IR 05000275/2014501: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML15009A445
| number = ML15009A445
| issue date = 01/12/2015
| issue date = 01/12/2015
| title = Diablo Canyon Power Plant, Units 1 and 2 - NRC Emergency Preparedness Annual Inspection Report 05000275/2014501 and 05000323/2014501
| title = NRC Emergency Preparedness Annual Inspection Report 05000275/2014501 and 05000323/2014501
| author name = Haire M S
| author name = Haire M
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| addressee name = Halpin E D
| addressee name = Halpin E
| addressee affiliation = Pacific Gas & Electric Co
| addressee affiliation = Pacific Gas & Electric Co
| docket = 05000275, 05000323
| docket = 05000275, 05000323
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:ary 7, 2015
[[Issue date::January 7, 2015]]


Mr. Edward Senior Vice President
==SUBJECT:==
 
DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000275/2014501 AND 05000323/2014501
and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6
 
Avila Beach, CA 93424
 
SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000275/2014501 AND 05000323/2014501


==Dear Mr. Halpin:==
==Dear Mr. Halpin:==
On December 31, 2014, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Diablo Canyon Power Plant, Units 1 and 2. This inspection began on January 1, 2014. Issuance of this letter closes NRC Inspection Report 05000275/2014501 and 05000323/2014501. The inspection results associated with the 2014-501 reports are documented in integrated Resident Inspector Reports  
On December 31, 2014, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Diablo Canyon Power Plant, Units 1 and 2. This inspection began on January 1, 2014. Issuance of this letter closes NRC Inspection Report 05000275/2014501 and 05000323/2014501. The inspection results associated with the 2014-501 reports are documented in integrated Resident Inspector Reports 2014-002, 2014-003, 2014-004, and 2014-005.


2014-002, 2014-003, 2014-004, and 2014-005.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
Sincerely,
/RA/
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Dockets: 50-275; 50-323 Licenses: DPR-80; DPR-82 cc: Electronic Distribution


available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
ML15009A445 SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:
By: PElkmann  Yes No Non-Publicly Available Sensitive NRC-002 OFFICE PSB1:SEPI PSB1:BC NAME PElkmann/dch MHaire SIGNATURE /RA/ /RA/
DATE 1/7/15 1/7/15


Sincerely,/RA/ Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety
Letter to Edward from Mark S. Haire, dated January 7, 2015 SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000275/2014501 AND 05000323/2014501 DISTRIBUTION:
 
Regional Administrator (Marc.Dapas@nrc.gov)
Dockets: 50-275; 50-323 Licenses: DPR-80; DPR-82
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
 
Acting DRP Director (Troy.Pruett@nrc.gov)
cc: Electronic Distribution ML15009A445 SUNSI Review By: PElkmann ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: NRC-002 OFFICE PSB1:SEPI PSB1:BC NAME PElkmann/dch MHaire SIGNATURE /RA/ /RA/ DATE 1/7/15 1/7/15 Letter to Edward from Mark S. Haire, dated January 7, 2015
Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov)
 
SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000275/2014501 AND 05000323/2014501  
 
DISTRIBUTION
: Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) Acting DRP Director (Troy.Pruett@nrc.gov) Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Thomas.Hipschman@nrc.gov) Resident Inspector (John.Reynoso@nrc.gov) Administrative Assistant (Madeleine.Arel-Davis@nrc.gov)
Senior Resident Inspector (Thomas.Hipschman@nrc.gov)
Resident Inspector (John.Reynoso@nrc.gov)
Administrative Assistant (Madeleine.Arel-Davis@nrc.gov)
Branch Chief, DRP/A (Wayne.Walker@nrc.gov)
Branch Chief, DRP/A (Wayne.Walker@nrc.gov)
Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)  
Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)
 
Acting Senior Project Engineer, DRP/A (Theresa.Buchanan@nrc.gov)
Acting Senior Project Engineer, DRP/A (Theresa.Buchanan@nrc.gov) Project Engineer, DRP/A (Thomas.Sullivan@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Engineer, DRP/A (Thomas.Sullivan@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)  
Public Affairs Officer (Victor.Dricks@nrc.gov)
 
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (
Project Manager (Siva.Lingam@nrc.gov)
Siva.Lingam@nrc.gov) Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) RIV/ETA: OEDO (Cayetano.Santos@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Cayetano.Santos@nrc.gov)
}}
}}

Latest revision as of 17:06, 31 October 2019

NRC Emergency Preparedness Annual Inspection Report 05000275/2014501 and 05000323/2014501
ML15009A445
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/12/2015
From: Mark Haire
Plant Support Branch-1
To: Halpin E
Pacific Gas & Electric Co
References
IR 2014501
Download: ML15009A445 (3)


Text

ary 7, 2015

SUBJECT:

DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000275/2014501 AND 05000323/2014501

Dear Mr. Halpin:

On December 31, 2014, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Diablo Canyon Power Plant, Units 1 and 2. This inspection began on January 1, 2014. Issuance of this letter closes NRC Inspection Report 05000275/2014501 and 05000323/2014501. The inspection results associated with the 2014-501 reports are documented in integrated Resident Inspector Reports 2014-002, 2014-003, 2014-004, and 2014-005.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Dockets: 50-275; 50-323 Licenses: DPR-80; DPR-82 cc: Electronic Distribution

ML15009A445 SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: PElkmann Yes No Non-Publicly Available Sensitive NRC-002 OFFICE PSB1:SEPI PSB1:BC NAME PElkmann/dch MHaire SIGNATURE /RA/ /RA/

DATE 1/7/15 1/7/15

Letter to Edward from Mark S. Haire, dated January 7, 2015 SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000275/2014501 AND 05000323/2014501 DISTRIBUTION:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

Acting DRP Director (Troy.Pruett@nrc.gov)

Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Thomas.Hipschman@nrc.gov)

Resident Inspector (John.Reynoso@nrc.gov)

Administrative Assistant (Madeleine.Arel-Davis@nrc.gov)

Branch Chief, DRP/A (Wayne.Walker@nrc.gov)

Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)

Acting Senior Project Engineer, DRP/A (Theresa.Buchanan@nrc.gov)

Project Engineer, DRP/A (Thomas.Sullivan@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Siva.Lingam@nrc.gov)

Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Cayetano.Santos@nrc.gov)