IR 05000390/2015005: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 09/01/2015
| issue date = 09/01/2015
| title = Mid-Cycle Assessment Letter for the Watts Bar Nuclear Plant Unit 1, NRC Inspection Report 005000390/2015005
| title = Mid-Cycle Assessment Letter for the Watts Bar Nuclear Plant Unit 1, NRC Inspection Report 005000390/2015005
| author name = Blamey A J
| author name = Blamey A
| author affiliation = NRC/RGN-II/DRP
| author affiliation = NRC/RGN-II/DRP
| addressee name = Shea J W
| addressee name = Shea J
| addressee affiliation = Tennessee Valley Authority
| addressee affiliation = Tennessee Valley Authority
| docket = 05000390
| docket = 05000390
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION ber 1, 2015
[[Issue date::September 1, 2015]]


Mr. Joseph Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801
==SUBJECT:==
MID-CYCLE ASSESSMENT LETTER FOR THE WATTS BAR NUCLEAR PLANT UNIT 1, NRC INSPECTION REPORT 005000390/2015005


SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR THE WATTS BAR NUCLEAR PLANT UNIT 1, NRC INSPECTION REPORT 005000390/2015005
==Dear Mr. Shea:==
On August 13, 2015, the NRC completed its mid-cycle performance review of Watts Bar Nuclear Plant Unit 1. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2014 through June 30, 2015.
 
This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
 
The NRC determined that overall, Watts Bar Nuclear Plant Unit 1 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Watts Bar Nuclear Plant Unit 1 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green).
 
Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
 
The enclosed inspection plan lists the inspections scheduled through June 30, 2017. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
 
In addition to the routine ROP baseline inspections at your facility, we also plan on conducting infrequently performed inspections which include: Inspection Procedure (IP) 43004, Inspection of Commercial-Grade Dedication Programs, and an initial operator license examination. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Please contact me at 404-997-4415 with any questions you have regarding this letter.


==Dear Mr. Shea:==
Sincerely,
On August 13, 2015, the NRC completed its mid-cycle performance review of Watts Bar Nuclear Plant Unit 1. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2014 through June 30, 2015. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC determined that overall, Watts Bar Nuclear Plant Unit 1 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Watts Bar Nuclear Plant Unit 1 during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through June 30, 2017. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
/RA/
Alan Blamey, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-390 License Nos. NPF-90 Enclosure: Watts Bar Inspection/Activity Plan (07/01/2015 - 06/30/2017)
cc distribution via ListServ


In addition to the routine ROP baseline inspections at your facility, we also plan on conducting infrequently performed inspections which include: Inspection Procedure (IP) 43004, "Inspection of Commercial-Grade Dedication Programs," and an initial operator license examination. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 404-997-4415 with any questions you have regarding this letter.
_________________________ XSUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE BDB3 CRK1 AJB3 NAME BBISHOP CKONTZ ABLAMEY DATE  8/25/2015 8/25/2015 8/31/2015 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO Letter to Joseph Shea from Alan Blamey dated September 1, 2015 SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR THE WATTS BAR NUCLEAR PLANT UNIT 1, NRC INSPECTION REPORT 005000390/2015005 DISTRIBUTION:
D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC A. Adams, NRR RidsNrrPMWattsBar Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)


Sincerely,/RA/
Page 1 of 3      Watts Bar 09/01/2015 10:35:16    Inspection / Activity Plan Report 22 09/01/2015 - 06/30/2017 Unit Planned Dates        No. of Staff Number Start End Inspection Activity    Title  on Site ISFSI - ISFSI PAD CONCRETE PLACEMENT    1 1 09/21/2015 09/25/2015 IP 60853  On-Site Fabrication Of Components And Construction On An ISFSI RP - RP OCCUPATIONAL BASELINE WEEK 1    2 1 10/05/2015 10/09/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 10/05/2015 10/09/2015 IP 71124.02 Occupational ALARA Planning and Controls 1 10/05/2015 10/09/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 10/05/2015 10/09/2015 IP 71124.04 Occupational Dose Assessment 1 10/05/2015 10/09/2015 IP 71124.05 Radiation Monitoring Instrumentation 1 10/05/2015 10/09/2015 IP 71151  Performance Indicator Verification ISI - UNIT 1 IN-SERVICE INSPECTION    1 1 10/12/2015 10/16/2015 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL BASELINE WEEK 2    3 1 10/19/2015 10/23/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 10/19/2015 10/23/2015 IP 71124.02 Occupational ALARA Planning and Controls 1 10/19/2015 10/23/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 10/19/2015 10/23/2015 IP 71124.04 Occupational Dose Assessment 1 10/19/2015 10/23/2015 IP 71124.05 Radiation Monitoring Instrumentation 1 10/19/2015 10/23/2015 IP 71151  Performance Indicator Verification EP - EP EXERCISE      8 1 11/16/2015 11/20/2015 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 11/16/2015 11/20/2015 IP 7111407 Exercise Evaluation - Hostile Action (HA) Event 1 11/16/2015 11/20/2015 IP 71151  Performance Indicator Verification CDBI - COMPONENT DESIGN BASES INSPECTION    7 1 02/01/2016 02/05/2016 IP 7111121 Component Design Bases Inspection 1 02/29/2016 03/04/2016 IP 7111121 Component Design Bases Inspection 1 03/14/2016 03/18/2016 IP 7111121 Component Design Bases Inspection 1 03/28/2016 04/01/2016 IP 7111121 Component Design Bases Inspection OL EXAM - INITIAL LICENSE EXAM PREP    3 1 06/20/2016 06/24/2016 V23475 WATTS BAR JULY 2016 INITIAL EXAM AT POWER FACILITIES OL EXAM - INITIAL LICENSE EXAM      3 1 07/18/2016 07/22/2016 V23475 WATTS BAR JULY 2016 INITIAL EXAM AT POWER FACILITIES MODS - PLANT MODIFICATIONS INSPECTION    3 1 07/25/2016 07/29/2016 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications This report does not include INPO and OUTAGE activities.
Alan Blamey, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-390 License Nos. NPF-90


===Enclosure:===
This report shows only on-site and announced inspection procedures. Enclosure
Watts Bar Inspection/Activity Plan  (07/01/2015 - 06/30/2017) cc distribution via ListServ 


_________________________ XSUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE BDB3 CRK1 AJB3 NAME BBISHOP CKONTZ ABLAMEY DATE 8/25/2015 8/25/2015 8/31/2015 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO Letter to Joseph Shea from Alan Blamey dated September 1, 2015
Page 2 of 3      Watts Bar 09/01/2015 10:35:16    Inspection / Activity Plan Report 22 09/01/2015 - 06/30/2017 Unit Planned Dates        No. of Staff Number Start End Inspection Activity    Title  on Site MODS - PLANT MODIFICATIONS INSPECTION      3 1 08/08/2016 08/12/2016 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications RP - RP PUBLIC RAD SAFETY BASELINE      4 1 08/01/2016 08/05/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 08/01/2016 08/05/2016 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1 08/01/2016 08/05/2016 IP 71124.07 Radiological Environmental Monitoring Program 1 08/01/2016 08/05/2016 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1 08/01/2016 08/05/2016 IP 71151  Performance Indicator Verification PI&R - PROBLEM IDENTIFICATION AND RESOLUTION      4 1 10/31/2016 11/04/2016 IP 71152B Problem Identification and Resolution 1 11/14/2016 11/18/2016 IP 71152B Problem Identification and Resolution EP - EP PROGRAM INSPECTION      4 1 11/14/2016 11/18/2016 IP 7111402 Alert and Notification System Testing 1 11/14/2016 11/18/2016 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 11/14/2016 11/18/2016 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 11/14/2016 11/18/2016 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1 11/14/2016 11/18/2016 IP 71151  Performance Indicator Verification ISI - UNIT 1 IN-SERVICE INSPECTION & RVH EXAM      2 1 03/27/2017 03/31/2017 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL INSPECTION WEEK 1      2 1 03/27/2017 03/31/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 03/27/2017 03/31/2017 IP 71124.02 Occupational ALARA Planning and Controls 1 03/27/2017 03/31/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 03/27/2017 03/31/2017 IP 71124.04 Occupational Dose Assessment 1 03/27/2017 03/31/2017 IP 71124.05 Radiation Monitoring Instrumentation 1 03/27/2017 03/31/2017 IP 71151  Performance Indicator Verification SGISI - UNIT 1 SG IN-SERVICE INSPECTION      1 1 04/03/2017 04/07/2017 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL INSPECTION WEEK 2      3 1 04/10/2017 04/14/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 04/10/2017 04/14/2017 IP 71124.02 Occupational ALARA Planning and Controls 1 04/10/2017 04/14/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 04/10/2017 04/14/2017 IP 71124.04 Occupational Dose Assessment This report does not include INPO and OUTAGE activities.


SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR THE WATTS BAR NUCLEAR PLANT UNIT 1, NRC INSPECTION REPORT 005000390/2015005 DISTRIBUTION: D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC A. Adams, NRR RidsNrrPMWattsBar Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)
This report shows only on-site and announced inspection procedures.
Page 1 of 309/01/201510:35:16Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteWatts BarInspection / Activity Plan09/01/2015-06/30/2017ISFSI-ISFSI PAD CONCRETE PLACEMENT11 IPOn-Site Fabrication Of Components And Construction On An ISFSI6085309/21/201509/25/2015RP-RP OCCUPATIONAL BASELINE WEEK 121 IPRadiological Hazard Assessment and Exposure Controls71124.0110/05/201510/09/20151 IPOccupational ALARA Planning and Controls71124.0210/05/201510/09/20151 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/05/201510/09/20151 IPOccupational Dose Assessment71124.0410/05/201510/09/20151 IPRadiation Monitoring Instrumentation71124.0510/05/201510/09/20151 IPPerformance Indicator Verification7115110/05/201510/09/2015ISI-UNIT 1 IN-SERVICE INSPECTION11 IPInservice Inspection Activities - PWR7111108P10/12/201510/16/2015RP-RP OCCUPATIONAL BASELINE WEEK 231 IPRadiological Hazard Assessment and Exposure Controls71124.0110/19/201510/23/20151 IPOccupational ALARA Planning and Controls71124.0210/19/201510/23/20151 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/19/201510/23/20151 IPOccupational Dose Assessment71124.0410/19/201510/23/20151 IPRadiation Monitoring Instrumentation71124.0510/19/201510/23/20151 IPPerformance Indicator Verification7115110/19/201510/23/2015EP-EP EXERCISE81 IPEmergency Action Level and Emergency Plan Changes711140411/16/201511/20/20151 IPExercise Evaluation - Hostile Action (HA) Event711140711/16/201511/20/20151 IPPerformance Indicator Verification7115111/16/201511/20/2015CDBI-COMPONENT DESIGN BASES INSPECTION71 IPComponent Design Bases Inspection711112102/01/201602/05/20161 IPComponent Design Bases Inspection711112102/29/201603/04/20161 IPComponent Design Bases Inspection711112103/14/201603/18/20161 IPComponent Design Bases Inspection711112103/28/201604/01/2016OL EXAM-INITIAL LICENSE EXAM PREP31 WATTS BAR JULY 2016 INITIAL EXAM AT POWER FACILITIESV2347506/20/201606/24/2016OL EXAM-INITIAL LICENSE EXAM31 WATTS BAR JULY 2016 INITIAL EXAM AT POWER FACILITIESV2347507/18/201607/22/2016MODS-PLANT MODIFICATIONS INSPECTION31 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T07/25/201607/29/2016This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.


Page 2 of 309/01/201510:35:16Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteWatts BarInspection / Activity Plan09/01/2015-06/30/2017MODS-PLANT MODIFICATIONS INSPECTION31 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T08/08/201608/12/2016RP-RP PUBLIC RAD SAFETY BASELINE41 IPRadiological Hazard Assessment and Exposure Controls71124.0108/01/201608/05/20161 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0608/01/201608/05/20161 IPRadiological Environmental Monitoring Program71124.0708/01/201608/05/20161 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0808/01/201608/05/20161 IPPerformance Indicator Verification7115108/01/201608/05/2016PI&R-PROBLEM IDENTIFICATION AND RESOLUTION41 IPProblem Identification and Resolution71152B10/31/201611/04/20161 IPProblem Identification and Resolution71152B11/14/201611/18/2016EP-EP PROGRAM INSPECTION41 IPAlert and Notification System Testing711140211/14/201611/18/20161 IPEmergency Preparedness Organization Staffing and Augmentation System711140311/14/201611/18/20161 IPEmergency Action Level and Emergency Plan Changes711140411/14/201611/18/20161 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140511/14/201611/18/20161 IPPerformance Indicator Verification7115111/14/201611/18/2016ISI-UNIT 1 IN-SERVICE INSPECTION & RVH EXAM21 IPInservice Inspection Activities - PWR7111108P03/27/201703/31/2017RP-RP OCCUPATIONAL INSPECTION WEEK 121 IPRadiological Hazard Assessment and Exposure Controls71124.0103/27/201703/31/20171 IPOccupational ALARA Planning and Controls71124.0203/27/201703/31/20171 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0303/27/201703/31/20171 IPOccupational Dose Assessment71124.0403/27/201703/31/20171 IPRadiation Monitoring Instrumentation71124.0503/27/201703/31/20171 IPPerformance Indicator Verification7115103/27/201703/31/2017SGISI-UNIT 1 SG IN-SERVICE INSPECTION11 IPInservice Inspection Activities - PWR7111108P04/03/201704/07/2017RP-RP OCCUPATIONAL INSPECTION WEEK 231 IPRadiological Hazard Assessment and Exposure Controls71124.0104/10/201704/14/20171 IPOccupational ALARA Planning and Controls71124.0204/10/201704/14/20171 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0304/10/201704/14/20171 IPOccupational Dose Assessment71124.0404/10/201704/14/2017This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Enclosure


Page 3 of 309/01/201510:35:16Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteWatts BarInspection / Activity Plan09/01/2015-06/30/2017RP-RP OCCUPATIONAL INSPECTION WEEK 231 IPRadiation Monitoring Instrumentation71124.0504/10/201704/14/20171 IPPerformance Indicator Verification7115104/10/201704/14/2017This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Page 3 of 3      Watts Bar 09/01/2015 10:35:16    Inspection / Activity Plan Report 22 09/01/2015 - 06/30/2017 Unit Planned Dates      No. of Staff Number Start End Inspection Activity    Title on Site RP - RP OCCUPATIONAL INSPECTION WEEK 2  3 1 04/10/2017 04/14/2017 IP 71124.05 Radiation Monitoring Instrumentation 1 04/10/2017 04/14/2017 IP 71151  Performance Indicator Verification This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.
}}
}}

Latest revision as of 07:06, 31 October 2019

Mid-Cycle Assessment Letter for the Watts Bar Nuclear Plant Unit 1, NRC Inspection Report 005000390/2015005
ML15244B056
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 09/01/2015
From: Alan Blamey
Division Reactor Projects II
To: James Shea
Tennessee Valley Authority
References
IR 2015005
Download: ML15244B056 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION ber 1, 2015

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR THE WATTS BAR NUCLEAR PLANT UNIT 1, NRC INSPECTION REPORT 005000390/2015005

Dear Mr. Shea:

On August 13, 2015, the NRC completed its mid-cycle performance review of Watts Bar Nuclear Plant Unit 1. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2014 through June 30, 2015.

This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Watts Bar Nuclear Plant Unit 1 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Watts Bar Nuclear Plant Unit 1 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green).

Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2017. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

In addition to the routine ROP baseline inspections at your facility, we also plan on conducting infrequently performed inspections which include: Inspection Procedure (IP) 43004, Inspection of Commercial-Grade Dedication Programs, and an initial operator license examination. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4415 with any questions you have regarding this letter.

Sincerely,

/RA/

Alan Blamey, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-390 License Nos. NPF-90 Enclosure: Watts Bar Inspection/Activity Plan (07/01/2015 - 06/30/2017)

cc distribution via ListServ

_________________________ XSUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE BDB3 CRK1 AJB3 NAME BBISHOP CKONTZ ABLAMEY DATE 8/25/2015 8/25/2015 8/31/2015 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO Letter to Joseph Shea from Alan Blamey dated September 1, 2015 SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR THE WATTS BAR NUCLEAR PLANT UNIT 1, NRC INSPECTION REPORT 005000390/2015005 DISTRIBUTION:

D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC A. Adams, NRR RidsNrrPMWattsBar Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

Page 1 of 3 Watts Bar 09/01/2015 10:35:16 Inspection / Activity Plan Report 22 09/01/2015 - 06/30/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site ISFSI - ISFSI PAD CONCRETE PLACEMENT 1 1 09/21/2015 09/25/2015 IP 60853 On-Site Fabrication Of Components And Construction On An ISFSI RP - RP OCCUPATIONAL BASELINE WEEK 1 2 1 10/05/2015 10/09/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 10/05/2015 10/09/2015 IP 71124.02 Occupational ALARA Planning and Controls 1 10/05/2015 10/09/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 10/05/2015 10/09/2015 IP 71124.04 Occupational Dose Assessment 1 10/05/2015 10/09/2015 IP 71124.05 Radiation Monitoring Instrumentation 1 10/05/2015 10/09/2015 IP 71151 Performance Indicator Verification ISI - UNIT 1 IN-SERVICE INSPECTION 1 1 10/12/2015 10/16/2015 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL BASELINE WEEK 2 3 1 10/19/2015 10/23/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 10/19/2015 10/23/2015 IP 71124.02 Occupational ALARA Planning and Controls 1 10/19/2015 10/23/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 10/19/2015 10/23/2015 IP 71124.04 Occupational Dose Assessment 1 10/19/2015 10/23/2015 IP 71124.05 Radiation Monitoring Instrumentation 1 10/19/2015 10/23/2015 IP 71151 Performance Indicator Verification EP - EP EXERCISE 8 1 11/16/2015 11/20/2015 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 11/16/2015 11/20/2015 IP 7111407 Exercise Evaluation - Hostile Action (HA) Event 1 11/16/2015 11/20/2015 IP 71151 Performance Indicator Verification CDBI - COMPONENT DESIGN BASES INSPECTION 7 1 02/01/2016 02/05/2016 IP 7111121 Component Design Bases Inspection 1 02/29/2016 03/04/2016 IP 7111121 Component Design Bases Inspection 1 03/14/2016 03/18/2016 IP 7111121 Component Design Bases Inspection 1 03/28/2016 04/01/2016 IP 7111121 Component Design Bases Inspection OL EXAM - INITIAL LICENSE EXAM PREP 3 1 06/20/2016 06/24/2016 V23475 WATTS BAR JULY 2016 INITIAL EXAM AT POWER FACILITIES OL EXAM - INITIAL LICENSE EXAM 3 1 07/18/2016 07/22/2016 V23475 WATTS BAR JULY 2016 INITIAL EXAM AT POWER FACILITIES MODS - PLANT MODIFICATIONS INSPECTION 3 1 07/25/2016 07/29/2016 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 3 Watts Bar 09/01/2015 10:35:16 Inspection / Activity Plan Report 22 09/01/2015 - 06/30/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site MODS - PLANT MODIFICATIONS INSPECTION 3 1 08/08/2016 08/12/2016 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications RP - RP PUBLIC RAD SAFETY BASELINE 4 1 08/01/2016 08/05/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 08/01/2016 08/05/2016 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1 08/01/2016 08/05/2016 IP 71124.07 Radiological Environmental Monitoring Program 1 08/01/2016 08/05/2016 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1 08/01/2016 08/05/2016 IP 71151 Performance Indicator Verification PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 4 1 10/31/2016 11/04/2016 IP 71152B Problem Identification and Resolution 1 11/14/2016 11/18/2016 IP 71152B Problem Identification and Resolution EP - EP PROGRAM INSPECTION 4 1 11/14/2016 11/18/2016 IP 7111402 Alert and Notification System Testing 1 11/14/2016 11/18/2016 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 11/14/2016 11/18/2016 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 11/14/2016 11/18/2016 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1 11/14/2016 11/18/2016 IP 71151 Performance Indicator Verification ISI - UNIT 1 IN-SERVICE INSPECTION & RVH EXAM 2 1 03/27/2017 03/31/2017 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL INSPECTION WEEK 1 2 1 03/27/2017 03/31/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 03/27/2017 03/31/2017 IP 71124.02 Occupational ALARA Planning and Controls 1 03/27/2017 03/31/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 03/27/2017 03/31/2017 IP 71124.04 Occupational Dose Assessment 1 03/27/2017 03/31/2017 IP 71124.05 Radiation Monitoring Instrumentation 1 03/27/2017 03/31/2017 IP 71151 Performance Indicator Verification SGISI - UNIT 1 SG IN-SERVICE INSPECTION 1 1 04/03/2017 04/07/2017 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL INSPECTION WEEK 2 3 1 04/10/2017 04/14/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 04/10/2017 04/14/2017 IP 71124.02 Occupational ALARA Planning and Controls 1 04/10/2017 04/14/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 04/10/2017 04/14/2017 IP 71124.04 Occupational Dose Assessment This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Page 3 of 3 Watts Bar 09/01/2015 10:35:16 Inspection / Activity Plan Report 22 09/01/2015 - 06/30/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RP - RP OCCUPATIONAL INSPECTION WEEK 2 3 1 04/10/2017 04/14/2017 IP 71124.05 Radiation Monitoring Instrumentation 1 04/10/2017 04/14/2017 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.