| | issue date = 03/18/2015 | | | issue date = 03/18/2015 |
| | title = 3/18/2015, Meeting Slide for Reactor Oversight Process (ROP) Transition Plan for Watts Bar Unit 2 | | | title = 3/18/2015, Meeting Slide for Reactor Oversight Process (ROP) Transition Plan for Watts Bar Unit 2 |
| | author name = Cobey E W | | | author name = Cobey E |
| | author affiliation = Tennessee Valley Authority | | | author affiliation = Tennessee Valley Authority |
| | addressee name = | | | addressee name = |
Line 9: |
Line 9: |
| | docket = 05000391 | | | docket = 05000391 |
| | license number = | | | license number = |
| | contact person = Minarik A J, NRR/DORL/LPLWB, 415-6185 | | | contact person = Minarik A, NRR/DORL/LPLWB, 415-6185 |
| | package number = ML15125A344 | | | package number = ML15125A344 |
| | document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs | | | document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs |
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:Reactor Oversight Process (ROP) Transition Plan for Watts Bar Unit 2 Eugene Cobey Senior Manager New Plant Licensing March 18, 2015 | | {{#Wiki_filter:Reactor Oversight Process (ROP) |
| | Transition Plan for Watts Bar Unit 2 Eugene Cobey Senior Manager New Plant Licensing March 18, 2015 |
|
| |
|
| Purpose *Continue the dialogue on NRC's Draft ROP Transition Plan for Watts Bar (WBN) Unit 2 | | Purpose |
| *Align on path forward ROP Transition Plan for WBN2 l 2 Assessment NRC's Draft Transition Plan (March 4th public meeting)
| | * Continue the dialogue on NRCs Draft ROP Transition Plan for Watts Bar (WBN) Unit 2 |
| *Assessment conducted in accordance with Inspection Manual Chapter (IMC) 2517 until completion of IMC 2514 inspection program
| | * Align on path forward ROP Transition Plan for WBN2 l 2 |
| *Action Matrix utilized after TVA notified of full transition into the ROP ROP Transition Plan for WBN2 l 3 Assessment Treatment of violations identified prior to implementation of Action Matrix
| | |
| *TVA proposes that violations identified (typically the date of the inspection exit meeting) while the IMC 2517 assessment process is in effect should be characterized and assessed in accordance this Manual Chapter
| | Assessment NRCs Draft Transition Plan (March 4th public meeting) |
| *Any greater than green inspection finding identified after the Action Matrix is implemented should be treated as an input into the Action Matrix ROP Transition Plan for WBN2 l 4 Significance Determination NRC's Draft Transition Plan (March 4th public meeting)
| | * Assessment conducted in accordance with Inspection Manual Chapter (IMC) 2517 until completion of IMC 2514 inspection program |
| *Significance Determination Process (SDP) will be used to characterize inspection findings once cornerstones have been transitioned to the ROP
| | * Action Matrix utilized after TVA notified of full transition into the ROP ROP Transition Plan for WBN2 l 3 |
| *Prior to cornerstones being transitioned into the ROP, violations will be dispositioned in accordance with the Traditional Enforcement Process ROP Transition Plan for WBN2 l 5 Significance Determination
| | |
| *During the March 4th public meeting the NRC staff acknowledged that prior to entering commercial operations, the risk profile for WBN Unit 2 would be lower than an operating nuclear plant
| | Assessment Treatment of violations identified prior to implementation of Action Matrix |
| *TVA proposes that prior to commercial operations the SDP account for the lower risk profile of the plant ROP Transition Plan for WBN2 l 6 Significance Determination Emergency Preparedness
| | * TVA proposes that violations identified (typically the date of the inspection exit meeting) while the IMC 2517 assessment process is in effect should be characterized and assessed in accordance this Manual Chapter |
| - IMC 0609, Appendix B | | * Any greater than green inspection finding identified after the Action Matrix is implemented should be treated as an input into the Action Matrix ROP Transition Plan for WBN2 l 4 |
| *Failure to implement
| | |
| - no impact *Failure to comply should account for plant conditions and risk profile of plant | | Significance Determination NRCs Draft Transition Plan (March 4th public meeting) |
| *Example: an inspection finding involving a loss of planning standard (ex.
| | * Significance Determination Process (SDP) will be used to characterize inspection findings once cornerstones have been transitioned to the ROP |
| staffing) *Could be characterized as a White inspection finding | | * Prior to cornerstones being transitioned into the ROP, violations will be dispositioned in accordance with the Traditional Enforcement Process ROP Transition Plan for WBN2 l 5 |
| *White characterization would not be appropriate for some plant conditions (i.e., prior to plant startup)
| | |
| ROP Transition Plan for WBN2 l 7 Significance Determination Occupational Radiation Safety | | Significance Determination |
| - IMC 0609, Appendix C | | * During the March 4th public meeting the NRC staff acknowledged that prior to entering commercial operations, the risk profile for WBN Unit 2 would be lower than an operating nuclear plant |
| *No impact Public Radiation Safety
| | * TVA proposes that prior to commercial operations the SDP account for the lower risk profile of the plant ROP Transition Plan for WBN2 l 6 |
| - IMC 0609, Appendix D | | |
| *No impact Safeguards
| | Significance Determination Emergency Preparedness - IMC 0609, Appendix B |
| - IMC 0609, Appendix E | | * Failure to implement - no impact |
| *Should account for plant conditions and risk profile of plant (i.e., significance of loss of target set equipment for a plant with low decay heat is less)
| | * Failure to comply should account for plant conditions and risk profile of plant |
| ROP Transition Plan for WBN2 l 8 Significance Determination | | * Example: an inspection finding involving a loss of planning standard (ex. staffing) |
| *Use of other SDP Appendices to inform the characterization of noncompliances within the Traditional Enforcement Process should account for plant conditions and risk profile of plant *Example: an inspection finding associated with a heat removal system (i.e., auxiliary feedwater)
| | * Could be characterized as a White inspection finding |
| *Could be characterized as a greater than Green inspection finding using IMC 0609, Appendix A
| | * White characterization would not be appropriate for some plant conditions (i.e., prior to plant startup) |
| *Greater than Green characterization would not be appropriate for some plant conditions (i.e., low decay heat)
| | ROP Transition Plan for WBN2 l 7 |
| ROP Transition Plan for WBN2 l 9 Mitigating System Performance Index (MSPI) | | |
| NRC Draft Transition Plan Approach (March 4th public meeting) *MSPI for common unit equipment becomes effective when the Mitigating Cornerstone is transition into the ROP *MSPI for Unit 2 specific equipment become valid after four full quarters have elapsed following the transition of the Mitigating Cornerstone into the ROP ROP Transition Plan for WBN2 l 10 MSPI for Common Unit Equipment | | Significance Determination Occupational Radiation Safety - IMC 0609, Appendix C |
| *TVA agrees that these indicators can become valid the first full quarter following the Mitigating Systems Cornerstone being transition into the ROP
| | * No impact Public Radiation Safety - IMC 0609, Appendix D |
| *TVA proposes using Unit 2 specific data (critical hours, unavailability hours, failures, etc.) for each full quarter following the cornerstone being transition into the ROP and using the Unit 1 data for the balance of the 12 quarters *Unit 1 PRA will be used for reporting Unit 1 MSPI and Unit 2 PRA will be used for reporting Unit 2 MSPI ROP Transition Plan for WBN2 l 11 MSPI for Unit 2 Specific Equipment
| | * No impact Safeguards - IMC 0609, Appendix E |
| *Treating MSPI for Unit 2 specific equipment as valid prior to 12 full quarters having elapsed will result in the potential for false positives
| | * Should account for plant conditions and risk profile of plant (i.e., significance of loss of target set equipment for a plant with low decay heat is less) |
| *TVA proposes performing a WBN Unit 2 specific analysis to evaluate the likelihood of false positives to inform the NRC staff's decision on when these indicators should be treated as valid
| | ROP Transition Plan for WBN2 l 8 |
| *TVA plans to complete the WBN Unit 2 specific analysis and be in a position to present the results to the NRC by the end of April ROP Transition Plan for WBN2 l 12 Unit 2 Specific MSPI Analysis Perform a sensitivity study for each MSPI using the following assumptions to determine the number of failures and/or unavailability hours necessary for the indicator to exceed the threshold each quarter between 4 and 12 quarters *Unit 2 PRA will be used
| | |
| *NEI 99-02 values for WBN Unit 1 will be used where Unit 2 values do not exist (i.e., common cause failure)
| | Significance Determination |
| *Data accrual begins the first full quarter following transition of the Mitigating Systems Cornerstone into the ROP ROP Transition Plan for WBN2 l 13 Unit 2 Specific MSPI Analysis
| | * Use of other SDP Appendices to inform the characterization of noncompliances within the Traditional Enforcement Process should account for plant conditions and risk profile of plant |
| *Critical Hours
| | * Example: an inspection finding associated with a heat removal system (i.e., auxiliary feedwater) |
| - 2000 hours per quarter | | * Could be characterized as a greater than Green inspection finding using IMC 0609, Appendix A |
| *Use Unit 1 values adjusted for number of quarters
| | * Greater than Green characterization would not be appropriate for some plant conditions (i.e., low decay heat) |
| *Non-test and test run hours
| | ROP Transition Plan for WBN2 l 9 |
| *Non-test and test demands
| | |
| *Planned and unplanned baseline unavailability (NEI 99
| | Mitigating System Performance Index (MSPI) |
| -02) *Planned unavailability hours | | NRC Draft Transition Plan Approach (March 4th public meeting) |
| *Unplanned unavailability hours assumed only for simulated failures
| | * MSPI for common unit equipment becomes effective when the Mitigating Cornerstone is transition into the ROP |
| - TS LCO allowed outage time will be assumed ROP Transition Plan for WBN2 l 14 Unit 2 Specific MSPI Analysis | | * MSPI for Unit 2 specific equipment become valid after four full quarters have elapsed following the transition of the Mitigating Cornerstone into the ROP ROP Transition Plan for WBN2 l 10 |
| - Example Illustrative example for one indicator | | |
| *Assuming 12 quarters of data (no failures)
| | MSPI for Common Unit Equipment |
| *MSPI is -9.8E-7 *Margin is 4 start failures, 5 fail to load/run, 1 fail to run, OR 2700 hours unavailability
| | * TVA agrees that these indicators can become valid the first full quarter following the Mitigating Systems Cornerstone being transition into the ROP |
| *Assuming 4 quarters of data (no failures)
| | * TVA proposes using Unit 2 specific data (critical hours, unavailability hours, failures, etc.) for each full quarter following the cornerstone being transition into the ROP and using the Unit 1 data for the balance of the 12 quarters |
| *MSPI is 1.7E
| | * Unit 1 PRA will be used for reporting Unit 1 MSPI and Unit 2 PRA will be used for reporting Unit 2 MSPI ROP Transition Plan for WBN2 l 11 |
| -7 *Margin is 1 start failure, 1 fail to load/run, 1 failure to run, OR 372 hours of unavailability | | |
| *Treating this MSPI as valid after 4 quarters creates the substantial potential for a false positive ROP Transition Plan for WBN2 l 15}}
| | MSPI for Unit 2 Specific Equipment |
| | * Treating MSPI for Unit 2 specific equipment as valid prior to 12 full quarters having elapsed will result in the potential for false positives |
| | * TVA proposes performing a WBN Unit 2 specific analysis to evaluate the likelihood of false positives to inform the NRC staffs decision on when these indicators should be treated as valid |
| | * TVA plans to complete the WBN Unit 2 specific analysis and be in a position to present the results to the NRC by the end of April ROP Transition Plan for WBN2 l 12 |
| | |
| | Unit 2 Specific MSPI Analysis Perform a sensitivity study for each MSPI using the following assumptions to determine the number of failures and/or unavailability hours necessary for the indicator to exceed the threshold each quarter between 4 and 12 quarters |
| | * Unit 2 PRA will be used |
| | * NEI 99-02 values for WBN Unit 1 will be used where Unit 2 values do not exist (i.e., common cause failure) |
| | * Data accrual begins the first full quarter following transition of the Mitigating Systems Cornerstone into the ROP ROP Transition Plan for WBN2 l 13 |
| | |
| | Unit 2 Specific MSPI Analysis |
| | * Critical Hours - 2000 hours per quarter |
| | * Use Unit 1 values adjusted for number of quarters |
| | * Non-test and test run hours |
| | * Non-test and test demands |
| | * Planned and unplanned baseline unavailability (NEI 99-02) |
| | * Planned unavailability hours |
| | * Unplanned unavailability hours assumed only for simulated failures - TS LCO allowed outage time will be assumed ROP Transition Plan for WBN2 l 14 |
| | |
| | Unit 2 Specific MSPI Analysis - Example Illustrative example for one indicator |
| | * Assuming 12 quarters of data (no failures) |
| | * MSPI is -9.8E-7 |
| | * Margin is 4 start failures, 5 fail to load/run, 1 fail to run, OR 2700 hours unavailability |
| | * Assuming 4 quarters of data (no failures) |
| | * MSPI is 1.7E-7 |
| | * Margin is 1 start failure, 1 fail to load/run, 1 failure to run, OR 372 hours of unavailability |
| | * Treating this MSPI as valid after 4 quarters creates the substantial potential for a false positive ROP Transition Plan for WBN2 l 15}} |
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24312A0532024-11-0707 November 2024 FLEX HP Pump SDP for Nextera RUG Meeting - 11.7.2024 - Rev. 0 ML24312A1432024-11-0707 November 2024 SDP for Nextera RUG Meeting - 11.7.2024 - Rev. 0 ML24284A0042024-10-16016 October 2024 Application to Use Online Monitoring Methodology for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant Session Slides ML24228A2312024-08-15015 August 2024 TVA Meeting Slides for August 19 Public Meeting Re QAPD Supplement ML24225A2542024-08-14014 August 2024 August 14, 2024 - TVA Pre-Sub Meeting Presentation - Sequoyah, Units 1 and 2; Watts Bar, Units 1 and 2 - License Amendment Request to Revise TS 3.5.2 ECCS - Operating ML24137A2872024-05-16016 May 2024 Pre-Submittal Meetingfor Proposed License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources - Operating to Clarify Requirements for Diesel Generator Testing ML24127A0412024-05-0606 May 2024 May 6, 2024 Meeting Slides ML24067A2832024-03-27027 March 2024 2023 Browns Ferry, Sequoyah and Watts Bar Annual Assessment Public Meeting Presentation Slides ML24044A0872024-02-14014 February 2024 TVA Slides - Watts Bar Nuclear Plant Pre-Submittal Meeting for License Amendment Request to Revise TS 3.7.11, Main Control Room Area Chilled Water System ML23291A1562023-10-18018 October 2023 NRC Pre-Submittal Meeting Watts Bar & Sequoyah LAR, TVA Presentation Slides ML23264A0412023-09-27027 September 2023 NRC Pre-Submittal Meeting WBN Rebaseline LAR, TVA Presentation Slides ML23251A1252023-09-12012 September 2023 Pre-submittal Meeting for License Amendment Request, Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specification Surveillance Requirement 3.9.5.1 ML23251A1212023-09-12012 September 2023 RHR Flow Rate Reduction During Mode 6 Operation at 23 Ft. Refueling Water Level Technical Specification Change NON-PROPRIETARY Slides ML23178A0832023-07-10010 July 2023 Pre-submittal Meeting Slides for License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML23128A2882023-05-0808 May 2023 TVA Nuclear Plants -2022 EOC Media Slides ML23052A0362023-02-22022 February 2023 February 22, 2023, Pre-Submittal Meeting for the License Amendment Request for Increased Tritium Production at Watts Bar (EPID L-2023-LRM-0010) - Meeting Slides ML23041A3562023-02-15015 February 2023 February 15, 2023 Pre-submittal Meeting for Expedited License Amendment Request Main Control Room (MCR) Chiller Completion Time Extension (EPID L-2022-LRM-0098) (Slides) ML23044A5182023-02-15015 February 2023 Pre-Submittal Meeting Slides for Expedited License Amendment Request Re Main Control Room Chiller Completion Time Extension ML22318A1042022-11-14014 November 2022 Pre-submittal Meeting for American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-01 Slide Presentation ML22157A4132022-06-0606 June 2022 Plants - Pre-Submittal Teleconference for Proposed Amendment Request Regarding the Change for the Sequoyah and Watts Bar Nuclear Plants Technical Specification 3.4.12 Meeting Slides ML22102A3032022-04-12012 April 2022 Pre-submittal Meeting for Request for Exemption from Requirements of 10 CFR 26.205(d)(4) and 10 CFR 26.205(d)(6) Slide Presentation ML22080A1662022-03-21021 March 2022 TVA Nuclear Plants -2021 EOC Media Loop Slides for Automatic Play ML21343A0282021-12-14014 December 2021 TVA Slide Presentation Regarding Pre-Submittal Meeting for Proposed Revision to Capsule Withdrawal Schedule ML21281A2282021-10-13013 October 2021 Tennessee Valley Authority Fleet Pre-Submittal Meeting for License Amendment Request to Change Emergency Action Level Scheme Presentation - October 13, 2021 (EPID L-2021-LRM-0096) (Slides) ML21250A3652021-09-0808 September 2021 Meeting Slides - Watts Bar Nuclear Plant Unit 2, Presubmittal Teleconference for Proposed License Amendment to Revise the Updated Final Safety Analyses Report (UFSAR) to Use a Tube Support Plate Locking/Displacement Analysis ML21229A1992021-08-19019 August 2021 Mid-Cycle SG Outage Strategy (EPID L-2021-LRM-0067) (Slides) ML21217A2872021-08-19019 August 2021 TVA Slides - Pre-Submittal Meeting for Proposed License Amendment Request Re Application to Modify Technical Specification 3.7.8 Essential Raw Cooling Water (ERCW) System, to Support Permanent Shutdown Board ML21231A0972021-08-18018 August 2021 TVA Slides - Pre-Submittal Meeting for Proposed LAR Regarding Application to Modify Watts Bar Units 1 and 2 Technical Specification 3.7.8, Essential Raw Cooling Water (ERCW) System, to Support Permanent Shutdown Board Cleaning ML21117A0722021-04-27027 April 2021 Meeting Slides for April 28, 2021 Meeting with TVA ML21096A1312021-04-0707 April 2021 Pre-submittal Meeting for Inservice Testing (IST) Program Request for One-Time Extension of Test Frequency of WBN Unit 1 Group 6 Relief Valves ML21041A1552021-02-11011 February 2021 Meeting Slides for February 11, 2021 Meeting with TVA ML20345A0262020-12-10010 December 2020 Replacement Steam Generator Project Planned License Amendment Request (Lars). LAR Descriptions and Submittal Schedule Meeting Slides ML20329A3722020-11-24024 November 2020 Pre-Submittal Teleconference for Proposed License Amendment Request Regarding Technical Specification 5.9.9, Steam Generator Tube Inspection Report, to Use Popcd Methodology ML20302A1232020-10-28028 October 2020 Pre-Submittal Meeting Slides Non-Voluntary Application to Modify WBN Unit 1 and Unit 2 TS Surveillance Requirement 3.6.15.4, Shield Building ML20239A8672020-08-27027 August 2020 Pre-Submittal Meeting Slides License Amendment Request for Technical Specification 5.7.2.19 ML20175A0552020-06-23023 June 2020 TVA Slides for June 23, 2020, Emergency Plan Change Presubmittal Meeting ML20125A3242020-05-0505 May 2020 Pre-Submittal Meeting Slides for License Amendment Request - Main Control Room Chiller Completion Time Extension ML20049G1822020-02-18018 February 2020 February 20, 2020 - Pre-submittal Meeting Presentation - Transition to Westinghouse Fuel ML20009C3962020-01-0808 January 2020 Pre-Submittal Telecon for Expedited License Amendment Request to Revise Technical Specification 3.3.5, LOP DG Start Instrumentation ML19347B0722019-12-12012 December 2019 TVA and Xcel Energy Slides for Joint Presubmittal Meeting to License Amendment Requests to Adopt WCAP-17661, Revision 1 ML19282A0082019-10-0909 October 2019 TVA Slides for Pre-Submittal Meeting for License Amendment Request to Correct Unbalanced Voltage Relay Instrumentation Values ML19298A0042019-09-12012 September 2019 Presentation Slides for 9/12/19 Public Meeting ML19255H5522019-09-12012 September 2019 August 27, 2019, Summary of Public Meeting - Tennessee Valley Safety Conscious Work Environment Update at Watts Bar, Docket 50-390 and 50-391 ML19252A0532019-09-0909 September 2019 TVA Presentation Slides: Watts Bar Nuclear Plant Pre-Submittal Meeting for License Amendment Request Revised Offsite Electrical Power Sources ML19235A2882019-08-23023 August 2019 2019 WBN SCWE Public Meeting Slides 8-27-2019 (NRC Slides) ML19235A2712019-08-23023 August 2019 2019 TVA Watts Bar Nuclear Plant Public Meeting Slides 08-27-2019 (TVA Slides) ML19178A2462019-07-0101 July 2019 Presentation Material for July 1, 2019 Pre-submittal Meeting with TVA on Full Spectrum LOCA Methodology for Watts Bar, Units 1 and 2 ML19161A2412019-06-11011 June 2019 Pre-Application Meeting for Proposed License Amendment Request (LAR) Regarding Change to the WBN Unit 2 Technical Specifications (TS) 3.4.17, Steam Generator Tube Integrity and 5.7.2.12 Steam Generator Program ML19161A2392019-06-10010 June 2019 Plants Pre-Submittal Meeting for Proposed License Amendments Hydrological Analysis Updates June 10, 2019 ML19142A3602019-05-21021 May 2019 May 9, 2019 Summary of Public Meeting; Watts Bar Nuclear Plant 2024-08-15
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24312A1432024-11-0707 November 2024 SDP for Nextera RUG Meeting - 11.7.2024 - Rev. 0 ML24312A0532024-11-0707 November 2024 FLEX HP Pump SDP for Nextera RUG Meeting - 11.7.2024 - Rev. 0 ML24284A0042024-10-16016 October 2024 Application to Use Online Monitoring Methodology for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant Session Slides ML24228A2312024-08-15015 August 2024 TVA Meeting Slides for August 19 Public Meeting Re QAPD Supplement ML24225A2542024-08-14014 August 2024 August 14, 2024 - TVA Pre-Sub Meeting Presentation - Sequoyah, Units 1 and 2; Watts Bar, Units 1 and 2 - License Amendment Request to Revise TS 3.5.2 ECCS - Operating ML24184B9162024-07-10010 July 2024 U.S. NRC Meeting Slides for Meeting with Tennessee Valley Authority Regarding NRC Questions Regarding Scope of Nuclear Quality Assurance Program ML24137A2872024-05-16016 May 2024 Pre-Submittal Meetingfor Proposed License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources - Operating to Clarify Requirements for Diesel Generator Testing ML24127A0412024-05-0606 May 2024 May 6, 2024 Meeting Slides ML24067A2832024-03-27027 March 2024 2023 Browns Ferry, Sequoyah and Watts Bar Annual Assessment Public Meeting Presentation Slides ML23291A1562023-10-18018 October 2023 NRC Pre-Submittal Meeting Watts Bar & Sequoyah LAR, TVA Presentation Slides ML23264A0412023-09-27027 September 2023 NRC Pre-Submittal Meeting WBN Rebaseline LAR, TVA Presentation Slides ML23251A1212023-09-12012 September 2023 RHR Flow Rate Reduction During Mode 6 Operation at 23 Ft. Refueling Water Level Technical Specification Change NON-PROPRIETARY Slides ML23251A1252023-09-12012 September 2023 Pre-submittal Meeting for License Amendment Request, Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specification Surveillance Requirement 3.9.5.1 ML23178A0832023-07-10010 July 2023 Pre-submittal Meeting Slides for License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML23128A2882023-05-0808 May 2023 TVA Nuclear Plants -2022 EOC Media Slides ML23052A0362023-02-22022 February 2023 February 22, 2023, Pre-Submittal Meeting for the License Amendment Request for Increased Tritium Production at Watts Bar (EPID L-2023-LRM-0010) - Meeting Slides ML23044A5182023-02-15015 February 2023 Pre-Submittal Meeting Slides for Expedited License Amendment Request Re Main Control Room Chiller Completion Time Extension ML23041A3562023-02-15015 February 2023 February 15, 2023 Pre-submittal Meeting for Expedited License Amendment Request Main Control Room (MCR) Chiller Completion Time Extension (EPID L-2022-LRM-0098) (Slides) ML23010A2542023-01-12012 January 2023 Pre-submittal Meeting for Expedited License Amendment Request Main Control Room (MCR) Chiller Completion Time Extension -- Meeting Slides ML22318A1042022-11-14014 November 2022 Pre-submittal Meeting for American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-01 Slide Presentation ML22157A4132022-06-0606 June 2022 Plants - Pre-Submittal Teleconference for Proposed Amendment Request Regarding the Change for the Sequoyah and Watts Bar Nuclear Plants Technical Specification 3.4.12 Meeting Slides ML22103A0852022-04-14014 April 2022 And Watts Bar Plant Pre-submittal Meeting for Inservice Testing (IST) Program Request for Alternative for the Motor Driven Auxiliary Feedwater Pump Testing Following Maintenance During an Outage Per ISTB-3310 ML22102A3032022-04-12012 April 2022 Pre-submittal Meeting for Request for Exemption from Requirements of 10 CFR 26.205(d)(4) and 10 CFR 26.205(d)(6) Slide Presentation ML22080A1662022-03-21021 March 2022 TVA Nuclear Plants -2021 EOC Media Loop Slides for Automatic Play ML22035A0002022-02-0404 February 2022 February 8, 2022, Pre-Submittal Meeting Slides Regarding Proposed Change to Modify the Allowable Value for Technical Specification Table 3.3.2-1, Function 6.e(1) ML22013A6432022-01-19019 January 2022 TVA Slides - Watts Bar Nuclear Plant (WBN) Schedule for the Development of a License Amendment Request (LAR) for Increased Tritium Production at WBN ML21343A0282021-12-14014 December 2021 TVA Slide Presentation Regarding Pre-Submittal Meeting for Proposed Revision to Capsule Withdrawal Schedule ML21281A2282021-10-13013 October 2021 Tennessee Valley Authority Fleet Pre-Submittal Meeting for License Amendment Request to Change Emergency Action Level Scheme Presentation - October 13, 2021 (EPID L-2021-LRM-0096) (Slides) ML21250A3652021-09-0808 September 2021 Meeting Slides - Watts Bar Nuclear Plant Unit 2, Presubmittal Teleconference for Proposed License Amendment to Revise the Updated Final Safety Analyses Report (UFSAR) to Use a Tube Support Plate Locking/Displacement Analysis ML21229A1992021-08-19019 August 2021 Mid-Cycle SG Outage Strategy (EPID L-2021-LRM-0067) (Slides) ML21217A2872021-08-19019 August 2021 TVA Slides - Pre-Submittal Meeting for Proposed License Amendment Request Re Application to Modify Technical Specification 3.7.8 Essential Raw Cooling Water (ERCW) System, to Support Permanent Shutdown Board ML21231A0972021-08-18018 August 2021 TVA Slides - Pre-Submittal Meeting for Proposed LAR Regarding Application to Modify Watts Bar Units 1 and 2 Technical Specification 3.7.8, Essential Raw Cooling Water (ERCW) System, to Support Permanent Shutdown Board Cleaning ML21096A1312021-04-0707 April 2021 Pre-submittal Meeting for Inservice Testing (IST) Program Request for One-Time Extension of Test Frequency of WBN Unit 1 Group 6 Relief Valves ML21096A1002021-04-0606 April 2021 Annual Assessments ML21041A1552021-02-11011 February 2021 Meeting Slides for February 11, 2021 Meeting with TVA ML21019A5692021-01-19019 January 2021 Pre-Submittal Teleconference for Proposed License Amendment Requests (Lars) for the WBN Unit 2 Replacement Steam Generator (RSG) Project ML20352A0362020-12-17017 December 2020 Pre-Submittal Teleconference for Proposed License Amendment to Revise the Updated Final Safety Analysis Report (UFSAR) to Use an Alternate Probability of Detection (POD) ML20329A3722020-11-24024 November 2020 Pre-Submittal Teleconference for Proposed License Amendment Request Regarding Technical Specification 5.9.9, Steam Generator Tube Inspection Report, to Use Popcd Methodology ML21050A1562020-10-21021 October 2020 Graizer - Presentation - Analysis of Tva'S Watts Bar Nuclear Power Plant Strong-Motion Records of the M 4.4 December 12, 2018 Decatur Tennessee Earthquake ML20239A8672020-08-27027 August 2020 Pre-Submittal Meeting Slides License Amendment Request for Technical Specification 5.7.2.19 ML20220A2022020-08-0707 August 2020 Pre-Submittal Meeting Slides - Proposed License Approach Regarding a Change for Watts Bar Nuclear Plant Units 1 & 2 Technical Specification 3.3.2 Table 1 Function 6.e Auxiliary Feedwater Auto-Start from Loss of Main Feedwater Pumps(Epid L-2 ML20209A0702020-07-27027 July 2020 Pre-submittal Meeting for Inservice Testing (IST) Program Request for Relief from Increased Frequency Testing of Residual Heat Removal (RHR) Pump 1B-B Meeting Slides ML20169A5222020-06-25025 June 2020 Pre-Submittal Meeting for License Amendment Request (LAR) Revised Steam Generator (SG) Inspection Intervals and TSTF-510 ML20175A0552020-06-23023 June 2020 TVA Slides for June 23, 2020, Emergency Plan Change Presubmittal Meeting ML20148M1452020-05-27027 May 2020 (Wbn)Proposed License Approach Regarding a Change for the WBN Units 1& 2 Technical Specification (TS) 3.3.2 Table 1 Function 6.e Auxiliary Feedwater Auto-Start from Loss of Main Feedwater Pumps ML20147A0132020-05-26026 May 2020 NRC Slides Final WBN-1 TS 3.3.3 LAR ML20134J0102020-05-14014 May 2020 Pre-Submittal Meeting for License Amendment Request Technical Specification 5.9.6 Add NRC-approved Neutron Fluence Calculational Methodology ML20125A3242020-05-0505 May 2020 Pre-Submittal Meeting Slides for License Amendment Request - Main Control Room Chiller Completion Time Extension ML20112F5302020-04-21021 April 2020 TVA Nuclear Plants -2019 EOC Media Loop Slides for Automatic Play (Final) ML20049G1822020-02-18018 February 2020 February 20, 2020 - Pre-submittal Meeting Presentation - Transition to Westinghouse Fuel 2024-08-15
[Table view] |
Text
Reactor Oversight Process (ROP)
Transition Plan for Watts Bar Unit 2 Eugene Cobey Senior Manager New Plant Licensing March 18, 2015
Purpose
- Continue the dialogue on NRCs Draft ROP Transition Plan for Watts Bar (WBN) Unit 2
- Align on path forward ROP Transition Plan for WBN2 l 2
Assessment NRCs Draft Transition Plan (March 4th public meeting)
- Action Matrix utilized after TVA notified of full transition into the ROP ROP Transition Plan for WBN2 l 3
Assessment Treatment of violations identified prior to implementation of Action Matrix
- TVA proposes that violations identified (typically the date of the inspection exit meeting) while the IMC 2517 assessment process is in effect should be characterized and assessed in accordance this Manual Chapter
- Any greater than green inspection finding identified after the Action Matrix is implemented should be treated as an input into the Action Matrix ROP Transition Plan for WBN2 l 4
Significance Determination NRCs Draft Transition Plan (March 4th public meeting)
- Prior to cornerstones being transitioned into the ROP, violations will be dispositioned in accordance with the Traditional Enforcement Process ROP Transition Plan for WBN2 l 5
Significance Determination
- During the March 4th public meeting the NRC staff acknowledged that prior to entering commercial operations, the risk profile for WBN Unit 2 would be lower than an operating nuclear plant
- TVA proposes that prior to commercial operations the SDP account for the lower risk profile of the plant ROP Transition Plan for WBN2 l 6
Significance Determination Emergency Preparedness - IMC 0609, Appendix B
- Failure to implement - no impact
- Failure to comply should account for plant conditions and risk profile of plant
- Example: an inspection finding involving a loss of planning standard (ex. staffing)
- Could be characterized as a White inspection finding
- White characterization would not be appropriate for some plant conditions (i.e., prior to plant startup)
ROP Transition Plan for WBN2 l 7
Significance Determination Occupational Radiation Safety - IMC 0609, Appendix C
- Should account for plant conditions and risk profile of plant (i.e., significance of loss of target set equipment for a plant with low decay heat is less)
ROP Transition Plan for WBN2 l 8
Significance Determination
- Use of other SDP Appendices to inform the characterization of noncompliances within the Traditional Enforcement Process should account for plant conditions and risk profile of plant
- Example: an inspection finding associated with a heat removal system (i.e., auxiliary feedwater)
- Greater than Green characterization would not be appropriate for some plant conditions (i.e., low decay heat)
ROP Transition Plan for WBN2 l 9
Mitigating System Performance Index (MSPI)
NRC Draft Transition Plan Approach (March 4th public meeting)
- MSPI for common unit equipment becomes effective when the Mitigating Cornerstone is transition into the ROP
- MSPI for Unit 2 specific equipment become valid after four full quarters have elapsed following the transition of the Mitigating Cornerstone into the ROP ROP Transition Plan for WBN2 l 10
MSPI for Common Unit Equipment
- TVA agrees that these indicators can become valid the first full quarter following the Mitigating Systems Cornerstone being transition into the ROP
- TVA proposes using Unit 2 specific data (critical hours, unavailability hours, failures, etc.) for each full quarter following the cornerstone being transition into the ROP and using the Unit 1 data for the balance of the 12 quarters
- Unit 1 PRA will be used for reporting Unit 1 MSPI and Unit 2 PRA will be used for reporting Unit 2 MSPI ROP Transition Plan for WBN2 l 11
MSPI for Unit 2 Specific Equipment
- Treating MSPI for Unit 2 specific equipment as valid prior to 12 full quarters having elapsed will result in the potential for false positives
- TVA proposes performing a WBN Unit 2 specific analysis to evaluate the likelihood of false positives to inform the NRC staffs decision on when these indicators should be treated as valid
- TVA plans to complete the WBN Unit 2 specific analysis and be in a position to present the results to the NRC by the end of April ROP Transition Plan for WBN2 l 12
Unit 2 Specific MSPI Analysis Perform a sensitivity study for each MSPI using the following assumptions to determine the number of failures and/or unavailability hours necessary for the indicator to exceed the threshold each quarter between 4 and 12 quarters
- NEI 99-02 values for WBN Unit 1 will be used where Unit 2 values do not exist (i.e., common cause failure)
- Data accrual begins the first full quarter following transition of the Mitigating Systems Cornerstone into the ROP ROP Transition Plan for WBN2 l 13
Unit 2 Specific MSPI Analysis
- Critical Hours - 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> per quarter
- Use Unit 1 values adjusted for number of quarters
- Non-test and test run hours
- Non-test and test demands
- Planned and unplanned baseline unavailability (NEI 99-02)
- Planned unavailability hours
- Unplanned unavailability hours assumed only for simulated failures - TS LCO allowed outage time will be assumed ROP Transition Plan for WBN2 l 14
Unit 2 Specific MSPI Analysis - Example Illustrative example for one indicator
- Assuming 12 quarters of data (no failures)
- Margin is 4 start failures, 5 fail to load/run, 1 fail to run, OR 2700 hours0.0313 days <br />0.75 hours <br />0.00446 weeks <br />0.00103 months <br /> unavailability
- Assuming 4 quarters of data (no failures)
- Margin is 1 start failure, 1 fail to load/run, 1 failure to run, OR 372 hours0.00431 days <br />0.103 hours <br />6.150794e-4 weeks <br />1.41546e-4 months <br /> of unavailability
- Treating this MSPI as valid after 4 quarters creates the substantial potential for a false positive ROP Transition Plan for WBN2 l 15