{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406
{{#Wiki_filter:ugust 13, 2014
-2713 August 13, 2014 Mr. John Dent, Jr.


Site Vice President Entergy Nuclear Operations, Inc.
==SUBJECT:==
 
PILGRIM NUCLEAR POWER STATION - NRC SECURITY INSPECTION REPORT 05000293/2014403 AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY INSPECTION REPORT 07201044/2014001
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360
-5508 SUBJECT: PILGRIM NUCLEAR POWER STATION - NRC SECURITY INSPECTION REPORT 05000 293/201 4 40 3 AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY INSPECTION REPORT 07201044/2014001


==Dear Mr. Dent:==
==Dear Mr. Dent:==
On June 13, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Pilgrim Nuclear Power Station. Additionally, an initial inspection of your Independent Spent Fuel Storage Installation (ISFSI) was performed prior to placement of spent fuel on the ISFISI to ensure compliance with the NRC's Additional Security Measures (ASM) for the Physical Protection of Dry Fuel Storage Installations issued to Pilgrim on July 23, 2013.
On June 13, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Pilgrim Nuclear Power Station. Additionally, an initial inspection of your Independent Spent Fuel Storage Installation (ISFSI) was performed prior to placement of spent fuel on the ISFISI to ensure compliance with the NRCs Additional Security Measures (ASM) for the Physical Protection of Dry Fuel Storage Installations issued to Pilgrim on July 23, 2013.


On July, 22, 2014 , t he NRC inspectors discussed the results of this inspection with Mr. David Noyes, Director Regulatory and Performance Improvement and other members of your staff.
On July, 22, 2014, the NRC inspectors discussed the results of this inspection with Mr. David Noyes, Director Regulatory and Performance Improvement and other members of your staff.


Inspectors documented the results of this inspection in the enclosed inspection report.
Inspectors documented the results of this inspection in the enclosed inspection report.


The NRC inspectors did not identify any findings or violations of more than minor significance
The NRC inspectors did not identify any findings or violations of more than minor significance.
. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).


However, the material enclosed herewith contains Security
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
-Related Information in accordance with 10 CFR §2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability.


Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS.
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR §2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRCs ADAMS.


Enclosure contains Sensitive Unclassified Non
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, the transmittal document is decontrolled. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information -
-Safeguards Information. When separated from enclosure, the transmittal document is decontrolled. If you choose to provide a response and Security
Withhold From Public Disclosure Under 10 CFR §2.390 in accordance with 10 CFR
-Related Information is necessary to provide an acceptable response, please mark your entire response "Security
§2.390(d)(1) and follow the instructions for withholding in 10 CFR §2.390(b)(1). In accordance with 10 CFR §2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
-Related Information - Withhold From Public Disclosure Under 10 CFR §2.390" in accordance with 10 CFR §2.390(d)(1) and follow the instructions for withholding in 10 CFR §2.390(b)(1). In accordance with 10 CFR §2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.


Sincerely,
Sincerely,
/RA/
/RA/
Anthony Dimitriadis, Chief Plant Support Branch 1 Division of Reactor Safety Docket No s. 0 50-00 29 3; 072-01044 License No.
Anthony Dimitriadis, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 050-00293; 072-01044 License No. DPR-35 Enclosure:
 
Inspection Report 05000293/2014403 and 07201044/2014001 w/Attachment: Supplemental Information (OUO-SRI)
DPR-3 5 Enclosure:
cc w/o encl; w/o OUO-SRI: Distribution via ListServ cc w/encl; w/OUO-SRI:
Inspection Report 05000 29 3/2014403 and 07201044/2014001 w/Attachment: Supplemental Information (OUO-SRI) cc w/o encl; w/o OUO
D. Burke, Protective Services Department Section Manager J. Giarrusso, SLO, Massachusetts Emergency Management Agency (MEMA)
-SRI: Distribution via ListServ cc w/encl; w/OUO
Distribution: See Next Page ML14225A470 (Cover letter)
-SRI: D. Burke, Protective Services Department Section Manager J. Giarrusso, SLO, Massachusetts Emergency Management Agency (MEMA)
Distribution: See Next Page
 
ML14225A470 (Cover letter)
ADAMS ACCESSION NUMBER: ML14225A479 (Cover letter w/enc)
ADAMS ACCESSION NUMBER: ML14225A479 (Cover letter w/enc)
Cover Letter SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available Cover Letter w/Enclosure SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRS RI/DRS RI/DRS RI/DRP RI/DRS NAME DEverhart/email JCherubini SMcCarver/email RMcKinley ADimitriadis DATE 8/12/14 8/11/14 8/12/14 8/12/14 8/13/14 OFFICE RI/DMNS NAME MFerdas DATE 8/11/14 3 Distribution w
Cover Letter   Non-Sensitive Publicly Available SUNSI Review  Sensitive  Non-Publicly Available Cover Letter w/Enclosure Non-Sensitive   Publicly Available SUNSI Review  Sensitive  Non-Publicly Available OFFICE RI/DRS RI/DRS RI/DRS RI/DRP RI/DRS NAME DEverhart/email JCherubini SMcCarver/email RMcKinley ADimitriadis DATE 8/12/14 8/11/14 8/12/14 8/12/14 8/13/14 OFFICE RI/DMNS NAME MFerdas DATE 8/11/14 3 Distribution w/o encl; w/o OUO-SRI:
/o encl; w/o OUO-SRI: W. Dean, RA D. Lew, DRA H. Nieh, DRP M. Scott, DRP J. Clifford, DNMS M. Ferdas, DNMS J. Trapp, DRS P. Krohn, DRS R. McKinley, DRP S. Shaffer, DRP J. DeBoer, DRP E. Carfang, DRP, SRI B. Scrabeck, DRP, RI S. Campbell, DRP, AA D. Screnci, ORA N. Sheehan, ORA N. McNamara, ORA D. Tift, ORA A. Bowers, RI OEDO RidsNrrPMPilgrim Resource RidsNrrDorlLPL1
W. Dean, RA D. Lew, DRA H. Nieh, DRP M. Scott, DRP J. Clifford, DNMS M. Ferdas, DNMS J. Trapp, DRS P. Krohn, DRS R. McKinley, DRP S. Shaffer, DRP J. DeBoer, DRP E. Carfang, DRP, SRI B. Scrabeck, DRP, RI S. Campbell, DRP, AA D. Screnci, ORA N. Sheehan, ORA N. McNamara, ORA D. Tift, ORA A. Bowers, RI OEDO RidsNrrPMPilgrim Resource RidsNrrDorlLPL1-1 Resource ROPReports.Resource Distribution w/encl; w/OUO-SRI:
-1 Resourc e ROPReports.Resource Distribution w/encl; w/OUO
C. Johnson, NSIR N. Simonian, NSIR E. Wharton, NSIR B. Desai, DRS, RII R. Skokowski, DRS, RIII M. Haire, DRS, RIV R. McKinley, DRP E. Carfang, DRP T. Dimitriadis, DRS J. Cherubini, DRS M. Ferdas, DNMS
-SRI: C. Johnson, NSIR N. Simonian, NSIR E. Wharton, NSIR B. Desai, DRS, RII R. Skokowski, DRS, RIII M. Haire, DRS, RIV R. McKinley, DRP E. Carfang, DRP T. Dimitriadis, DRS J. Cherubini, DRS M. Ferdas, DNMS
}}
}}

Latest revision as of 01:28, 4 November 2019

IR 05000293-14-403 and 07201044-14-001; 6/9/2014 to 6/13/2014; Pilgrim Nuclear Power Station; Baseline Security Inspection, Letter Only
ML14225A470
Person / Time
Site: Pilgrim
Issue date: 08/13/2014
From: Anthony Dimitriadis
Plant Support Branch 1
To: Dent J
Entergy Nuclear Operations
References
IR-14-001, IR-14-403
Download: ML14225A470 (4)


Text

ugust 13, 2014

SUBJECT:

PILGRIM NUCLEAR POWER STATION - NRC SECURITY INSPECTION REPORT 05000293/2014403 AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY INSPECTION REPORT 07201044/2014001

Dear Mr. Dent:

On June 13, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Pilgrim Nuclear Power Station. Additionally, an initial inspection of your Independent Spent Fuel Storage Installation (ISFSI) was performed prior to placement of spent fuel on the ISFISI to ensure compliance with the NRCs Additional Security Measures (ASM) for the Physical Protection of Dry Fuel Storage Installations issued to Pilgrim on July 23, 2013.

On July, 22, 2014, the NRC inspectors discussed the results of this inspection with Mr. David Noyes, Director Regulatory and Performance Improvement and other members of your staff.

Inspectors documented the results of this inspection in the enclosed inspection report.

The NRC inspectors did not identify any findings or violations of more than minor significance.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR §2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRCs ADAMS.

Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, the transmittal document is decontrolled. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information -

Withhold From Public Disclosure Under 10 CFR §2.390 in accordance with 10 CFR

§2.390(d)(1) and follow the instructions for withholding in 10 CFR §2.390(b)(1). In accordance with 10 CFR §2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Anthony Dimitriadis, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 050-00293; 072-01044 License No. DPR-35 Enclosure:

Inspection Report 05000293/2014403 and 07201044/2014001 w/Attachment: Supplemental Information (OUO-SRI)

cc w/o encl; w/o OUO-SRI: Distribution via ListServ cc w/encl; w/OUO-SRI:

D. Burke, Protective Services Department Section Manager J. Giarrusso, SLO, Massachusetts Emergency Management Agency (MEMA)

Distribution: See Next Page ML14225A470 (Cover letter)

ADAMS ACCESSION NUMBER: ML14225A479 (Cover letter w/enc)

Cover Letter Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available Cover Letter w/Enclosure Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRS RI/DRS RI/DRS RI/DRP RI/DRS NAME DEverhart/email JCherubini SMcCarver/email RMcKinley ADimitriadis DATE 8/12/14 8/11/14 8/12/14 8/12/14 8/13/14 OFFICE RI/DMNS NAME MFerdas DATE 8/11/14 3 Distribution w/o encl; w/o OUO-SRI:

W. Dean, RA D. Lew, DRA H. Nieh, DRP M. Scott, DRP J. Clifford, DNMS M. Ferdas, DNMS J. Trapp, DRS P. Krohn, DRS R. McKinley, DRP S. Shaffer, DRP J. DeBoer, DRP E. Carfang, DRP, SRI B. Scrabeck, DRP, RI S. Campbell, DRP, AA D. Screnci, ORA N. Sheehan, ORA N. McNamara, ORA D. Tift, ORA A. Bowers, RI OEDO RidsNrrPMPilgrim Resource RidsNrrDorlLPL1-1 Resource ROPReports.Resource Distribution w/encl; w/OUO-SRI:

C. Johnson, NSIR N. Simonian, NSIR E. Wharton, NSIR B. Desai, DRS, RII R. Skokowski, DRS, RIII M. Haire, DRS, RIV R. McKinley, DRP E. Carfang, DRP T. Dimitriadis, DRS J. Cherubini, DRS M. Ferdas, DNMS