MONTHYEARIR 05000293/20234012023-08-31031 August 2023 NRC Inspection Report No. 05000293/2023401 & 2023001 (Cover Letter Only) IR 05000293/20230022023-08-0404 August 2023 NRC Inspection Report No. 05000293/2023002 IR 05000293/19570012023-05-26026 May 2023 635390- Amendment 8 Providence Imaging Center 50-29357-01/030-38077 IR 05000293/20220042023-02-15015 February 2023 NRC Inspection Report No. 05000293/2022004 IR 05000293/20220032022-11-18018 November 2022 NRC Inspection Report No. 05000293/2022003 IR 05000293/20220022022-08-12012 August 2022 NRC Inspection Report No. 05000293/2022002 IR 05000293/20220012022-05-11011 May 2022 NRC Inspection Report No. 05000293/2022001 IR 05000293/20210042022-02-0909 February 2022 NRC Inspection Report No. 05000293/2021004 IR 05000293/20210032021-11-12012 November 2021 NRC Inspection Report No. 05000293/2021003 IR 05000293/20210022021-08-10010 August 2021 NRC Innspection Report No. 05000293/2021002 ML21187A2702021-07-12012 July 2021 NRC Independent Spent Fuel Storage Security Inspection Report No. 07201044/2021401 IR 05000293/20214022021-07-12012 July 2021 Security Decommissioning Inspection Report 05000293/2021402 IR 05000293/20210012021-05-13013 May 2021 NRC Inspection Report No. 05000293/2021001, Holtec Decommissioning International, LLC, Pilgrim Nuclear Power Station IR 05000293/20214012021-04-27027 April 2021 Security Decommissioning Inspection Report 05000293/2021401 IR 05000293/20200042021-02-22022 February 2021 NRC Inspection Report No. 05000293/2020004, Holtec Decommissioning International, LLC, Pilgrim Nuclear Power Station, Plymouth, Massachusetts IR 05000293/20204012020-12-17017 December 2020 Security Decommissioning Inspection Report 05000293/2020401 Without OUO Enclosure (Public Cover Letter Only) ML20335A0092020-11-30030 November 2020 NRC Inspection Report No. 05000293/2020002 & 2020003, Holtec Decommissioning International, LLC, Pilgrim Nuclear Power Station, Plymouth, Massachusetts IR 05000293/20200022020-11-30030 November 2020 NRC Inspection Report No. 05000293/2020002 & 2020003, Holtec Decommissioning International, LLC, Pilgrim Nuclear Power Station, Plymouth, Massachusetts ML20070P3342020-03-10010 March 2020 NRC Inspection Report No. 07201044/2019001, Holtec Decomissioning International, LLC, Pilgrim Nuclear Power Station, Plymouth, Massachusetts IR 05000293/19820012020-01-0303 January 2020 David Paul Dba C.Q.C. Company; Termination; License 50-29382-01; Docket 030-38241; Control 616184 IR 05000293/20190022019-07-24024 July 2019 Integrated Inspection Report 05000293/2019002 and Assessment Follow-up Letter IR 05000293/20190012019-05-13013 May 2019 Integrated Inspection Report 05000293/2019001 IR 05000293/20180062019-03-0404 March 2019 Annual Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2018006) and Confirmatory Action Letter Closure IR 05000293/20180042019-02-13013 February 2019 Integrated Inspection Report 05000293/2018004 and Independent Spent Fuel Storage Installation Report 07201044/2018201 IR 05000293/20180132019-01-23023 January 2019 Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2018013 IR 05000293/20185012018-12-0606 December 2018 Evaluated Emergency Preparedness Exercise Inspection Report 05000293/2018501 IR 05000293/20180152018-11-21021 November 2018 Triennial Fire Protection Inspection Report 05000293/2018015 IR 05000293/20180032018-11-13013 November 2018 Integrated Inspection Report 05000293/2018003 and Independent Spent Fuel Storage Installation Inspection Report 07201014/2018001 IR 05000293/20180122018-11-0101 November 2018 Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2018012 IR 05000293/20180112018-10-0909 October 2018 Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2018011 IR 05000293/20184112018-09-24024 September 2018 Baseline Security Inspection Report 05000293/2018411 IR 05000293/20180052018-08-28028 August 2018 Assessment Follow-up Letter and Updated Inspection Plan (Inspection Report 05000293/2018005) IR 05000293/20180022018-08-14014 August 2018 Integrated Inspection Report 05000293/2018002 IR 05000293/20184102018-06-20020 June 2018 Baseline Security Inspection Report 05000293/2018410 (Letter Only) IR 05000293/20180102018-06-13013 June 2018 Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2018010 IR 05000293/20180012018-05-14014 May 2018 Integrated Inspection Report 05000293/2018001 IR 05000416/20170142018-03-12012 March 2018 Confirmatory Order, NRC Inspection Report 05000416/2017014, and NRC Investigation Reports 4-2016-004 and 4-2014-021 IR 05000293/20170062018-02-28028 February 2018 Annual Assessment Letter for Pilgrim Nuclear Power Station (Reports 05000293/2017006, 05000293/2017402, and 05000293/2017501) IR 05000293/20170042018-02-14014 February 2018 Integrated Inspection Report 05000293/2017004 IR 05000293/20170102018-02-0101 February 2018 Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2017010 IR 05000293/20170092017-12-21021 December 2017 Problem Identification and Resolution Inspection Report 05000293/2017009 IR 05000293/20172012017-11-21021 November 2017 NRC Security Inspection Report 05000293/2017201 IR 05000293/20170032017-11-14014 November 2017 Integrated Inspection Report 05000293/2017003 IR 05000293/20174042017-10-17017 October 2017 Material Control and Accounting Program Inspection Report 05000293/2017404 (Letter Only) IR 05000293/20174032017-10-12012 October 2017 Baseline Security Inspection Report 05000293/2017403, (Letter Only) IR 05000293/20170072017-09-28028 September 2017 Design Bases Assurance Inspection Report 05000293/2017007 IR 05000293/20174052017-09-0505 September 2017 Problem Identification and Resolution Sample Inspection Report 05000293/2017405 (Letter Only) IR 05000293/20170052017-08-28028 August 2017 Quarterly Assessment and Updated Inspection Plan for Pilgrim Nuclear Power Station (Report 05000293/2017005) IR 05000293/20170022017-08-14014 August 2017 Integrated Inspection Report 05000293/2017002 IR 05000293/20170082017-08-0909 August 2017 Final Significance Determination for a Green Finding and Results of Regulatory Conference - Inspection Report 05000293/2017008 2023-08-04
[Table view] Category:Letter
MONTHYEARL-24-002, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2024-02-0202 February 2024 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML23342A1182024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23334A1822023-11-30030 November 2023 Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary November 2021 Through October 2023 L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 and Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) L-23-011, 10 CFR 72.48 Biennial Change Summary Report2023-10-27027 October 2023 10 CFR 72.48 Biennial Change Summary Report IR 05000293/20234012023-08-31031 August 2023 NRC Inspection Report No. 05000293/2023401 & 2023001 (Cover Letter Only) IR 05000293/20230022023-08-0404 August 2023 NRC Inspection Report No. 05000293/2023002 L-23-008, Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI)2023-05-23023 May 2023 Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI) ML23136A7792023-05-15015 May 2023 Annual Radiological Environmental Operating Report, January 1 Through December 31, 2022 ML23135A2152023-05-15015 May 2023 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML23069A2782023-03-13013 March 2023 Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1 Subsequent License Renewal Application ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000293/20220042023-02-15015 February 2023 NRC Inspection Report No. 05000293/2022004 ML22356A0712023-01-31031 January 2023 Issuance of Exemption for Pilgrim Nuclear Power Station ISFSI Regarding Annual Radioactive Effluent Release Report - Cover Letter ML22347A2782022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 L-22-041, Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension2022-12-0909 December 2022 Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension IR 05000293/20220032022-11-18018 November 2022 NRC Inspection Report No. 05000293/2022003 L-22-036, Decommissioning Trust Fund Agreement2022-11-0808 November 2022 Decommissioning Trust Fund Agreement ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22266A1922022-09-23023 September 2022 and Pilgrim Nuclear Power Station - Request to Withdraw Prior Submissions from NRC Consideration ML22272A0352022-09-22022 September 2022 S. Lynch-Benttinen Letter Regarding U.S. Citizen Intent to Sue U.S. Fish and Wildlife and NOAA Fisheries Representing the Endangered Species (Na Right Whale) Which Will Be Adversely Affected by Holtec International Potential Actions ML22269A4202022-09-22022 September 2022 Citizen Lawsuit ML22241A1122022-08-29029 August 2022 Request for Exemption from 10 CFR 72.212(a)(2), (b)(2), (b)(3), (b)(4), (B)(5)(i), (b)(11), and 72.214 for Pilgrim ISFSI Annual Radioactive Effluent Release Report IR 05000293/20220022022-08-12012 August 2022 NRC Inspection Report No. 05000293/2022002 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22206A1512022-08-0101 August 2022 NRC Office of Investigations Case Nos. 1-2022-002 & 1-2022-006 ML22221A2592022-08-0101 August 2022 LTR-22-0217-1-NMSS - Town of Duxbury Letter Opposing the Irradiated Water Release from Pilgrim (Docket No. 05000293) ML22193A1662022-07-28028 July 2022 LTR-22-0154-1 - Heather Govern, VP, Clean Air and Water Program, Et Al., Letter Regarding Radioactive Wastewater Disposal from the Pilgrim Nuclear Power Station (Docket No. 05000293) ML22175A1732022-07-28028 July 2022 LTR-22-0153-1 - Response Letter to D. Turco, Cape Downwinders, from A. Roberts, NRC, Regarding Holtec-Pilgrim Plans to Dump One Million Gallons of Radioactive Waste Into Cape Cod Bay ML22154A4882022-06-0101 June 2022 Letter from Conservation Law Foundation Regarding Irradiated Water Release from Pilgrim ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22136A2602022-05-16016 May 2022 Submittal of Annual Radiological Environmental Operating Report for January 1 Through December 31, 2021 ML22136A2572022-05-16016 May 2022 Submittal of Annual Radioactive Effluent Release Report for January 1 Through December 31, 2021 ML22102A0932022-05-12012 May 2022 LTR-22-0067 Response to Matthew P. Levesque, President, Barnstable Town Council Regarding Irradiated Water Release from Pilgrim IR 05000293/20220012022-05-11011 May 2022 NRC Inspection Report No. 05000293/2022001 ML22104A0542022-04-30030 April 2022 LTR-22-0093 Response to Sheila Lynch-Benttinen, Regarding Irradiated Water Release from Pilgrim L-22-026, Occupational Radiation Exposure Data Report - 20212022-04-29029 April 2022 Occupational Radiation Exposure Data Report - 2021 ML22152A2592022-04-25025 April 2022 Zaccagnini Letter Dated 04/25/22 ML22152A2642022-04-19019 April 2022 Flynn Letter Dated 04/19/22 ML22091A1062022-04-0101 April 2022 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) L-22-022, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec.2022-03-25025 March 2022 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec. ML22130A6762022-03-14014 March 2022 Decola Ltr Dtd 03/14/22 Re Potential Discharge of Radioactive Water from Pilgrim Nuclear Power Station ML22041B0762022-03-0707 March 2022 03-07-22 - Letter to the Honorable William R. Keating, Responds to Letter Regarding Proposed Release of Irradiated Water at Pilgrim Nuclear Power Station Into Cape Cod Bay ML22054A2962022-02-23023 February 2022 Annual ISFSI Radioactive Effluent Release Report for 2021 2024-02-02
[Table view] |
Text
une 10, 2014
SUBJECT:
PILGRIM NUCLEAR POWER STATION: NRC EVALUATED EMERGENCY PREPAREDNESS EXERCISE - INSPECTION REPORT 05000293/2014502
Dear Mr. Dent:
On May 2, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of the April 30, 2014, evaluated emergency preparedness exercise at your Pilgrim Nuclear Power Station. The enclosed inspection report documents the inspection results, which were discussed on May 2, 2014, with you and other members of your staff.
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection, no findings were identified.
In accordance with Title 10 of the Code of Federal Regulation (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Anthony Dimitriadis, Chief Plant Support Branch 1 Division of Reactor Safety Docket No.: 50-293 License No.: DPR-35 Enclosure: NRC Inspection Report No. 05000293/2014502 cc w/encl: Distribution via ListServ S. Coleman, RAC Chair, FEMA Region I
SUMMARY OF FINDINGS
Inspection Report 05000293/2014502; 04/28/2014 - 05/02/2014; Pilgrim Nuclear Power Station;
Exercise Evaluation - Hostile Action (HA) Event; Exercise Evaluation - Scenario Review;
Performance Indicator Verification.
This was an announced inspection conducted by five Region I-based inspectors and one headquarters-based inspector. No findings were identified during the inspection. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 5.
Cornerstone: Emergency Preparedness
No findings were identified.
ii
REPORT DETAILS
REACTOR SAFETY
1EP7 Exercise Evaluation - Hostile Action Event (71114.07 - 1 Sample)
a. Inspection Scope
Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Appendix E,Section IV.F.2.j, requires in part that nuclear power reactor licensees, in each eight calendar year exercise cycle, provide the opportunity for their emergency response organization (ERO) to demonstrate proficiency in the key skills necessary to respond to a hostile action (HA) directed at the plant site. Entergy designed the April 30, 2014, Pilgrim EP exercise to satisfy that requirement, and the NRC inspected the Pilgrim HA event exercise to assess Entergys ability to effectively implement the Pilgrim Emergency Plan during an HA event. This overall exercise inspection activity represented the completion of one sample on a biennial cycle.
The exercise evaluation consisted of the following review and assessment:
- The adequacy of the Entergy EROs performance in the biennial full-participation exercise regarding the implementation of the planning standards described in 10 CFR 50.47(b) (4), (5), (9), and (10), which are: emergency classification; offsite notification; radiological assessment; onsite protective actions, and public protective action recommendations, respectively.
- The overall adequacy of Entergys emergency response facilities with regard to Emergency Plan commitments. The facilities assessed were the Control Room Simulator, the Alternative Facility, the Central Alarm Station (CAS), the local law enforcement Incident Command Post (ICP), and the Emergency Operations Facility (EOF).
- A review of other performance areas, such as the Entergy EROs: recognition of abnormal plant conditions; command and control, including interactions with site security staff; intra- and inter-facility communications; prioritization of mitigating activities; utilization of repair and field monitoring teams; interface with offsite agencies, including local law enforcement agencies; staffing and procedure adequacy; and the overall implementation of the Pilgrim Emergency Plan and its implementing procedures.
- A review of past performance issues from the last NRC Pilgrim exercise inspection report and recent Entergy Pilgrim EP drill reports, to determine the effectiveness of licensee corrective actions as demonstrated during the April 30, 2014, exercise and to ensure compliance with 10 CFR 50.47(b)(14).
- The licensees post-exercise critiques, to evaluate Entergys self-assessment of its Pilgrim ERO performance during the April 30, 2014, exercise and to ensure compliance with 10 CFR Part 50, Appendix E, Section IV.F.2.g.
The inspectors reviewed the documents listed in the attachment to this report.
b. Findings
No findings were identified.
1EP8 Exercise Evaluation - Scenario Review (71114.08 - 1 Sample)
a. Inspection Scope
Prior to the April 30, 2014, emergency preparedness exercise, the NRC inspectors conducted an in-office review of the exercise objectives and scenario, which Entergy had submitted to the NRC, to determine if the exercise would test major elements of the Pilgrim Emergency Plan as required by 10 CFR 50.47(b)(14). This overall exercise inspection activity represented the completion of one sample on a biennial cycle.
The inspectors reviewed the documents listed in the attachment to this report.
b. Findings
No findings were identified.
OTHER ACTIVITIES (OA)
4OA1 Performance Indicator Verification (71151 - 3 Samples)
a. Inspection Scope
The inspectors reviewed data for the Pilgrim EP Performance Indicators (PI), which are:
- (1) Drill and Exercise Performance (DEP) (EP01);
- (2) ERO Drill Participation (EP02);and
- (3) Alert and Notification System (ANS) Reliability (EP03). The last NRC EP inspection at Pilgrim was conducted in the fourth calendar quarter of 2013, so the inspectors reviewed supporting documentation from EP drills and tests from the fourth calendar quarter of 2013 through the first calendar quarter of 2014, to verify the accuracy of the reported PI data. The review of these PIs was conducted in accordance with NRC Inspection Procedure 71151, using the acceptance criteria documented in NEI 99-02, Regulatory Assessment Performance Indicator Guidelines, Revision 7.
This inspection activity represented the completion of three samples.
b. Findings
No findings were identified.
4OA6 Meetings, including Exit
On May 2, 2014, the inspectors presented the results of this inspection to Mr. J. Dent, Pilgrim Site Vice President, and other members of the Entergy staff. The inspectors verified that no proprietary information was retained by the inspectors or documented in this report.
ATTACHMENT
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
- J. Dent, Pilgrim Site Vice President
- M. Wilson, Entergy Emergency Planning Manager
- J. Parmenter, Pilgrim Emergency Planning Manager
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
None.
LIST OF DOCUMENTS REVIEWED