| issue date = 08/26/2014 | | issue date = 08/26/2014 | ||
| title = Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | | title = Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | ||
| author name = Sartain M | | author name = Sartain M | ||
| author affiliation = Virginia Electric & Power Co (VEPCO) | | author affiliation = Virginia Electric & Power Co (VEPCO) | ||
| addressee name = | | addressee name = | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 10 CFR 2.202 EA-12-051 | {{#Wiki_filter:VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 10 CFR 2.202 it EA-12-051 August 26, 2014 Attention: Document Control Desk Serial No.: 14-392 U.S. Nuclear Regulatory Commission NL&OS/MAE: R1 Washington, D.C. 20555-0001 Docket Nos.: 50-280/281 License Nos.: DPR-32/37 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS I AND 2 SIX-MONTH STATUS REPORT IN RESPONSE . w MARCH 12, 2012 COMMISSION ORDER MODIFYING LICENSES WITH REGARE RELIABLE SPENT FUEL POOL INSTRUMENTATION (ORDER NUMBER EA-12-05' | ||
Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 | |||
==References:== | ==References:== | ||
: 1. NRC Order Number EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," dated March 12, 2012 2. Virginia Electric and Power Company's Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), dated February 28, 2013 (Serial No. 12-167B)3. Virginia Electric and Power Company's Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), dated February 28, 2014 (Serial No.12-167D)On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued an order (Reference 1)to Virginia Electric and Power Company (Dominion). | : 1. NRC Order Number EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," dated March 12, 2012 | ||
Reference 1 was immediately effective and directed Dominion to install reliable Spent Fuel Pool (SFP) Level Instrumentation. | : 2. Virginia Electric and Power Company's Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), dated February 28, 2013 (Serial No. 12-167B) | ||
Reference 1 required submission of an Overall Integrated Plan (OIP) (Reference | : 3. Virginia Electric and Power Company's Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), dated February 28, 2014 (Serial No. | ||
12-167D) | |||
Serial No. 14-392 Docket Nos. 50-280/281 Order EA-12-051 Page 2 of 3 If you have any questions, please contact Ms. Margaret Earle at (804) 273-2768.Sincerely, Mark D. Sartain Vice President Nuclear Engineering Virginia Electric and Power Company Attachment (1)Commitments made by this letter: No new Regulatory Commitments COMMONWEALTH OF VIRGINIA COUNTY OF HENRICO The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Mark D. Sartain who is Vice President Nuclear Engineering of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of the Company, and that the statements in the document are true to the best of his knowledge and belief..e Acknowledged before me this ,Z -'day of 12014.My Commission Expires: 14 (SEAL) tNoe~R L. Mi Notary Public Reg. | On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued an order (Reference 1) to Virginia Electric and Power Company (Dominion). Reference 1 was immediately effective and directed Dominion to install reliable Spent Fuel Pool (SFP) Level Instrumentation. | ||
Serial No. 14-392 Docket Nos. 50-280/281 Order EA-12-051 Attachment Page 1 of 9 Six Month Status Report for the Implementation of Order EA-1 2-051 1 Introduction Dominion developed an Overall Integrated Plan (OIP) (Reference | Reference 1 required submission of an Overall Integrated Plan (OIP) (Reference 2) pursuant to Section IV, Condition C. Reference 1 also required submission of a status report at six-month intervals following submittal of the OIP. | ||
The attachment to this letter provides the third six-month status report and an update of milestone accomplishments since the submittal of the second six-month status report (Reference 3), including any changes to the compliance method, schedule, or need for relief and the basis. | |||
Milestone Target Activity Revised Target Completion Date Status Completion Date Submit OIP Feb 2013 Complete Commence Engineering and | |||
* The components of the SFP Level Instrumentation system required for installation have been procured and delivered. | Serial No. 14-392 Docket Nos. 50-280/281 Order EA-12-051 Page 2 of 3 If you have any questions, please contact Ms. Margaret Earle at (804) 273-2768. | ||
However, as of the effective date of this status report (July 31, 2014), the calibration kit has not been delivered to the site, but will be available by the revised target completion date.** The revised milestone target completion dates for 'Commence Installation of SFP Instruments' and 'Level Measurement System Functional' do not impact the Order implementation date for Surry Power Station.4 Changes to Compliance Method There are no changes to Dominion's compliance method with NEI 12-02 (Reference 4).5 Need for Relief/Relaxation and Basis for the Relief/Relaxation Dominion expects to comply with the Order implementation date, and no required relief/relaxation has been identified at this time.6 Open Items from Overall Integrated Plan and Interim Staff Evaluation No open items were identified in the Surry Power Station Overall Integrated Plan.However, the Requests for Additional Information (RAIs) identified in the Interim Staff Evaluation (Reference | Sincerely, Mark D. Sartain Vice President Nuclear Engineering Virginia Electric and Power Company Attachment (1) | ||
Commitments made by this letter: No new Regulatory Commitments COMMONWEALTH OF VIRGINIA COUNTY OF HENRICO The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Mark D. Sartain who is Vice President Nuclear Engineering of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of the Company, and that the statements in the document are true to the best of his knowledge and belief. | |||
Serial No. 14-392 Docket Nos. 50-280/281 Order EA-12-051 Attachment Page 3 of 9 Interim Staff Evaluation Open Items (RAIs)RAI # Description Status Please provide a clearly labeled sketch or marked-up The response to this RAI plant drawing of the plan view of the SFP area, depicting has been addressed as part the SFP inside dimensions, the planned locations/ | .e Acknowledged before me this ,Z -'day of 12014. | ||
of the on-going NRC audit placement of the primary and back-up SFP level sensor, process for Order EA-1 2-and the proposed routing of the cables that will extend 051.from these sensors toward the location of the read-out/display device.Provide the following: | My Commission Expires: 14 (SEAL) tNoe~R L. | ||
The response to this RAI has been addressed as part a) The design criteria that will be used to estimate the of the on-going NRC audit total loading on the mounting device(s), including static process for Order EA | Mi Notary Public | ||
Indicate in a schematic the portions of the level sensor that will serve as points of attachment for mechanical/mounting or electrical connections. | -pmMay mycnwt w # 140542 Reg. 31, 2018 | ||
c) A description of the manner by which the mechanical connections will attach the level instrument to permanent SFP structures so as to support the level sensor assembly.For RAI 2(a) above, please provide the analyses used to The response to this RAI verify the design criteria and methodology for seismic was provided in Attachment testing of the SFP instrumentation and the electronics 2 to the February 28, 2014 3 units, including, design basis maximum seismic loads Six-Month Status Report and the hydrodynamic loads that could result from pool letter (Reference 3).sloshing or other effects that could accompany such seismic forces. | |||
Serial No. 14-392 Docket Nos. 50-280/281 Order EA-1 2-051 Attachment Page 4 of 9 Interim Staff Evaluation Open Items (RAIs)RAI # Description Status For each of the mounting attachments required to attach The response to this RAI SFP Level equipment to plant structures, please has been addressed as part 4 describe the design inputs, and the methodology that of the on-going NRC audit was used to qualify the structural integrity of the affected process for Order EA-1 2-structures/equipment. | Serial No. 14-392 Docket Nos. 50-280/281 Order EA-12-051 Page 3 of 3 cc: Director of Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 13H16M 11555 Rockville Pike Rockville, MD 20852-2738 U. S. Nuclear Regulatory Commission, Region II Regional Administrator Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 Ms. K. R. Cotton NRC Project Manager Surry U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 Dr. V. Sreenivas NRC Project Manager North Anna U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Surry Power Station | ||
051.Please provide analysis of the maximum expected The response to this RAI radiological conditions (dose rate and total integrated has been addressed as part dose) to which the equipment (including transmitters, of the on-going NRC audit control boxes, and display panels) will be exposed. Also, process for Order EA | |||
Serial No. 14-392 Docket Nos. 50-280/281 Order EA-12-051 Attachment Page 5 of 9 Interim Staff Evaluation Open Items (RAIs)RAI # Description Status Please provide information describing the evaluation of The response to this RAI the comparative sensor design, the shock test method, was provided in Attachment test results, and forces applied to the sensor applicable 2 to the February 28, 2014 8 to its successful tests demonstrating that the referenced Six-Month Status Report previous testing provides an appropriate means to letter (Reference 3).demonstrate reliability of the sensor under the effects of severe shock.Please provide information describing the evaluation of The response to this RAI the comparative sensor design, the vibration test was provided in Attachment method, test results, and the forces and their frequency 2 to the February 28, 2014 ranges and directions applied to the sensor applicable to Six-Month Status Report its successful tests, demonstrating that the referenced letter (Reference 3).previous testing provides an appropriate means to demonstrate reliability of the sensor under the effects of high vibration. | Serial No. 14-392 Docket Nos. 50-280/281 Order EA-12-051 Attachment Six Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation August 2014 Surry Power Station Units 1 and 2 Virginia Electric and Power Company (Dominion) | ||
Please provide information describing the evaluation of The response to this RAI the comparative system electronics (including was provided in Attachment transmitters, control boxes, and display panels) ratings 2 to the February 28, 2014 10 against postulated plant conditions. | |||
Also provide results Six-Month Status Report of the manufacturer's shock and vibration test methods, letter (Reference 3).test results, and the forces and their frequency ranges and directions applied to the system electronics and display panel associated with its successful tests. | Serial No. 14-392 Docket Nos. 50-280/281 Order EA-12-051 Attachment Page 1 of 9 Six Month Status Report for the Implementation of Order EA-1 2-051 1 Introduction Dominion developed an Overall Integrated Plan (OIP) (Reference 1) documenting the requirements to install reliable Spent Fuel Pool (SFP) Level Instrumentation in response to Order EA-12-051 (the Order) (Reference 2). This attachment provides an update of milestone accomplishments since submittal of the last status report (Reference 3), | ||
Serial No. 14-392 Docket Nos. 50-280/281 Order EA-12-051 Attachment Page 6 of 9 Interim Staff Evaluation Open Items (RAIs)RAI # Description Status Please provide the following: | including any changes to the compliance method, schedule, or need for relief/relaxation and the basis, if any. | ||
The response to this RAI was provided in Attachment a) A description of the testing and/or analyses that will 2 to the February 28, 2014 be conducted to provide assurance that the equipment Six-Month Status Report will perform reliably under the worst-case credible design letter (Reference 3).basis loading at the location where the equipment will be mounted. Include a discussion of this seismic reliability demonstration as it applies to (a) the level sensor mounted in the SFP area, and (b) any control boxes, electronics, or read-out and retransmitting devices that will be employed to convey the level information from the level sensor to the plant operators or emergency responders. | 2 Milestone Accomplishments The following milestones have been completed since the development of the Surry Power Station OIP for Order EA-12-051 and are current as of July 31, 2014. | ||
b) A description of the specific method or combination of methods that will be used to confirm the reliability of the permanently installed equipment during and following seismic conditions to maintain its required accuracy.For RAI #11 above, please provide the results for the The response to this RAI selected methods, tests and analyses used to was provided in Attachment 12 demonstrate the qualification and reliability of the 2 to the February 28, 2014 installed equipment in accordance with the Order Six-Month Status Report requirements. | " Submit OIP | ||
letter (Reference 3).Please provide the following: | * Commence Engineering and Design | ||
The response to this RAI has been addressed as part a) A description of the electrical AC power sources and of the on-going NRC audit capabilities for the primary and backup channels. | " Complete Engineering and Design 3 Milestone Schedule Status The following table provides an update to the milestone schedule supporting the OIP. | ||
process for Order EA | This table provides the activity status of each item and the expected completion date, noting any change. The target completion dates are subject to change as design and implementation details are developed. | ||
Serial No. 14-392 Docket Nos. 50-280/281 Order EA-12-051 Attachment Page 7 of 9 Interim Staff Evaluation Open Items (RAIs)RAI # Description Status Please provide the results of the calculation depicting The response to this RAI the battery backup duty cycle requirements was provided in Attachment 14 demonstrating that its capacity is sufficient to maintain 2 to the February 28, 2014 the level indication function until offsite resource Six-Month Status Report availability is reasonably assured. letter (Reference 3).Please provide the following: | Milestone Target Activity Revised Target Completion Date Status Completion Date Submit OIP Feb 2013 Complete Commence Engineering and MarchMarch2013 2013 Complete Design Complete Engineering and May 2014 Complete Design Complete Procurement of SFP June 2014 In-Progress August 2014* | ||
The response to this RAI was provided in Attachment a) A description of the methodology that will be used for 2 to the February 28, 2014 determining the maximum allowed deviation from the Six-Month Status Report instrument channel design accuracy that will be letter (Reference 3).employed under normal operating conditions as an acceptance criterion for a calibration procedure to flag to operators and to technicians that the channel requires 15 adjustment to within the normal condition design accuracy.b) Please provide analysis verifying that the proposed instrument performance is consistent with these estimated accuracy normal and BDB values. Please demonstrate that the channels will retain these accuracy performance values following a loss of power and subsequent restoration of power.Please provide the following: | Instruments | ||
The response to this RAI has been addressed as part a) For both SFP level instrumentation read-out/displays of the on-going NRC audit located outside the main control room, please describe process for Order EA | |||
Serial No. 14-392 Docket Nos. 50-280/281 Order EA-12-051 Attachment Page 8 of 9 Interim Staff Evaluation Open Items (RAIs)RAI # Description Status Please provide a list of the procedures addressing The response to this RAI operation (both normal and abnormal response), has been addressed as part calibration, test, maintenance, and inspection of the on-going NRC audit 17 procedures that will be developed for use of the spent process for Order EA-1 2-SFP instrumentation. | Serial No. 14-392 Docket Nos. 50-280/281 Order EA-12-051 Attachment Page 2 of 9 Milestone Target Activity Revised Target Completion Date Status Completion Date Commence Installation of SFP Instruments June 2014 Not Started November 2014** | ||
The licensee is requested to 051.include a brief description of the specific technical objectives to be achieved within each procedure. | Level Measurement System September 2014 Started December 2014** | ||
Please provide the following: | Functional | ||
The response to this RAI has been addressed as part a) Further information describing the maintenance and of the on-going NRC audit testing program the licensee will establish and process for Order EA | * The components of the SFP Level Instrumentation system required for installation have been procured and delivered. However, as of the effective date of this status report (July 31, 2014), | ||
Please include a description of the plans for ensuring that necessary channel checks, functional tests, periodic calibration, and maintenance 18 will be conducted for the level measurement system and its supporting equipment. | the calibration kit has not been delivered to the site, but will be available by the revised target completion date. | ||
** The revised milestone target completion dates for 'Commence Installation of SFP Instruments' and 'Level Measurement System Functional' do not impact the Order implementation date for Surry Power Station. | |||
4 Changes to Compliance Method There are no changes to Dominion's compliance method with NEI 12-02 (Reference 4). | |||
5 Need for Relief/Relaxation and Basis for the Relief/Relaxation Dominion expects to comply with the Order implementation date, and no required relief/relaxation has been identified at this time. | |||
6 Open Items from Overall Integrated Plan and Interim Staff Evaluation No open items were identified in the Surry Power Station Overall Integrated Plan. | |||
However, the Requests for Additional Information (RAIs) identified in the Interim Staff Evaluation (Reference 5) are considered as Open Items. The following table provides a summary of these RAI Open Items from the Surry Power Station Interim Staff Evaluation and the status of each item. Several of the RAIs in the following table have been addressed as part of the on-going NRC audit process for the Order regarding FLEX Mitigating Strategies, EA-12-049 (Reference 6). Per direction from the NRC Project Manager, this process has been applied to the Order regarding Spent Fuel Level Instrumentation, EA-12-051. | |||
Serial No. 14-392 Docket Nos. 50-280/281 Order EA-12-051 Attachment Page 3 of 9 Interim Staff Evaluation Open Items (RAIs) | |||
RAI # Description Status Please provide a clearly labeled sketch or marked-up The response to this RAI plant drawing of the plan view of the SFP area, depicting has been addressed as part the SFP inside dimensions, the planned locations/ of the on-going NRC audit placement of the primary and back-up SFP level sensor, process for Order EA-1 2-and the proposed routing of the cables that will extend 051. | |||
from these sensors toward the location of the read-out/display device. | |||
Provide the following: The response to this RAI has been addressed as part a) The design criteria that will be used to estimate the of the on-going NRC audit total loading on the mounting device(s), including static process for Order EA weight loads and dynamic loads. Describe the 051 methodology that will be used to estimate the total loading, inclusive of design basis maximum seismic loads and the hydrodynamic loads that could result from pool sloshing or other effects that could accompany such seismic forces. | |||
2 b) A description of the manner in which the level sensor will be attached to the refueling floor and/or other support structures for each planned point of attachment of the probe assembly. Indicate in a schematic the portions of the level sensor that will serve as points of attachment for mechanical/mounting or electrical connections. | |||
c) A description of the manner by which the mechanical connections will attach the level instrument to permanent SFP structures so as to support the level sensor assembly. | |||
For RAI 2(a) above, please provide the analyses used to The response to this RAI verify the design criteria and methodology for seismic was provided in Attachment testing of the SFP instrumentation and the electronics 2 to the February 28, 2014 3 units, including, design basis maximum seismic loads Six-Month Status Report and the hydrodynamic loads that could result from pool letter (Reference 3). | |||
sloshing or other effects that could accompany such seismic forces. | |||
Serial No. 14-392 Docket Nos. 50-280/281 Order EA-1 2-051 Attachment Page 4 of 9 Interim Staff Evaluation Open Items (RAIs) | |||
RAI # Description Status For each of the mounting attachments required to attach The response to this RAI SFP Level equipment to plant structures, please has been addressed as part 4 describe the design inputs, and the methodology that of the on-going NRC audit was used to qualify the structural integrity of the affected process for Order EA-1 2-structures/equipment. 051. | |||
Please provide analysis of the maximum expected The response to this RAI radiological conditions (dose rate and total integrated has been addressed as part dose) to which the equipment (including transmitters, of the on-going NRC audit control boxes, and display panels) will be exposed. Also, process for Order EA 5 please provide documentation indicating how it was 051. | |||
determined that the electronics for the SFP level instrumentation is capable of withstanding a total integrated dose of lX10 4 Rads. Please discuss the time period over which the analyzed total integrated dose was applied. | |||
Please provide information indicating (a) what are the The response to this RAI temperature ratings and whether the temperature ratings has been addressed as part for the system electronics (including transmitters, control of the on-going NRC audit boxes, and display panels) are continuous duty ratings, process for Order EA 6 and (b) what will be the maximum expected ambient 051. | |||
temperature in the rooms in which the system electronics will be located under BDB conditions in which there are no AC power available to run Heating Ventilation and Air Conditioning (HVAC) systems? | |||
Please provide information indicating the maximum The response to this RAI expected relative humidity in the rooms in which the has been addressed as part 7 system electronics will be located under BDB conditions, of the on-going NRC audit in which there are no AC power available to run process for Order EA performing its required functions under this expected 051. | |||
humidity condition. | |||
Serial No. 14-392 Docket Nos. 50-280/281 Order EA-12-051 Attachment Page 5 of 9 Interim Staff Evaluation Open Items (RAIs) | |||
RAI # Description Status Please provide information describing the evaluation of The response to this RAI the comparative sensor design, the shock test method, was provided in Attachment test results, and forces applied to the sensor applicable 2 to the February 28, 2014 8 to its successful tests demonstrating that the referenced Six-Month Status Report previous testing provides an appropriate means to letter (Reference 3). | |||
demonstrate reliability of the sensor under the effects of severe shock. | |||
Please provide information describing the evaluation of The response to this RAI the comparative sensor design, the vibration test was provided in Attachment method, test results, and the forces and their frequency 2 to the February 28, 2014 ranges and directions applied to the sensor applicable to Six-Month Status Report its successful tests, demonstrating that the referenced letter (Reference 3). | |||
previous testing provides an appropriate means to demonstrate reliability of the sensor under the effects of high vibration. | |||
Please provide information describing the evaluation of The response to this RAI the comparative system electronics (including was provided in Attachment transmitters, control boxes, and display panels) ratings 2 to the February 28, 2014 10 against postulated plant conditions. Also provide results Six-Month Status Report of the manufacturer's shock and vibration test methods, letter (Reference 3). | |||
test results, and the forces and their frequency ranges and directions applied to the system electronics and display panel associated with its successful tests. | |||
Serial No. 14-392 Docket Nos. 50-280/281 Order EA-12-051 Attachment Page 6 of 9 Interim Staff Evaluation Open Items (RAIs) | |||
RAI # Description Status Please provide the following: The response to this RAI was provided in Attachment a) A description of the testing and/or analyses that will 2 to the February 28, 2014 be conducted to provide assurance that the equipment Six-Month Status Report will perform reliably under the worst-case credible design letter (Reference 3). | |||
basis loading at the location where the equipment will be mounted. Include a discussion of this seismic reliability demonstration as it applies to (a) the level sensor mounted in the SFP area, and (b) any control boxes, electronics, or read-out and retransmitting devices that will be employed to convey the level information from the level sensor to the plant operators or emergency responders. | |||
b) A description of the specific method or combination of methods that will be used to confirm the reliability of the permanently installed equipment during and following seismic conditions to maintain its required accuracy. | |||
For RAI #11 above, please provide the results for the The response to this RAI selected methods, tests and analyses used to was provided in Attachment 12 demonstrate the qualification and reliability of the 2 to the February 28, 2014 installed equipment in accordance with the Order Six-Month Status Report requirements. letter (Reference 3). | |||
Please provide the following: The response to this RAI has been addressed as part a) A description of the electrical AC power sources and of the on-going NRC audit capabilities for the primary and backup channels. process for Order EA 13 051. | |||
13 b) Please provide the NRC staff with the final configuration of the power supply source for each channel so that the staff may conclude that the two channels are independent from a power supply assignment perspective. | |||
Serial No. 14-392 Docket Nos. 50-280/281 Order EA-12-051 Attachment Page 7 of 9 Interim Staff Evaluation Open Items (RAIs) | |||
RAI # Description Status Please provide the results of the calculation depicting The response to this RAI the battery backup duty cycle requirements was provided in Attachment 14 demonstrating that its capacity is sufficient to maintain 2 to the February 28, 2014 the level indication function until offsite resource Six-Month Status Report availability is reasonably assured. letter (Reference 3). | |||
Please provide the following: The response to this RAI was provided in Attachment a) A description of the methodology that will be used for 2 to the February 28, 2014 determining the maximum allowed deviation from the Six-Month Status Report instrument channel design accuracy that will be letter (Reference 3). | |||
employed under normal operating conditions as an acceptance criterion for a calibration procedure to flag to operators and to technicians that the channel requires 15 adjustment to within the normal condition design accuracy. | |||
b) Please provide analysis verifying that the proposed instrument performance is consistent with these estimated accuracy normal and BDB values. Please demonstrate that the channels will retain these accuracy performance values following a loss of power and subsequent restoration of power. | |||
Please provide the following: The response to this RAI has been addressed as part a) For both SFP level instrumentation read-out/displays of the on-going NRC audit located outside the main control room, please describe process for Order EA the evaluation used to validate that the display location 051. | |||
can be accessed without unreasonable delay following a BDB event. Include the time available for personnel to access the display as credited in the evaluation, as well 16 as the actual time (e.g., based on walk-throughs) that it will take for personnel to access the display. Additionally, please include a description of the radiological and environmental conditions on the paths personnel might take. Describe whether the display location remains habitable for radiological, heat and humidity, and other environmental conditions following a BDB event. | |||
Describe whether personnel are continuously stationed at the display or monitor the display periodically. | |||
Serial No. 14-392 Docket Nos. 50-280/281 Order EA-12-051 Attachment Page 8 of 9 Interim Staff Evaluation Open Items (RAIs) | |||
RAI # Description Status Please provide a list of the procedures addressing The response to this RAI operation (both normal and abnormal response), has been addressed as part calibration, test, maintenance, and inspection of the on-going NRC audit 17 procedures that will be developed for use of the spent process for Order EA-1 2-SFP instrumentation. The licensee is requested to 051. | |||
include a brief description of the specific technical objectives to be achieved within each procedure. | |||
Please provide the following: The response to this RAI has been addressed as part a) Further information describing the maintenance and of the on-going NRC audit testing program the licensee will establish and process for Order EA implement to ensure that regular testing and calibration 051. | |||
is performed and verified by inspection and audit to demonstrate conformance with design and system readiness requirements. Please include a description of the plans for ensuring that necessary channel checks, functional tests, periodic calibration, and maintenance 18 will be conducted for the level measurement system and its supporting equipment. | |||
b) Information describing compensatory actions when both channels are out-of order, and the implementation procedures. | b) Information describing compensatory actions when both channels are out-of order, and the implementation procedures. | ||
c) Additional information describing expedited and compensatory actions in the maintenance procedure to address when one of the instrument channels cannot be restored to functional status within 90 days.7 Potential Interim Staff Evaluation (ISE) Impacts In the second Six Month Status Report letter (Reference 3), Dominion reported a change in the SFP Level Instrumentation vendor and reported conclusions of a comparison between the Westinghouse SFP Level Instrumentation design and the details that were previously provided to the staff and included in the ISE (Reference 5). | c) Additional information describing expedited and compensatory actions in the maintenance procedure to address when one of the instrument channels cannot be restored to functional status within 90 days. | ||
Serial No. 14-392 Docket Nos. 50-280/281 Order EA-12-051 Attachment Page 9 of 9 8 References The following references support the update to the SFP Level Instrumentation Overall Integrated Plan described in this attachment. | 7 Potential Interim Staff Evaluation (ISE) Impacts In the second Six Month Status Report letter (Reference 3), Dominion reported a change in the SFP Level Instrumentation vendor and reported conclusions of a comparison between the Westinghouse SFP Level Instrumentation design and the details that were previously provided to the staff and included in the ISE (Reference 5). | ||
: 1. "Virginia Electric and Power Company's Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)," Serial No. 12-167B, dated February 28, 2013.2. NRC Order Number EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," dated March 12, 2012.3. "Virginia Electric and Power Company's Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)," dated February 28, 2014 (Serial No. 12-167D).4. NEI 12-02 (Revision 1), Industry Guidance for Compliance with NRC Order EA | |||
Serial No. 14-392 Docket Nos. 50-280/281 Order EA-12-051 Attachment Page 9 of 9 8 References The following references support the update to the SFP Level Instrumentation Overall Integrated Plan described in this attachment. | |||
: 1. "Virginia Electric and Power Company's Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)," Serial No. 12-167B, dated February 28, 2013. | |||
: 2. NRC Order Number EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," dated March 12, 2012. | |||
: 3. "Virginia Electric and Power Company's Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)," dated February 28, 2014 (Serial No. 12-167D). | |||
: 4. NEI 12-02 (Revision 1), Industry Guidance for Compliance with NRC Order EA 051, "To Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," dated August 2012. | |||
: 5. Surry Power Station, Units 1 and 2: Interim Staff Evaluation and Request for Additional Information Regarding Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation," dated November 1, 2013. | |||
: 6. NRC Letter, "Nuclear Regulatory Commission Audits of Licensee Responses to Mitigation Strategies Order EA-12-049," dated August 28, 2013.}} |
Latest revision as of 00:49, 4 November 2019
ML14245A402 | |
Person / Time | |
---|---|
Site: | Surry |
Issue date: | 08/26/2014 |
From: | Mark D. Sartain Virginia Electric & Power Co (VEPCO) |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
14-392, EA-12-051 | |
Download: ML14245A402 (13) | |
Text
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 10 CFR 2.202 it EA-12-051 August 26, 2014 Attention: Document Control Desk Serial No.: 14-392 U.S. Nuclear Regulatory Commission NL&OS/MAE: R1 Washington, D.C. 20555-0001 Docket Nos.: 50-280/281 License Nos.: DPR-32/37 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS I AND 2 SIX-MONTH STATUS REPORT IN RESPONSE . w MARCH 12, 2012 COMMISSION ORDER MODIFYING LICENSES WITH REGARE RELIABLE SPENT FUEL POOL INSTRUMENTATION (ORDER NUMBER EA-12-05'
References:
- 1. NRC Order Number EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," dated March 12, 2012
- 2. Virginia Electric and Power Company's Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), dated February 28, 2013 (Serial No. 12-167B)
- 3. Virginia Electric and Power Company's Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), dated February 28, 2014 (Serial No.
12-167D)
On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued an order (Reference 1) to Virginia Electric and Power Company (Dominion). Reference 1 was immediately effective and directed Dominion to install reliable Spent Fuel Pool (SFP) Level Instrumentation.
Reference 1 required submission of an Overall Integrated Plan (OIP) (Reference 2) pursuant to Section IV, Condition C. Reference 1 also required submission of a status report at six-month intervals following submittal of the OIP.
The attachment to this letter provides the third six-month status report and an update of milestone accomplishments since the submittal of the second six-month status report (Reference 3), including any changes to the compliance method, schedule, or need for relief and the basis.
Serial No.14-392 Docket Nos. 50-280/281 Order EA-12-051 Page 2 of 3 If you have any questions, please contact Ms. Margaret Earle at (804) 273-2768.
Sincerely, Mark D. Sartain Vice President Nuclear Engineering Virginia Electric and Power Company Attachment (1)
Commitments made by this letter: No new Regulatory Commitments COMMONWEALTH OF VIRGINIA COUNTY OF HENRICO The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Mark D. Sartain who is Vice President Nuclear Engineering of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of the Company, and that the statements in the document are true to the best of his knowledge and belief.
.e Acknowledged before me this ,Z -'day of 12014.
My Commission Expires: 14 (SEAL) tNoe~R L.
Mi Notary Public
-pmMay mycnwt w # 140542 Reg. 31, 2018
Serial No.14-392 Docket Nos. 50-280/281 Order EA-12-051 Page 3 of 3 cc: Director of Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 13H16M 11555 Rockville Pike Rockville, MD 20852-2738 U. S. Nuclear Regulatory Commission, Region II Regional Administrator Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 Ms. K. R. Cotton NRC Project Manager Surry U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 Dr. V. Sreenivas NRC Project Manager North Anna U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Surry Power Station
Serial No.14-392 Docket Nos. 50-280/281 Order EA-12-051 Attachment Six Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation August 2014 Surry Power Station Units 1 and 2 Virginia Electric and Power Company (Dominion)
Serial No.14-392 Docket Nos. 50-280/281 Order EA-12-051 Attachment Page 1 of 9 Six Month Status Report for the Implementation of Order EA-1 2-051 1 Introduction Dominion developed an Overall Integrated Plan (OIP) (Reference 1) documenting the requirements to install reliable Spent Fuel Pool (SFP) Level Instrumentation in response to Order EA-12-051 (the Order) (Reference 2). This attachment provides an update of milestone accomplishments since submittal of the last status report (Reference 3),
including any changes to the compliance method, schedule, or need for relief/relaxation and the basis, if any.
2 Milestone Accomplishments The following milestones have been completed since the development of the Surry Power Station OIP for Order EA-12-051 and are current as of July 31, 2014.
" Submit OIP
- Commence Engineering and Design
" Complete Engineering and Design 3 Milestone Schedule Status The following table provides an update to the milestone schedule supporting the OIP.
This table provides the activity status of each item and the expected completion date, noting any change. The target completion dates are subject to change as design and implementation details are developed.
Milestone Target Activity Revised Target Completion Date Status Completion Date Submit OIP Feb 2013 Complete Commence Engineering and MarchMarch2013 2013 Complete Design Complete Engineering and May 2014 Complete Design Complete Procurement of SFP June 2014 In-Progress August 2014*
Instruments
Serial No.14-392 Docket Nos. 50-280/281 Order EA-12-051 Attachment Page 2 of 9 Milestone Target Activity Revised Target Completion Date Status Completion Date Commence Installation of SFP Instruments June 2014 Not Started November 2014**
Level Measurement System September 2014 Started December 2014**
Functional
- The components of the SFP Level Instrumentation system required for installation have been procured and delivered. However, as of the effective date of this status report (July 31, 2014),
the calibration kit has not been delivered to the site, but will be available by the revised target completion date.
- The revised milestone target completion dates for 'Commence Installation of SFP Instruments' and 'Level Measurement System Functional' do not impact the Order implementation date for Surry Power Station.
4 Changes to Compliance Method There are no changes to Dominion's compliance method with NEI 12-02 (Reference 4).
5 Need for Relief/Relaxation and Basis for the Relief/Relaxation Dominion expects to comply with the Order implementation date, and no required relief/relaxation has been identified at this time.
6 Open Items from Overall Integrated Plan and Interim Staff Evaluation No open items were identified in the Surry Power Station Overall Integrated Plan.
However, the Requests for Additional Information (RAIs) identified in the Interim Staff Evaluation (Reference 5) are considered as Open Items. The following table provides a summary of these RAI Open Items from the Surry Power Station Interim Staff Evaluation and the status of each item. Several of the RAIs in the following table have been addressed as part of the on-going NRC audit process for the Order regarding FLEX Mitigating Strategies, EA-12-049 (Reference 6). Per direction from the NRC Project Manager, this process has been applied to the Order regarding Spent Fuel Level Instrumentation, EA-12-051.
Serial No.14-392 Docket Nos. 50-280/281 Order EA-12-051 Attachment Page 3 of 9 Interim Staff Evaluation Open Items (RAIs)
RAI # Description Status Please provide a clearly labeled sketch or marked-up The response to this RAI plant drawing of the plan view of the SFP area, depicting has been addressed as part the SFP inside dimensions, the planned locations/ of the on-going NRC audit placement of the primary and back-up SFP level sensor, process for Order EA-1 2-and the proposed routing of the cables that will extend 051.
from these sensors toward the location of the read-out/display device.
Provide the following: The response to this RAI has been addressed as part a) The design criteria that will be used to estimate the of the on-going NRC audit total loading on the mounting device(s), including static process for Order EA weight loads and dynamic loads. Describe the 051 methodology that will be used to estimate the total loading, inclusive of design basis maximum seismic loads and the hydrodynamic loads that could result from pool sloshing or other effects that could accompany such seismic forces.
2 b) A description of the manner in which the level sensor will be attached to the refueling floor and/or other support structures for each planned point of attachment of the probe assembly. Indicate in a schematic the portions of the level sensor that will serve as points of attachment for mechanical/mounting or electrical connections.
c) A description of the manner by which the mechanical connections will attach the level instrument to permanent SFP structures so as to support the level sensor assembly.
For RAI 2(a) above, please provide the analyses used to The response to this RAI verify the design criteria and methodology for seismic was provided in Attachment testing of the SFP instrumentation and the electronics 2 to the February 28, 2014 3 units, including, design basis maximum seismic loads Six-Month Status Report and the hydrodynamic loads that could result from pool letter (Reference 3).
sloshing or other effects that could accompany such seismic forces.
Serial No.14-392 Docket Nos. 50-280/281 Order EA-1 2-051 Attachment Page 4 of 9 Interim Staff Evaluation Open Items (RAIs)
RAI # Description Status For each of the mounting attachments required to attach The response to this RAI SFP Level equipment to plant structures, please has been addressed as part 4 describe the design inputs, and the methodology that of the on-going NRC audit was used to qualify the structural integrity of the affected process for Order EA-1 2-structures/equipment. 051.
Please provide analysis of the maximum expected The response to this RAI radiological conditions (dose rate and total integrated has been addressed as part dose) to which the equipment (including transmitters, of the on-going NRC audit control boxes, and display panels) will be exposed. Also, process for Order EA 5 please provide documentation indicating how it was 051.
determined that the electronics for the SFP level instrumentation is capable of withstanding a total integrated dose of lX10 4 Rads. Please discuss the time period over which the analyzed total integrated dose was applied.
Please provide information indicating (a) what are the The response to this RAI temperature ratings and whether the temperature ratings has been addressed as part for the system electronics (including transmitters, control of the on-going NRC audit boxes, and display panels) are continuous duty ratings, process for Order EA 6 and (b) what will be the maximum expected ambient 051.
temperature in the rooms in which the system electronics will be located under BDB conditions in which there are no AC power available to run Heating Ventilation and Air Conditioning (HVAC) systems?
Please provide information indicating the maximum The response to this RAI expected relative humidity in the rooms in which the has been addressed as part 7 system electronics will be located under BDB conditions, of the on-going NRC audit in which there are no AC power available to run process for Order EA performing its required functions under this expected 051.
humidity condition.
Serial No.14-392 Docket Nos. 50-280/281 Order EA-12-051 Attachment Page 5 of 9 Interim Staff Evaluation Open Items (RAIs)
RAI # Description Status Please provide information describing the evaluation of The response to this RAI the comparative sensor design, the shock test method, was provided in Attachment test results, and forces applied to the sensor applicable 2 to the February 28, 2014 8 to its successful tests demonstrating that the referenced Six-Month Status Report previous testing provides an appropriate means to letter (Reference 3).
demonstrate reliability of the sensor under the effects of severe shock.
Please provide information describing the evaluation of The response to this RAI the comparative sensor design, the vibration test was provided in Attachment method, test results, and the forces and their frequency 2 to the February 28, 2014 ranges and directions applied to the sensor applicable to Six-Month Status Report its successful tests, demonstrating that the referenced letter (Reference 3).
previous testing provides an appropriate means to demonstrate reliability of the sensor under the effects of high vibration.
Please provide information describing the evaluation of The response to this RAI the comparative system electronics (including was provided in Attachment transmitters, control boxes, and display panels) ratings 2 to the February 28, 2014 10 against postulated plant conditions. Also provide results Six-Month Status Report of the manufacturer's shock and vibration test methods, letter (Reference 3).
test results, and the forces and their frequency ranges and directions applied to the system electronics and display panel associated with its successful tests.
Serial No.14-392 Docket Nos. 50-280/281 Order EA-12-051 Attachment Page 6 of 9 Interim Staff Evaluation Open Items (RAIs)
RAI # Description Status Please provide the following: The response to this RAI was provided in Attachment a) A description of the testing and/or analyses that will 2 to the February 28, 2014 be conducted to provide assurance that the equipment Six-Month Status Report will perform reliably under the worst-case credible design letter (Reference 3).
basis loading at the location where the equipment will be mounted. Include a discussion of this seismic reliability demonstration as it applies to (a) the level sensor mounted in the SFP area, and (b) any control boxes, electronics, or read-out and retransmitting devices that will be employed to convey the level information from the level sensor to the plant operators or emergency responders.
b) A description of the specific method or combination of methods that will be used to confirm the reliability of the permanently installed equipment during and following seismic conditions to maintain its required accuracy.
For RAI #11 above, please provide the results for the The response to this RAI selected methods, tests and analyses used to was provided in Attachment 12 demonstrate the qualification and reliability of the 2 to the February 28, 2014 installed equipment in accordance with the Order Six-Month Status Report requirements. letter (Reference 3).
Please provide the following: The response to this RAI has been addressed as part a) A description of the electrical AC power sources and of the on-going NRC audit capabilities for the primary and backup channels. process for Order EA 13 051.
13 b) Please provide the NRC staff with the final configuration of the power supply source for each channel so that the staff may conclude that the two channels are independent from a power supply assignment perspective.
Serial No.14-392 Docket Nos. 50-280/281 Order EA-12-051 Attachment Page 7 of 9 Interim Staff Evaluation Open Items (RAIs)
RAI # Description Status Please provide the results of the calculation depicting The response to this RAI the battery backup duty cycle requirements was provided in Attachment 14 demonstrating that its capacity is sufficient to maintain 2 to the February 28, 2014 the level indication function until offsite resource Six-Month Status Report availability is reasonably assured. letter (Reference 3).
Please provide the following: The response to this RAI was provided in Attachment a) A description of the methodology that will be used for 2 to the February 28, 2014 determining the maximum allowed deviation from the Six-Month Status Report instrument channel design accuracy that will be letter (Reference 3).
employed under normal operating conditions as an acceptance criterion for a calibration procedure to flag to operators and to technicians that the channel requires 15 adjustment to within the normal condition design accuracy.
b) Please provide analysis verifying that the proposed instrument performance is consistent with these estimated accuracy normal and BDB values. Please demonstrate that the channels will retain these accuracy performance values following a loss of power and subsequent restoration of power.
Please provide the following: The response to this RAI has been addressed as part a) For both SFP level instrumentation read-out/displays of the on-going NRC audit located outside the main control room, please describe process for Order EA the evaluation used to validate that the display location 051.
can be accessed without unreasonable delay following a BDB event. Include the time available for personnel to access the display as credited in the evaluation, as well 16 as the actual time (e.g., based on walk-throughs) that it will take for personnel to access the display. Additionally, please include a description of the radiological and environmental conditions on the paths personnel might take. Describe whether the display location remains habitable for radiological, heat and humidity, and other environmental conditions following a BDB event.
Describe whether personnel are continuously stationed at the display or monitor the display periodically.
Serial No.14-392 Docket Nos. 50-280/281 Order EA-12-051 Attachment Page 8 of 9 Interim Staff Evaluation Open Items (RAIs)
RAI # Description Status Please provide a list of the procedures addressing The response to this RAI operation (both normal and abnormal response), has been addressed as part calibration, test, maintenance, and inspection of the on-going NRC audit 17 procedures that will be developed for use of the spent process for Order EA-1 2-SFP instrumentation. The licensee is requested to 051.
include a brief description of the specific technical objectives to be achieved within each procedure.
Please provide the following: The response to this RAI has been addressed as part a) Further information describing the maintenance and of the on-going NRC audit testing program the licensee will establish and process for Order EA implement to ensure that regular testing and calibration 051.
is performed and verified by inspection and audit to demonstrate conformance with design and system readiness requirements. Please include a description of the plans for ensuring that necessary channel checks, functional tests, periodic calibration, and maintenance 18 will be conducted for the level measurement system and its supporting equipment.
b) Information describing compensatory actions when both channels are out-of order, and the implementation procedures.
c) Additional information describing expedited and compensatory actions in the maintenance procedure to address when one of the instrument channels cannot be restored to functional status within 90 days.
7 Potential Interim Staff Evaluation (ISE) Impacts In the second Six Month Status Report letter (Reference 3), Dominion reported a change in the SFP Level Instrumentation vendor and reported conclusions of a comparison between the Westinghouse SFP Level Instrumentation design and the details that were previously provided to the staff and included in the ISE (Reference 5).
Serial No.14-392 Docket Nos. 50-280/281 Order EA-12-051 Attachment Page 9 of 9 8 References The following references support the update to the SFP Level Instrumentation Overall Integrated Plan described in this attachment.
- 1. "Virginia Electric and Power Company's Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)," Serial No. 12-167B, dated February 28, 2013.
- 2. NRC Order Number EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," dated March 12, 2012.
- 3. "Virginia Electric and Power Company's Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)," dated February 28, 2014 (Serial No. 12-167D).
- 4. NEI 12-02 (Revision 1), Industry Guidance for Compliance with NRC Order EA 051, "To Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," dated August 2012.
- 5. Surry Power Station, Units 1 and 2: Interim Staff Evaluation and Request for Additional Information Regarding Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation," dated November 1, 2013.
- 6. NRC Letter, "Nuclear Regulatory Commission Audits of Licensee Responses to Mitigation Strategies Order EA-12-049," dated August 28, 2013.