{{#Wiki_filter:SEQUOYAH NUCLEAR PLANT   1311 NRC SIMULATOR JPM I PLANT JPM I Page 2 of 6   RO/SRO JOB PERFORMANCE MEASURE     Task: Respond to an ATWS Trip the Reactor Locally   Task #: 0000130504 Task Standard: Reactor is tripped locally by opening of BOTH MG set supply breakers. Alternate Path: YES: NO: X   Time Critical Task: YES: NO: X   K/A Reference/Ratings: APE 029 EA1.12 (4.1/4.0) Method of Testing:   Simulated Performance: X Actual Performance:   Evaluation Method:   Simulator In-Plant X Classroom             Main Control Room   Mock-up       Performer:   Trainee Name   Evaluator: /     Name / Signature DATE Performance Rating: SAT: UNSAT:   Validation Time: 5 min Total Time:       Performance Time: Start Time:   Finish Time:     COMMENTS PLANT JPM I Page 3 of 6 SPECIAL INSTRUCTIONS TO EVALUATOR: 1. 2. Any UNSAT requires comments. Tools/Equipment/Procedures Needed:  
{{#Wiki_filter:SEQUOYAH NUCLEAR PLANT 1311 NRC SIMULATOR JPM I
 
PLANT JPM I Page 2 of 6 RO/SRO JOB PERFORMANCE MEASURE Task:             Respond to an ATWS Trip the Reactor Locally Task #:             0000130504 Task Standard:   Reactor is tripped locally by opening of BOTH MG set supply breakers.
Alternate Path:           YES:             NO:       X Time Critical Task:       YES:             NO:       X K/A Reference/Ratings:     APE 029 EA1.12 (4.1/4.0)
Method of Testing:
Simulated Performance:         X         Actual Performance:
Evaluation Method:
Simulator               In-Plant       X       Classroom Main Control Room                             Mock-up Performer:
Trainee Name Evaluator:                                     /
Name / Signature                               DATE Performance Rating:     SAT:                 UNSAT:
Validation Time:           5 min                         Total Time:
Performance Time:         Start Time:                   Finish Time:
COMMENTS
 
PLANT JPM I Page 3 of 6 SPECIAL INSTRUCTIONS TO EVALUATOR:
: 1. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
: 2. Any UNSAT requires comments.
Tools/Equipment/Procedures Needed:


==References:==
==References:==
Reference Title Rev No. FR-S.1 Nuclear Power Generation/ATWS 23 ==================================================================================== READ TO OPERATOR HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME! DIRECTIONS TO EXAMINEE: I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS: 1. Unit 1 is in an ATWS condition. 2. FR-S.1 Nuclear Power Generation/ATWS is in progress. INITIATING CUES: 1. You have been directed to the trip the M-G supply breakers at the U1 A and B 480V Unit Boards using FR-S.1, NUCLEAR POWER GENERATION / ATWS step 7. 2. Inform the SRO when complete.
 
PLANT JPM I Page 4 of 6   Start Time     STEP 1 : Obtain a copy of FR-S.1, NUCLEAR POWER GENERATION / ATWS   SAT      UNSAT   Standard: Examinee obtains a copy of FR-S.1, NUCLEAR POWER GENERATION / ATWS. Cue Provide a copy of FR-S.1, NUCLEAR POWER GENERATION / ATWS, step 7. Comment    STEP 2 :     SAT     UNSAT   Standard: Operator simulates tripping the Control Rod Drive MG Set 1A breaker by depressing the Mechanical Red trip button (on front of compartment). CRITICAL Cue After attempts to simulate opening the MG set output breaker provide the following cue, MG set output breaker is GREEN". Examiner Note: The JPM Steps can be performed in any order. Examiner Note The breaker is located on 480V UNIT BOARD 1A, 1-BCTB-85-DE/4D Compt 4D. Comment PLANT JPM I Page 5 of 6 STEP 3 :     SAT     UNSAT   Standard: Operator simulates tripping the Control Rod Drive MG Set 1B breaker by depressing the Mechanical Red trip button (on front of compartment). CRITICAL Cue After attempts to simulate opening the MG set output breaker provide the following cue, MG set output breaker is GREEN". Examiner Note The breaker is located on 480V UNIT BOARD 1B, 1-BCTB-85-DF/3B Compt 3B. Comment   STEP 4 : Inform the Control Room of actions taken. SAT     UNSAT   Standard: Operator simulates contacting the Control Room and informing them that MG set output breakers are open. Comment     Terminating Cue: The task is complete when the operator initiates communication with the MCR regarding tripping the MG Set Output Breakers. STOP  Stop Time JPM BRIEFING SHEET DIRECTIONS TO EXAMINEE: All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. You will be provided initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS: 1. Unit 1 is in an ATWS condition. 2. FR-S.1 Nuclear Power Generation/ATWS is in progress. INITIATING CUES: 1. You have been directed to the trip the M-G supply breakers at the U1 A and B 480V Unit Boards using FR-S.1, NUCLEAR POWER GENERATION / ATWS step 7. 2. Inform the SRO when complete. Acknowledge to the examiner when you are ready to begin. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
Reference                                       Title                       Rev No.
SEQUOYAH NUCLEAR PLANT   1311 NRC PLANT JPM J PLANT JPM J Page 2 of 15 RO/SRO JOB PERFORMANCE MEASURE     Task: Local Alignment of 2-RM-90-112 to Lower Containment   Task #: 0730990101 Task Standard: The Examinee manually starts a sample pump and aligns 2-RM-90-112 to Lower Containment. Alternate Path: YES: NO: X   Time Critical Task: YES: NO: X   K/A Reference/Ratings: 002 A3.01 (3.7/3.9) Method of Testing:   Simulated Performance: X Actual Performance:   Evaluation Method:   Simulator In-Plant X Classroom             Main Control Room   Mock-up       Performer:   Trainee Name   Evaluator: /     Name / Signature DATE Performance Rating: SAT: UNSAT:   Validation Time: 15 min Total Time:       Performance Time: Start Time:   Finish Time:     COMMENTS PLANT JPM J Page 3 of 15 SPECIAL INSTRUCTIONS TO EVALUATOR: 1. 2. Any UNSAT requires comments. Tools/Equipment/Procedures Needed: 1. 2-SO-90-2, Sections 5.1 and 8.3
FR-S.1                               Nuclear Power Generation/ATWS                       23
====================================================================================
READ TO OPERATOR HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
DIRECTIONS TO EXAMINEE:
I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. I will provide initiating cues and indicate any steps to be discussed.
When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
: 1. Unit 1 is in an ATWS condition.
: 2. FR-S.1 Nuclear Power Generation/ATWS is in progress.
INITIATING CUES:
: 1. You have been directed to the trip the M-G supply breakers at the U1 A and B 480V Unit Boards using FR-S.1, NUCLEAR POWER GENERATION / ATWS step 7.
: 2. Inform the SRO when complete.
 
PLANT JPM I Page 4 of 6 Start Time STEP   1 :                                                                                 SAT Obtain a copy of FR-S.1, NUCLEAR POWER GENERATION / ATWS UNSAT Standard:   Examinee obtains a copy of FR-S.1, NUCLEAR POWER GENERATION
            / ATWS.
Cue     Provide a copy of FR-S.1, NUCLEAR POWER GENERATION / ATWS, step 7.
Comment STEP   2 :                                                                                 SAT UNSAT Standard:   Operator simulates tripping the Control Rod Drive MG Set 1A breaker by CRITICAL depressing the Mechanical Red trip button (on front of compartment).
Cue     After attempts to simulate opening the MG set output breaker provide the following cue, Flags/Targets on MG set output breaker is GREEN".
Examiner Note:   The JPM Steps can be performed in any order.
Examiner   The breaker is located on 480V UNIT BOARD 1A, 1-BCTB-85-DE/4D Note    Compt 4D.
Comment
 
PLANT JPM I Page 5 of 6 STEP   3   :                                                                               SAT UNSAT Standard:   Operator simulates tripping the Control Rod Drive MG Set 1B breaker by CRITICAL depressing the Mechanical Red trip button (on front of compartment).
Cue       After attempts to simulate opening the MG set output breaker provide the following cue, Flags/Targets on MG set output breaker is GREEN".
Examiner   The breaker is located on 480V UNIT BOARD 1B, 1-BCTB-85-DF/3B Note      Compt 3B.
Comment Inform the Control Room of actions taken.
STEP    4  :                                                                                SAT UNSAT Standard:   Operator simulates contacting the Control Room and informing them that MG set output breakers are open.
Comment Terminating   The task is complete when the operator initiates communication Cue:                                                                                  STOP with the MCR regarding tripping the MG Set Output Breakers.
Stop Time
 
JPM BRIEFING SHEET DIRECTIONS TO EXAMINEE:
All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. You will be provided initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
: 1. Unit 1 is in an ATWS condition.
: 2. FR-S.1 Nuclear Power Generation/ATWS is in progress.
INITIATING CUES:
: 1. You have been directed to the trip the M-G supply breakers at the U1 A and B 480V Unit Boards using FR-S.1, NUCLEAR POWER GENERATION / ATWS step 7.
: 2. Inform the SRO when complete.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
 
SEQUOYAH NUCLEAR PLANT 1311 NRC PLANT JPM J
 
PLANT JPM J Page 2 of 15 RO/SRO JOB PERFORMANCE MEASURE Task:             Local Alignment of 2-RM-90-112 to Lower Containment Task #:             0730990101 Task Standard:   The Examinee manually starts a sample pump and aligns 2-RM-90-112 to Lower Containment.
Alternate Path:           YES:             NO:         X Time Critical Task:       YES:             NO:         X K/A Reference/Ratings:     002 A3.01 (3.7/3.9)
Method of Testing:
Simulated Performance:         X         Actual Performance:
Evaluation Method:
Simulator               In-Plant       X     Classroom Main Control Room                             Mock-up Performer:
Trainee Name Evaluator:                                     /
Name / Signature                                 DATE Performance Rating:     SAT:                 UNSAT:
Validation Time:           15 min                       Total Time:
Performance Time:         Start Time:                   Finish Time:
COMMENTS
 
PLANT JPM J Page 3 of 15 SPECIAL INSTRUCTIONS TO EVALUATOR:
: 1. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
: 2. Any UNSAT requires comments.
Tools/Equipment/Procedures Needed:
: 1.       2-SO-90-2, Sections 5.1 and 8.3


==References:==
==References:==
Reference Title Rev No. 2-SO-90-2 Gaseous Process Radiation Monitoring System 37  ==================================================================================== READ TO EXAMINEE HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME! DIRECTIONS TO EXAMINEE: I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS: 1. Unit 2 is in MODE 1. 2. 2-RM-90-112 had been isolated and tagged electrically for maintenance. The Hold Order has been picked up from the breaker, Checklist 2-90-2.03 attachment 2 is complete, but the pumps are off. 3. 2-RM-90-106 has just tripped and neither of its associated pumps can be started. 4. Section 3 and 4 of 2-SO-90-2 Gaseous Process Radiation Monitoring System, is complete. INITIATING CUES: 1. The Control Room has directed you to start a sample pump and align monitor 2-RM-90-112 to sample lower containment using 2-SO-90-2, Section 8.3 steps 1 through 4. 2. Inform the Control Room when complete.
 
PLANT JPM J Page 4 of 15   Start Time    STEP 1 : Obtain a copy of 2-SO-90-2, Gaseous Process Radiation Monitoring System. SAT      UNSAT   Standard: Examinee obtains a copy of 2-SO-90-2, Gaseous Process Radiation Monitoring System. Cue Provide a copy of 2-SO-90-2, Gaseous Process Radiation Monitoring System section 5.1 and 8.3. Comment     STEP 2 :   SAT     UNSAT   Standard: The Examinee addresses the procedure step as being complete in the initial conditions. Comment PLANT JPM J Page 5 of 15 STEP 3 :   SAT     UNSAT   Standard: The Examinee determines a sample pump for 2-RM-90-112 is not running and goes to section 5.1. Comment     STEP 4 :   SAT     UNSAT   Standard: The Examinee selects 2-RM-90-112 based on the initiating cue. Comment PLANT JPM J Page 6 of 15 STEP 5 :   SAT     UNSAT   Standard: The Examinee determines the valve checklist is complete for 2-RM-90-112 based on the initial conditions. Comment    STEP 6 :   SAT     UNSAT   Standard: The Examinee determines the step is N/A based on the initial conditions. Comment PLANT JPM J Page 7 of 15   STEP 7 :   SAT     UNSAT   Standard: The Examinee simulates placing 2-HS-90-112, Heat Trace for 2-RM-90-112 to ON. CRITICAL Cue: If asked provide the following cue, RM-90-112 on Heat Trace Control Panel [2-JBOX-90-3919] is ON. Comment   STEP 8 :   SAT     UNSAT   Standard: The Examinee addresses the step as N/A. Cue: Provide the following cue, Testing is not required Comment PLANT JPM J Page 8 of 15 STEP 9 :   SAT     UNSAT   Standard: The Examinee addresses the procedure step. Cue: Provide the following cue, The Unit 2 Control Room has contacted I&C. Comment    STEP 10 :   SAT     UNSAT   Standard: The Examinee simulates depressing 2-HS-90-112A or 2-HS-90-112B, Sample pump for 2-RM-90-112 to ON. CRITICAL Cue: If asked provide the following cue, You hear a rotational mechanical sound from the vicinity of the sample pump. Comment PLANT JPM J Page 9 of 15 STEP 11 :     SAT     UNSAT   Standard: The Examinee addresses the step as N/A. Comment     STEP 12 :     SAT     UNSAT   Standard: The Examinee addresses the procedure step. Cue: If asked provide the following cue,   Comment PLANT JPM J Page 10 of 15 STEP 13 :     SAT     UNSAT   Standard: The Examinee addresses the procedure step. Cue: If asked provide the following cue, Flow has been established Comment     STEP 14 :     SAT     UNSAT   Standard: The Examinee simulates resetting local low flow seal-in by turning [2-HS-90-112F] to the left to RESET. CRITICAL Comment PLANT JPM J Page 11 of 15 STEP 15 :     SAT     UNSAT   Standard: The Examinee addresses the procedure step. Cue: If asked provide the following cue, Alarms on Panel 0-XA-55-12D Windows A-2 and A-3 are dark Comment    STEP 16 :     SAT     UNSAT   Standard: The Examinee addresses the step as N/A. Cue: If asked provide the following cue, Alarms on Panel 0-XA-55-12D Windows A-2 and A-3 are dark Comment PLANT JPM J Page 12 of 15   STEP 17 :   SAT     UNSAT   Standard: The Examinee addresses the step as N/A. Cue: Provide the following cue, Background count rate is greater than 9,000 cpm Examiner Note: The Examinee returns to section 8.3 step 1[c]. Comment     STEP 18 :   SAT     UNSAT   Standard: The Examinee addresses the procedure step Examiner Note: The heat tracing was placed in service in JPM step 7. Comment PLANT JPM J Page 13 of 15 STEP 19 :   SAT     UNSAT   Standard: The Examinee addresses the procedure step. Cue: If asked provide the following cue, Testing of the heat trace is not   Comment     STEP 20 :   SAT     UNSAT   Standard: The Examinee addresses the procedure step. Cue: Provide the following cue, Background count rate is greater than 9,000 cpm Comment   Examiner Note PLANT JPM J Page 14 of 15 STEP 21 :   SAT     UNSAT   Standard: The Examinee simulates opening 1-ISIV-90-283G by indicating handwheel turned as far left (counter-clockwise) as possible. CRITICAL Cue: If asked provide the following cue,   Comment   Terminating Cue: The task is complete when the Examinee returns the cue sheet to the Examiner. STOP  Stop Time JPM BRIEFING SHEET DIRECTIONS TO EXAMINEE: All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. You will be provided initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS: 1. Unit 2 is in MODE 1. 2. 2-RM-90-112 had been isolated and tagged electrically for maintenance. The Hold Order has been picked up from the breaker, Checklist 2-90-2.03 attachment 2 is complete, but the pumps are off. 3. 2-RM-90-106 has just tripped and neither of its associated pumps can be started. 4. Section 3 and 4 of 2-SO-90-2 Gaseous Process Radiation Monitoring System, is complete. INITIATING CUES: 1. The Control Room has directed you to start a sample pump and align monitor 2-RM-90-112 to sample lower containment using 2-SO-90-2, Section 8.3 steps 1 through 4. 2. Inform the Control Room when complete. Acknowledge to the examiner when you are ready to begin. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
Reference                                       Title                       Rev No.
SEQUOYAH NUCLEAR PLANT   1311 NRC PLANT JPM K PLANT JPM K Page 2 of 8 RO/SRO JOB PERFORMANCE MEASURE     Task: Cycle the Unit 2 Main Generator PCB   Task #: 0620510201 Task Standard: The Examinee cycles the Unit 2 Main Generator circuit breaker with generator off-line. Alternate Path: YES: NO: X   Time Critical Task: YES: NO: X   K/A Reference/Ratings: 062A4.04 (2.6/2.7) Method of Testing:   Simulated Performance: X Actual Performance:   Evaluation Method:   Simulator In-Plant X Classroom             Main Control Room   Mock-up       Performer:   Trainee Name   Evaluator: /     Name / Signature DATE Performance Rating: SAT: UNSAT:   Validation Time: 10 min Total Time:       Performance Time: Start Time:   Finish Time:     COMMENTS PLANT JPM K Page 3 of 8 SPECIAL INSTRUCTIONS TO EVALUATOR: 1. 2. Any UNSAT requires comments. Tools/Equipment/Procedures Needed: 3. 2-SO-57-1 GENERATOR CIRCUIT BREAKER, Section 8.1.
2-SO-90-2                             Gaseous Process Radiation Monitoring                 37 System
====================================================================================
READ TO EXAMINEE HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
DIRECTIONS TO EXAMINEE:
I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. I will provide initiating cues and indicate any steps to be discussed.
When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
: 1. Unit 2 is in MODE 1.
: 2. 2-RM-90-112 had been isolated and tagged electrically for maintenance. The Hold Order has been picked up from the breaker, Checklist 2-90-2.03 attachment 2 is complete, but the pumps are off.
: 3. 2-RM-90-106 has just tripped and neither of its associated pumps can be started.
: 4. Section 3 and 4 of 2-SO-90-2 Gaseous Process Radiation Monitoring System, is complete.
INITIATING CUES:
: 1. The Control Room has directed you to start a sample pump and align monitor 2-RM-90-112 to sample lower containment using 2-SO-90-2, Section 8.3 steps 1 through 4.
: 2. Inform the Control Room when complete.
 
PLANT JPM J Page 4 of 15 Start Time STEP   1 :                                                                               SAT Obtain a copy of 2-SO-90-2, Gaseous Process Radiation Monitoring System.                                                                       UNSAT Standard:   Examinee obtains a copy of 2-SO-90-2, Gaseous Process Radiation Monitoring System.
Cue     Provide a copy of 2-SO-90-2, Gaseous Process Radiation Monitoring System section 5.1 and 8.3.
Comment STEP   2 :                                                                               SAT UNSAT Standard:   The Examinee addresses the procedure step as being complete in the initial conditions.
Comment
 
PLANT JPM J Page 5 of 15 STEP   3   :                                                                     SAT UNSAT The Examinee determines a sample pump for 2-RM-90-112 is not Standard:
running and goes to section 5.1.
Comment STEP   4   :                                                                     SAT UNSAT Standard:   The Examinee selects 2-RM-90-112 based on the initiating cue.
Comment
 
PLANT JPM J Page 6 of 15 STEP   5   :                                                                           SAT UNSAT The Examinee determines the valve checklist is complete for 2-RM   Standard:
112 based on the initial conditions.
Comment STEP   6   :                                                                           SAT UNSAT The Examinee determines the step is N/A based on the initial Standard:
conditions.
Comment
 
PLANT JPM J Page 7 of 15 STEP   7   :                                                                         SAT UNSAT The Examinee simulates placing 2-HS-90-112, Heat Trace for 2-RM-Standard:                                                                        CRITICAL 90-112 to ON.
If asked provide the following cue, Amber light for RM-90-112 on Cue:
Heat Trace Control Panel [2-JBOX-90-3919] is ON.
Comment STEP     8   :                                                                         SAT UNSAT Standard:     The Examinee addresses the step as N/A.
Cue:       Provide the following cue, Testing is not required Comment
 
PLANT JPM J Page 8 of 15 STEP   9   :                                                                         SAT UNSAT Standard:   The Examinee addresses the procedure step.
Provide the following cue, The Unit 2 Control Room has contacted Cue:
I&C.
Comment STEP   10   :                                                                         SAT UNSAT The Examinee simulates depressing 2-HS-90-112A or 2-HS-90-112B, Standard:                                                                        CRITICAL Sample pump for 2-RM-90-112 to ON.
If asked provide the following cue, You hear a rotational Cue:
mechanical sound from the vicinity of the sample pump.
Comment
 
PLANT JPM J Page 9 of 15 STEP   11 :                                                                   SAT UNSAT Standard:   The Examinee addresses the step as N/A.
Comment STEP   12 :                                                                   SAT UNSAT Standard:   The Examinee addresses the procedure step.
Cue:     If asked provide the following cue, I&C has been informed.
Comment
 
PLANT JPM J Page 10 of 15 STEP   13 :                                                                             SAT UNSAT Standard:   The Examinee addresses the procedure step.
Cue:     If asked provide the following cue, Flow has been established.
Comment STEP   14 :                                                                             SAT UNSAT The Examinee simulates resetting local low flow seal-in by turning [2-Standard:                                                                            CRITICAL HS-90-112F] to the left to RESET.
Comment
 
PLANT JPM J Page 11 of 15 STEP   15 :                                                                       SAT UNSAT Standard:   The Examinee addresses the procedure step.
If asked provide the following cue, Alarms on Panel 0-XA-55-12D Cue:
Windows A-2 and A-3 are dark.
Comment STEP   16 :                                                                       SAT UNSAT Standard:   The Examinee addresses the step as N/A.
If asked provide the following cue, Alarms on Panel 0-XA-55-12D Cue:
Windows A-2 and A-3 are dark.
Comment
 
PLANT JPM J Page 12 of 15 STEP   17 :                                                                           SAT UNSAT Standard:     The Examinee addresses the step as N/A.
Provide the following cue, Background count rate is greater than Cue:
9,000 cpm.
Examiner The Examinee returns to section 8.3 step 1[c].
Note:
Comment STEP   18   :                                                                         SAT UNSAT Standard:     The Examinee addresses the procedure step Examiner Note:       The heat tracing was placed in service in JPM step 7.
Comment
 
PLANT JPM J Page 13 of 15 STEP   19   :                                                                             SAT UNSAT Standard:   The Examinee addresses the procedure step.
Cue:     If asked provide the following cue, Testing of the heat trace is not required.
Comment STEP   20   :                                                                             SAT UNSAT Standard:   The Examinee addresses the procedure step.
Provide the following cue, Background count rate is greater than Cue:
9,000 cpm.
Comment Examiner Note
 
PLANT JPM J Page 14 of 15 STEP   21   :                                                                             SAT UNSAT Standard:   The Examinee simulates opening 1-ISIV-90-283G by indicating CRITICAL handwheel turned as far left (counter-clockwise) as possible.
Cue:       If asked provide the following cue, The valve HW turns several turns CCW and movement has stopped.
Comment Terminating   The task is complete when the Examinee returns the cue sheet to Cue:                                                                                STOP the Examiner.
Stop Time
 
JPM BRIEFING SHEET DIRECTIONS TO EXAMINEE:
All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. You will be provided initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
: 1. Unit 2 is in MODE 1.
: 2. 2-RM-90-112 had been isolated and tagged electrically for maintenance. The Hold Order has been picked up from the breaker, Checklist 2-90-2.03 attachment 2 is complete, but the pumps are off.
: 3. 2-RM-90-106 has just tripped and neither of its associated pumps can be started.
: 4. Section 3 and 4 of 2-SO-90-2 Gaseous Process Radiation Monitoring System, is complete.
INITIATING CUES:
: 1. The Control Room has directed you to start a sample pump and align monitor 2-RM-90-112 to sample lower containment using 2-SO-90-2, Section 8.3 steps 1 through 4.
: 2. Inform the Control Room when complete.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
 
SEQUOYAH NUCLEAR PLANT 1311 NRC PLANT JPM K
 
PLANT JPM K Page 2 of 8 RO/SRO JOB PERFORMANCE MEASURE Task:             Cycle the Unit 2 Main Generator PCB Task #:             0620510201 Task Standard:   The Examinee cycles the Unit 2 Main Generator circuit breaker with generator off-line.
Alternate Path:           YES:             NO:         X Time Critical Task:       YES:             NO:         X K/A Reference/Ratings:     062A4.04 (2.6/2.7)
Method of Testing:
Simulated Performance:         X         Actual Performance:
Evaluation Method:
Simulator               In-Plant       X     Classroom Main Control Room                             Mock-up Performer:
Trainee Name Evaluator:                                     /
Name / Signature                                     DATE Performance Rating:     SAT:                 UNSAT:
Validation Time:           10 min                       Total Time:
Performance Time:         Start Time:                   Finish Time:
COMMENTS
 
PLANT JPM K Page 3 of 8 SPECIAL INSTRUCTIONS TO EVALUATOR:
: 1. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
: 2. Any UNSAT requires comments.
Tools/Equipment/Procedures Needed:
: 3. 2-SO-57-1 GENERATOR CIRCUIT BREAKER, Section 8.1.


==References:==
==References:==
Reference Title Rev No. 2-SO-57-1 GENERATOR CIRCUIT BREAKER 3 ==================================================================================== READ TO EXAMINEE HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME! DIRECTIONS TO EXAMINEE: I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS: 1. Unit 2 is in MODE 5 2. Maintenance has been completed on the Unit 2 main Generator PCB 3. 2-SO-57-1, GENERATOR CIRCUIT BREAKER Section 8.1 is in progress complete through step 8. 4. 2-SO-57-1, GENERATOR CIRCUIT BREAKER section 3 and 4 are complete. INITIATING CUES: 1. You have been directed to cycle the Unit 2 Main Generator circuit breaker with generator off-line starting at step 9. 2. Inform the SRO when complete.
 
PLANT JPM K Page 4 of 8   Start Time   STEP 1 : Obtain a copy of 2-SO-57-1, GENERATOR CIRCUIT BREAKER. SAT     UNSAT   Standard: Examinee obtains a copy of 2-SO-57-1, GENERATOR CIRCUIT BREAKER. Cue Provide an in progress copy of 2-SO-57-1, GENERATOR CIRCUIT BREAKER. Comment     STEP 2 :   SAT     UNSAT   Standard: The Examinee verifies [2-MOD-57-323G], MOD 323G Ground Sw 57/1 is OPEN by observing XXXXX Cue:   Comment PLANT JPM K Page 5 of 8 STEP 3 :   SAT     UNSAT   Standard: The Examinee verifies [2-MOD-57-323G], MOD 323G Ground Sw 57/2 is OPEN by observing XXXXX Cue:   Comment   STEP 4 :   SAT     UNSAT   Standard: The Examinee verifies [2-MOD-57-323], MOD 323 Disconnect Sw 89 is CLOSED by observing XXXXX Cue:   Comment PLANT JPM K Page 6 of 8  STEP 5 :   SAT     UNSAT   Standard: The examinee simulates CRITICAL Cue:   Comment   STEP 6 :   SAT     UNSAT   Standard: The examinee simulates CRITICAL Cue:   Comment PLANT JPM K Page 7 of 8 STEP 7 :   SAT     UNSAT   Standard: The examinee addresses the procedure step. Comment   Terminating Cue: STOP  Stop Time JPM BRIEFING SHEET DIRECTIONS TO EXAMINEE: All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. You will be provided initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS: 1. INITIATING CUES: 1. Inform the US when complete. Acknowledge to the examiner when you are ready to begin. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
Reference                                       Title                       Rev No.
SEQUOYAH NUCLEAR PLANT   1311 NRC SIMULATOR JPM A SIM JPM A Page 2 of 8 RO/SRO JOB PERFORMANCE MEASURE     Task: Initiate Emergency Boration from the RWST. Task #: 0000290501   Task Standard: Examinee initiates an emergency boration to the RCS from the RWST through the CCPIT valves using EA-68-4 section 4.3. Alternate Path: YES: X NO:     Time Critical Task: YES: NO: X   K/A Reference/Ratings: EPE 029 EA 1.06 (3.2/3.1) Method of Testing:   Simulated Performance:   Actual Performance: X   Evaluation Method:   Simulator X In-Plant Classroom             Main Control Room   Mock-up       Performer:   Trainee Name   Evaluator: /     Name / Signature DATE Performance Rating: SAT: UNSAT:   Validation Time: 8 min Total Time:       Performance Time: Start Time:   Finish Time:     COMMENTS SIM JPM A Page 3 of 8 SPECIAL INSTRUCTIONS: 1. Ensure Simulator Operator Checklist is complete 2. Reset to IC 345 3. If IC 345 is not available perform the following: PLACE SIMULATOR IN RUN IMF RD14A f:228 IMF RD14B f:228 IMF ZDIHS62138A f:0 IMF CV42AUTO f:80 IMF CV42COMP f:80 TRIP the Reactor 4. PLACE SIMULATOR IN RUN 5. An extra operator will be required to acknowledge alarms. 6. ACKNOWLEDGE ALARMS 7. FREEZE SIMULATOR. 8. Save as a temporary IC, if repeat runs of JPM will be desired. 9. PLACE SIMULATOR IN RUN 10. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted. Tools/Equipment/Procedures Needed:
2-SO-57-1                             GENERATOR CIRCUIT BREAKER                           3
====================================================================================
READ TO EXAMINEE HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
DIRECTIONS TO EXAMINEE:
I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. I will provide initiating cues and indicate any steps to be discussed.
When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
: 1. Unit 2 is in MODE 5
: 2. Maintenance has been completed on the Unit 2 main Generator PCB
: 3. 2-SO-57-1, GENERATOR CIRCUIT BREAKER Section 8.1 is in progress complete through step 8.
: 4. 2-SO-57-1, GENERATOR CIRCUIT BREAKER section 3 and 4 are complete.
INITIATING CUES:
: 1. You have been directed to cycle the Unit 2 Main Generator circuit breaker with generator off-line starting at step 9.
: 2. Inform the SRO when complete.
 
PLANT JPM K Page 4 of 8 Start Time Obtain a copy of 2-SO-57-1, GENERATOR CIRCUIT BREAKER.
STEP    1  :                                                                        SAT UNSAT Standard:   Examinee obtains a copy of 2-SO-57-1, GENERATOR CIRCUIT BREAKER.
Cue     Provide an in progress copy of 2-SO-57-1, GENERATOR CIRCUIT BREAKER.
Comment STEP   2 :                                                                         SAT UNSAT Standard:   The Examinee verifies [2-MOD-57-323G], MOD 323G Ground Sw 57/1 is OPEN by observing XXXXX Cue:
Comment
 
PLANT JPM K Page 5 of 8 STEP   3   :                                                                     SAT UNSAT Standard:   The Examinee verifies [2-MOD-57-323G], MOD 323G Ground Sw 57/2 is OPEN by observing XXXXX Cue:
Comment STEP   4   :                                                                     SAT UNSAT Standard:   The Examinee verifies [2-MOD-57-323], MOD 323 Disconnect Sw 89 is CLOSED by observing XXXXX Cue:
Comment
 
PLANT JPM K Page 6 of 8 STEP   5   :                             SAT UNSAT Standard:   The examinee simulates   CRITICAL Cue:
Comment STEP   6   :                             SAT UNSAT Standard:   The examinee simulates   CRITICAL Cue:
Comment
 
PLANT JPM K Page 7 of 8 STEP   7   :                                                                       SAT UNSAT Standard:   The examinee addresses the procedure step.
Comment Terminating   Provide the following cue, Another operator will complete the STOP Cue:       remaining steps of this procedure.
Stop Time
 
JPM BRIEFING SHEET DIRECTIONS TO EXAMINEE:
All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. You will be provided initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
1.
INITIATING CUES:
: 1. Inform the US when complete.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
 
SEQUOYAH NUCLEAR PLANT 1311 NRC SIMULATOR JPM A
 
SIM JPM A Page 2 of 8 RO/SRO JOB PERFORMANCE MEASURE Task:               Initiate Emergency Boration from the RWST.
Task #:             0000290501 Task Standard:     Examinee initiates an emergency boration to the RCS from the RWST through the CCPIT valves using EA-68-4 section 4.3.
Alternate Path:               YES:     X       NO:
Time Critical Task:           YES:             NO:         X K/A Reference/Ratings:       EPE 029 EA 1.06 (3.2/3.1)
Method of Testing:
Simulated Performance:                       Actual Performance:         X Evaluation Method:
Simulator         X       In-Plant               Classroom Main Control Room                                 Mock-up Performer:
Trainee Name Evaluator:                                         /
Name / Signature                                   DATE Performance Rating:       SAT:                 UNSAT:
Validation Time:             8 min                           Total Time:
Performance Time:             Start Time:                     Finish Time:
COMMENTS
 
SIM JPM A Page 3 of 8 SPECIAL INSTRUCTIONS:
: 1. Ensure Simulator Operator Checklist is complete
: 2. Reset to IC 345
: 3. If IC 345 is not available perform the following:
PLACE SIMULATOR IN RUN IMF RD14A f:228 IMF RD14B f:228 IMF ZDIHS62138A f:0 IMF CV42AUTO f:80 IMF CV42COMP f:80 TRIP the Reactor
: 4. PLACE SIMULATOR IN RUN
: 5. An extra operator will be required to acknowledge alarms.
: 6. ACKNOWLEDGE ALARMS
: 7. FREEZE SIMULATOR.
: 8. Save as a temporary IC, if repeat runs of JPM will be desired.
: 9. PLACE SIMULATOR IN RUN
: 10. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.
Tools/Equipment/Procedures Needed:


==References:==
==References:==
Reference Title Rev No. 1. EA-68-4 Emergency Boration 11 2.
 
SIM JPM A Page 4 of 8 DIRECTIONS TO TRAINEE: I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME! INITIAL CONDITIONS: 1. Unit 1 is in MODE 3 following a Reactor Trip. 2. Two Control Rods are not fully inserted. 3. Flow from the BAT cannot be established. INITIATING CUES: 1. The SRO has directed you to initiate emergency boration from the RWST using EA-68-4 Emergency Boration Section 4.3. 2. Inform the SRO when complete.
Reference                                     Title                                 Rev No.
SIM JPM A Page 5 of 8   Start Time   STEP 1 : Obtain a copy of EA-68-4, EMERGENCY BORATION. SAT      UNSAT   Standard: Examinee obtains a copy of EA-68-4, EMERGENCY BORATION. Comment     STEP 2 :     SAT     UNSAT   Standard: Examinee places HS-135 RWST to CCP to IN and OPEN CRITICAL Comment     STEP 2 :     SAT     UNSAT   Standard: Examinee places HS-136 RWST to CCP to IN and OPEN CRITICAL Comment SIM JPM A Page 6 of 8 STEP 2 :   SAT     UNSAT   Standard: Examinee places HS-132 VCT OUTLET TO CCP to IN and CLOSE CRITICAL Comment     STEP 2 :   SAT     UNSAT   Standard: Examinee places HS-132 VCT OUTLET TO CCP to IN and CLOSE CRITICAL Comment     STEP 3 :   SAT     UNSAT   Standard: Examinee addresses the procedure step as N/A and proceeds to step 4. Comment SIM JPM A Page 7 of 8 STEP 4 :   SAT     UNSAT   Standard: Examinee determines insufficient flow through FCV-62-93 CHARGING FLOW CONTROL cannot be attained and goes to the alternate path. Comment     STEP 5 : ALTERNATE PATH    SAT     UNSAT   Standard: Examinee places HS-63-26 CCPIT OUTLET ISOL OR HS-63-25 CCPIT OUTLET ISOL to OPEN. Comment     STEP 6 : ALTERNATE PATH    SAT     UNSAT   Standard: Examinee places HS-63-39 CCPIT INLET ISOL OR HS-63-40 CCPIT INLET ISOL to OPEN. Comment     Terminating Cue: When CCPIT valves have been opened provide the following cue, l complete the remaining steps of this STOP   Stop Time JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. INITIAL CONDITIONS: 1. Unit 1 is in MODE 3 following a Reactor Trip. 2. Two Control Rods are not fully inserted. 3. Flow from the BAT cannot be established. INITIATING CUES: 1. The SRO has directed you to initiate emergency boration from the RWST using EA-68-4 Emergency Boration Section 4.3. 2. Inform the SRO when complete. Acknowledge to the examiner when you are ready to begin. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
: 1. EA-68-4                 Emergency Boration                                                   11 2.
SEQUOYAH NUCLEAR PLANT   1311 NRC SIMULATOR JPM B SIM JPM B Page 2 of 14 RO/SRO JOB PERFORMANCE MEASURE     Task: Vent an unisolable Cold Leg Accumulator. Task #: 0060060101   Task Standard: The examinee vents the #4 Cold Leg Accumulator using EA-63-1, VENTING UNISOLATED COLD LEG ACCUMULATOR. Alternate Path: YES: X NO:     Time Critical Task: YES: NO: X   K/A Reference/Ratings: 006 A4.02 (4.0/3.8) Method of Testing:   Simulated Performance:   Actual Performance: X   Evaluation Method:   Simulator X In-Plant Classroom             Main Control Room   Mock-up       Performer:   Trainee Name   Evaluator: /     Name / Signature DATE Performance Rating: SAT: UNSAT:   Validation Time: 8 min Total Time:       Performance Time: Start Time:   Finish Time:     COMMENTS SIM JPM B Page 3 of 14 SPECIAL INSTRUCTIONS: 1. Ensure Simulator Operator Checklist is complete 2. Reset to IC 335/350 3. If IC 335 is not available perform the following. Reset to IC 24 Complete ES-1.3 Transfer to RHR Containment Sump. IOR ZDIHS6367A f:0 IRF IAR06 f:2 IRF SIR01 f:1 4. PLACE SIMULATOR IN RUN 5. Place MODE 1 sign on the simulator. 6. An extra operator will be required to acknowledge alarms. 7. ACKNOWLEDGE ALARMS 8. FREEZE SIMULATOR. 9. Save as a temporary IC, if repeat runs of JPM will be desired. 10. PLACE SIMULATOR IN RUN 11. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted. 12. When directed enter IRF IAR06 f:2 to supply non-essential air to the containment. Tools/Equipment/Procedures Needed:
 
SIM JPM A Page 4 of 8 DIRECTIONS TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
INITIAL CONDITIONS:
: 1.       Unit 1 is in MODE 3 following a Reactor Trip.
: 2.       Two Control Rods are not fully inserted.
: 3.       Flow from the BAT cannot be established.
INITIATING CUES:
: 1.       The SRO has directed you to initiate emergency boration from the RWST using EA-68-4 Emergency Boration Section 4.3.
: 2.       Inform the SRO when complete.
 
SIM JPM A Page 5 of 8 Start Time STEP   1   :                                                                     SAT Obtain a copy of EA-68-4, EMERGENCY BORATION.
UNSAT Standard:   Examinee obtains a copy of EA-68-4, EMERGENCY BORATION.
Comment STEP   2   :                                                                     SAT UNSAT Standard:   Examinee places HS-135 RWST to CCP to IN and OPEN               CRITICAL Comment STEP   2   :                                                                     SAT UNSAT Standard:   Examinee places HS-136 RWST to CCP to IN and OPEN               CRITICAL Comment
 
SIM JPM A Page 6 of 8 STEP   2   :                                                                       SAT UNSAT Standard:   Examinee places HS-132 VCT OUTLET TO CCP to IN and CLOSE         CRITICAL Comment STEP   2   :                                                                       SAT UNSAT Standard:   Examinee places HS-132 VCT OUTLET TO CCP to IN and CLOSE         CRITICAL Comment STEP   3   :                                                                       SAT UNSAT Standard:   Examinee addresses the procedure step as N/A and proceeds to step 4.
Comment
 
SIM JPM A Page 7 of 8 STEP   4   :                                                                       SAT UNSAT Standard:   Examinee determines insufficient flow through FCV-62-93 CHARGING FLOW CONTROL cannot be attained and goes to the alternate path.
Comment ALTERNATE PATH STEP   5   :                                                                       SAT UNSAT Standard:   Examinee places HS-63-26 CCPIT OUTLET ISOL OR HS-63-25 CCPIT OUTLET ISOL to OPEN.
Comment ALTERNATE PATH STEP   6   :                                                                       SAT UNSAT Standard:   Examinee places HS-63-39 CCPIT INLET ISOL OR HS-63-40 CCPIT INLET ISOL to OPEN.
Comment Terminating   When CCPIT valves have been opened provide the following cue, Cue:      Another operator will complete the remaining steps of this         STOP procedure.
Stop Time
 
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
: 1. Unit 1 is in MODE 3 following a Reactor Trip.
: 2. Two Control Rods are not fully inserted.
: 3. Flow from the BAT cannot be established.
INITIATING CUES:
: 1. The SRO has directed you to initiate emergency boration from the RWST using EA-68-4 Emergency Boration Section 4.3.
: 2. Inform the SRO when complete.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
 
SEQUOYAH NUCLEAR PLANT 1311 NRC SIMULATOR JPM B
 
SIM JPM B Page 2 of 14 RO/SRO JOB PERFORMANCE MEASURE Task:               Vent an unisolable Cold Leg Accumulator.
Task #:             0060060101 Task Standard:     The examinee vents the #4 Cold Leg Accumulator using EA-63-1, VENTING UNISOLATED COLD LEG ACCUMULATOR.
Alternate Path:             YES:       X       NO:
Time Critical Task:         YES:               NO:         X K/A Reference/Ratings:     006 A4.02 (4.0/3.8)
Method of Testing:
Simulated Performance:                       Actual Performance:         X Evaluation Method:
Simulator         X     In-Plant               Classroom Main Control Room                               Mock-up Performer:
Trainee Name Evaluator:                                       /
Name / Signature                                 DATE Performance Rating:     SAT:                   UNSAT:
Validation Time:           8 min                           Total Time:
Performance Time:           Start Time:                     Finish Time:
COMMENTS
 
SIM JPM B Page 3 of 14 SPECIAL INSTRUCTIONS:
: 1. Ensure Simulator Operator Checklist is complete
: 2. Reset to IC 335/350
: 3. If IC 335 is not available perform the following.
Reset to IC 24 Complete ES-1.3 Transfer to RHR Containment Sump.
IOR ZDIHS6367A f:0 IRF IAR06 f:2 IRF SIR01 f:1
: 4. PLACE SIMULATOR IN RUN
: 5. Place MODE 1 sign on the simulator.
: 6. An extra operator will be required to acknowledge alarms.
: 7. ACKNOWLEDGE ALARMS
: 8. FREEZE SIMULATOR.
: 9. Save as a temporary IC, if repeat runs of JPM will be desired.
: 10. PLACE SIMULATOR IN RUN
: 11. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.
: 12. When directed enter IRF IAR06 f:2 to supply non-essential air to the containment.
Tools/Equipment/Procedures Needed:


==References:==
==References:==
Reference Title Rev No. 1. EA-63-1 VENTING UNISOLATED COLD LEG ACCUMULATOR. 0 2.
 
SIM JPM B Page 4 of 14 DIRECTIONS TO TRAINEE: I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME! INITIAL CONDITIONS: 1. Unit 1 was in MODE 1 prior to an event. 2. The event is still in progress. 3. E-1, LOSS OF REACTOR OR SECONDARY COOLANT is in progress complete through step 16. INITIATING CUES: 1. You have been directed to perform E-1, LOSS OF REACTOR OR SECONDARY COOLANT starting at step 17. 2. Inform the SRO when complete.
Reference                                     Title                                 Rev No.
SIM JPM B Page 5 of 14   Start Time   STEP 1 : Obtain a copy of E-1, LOSS OF REACTOR OR SECONDARY COOLANT. SAT      UNSAT   Standard: Examinee obtains a copy of E-1, LOSS OF REACTOR OR SECONDARY COOLANT. Cue: Provide an in progress copy of E-1, LOSS OF REACTOR OR SECONDARY COOLANT. Comment   STEP 2 :   SAT     UNSAT   Standard: The examinee determines RHR Spray will not be placed in service and proceeds to step 18. Comment SIM JPM B Page 6 of 14 STEP 3 :   SAT     UNSAT   Standard: The examinee determines RCS pressure is less than 100 psig by observing installed instrumentation. Comment     STEP 4 :   SAT     UNSAT   Standard: The examinee determines dispatches personnel to restore power to the CLA Isolation valves. Cue: compressed, power has been   Comment     STEP 5 :   SAT     UNSAT   Standard: Examinee depresses HS-63-134A and HS-63-134B SIS RESET TRAIN 1A and 1B. Comment SIM JPM B Page 7 of 14 STEP 6 :   SAT     UNSAT   Standard: The examinee places HS-63-118A, 63-98A, 63-80A and HS-63-67A NO 1, 2, and 3 CL ACCUM OUTLET ISOL to CLOSE. CRITICAL Comment     STEP 7 : ALTERNATE PATH    SAT     UNSAT   Standard: The examinee places HS-63-67A NO 4 CL ACCUM OUTLET ISOL to CLOSE, observes RED light above HS and proceeds to the RNO. Comment SIM JPM B Page 8 of 14 STEP 8 :     SAT     UNSAT   Standard: The examinee places HS-63-67A NO 4 CL ACCUM OUTLET ISOL to CLOSE, observes RED light above HS and proceeds to the RNO. Cue: Provide the following cue, 67 cannot be closed electrically. Cue: Provide the following cue, TSC has determined CLA #4 should be   Comment SIM JPM B Page 9 of 14   STEP 9 : ALTERNATE PATH   SAT     UNSAT   Standard: The examinee simultaneously depresses HS-30-64D and HS-30-64D PHASE B ISOL RESET TR-A and TR-B. CRITICAL Comment     STEP 10 :   SAT     UNSAT   Standard: The examinee addresses the procedure step. Cue: Direct the simulator operator to align Non-Essential Control Air to the Containment. Cue: Provide the following cue, -Essential Air has been supplied to the   Comment SIM JPM B Page 10 of 14 STEP 11 :   SAT     UNSAT   Standard: The examinee goes to EA-63-1, VENTING UNISOLATED COLD LEG ACCUMULATOR. Comment     STEP 12 : Obtain a copy of EA-63-1, VENTING UNISOLATED COLD LEG ACCUMULATOR. SAT      UNSAT   Standard: Examinee obtains a copy of EA-63-1, VENTING UNISOLATED COLD LEG ACCUMULATOR. Comment     STEP 13 :   SAT     UNSAT   Standard: The examinee addresses the procedure step. Comment SIM JPM B Page 11 of 14 STEP 14 :     SAT     UNSAT   Standard: The examinee simultaneously depresses HS-30-64D and HS-30-64D PHASE B ISOL RESET TR-A and TR-B. Examiner Note The examinee reset Containment Isolation Phase B in JPM Step 9. Comment     STEP 15 :   SAT     UNSAT   Standard: The examinee addresses the procedure step. Cue: Provide the following cue, -Essential Air has been supplied to the   Examiner Note The examinee reset Containment Isolation Phase B in JPM Step 10. Comment SIM JPM B Page 12 of 14 STEP 16 :   SAT     UNSAT   Standard: The examinee verifies valves closed by observing green lights above valve handswitches ON. Comment     STEP 17 :   SAT     UNSAT   Standard: The examinee rotates HIC-63-65 CL ACCUM N2 HDR VENT FLOW CONTROL fully CCW. CRITICAL Comment     STEP 18 :   SAT     UNSAT   Standard: The examinee places HS-63-63A NO 4 CL ACCUM N2 SUPPLY ISOL to OPEN. CRITICAL Comment SIM JPM B Page 13 of 14 STEP 19 :     SAT     UNSAT   Standard: The examinee places HS-63-63A NO 4 CL ACCUM N2 SUPPLY ISOL to CLOSE. Comment   STEP 20 :   SAT     UNSAT   Standard: The examinee rotates HIC-63-65 CL ACCUM N2 HDR VENT FLOW CONTROL fully CW. Comment   Terminating Cue: Provide the following cue, Another operator will address the remaining steps of this procedure. STOP  Stop Time JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. INITIAL CONDITIONS: 1. Unit 1 was in MODE 1 prior to an event. 2. The event is still in progress. 3. E-1, LOSS OF REACTOR OR SECONDARY COOLANT is in progress complete through step 16. INITIATING CUES: 1. You have been directed to perform E-1, LOSS OF REACTOR OR SECONDARY COOLANT starting at step 17. 2. Inform the SRO when complete. Acknowledge to the examiner when you are ready to begin. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
: 1. EA-63-1                 VENTING UNISOLATED COLD LEG ACCUMULATOR.                               0 2.
SEQUOYAH NUCLEAR PLANT   1311 NRC SIMULATOR JPM C SIM JPM C Page 2 of 23 RO/SRO JOB PERFORMANCE MEASURE     Task: Respond to a Shutdown LOCA   Task #: 3210330301   Task Standard: The examinee will align Charging to the CCPIT and initiate a Containment Vent Isolation by closing individual valves in response to a LOCA while in MODE 5 and RHR in service. Alternate Path: YES: X NO:     Time Critical Task: YES: NO: X   K/A Reference/Ratings: EPE 011 EA 2.04 (3.8/4.0) Method of Testing:   Simulated Performance:   Actual Performance: X   Evaluation Method:   Simulator X In-Plant Classroom             Main Control Room   Mock-up       Performer:   Trainee Name   Evaluator: /     Name / Signature DATE Performance Rating: SAT: UNSAT:   Validation Time: 25 min Total Time:       Performance Time: Start Time:   Finish Time:     COMMENTS SIM JPM C Page 3 of 23 SPECIAL INSTRUCTIONS: 1. Ensure Simulator Operator Checklist is complete 2. Reset to IC 349 3. If IC 349 is not available, perform the following: Reset to IC 36 Run scenario file 1311 NRC JPM C Remove power form CCPIT valves IRF CVR12 f:0 Remove power form CCPIT valves IRF CVR14 f:0 4. Place Red Hold Orders on   CLA valves: FCV-63-118, -98, -80, & -67 Containment Spray valves: FCV-72-39, -2, -40, -41, -23, -20, Containment Spray Pumps HS-72 -27A, & 72-10A CCPIT valves: FCV-63-25, -26, -39, & -40 5. Place the following in PTL and hang red tags on the following: 1B CCP HS-62-104A 1A SIP HS-63-10A 1B SIP HS-63-15A 6. Place Yellow Caution Orders on: Cold Leg Injection valves: FCV-63-93, & -94 SI Hot leg Injection Valves: FCV-63 -156, -157, & -172 Makeup to Accumulators from SI FCV-63-23 Suction to RHR Pumps from RWST 63-1 RHR Hx Valves 74-16 and 74-28 (flow limiting blocks installed) 7. PLACE SIMULATOR IN RUN 8. Place Mode 5 placard on panels. 9. Place A Train Week sign on the simulator. 10. An extra operator will be required to acknowledge alarms. 11. ACKNOWLEDGE ALARMS SIM JPM C Page 4 of 23 12. FREEZE SIMULATOR. 13. PLACE SIMULATOR IN RUN 14. When directed IMF TH01D f:0.1 k:1 to initiate LOCA 15. When directed IRF CVR12 f:1 and IRF CVR14 f:1 k:2 to energize CCPIT valves Tools/Equipment/Procedures Needed:
 
SIM JPM B Page 4 of 14 DIRECTIONS TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
INITIAL CONDITIONS:
: 1.       Unit 1 was in MODE 1 prior to an event.
: 2.       The event is still in progress.
: 3.       E-1, LOSS OF REACTOR OR SECONDARY COOLANT is in progress complete through step 16.
INITIATING CUES:
: 1.       You have been directed to perform E-1, LOSS OF REACTOR OR SECONDARY COOLANT starting at step 17.
: 2.       Inform the SRO when complete.
 
SIM JPM B Page 5 of 14 Start Time STEP   1   :                                                                           SAT Obtain a copy of E-1, LOSS OF REACTOR OR SECONDARY COOLANT.                                                                   UNSAT Standard:   Examinee obtains a copy of E-1, LOSS OF REACTOR OR SECONDARY COOLANT.
Cue:     Provide an in progress copy of E-1, LOSS OF REACTOR OR SECONDARY COOLANT.
Comment STEP   2   :                                                                           SAT UNSAT Standard:   The examinee determines RHR Spray will not be placed in service and proceeds to step 18.
Comment
 
SIM JPM B Page 6 of 14 STEP   3   :                                                                         SAT UNSAT Standard:   The examinee determines RCS pressure is less than 100 psig by observing installed instrumentation.
Comment STEP   4   :                                                                         SAT UNSAT Standard:   The examinee determines dispatches personnel to restore power to the CLA Isolation valves.
Cue:     Provide the following cue, Time has been compressed, power has been restored to the CLA Isolation valves.
Comment STEP   5   :                                                                         SAT UNSAT Standard:   Examinee depresses HS-63-134A and HS-63-134B SIS RESET TRAIN 1A and 1B.
Comment
 
SIM JPM B Page 7 of 14 STEP   6   :                                                                     SAT UNSAT Standard:   The examinee places HS-63-118A, 63-98A, 63-80A and HS-63-67A NO CRITICAL 1, 2, and 3 CL ACCUM OUTLET ISOL to CLOSE.
Comment ALTERNATE PATH STEP   7   :                                                                     SAT UNSAT Standard:   The examinee places HS-63-67A NO 4 CL ACCUM OUTLET ISOL to CLOSE, observes RED light above HS and proceeds to the RNO.
Comment
 
SIM JPM B Page 8 of 14 STEP   8   :                                                                           SAT UNSAT Standard:   The examinee places HS-63-67A NO 4 CL ACCUM OUTLET ISOL to CLOSE, observes RED light above HS and proceeds to the RNO.
Cue:     Provide the following cue, FCV-63-67 cannot be closed electrically.
Cue:     Provide the following cue, TSC has determined CLA #4 should be vented.
Comment
 
SIM JPM B Page 9 of 14 STEP   9   : ALTERNATE PATH                                                             SAT UNSAT Standard:   The examinee simultaneously depresses HS-30-64D and HS-30-64D CRITICAL PHASE B ISOL RESET TR-A and TR-B.
Comment STEP   10 :                                                                             SAT UNSAT Standard:   The examinee addresses the procedure step.
Cue:     Direct the simulator operator to align Non-Essential Control Air to the Containment.
Cue:     Provide the following cue, Non-Essential Air has been supplied to the Containment.
Comment
 
SIM JPM B Page 10 of 14 STEP   11 :                                                                 SAT UNSAT Standard:   The examinee goes to EA-63-1, VENTING UNISOLATED COLD LEG ACCUMULATOR.
Comment STEP   12 :                                                                 SAT Obtain a copy of EA-63-1, VENTING UNISOLATED COLD LEG ACCUMULATOR.                                                     UNSAT Standard:   Examinee obtains a copy of EA-63-1, VENTING UNISOLATED COLD LEG ACCUMULATOR.
Comment STEP   13 :                                                                 SAT UNSAT Standard:   The examinee addresses the procedure step.
Comment
 
SIM JPM B Page 11 of 14 STEP   14 :                                                                             SAT UNSAT Standard:   The examinee simultaneously depresses HS-30-64D and HS-30-64D PHASE B ISOL RESET TR-A and TR-B.
Examiner Note     The examinee reset Containment Isolation Phase B in JPM Step 9.
Comment STEP   15 :                                                                             SAT UNSAT Standard:   The examinee addresses the procedure step.
Cue:     Provide the following cue, Non-Essential Air has been supplied to the Containment.
Examiner Note     The examinee reset Containment Isolation Phase B in JPM Step 10.
Comment
 
SIM JPM B Page 12 of 14 STEP   16 :                                                                         SAT UNSAT Standard:   The examinee verifies valves closed by observing green lights above valve handswitches ON.
Comment STEP   17 :                                                                         SAT UNSAT Standard:   The examinee rotates HIC-63-65 CL ACCUM N2 HDR VENT FLOW CRITICAL CONTROL fully CCW.
Comment STEP   18 :                                                                         SAT UNSAT Standard:   The examinee places HS-63-63A NO 4 CL ACCUM N2 SUPPLY ISOL CRITICAL to OPEN.
Comment
 
SIM JPM B Page 13 of 14 STEP   19   :                                                                         SAT UNSAT Standard:   The examinee places HS-63-63A NO 4 CL ACCUM N2 SUPPLY ISOL to CLOSE.
Comment STEP   20   :                                                                         SAT UNSAT Standard:   The examinee rotates HIC-63-65 CL ACCUM N2 HDR VENT FLOW CONTROL fully CW.
Comment Terminating   Provide the following cue, Another operator will address the Cue:                                                                            STOP remaining steps of this procedure.
Stop Time
 
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
: 1. Unit 1 was in MODE 1 prior to an event.
: 2. The event is still in progress.
: 3. E-1, LOSS OF REACTOR OR SECONDARY COOLANT is in progress complete through step 16.
INITIATING CUES:
: 1. You have been directed to perform E-1, LOSS OF REACTOR OR SECONDARY COOLANT starting at step 17.
: 2. Inform the SRO when complete.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
 
SEQUOYAH NUCLEAR PLANT 1311 NRC SIMULATOR JPM C
 
SIM JPM C Page 2 of 23 RO/SRO JOB PERFORMANCE MEASURE Task:               Respond to a Shutdown LOCA Task #:             3210330301 Task Standard:     The examinee will align Charging to the CCPIT and initiate a Containment Vent Isolation by closing individual valves in response to a LOCA while in MODE 5 and RHR in service.
Alternate Path:             YES:       X       NO:
Time Critical Task:         YES:               NO:         X K/A Reference/Ratings:       EPE 011 EA 2.04 (3.8/4.0)
Method of Testing:
Simulated Performance:                       Actual Performance:           X Evaluation Method:
Simulator         X       In-Plant               Classroom Main Control Room                                 Mock-up Performer:
Trainee Name Evaluator:                                         /
Name / Signature                                       DATE Performance Rating:       SAT:                   UNSAT:
Validation Time:             25 min                           Total Time:
Performance Time:           Start Time:                     Finish Time:
COMMENTS
 
SIM JPM C Page 3 of 23 SPECIAL INSTRUCTIONS:
: 1. Ensure Simulator Operator Checklist is complete
: 2. Reset to IC 349
: 3. If IC 349 is not available, perform the following:
Reset to IC 36 Run scenario file 1311 NRC JPM C Remove power form CCPIT valves IRF CVR12 f:0 Remove power form CCPIT valves IRF CVR14 f:0
: 4. Place Red Hold Orders on CLA valves: FCV-63-118, -98, -80, & -67 Containment Spray valves: FCV-72-39, -2, -40, -41, -23, -20, Containment Spray Pumps HS-72 -27A, & 72-10A CCPIT valves: FCV-63-25, -26, -39, & -40
: 5. Place the following in PTL and hang red tags on the following:
1B CCP HS-62-104A 1A SIP HS-63-10A 1B SIP HS-63-15A
: 6. Place Yellow Caution Orders on:
Cold Leg Injection valves: FCV-63-93, & -94 SI Hot leg Injection Valves: FCV-63 -156, -157, & -172 Makeup to Accumulators from SI FCV-63-23 Suction to RHR Pumps from RWST 63-1 RHR Hx Valves 74-16 and 74-28 (flow limiting blocks installed)
: 7. PLACE SIMULATOR IN RUN
: 8. Place Mode 5 placard on panels.
: 9. Place A Train Week sign on the simulator.
: 10. An extra operator will be required to acknowledge alarms.
: 11. ACKNOWLEDGE ALARMS
 
SIM JPM C Page 4 of 23
: 12. FREEZE SIMULATOR.
: 13. PLACE SIMULATOR IN RUN
: 14. When directed IMF TH01D f:0.1 k:1 to initiate LOCA
: 15. When directed IRF CVR12 f:1 and IRF CVR14 f:1 k:2 to energize CCPIT valves Tools/Equipment/Procedures Needed:


==References:==
==References:==
Reference Title Rev No. 1. AOP-R.02 SHUTDOWN LOCA 16 2.
 
SIM JPM C Page 5 of 23 DIRECTIONS TO TRAINEE: I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME! INITIAL CONDITIONS: 1. Unit has recently entered Mode 5. 2. Both Trains of RHR are in service. 3. 0-GO-7 UNIT SHUTDOWN FROM HOT STANDBY TO COLD SHUTDOWN is in progress at Section 5.4 Step 5. INITIATING CUES: 1. Respond to plant conditions.
Reference                                 Title                   Rev No.
SIM JPM C Page 6 of 23   Start Time    STEP 1 :     SAT     UNSAT   Standard: Examinee transitions to AOP-R.02, SHUTDOWN LOCA Cue: If required direct the Simulator Operator to initiate the following cue,  Examiner Note: The Examinee may go directly to AOP-R.02, SHUTDOWN LOCA on JPM step 2. Comment SIM JPM C Page 7 of 23 STEP 2 : Obtain a copy of AOP-R.02, SHUTDOWN LOCA  SAT      UNSAT  Standard: Examinee obtains a copy of AOP-R.02, SHUTDOWN LOCA Comment     STEP 3 :   SAT     UNSAT   Standard: The Examinee places HS 68- when RCP trip criteria is reached. CRITICAL Comment SIM JPM C Page 8 of 23 STEP 4 :     SAT     UNSAT   Standard: The Examinee determines RHR SUCTION FROM LOOP 4 HL OPEN by observing red lights above handswitches ON. Comment     STEP 5 :     SAT     UNSAT   Standard: The Examinee determines Pressurizer Level less than 10% by observing installed instrumentation. Comment SIM JPM C Page 9 of 23 STEP 6 :     SAT     UNSAT   Standard: The Examinee places HS-74-10A and HS-74-20A RHR Pumps to PTL. CRITICAL Comment   STEP 7 :     SAT     UNSAT   Standard: The Examinee places HS-74-1A or HS-74-2A RHR SUCTION FROM LOOP 4 HL to CLOSE. AND The Examinee places HS-74-33A or HS-74-35A RHR HX 1A and 1B CROSSTIE ISOL to CLOSE CRITICAL Comment SIM JPM C Page 10 of 23 STEP 8 :     SAT     UNSAT   Standard: The Examinee determines LETDOWN OREFICE ISOLATION valves CLOSED by observing green lights above handswitches ON. The Examinee may place the handswitches to CLOSE. Comment     STEP 9 :     SAT     UNSAT   Standard: The Examinee determines LETDOWN ISOLATION valves CLOSED by observing green lights above handswitches ON. The Examinee may place the handswitches to CLOSE. Comment SIM JPM C Page 11 of 23 STEP 10 :     SAT     UNSAT   Standard: The Examinee places HIC-62-83A RHR LETDOWN fully CW. CRITICAL Comment   STEP 11 :     SAT     UNSAT   Standard: The Examinee determines SI did not actuate and proceeds to step 4. Comment   STEP 12 :     SAT     UNSAT   Standard: The Examinee places HIC-63-93 CHARGING FLOW CONTROL in MANUAL and zero output. CRITICAL Comment SIM JPM C Page 12 of 23 STEP 13 :     SAT     UNSAT   Standard: The Examinee determines Pressurizer Level less than 10% by observing installed instrumentation. Comment     STEP 14 :     SAT     UNSAT   Standard: The Examinee determines RHR was in service by the initial conditions. Comment   STEP 15 :     SAT     UNSAT   Standard: The Examinee addresses the procedure step as N/A. Comment SIM JPM C Page 13 of 23 STEP 16 :     SAT     UNSAT   Standard: The Examinee addresses the procedure step. Cue: If asked, provide the following cue,   Comment    STEP 17 :     SAT     UNSAT   Standard: The Examinee addresses the procedure step. Cue: If asked, provide the following cue,   Comment SIM JPM C Page 14 of 23   STEP 18 :     SAT     UNSAT   Standard: The Examinee determines 1B Charging Pump is in PTL by observing HS-62-104A in PTL. Comment    STEP 19 :     SAT     UNSAT   Standard: The Examinee determines the 1A Charging Pump is running by observing red light above HS-63-108A is ON. The Examinee dispatches operators to energize CCPIT valves. Cue: If asked provide the following cue,   Examiner Note: Direct the simulator operator to energize the CCPIT valves. Cue: When the CCPIT valves have been energized provide the following cue, Time has been compressed, the CCPIT valves have been energized Comment SIM JPM C Page 15 of 23 STEP 20 :     SAT     UNSAT   Standard: The Examinee determines Safety Injection pumps are in PTL by observing HS-63-10A and HS-63-15A in PTL. Comment   STEP 21 :     SAT     UNSAT   Standard: The Examinee addresses the procedure step. Cue: If asked, provide the following cue Time has been compressed, both SI pumps are capable of being placed in service from MCR. Comment     STEP 22 :   SAT     UNSAT   Standard: The Examinee determines the 1A Charging Pump is running by observing red light above HS-63-108A is ON. Comment SIM JPM C Page 16 of 23 STEP 23 :   SAT     UNSAT   Standard: The Examinee determines Pressurizer Level less than 10% by observing installed instrumentation. Comment   STEP 24 :     SAT     UNSAT   Standard: The Examinee verifies LCV-62-135 and LCV-62-136 OPEN by observing red lights above handswitch ON. AND Verifies LCV-62-132 and LCV-62-133 CLOSED by observing green lights above handswitch ON. Comment SIM JPM C Page 17 of 23 STEP 25 :     SAT     UNSAT   Standard: The Examinee places HS-62-91 and HS-62-90 CHARGING FLOW ISOL to CLOSE CRITICAL Comment    STEP 26 :     SAT     UNSAT   Standard: The Examinee places HS-62-26 and HS-62-25 CCPIT OUTLET ISOL to OPEN. CRITICAL Comment   STEP 27 :     SAT     UNSAT   Standard: The Examinee places HS-62-39 and HS-62-40 CCPIT INLET ISOL to OPEN. CRITICAL Comment SIM JPM C Page 18 of 23 STEP 28 :   SAT     UNSAT   Standard: The Examinee places HIC-63-93 CHARGING FLOW CONTROL in MANUAL and zero output. CRITICAL Examiner Note: This step was previously performed in JPM step 12. Comment    STEP 29 :   SAT     UNSAT   Standard: The Examinee addresses the procedure step. Cue: If asked, provide the following cue,   Comment SIM JPM C Page 19 of 23 STEP 29 :   SAT     UNSAT   Standard: The Examinee determines RHR pumps stopped by observing green lights above HS-74-10A and HS-74-20A and RHR discharge less than 150 psig by observing plant instrumentation. Comment   STEP 30 :   SAT     UNSAT   Standard: The Examinee addresses the procedure step. Cue: If asked, provide the following cue, The SM and STA have been informed Comment SIM JPM C Page 20 of 23 STEP 31 :   SAT     UNSAT   Standard: The Examinee addresses the procedure step. Cue: If asked, provide the following cue,   Comment     STEP 32 :   SAT     UNSAT   Standard: The Examinee determines ECCS Termination is not met by observing installed plant instrumentation. Comment SIM JPM C Page 21 of 23 STEP 33 :   SAT     UNSAT   Standard: The Examinee places HS 68-already performed. CRITICAL Comment     STEP 34 :   SAT     UNSAT   Standard: The Examinee places HS-30-63A and HS-30-63B PHASE A AND CONTAINMENT VENT ISOL to ACTUATE. Comment SIM JPM C Page 22 of 23 STEP 35 : ALTERNATE PATH    SAT     UNSAT   Standard: The examinee observes all Containment Vent lights NOT GREEN (Not critical) and goes to the RNO. The Examinee places HS-90-113, HS-90-114, HS-90-115, HS-90-116, HS-90-117, Containment Rad Monitor Isolation and HS-30-14 Containment Purge Isolation to CLOSE CRITICAL Examiner Note: the minimum standard. Comment    STEP 36 :     SAT     UNSAT   Standard: The examinee observes all Containment Vent lights NOT GREEN (Not critical) and goes to the RNO. The Examinee places HS-90-107, HS-90-108, HS-90-109, HS-90-110, HS-90-111, Containment Rad Monitor Isolation and HS-30-15 Containment Purge Isolation to CLOSE CRITICAL Comment   Terminating Cue: he  STOP  Stop Time JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. INITIAL CONDITIONS: 1. Unit has recently entered Mode 5. 2. Both Trains of RHR are in service. 3. 0-GO-7 UNIT SHUTDOWN FROM HOT STANDBY TO COLD SHUTDOWN is in progress at Section 5.4 Step 5. INITIATING CUES: 1. Respond to plant conditions. Acknowledge to the examiner when you are ready to begin. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
: 1. AOP-R.02             SHUTDOWN LOCA                                         16 2.
SEQUOYAH NUCLEAR PLANT   1311 NRC SIMULATOR JPM D SIM JPM D Page 2 of 11 RO/SRO JOB PERFORMANCE MEASURE     Task: Establish Once Through Cooling by Initiating RCS Bleed and Feed   Task #: 3110060601   Task Standard: The examinee starts the 1A SI pump and opens the A Train CCPIT valves to establish once through cooling using FR-H.1. Alternate Path: YES: X NO:     Time Critical Task: YES: NO: X   K/A Reference/Ratings: EPE E05 EA 2.2 (3.7/4.3) Method of Testing:   Simulated Performance:   Actual Performance: X   Evaluation Method:   Simulator X In-Plant Classroom             Main Control Room   Mock-up       Performer:   Trainee Name   Evaluator: /     Name / Signature DATE Performance Rating: SAT: UNSAT:   Validation Time: 8 min Total Time:       Performance Time: Start Time:   Finish Time:     COMMENTS SIM JPM D Page 3 of 11 SPECIAL INSTRUCTIONS: 1. Ensure Simulator Operator Checklist is complete 2. Reset to IC 347. Add IOR ZDIHS68340AA f:0 to IC 3. If IC 347 is not available perform the following: Reset to IC 30 Go to RUN IOR ZDIHS68340AA f:0 IMF SI13A f:1 e:1 IMF FW07C f:1 e:1 IMF FW21A f:100 e:1 IMF ED06B f:1 e:1 IMF CV01A f:1 e:1 IMF FW23C f:100 Place HS-3-118A 1A MDAFW pump HS in PTL Place HS-62-108A 1A CHP pump HS in PTL Place all RCP HS in PTL When S/G WR level is 50% FREEZE 4. PLACE SIMULATOR IN RUN 5. An extra operator will be required to acknowledge alarms. 6. ACKNOWLEDGE ALARMS 7. FREEZE SIMULATOR. 8. Save as a temporary IC, if repeat runs of JPM will be desired. 9. PLACE SIMULATOR IN RUN 10. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted. Tools/Equipment/Procedures Needed:
 
SIM JPM C Page 5 of 23 DIRECTIONS TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
INITIAL CONDITIONS:
: 1.       Unit has recently entered Mode 5.
: 2.       Both Trains of RHR are in service.
: 3.       0-GO-7 UNIT SHUTDOWN FROM HOT STANDBY TO COLD SHUTDOWN is in progress at Section 5.4 Step 5.
INITIATING CUES:
: 1.       Respond to plant conditions.
 
SIM JPM C Page 6 of 23 Start Time STEP   1 :                                                                                     SAT UNSAT Standard:   Examinee transitions to AOP-R.02, SHUTDOWN LOCA If required direct the Simulator Operator to initiate the following cue, Cue:    There is a large leak in lower containment, I cannot see where the leak is coming from.
Examiner   The Examinee may go directly to AOP-R.02, SHUTDOWN LOCA on Note:    JPM step 2.
Comment
 
SIM JPM C Page 7 of 23 STEP   2   :                                                               SAT Obtain a copy of AOP-R.02, SHUTDOWN LOCA UNSAT Standard:   Examinee obtains a copy of AOP-R.02, SHUTDOWN LOCA Comment STEP   3   :                                                               SAT UNSAT Standard:   The Examinee places HS 68-31A, and 73A RCPs to STOP when CRITICAL RCP trip criteria is reached.
Comment
 
SIM JPM C Page 8 of 23 STEP   4   :                                                               SAT UNSAT Standard:   The Examinee determines RHR SUCTION FROM LOOP 4 HL OPEN by observing red lights above handswitches ON.
Comment STEP   5   :                                                               SAT UNSAT The Examinee determines Pressurizer Level less than 10% by Standard:
observing installed instrumentation.
Comment
 
SIM JPM C Page 9 of 23 STEP   6   :                                                                 SAT UNSAT Standard:   The Examinee places HS-74-10A and HS-74-20A RHR Pumps to CRITICAL PTL.
Comment STEP   7   :                                                                 SAT UNSAT The Examinee places HS-74-1A or HS-74-2A RHR SUCTION FROM LOOP 4 HL to CLOSE.
Standard:  AND                                                        CRITICAL The Examinee places HS-74-33A or HS-74-35A RHR HX 1A and 1B CROSSTIE ISOL to CLOSE Comment
 
SIM JPM C Page 10 of 23 STEP   8   :                                                                   SAT UNSAT The Examinee determines LETDOWN OREFICE ISOLATION valves Standard:  CLOSED by observing green lights above handswitches ON. The Examinee may place the handswitches to CLOSE.
Comment STEP   9   :                                                                   SAT UNSAT The Examinee determines LETDOWN ISOLATION valves CLOSED Standard:  by observing green lights above handswitches ON. The Examinee may place the handswitches to CLOSE.
Comment
 
SIM JPM C Page 11 of 23 STEP   10 :                                                                         SAT UNSAT Standard:   The Examinee places HIC-62-83A RHR LETDOWN fully CW.               CRITICAL Comment STEP   11 :                                                                         SAT UNSAT Standard:   The Examinee determines SI did not actuate and proceeds to step 4.
Comment STEP   12 :                                                                         SAT UNSAT Standard:   The Examinee places HIC-63-93 CHARGING FLOW CONTROL in CRITICAL MANUAL and zero output.
Comment
 
SIM JPM C Page 12 of 23 STEP   13 :                                                                           SAT UNSAT Standard:   The Examinee determines Pressurizer Level less than 10% by observing installed instrumentation.
Comment STEP 14   :                                                                           SAT UNSAT Standard:   The Examinee determines RHR was in service by the initial conditions.
Comment STEP   15 :                                                                           SAT UNSAT Standard:   The Examinee addresses the procedure step as N/A.
Comment
 
SIM JPM C Page 13 of 23 STEP   16 :                                                                         SAT UNSAT Standard:   The Examinee addresses the procedure step.
Cue:     If asked, provide the following cue, Another operator will address this procedure step.
Comment STEP   17 :                                                                         SAT UNSAT Standard:   The Examinee addresses the procedure step.
Cue:     If asked, provide the following cue, Another operator will address this procedure step.
Comment
 
SIM JPM C Page 14 of 23 STEP   18 :                                                                     SAT UNSAT Standard:   The Examinee determines 1B Charging Pump is in PTL by observing HS-62-104A in PTL.
Comment STEP   19 :                                                                     SAT UNSAT The Examinee determines the 1A Charging Pump is running by Standard:  observing red light above HS-63-108A is ON.
The Examinee dispatches operators to energize CCPIT valves.
Cue:     If asked provide the following cue, Operators have been dispatched to energize CCPIT valves.
Examiner Note:   Direct the simulator operator to energize the CCPIT valves.
When the CCPIT valves have been energized provide the following Cue:    cue, Time has been compressed, the CCPIT valves have been energized.
Comment
 
SIM JPM C Page 15 of 23 STEP   20 :                                                                     SAT UNSAT Standard:   The Examinee determines Safety Injection pumps are in PTL by observing HS-63-10A and HS-63-15A in PTL.
Comment STEP   21 :                                                                     SAT UNSAT Standard:   The Examinee addresses the procedure step.
Cue:     If asked, provide the following cue Time has been compressed, both SI pumps are capable of being placed in service from MCR.
Comment STEP   22 :                                                                     SAT UNSAT Standard:   The Examinee determines the 1A Charging Pump is running by observing red light above HS-63-108A is ON.
Comment
 
SIM JPM C Page 16 of 23 STEP   23 :                                                                   SAT UNSAT Standard:   The Examinee determines Pressurizer Level less than 10% by observing installed instrumentation.
Comment STEP   24 :                                                                   SAT UNSAT The Examinee verifies LCV-62-135 and LCV-62-136 OPEN by observing red lights above handswitch ON.
Standard:  AND Verifies LCV-62-132 and LCV-62-133 CLOSED by observing green lights above handswitch ON.
Comment
 
SIM JPM C Page 17 of 23 STEP   25 :                                                                   SAT UNSAT Standard:   The Examinee places HS-62-91 and HS-62-90 CHARGING FLOW CRITICAL ISOL to CLOSE Comment STEP   26 :                                                                   SAT UNSAT Standard:   The Examinee places HS-62-26 and HS-62-25 CCPIT OUTLET ISOL CRITICAL to OPEN.
Comment STEP   27   :                                                                   SAT UNSAT Standard:   The Examinee places HS-62-39 and HS-62-40 CCPIT INLET ISOL to CRITICAL OPEN.
Comment
 
SIM JPM C Page 18 of 23 STEP   28 :                                                                         SAT UNSAT Standard:   The Examinee places HIC-63-93 CHARGING FLOW CONTROL in CRITICAL MANUAL and zero output.
Examiner Note:   This step was previously performed in JPM step 12.
Comment STEP   29 :                                                                         SAT UNSAT Standard:   The Examinee addresses the procedure step.
Cue:     If asked, provide the following cue, Another operator will address this procedure step.
Comment
 
SIM JPM C Page 19 of 23 STEP   29 :                                                                       SAT UNSAT The Examinee determines RHR pumps stopped by observing green Standard:  lights above HS-74-10A and HS-74-20A and RHR discharge less than 150 psig by observing plant instrumentation.
Comment STEP   30 :                                                                       SAT UNSAT Standard:   The Examinee addresses the procedure step.
Cue:     If asked, provide the following cue, The SM and STA have been informed.
Comment
 
SIM JPM C Page 20 of 23 STEP   31 :                                                                         SAT UNSAT Standard:   The Examinee addresses the procedure step.
Cue:     If asked, provide the following cue, Another operator will address this procedure step.
Comment STEP   32 :                                                                         SAT UNSAT Standard:   The Examinee determines ECCS Termination is not met by observing installed plant instrumentation.
Comment
 
SIM JPM C Page 21 of 23 STEP   33   :                                                                   SAT UNSAT Standard:   The Examinee places HS 68-31A, and 73A RCPs to STOP, (if not CRITICAL already performed.
Comment STEP   34   :                                                                   SAT UNSAT Standard:   The Examinee places HS-30-63A and HS-30-63B PHASE A AND CONTAINMENT VENT ISOL to ACTUATE.
Comment
 
SIM JPM C Page 22 of 23 ALTERNATE PATH STEP   35 :                                                                           SAT UNSAT The examinee observes all Containment Vent lights NOT GREEN (Not critical) and goes to the RNO.
Standard:                                                                          CRITICAL The Examinee places HS-90-113, HS-90-114, HS-90-115, HS-90-116, HS-90-117, Containment Rad Monitor Isolation and HS-30-14 Containment Purge Isolation to CLOSE Examiner   The Examinee must perform step 35 OR 36 in its entirety to achieve Note:     the minimum standard.
Comment STEP   36 :                                                                           SAT UNSAT The examinee observes all Containment Vent lights NOT GREEN (Not critical) and goes to the RNO.
Standard:                                                                          CRITICAL The Examinee places HS-90-107, HS-90-108, HS-90-109, HS-90-110, HS-90-111, Containment Rad Monitor Isolation and HS-30-15 Containment Purge Isolation to CLOSE Comment Terminating   Provide the following cue, Another operator will complete the STOP Cue:     remaining steps of this procedure.
Stop Time
 
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
: 1. Unit has recently entered Mode 5.
: 2. Both Trains of RHR are in service.
: 3. 0-GO-7 UNIT SHUTDOWN FROM HOT STANDBY TO COLD SHUTDOWN is in progress at Section 5.4 Step 5.
INITIATING CUES:
: 1. Respond to plant conditions.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
 
SEQUOYAH NUCLEAR PLANT 1311 NRC SIMULATOR JPM D
 
SIM JPM D Page 2 of 11 RO/SRO JOB PERFORMANCE MEASURE Task:               Establish Once Through Cooling by Initiating RCS Bleed and Feed Task #:             3110060601 Task Standard:     The examinee starts the 1A SI pump and opens the A Train CCPIT valves to establish once through cooling using FR-H.1.
Alternate Path:             YES:       X       NO:
Time Critical Task:         YES:               NO:         X K/A Reference/Ratings:     EPE E05 EA 2.2 (3.7/4.3)
Method of Testing:
Simulated Performance:                       Actual Performance:         X Evaluation Method:
Simulator         X     In-Plant               Classroom Main Control Room                               Mock-up Performer:
Trainee Name Evaluator:                                       /
Name / Signature                                     DATE Performance Rating:     SAT:                   UNSAT:
Validation Time:           8 min                           Total Time:
Performance Time:           Start Time:                     Finish Time:
COMMENTS
 
SIM JPM D Page 3 of 11 SPECIAL INSTRUCTIONS:
: 1. Ensure Simulator Operator Checklist is complete
: 2. Reset to IC 347. Add IOR ZDIHS68340AA f:0 to IC
: 3. If IC 347 is not available perform the following:
Reset to IC 30 Go to RUN IOR ZDIHS68340AA f:0 IMF SI13A f:1 e:1 IMF FW07C f:1 e:1 IMF FW21A f:100 e:1 IMF ED06B f:1 e:1 IMF CV01A f:1 e:1 IMF FW23C f:100 Place HS-3-118A 1A MDAFW pump HS in PTL Place HS-62-108A 1A CHP pump HS in PTL Place all RCP HS in PTL When S/G WR level is 50% FREEZE
: 4. PLACE SIMULATOR IN RUN
: 5. An extra operator will be required to acknowledge alarms.
: 6. ACKNOWLEDGE ALARMS
: 7. FREEZE SIMULATOR.
: 8. Save as a temporary IC, if repeat runs of JPM will be desired.
: 9. PLACE SIMULATOR IN RUN
: 10. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.
Tools/Equipment/Procedures Needed:


==References:==
==References:==
Reference Title Rev No. 1. FR-H.1 LOSS OF SECONDARY HEAT SINK 19 SIM JPM D Page 4 of 11 DIRECTIONS TO TRAINEE: I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME! INITIAL CONDITIONS: 1. Unit 1 is in MODE 3. 2. An event is in progress. 3. The 1B 6.9KV Shutdown Board is de-energized. 4. The 1A Charging Pump tripped and is in PTL. 5. No AFW is available. 6. The SRO has directed you to restore a Heat Sink using FR-H.1 LOSS OF SECONDARY HEAT SINK. INITIATING CUES: 1. Inform the SRO when complete.
 
SIM JPM D Page 5 of 11   Start Time    STEP 1 : Obtain a copy of FR-H.1 LOSS OF SECONDARY HEAT SINK. SAT      UNSAT   Standard: The examinee obtains a copy of FR-H.1 LOSS OF SECONDARY HEAT SINK. Cue Provide a copy of FR-H.1 LOSS OF SECONDARY HEAT SINK. Comment     STEP 2 :   SAT     UNSAT   Standard: The examinee verifies total feed flow less than 440 gpm from the initiating cue. Comment    STEP 3 :   SAT     UNSAT   Standard: The examinee verifies RWST level greater than 27% by observing installed instrumentation. Comment SIM JPM D Page 6 of 11 STEP 4 :   SAT     UNSAT   Standard: The examinee verifies RCS pressure greater than any non-faulted S/G pressure and RCS temperature greater than 350F by observing installed instrumentation. Examiner Note   Comment     STEP 5 :   SAT     UNSAT   Standard: The examinee observes no Charging Pumps running and transitions to step 17. Comment SIM JPM D Page 7 of 11  STEP 6 :   SAT     UNSAT   Standard: The examinee places and HS 63-133A AND/OR HS 63-133B SIS Train A&B Actuate to ACTUATE. Comment     STEP 7 :   SAT     UNSAT   Standard: The examinee verifies Train A CCPIT INLET and OUTLET isolation valves open by observing red light above HS-63-39 and 26 ON. Comment SIM JPM D Page 8 of 11 STEP 8 : ALTERNATE PATH    SAT     UNSAT   Standard: The Examinee determines 1A Safety Injection pump is not running and proceeds to the RNO Cue: Provide the following cue, tor will perform Appendix   Comment   STEP 9 : ALTERNATE PATH    SAT     UNSAT   Standard: The examinee places HS-63-10A SI Pump 1A to START. CRITICAL Cue: Provide the following cue,   Comment SIM JPM D Page 9 of 11 STEP 10 :   SAT     UNSAT   Standard: The examinee places HS-68-340AA and HS-68-334A PZR PORV to OPEN determines RORV 68-340A does NOT open and goes to step 20. Cue: If asked provide the following cue, dispatched to restore Comment   STEP 11 : ALTERNATE PATH    SAT     UNSAT   Standard: the RNO Comment SIM JPM D Page 10 of 11 STEP 12 : ALTERNATE PATH    SAT     UNSAT   Standard: The Examinee places HS-68-394 and 395 RX HEAD VENT ISOL to OPEN AND HIC-68-396 and HIC-68-397 to obtain maximum output. CRITICAL Comment     Terminating Cue: remaining steps of this procedure. STOP  Stop Time JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. INITIAL CONDITIONS: 1. Unit 1 is in MODE 3. 2. An event is in progress. 3. The 1B 6.9KV Shutdown Board is de-energized. 4. The 1A Charging Pump tripped and is in PTL. 5. No AFW is available. 6. The SRO has directed you to restore a Heat Sink using FR-H.1 LOSS OF SECONDARY HEAT SINK. INITIATING CUES: 1. Inform the SRO when complete. Acknowledge to the examiner when you are ready to begin. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
Reference                                     Title                                 Rev No.
SEQUOYAH NUCLEAR PLANT   1311 NRC SIMULATOR JPM E SIM JPM E Page 2 of 15 RO/SRO JOB PERFORMANCE MEASURE     Task: Synchronize the Main Generator to the Grid   Task #: 0450970101   Task Standard: The examinee will synchronize the Main Generator and raise load to 50 to 60 MW. Alternate Path: YES: NO: X   Time Critical Task: YES: NO: X   K/A Reference/Ratings: 045 A4.02 (2.7/2.6) Method of Testing:   Simulated Performance:   Actual Performance: X   Evaluation Method:   Simulator X In-Plant Classroom             Main Control Room   Mock-up       Performer:   Trainee Name   Evaluator: /     Name / Signature DATE Performance Rating: SAT: UNSAT:   Validation Time: 20 min Total Time:       Performance Time: Start Time:   Finish Time:     COMMENTS SIM JPM E Page 3 of 15 SPECIAL INSTRUCTIONS: 1. Ensure Simulator Operator Checklist is complete 2. Reset to IC 346. 3. If IC 346 is not available perform the following. Reset to IC 11 PLACE SIMULATOR IN RUN Perform GO-4 up to step 25 IRF EGR04 f:1 IRF EGR02 f:1 IRF EGR01 f:1 4. PLACE SIMULATOR IN RUN 5. Place MODE 1 sign on the simulator. 6. An extra operator will be required to acknowledge alarms. 7. ACKNOWLEDGE ALARMS 8. FREEZE SIMULATOR. 9. Save as a temporary IC, if repeat runs of JPM will be desired. 10. PLACE SIMULATOR IN RUN 11. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted. 12. When directed IRF EGR01 f:1 to close Main Generator PCB MOD. Tools/Equipment/Procedures Needed:
: 1. FR-H.1                 LOSS OF SECONDARY HEAT SINK                                         19
 
SIM JPM D Page 4 of 11 DIRECTIONS TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
INITIAL CONDITIONS:
: 1.       Unit 1 is in MODE 3.
: 2.       An event is in progress.
: 3.       The 1B 6.9KV Shutdown Board is de-energized.
: 4.       The 1A Charging Pump tripped and is in PTL.
: 5.       No AFW is available.
: 6.       The SRO has directed you to restore a Heat Sink using FR-H.1 LOSS OF SECONDARY HEAT SINK.
INITIATING CUES:
: 1.       Inform the SRO when complete.
 
SIM JPM D Page 5 of 11 Start Time STEP   1 :                                                                           SAT Obtain a copy of FR-H.1 LOSS OF SECONDARY HEAT SINK.
UNSAT Standard:   The examinee obtains a copy of FR-H.1 LOSS OF SECONDARY HEAT SINK.
Cue     Provide a copy of FR-H.1 LOSS OF SECONDARY HEAT SINK.
Comment STEP   2 :                                                                           SAT UNSAT Standard:   The examinee verifies total feed flow less than 440 gpm from the initiating cue.
Comment STEP   3 :                                                                           SAT UNSAT Standard:   The examinee verifies RWST level greater than 27% by observing installed instrumentation.
Comment
 
SIM JPM D Page 6 of 11 STEP   4 :                                                                         SAT UNSAT The examinee verifies RCS pressure greater than any non-faulted S/G Standard:  pressure and RCS temperature greater than 350F by observing installed instrumentation.
Examiner Note Comment STEP   5 :                                                                         SAT UNSAT Standard:   The examinee observes no Charging Pumps running and transitions to step 17.
Comment
 
SIM JPM D Page 7 of 11 STEP   6   :                                                                   SAT UNSAT Standard:   The examinee places and HS 63-133A AND/OR HS 63-133B SIS Train A&B Actuate to ACTUATE.
Comment STEP   7   :                                                                   SAT UNSAT Standard:   The examinee verifies Train A CCPIT INLET and OUTLET isolation valves open by observing red light above HS-63-39 and 26 ON.
Comment
 
SIM JPM D Page 8 of 11 ALTERNATE PATH STEP   8   :                                                                         SAT UNSAT Standard:   The Examinee determines 1A Safety Injection pump is not running and proceeds to the RNO Cue:     Provide the following cue, Another operator will perform Appendix A.
Comment ALTERNATE PATH STEP   9   :                                                                         SAT UNSAT Standard:   The examinee places HS-63-10A SI Pump 1A to START.                 CRITICAL Cue:     Provide the following cue, Another operator will perform Appendix A.
Comment
 
SIM JPM D Page 9 of 11 STEP   10 :                                                                 SAT UNSAT The examinee places HS-68-340AA and HS-68-334A PZR PORV to Standard:  OPEN determines RORV 68-340A does NOT open and goes to step 20.
Cue:     If asked provide the following cue, Operators have been dispatched to restore power.
Comment ALTERNATE PATH STEP   11 :                                                                 SAT UNSAT Standard:   The Examinee determines both PORVs NOT open and proceeds to the RNO Comment
 
SIM JPM D Page 10 of 11 ALTERNATE PATH STEP   12   :                                                                       SAT UNSAT The Examinee places HS-68-394 and 395 RX HEAD VENT ISOL to OPEN Standard:                                                                      CRITICAL AND HIC-68-396 and HIC-68-397 to obtain maximum output.
Comment Terminating   Provide the following cue, Another operator will complete the Cue:                                                                           STOP remaining steps of this procedure.
Stop Time
 
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
: 1. Unit 1 is in MODE 3.
: 2. An event is in progress.
: 3. The 1B 6.9KV Shutdown Board is de-energized.
: 4. The 1A Charging Pump tripped and is in PTL.
: 5. No AFW is available.
: 6. The SRO has directed you to restore a Heat Sink using FR-H.1 LOSS OF SECONDARY HEAT SINK.
INITIATING CUES:
: 1. Inform the SRO when complete.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
 
SEQUOYAH NUCLEAR PLANT 1311 NRC SIMULATOR JPM E
 
SIM JPM E Page 2 of 15 RO/SRO JOB PERFORMANCE MEASURE Task:               Synchronize the Main Generator to the Grid Task #:             0450970101 Task Standard:     The examinee will synchronize the Main Generator and raise load to 50 to 60 MW.
Alternate Path:             YES:             NO:         X Time Critical Task:         YES:             NO:         X K/A Reference/Ratings:     045 A4.02 (2.7/2.6)
Method of Testing:
Simulated Performance:                     Actual Performance:         X Evaluation Method:
Simulator         X     In-Plant               Classroom Main Control Room                               Mock-up Performer:
Trainee Name Evaluator:                                       /
Name / Signature                                     DATE Performance Rating:     SAT:                 UNSAT:
Validation Time:           20 min                         Total Time:
Performance Time:           Start Time:                     Finish Time:
COMMENTS
 
SIM JPM E Page 3 of 15 SPECIAL INSTRUCTIONS:
: 1. Ensure Simulator Operator Checklist is complete
: 2. Reset to IC 346.
: 3. If IC 346 is not available perform the following.
Reset to IC 11 PLACE SIMULATOR IN RUN Perform GO-4 up to step 25 IRF EGR04 f:1 IRF EGR02 f:1 IRF EGR01 f:1
: 4. PLACE SIMULATOR IN RUN
: 5. Place MODE 1 sign on the simulator.
: 6. An extra operator will be required to acknowledge alarms.
: 7. ACKNOWLEDGE ALARMS
: 8. FREEZE SIMULATOR.
: 9. Save as a temporary IC, if repeat runs of JPM will be desired.
: 10. PLACE SIMULATOR IN RUN
: 11. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.
: 12. When directed IRF EGR01 f:1 to close Main Generator PCB MOD.
Tools/Equipment/Procedures Needed:


==References:==
==References:==
Reference Title Rev No. 1. 0-GO-4 POWER ASCENSION FROM LESS THAN 5% REACTOR POWER TO 30% REACTOR POWER 84 2.
 
SIM JPM E Page 4 of 15 DIRECTIONS TO TRAINEE: I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME! INITIAL CONDITIONS: 1. Unit 1 is in MODE 1. 2. 0-GO-4 POWER ASCENSION FROM LESS THAN 5% REACTOR POWER TO 30% REACTOR POWER section 5.4 is in progress complete through step 24. INITIATING CUES: 1. The SRO has directed you to synchronize the Main generator and raise load to 30 to 60 MW using 0-GO-4 POWER ASCENSION FROM LESS THAN 5% REACTOR POWER TO 30% REACTOR POWER section 5.4 starting at step 25. 2. Inform the SRO when complete.
Reference                                     Title                                 Rev No.
SIM JPM E Page 5 of 15   Start Time   STEP 1 : Obtain a copy of 0-GO-4 POWER ASCENSION FROM LESS THAN 5% REACTOR POWER TO 30% REACTOR POWER. SAT      UNSAT   Standard: Examinee obtains a copy of 0-GO-4 POWER ASCENSION FROM LESS THAN 5% REACTOR POWER TO 30% REACTOR POWER Cue: Provide an in-progress copy of 0-GO-4 POWER ASCENSION FROM LESS THAN 5% REACTOR POWER TO 30% REACTOR POWER. Comment SIM JPM E Page 6 of 15  STEP 2 :   SAT     UNSAT   Standard: Examinee places [HS-57-20] EXCITER REGULATOR in the TEST position. CRITICAL Comment SIM JPM E Page 7 of 15   STEP 3 :   SAT     UNSAT   Standard: Examinee adjusts [HS-57-22] EXCITER VOLTAGE AUTO ADJUSTER, to balance voltage output meter [EI-57-12] to zero + 0.2V. CRITICAL Comment     STEP 4 :   SAT     UNSAT   Standard: Examinee places [HS-57-20] EXCITER REGULATOR to ON position. CRITICAL Comment     STEP 5 :   SAT     UNSAT   Standard: Examinee DEPRESS turbine control panel pushbutton [OPER AUTO SYNC]. CRITICAL Comment SIM JPM E Page 8 of 15   STEP 6 :   SAT     UNSAT   Standard: Examinee adjusts [HS-57-21] GEN SPEED CONTROL to obtain desired speed on [XI-57-1] rotating slowly in the fast (clockwise) direction. Comment     STEP 7 :   SAT     UNSAT   Standard: Examinee addresses the procedure step. Cue: If asked provide the following cue, alarms on XA Comment SIM JPM E Page 9 of 15 STEP 8 :   SAT     UNSAT   Standard: Examinee VERIFY Unit 1 generator PCBs indicate OPEN by observing green lights above HS-57-24 and 26 ON. Comment   STEP 9 :   SAT     UNSAT   Standard: Examinee addresses the procedure step. Cue: Provide the following cue,   Comment SIM JPM E Page 10 of 15 STEP 10 :   SAT     UNSAT   Standard: Examinee verifies Unit 1 generator PCBs indicate OPEN by observing red light above HS-57-24 labeled MOD 5033 or red light above HS-57-26 labeled MOD 5037 ON. Cue: If asked provide the following cue, Another operator will close the   Cue: Direct the simulator operator to close the applicable Main Generator PCB MOD. Comment   STEP 11 :   SAT     UNSAT   Standard: Examinee adjusts [HS-57-22] voltage adjust, to match [EI-57-2] incoming voltage with [EI-57-3] running voltage within + 1 division. Comment SIM JPM E Page 11 of 15 STEP 12 :   SAT     UNSAT   Standard: Examinee addresses the step as N/A. Comment     STEP 13 :   SAT     UNSAT   Standard: Examinee addresses the procedure step. Cue: Provide the following cue, will RECORD the first   Comment SIM JPM E Page 12 of 15 STEP 14 :   SAT     UNSAT   Standard: Examinee addresses the procedure step. Cue: Provide the following cue, has determined time   Comment     STEP 15 :   SAT     UNSAT   Standard: Examinee places generator breaker [HS-57-24] or [HS-57-26] to CLOSE and respective breaker stays closed. CRITICAL Comment   Examiner Note: The examinee may attempt one additional breaker closure using the next procedure step.
: 1. 0-GO-4                 POWER ASCENSION FROM LESS THAN 5% REACTOR                           84 POWER TO 30% REACTOR POWER 2.
SIM JPM E Page 13 of 15   STEP 16 :   SAT     UNSAT   Standard: Examinee places [HS-57-24] or [HS-57-26] 500KV BUS BREAKER to CLOSE and respective breaker stays closed. CRITICAL Comment     STEP 17 :   SAT     UNSAT   Standard: Examinee all main generator ammeters raise and are approximately equal by observing [EI-57-9], [EI-57-10], and [EI-57-11]. Comment SIM JPM E Page 14 of 15  STEP 18 :   SAT     UNSAT   Standard: Examinee attains a Main Generator load of 30 to 60 MW by depressing the [GO] pushbutton. CRITICAL Cue: If asked provide the following cue,   Comment   Terminating Cue: The task is complete when the Examinee returns the cue sheet to the Examiner. STOP  Stop Time JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. INITIAL CONDITIONS: 1. Unit 1 is in MODE 1. 2. 0-GO-4 POWER ASCENSION FROM LESS THAN 5% REACTOR POWER TO 30% REACTOR POWER section 5.4 is in progress complete through step 24. INITIATING CUES: 1. The SRO has directed you to synchronize the Main generator and raise load to 30 to 60 MW using 0-GO-4 POWER ASCENSION FROM LESS THAN 5% REACTOR POWER TO 30% REACTOR POWER section 5.4 starting at step 25. 2. Inform the SRO when complete. Acknowledge to the examiner when you are ready to begin. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
 
SEQUOYAH NUCLEAR PLANT   1311 NRC SIMULATOR JPM F SIM JPM F Page 2 of 15 RO/SRO JOB PERFORMANCE MEASURE     Task: Perform Equipment Checks Following ESF Actuation with a Failure of ESF Slave Relays   Task #: 3010010601   Task Standard: The Examinee will manually start at least one Emergency Gas Treatment System fan and manually start at least one Auxiliary Building Gas Treatment fans using EA-0-1, EQUIPMENT CHECKS FOLLOWING ESF ACTUATION. Alternate Path: YES: X NO:     Time Critical Task: YES: NO: X   K/A Reference/Ratings:   Method of Testing:   Simulated Performance:   Actual Performance: X   Evaluation Method:   Simulator X In-Plant Classroom             Main Control Room   Mock-up       Performer:   Trainee Name   Evaluator: /     Name / Signature DATE Performance Rating: SAT: UNSAT:   Validation Time: 10 min Total Time:       Performance Time: Start Time:   Finish Time:     COMMENTS SIM JPM F Page 3 of 15 SPECIAL INSTRUCTIONS: 1. Ensure Simulator Operator Checklist is complete 2. Reset to IC 337 3. If IC 337 is not available perform the following: Reset to IC 16 IOR ZDIHS6523A f:3 IOR ZLOHS6523A_GREEN f:1 {global95[2481]} DOR ZDIHS6523A {global95[2481]} DOR ZLOHS6523A_GREEN IOR ZDIHS6542A f:3 IOR ZLOHS6542A_GREEN f:1 {global95[2494]} DOR ZDIHS6542A {global95[2494]} DOR ZLOHS6542A_GREEN IOR ZDIHS30146A f:3 IOR ZLOHS30146A_GREEN f:1 IOR ZLOHS30146AM6_GREEN f:1 {global95[2138]} DOR ZDIHS30146A {global95[2138]} DOR ZLOHS30146A_GREEN {global95[2138]} DOR ZLOHS30146AM6_GREEN IOR ZDIHS30157A f:3 IOR ZLOHS30157A_GREEN f:1 IOR ZLOHS30157AM6_GREEN f:1 {global95[7964]} DOR ZDIHS30157A {global95[7964]} DOR ZLOHS30157A_GREEN {global95[7964]} DOR ZLOHS30157AM6_GREEN IMF RP04A f:1 Terminate SI.
SIM JPM E Page 4 of 15 DIRECTIONS TO TRAINEE:
SIM JPM F Page 4 of 15 Place Letdown in service. Perform GO-12. 4. PLACE SIMULATOR IN RUN 5. An extra operator will be required to acknowledge alarms. 6. ACKNOWLEDGE ALARMS 7. FREEZE SIMULATOR. 8. Save as a temporary IC, if repeat runs of JPM will be desired. 9. PLACE SIMULATOR IN RUN 10. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted. Tools/Equipment/Procedures Needed:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
INITIAL CONDITIONS:
: 1.       Unit 1 is in MODE 1.
: 2.       0-GO-4 POWER ASCENSION FROM LESS THAN 5% REACTOR POWER TO 30% REACTOR POWER section 5.4 is in progress complete through step 24.
INITIATING CUES:
: 1.       The SRO has directed you to synchronize the Main generator and raise load to 30 to 60 MW using 0-GO-4 POWER ASCENSION FROM LESS THAN 5% REACTOR POWER TO 30% REACTOR POWER section 5.4 starting at step 25.
: 2.       Inform the SRO when complete.
 
SIM JPM E Page 5 of 15 Start Time STEP   1   :                                                                     SAT Obtain a copy of 0-GO-4 POWER ASCENSION FROM LESS THAN 5% REACTOR POWER TO 30% REACTOR POWER.                             UNSAT Standard:   Examinee obtains a copy of 0-GO-4 POWER ASCENSION FROM LESS THAN 5% REACTOR POWER TO 30% REACTOR POWER Cue:     Provide an in-progress copy of 0-GO-4 POWER ASCENSION FROM LESS THAN 5% REACTOR POWER TO 30% REACTOR POWER.
Comment
 
SIM JPM E Page 6 of 15 STEP   2   :                                                             SAT UNSAT Standard:   Examinee places [HS-57-20] EXCITER REGULATOR in the TEST CRITICAL position.
Comment
 
SIM JPM E Page 7 of 15 STEP   3   :                                                                         SAT UNSAT Standard:   Examinee adjusts [HS-57-22] EXCITER VOLTAGE AUTO CRITICAL ADJUSTER, to balance voltage output meter [EI-57-12] to zero + 0.2V.
Comment STEP   4   :                                                                         SAT UNSAT Standard:   Examinee places [HS-57-20] EXCITER REGULATOR to ON position.         CRITICAL Comment STEP   5   :                                                                         SAT UNSAT Standard:   Examinee DEPRESS turbine control panel pushbutton [OPER AUTO CRITICAL SYNC].
Comment
 
SIM JPM E Page 8 of 15 STEP   6   :                                                                       SAT UNSAT Examinee adjusts [HS-57-21] GEN SPEED CONTROL to obtain Standard:  desired speed on [XI-57-1] rotating slowly in the fast (clockwise) direction.
Comment STEP   7   :                                                                       SAT UNSAT Standard:   Examinee addresses the procedure step.
Cue:     If asked provide the following cue, There are no annunciators or alarms on XA-55-ECB6A.
Comment
 
SIM JPM E Page 9 of 15 STEP   8   :                                                                   SAT UNSAT Standard:   Examinee VERIFY Unit 1 generator PCBs indicate OPEN by observing green lights above HS-57-24 and 26 ON.
Comment STEP   9   :                                                                   SAT UNSAT Standard:   Examinee addresses the procedure step.
Cue:     Provide the following cue, Another operator will address this procedure step.
Comment
 
SIM JPM E Page 10 of 15 STEP   10 :                                                                           SAT UNSAT Examinee verifies Unit 1 generator PCBs indicate OPEN by observing Standard:  red light above HS-57-24 labeled MOD 5033 or red light above HS             26 labeled MOD 5037 ON.
Cue:     If asked provide the following cue, Another operator will close the MODs.
Cue:     Direct the simulator operator to close the applicable Main Generator PCB MOD.
Comment STEP   11 :                                                                           SAT UNSAT Standard:   Examinee adjusts [HS-57-22] voltage adjust, to match [EI-57-2]
incoming voltage with [EI-57-3] running voltage within + 1 division.
Comment
 
SIM JPM E Page 11 of 15 STEP   12   :                                                                         SAT UNSAT Standard:     Examinee addresses the step as N/A.
Comment STEP   13   :                                                                           SAT UNSAT Standard:     Examinee addresses the procedure step.
Cue:       Provide the following cue, Another operator will RECORD the first stage metal temperature.
Comment
 
SIM JPM E Page 12 of 15 STEP   14 :                                                                       SAT UNSAT Standard:   Examinee addresses the procedure step.
Cue:     Provide the following cue, Another operator has determined time to hold at 5% turbine load is 15 minutes.
Comment STEP   15 :                                                                       SAT UNSAT Standard:   Examinee places generator breaker [HS-57-24] or [HS-57-26] to CRITICAL CLOSE and respective breaker stays closed.
Comment Examiner   The examinee may attempt one additional breaker closure using the Note:    next procedure step.
 
SIM JPM E Page 13 of 15 STEP   16   :                                                                             SAT UNSAT Standard:     Examinee places [HS-57-24] or [HS-57-26] 500KV BUS BREAKER to CRITICAL CLOSE and respective breaker stays closed.
Comment STEP   17   :                                                                               SAT UNSAT Standard:     Examinee all main generator ammeters raise and are approximately equal by observing [EI-57-9], [EI-57-10], and [EI-57-11].
Comment
 
SIM JPM E Page 14 of 15 STEP   18   :                                                                           SAT UNSAT Standard:   Examinee attains a Main Generator load of 30 to 60 MW by CRITICAL depressing the [GO] pushbutton.
Cue:       If asked provide the following cue, Loading rate is 1%/minute.
Comment Terminating   The task is complete when the Examinee returns the cue sheet to Cue:                                                                              STOP the Examiner.
Stop Time
 
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
: 1. Unit 1 is in MODE 1.
: 2. 0-GO-4 POWER ASCENSION FROM LESS THAN 5% REACTOR POWER TO 30% REACTOR POWER section 5.4 is in progress complete through step 24.
INITIATING CUES:
: 1. The SRO has directed you to synchronize the Main generator and raise load to 30 to 60 MW using 0-GO-4 POWER ASCENSION FROM LESS THAN 5% REACTOR POWER TO 30% REACTOR POWER section 5.4 starting at step 25.
: 2. Inform the SRO when complete.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
 
SEQUOYAH NUCLEAR PLANT 1311 NRC SIMULATOR JPM F
 
SIM JPM F Page 2 of 15 RO/SRO JOB PERFORMANCE MEASURE Task:               Perform Equipment Checks Following ESF Actuation with a Failure of ESF Slave Relays Task #:             3010010601 Task Standard:     The Examinee will manually start at least one Emergency Gas Treatment System fan and manually start at least one Auxiliary Building Gas Treatment fans using EA-0-1, EQUIPMENT CHECKS FOLLOWING ESF ACTUATION.
Alternate Path:             YES:       X       NO:
Time Critical Task:         YES:               NO:         X K/A Reference/Ratings:
Method of Testing:
Simulated Performance:                       Actual Performance:           X Evaluation Method:
Simulator         X     In-Plant                 Classroom Main Control Room                                 Mock-up Performer:
Trainee Name Evaluator:                                         /
Name / Signature                                       DATE Performance Rating:     SAT:                   UNSAT:
Validation Time:           10 min                           Total Time:
Performance Time:           Start Time:                       Finish Time:
COMMENTS
 
SIM JPM F Page 3 of 15 SPECIAL INSTRUCTIONS:
: 1. Ensure Simulator Operator Checklist is complete
: 2. Reset to IC 337
: 3. If IC 337 is not available perform the following:
Reset to IC 16 IOR ZDIHS6523A f:3 IOR ZLOHS6523A_GREEN f:1
{global95[2481]} DOR ZDIHS6523A
{global95[2481]} DOR ZLOHS6523A_GREEN IOR ZDIHS6542A f:3 IOR ZLOHS6542A_GREEN f:1
{global95[2494]} DOR ZDIHS6542A
{global95[2494]} DOR ZLOHS6542A_GREEN IOR ZDIHS30146A f:3 IOR ZLOHS30146A_GREEN f:1 IOR ZLOHS30146AM6_GREEN f:1
{global95[2138]} DOR ZDIHS30146A
{global95[2138]} DOR ZLOHS30146A_GREEN
{global95[2138]} DOR ZLOHS30146AM6_GREEN IOR ZDIHS30157A f:3 IOR ZLOHS30157A_GREEN f:1 IOR ZLOHS30157AM6_GREEN f:1
{global95[7964]} DOR ZDIHS30157A
{global95[7964]} DOR ZLOHS30157A_GREEN
{global95[7964]} DOR ZLOHS30157AM6_GREEN IMF RP04A f:1 Terminate SI.
 
SIM JPM F Page 4 of 15 Place Letdown in service.
Perform GO-12.
: 4. PLACE SIMULATOR IN RUN
: 5. An extra operator will be required to acknowledge alarms.
: 6. ACKNOWLEDGE ALARMS
: 7. FREEZE SIMULATOR.
: 8. Save as a temporary IC, if repeat runs of JPM will be desired.
: 9. PLACE SIMULATOR IN RUN
: 10. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.
Tools/Equipment/Procedures Needed:


==References:==
==References:==
Reference Title Rev No. 1. EA-0-1 EQUIPMENT CHECKS FOLLOWING ESF ACTUATION 11 2.
 
SIM JPM F Page 5 of 15 DIRECTIONS TO TRAINEE: I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME! INITIAL CONDITIONS: 1. Unit 1 is in MODE 3. 2. Safety Injection actuated and was terminated. 3. Letdown was placed in service. INITIATING CUES: 1. You have been directed to perform EA-0-1 EQUIPMENT CHECKS FOLLOWING ESF ACTUATION. 2. Inform the SRO when complete.
Reference                                     Title                                 Rev No.
SIM JPM F Page 6 of 15   Start Time   STEP 1 : Obtain a copy of EA-0-1 EQUIPMENT CHECKS FOLLOWING ESF ACTUATION. SAT      UNSAT   Standard: Examinee obtains a copy of EA-0-1 EQUIPMENT CHECKS FOLLOWING ESF ACTUATION. Comment     STEP 2 :   SAT     UNSAT   Standard: The examinee addresses the procedure step. Comment SIM JPM F Page 7 of 15 STEP 3 : ALTERNATE PATH    SAT     UNSAT   Standard: The Examinee places HS-65-23A or 65-42A Train A and Train B EGTS fans to START. CRITICAL Comment     STEP 4 :   SAT     UNSAT   Standard: The Examinee determines Annulus Vacuum Fans have stopped by observing green lights above HS-65-77A and HS-65-74A ON. Examiner Note   Comment    STEP 5 :   SAT     UNSAT   Standard: The Examinee addresses the procedure step as N/A. Comment SIM JPM F Page 8 of 15 STEP 6 :   SAT     UNSAT   Standard: The Examinee inches of water by observing installed instrumentation. Comment   STEP 7 :   SAT     UNSAT   Standard: The Examinee determines annulus differential pressure is more negative than -0.5 inches of water by observing installed instrumentation. Comment SIM JPM F Page 9 of 15 STEP 8 :   SAT     UNSAT   Standard: The Examinee determines Unit 2 EGTS Dampers CLOSED by observing green lights above handswitches ON. Comment   STEP 9 :   SAT     UNSAT   Standard: The Examinee addresses the procedure step as N/A. Comment SIM JPM F Page 10 of 15 STEP 10 :   SAT     UNSAT   Standard: The Examinee checks Containment Purge stopped by observing green lights above HS-30-1A and HS-30-4A ON. The Examinee checks Incore Instrument Room purge fans stopped by observing green lights above HS-30-4A and HS-30-11A ON. Cue: Provide the following cue, Unit 2 Containment Purge is not in   Comment   STEP 11 :   SAT     UNSAT   Standard: The Examinee determines Unit 1 and 2 Auxiliary Building General Supply fans stopped by observing green lights above handswitch ON or handswitch in PTL. Comment SIM JPM F Page 11 of 15 STEP 12 :   SAT     UNSAT   Standard: The Examinee determines Unit 1 and 2 Auxiliary Building General Exhaust fans stopped by observing green lights above handswitch ON or handswitch in PTL. Comment     STEP 13 :   SAT     UNSAT   Standard: The Examinee determines Unit 1 Auxiliary Building Dampers CLOSED by observing green lights above handswitches ON. Comment SIM JPM F Page 12 of 15 STEP 14 :   SAT     UNSAT   Standard: The Examinee determines Unit 2 Auxiliary Building Dampers CLOSED by observing green lights above handswitches ON. Comment   STEP 15 :   SAT     UNSAT   Standard: The Examinee determines Cask Loading Area Dampers CLOSED by observing green lights above handswitches ON. Comment SIM JPM F Page 13 of 15 STEP 16 :   SAT     UNSAT   Standard: The Examinee determines Fuel Handling Exhaust Fans STOPPED by observing green lights above handswitch ON or handswitch in PTL. Comment   STEP 17 :   SAT     UNSAT   Standard: The Examinee determines Fuel Handling dampers CLOSED by observing green lights above handswitches ON. Comment   STEP 18 :   SAT     UNSAT   Standard: The Examinee places HS-30-146A or HS 30-157A to START. CRITICAL Comment SIM JPM F Page 14 of 15 Terminating Cue: STOP  Stop Time JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. INITIAL CONDITIONS: 1. Unit 1 is in MODE 3. 2. Safety Injection actuated and was terminated. 3. Letdown was placed in service. INITIATING CUES: 1. You have been directed to perform EA-0-1 EQUIPMENT CHECKS FOLLOWING ESF ACTUATION. 2. Inform the SRO when complete. Acknowledge to the examiner when you are ready to begin. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
: 1. EA-0-1                 EQUIPMENT CHECKS FOLLOWING ESF ACTUATION                               11 2.
SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE   1311 NRC SIMULATOR JPM G Sim JPM G Page 2 of 12 RO/SRO JOB PERFORMANCE MEASURE     Task: Emergency Mode Control Room Isolation due to High Radiation   Task #: 0880980101   Task Standard: The examinee will manually place one train of Emergency Control Room Ventilation in service and isolate Normal Control Room Ventilation. Alternate Path: YES: X NO:     Time Critical Task: YES: NO: X     K/A Reference/Ratings: APE 061 AA1.01 (3.6/3.6) Method of Testing:   Simulated Performance:   Actual Performance: X   Evaluation Method:   Simulator X In-Plant Classroom             Main Control Room   Mock-up       Performer:   Trainee Name   Evaluator: /     Name / Signature DATE Performance Rating: SAT: UNSAT:   Validation Time: 15 minutes Total Time:       Performance Time: Start Time:   Finish Time:     COMMENTS Sim JPM G Page 3 of 12 SPECIAL INSTRUCTIONS: 1. Ensure Simulator Operator Checklist is complete 2. Reset to IC 16 3. An extra operator will be required to acknowledge alarms. 4. ACKNOWLEDGE ALARMS 5. FREEZE SIMULATOR. 6. When directed insert the following: IMF CH07A f:1 IMF CH07B f:1 IMF RM90125 f:10000 r:300 IMF RM90126 f:10000 r:300 IMF AN_OV_1255 f:2 d:10 IMF AN_OV_1262 f:2 d:10 7. Save as a temporary IC, if repeat runs of JPM will be desired. 8. PLACE SIMULATOR IN RUN when directed by the Lead Examiner 9. After JPM is complete, delete the temporary IC, if used. Tools/Equipment/Procedures Needed: 0-SO-30-2 Control Room Isolation
 
SIM JPM F Page 5 of 15 DIRECTIONS TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
INITIAL CONDITIONS:
: 1.       Unit 1 is in MODE 3.
: 2.       Safety Injection actuated and was terminated.
: 3.       Letdown was placed in service.
INITIATING CUES:
: 1.       You have been directed to perform EA-0-1 EQUIPMENT CHECKS FOLLOWING ESF ACTUATION.
: 2.       Inform the SRO when complete.
 
SIM JPM F Page 6 of 15 Start Time STEP   1   :                                                                   SAT Obtain a copy of EA-0-1 EQUIPMENT CHECKS FOLLOWING ESF ACTUATION.                                                       UNSAT Standard:   Examinee obtains a copy of EA-0-1 EQUIPMENT CHECKS FOLLOWING ESF ACTUATION.
Comment STEP   2   :                                                                   SAT UNSAT Standard:   The examinee addresses the procedure step.
Comment
 
SIM JPM F Page 7 of 15 ALTERNATE PATH STEP   3 :                                                                 SAT UNSAT Standard:   The Examinee places HS-65-23A or 65-42A Train A and Train B CRITICAL EGTS fans to START.
Comment STEP   4 :                                                                 SAT UNSAT The Examinee determines Annulus Vacuum Fans have stopped by Standard:
observing green lights above HS-65-77A and HS-65-74A ON.
Examiner Note Comment STEP   5 :                                                                 SAT UNSAT Standard:   The Examinee addresses the procedure step as N/A.
Comment
 
SIM JPM F Page 8 of 15 STEP   6   :                                                                     SAT UNSAT The Examinee determines EGTS Filter A & B  P is between 1 and 7 Standard:
inches of water by observing installed instrumentation.
Comment STEP   7   :                                                                     SAT UNSAT The Examinee determines annulus differential pressure is more Standard:  negative than -0.5 inches of water by observing installed instrumentation.
Comment
 
SIM JPM F Page 9 of 15 STEP   8   :                                                           SAT UNSAT Standard:   The Examinee determines Unit 2 EGTS Dampers CLOSED by observing green lights above handswitches ON.
Comment STEP   9   :                                                           SAT UNSAT Standard:   The Examinee addresses the procedure step as N/A.
Comment
 
SIM JPM F Page 10 of 15 STEP   10 :                                                                       SAT UNSAT The Examinee checks Containment Purge stopped by observing green lights above HS-30-1A and HS-30-4A ON.
Standard:
The Examinee checks Incore Instrument Room purge fans stopped by observing green lights above HS-30-4A and HS-30-11A ON.
Cue:     Provide the following cue, Unit 2 Containment Purge is not in service.
Comment STEP   11 :                                                                       SAT UNSAT The Examinee determines Unit 1 and 2 Auxiliary Building General Standard:  Supply fans stopped by observing green lights above handswitch ON or handswitch in PTL.
Comment
 
SIM JPM F Page 11 of 15 STEP   12 :                                                                         SAT UNSAT The Examinee determines Unit 1 and 2 Auxiliary Building General Standard:  Exhaust fans stopped by observing green lights above handswitch ON or handswitch in PTL.
Comment STEP   13 :                                                                         SAT UNSAT Standard:   The Examinee determines Unit 1 Auxiliary Building Dampers CLOSED by observing green lights above handswitches ON.
Comment
 
SIM JPM F Page 12 of 15 STEP   14 :                                                                       SAT UNSAT Standard:   The Examinee determines Unit 2 Auxiliary Building Dampers CLOSED by observing green lights above handswitches ON.
Comment STEP   15 :                                                                       SAT UNSAT Standard:   The Examinee determines Cask Loading Area Dampers CLOSED by observing green lights above handswitches ON.
Comment
 
SIM JPM F Page 13 of 15 STEP   16 :                                                                       SAT UNSAT Standard:   The Examinee determines Fuel Handling Exhaust Fans STOPPED by observing green lights above handswitch ON or handswitch in PTL.
Comment STEP   17 :                                                                       SAT UNSAT Standard:   The Examinee determines Fuel Handling dampers CLOSED by observing green lights above handswitches ON.
Comment STEP   18 :                                                                       SAT UNSAT Standard:   The Examinee places HS-30-146A or HS 30-157A to START.           CRITICAL Comment
 
SIM JPM F Page 14 of 15 Terminating Provide the following cue, Another operator will complete the STOP Cue:     remaining steps of this procedure.
Stop Time
 
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
: 1. Unit 1 is in MODE 3.
: 2. Safety Injection actuated and was terminated.
: 3. Letdown was placed in service.
INITIATING CUES:
: 1. You have been directed to perform EA-0-1 EQUIPMENT CHECKS FOLLOWING ESF ACTUATION.
: 2. Inform the SRO when complete.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
 
SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 1311 NRC SIMULATOR JPM G
 
Sim JPM G Page 2 of 12 RO/SRO JOB PERFORMANCE MEASURE Task:               Emergency Mode Control Room Isolation due to High Radiation Task #:             0880980101 Task Standard:     The examinee will manually place one train of Emergency Control Room Ventilation in service and isolate Normal Control Room Ventilation.
Alternate Path:             YES:     X       NO:
Time Critical Task:         YES:             NO:         X K/A Reference/Ratings:       APE 061 AA1.01 (3.6/3.6)
Method of Testing:
Simulated Performance:                       Actual Performance:         X Evaluation Method:
Simulator         X       In-Plant               Classroom Main Control Room                               Mock-up Performer:
Trainee Name Evaluator:                                       /
Name / Signature                                     DATE Performance Rating:     SAT:                   UNSAT:
Validation Time:             15 minutes                     Total Time:
Performance Time:           Start Time:                     Finish Time:
COMMENTS
 
Sim JPM G Page 3 of 12 SPECIAL INSTRUCTIONS:
: 1. Ensure Simulator Operator Checklist is complete
: 2. Reset to IC 16
: 3. An extra operator will be required to acknowledge alarms.
: 4. ACKNOWLEDGE ALARMS
: 5. FREEZE SIMULATOR.
: 6. When directed insert the following:
IMF CH07A f:1 IMF CH07B f:1 IMF RM90125 f:10000 r:300 IMF RM90126 f:10000 r:300 IMF AN_OV_1255 f:2 d:10 IMF AN_OV_1262 f:2 d:10
: 7. Save as a temporary IC, if repeat runs of JPM will be desired.
: 8. PLACE SIMULATOR IN RUN when directed by the Lead Examiner
: 9. After JPM is complete, delete the temporary IC, if used.
Tools/Equipment/Procedures Needed:
0-SO-30-2 Control Room Isolation


==References:==
==References:==
Reference Title Rev No. 0-SO-30-2 Control Room Isolation 15 1-AR-M6-C CVCS-HEAT TRACE-UHI 34 0-AR-M12-B COMMON RADIATION MONITOR 29 Sim JPM G Page 4 of 12 DIRECTIONS TO TRAINEE: I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. Assume all independent and concurrent verifications are completed when called for by the procedure. To indicate that you have completed your assigned task return the handout sheet I provided you. HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME! INITIAL CONDITIONS: 1. Unit 1 is in MODE 1. 2. You are the Unit 1 CRO. INITIATING CUES: 1. Respond to plant conditions.
 
Sim JPM G Page 5 of 12   Start Time     STEP 1 :   SAT     UNSAT   Standard: Examinee responds to alarm using 1-AR-M6C window E-5 or E-6 and refers to 0-SO-30-2 Control Room Isolation. Cue: If asked provide the following cue, 125 and RM Examiner Note: The examinee may place HS 31A-7A and HS 31A-38A Control Bldg Isol Train A and B to ACTUATE in an attempt to manually actuate a Control Bldg Isolation. Examiner Note: Inserted simulator malfunction disables the Control Building Isolation automatic and manual isolation signals. Examiner Note: Examinee may address the M12B alarms in the next JPM step, if not proceed to JPM step 3 on the next page. Comment Sim JPM G Page 6 of 12   STEP 2 :   SAT     UNSAT   Standard: Examinee responds to alarm using 0-AR-M12B window C-7 or D-5 and refers to 0-SO-30-2 Control Room Isolation. Cue If asked acknowledge communication to Radcon. Examiner Note: May have been previously performed. Comment   STEP 3 : Obtain a copy of 0-SO-30-2 Control Room Isolation   SAT     UNSAT   Standard: Examinee obtains a copy of 0-SO-30-2 Control Room Isolation Cue Provide a copy of 0-SO-30-2 Control Room Isolation Section 8.1 Cue If asked provide the following cue, 0-SO-30-2 Control Room Isolation   Comment Sim JPM G Page 7 of 12 STEP 4 :   SAT     UNSAT   Standard: Examinee acknowledges CRI alarm. Comment     STEP 5 :   SAT     UNSAT   Standard: Examinee determines that alarm is valid by observing RM-90-125 and 126 alarms or by verification in ICS and notifies the Radcon to take air samples and determine if the MCR must be evacuated. Cue If asked acknowledge communication to the Radcon. Comment     STEP 6 :   SAT     UNSAT   Standard: Examinee verifies that B Train Control Building A/C AHU is running and 0-FCO-311-23 is open by observing red light on XI-311-23A (Panel 1-M-6) or red light above 0-HS-23A is ON and red light for indicator 0-XI-311-23 (Panel 1-M-11) is ON Comment Sim JPM G Page 8 of 12 STEP 7 :   SAT     UNSAT   Standard: Examinee verifies Control Building A/C AHUs are running and addresses the step as not applicable. Comment     STEP 8 :   SAT     UNSAT   Standard: Examinee verifies that B Train Electrical Board Room A/C AHU is running and 0-FCO-311-28 is open by observing red light above 0-HS-311-28A ELECT BD ROOM A/C AHU B is ON and red light for indicator 0-XI-311-28 ELECT BD RM AHU B INLET ON. Comment Sim JPM G Page 9 of 12 STEP 9 : ALTERNATE PATH    SAT     UNSAT   Standard: Examinee places 0-HS-311-9A CNTL BLDG EMERG AIR CLEAN UP FAN A OR 0-HS-311-11A CNTL BLDG EMERG AIR CLEAN UP FAN B to START. Examinee verifies damper 0-FCO-311-9 is open by observing red light for indicator 0-XI-311-9 ON OR Examinee verifies damper 0-FCO-311-11 is open by observing red light for indicator 0-XI-311-11 ON CRITICAL Examiner Note: Placing both fans in service is acceptable. Examiner Note: The damper position indication verification is not critical Comment Sim JPM G Page 10 of 12 STEP 10 : ALTERNATE PATH    SAT     UNSAT   Standard: Examinee places 0-HS-311-108A CNTL BLDG EMERG PRESS FAN A OR 0-HS-311-109A CNTL BLDG EMERG PRESS FAN B to START. Examinee verifies damper 0-FCO-311-108 is open by observing red light for indicator 0-XI-311-108 ON OR Examinee verifies damper 0-FCO-311-109 is open by observing red light for indicator 0-XI-311-109 ON CRITICAL Examiner Note: Placing both fans in service is acceptable. Examiner Note: The damper position indication verification is not critical Comment    STEP 11 : ALTERNATE PATH    SAT      UNSAT   Standard: Examinee places 0-HS-311-36A Spreading Room Supply Fan to STOP CRITICAL Comment Sim JPM G Page 11 of 12 STEP 12 :     SAT     UNSAT   Standard: Examinee verifies Spreading Room Exhaust Fan A is stopped by observing green lights above HS-311-79A ON. Comment   STEP 13 : ALTERNATE PATH    SAT     UNSAT   Standard: Examinee places 0-HS-311-80A Spreading Room Exhaust Fan B to STOP CRITICAL Comment   Terminating Cue: Provide the following cue, another operator will complete the remaining steps of this procedure. STOP  Stop Time 1201 NRC Simulator JPM G JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. Assume all independent and concurrent verifications are completed when called for by the procedure. INITIAL CONDITIONS: 1. Unit 1 is in MODE 1. 2. You are the Unit 1 CRO. INITIATING CUES: 1. Respond to plant conditions. Acknowledge to the examiner when you are ready to begin. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
Reference                                     Title   Rev No.
SEQUOYAH NUCLEAR PLANT   1311 NRC SIMULATOR JPM H SIM JPM H Page 2 of 14 RO/SRO JOB PERFORMANCE MEASURE     Task: Perform CR Actions for Fire in the Auxiliary Building   Task #: 3010070401   Task Standard: The Examinee re-aligns Charging Pump suction to the SI Pump and re-starts Charging Pumps. Alternate Path: YES: NO: X   Time Critical Task: YES: X NO:     K/A Reference/Ratings: APE 067 AA2.17 (3.5/4.3) Method of Testing:   Simulated Performance:   Actual Performance: X   Evaluation Method:   Simulator X In-Plant Classroom             Main Control Room   Mock-up       Performer:   Trainee Name   Evaluator: /     Name / Signature DATE Performance Rating: SAT: UNSAT:   Validation Time: 6 min Total Time:       Performance Time: Start Time:   Finish Time:     COMMENTS SIM JPM H Page 3 of 14 SPECIAL INSTRUCTIONS: 1. Ensure Simulator Operator Checklist is complete 2. Reset to IC 348 3. If IC 348 is not available, perform the following. 4. Reset to IC 16 IMF RP04A f:1 PLACE SIMULATOR IN RUN PLACE all RCP handswitches in STOP/PULL TO LOCK. PLACE all four S/G atmospheric relief valve handswitches in CLOSE. PLACE atmospheric relief valve controllers in MANUAL with output adjusted to zero. PLACE MSIV switches in CLOSE. PLACE all MFW Reg Valve controllers to MANUAL and CLOSE. PLACE FIC-15-43 S/G Blowdown Flow Controller output adjusted to ZERO. Place TD AFW in MANUAL at minimum speed. 5. An extra operator will be required to acknowledge alarms. 6. ACKNOWLEDGE ALARMS 7. FREEZE SIMULATOR. 8. Save as a temporary IC, if repeat runs of JPM will be desired. 9. PLACE SIMULATOR IN RUN 10. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted. Tools/Equipment/Procedures Needed:
0-SO-30-2               Control Room Isolation             15 1-AR-M6-C               CVCS-HEAT TRACE-UHI                 34 0-AR-M12-B             COMMON RADIATION MONITOR           29
 
Sim JPM G Page 4 of 12 DIRECTIONS TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. Assume all independent and concurrent verifications are completed when called for by the procedure. To indicate that you have completed your assigned task return the handout sheet I provided you.
HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
INITIAL CONDITIONS:
: 1.       Unit 1 is in MODE 1.
: 2.       You are the Unit 1 CRO.
INITIATING CUES:
: 1.       Respond to plant conditions.
 
Sim JPM G Page 5 of 12 Start Time STEP   1 :                                                                                 SAT UNSAT Standard:   Examinee responds to alarm using 1-AR-M6C window E-5 or E-6 and refers to 0-SO-30-2 Control Room Isolation.
Cue:     If asked provide the following cue, The AUO reports both RM-90-125 and RM-90-126 counts are going up.
Examiner   The examinee may place HS 31A-7A and HS 31A-38A Control Bldg Isol Note:    Train A and B to ACTUATE in an attempt to manually actuate a Control Bldg Isolation.
Examiner   Inserted simulator malfunction disables the Control Building Isolation Note:    automatic and manual isolation signals.
Examiner   Examinee may address the M12B alarms in the next JPM step, if not Note:    proceed to JPM step 3 on the next page.
Comment
 
Sim JPM G Page 6 of 12 STEP   2 :                                                                           SAT UNSAT Standard:   Examinee responds to alarm using 0-AR-M12B window C-7 or D-5 and refers to 0-SO-30-2 Control Room Isolation.
Cue     If asked acknowledge communication to Radcon.
Examiner Note:   May have been previously performed.
Comment Obtain a copy of 0-SO-30-2 Control Room Isolation STEP    3  :                                                                          SAT UNSAT Standard:   Examinee obtains a copy of 0-SO-30-2 Control Room Isolation Cue     Provide a copy of 0-SO-30-2 Control Room Isolation Section 8.1 Cue     If asked provide the following cue, 0-SO-30-2 Control Room Isolation section 4 is complete.
Comment
 
Sim JPM G Page 7 of 12 STEP   4 :                                                                               SAT UNSAT Standard:   Examinee acknowledges CRI alarm.
Comment STEP   5 :                                                                               SAT UNSAT Examinee determines that alarm is valid by observing RM-90-125 and Standard:  126 alarms or by verification in ICS and notifies the Radcon to take air samples and determine if the MCR must be evacuated.
Cue     If asked acknowledge communication to the Radcon.
Comment STEP   6 :                                                                               SAT UNSAT Examinee verifies that B Train Control Building A/C AHU is running and Standard:  0-FCO-311-23 is open by observing red light on XI-311-23A (Panel 1-M-
: 6) or red light above 0-HS-23A is ON and red light for indicator 0-XI-311-23 (Panel 1-M-11) is ON Comment
 
Sim JPM G Page 8 of 12 STEP   7   :                                                                             SAT UNSAT Standard:   Examinee verifies Control Building A/C AHUs are running and addresses the step as not applicable.
Comment STEP   8   :                                                                             SAT UNSAT Examinee verifies that B Train Electrical Board Room A/C AHU is running Standard:  and 0-FCO-311-28 is open by observing red light above 0-HS-311-28A ELECT BD ROOM A/C AHU B is ON and red light for indicator 0-XI-311-28 ELECT BD RM AHU B INLET ON.
Comment
 
Sim JPM G Page 9 of 12 ALTERNATE PATH STEP   9 :                                                                         SAT UNSAT Examinee places 0-HS-311-9A CNTL BLDG EMERG AIR CLEAN UP FAN A OR 0-HS-311-11A CNTL BLDG EMERG AIR CLEAN UP FAN B to START.
Examinee verifies damper 0-FCO-311-9 is open by observing red light Standard:  for indicator 0-XI-311-9 ON                                         CRITICAL OR Examinee verifies damper 0-FCO-311-11 is open by observing red light for indicator 0-XI-311-11 ON Examiner Note:   Placing both fans in service is acceptable.
Examiner Note:   The damper position indication verification is not critical Comment
 
Sim JPM G Page 10 of 12 ALTERNATE PATH STEP   10 :                                                                           SAT UNSAT Examinee places 0-HS-311-108A CNTL BLDG EMERG PRESS FAN A OR 0-HS-311-109A CNTL BLDG EMERG PRESS FAN B to START.
Examinee verifies damper 0-FCO-311-108 is open by observing red light Standard:  for indicator 0-XI-311-108 ON CRITICAL OR Examinee verifies damper 0-FCO-311-109 is open by observing red light for indicator 0-XI-311-109 ON Examiner Note:   Placing both fans in service is acceptable.
Examiner Note:   The damper position indication verification is not critical Comment ALTERNATE PATH STEP   11 :                                                                           SAT UNSAT Standard:   Examinee places 0-HS-311-36A Spreading Room Supply Fan to STOP         CRITICAL Comment
 
Sim JPM G Page 11 of 12 STEP   12   :                                                                         SAT UNSAT Standard:   Examinee verifies Spreading Room Exhaust Fan A is stopped by observing green lights above HS-311-79A ON.
Comment ALTERNATE PATH STEP   13   :                                                                         SAT UNSAT Standard:   Examinee places 0-HS-311-80A Spreading Room Exhaust Fan B to CRITICAL STOP Comment Terminating   Provide the following cue, another operator will complete the Cue:                                                                            STOP remaining steps of this procedure.
Stop Time
 
1201 NRC Simulator JPM G JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Assume all independent and concurrent verifications are completed when called for by the procedure.
INITIAL CONDITIONS:
: 1. Unit 1 is in MODE 1.
: 2. You are the Unit 1 CRO.
INITIATING CUES:
: 1. Respond to plant conditions.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
 
SEQUOYAH NUCLEAR PLANT 1311 NRC SIMULATOR JPM H
 
SIM JPM H Page 2 of 14 RO/SRO JOB PERFORMANCE MEASURE Task:               Perform CR Actions for Fire in the Auxiliary Building Task #:             3010070401 Task Standard:     The Examinee re-aligns Charging Pump suction to the SI Pump and re-starts Charging Pumps.
Alternate Path:             YES:             NO:         X Time Critical Task:         YES:     X       NO:
K/A Reference/Ratings:     APE 067 AA2.17 (3.5/4.3)
Method of Testing:
Simulated Performance:                     Actual Performance:           X Evaluation Method:
Simulator         X     In-Plant               Classroom Main Control Room                               Mock-up Performer:
Trainee Name Evaluator:                                       /
Name / Signature                                     DATE Performance Rating:     SAT:                 UNSAT:
Validation Time:           6 min                           Total Time:
Performance Time:           Start Time:                     Finish Time:
COMMENTS
 
SIM JPM H Page 3 of 14 SPECIAL INSTRUCTIONS:
: 1. Ensure Simulator Operator Checklist is complete
: 2. Reset to IC 348
: 3. If IC 348 is not available, perform the following.
: 4. Reset to IC 16 IMF RP04A f:1 PLACE SIMULATOR IN RUN PLACE all RCP handswitches in STOP/PULL TO LOCK.
PLACE all four S/G atmospheric relief valve handswitches in CLOSE.
PLACE atmospheric relief valve controllers in MANUAL with output adjusted to zero.
PLACE MSIV switches in CLOSE.
PLACE all MFW Reg Valve controllers to MANUAL and CLOSE.
PLACE FIC-15-43 S/G Blowdown Flow Controller output adjusted to ZERO.
Place TD AFW in MANUAL at minimum speed.
: 5. An extra operator will be required to acknowledge alarms.
: 6. ACKNOWLEDGE ALARMS
: 7. FREEZE SIMULATOR.
: 8. Save as a temporary IC, if repeat runs of JPM will be desired.
: 9. PLACE SIMULATOR IN RUN
: 10. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.
Tools/Equipment/Procedures Needed:


==References:==
==References:==
Reference Title Rev No. 1. AOP-N.08 APPENDIX R FIRE SAFE SHUTDOWN 32 2.
 
SIM JPM H Page 4 of 14 DIRECTIONS TO TRAINEE: I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME! INITIAL CONDITIONS: 1. Unit 1 is in MODE 3. 2. An uncontrolled fire is in Aux Building el. 669 Unit 1 Penetration Room. 3. AOP-N.08 APPENDIX R FIRE SAFE SHUTDOWN is in progress, completed through step 6. INITIATING CUES: 1. You have been directed to perform AOP-N.08 APPENDIX R FIRE SAFE SHUTDOWN starting at step 7. 2. Inform the SRO when complete.
Reference                                     Title                                 Rev No.
SIM JPM H Page 5 of 14   Start Time   STEP 1 : Obtain a copy of AOP-N.08 APPENDIX R FIRE SAFE SHUTDOWN. SAT      UNSAT   Standard: Examinee obtains a copy of AOP-N.08 APPENDIX R FIRE SAFE SHUTDOWN. Cue: Provide an in progress copy of AOP-N.08 APPENDIX R FIRE SAFE SHUTDOWN completed through step 6. Comment     STEP 2 :   SAT     UNSAT   Standard: The examinee goes to step 7.b based on the initial conditions. Comment SIM JPM H Page 6 of 14 STEP 3 :   SAT     UNSAT   Standard: The examinee places HS-62-108A and HS-62-104A Charging Pump A and B in PTL. CRITICAL Comment     STEP 4 :   SAT     UNSAT   Standard: The examinee proceeds to step 10. Comment SIM JPM H Page 7 of 14 STEP 5 :   SAT     UNSAT   Standard: The examinee places HS-62-72A, FCV-62-73A, FCV-62-74A Letdown Orifice Isolation valves and HS-62-69A, HS-62-70A Letdown Loop Isolation valves to CLOSE. Comment     STEP 6 :   SAT     UNSAT   Standard: The examinee verifies FCV-62-90 and FCV-62-91 Charging Flow Isolation valves closed by observing the green lights above handswitches ON. Comment SIM JPM H Page 8 of 14 STEP 7 :   SAT     UNSAT   Standard:   Cue: If asked provide the following cue,   Comment     STEP 8 :   SAT     UNSAT   Standard: The examinee addresses the procedure step. Comment   STEP 9 :   SAT     UNSAT   Standard: The examinee proceeds to step 15 based on the initiating cue. Comment SIM JPM H Page 9 of 14 STEP 10 :     SAT     UNSAT   Standard: The Examinee proceeds to Section 2.4 based on the initiating cue. Comment     STEP 11 :     SAT     UNSAT   Standard: The examinee addresses the procedure step based on the initiating cue. Comment SIM JPM H Page 10 of 14 STEP 12 :   SAT     UNSAT   Standard: The examinee addresses the procedure step. Cue: If asked provide the following cue, Operators have been dispatched Comment     STEP 13 :   SAT     UNSAT   Standard: The examinee verifies FCV-63-5 and RWST To SIS Pumps Flow Control Valve and FCV-63-47 SIS Pump 1A-A Inlet Valve open by observing the red lights above handswitches ON. Comment SIM JPM H Page 11 of 14 STEP 14 :   SAT     UNSAT   Standard: The Examinee places 1-FCV-63-6 SIS Pump Inlet To CCP Valve OR 1-FCV-63-7 SIS Pump 1A-A Inlet to CCP Valve to OPEN. CRITICAL Comment   STEP 15 :   SAT     UNSAT   Standard: The examinee addresses the procedure step as N/A. Comment   STEP 15 :     SAT     UNSAT   Standard: The examinee verifies LCV-62-132 and LCV-62-133 VCT Outlet to CCP closed by observing the green lights above handswitches ON. Comment SIM JPM H Page 12 of 14  STEP 16 :   SAT     UNSAT   Standard: The Examinee determines CCPIT valves open by observing red lights above HS-63-39A, HS-63-40A, HS-63-26A and HS-63-25 CCPIT INLET/OUTLET ISOL ON. Comment   STEP 17 :   SAT     UNSAT   Standard: The Examinee depresses HS-63-134A AND HS-63-134B. CRITICAL Comment SIM JPM H Page 13 of 14 STEP 18 :   SAT     UNSAT   Standard: The examinee places HS-63-39A and HS-63-40A CCPIT INLET ISOL OR HS-63-26A and HS-63-25 CCPIT OUTLET ISOL to CLOSE. CRITICAL Comment   STEP 19 :   SAT     UNSAT   Standard: The examinee places HS-62-108A Charging Pump A OR HS-62-104A Charging Pump B to START. CRITICAL Examiner  Time critical portion of this JPM starts when the Examinee acknowledges starting the task. Note time here________ Comment   Terminating Cue: Provide the following cue, another operator will complete the remaining steps of this procedure. STOP  Stop Time JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. INITIAL CONDITIONS: 1. Unit 1 is in MODE 3. 2. An uncontrolled fire is in Aux Building el. 669 Unit 1 Penetration Room. 3. AOP-N.08 APPENDIX R FIRE SAFE SHUTDOWN is in progress, completed through step 6. INITIATING CUES: 1. You have been directed to perform AOP-N.08 APPENDIX R FIRE SAFE SHUTDOWN starting at step 7. 2. Inform the SRO when complete. 3. There is (are) element(s) of this task that are time critical. Acknowledge to the examiner when you are ready to begin. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.}}
: 1. AOP-N.08                 APPENDIX R FIRE SAFE SHUTDOWN                                       32 2.
 
SIM JPM H Page 4 of 14 DIRECTIONS TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
INITIAL CONDITIONS:
: 1.       Unit 1 is in MODE 3.
: 2.       An uncontrolled fire is in Aux Building el. 669 Unit 1 Penetration Room.
: 3.       AOP-N.08 APPENDIX R FIRE SAFE SHUTDOWN is in progress, completed through step 6.
INITIATING CUES:
: 1.       You have been directed to perform AOP-N.08 APPENDIX R FIRE SAFE SHUTDOWN starting at step 7.
: 2.       Inform the SRO when complete.
 
SIM JPM H Page 5 of 14 Start Time STEP   1   :                                                                             SAT Obtain a copy of AOP-N.08 APPENDIX R FIRE SAFE SHUTDOWN.
UNSAT Standard:   Examinee obtains a copy of AOP-N.08 APPENDIX R FIRE SAFE SHUTDOWN.
Cue:     Provide an in progress copy of AOP-N.08 APPENDIX R FIRE SAFE SHUTDOWN completed through step 6.
Comment STEP   2   :                                                                             SAT UNSAT Standard:   The examinee goes to step 7.b based on the initial conditions.
Comment
 
SIM JPM H Page 6 of 14 STEP   3   :                                                                   SAT UNSAT Standard:   The examinee places HS-62-108A and HS-62-104A Charging Pump A CRITICAL and B in PTL.
Comment STEP   4   :                                                                   SAT UNSAT Standard:   The examinee proceeds to step 10.
Comment
 
SIM JPM H Page 7 of 14 STEP   5   :                                                                   SAT UNSAT The examinee places HS-62-72A, FCV-62-73A, FCV-62-74A Letdown Standard:  Orifice Isolation valves and HS-62-69A, HS-62-70A Letdown Loop Isolation valves to CLOSE.
Comment STEP   6   :                                                                   SAT UNSAT The examinee verifies FCV-62-90 and FCV-62-91 Charging Flow Standard:  Isolation valves closed by observing the green lights above handswitches ON.
Comment
 
SIM JPM H Page 8 of 14 STEP   7   :                                                                     SAT UNSAT Standard:
Cue:     If asked provide the following cue, The Incident Commander has been recalled to the MCR.
Comment STEP   8   :                                                                     SAT UNSAT Standard:   The examinee addresses the procedure step.
Comment STEP   9   :                                                                     SAT UNSAT Standard:   The examinee proceeds to step 15 based on the initiating cue.
Comment
 
SIM JPM H Page 9 of 14 STEP   10 :                                                                       SAT UNSAT Standard:   The Examinee proceeds to Section 2.4 based on the initiating cue.
Comment STEP   11 :                                                                       SAT UNSAT Standard:   The examinee addresses the procedure step based on the initiating cue.
Comment
 
SIM JPM H Page 10 of 14 STEP   12 :                                                                   SAT UNSAT Standard:   The examinee addresses the procedure step.
Cue:     If asked provide the following cue, Operators have been dispatched.
Comment STEP   13 :                                                                   SAT UNSAT The examinee verifies FCV-63-5 and RWST To SIS Pumps Flow Standard:  Control Valve and FCV-63-47 SIS Pump 1A-A Inlet Valve open by observing the red lights above handswitches ON.
Comment
 
SIM JPM H Page 11 of 14 STEP   14 :                                                                     SAT UNSAT Standard:   The Examinee places 1-FCV-63-6 SIS Pump Inlet To CCP Valve OR CRITICAL 1-FCV-63-7 SIS Pump 1A-A Inlet to CCP Valve to OPEN.
Comment STEP   15 :                                                                     SAT UNSAT Standard:   The examinee addresses the procedure step as N/A.
Comment STEP   15 :                                                                     SAT UNSAT Standard:   The examinee verifies LCV-62-132 and LCV-62-133 VCT Outlet to CCP closed by observing the green lights above handswitches ON.
Comment
 
SIM JPM H Page 12 of 14 STEP   16 :                                                                       SAT UNSAT The Examinee determines CCPIT valves open by observing red lights Standard:  above HS-63-39A, HS-63-40A, HS-63-26A and HS-63-25 CCPIT INLET/OUTLET ISOL ON.
Comment STEP   17 :                                                                       SAT UNSAT Standard:   The Examinee depresses HS-63-134A AND HS-63-134B.                 CRITICAL Comment
 
SIM JPM H Page 13 of 14 STEP   18   :                                                                           SAT UNSAT Standard:   The examinee places HS-63-39A and HS-63-40A CCPIT INLET ISOL CRITICAL OR HS-63-26A and HS-63-25 CCPIT OUTLET ISOL to CLOSE.
Comment STEP   19   :                                                                           SAT UNSAT Standard:   The examinee places HS-62-108A Charging Pump A OR HS-62-104A CRITICAL Charging Pump B to START.
Time critical portion of this JPM starts when the Examinee Examiner    acknowledges starting the task.
Note time here________
Comment Terminating   Provide the following cue, another operator will complete the Cue:                                                                            STOP remaining steps of this procedure.
Stop Time
 
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
: 1. Unit 1 is in MODE 3.
: 2. An uncontrolled fire is in Aux Building el. 669 Unit 1 Penetration Room.
: 3. AOP-N.08 APPENDIX R FIRE SAFE SHUTDOWN is in progress, completed through step 6.
INITIATING CUES:
: 1. You have been directed to perform AOP-N.08 APPENDIX R FIRE SAFE SHUTDOWN starting at step 7.
: 2. Inform the SRO when complete.
: 3. There is (are) element(s) of this task that are time critical.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.}}

Latest revision as of 07:40, 4 November 2019

Initial Exam 2013-302 Draft Sim In-Plant Jpms
ML14080A038
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 03/21/2014
From:
NRC/RGN-II
To:
Tennessee Valley Authority
Shared Package
ML14080A058 List:
References
50-327/13-302, 50-328/13-302
Download: ML14080A038 (141)


Text

SEQUOYAH NUCLEAR PLANT 1311 NRC SIMULATOR JPM I

PLANT JPM I Page 2 of 6 RO/SRO JOB PERFORMANCE MEASURE Task: Respond to an ATWS Trip the Reactor Locally Task #: 0000130504 Task Standard: Reactor is tripped locally by opening of BOTH MG set supply breakers.

Alternate Path: YES: NO: X Time Critical Task: YES: NO: X K/A Reference/Ratings: APE 029 EA1.12 (4.1/4.0)

Method of Testing:

Simulated Performance: X Actual Performance:

Evaluation Method:

Simulator In-Plant X Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name / Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 5 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

PLANT JPM I Page 3 of 6 SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
2. Any UNSAT requires comments.

Tools/Equipment/Procedures Needed:

References:

Reference Title Rev No.

FR-S.1 Nuclear Power Generation/ATWS 23

========================================================================

READ TO OPERATOR HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

DIRECTIONS TO EXAMINEE:

I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. I will provide initiating cues and indicate any steps to be discussed.

When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit 1 is in an ATWS condition.
2. FR-S.1 Nuclear Power Generation/ATWS is in progress.

INITIATING CUES:

1. You have been directed to the trip the M-G supply breakers at the U1 A and B 480V Unit Boards using FR-S.1, NUCLEAR POWER GENERATION / ATWS step 7.
2. Inform the SRO when complete.

PLANT JPM I Page 4 of 6 Start Time STEP 1  : SAT Obtain a copy of FR-S.1, NUCLEAR POWER GENERATION / ATWS UNSAT Standard: Examinee obtains a copy of FR-S.1, NUCLEAR POWER GENERATION

/ ATWS.

Cue Provide a copy of FR-S.1, NUCLEAR POWER GENERATION / ATWS, step 7.

Comment STEP 2  : SAT UNSAT Standard: Operator simulates tripping the Control Rod Drive MG Set 1A breaker by CRITICAL depressing the Mechanical Red trip button (on front of compartment).

Cue After attempts to simulate opening the MG set output breaker provide the following cue, Flags/Targets on MG set output breaker is GREEN".

Examiner Note: The JPM Steps can be performed in any order.

Examiner The breaker is located on 480V UNIT BOARD 1A, 1-BCTB-85-DE/4D Note Compt 4D.

Comment

PLANT JPM I Page 5 of 6 STEP 3  : SAT UNSAT Standard: Operator simulates tripping the Control Rod Drive MG Set 1B breaker by CRITICAL depressing the Mechanical Red trip button (on front of compartment).

Cue After attempts to simulate opening the MG set output breaker provide the following cue, Flags/Targets on MG set output breaker is GREEN".

Examiner The breaker is located on 480V UNIT BOARD 1B, 1-BCTB-85-DF/3B Note Compt 3B.

Comment Inform the Control Room of actions taken.

STEP 4  : SAT UNSAT Standard: Operator simulates contacting the Control Room and informing them that MG set output breakers are open.

Comment Terminating The task is complete when the operator initiates communication Cue: STOP with the MCR regarding tripping the MG Set Output Breakers.

Stop Time

JPM BRIEFING SHEET DIRECTIONS TO EXAMINEE:

All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. You will be provided initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit 1 is in an ATWS condition.
2. FR-S.1 Nuclear Power Generation/ATWS is in progress.

INITIATING CUES:

1. You have been directed to the trip the M-G supply breakers at the U1 A and B 480V Unit Boards using FR-S.1, NUCLEAR POWER GENERATION / ATWS step 7.
2. Inform the SRO when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT 1311 NRC PLANT JPM J

PLANT JPM J Page 2 of 15 RO/SRO JOB PERFORMANCE MEASURE Task: Local Alignment of 2-RM-90-112 to Lower Containment Task #: 0730990101 Task Standard: The Examinee manually starts a sample pump and aligns 2-RM-90-112 to Lower Containment.

Alternate Path: YES: NO: X Time Critical Task: YES: NO: X K/A Reference/Ratings: 002 A3.01 (3.7/3.9)

Method of Testing:

Simulated Performance: X Actual Performance:

Evaluation Method:

Simulator In-Plant X Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name / Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 15 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

PLANT JPM J Page 3 of 15 SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
2. Any UNSAT requires comments.

Tools/Equipment/Procedures Needed:

1. 2-SO-90-2, Sections 5.1 and 8.3

References:

Reference Title Rev No.

2-SO-90-2 Gaseous Process Radiation Monitoring 37 System

========================================================================

READ TO EXAMINEE HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

DIRECTIONS TO EXAMINEE:

I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. I will provide initiating cues and indicate any steps to be discussed.

When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit 2 is in MODE 1.
2. 2-RM-90-112 had been isolated and tagged electrically for maintenance. The Hold Order has been picked up from the breaker, Checklist 2-90-2.03 attachment 2 is complete, but the pumps are off.
3. 2-RM-90-106 has just tripped and neither of its associated pumps can be started.
4. Section 3 and 4 of 2-SO-90-2 Gaseous Process Radiation Monitoring System, is complete.

INITIATING CUES:

1. The Control Room has directed you to start a sample pump and align monitor 2-RM-90-112 to sample lower containment using 2-SO-90-2, Section 8.3 steps 1 through 4.
2. Inform the Control Room when complete.

PLANT JPM J Page 4 of 15 Start Time STEP 1  : SAT Obtain a copy of 2-SO-90-2, Gaseous Process Radiation Monitoring System. UNSAT Standard: Examinee obtains a copy of 2-SO-90-2, Gaseous Process Radiation Monitoring System.

Cue Provide a copy of 2-SO-90-2, Gaseous Process Radiation Monitoring System section 5.1 and 8.3.

Comment STEP 2  : SAT UNSAT Standard: The Examinee addresses the procedure step as being complete in the initial conditions.

Comment

PLANT JPM J Page 5 of 15 STEP 3  : SAT UNSAT The Examinee determines a sample pump for 2-RM-90-112 is not Standard:

running and goes to section 5.1.

Comment STEP 4  : SAT UNSAT Standard: The Examinee selects 2-RM-90-112 based on the initiating cue.

Comment

PLANT JPM J Page 6 of 15 STEP 5  : SAT UNSAT The Examinee determines the valve checklist is complete for 2-RM Standard:

112 based on the initial conditions.

Comment STEP 6  : SAT UNSAT The Examinee determines the step is N/A based on the initial Standard:

conditions.

Comment

PLANT JPM J Page 7 of 15 STEP 7  : SAT UNSAT The Examinee simulates placing 2-HS-90-112, Heat Trace for 2-RM-Standard: CRITICAL 90-112 to ON.

If asked provide the following cue, Amber light for RM-90-112 on Cue:

Heat Trace Control Panel [2-JBOX-90-3919] is ON.

Comment STEP 8  : SAT UNSAT Standard: The Examinee addresses the step as N/A.

Cue: Provide the following cue, Testing is not required Comment

PLANT JPM J Page 8 of 15 STEP 9  : SAT UNSAT Standard: The Examinee addresses the procedure step.

Provide the following cue, The Unit 2 Control Room has contacted Cue:

I&C.

Comment STEP 10  : SAT UNSAT The Examinee simulates depressing 2-HS-90-112A or 2-HS-90-112B, Standard: CRITICAL Sample pump for 2-RM-90-112 to ON.

If asked provide the following cue, You hear a rotational Cue:

mechanical sound from the vicinity of the sample pump.

Comment

PLANT JPM J Page 9 of 15 STEP 11  : SAT UNSAT Standard: The Examinee addresses the step as N/A.

Comment STEP 12  : SAT UNSAT Standard: The Examinee addresses the procedure step.

Cue: If asked provide the following cue, I&C has been informed.

Comment

PLANT JPM J Page 10 of 15 STEP 13  : SAT UNSAT Standard: The Examinee addresses the procedure step.

Cue: If asked provide the following cue, Flow has been established.

Comment STEP 14  : SAT UNSAT The Examinee simulates resetting local low flow seal-in by turning [2-Standard: CRITICAL HS-90-112F] to the left to RESET.

Comment

PLANT JPM J Page 11 of 15 STEP 15  : SAT UNSAT Standard: The Examinee addresses the procedure step.

If asked provide the following cue, Alarms on Panel 0-XA-55-12D Cue:

Windows A-2 and A-3 are dark.

Comment STEP 16  : SAT UNSAT Standard: The Examinee addresses the step as N/A.

If asked provide the following cue, Alarms on Panel 0-XA-55-12D Cue:

Windows A-2 and A-3 are dark.

Comment

PLANT JPM J Page 12 of 15 STEP 17  : SAT UNSAT Standard: The Examinee addresses the step as N/A.

Provide the following cue, Background count rate is greater than Cue:

9,000 cpm.

Examiner The Examinee returns to section 8.3 step 1[c].

Note:

Comment STEP 18  : SAT UNSAT Standard: The Examinee addresses the procedure step Examiner Note: The heat tracing was placed in service in JPM step 7.

Comment

PLANT JPM J Page 13 of 15 STEP 19  : SAT UNSAT Standard: The Examinee addresses the procedure step.

Cue: If asked provide the following cue, Testing of the heat trace is not required.

Comment STEP 20  : SAT UNSAT Standard: The Examinee addresses the procedure step.

Provide the following cue, Background count rate is greater than Cue:

9,000 cpm.

Comment Examiner Note

PLANT JPM J Page 14 of 15 STEP 21  : SAT UNSAT Standard: The Examinee simulates opening 1-ISIV-90-283G by indicating CRITICAL handwheel turned as far left (counter-clockwise) as possible.

Cue: If asked provide the following cue, The valve HW turns several turns CCW and movement has stopped.

Comment Terminating The task is complete when the Examinee returns the cue sheet to Cue: STOP the Examiner.

Stop Time

JPM BRIEFING SHEET DIRECTIONS TO EXAMINEE:

All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. You will be provided initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit 2 is in MODE 1.
2. 2-RM-90-112 had been isolated and tagged electrically for maintenance. The Hold Order has been picked up from the breaker, Checklist 2-90-2.03 attachment 2 is complete, but the pumps are off.
3. 2-RM-90-106 has just tripped and neither of its associated pumps can be started.
4. Section 3 and 4 of 2-SO-90-2 Gaseous Process Radiation Monitoring System, is complete.

INITIATING CUES:

1. The Control Room has directed you to start a sample pump and align monitor 2-RM-90-112 to sample lower containment using 2-SO-90-2, Section 8.3 steps 1 through 4.
2. Inform the Control Room when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT 1311 NRC PLANT JPM K

PLANT JPM K Page 2 of 8 RO/SRO JOB PERFORMANCE MEASURE Task: Cycle the Unit 2 Main Generator PCB Task #: 0620510201 Task Standard: The Examinee cycles the Unit 2 Main Generator circuit breaker with generator off-line.

Alternate Path: YES: NO: X Time Critical Task: YES: NO: X K/A Reference/Ratings: 062A4.04 (2.6/2.7)

Method of Testing:

Simulated Performance: X Actual Performance:

Evaluation Method:

Simulator In-Plant X Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name / Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 10 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

PLANT JPM K Page 3 of 8 SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
2. Any UNSAT requires comments.

Tools/Equipment/Procedures Needed:

3. 2-SO-57-1 GENERATOR CIRCUIT BREAKER, Section 8.1.

References:

Reference Title Rev No.

2-SO-57-1 GENERATOR CIRCUIT BREAKER 3

========================================================================

READ TO EXAMINEE HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

DIRECTIONS TO EXAMINEE:

I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. I will provide initiating cues and indicate any steps to be discussed.

When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit 2 is in MODE 5
2. Maintenance has been completed on the Unit 2 main Generator PCB
3. 2-SO-57-1, GENERATOR CIRCUIT BREAKER Section 8.1 is in progress complete through step 8.
4. 2-SO-57-1, GENERATOR CIRCUIT BREAKER section 3 and 4 are complete.

INITIATING CUES:

1. You have been directed to cycle the Unit 2 Main Generator circuit breaker with generator off-line starting at step 9.
2. Inform the SRO when complete.

PLANT JPM K Page 4 of 8 Start Time Obtain a copy of 2-SO-57-1, GENERATOR CIRCUIT BREAKER.

STEP 1  : SAT UNSAT Standard: Examinee obtains a copy of 2-SO-57-1, GENERATOR CIRCUIT BREAKER.

Cue Provide an in progress copy of 2-SO-57-1, GENERATOR CIRCUIT BREAKER.

Comment STEP 2  : SAT UNSAT Standard: The Examinee verifies [2-MOD-57-323G], MOD 323G Ground Sw 57/1 is OPEN by observing XXXXX Cue:

Comment

PLANT JPM K Page 5 of 8 STEP 3  : SAT UNSAT Standard: The Examinee verifies [2-MOD-57-323G], MOD 323G Ground Sw 57/2 is OPEN by observing XXXXX Cue:

Comment STEP 4  : SAT UNSAT Standard: The Examinee verifies [2-MOD-57-323], MOD 323 Disconnect Sw 89 is CLOSED by observing XXXXX Cue:

Comment

PLANT JPM K Page 6 of 8 STEP 5  : SAT UNSAT Standard: The examinee simulates CRITICAL Cue:

Comment STEP 6  : SAT UNSAT Standard: The examinee simulates CRITICAL Cue:

Comment

PLANT JPM K Page 7 of 8 STEP 7  : SAT UNSAT Standard: The examinee addresses the procedure step.

Comment Terminating Provide the following cue, Another operator will complete the STOP Cue: remaining steps of this procedure.

Stop Time

JPM BRIEFING SHEET DIRECTIONS TO EXAMINEE:

All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. You will be provided initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1.

INITIATING CUES:

1. Inform the US when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT 1311 NRC SIMULATOR JPM A

SIM JPM A Page 2 of 8 RO/SRO JOB PERFORMANCE MEASURE Task: Initiate Emergency Boration from the RWST.

Task #: 0000290501 Task Standard: Examinee initiates an emergency boration to the RCS from the RWST through the CCPIT valves using EA-68-4 section 4.3.

Alternate Path: YES: X NO:

Time Critical Task: YES: NO: X K/A Reference/Ratings: EPE 029 EA 1.06 (3.2/3.1)

Method of Testing:

Simulated Performance: Actual Performance: X Evaluation Method:

Simulator X In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name / Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 8 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

SIM JPM A Page 3 of 8 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. Reset to IC 345
3. If IC 345 is not available perform the following:

PLACE SIMULATOR IN RUN IMF RD14A f:228 IMF RD14B f:228 IMF ZDIHS62138A f:0 IMF CV42AUTO f:80 IMF CV42COMP f:80 TRIP the Reactor

4. PLACE SIMULATOR IN RUN
5. An extra operator will be required to acknowledge alarms.
6. ACKNOWLEDGE ALARMS
7. FREEZE SIMULATOR.
8. Save as a temporary IC, if repeat runs of JPM will be desired.
9. PLACE SIMULATOR IN RUN
10. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.

Tools/Equipment/Procedures Needed:

References:

Reference Title Rev No.

1. EA-68-4 Emergency Boration 11 2.

SIM JPM A Page 4 of 8 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1. Unit 1 is in MODE 3 following a Reactor Trip.
2. Two Control Rods are not fully inserted.
3. Flow from the BAT cannot be established.

INITIATING CUES:

1. The SRO has directed you to initiate emergency boration from the RWST using EA-68-4 Emergency Boration Section 4.3.
2. Inform the SRO when complete.

SIM JPM A Page 5 of 8 Start Time STEP 1  : SAT Obtain a copy of EA-68-4, EMERGENCY BORATION.

UNSAT Standard: Examinee obtains a copy of EA-68-4, EMERGENCY BORATION.

Comment STEP 2  : SAT UNSAT Standard: Examinee places HS-135 RWST to CCP to IN and OPEN CRITICAL Comment STEP 2  : SAT UNSAT Standard: Examinee places HS-136 RWST to CCP to IN and OPEN CRITICAL Comment

SIM JPM A Page 6 of 8 STEP 2  : SAT UNSAT Standard: Examinee places HS-132 VCT OUTLET TO CCP to IN and CLOSE CRITICAL Comment STEP 2  : SAT UNSAT Standard: Examinee places HS-132 VCT OUTLET TO CCP to IN and CLOSE CRITICAL Comment STEP 3  : SAT UNSAT Standard: Examinee addresses the procedure step as N/A and proceeds to step 4.

Comment

SIM JPM A Page 7 of 8 STEP 4  : SAT UNSAT Standard: Examinee determines insufficient flow through FCV-62-93 CHARGING FLOW CONTROL cannot be attained and goes to the alternate path.

Comment ALTERNATE PATH STEP 5  : SAT UNSAT Standard: Examinee places HS-63-26 CCPIT OUTLET ISOL OR HS-63-25 CCPIT OUTLET ISOL to OPEN.

Comment ALTERNATE PATH STEP 6  : SAT UNSAT Standard: Examinee places HS-63-39 CCPIT INLET ISOL OR HS-63-40 CCPIT INLET ISOL to OPEN.

Comment Terminating When CCPIT valves have been opened provide the following cue, Cue: Another operator will complete the remaining steps of this STOP procedure.

Stop Time

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. Unit 1 is in MODE 3 following a Reactor Trip.
2. Two Control Rods are not fully inserted.
3. Flow from the BAT cannot be established.

INITIATING CUES:

1. The SRO has directed you to initiate emergency boration from the RWST using EA-68-4 Emergency Boration Section 4.3.
2. Inform the SRO when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT 1311 NRC SIMULATOR JPM B

SIM JPM B Page 2 of 14 RO/SRO JOB PERFORMANCE MEASURE Task: Vent an unisolable Cold Leg Accumulator.

Task #: 0060060101 Task Standard: The examinee vents the #4 Cold Leg Accumulator using EA-63-1, VENTING UNISOLATED COLD LEG ACCUMULATOR.

Alternate Path: YES: X NO:

Time Critical Task: YES: NO: X K/A Reference/Ratings: 006 A4.02 (4.0/3.8)

Method of Testing:

Simulated Performance: Actual Performance: X Evaluation Method:

Simulator X In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name / Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 8 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

SIM JPM B Page 3 of 14 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. Reset to IC 335/350
3. If IC 335 is not available perform the following.

Reset to IC 24 Complete ES-1.3 Transfer to RHR Containment Sump.

IOR ZDIHS6367A f:0 IRF IAR06 f:2 IRF SIR01 f:1

4. PLACE SIMULATOR IN RUN
5. Place MODE 1 sign on the simulator.
6. An extra operator will be required to acknowledge alarms.
7. ACKNOWLEDGE ALARMS
8. FREEZE SIMULATOR.
9. Save as a temporary IC, if repeat runs of JPM will be desired.
10. PLACE SIMULATOR IN RUN
11. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.
12. When directed enter IRF IAR06 f:2 to supply non-essential air to the containment.

Tools/Equipment/Procedures Needed:

References:

Reference Title Rev No.

1. EA-63-1 VENTING UNISOLATED COLD LEG ACCUMULATOR. 0 2.

SIM JPM B Page 4 of 14 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1. Unit 1 was in MODE 1 prior to an event.
2. The event is still in progress.
3. E-1, LOSS OF REACTOR OR SECONDARY COOLANT is in progress complete through step 16.

INITIATING CUES:

1. You have been directed to perform E-1, LOSS OF REACTOR OR SECONDARY COOLANT starting at step 17.
2. Inform the SRO when complete.

SIM JPM B Page 5 of 14 Start Time STEP 1  : SAT Obtain a copy of E-1, LOSS OF REACTOR OR SECONDARY COOLANT. UNSAT Standard: Examinee obtains a copy of E-1, LOSS OF REACTOR OR SECONDARY COOLANT.

Cue: Provide an in progress copy of E-1, LOSS OF REACTOR OR SECONDARY COOLANT.

Comment STEP 2  : SAT UNSAT Standard: The examinee determines RHR Spray will not be placed in service and proceeds to step 18.

Comment

SIM JPM B Page 6 of 14 STEP 3  : SAT UNSAT Standard: The examinee determines RCS pressure is less than 100 psig by observing installed instrumentation.

Comment STEP 4  : SAT UNSAT Standard: The examinee determines dispatches personnel to restore power to the CLA Isolation valves.

Cue: Provide the following cue, Time has been compressed, power has been restored to the CLA Isolation valves.

Comment STEP 5  : SAT UNSAT Standard: Examinee depresses HS-63-134A and HS-63-134B SIS RESET TRAIN 1A and 1B.

Comment

SIM JPM B Page 7 of 14 STEP 6  : SAT UNSAT Standard: The examinee places HS-63-118A,63-98A, 63-80A and HS-63-67A NO CRITICAL 1, 2, and 3 CL ACCUM OUTLET ISOL to CLOSE.

Comment ALTERNATE PATH STEP 7  : SAT UNSAT Standard: The examinee places HS-63-67A NO 4 CL ACCUM OUTLET ISOL to CLOSE, observes RED light above HS and proceeds to the RNO.

Comment

SIM JPM B Page 8 of 14 STEP 8  : SAT UNSAT Standard: The examinee places HS-63-67A NO 4 CL ACCUM OUTLET ISOL to CLOSE, observes RED light above HS and proceeds to the RNO.

Cue: Provide the following cue, FCV-63-67 cannot be closed electrically.

Cue: Provide the following cue, TSC has determined CLA #4 should be vented.

Comment

SIM JPM B Page 9 of 14 STEP 9  : ALTERNATE PATH SAT UNSAT Standard: The examinee simultaneously depresses HS-30-64D and HS-30-64D CRITICAL PHASE B ISOL RESET TR-A and TR-B.

Comment STEP 10  : SAT UNSAT Standard: The examinee addresses the procedure step.

Cue: Direct the simulator operator to align Non-Essential Control Air to the Containment.

Cue: Provide the following cue, Non-Essential Air has been supplied to the Containment.

Comment

SIM JPM B Page 10 of 14 STEP 11  : SAT UNSAT Standard: The examinee goes to EA-63-1, VENTING UNISOLATED COLD LEG ACCUMULATOR.

Comment STEP 12  : SAT Obtain a copy of EA-63-1, VENTING UNISOLATED COLD LEG ACCUMULATOR. UNSAT Standard: Examinee obtains a copy of EA-63-1, VENTING UNISOLATED COLD LEG ACCUMULATOR.

Comment STEP 13  : SAT UNSAT Standard: The examinee addresses the procedure step.

Comment

SIM JPM B Page 11 of 14 STEP 14  : SAT UNSAT Standard: The examinee simultaneously depresses HS-30-64D and HS-30-64D PHASE B ISOL RESET TR-A and TR-B.

Examiner Note The examinee reset Containment Isolation Phase B in JPM Step 9.

Comment STEP 15  : SAT UNSAT Standard: The examinee addresses the procedure step.

Cue: Provide the following cue, Non-Essential Air has been supplied to the Containment.

Examiner Note The examinee reset Containment Isolation Phase B in JPM Step 10.

Comment

SIM JPM B Page 12 of 14 STEP 16  : SAT UNSAT Standard: The examinee verifies valves closed by observing green lights above valve handswitches ON.

Comment STEP 17  : SAT UNSAT Standard: The examinee rotates HIC-63-65 CL ACCUM N2 HDR VENT FLOW CRITICAL CONTROL fully CCW.

Comment STEP 18  : SAT UNSAT Standard: The examinee places HS-63-63A NO 4 CL ACCUM N2 SUPPLY ISOL CRITICAL to OPEN.

Comment

SIM JPM B Page 13 of 14 STEP 19  : SAT UNSAT Standard: The examinee places HS-63-63A NO 4 CL ACCUM N2 SUPPLY ISOL to CLOSE.

Comment STEP 20  : SAT UNSAT Standard: The examinee rotates HIC-63-65 CL ACCUM N2 HDR VENT FLOW CONTROL fully CW.

Comment Terminating Provide the following cue, Another operator will address the Cue: STOP remaining steps of this procedure.

Stop Time

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. Unit 1 was in MODE 1 prior to an event.
2. The event is still in progress.
3. E-1, LOSS OF REACTOR OR SECONDARY COOLANT is in progress complete through step 16.

INITIATING CUES:

1. You have been directed to perform E-1, LOSS OF REACTOR OR SECONDARY COOLANT starting at step 17.
2. Inform the SRO when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT 1311 NRC SIMULATOR JPM C

SIM JPM C Page 2 of 23 RO/SRO JOB PERFORMANCE MEASURE Task: Respond to a Shutdown LOCA Task #: 3210330301 Task Standard: The examinee will align Charging to the CCPIT and initiate a Containment Vent Isolation by closing individual valves in response to a LOCA while in MODE 5 and RHR in service.

Alternate Path: YES: X NO:

Time Critical Task: YES: NO: X K/A Reference/Ratings: EPE 011 EA 2.04 (3.8/4.0)

Method of Testing:

Simulated Performance: Actual Performance: X Evaluation Method:

Simulator X In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name / Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 25 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

SIM JPM C Page 3 of 23 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. Reset to IC 349
3. If IC 349 is not available, perform the following:

Reset to IC 36 Run scenario file 1311 NRC JPM C Remove power form CCPIT valves IRF CVR12 f:0 Remove power form CCPIT valves IRF CVR14 f:0

4. Place Red Hold Orders on CLA valves: FCV-63-118, -98, -80, & -67 Containment Spray valves: FCV-72-39, -2, -40, -41, -23, -20, Containment Spray Pumps HS-72 -27A, & 72-10A CCPIT valves: FCV-63-25, -26, -39, & -40
5. Place the following in PTL and hang red tags on the following:

1B CCP HS-62-104A 1A SIP HS-63-10A 1B SIP HS-63-15A

6. Place Yellow Caution Orders on:

Cold Leg Injection valves: FCV-63-93, & -94 SI Hot leg Injection Valves: FCV-63 -156, -157, & -172 Makeup to Accumulators from SI FCV-63-23 Suction to RHR Pumps from RWST 63-1 RHR Hx Valves 74-16 and 74-28 (flow limiting blocks installed)

7. PLACE SIMULATOR IN RUN
8. Place Mode 5 placard on panels.
9. Place A Train Week sign on the simulator.
10. An extra operator will be required to acknowledge alarms.
11. ACKNOWLEDGE ALARMS

SIM JPM C Page 4 of 23

12. FREEZE SIMULATOR.
13. PLACE SIMULATOR IN RUN
14. When directed IMF TH01D f:0.1 k:1 to initiate LOCA
15. When directed IRF CVR12 f:1 and IRF CVR14 f:1 k:2 to energize CCPIT valves Tools/Equipment/Procedures Needed:

References:

Reference Title Rev No.

1. AOP-R.02 SHUTDOWN LOCA 16 2.

SIM JPM C Page 5 of 23 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1. Unit has recently entered Mode 5.
2. Both Trains of RHR are in service.
3. 0-GO-7 UNIT SHUTDOWN FROM HOT STANDBY TO COLD SHUTDOWN is in progress at Section 5.4 Step 5.

INITIATING CUES:

1. Respond to plant conditions.

SIM JPM C Page 6 of 23 Start Time STEP 1  : SAT UNSAT Standard: Examinee transitions to AOP-R.02, SHUTDOWN LOCA If required direct the Simulator Operator to initiate the following cue, Cue: There is a large leak in lower containment, I cannot see where the leak is coming from.

Examiner The Examinee may go directly to AOP-R.02, SHUTDOWN LOCA on Note: JPM step 2.

Comment

SIM JPM C Page 7 of 23 STEP 2  : SAT Obtain a copy of AOP-R.02, SHUTDOWN LOCA UNSAT Standard: Examinee obtains a copy of AOP-R.02, SHUTDOWN LOCA Comment STEP 3  : SAT UNSAT Standard: The Examinee places HS68-31A, and 73A RCPs to STOP when CRITICAL RCP trip criteria is reached.

Comment

SIM JPM C Page 8 of 23 STEP 4  : SAT UNSAT Standard: The Examinee determines RHR SUCTION FROM LOOP 4 HL OPEN by observing red lights above handswitches ON.

Comment STEP 5  : SAT UNSAT The Examinee determines Pressurizer Level less than 10% by Standard:

observing installed instrumentation.

Comment

SIM JPM C Page 9 of 23 STEP 6  : SAT UNSAT Standard: The Examinee places HS-74-10A and HS-74-20A RHR Pumps to CRITICAL PTL.

Comment STEP 7  : SAT UNSAT The Examinee places HS-74-1A or HS-74-2A RHR SUCTION FROM LOOP 4 HL to CLOSE.

Standard: AND CRITICAL The Examinee places HS-74-33A or HS-74-35A RHR HX 1A and 1B CROSSTIE ISOL to CLOSE Comment

SIM JPM C Page 10 of 23 STEP 8  : SAT UNSAT The Examinee determines LETDOWN OREFICE ISOLATION valves Standard: CLOSED by observing green lights above handswitches ON. The Examinee may place the handswitches to CLOSE.

Comment STEP 9  : SAT UNSAT The Examinee determines LETDOWN ISOLATION valves CLOSED Standard: by observing green lights above handswitches ON. The Examinee may place the handswitches to CLOSE.

Comment

SIM JPM C Page 11 of 23 STEP 10  : SAT UNSAT Standard: The Examinee places HIC-62-83A RHR LETDOWN fully CW. CRITICAL Comment STEP 11  : SAT UNSAT Standard: The Examinee determines SI did not actuate and proceeds to step 4.

Comment STEP 12  : SAT UNSAT Standard: The Examinee places HIC-63-93 CHARGING FLOW CONTROL in CRITICAL MANUAL and zero output.

Comment

SIM JPM C Page 12 of 23 STEP 13  : SAT UNSAT Standard: The Examinee determines Pressurizer Level less than 10% by observing installed instrumentation.

Comment STEP 14  : SAT UNSAT Standard: The Examinee determines RHR was in service by the initial conditions.

Comment STEP 15  : SAT UNSAT Standard: The Examinee addresses the procedure step as N/A.

Comment

SIM JPM C Page 13 of 23 STEP 16  : SAT UNSAT Standard: The Examinee addresses the procedure step.

Cue: If asked, provide the following cue, Another operator will address this procedure step.

Comment STEP 17  : SAT UNSAT Standard: The Examinee addresses the procedure step.

Cue: If asked, provide the following cue, Another operator will address this procedure step.

Comment

SIM JPM C Page 14 of 23 STEP 18 : SAT UNSAT Standard: The Examinee determines 1B Charging Pump is in PTL by observing HS-62-104A in PTL.

Comment STEP 19 : SAT UNSAT The Examinee determines the 1A Charging Pump is running by Standard: observing red light above HS-63-108A is ON.

The Examinee dispatches operators to energize CCPIT valves.

Cue: If asked provide the following cue, Operators have been dispatched to energize CCPIT valves.

Examiner Note: Direct the simulator operator to energize the CCPIT valves.

When the CCPIT valves have been energized provide the following Cue: cue, Time has been compressed, the CCPIT valves have been energized.

Comment

SIM JPM C Page 15 of 23 STEP 20  : SAT UNSAT Standard: The Examinee determines Safety Injection pumps are in PTL by observing HS-63-10A and HS-63-15A in PTL.

Comment STEP 21  : SAT UNSAT Standard: The Examinee addresses the procedure step.

Cue: If asked, provide the following cue Time has been compressed, both SI pumps are capable of being placed in service from MCR.

Comment STEP 22  : SAT UNSAT Standard: The Examinee determines the 1A Charging Pump is running by observing red light above HS-63-108A is ON.

Comment

SIM JPM C Page 16 of 23 STEP 23  : SAT UNSAT Standard: The Examinee determines Pressurizer Level less than 10% by observing installed instrumentation.

Comment STEP 24  : SAT UNSAT The Examinee verifies LCV-62-135 and LCV-62-136 OPEN by observing red lights above handswitch ON.

Standard: AND Verifies LCV-62-132 and LCV-62-133 CLOSED by observing green lights above handswitch ON.

Comment

SIM JPM C Page 17 of 23 STEP 25  : SAT UNSAT Standard: The Examinee places HS-62-91 and HS-62-90 CHARGING FLOW CRITICAL ISOL to CLOSE Comment STEP 26  : SAT UNSAT Standard: The Examinee places HS-62-26 and HS-62-25 CCPIT OUTLET ISOL CRITICAL to OPEN.

Comment STEP 27  : SAT UNSAT Standard: The Examinee places HS-62-39 and HS-62-40 CCPIT INLET ISOL to CRITICAL OPEN.

Comment

SIM JPM C Page 18 of 23 STEP 28 : SAT UNSAT Standard: The Examinee places HIC-63-93 CHARGING FLOW CONTROL in CRITICAL MANUAL and zero output.

Examiner Note: This step was previously performed in JPM step 12.

Comment STEP 29 : SAT UNSAT Standard: The Examinee addresses the procedure step.

Cue: If asked, provide the following cue, Another operator will address this procedure step.

Comment

SIM JPM C Page 19 of 23 STEP 29  : SAT UNSAT The Examinee determines RHR pumps stopped by observing green Standard: lights above HS-74-10A and HS-74-20A and RHR discharge less than 150 psig by observing plant instrumentation.

Comment STEP 30  : SAT UNSAT Standard: The Examinee addresses the procedure step.

Cue: If asked, provide the following cue, The SM and STA have been informed.

Comment

SIM JPM C Page 20 of 23 STEP 31  : SAT UNSAT Standard: The Examinee addresses the procedure step.

Cue: If asked, provide the following cue, Another operator will address this procedure step.

Comment STEP 32  : SAT UNSAT Standard: The Examinee determines ECCS Termination is not met by observing installed plant instrumentation.

Comment

SIM JPM C Page 21 of 23 STEP 33  : SAT UNSAT Standard: The Examinee places HS68-31A, and 73A RCPs to STOP, (if not CRITICAL already performed.

Comment STEP 34  : SAT UNSAT Standard: The Examinee places HS-30-63A and HS-30-63B PHASE A AND CONTAINMENT VENT ISOL to ACTUATE.

Comment

SIM JPM C Page 22 of 23 ALTERNATE PATH STEP 35  : SAT UNSAT The examinee observes all Containment Vent lights NOT GREEN (Not critical) and goes to the RNO.

Standard: CRITICAL The Examinee places HS-90-113, HS-90-114, HS-90-115, HS-90-116, HS-90-117, Containment Rad Monitor Isolation and HS-30-14 Containment Purge Isolation to CLOSE Examiner The Examinee must perform step 35 OR 36 in its entirety to achieve Note: the minimum standard.

Comment STEP 36  : SAT UNSAT The examinee observes all Containment Vent lights NOT GREEN (Not critical) and goes to the RNO.

Standard: CRITICAL The Examinee places HS-90-107, HS-90-108, HS-90-109, HS-90-110, HS-90-111, Containment Rad Monitor Isolation and HS-30-15 Containment Purge Isolation to CLOSE Comment Terminating Provide the following cue, Another operator will complete the STOP Cue: remaining steps of this procedure.

Stop Time

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. Unit has recently entered Mode 5.
2. Both Trains of RHR are in service.
3. 0-GO-7 UNIT SHUTDOWN FROM HOT STANDBY TO COLD SHUTDOWN is in progress at Section 5.4 Step 5.

INITIATING CUES:

1. Respond to plant conditions.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT 1311 NRC SIMULATOR JPM D

SIM JPM D Page 2 of 11 RO/SRO JOB PERFORMANCE MEASURE Task: Establish Once Through Cooling by Initiating RCS Bleed and Feed Task #: 3110060601 Task Standard: The examinee starts the 1A SI pump and opens the A Train CCPIT valves to establish once through cooling using FR-H.1.

Alternate Path: YES: X NO:

Time Critical Task: YES: NO: X K/A Reference/Ratings: EPE E05 EA 2.2 (3.7/4.3)

Method of Testing:

Simulated Performance: Actual Performance: X Evaluation Method:

Simulator X In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name / Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 8 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

SIM JPM D Page 3 of 11 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. Reset to IC 347. Add IOR ZDIHS68340AA f:0 to IC
3. If IC 347 is not available perform the following:

Reset to IC 30 Go to RUN IOR ZDIHS68340AA f:0 IMF SI13A f:1 e:1 IMF FW07C f:1 e:1 IMF FW21A f:100 e:1 IMF ED06B f:1 e:1 IMF CV01A f:1 e:1 IMF FW23C f:100 Place HS-3-118A 1A MDAFW pump HS in PTL Place HS-62-108A 1A CHP pump HS in PTL Place all RCP HS in PTL When S/G WR level is 50% FREEZE

4. PLACE SIMULATOR IN RUN
5. An extra operator will be required to acknowledge alarms.
6. ACKNOWLEDGE ALARMS
7. FREEZE SIMULATOR.
8. Save as a temporary IC, if repeat runs of JPM will be desired.
9. PLACE SIMULATOR IN RUN
10. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.

Tools/Equipment/Procedures Needed:

References:

Reference Title Rev No.

1. FR-H.1 LOSS OF SECONDARY HEAT SINK 19

SIM JPM D Page 4 of 11 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1. Unit 1 is in MODE 3.
2. An event is in progress.
3. The 1B 6.9KV Shutdown Board is de-energized.
4. The 1A Charging Pump tripped and is in PTL.
5. No AFW is available.
6. The SRO has directed you to restore a Heat Sink using FR-H.1 LOSS OF SECONDARY HEAT SINK.

INITIATING CUES:

1. Inform the SRO when complete.

SIM JPM D Page 5 of 11 Start Time STEP 1  : SAT Obtain a copy of FR-H.1 LOSS OF SECONDARY HEAT SINK.

UNSAT Standard: The examinee obtains a copy of FR-H.1 LOSS OF SECONDARY HEAT SINK.

Cue Provide a copy of FR-H.1 LOSS OF SECONDARY HEAT SINK.

Comment STEP 2  : SAT UNSAT Standard: The examinee verifies total feed flow less than 440 gpm from the initiating cue.

Comment STEP 3  : SAT UNSAT Standard: The examinee verifies RWST level greater than 27% by observing installed instrumentation.

Comment

SIM JPM D Page 6 of 11 STEP 4  : SAT UNSAT The examinee verifies RCS pressure greater than any non-faulted S/G Standard: pressure and RCS temperature greater than 350F by observing installed instrumentation.

Examiner Note Comment STEP 5  : SAT UNSAT Standard: The examinee observes no Charging Pumps running and transitions to step 17.

Comment

SIM JPM D Page 7 of 11 STEP 6  : SAT UNSAT Standard: The examinee places and HS 63-133A AND/OR HS 63-133B SIS Train A&B Actuate to ACTUATE.

Comment STEP 7  : SAT UNSAT Standard: The examinee verifies Train A CCPIT INLET and OUTLET isolation valves open by observing red light above HS-63-39 and 26 ON.

Comment

SIM JPM D Page 8 of 11 ALTERNATE PATH STEP 8  : SAT UNSAT Standard: The Examinee determines 1A Safety Injection pump is not running and proceeds to the RNO Cue: Provide the following cue, Another operator will perform Appendix A.

Comment ALTERNATE PATH STEP 9  : SAT UNSAT Standard: The examinee places HS-63-10A SI Pump 1A to START. CRITICAL Cue: Provide the following cue, Another operator will perform Appendix A.

Comment

SIM JPM D Page 9 of 11 STEP 10  : SAT UNSAT The examinee places HS-68-340AA and HS-68-334A PZR PORV to Standard: OPEN determines RORV 68-340A does NOT open and goes to step 20.

Cue: If asked provide the following cue, Operators have been dispatched to restore power.

Comment ALTERNATE PATH STEP 11  : SAT UNSAT Standard: The Examinee determines both PORVs NOT open and proceeds to the RNO Comment

SIM JPM D Page 10 of 11 ALTERNATE PATH STEP 12  : SAT UNSAT The Examinee places HS-68-394 and 395 RX HEAD VENT ISOL to OPEN Standard: CRITICAL AND HIC-68-396 and HIC-68-397 to obtain maximum output.

Comment Terminating Provide the following cue, Another operator will complete the Cue: STOP remaining steps of this procedure.

Stop Time

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. Unit 1 is in MODE 3.
2. An event is in progress.
3. The 1B 6.9KV Shutdown Board is de-energized.
4. The 1A Charging Pump tripped and is in PTL.
5. No AFW is available.
6. The SRO has directed you to restore a Heat Sink using FR-H.1 LOSS OF SECONDARY HEAT SINK.

INITIATING CUES:

1. Inform the SRO when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT 1311 NRC SIMULATOR JPM E

SIM JPM E Page 2 of 15 RO/SRO JOB PERFORMANCE MEASURE Task: Synchronize the Main Generator to the Grid Task #: 0450970101 Task Standard: The examinee will synchronize the Main Generator and raise load to 50 to 60 MW.

Alternate Path: YES: NO: X Time Critical Task: YES: NO: X K/A Reference/Ratings: 045 A4.02 (2.7/2.6)

Method of Testing:

Simulated Performance: Actual Performance: X Evaluation Method:

Simulator X In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name / Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 20 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

SIM JPM E Page 3 of 15 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. Reset to IC 346.
3. If IC 346 is not available perform the following.

Reset to IC 11 PLACE SIMULATOR IN RUN Perform GO-4 up to step 25 IRF EGR04 f:1 IRF EGR02 f:1 IRF EGR01 f:1

4. PLACE SIMULATOR IN RUN
5. Place MODE 1 sign on the simulator.
6. An extra operator will be required to acknowledge alarms.
7. ACKNOWLEDGE ALARMS
8. FREEZE SIMULATOR.
9. Save as a temporary IC, if repeat runs of JPM will be desired.
10. PLACE SIMULATOR IN RUN
11. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.
12. When directed IRF EGR01 f:1 to close Main Generator PCB MOD.

Tools/Equipment/Procedures Needed:

References:

Reference Title Rev No.

1. 0-GO-4 POWER ASCENSION FROM LESS THAN 5% REACTOR 84 POWER TO 30% REACTOR POWER 2.

SIM JPM E Page 4 of 15 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1. Unit 1 is in MODE 1.
2. 0-GO-4 POWER ASCENSION FROM LESS THAN 5% REACTOR POWER TO 30% REACTOR POWER section 5.4 is in progress complete through step 24.

INITIATING CUES:

1. The SRO has directed you to synchronize the Main generator and raise load to 30 to 60 MW using 0-GO-4 POWER ASCENSION FROM LESS THAN 5% REACTOR POWER TO 30% REACTOR POWER section 5.4 starting at step 25.
2. Inform the SRO when complete.

SIM JPM E Page 5 of 15 Start Time STEP 1  : SAT Obtain a copy of 0-GO-4 POWER ASCENSION FROM LESS THAN 5% REACTOR POWER TO 30% REACTOR POWER. UNSAT Standard: Examinee obtains a copy of 0-GO-4 POWER ASCENSION FROM LESS THAN 5% REACTOR POWER TO 30% REACTOR POWER Cue: Provide an in-progress copy of 0-GO-4 POWER ASCENSION FROM LESS THAN 5% REACTOR POWER TO 30% REACTOR POWER.

Comment

SIM JPM E Page 6 of 15 STEP 2  : SAT UNSAT Standard: Examinee places [HS-57-20] EXCITER REGULATOR in the TEST CRITICAL position.

Comment

SIM JPM E Page 7 of 15 STEP 3  : SAT UNSAT Standard: Examinee adjusts [HS-57-22] EXCITER VOLTAGE AUTO CRITICAL ADJUSTER, to balance voltage output meter [EI-57-12] to zero + 0.2V.

Comment STEP 4  : SAT UNSAT Standard: Examinee places [HS-57-20] EXCITER REGULATOR to ON position. CRITICAL Comment STEP 5  : SAT UNSAT Standard: Examinee DEPRESS turbine control panel pushbutton [OPER AUTO CRITICAL SYNC].

Comment

SIM JPM E Page 8 of 15 STEP 6  : SAT UNSAT Examinee adjusts [HS-57-21] GEN SPEED CONTROL to obtain Standard: desired speed on [XI-57-1] rotating slowly in the fast (clockwise) direction.

Comment STEP 7  : SAT UNSAT Standard: Examinee addresses the procedure step.

Cue: If asked provide the following cue, There are no annunciators or alarms on XA-55-ECB6A.

Comment

SIM JPM E Page 9 of 15 STEP 8  : SAT UNSAT Standard: Examinee VERIFY Unit 1 generator PCBs indicate OPEN by observing green lights above HS-57-24 and 26 ON.

Comment STEP 9  : SAT UNSAT Standard: Examinee addresses the procedure step.

Cue: Provide the following cue, Another operator will address this procedure step.

Comment

SIM JPM E Page 10 of 15 STEP 10  : SAT UNSAT Examinee verifies Unit 1 generator PCBs indicate OPEN by observing Standard: red light above HS-57-24 labeled MOD 5033 or red light above HS 26 labeled MOD 5037 ON.

Cue: If asked provide the following cue, Another operator will close the MODs.

Cue: Direct the simulator operator to close the applicable Main Generator PCB MOD.

Comment STEP 11  : SAT UNSAT Standard: Examinee adjusts [HS-57-22] voltage adjust, to match [EI-57-2]

incoming voltage with [EI-57-3] running voltage within + 1 division.

Comment

SIM JPM E Page 11 of 15 STEP 12  : SAT UNSAT Standard: Examinee addresses the step as N/A.

Comment STEP 13  : SAT UNSAT Standard: Examinee addresses the procedure step.

Cue: Provide the following cue, Another operator will RECORD the first stage metal temperature.

Comment

SIM JPM E Page 12 of 15 STEP 14  : SAT UNSAT Standard: Examinee addresses the procedure step.

Cue: Provide the following cue, Another operator has determined time to hold at 5% turbine load is 15 minutes.

Comment STEP 15  : SAT UNSAT Standard: Examinee places generator breaker [HS-57-24] or [HS-57-26] to CRITICAL CLOSE and respective breaker stays closed.

Comment Examiner The examinee may attempt one additional breaker closure using the Note: next procedure step.

SIM JPM E Page 13 of 15 STEP 16  : SAT UNSAT Standard: Examinee places [HS-57-24] or [HS-57-26] 500KV BUS BREAKER to CRITICAL CLOSE and respective breaker stays closed.

Comment STEP 17  : SAT UNSAT Standard: Examinee all main generator ammeters raise and are approximately equal by observing [EI-57-9], [EI-57-10], and [EI-57-11].

Comment

SIM JPM E Page 14 of 15 STEP 18  : SAT UNSAT Standard: Examinee attains a Main Generator load of 30 to 60 MW by CRITICAL depressing the [GO] pushbutton.

Cue: If asked provide the following cue, Loading rate is 1%/minute.

Comment Terminating The task is complete when the Examinee returns the cue sheet to Cue: STOP the Examiner.

Stop Time

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. Unit 1 is in MODE 1.
2. 0-GO-4 POWER ASCENSION FROM LESS THAN 5% REACTOR POWER TO 30% REACTOR POWER section 5.4 is in progress complete through step 24.

INITIATING CUES:

1. The SRO has directed you to synchronize the Main generator and raise load to 30 to 60 MW using 0-GO-4 POWER ASCENSION FROM LESS THAN 5% REACTOR POWER TO 30% REACTOR POWER section 5.4 starting at step 25.
2. Inform the SRO when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT 1311 NRC SIMULATOR JPM F

SIM JPM F Page 2 of 15 RO/SRO JOB PERFORMANCE MEASURE Task: Perform Equipment Checks Following ESF Actuation with a Failure of ESF Slave Relays Task #: 3010010601 Task Standard: The Examinee will manually start at least one Emergency Gas Treatment System fan and manually start at least one Auxiliary Building Gas Treatment fans using EA-0-1, EQUIPMENT CHECKS FOLLOWING ESF ACTUATION.

Alternate Path: YES: X NO:

Time Critical Task: YES: NO: X K/A Reference/Ratings:

Method of Testing:

Simulated Performance: Actual Performance: X Evaluation Method:

Simulator X In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name / Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 10 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

SIM JPM F Page 3 of 15 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. Reset to IC 337
3. If IC 337 is not available perform the following:

Reset to IC 16 IOR ZDIHS6523A f:3 IOR ZLOHS6523A_GREEN f:1

{global95[2481]} DOR ZDIHS6523A

{global95[2481]} DOR ZLOHS6523A_GREEN IOR ZDIHS6542A f:3 IOR ZLOHS6542A_GREEN f:1

{global95[2494]} DOR ZDIHS6542A

{global95[2494]} DOR ZLOHS6542A_GREEN IOR ZDIHS30146A f:3 IOR ZLOHS30146A_GREEN f:1 IOR ZLOHS30146AM6_GREEN f:1

{global95[2138]} DOR ZDIHS30146A

{global95[2138]} DOR ZLOHS30146A_GREEN

{global95[2138]} DOR ZLOHS30146AM6_GREEN IOR ZDIHS30157A f:3 IOR ZLOHS30157A_GREEN f:1 IOR ZLOHS30157AM6_GREEN f:1

{global95[7964]} DOR ZDIHS30157A

{global95[7964]} DOR ZLOHS30157A_GREEN

{global95[7964]} DOR ZLOHS30157AM6_GREEN IMF RP04A f:1 Terminate SI.

SIM JPM F Page 4 of 15 Place Letdown in service.

Perform GO-12.

4. PLACE SIMULATOR IN RUN
5. An extra operator will be required to acknowledge alarms.
6. ACKNOWLEDGE ALARMS
7. FREEZE SIMULATOR.
8. Save as a temporary IC, if repeat runs of JPM will be desired.
9. PLACE SIMULATOR IN RUN
10. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.

Tools/Equipment/Procedures Needed:

References:

Reference Title Rev No.

1. EA-0-1 EQUIPMENT CHECKS FOLLOWING ESF ACTUATION 11 2.

SIM JPM F Page 5 of 15 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1. Unit 1 is in MODE 3.
2. Safety Injection actuated and was terminated.
3. Letdown was placed in service.

INITIATING CUES:

1. You have been directed to perform EA-0-1 EQUIPMENT CHECKS FOLLOWING ESF ACTUATION.
2. Inform the SRO when complete.

SIM JPM F Page 6 of 15 Start Time STEP 1  : SAT Obtain a copy of EA-0-1 EQUIPMENT CHECKS FOLLOWING ESF ACTUATION. UNSAT Standard: Examinee obtains a copy of EA-0-1 EQUIPMENT CHECKS FOLLOWING ESF ACTUATION.

Comment STEP 2  : SAT UNSAT Standard: The examinee addresses the procedure step.

Comment

SIM JPM F Page 7 of 15 ALTERNATE PATH STEP 3  : SAT UNSAT Standard: The Examinee places HS-65-23A or 65-42A Train A and Train B CRITICAL EGTS fans to START.

Comment STEP 4  : SAT UNSAT The Examinee determines Annulus Vacuum Fans have stopped by Standard:

observing green lights above HS-65-77A and HS-65-74A ON.

Examiner Note Comment STEP 5  : SAT UNSAT Standard: The Examinee addresses the procedure step as N/A.

Comment

SIM JPM F Page 8 of 15 STEP 6  : SAT UNSAT The Examinee determines EGTS Filter A & B P is between 1 and 7 Standard:

inches of water by observing installed instrumentation.

Comment STEP 7  : SAT UNSAT The Examinee determines annulus differential pressure is more Standard: negative than -0.5 inches of water by observing installed instrumentation.

Comment

SIM JPM F Page 9 of 15 STEP 8  : SAT UNSAT Standard: The Examinee determines Unit 2 EGTS Dampers CLOSED by observing green lights above handswitches ON.

Comment STEP 9  : SAT UNSAT Standard: The Examinee addresses the procedure step as N/A.

Comment

SIM JPM F Page 10 of 15 STEP 10  : SAT UNSAT The Examinee checks Containment Purge stopped by observing green lights above HS-30-1A and HS-30-4A ON.

Standard:

The Examinee checks Incore Instrument Room purge fans stopped by observing green lights above HS-30-4A and HS-30-11A ON.

Cue: Provide the following cue, Unit 2 Containment Purge is not in service.

Comment STEP 11  : SAT UNSAT The Examinee determines Unit 1 and 2 Auxiliary Building General Standard: Supply fans stopped by observing green lights above handswitch ON or handswitch in PTL.

Comment

SIM JPM F Page 11 of 15 STEP 12  : SAT UNSAT The Examinee determines Unit 1 and 2 Auxiliary Building General Standard: Exhaust fans stopped by observing green lights above handswitch ON or handswitch in PTL.

Comment STEP 13  : SAT UNSAT Standard: The Examinee determines Unit 1 Auxiliary Building Dampers CLOSED by observing green lights above handswitches ON.

Comment

SIM JPM F Page 12 of 15 STEP 14  : SAT UNSAT Standard: The Examinee determines Unit 2 Auxiliary Building Dampers CLOSED by observing green lights above handswitches ON.

Comment STEP 15  : SAT UNSAT Standard: The Examinee determines Cask Loading Area Dampers CLOSED by observing green lights above handswitches ON.

Comment

SIM JPM F Page 13 of 15 STEP 16  : SAT UNSAT Standard: The Examinee determines Fuel Handling Exhaust Fans STOPPED by observing green lights above handswitch ON or handswitch in PTL.

Comment STEP 17  : SAT UNSAT Standard: The Examinee determines Fuel Handling dampers CLOSED by observing green lights above handswitches ON.

Comment STEP 18  : SAT UNSAT Standard: The Examinee places HS-30-146A or HS 30-157A to START. CRITICAL Comment

SIM JPM F Page 14 of 15 Terminating Provide the following cue, Another operator will complete the STOP Cue: remaining steps of this procedure.

Stop Time

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. Unit 1 is in MODE 3.
2. Safety Injection actuated and was terminated.
3. Letdown was placed in service.

INITIATING CUES:

1. You have been directed to perform EA-0-1 EQUIPMENT CHECKS FOLLOWING ESF ACTUATION.
2. Inform the SRO when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 1311 NRC SIMULATOR JPM G

Sim JPM G Page 2 of 12 RO/SRO JOB PERFORMANCE MEASURE Task: Emergency Mode Control Room Isolation due to High Radiation Task #: 0880980101 Task Standard: The examinee will manually place one train of Emergency Control Room Ventilation in service and isolate Normal Control Room Ventilation.

Alternate Path: YES: X NO:

Time Critical Task: YES: NO: X K/A Reference/Ratings: APE 061 AA1.01 (3.6/3.6)

Method of Testing:

Simulated Performance: Actual Performance: X Evaluation Method:

Simulator X In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name / Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 15 minutes Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

Sim JPM G Page 3 of 12 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. Reset to IC 16
3. An extra operator will be required to acknowledge alarms.
4. ACKNOWLEDGE ALARMS
5. FREEZE SIMULATOR.
6. When directed insert the following:

IMF CH07A f:1 IMF CH07B f:1 IMF RM90125 f:10000 r:300 IMF RM90126 f:10000 r:300 IMF AN_OV_1255 f:2 d:10 IMF AN_OV_1262 f:2 d:10

7. Save as a temporary IC, if repeat runs of JPM will be desired.
8. PLACE SIMULATOR IN RUN when directed by the Lead Examiner
9. After JPM is complete, delete the temporary IC, if used.

Tools/Equipment/Procedures Needed:

0-SO-30-2 Control Room Isolation

References:

Reference Title Rev No.

0-SO-30-2 Control Room Isolation 15 1-AR-M6-C CVCS-HEAT TRACE-UHI 34 0-AR-M12-B COMMON RADIATION MONITOR 29

Sim JPM G Page 4 of 12 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. Assume all independent and concurrent verifications are completed when called for by the procedure. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1. Unit 1 is in MODE 1.
2. You are the Unit 1 CRO.

INITIATING CUES:

1. Respond to plant conditions.

Sim JPM G Page 5 of 12 Start Time STEP 1  : SAT UNSAT Standard: Examinee responds to alarm using 1-AR-M6C window E-5 or E-6 and refers to 0-SO-30-2 Control Room Isolation.

Cue: If asked provide the following cue, The AUO reports both RM-90-125 and RM-90-126 counts are going up.

Examiner The examinee may place HS 31A-7A and HS 31A-38A Control Bldg Isol Note: Train A and B to ACTUATE in an attempt to manually actuate a Control Bldg Isolation.

Examiner Inserted simulator malfunction disables the Control Building Isolation Note: automatic and manual isolation signals.

Examiner Examinee may address the M12B alarms in the next JPM step, if not Note: proceed to JPM step 3 on the next page.

Comment

Sim JPM G Page 6 of 12 STEP 2  : SAT UNSAT Standard: Examinee responds to alarm using 0-AR-M12B window C-7 or D-5 and refers to 0-SO-30-2 Control Room Isolation.

Cue If asked acknowledge communication to Radcon.

Examiner Note: May have been previously performed.

Comment Obtain a copy of 0-SO-30-2 Control Room Isolation STEP 3  : SAT UNSAT Standard: Examinee obtains a copy of 0-SO-30-2 Control Room Isolation Cue Provide a copy of 0-SO-30-2 Control Room Isolation Section 8.1 Cue If asked provide the following cue, 0-SO-30-2 Control Room Isolation section 4 is complete.

Comment

Sim JPM G Page 7 of 12 STEP 4  : SAT UNSAT Standard: Examinee acknowledges CRI alarm.

Comment STEP 5  : SAT UNSAT Examinee determines that alarm is valid by observing RM-90-125 and Standard: 126 alarms or by verification in ICS and notifies the Radcon to take air samples and determine if the MCR must be evacuated.

Cue If asked acknowledge communication to the Radcon.

Comment STEP 6  : SAT UNSAT Examinee verifies that B Train Control Building A/C AHU is running and Standard: 0-FCO-311-23 is open by observing red light on XI-311-23A (Panel 1-M-

6) or red light above 0-HS-23A is ON and red light for indicator 0-XI-311-23 (Panel 1-M-11) is ON Comment

Sim JPM G Page 8 of 12 STEP 7  : SAT UNSAT Standard: Examinee verifies Control Building A/C AHUs are running and addresses the step as not applicable.

Comment STEP 8  : SAT UNSAT Examinee verifies that B Train Electrical Board Room A/C AHU is running Standard: and 0-FCO-311-28 is open by observing red light above 0-HS-311-28A ELECT BD ROOM A/C AHU B is ON and red light for indicator 0-XI-311-28 ELECT BD RM AHU B INLET ON.

Comment

Sim JPM G Page 9 of 12 ALTERNATE PATH STEP 9  : SAT UNSAT Examinee places 0-HS-311-9A CNTL BLDG EMERG AIR CLEAN UP FAN A OR 0-HS-311-11A CNTL BLDG EMERG AIR CLEAN UP FAN B to START.

Examinee verifies damper 0-FCO-311-9 is open by observing red light Standard: for indicator 0-XI-311-9 ON CRITICAL OR Examinee verifies damper 0-FCO-311-11 is open by observing red light for indicator 0-XI-311-11 ON Examiner Note: Placing both fans in service is acceptable.

Examiner Note: The damper position indication verification is not critical Comment

Sim JPM G Page 10 of 12 ALTERNATE PATH STEP 10 : SAT UNSAT Examinee places 0-HS-311-108A CNTL BLDG EMERG PRESS FAN A OR 0-HS-311-109A CNTL BLDG EMERG PRESS FAN B to START.

Examinee verifies damper 0-FCO-311-108 is open by observing red light Standard: for indicator 0-XI-311-108 ON CRITICAL OR Examinee verifies damper 0-FCO-311-109 is open by observing red light for indicator 0-XI-311-109 ON Examiner Note: Placing both fans in service is acceptable.

Examiner Note: The damper position indication verification is not critical Comment ALTERNATE PATH STEP 11 : SAT UNSAT Standard: Examinee places 0-HS-311-36A Spreading Room Supply Fan to STOP CRITICAL Comment

Sim JPM G Page 11 of 12 STEP 12  : SAT UNSAT Standard: Examinee verifies Spreading Room Exhaust Fan A is stopped by observing green lights above HS-311-79A ON.

Comment ALTERNATE PATH STEP 13  : SAT UNSAT Standard: Examinee places 0-HS-311-80A Spreading Room Exhaust Fan B to CRITICAL STOP Comment Terminating Provide the following cue, another operator will complete the Cue: STOP remaining steps of this procedure.

Stop Time

1201 NRC Simulator JPM G JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Assume all independent and concurrent verifications are completed when called for by the procedure.

INITIAL CONDITIONS:

1. Unit 1 is in MODE 1.
2. You are the Unit 1 CRO.

INITIATING CUES:

1. Respond to plant conditions.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT 1311 NRC SIMULATOR JPM H

SIM JPM H Page 2 of 14 RO/SRO JOB PERFORMANCE MEASURE Task: Perform CR Actions for Fire in the Auxiliary Building Task #: 3010070401 Task Standard: The Examinee re-aligns Charging Pump suction to the SI Pump and re-starts Charging Pumps.

Alternate Path: YES: NO: X Time Critical Task: YES: X NO:

K/A Reference/Ratings: APE 067 AA2.17 (3.5/4.3)

Method of Testing:

Simulated Performance: Actual Performance: X Evaluation Method:

Simulator X In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name / Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 6 min Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

SIM JPM H Page 3 of 14 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. Reset to IC 348
3. If IC 348 is not available, perform the following.
4. Reset to IC 16 IMF RP04A f:1 PLACE SIMULATOR IN RUN PLACE all RCP handswitches in STOP/PULL TO LOCK.

PLACE all four S/G atmospheric relief valve handswitches in CLOSE.

PLACE atmospheric relief valve controllers in MANUAL with output adjusted to zero.

PLACE MSIV switches in CLOSE.

PLACE all MFW Reg Valve controllers to MANUAL and CLOSE.

PLACE FIC-15-43 S/G Blowdown Flow Controller output adjusted to ZERO.

Place TD AFW in MANUAL at minimum speed.

5. An extra operator will be required to acknowledge alarms.
6. ACKNOWLEDGE ALARMS
7. FREEZE SIMULATOR.
8. Save as a temporary IC, if repeat runs of JPM will be desired.
9. PLACE SIMULATOR IN RUN
10. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.

Tools/Equipment/Procedures Needed:

References:

Reference Title Rev No.

1. AOP-N.08 APPENDIX R FIRE SAFE SHUTDOWN 32 2.

SIM JPM H Page 4 of 14 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1. Unit 1 is in MODE 3.
2. An uncontrolled fire is in Aux Building el. 669 Unit 1 Penetration Room.
3. AOP-N.08 APPENDIX R FIRE SAFE SHUTDOWN is in progress, completed through step 6.

INITIATING CUES:

1. You have been directed to perform AOP-N.08 APPENDIX R FIRE SAFE SHUTDOWN starting at step 7.
2. Inform the SRO when complete.

SIM JPM H Page 5 of 14 Start Time STEP 1  : SAT Obtain a copy of AOP-N.08 APPENDIX R FIRE SAFE SHUTDOWN.

UNSAT Standard: Examinee obtains a copy of AOP-N.08 APPENDIX R FIRE SAFE SHUTDOWN.

Cue: Provide an in progress copy of AOP-N.08 APPENDIX R FIRE SAFE SHUTDOWN completed through step 6.

Comment STEP 2  : SAT UNSAT Standard: The examinee goes to step 7.b based on the initial conditions.

Comment

SIM JPM H Page 6 of 14 STEP 3  : SAT UNSAT Standard: The examinee places HS-62-108A and HS-62-104A Charging Pump A CRITICAL and B in PTL.

Comment STEP 4  : SAT UNSAT Standard: The examinee proceeds to step 10.

Comment

SIM JPM H Page 7 of 14 STEP 5  : SAT UNSAT The examinee places HS-62-72A, FCV-62-73A, FCV-62-74A Letdown Standard: Orifice Isolation valves and HS-62-69A, HS-62-70A Letdown Loop Isolation valves to CLOSE.

Comment STEP 6  : SAT UNSAT The examinee verifies FCV-62-90 and FCV-62-91 Charging Flow Standard: Isolation valves closed by observing the green lights above handswitches ON.

Comment

SIM JPM H Page 8 of 14 STEP 7  : SAT UNSAT Standard:

Cue: If asked provide the following cue, The Incident Commander has been recalled to the MCR.

Comment STEP 8  : SAT UNSAT Standard: The examinee addresses the procedure step.

Comment STEP 9  : SAT UNSAT Standard: The examinee proceeds to step 15 based on the initiating cue.

Comment

SIM JPM H Page 9 of 14 STEP 10  : SAT UNSAT Standard: The Examinee proceeds to Section 2.4 based on the initiating cue.

Comment STEP 11  : SAT UNSAT Standard: The examinee addresses the procedure step based on the initiating cue.

Comment

SIM JPM H Page 10 of 14 STEP 12  : SAT UNSAT Standard: The examinee addresses the procedure step.

Cue: If asked provide the following cue, Operators have been dispatched.

Comment STEP 13  : SAT UNSAT The examinee verifies FCV-63-5 and RWST To SIS Pumps Flow Standard: Control Valve and FCV-63-47 SIS Pump 1A-A Inlet Valve open by observing the red lights above handswitches ON.

Comment

SIM JPM H Page 11 of 14 STEP 14  : SAT UNSAT Standard: The Examinee places 1-FCV-63-6 SIS Pump Inlet To CCP Valve OR CRITICAL 1-FCV-63-7 SIS Pump 1A-A Inlet to CCP Valve to OPEN.

Comment STEP 15  : SAT UNSAT Standard: The examinee addresses the procedure step as N/A.

Comment STEP 15  : SAT UNSAT Standard: The examinee verifies LCV-62-132 and LCV-62-133 VCT Outlet to CCP closed by observing the green lights above handswitches ON.

Comment

SIM JPM H Page 12 of 14 STEP 16  : SAT UNSAT The Examinee determines CCPIT valves open by observing red lights Standard: above HS-63-39A, HS-63-40A, HS-63-26A and HS-63-25 CCPIT INLET/OUTLET ISOL ON.

Comment STEP 17  : SAT UNSAT Standard: The Examinee depresses HS-63-134A AND HS-63-134B. CRITICAL Comment

SIM JPM H Page 13 of 14 STEP 18  : SAT UNSAT Standard: The examinee places HS-63-39A and HS-63-40A CCPIT INLET ISOL CRITICAL OR HS-63-26A and HS-63-25 CCPIT OUTLET ISOL to CLOSE.

Comment STEP 19  : SAT UNSAT Standard: The examinee places HS-62-108A Charging Pump A OR HS-62-104A CRITICAL Charging Pump B to START.

Time critical portion of this JPM starts when the Examinee Examiner acknowledges starting the task.

Note time here________

Comment Terminating Provide the following cue, another operator will complete the Cue: STOP remaining steps of this procedure.

Stop Time

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. Unit 1 is in MODE 3.
2. An uncontrolled fire is in Aux Building el. 669 Unit 1 Penetration Room.
3. AOP-N.08 APPENDIX R FIRE SAFE SHUTDOWN is in progress, completed through step 6.

INITIATING CUES:

1. You have been directed to perform AOP-N.08 APPENDIX R FIRE SAFE SHUTDOWN starting at step 7.
2. Inform the SRO when complete.
3. There is (are) element(s) of this task that are time critical.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.