideh.Saba@nrc.gov Recipients:
"Klett, Audrey" <Audrey.Klett@nrc.gov>
Tracking Status: None "Quichocho, Jessie" <Jessie.Quichocho@nrc.gov>
Tracking Status: None "Hess, Thomas A (tahess@tva.gov)" <tahess@tva.gov>
Tracking Status: None "Williams, Gordon Robert (grwilliams1@tva.gov)" <grwilliams1@tva.gov>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 2906 12/24/2013 1:43:00 PM Options Priority: Standard Return Notification: No Reply Requested: Yes Sensitivity: Normal Expiration Date:
Recipients Received: