ML14262A326: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(7 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML14262A326
| number = ML14262A326
| issue date = 09/18/2014
| issue date = 09/18/2014
| title = Shearon Harris Nuclear Plant - Notification Of Change In Licensed Operator Initial Examination 05000400/2014302 Date
| title = Notification of Change in Licensed Operator Initial Examination 05000400/2014302 Date
| author name = Widmann M T
| author name = Widmann M
| author affiliation = NRC/RGN-II/DRS
| author affiliation = NRC/RGN-II/DRS
| addressee name = Kapopoulos E J
| addressee name = Kapopoulos E
| addressee affiliation = Progress Energy Carolinas, Inc
| addressee affiliation = Progress Energy Carolinas, Inc
| docket = 05000400
| docket = 05000400
Line 14: Line 14:
| page count = 5
| page count = 5
}}
}}
See also: [[followed by::IR 05000400/2014302]]
See also: [[see also::IR 05000400/2014302]]


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES
[[Issue date::September 18, 2014]]
                                NUCLEAR REGULATORY COMMISSION
                                              REGION II
                            245 PEACHTREE CENTER AVENUE NE, SUITE 1200
                                      ATLANTA, GEORGIA 30303-1257
                                        September 18, 2014
Ernest J. Kapopoulos, Jr.
Vice President
Shearon Harris Nuclear Power Plant
5413 Shearon Harris Rd
New Hill, NC 27562-0165
SUBJECT:       SHEARON HARRIS NUCLEAR PLANT - NOTIFICATION OF CHANGE IN
                LICENSED OPERATOR INITIAL EXAMINATION 05000400/2014302 DATE
Dear Mr. Kapopoulos:
In a telephone conversation on September 12, 2014, Mr. Scott Rua, Exam Supervisor at
Shearon Harris Nuclear Plant requested from Mr. David Lanyi, Senior Operations Engineer in
Region II, to delay the Licensed Operator Initial Examination that was scheduled to begin
November 3, 2014. The operating test is now scheduled to be administered during the week of
November 17, 2014. The written examination will be administered the week of November 24,
2014. The on-site preparatory week remains the week of October 6, 2014.
As agreed during the telephone conversation, your staff is preparing both the operating test and
written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,
"Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory
Commission (NRC) regional office will discuss with your staff any changes that might be
necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish all outstanding test
material identified in Attachment 3 to ES-201 by September 26, 2014, Pursuant to Title 10,
Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized
representative of the facility licensee shall approve the examination, and test before they are
submitted to the NRC for review and approval. All materials shall be complete and ready-to-
use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in
your response be contained in a separate enclosure and appropriately marked. Any delay in
receiving the required examination and reference materials, or the submittal of inadequate or
incomplete materials, may cause the examinations to be rescheduled.


Ernest J. Kapopoulos, Jr. Vice President Shearon Harris Nuclear Power Plant 5413 Shearon Harris Rd New Hill, NC 27562-0165
E. Kapopoulos                                 2
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications, medical certifications, and waiver
requests (if any) at least 30 days before the first examination date. If the applications are not
received at least 30 days before the examination date, a postponement may be necessary.
Signed applications certifying that all training has been completed should be submitted at least
14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget (OMB) under approval number 3150-0018, which expires on April 30,
2016. The public reporting burden for this collection of information is estimated to average 500
hours per response, including the time for reviewing instructions, gathering and maintaining the
data needed, writing the examinations, and completing and reviewing the collection of
information. Send comments on any aspect of this collection of information, including
suggestions for reducing the burden, to the Information and Records Management Branch (T-6
F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet
electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information
and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,
Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosures will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of the NRCs document
system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-
rm.adams.html (the Public Electronic Reading Room).


SUBJECT: SHEARON HARRIS NUCLEAR PLANT - NOTIFICATION OF CHANGE IN LICENSED OPERATOR INITIAL EXAMINATION 05000400/2014302 DATE
E. Kapopoulos                                  3
Thank you for your cooperation in this matter. Mr. Rua has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRC's examination
procedures and guidelines, please contact Mr. Lanyi at (404) 997-4487, (Internet E-mail:
david.lanyi@nrc.gov ), or me at (404) 997- 4550, (Malcolm.widmann@nrc.gov ).
                                                Sincerely,
                                                /RA/
                                                Malcolm T. Widmann, Chief
                                                Operations Branch 1
                                                Division of Reactor Safety
Docket Nos.: 50-400
License Nos.: NPF-63
cc: Distribution via Listserv


==Dear Mr. Kapopoulos:==
In a telephone conversation on September 12, 2014, Mr. Scott Rua, Exam Supervisor at Shearon Harris Nuclear Plant requested from Mr. David Lanyi, Senior Operations Engineer in Region II, to delay the Licensed Operator Initial Examination that was scheduled to begin November 3, 2014. The operating test is now scheduled to be administered during the week of November 17, 2014. The written examination will be administered the week of November 24, 2014. The on-site preparatory week remains the week of October 6, 2014.


As agreed during the telephone conversation, your staff is preparing both the operating test and written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,
ML14262A326_________               SUNSI REVIEW COMPLETE   FORM 665 ATTACHED
"Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory Commission (NRC) regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
OFFICE           RII:DRS       RII:DRS
 
SIGNATURE         DRL2           MTW
To meet the above schedule, it will be necessary for your staff to furnish all outstanding test material identified in Attachment 3 to ES-201 by September 26, 2014, Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the examination, and test before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use.
NAME             LANYI         WIDMANN
 
DATE                 9/ 18 /2014   9/18 /2014     9/ /2014       9/   /2014     9/ /2014     9/ /2014     9/   /2014
We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
E-MAIL COPY?       YES     NO   YES     NO   YES   NO     YES     NO     YES   NO     YES     NO     YES     NO
 
       
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered. To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications, medical certifications, and waiver requests (if any) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
Letter to Ernest J. Kapopoulos from Malcolm T. Widmann dated September 18, 2014.
 
SUBJECT:       SHEARON HARRIS NUCLEAR PLANT - NOTIFICATION OF CHANGE IN
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB) under approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for this collection of information is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
              LICENSED OPERATOR INITIAL EXAMINATION 05000400/2014302 DATE
 
Distribution:
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
RIDSNRRDIRS
 
PUBLIC
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room). Thank you for your cooperation in this matter. Mr. Rua has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Lanyi at (404) 997-4487, (Internet E-mail: david.lanyi@nrc.gov ), or me at (404) 997- 4550, (Malcolm.widmann@nrc.gov ).
RidsNrrPMShearonHarris RESOURCE
 
Sincerely,/RA/
Malcolm T. Widmann, Chief Operations Branch 1 Division of Reactor Safety Docket Nos.: 50-400 License Nos.: NPF-63
 
cc: Distribution via Listserv Thank you for your cooperation in this matter. Mr. Rua has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Lanyi at (404) 997-4487, (Internet E-mail: david.lanyi@nrc.gov ), or me at (404) 997- 4550, (Malcolm.widmann@nrc.gov).
 
Sincerely,/RA/
Malcolm T. Widmann, Chief Operations Branch 1 Division of Reactor Safety Docket Nos.: 50-400 License Nos.: NPF-63
 
cc: Distribution via Listserv
 
x PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE x NON-SENSITIVE ADAMS:x Yes ACCESSION NUMBER:ML14262A326_________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE DRL2 MTW NAME LANYI WIDMANN DATE 9/ 18 /2014 9/18 /2014 9/ /2014 9/ /2014 9/ /2014 9/ /2014 9/ /2014 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\OLEXAMS\HARRIS EXAMINATIONS\INITIAL EXAM 2014-302\CORRESPONDENCE\HARRIS EXAM DATE CHANGE LETTER - 2014302.DOCX Letter to Ernest from Malcolm T. Widmann dated September 18, 2014.
 
SUBJECT: SHEARON HARRIS NUCLEAR PLANT - NOTIFICATION OF CHANGE IN LICENSED OPERATOR INITIAL EXAMINATION 05000400/2014302 DATE  
 
Distribution: RIDSNRRDIRS PUBLIC RidsNrrPMShearonHarris RESOURCE
}}
}}

Latest revision as of 01:06, 4 November 2019

Notification of Change in Licensed Operator Initial Examination 05000400/2014302 Date
ML14262A326
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/18/2014
From: Widmann M
Division of Reactor Safety II
To: Kapopoulos E
Progress Energy Carolinas
References
IR-14-302
Download: ML14262A326 (5)


See also: IR 05000400/2014302

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

September 18, 2014

Ernest J. Kapopoulos, Jr.

Vice President

Shearon Harris Nuclear Power Plant

5413 Shearon Harris Rd

New Hill, NC 27562-0165

SUBJECT: SHEARON HARRIS NUCLEAR PLANT - NOTIFICATION OF CHANGE IN

LICENSED OPERATOR INITIAL EXAMINATION 05000400/2014302 DATE

Dear Mr. Kapopoulos:

In a telephone conversation on September 12, 2014, Mr. Scott Rua, Exam Supervisor at

Shearon Harris Nuclear Plant requested from Mr. David Lanyi, Senior Operations Engineer in

Region II, to delay the Licensed Operator Initial Examination that was scheduled to begin

November 3, 2014. The operating test is now scheduled to be administered during the week of

November 17, 2014. The written examination will be administered the week of November 24,

2014. The on-site preparatory week remains the week of October 6, 2014.

As agreed during the telephone conversation, your staff is preparing both the operating test and

written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,

"Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory

Commission (NRC) regional office will discuss with your staff any changes that might be

necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish all outstanding test

material identified in Attachment 3 to ES-201 by September 26, 2014, Pursuant to Title 10,

Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized

representative of the facility licensee shall approve the examination, and test before they are

submitted to the NRC for review and approval. All materials shall be complete and ready-to-

use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

E. Kapopoulos 2

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications, medical certifications, and waiver

requests (if any) at least 30 days before the first examination date. If the applications are not

received at least 30 days before the examination date, a postponement may be necessary.

Signed applications certifying that all training has been completed should be submitted at least

14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget (OMB) under approval number 3150-0018, which expires on April 30,

2016. The public reporting burden for this collection of information is estimated to average 500

hours per response, including the time for reviewing instructions, gathering and maintaining the

data needed, writing the examinations, and completing and reviewing the collection of

information. Send comments on any aspect of this collection of information, including

suggestions for reducing the burden, to the Information and Records Management Branch (T-6

F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet

electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information

and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,

Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of the NRCs document

system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-

rm.adams.html (the Public Electronic Reading Room).

E. Kapopoulos 3

Thank you for your cooperation in this matter. Mr. Rua has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRC's examination

procedures and guidelines, please contact Mr. Lanyi at (404) 997-4487, (Internet E-mail:

david.lanyi@nrc.gov ), or me at (404) 997- 4550, (Malcolm.widmann@nrc.gov ).

Sincerely,

/RA/

Malcolm T. Widmann, Chief

Operations Branch 1

Division of Reactor Safety

Docket Nos.: 50-400

License Nos.: NPF-63

cc: Distribution via Listserv

ML14262A326_________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED

OFFICE RII:DRS RII:DRS

SIGNATURE DRL2 MTW

NAME LANYI WIDMANN

DATE 9/ 18 /2014 9/18 /2014 9/ /2014 9/ /2014 9/ /2014 9/ /2014 9/ /2014

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

Letter to Ernest J. Kapopoulos from Malcolm T. Widmann dated September 18, 2014.

SUBJECT: SHEARON HARRIS NUCLEAR PLANT - NOTIFICATION OF CHANGE IN

LICENSED OPERATOR INITIAL EXAMINATION 05000400/2014302 DATE

Distribution:

RIDSNRRDIRS

PUBLIC

RidsNrrPMShearonHarris RESOURCE