IR 05000293-14-502; 04/28/2014 - 05/02/2014; Pilgrim Nuclear Power Station; Exercise Evaluation - Hostile Action (Ha) Event; Exercise Evaluation - Scenario Review; Performance Indicator Verification
ML14161A704
Person / Time
Site: Pilgrim
Issue date: 06/10/2014
From: Anthony Dimitriadis
Plant Support Branch 1
To: Dent J
Entergy Nuclear Operations
Dimitriadis A
References
IR-14-502
Download: ML14161A704 (10)


Text

une 10, 2014

SUBJECT:

PILGRIM NUCLEAR POWER STATION: NRC EVALUATED EMERGENCY PREPAREDNESS EXERCISE - INSPECTION REPORT 05000293/2014502

Dear Mr. Dent:

On May 2, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of the April 30, 2014, evaluated emergency preparedness exercise at your Pilgrim Nuclear Power Station. The enclosed inspection report documents the inspection results, which were discussed on May 2, 2014, with you and other members of your staff.

The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings were identified.

In accordance with Title 10 of the Code of Federal Regulation (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Anthony Dimitriadis, Chief Plant Support Branch 1 Division of Reactor Safety Docket No.: 50-293 License No.: DPR-35 Enclosure: NRC Inspection Report No. 05000293/2014502 cc w/encl: Distribution via ListServ S. Coleman, RAC Chair, FEMA Region I

SUMMARY OF FINDINGS

Inspection Report 05000293/2014502; 04/28/2014 - 05/02/2014; Pilgrim Nuclear Power Station;

Exercise Evaluation - Hostile Action (HA) Event; Exercise Evaluation - Scenario Review;

Performance Indicator Verification.

This was an announced inspection conducted by five Region I-based inspectors and one headquarters-based inspector. No findings were identified during the inspection. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 5.

Cornerstone: Emergency Preparedness

No findings were identified.

ii

REPORT DETAILS

REACTOR SAFETY

Cornerstone: Emergency Preparedness (EP)

1EP7 Exercise Evaluation - Hostile Action Event (71114.07 - 1 Sample)

a. Inspection Scope

Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Appendix E,Section IV.F.2.j, requires in part that nuclear power reactor licensees, in each eight calendar year exercise cycle, provide the opportunity for their emergency response organization (ERO) to demonstrate proficiency in the key skills necessary to respond to a hostile action (HA) directed at the plant site. Entergy designed the April 30, 2014, Pilgrim EP exercise to satisfy that requirement, and the NRC inspected the Pilgrim HA event exercise to assess Entergys ability to effectively implement the Pilgrim Emergency Plan during an HA event. This overall exercise inspection activity represented the completion of one sample on a biennial cycle.

The exercise evaluation consisted of the following review and assessment:

  • The adequacy of the Entergy EROs performance in the biennial full-participation exercise regarding the implementation of the planning standards described in 10 CFR 50.47(b) (4), (5), (9), and (10), which are: emergency classification; offsite notification; radiological assessment; onsite protective actions, and public protective action recommendations, respectively.
  • The overall adequacy of Entergys emergency response facilities with regard to Emergency Plan commitments. The facilities assessed were the Control Room Simulator, the Alternative Facility, the Central Alarm Station (CAS), the local law enforcement Incident Command Post (ICP), and the Emergency Operations Facility (EOF).
  • A review of other performance areas, such as the Entergy EROs: recognition of abnormal plant conditions; command and control, including interactions with site security staff; intra- and inter-facility communications; prioritization of mitigating activities; utilization of repair and field monitoring teams; interface with offsite agencies, including local law enforcement agencies; staffing and procedure adequacy; and the overall implementation of the Pilgrim Emergency Plan and its implementing procedures.
  • A review of past performance issues from the last NRC Pilgrim exercise inspection report and recent Entergy Pilgrim EP drill reports, to determine the effectiveness of licensee corrective actions as demonstrated during the April 30, 2014, exercise and to ensure compliance with 10 CFR 50.47(b)(14).
  • The licensees post-exercise critiques, to evaluate Entergys self-assessment of its Pilgrim ERO performance during the April 30, 2014, exercise and to ensure compliance with 10 CFR Part 50, Appendix E, Section IV.F.2.g.

The inspectors reviewed the documents listed in the attachment to this report.

b. Findings

No findings were identified.

1EP8 Exercise Evaluation - Scenario Review (71114.08 - 1 Sample)

a. Inspection Scope

Prior to the April 30, 2014, emergency preparedness exercise, the NRC inspectors conducted an in-office review of the exercise objectives and scenario, which Entergy had submitted to the NRC, to determine if the exercise would test major elements of the Pilgrim Emergency Plan as required by 10 CFR 50.47(b)(14). This overall exercise inspection activity represented the completion of one sample on a biennial cycle.

The inspectors reviewed the documents listed in the attachment to this report.

b. Findings

No findings were identified.

OTHER ACTIVITIES (OA)

4OA1 Performance Indicator Verification (71151 - 3 Samples)

a. Inspection Scope

The inspectors reviewed data for the Pilgrim EP Performance Indicators (PI), which are:

(1) Drill and Exercise Performance (DEP) (EP01);
(2) ERO Drill Participation (EP02);and
(3) Alert and Notification System (ANS) Reliability (EP03). The last NRC EP inspection at Pilgrim was conducted in the fourth calendar quarter of 2013, so the inspectors reviewed supporting documentation from EP drills and tests from the fourth calendar quarter of 2013 through the first calendar quarter of 2014, to verify the accuracy of the reported PI data. The review of these PIs was conducted in accordance with NRC Inspection Procedure 71151, using the acceptance criteria documented in NEI 99-02, Regulatory Assessment Performance Indicator Guidelines, Revision 7.

This inspection activity represented the completion of three samples.

b. Findings

No findings were identified.

4OA6 Meetings, including Exit

On May 2, 2014, the inspectors presented the results of this inspection to Mr. J. Dent, Pilgrim Site Vice President, and other members of the Entergy staff. The inspectors verified that no proprietary information was retained by the inspectors or documented in this report.

ATTACHMENT

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee Personnel

J. Dent, Pilgrim Site Vice President
M. Wilson, Entergy Emergency Planning Manager
J. Parmenter, Pilgrim Emergency Planning Manager

LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED

None.

LIST OF DOCUMENTS REVIEWED