| number = ML15320A087
| number = ML15320A087
| issue date = 11/05/2015
| issue date = 11/05/2015
| title = Vogtle GSI-191 Resolution Plan and Current Status, NRC Public Meeting, November 5, 2015, Revised Meeting Handouts
| title = GSI-191 Resolution Plan and Current Status, NRC Public Meeting, November 5, 2015, Revised Meeting Handouts
| author name =  
| author name =  
| author affiliation = Southern Nuclear Company
| author affiliation = Southern Nuclear Company
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:NOVEMBER 5, 2015VOGTLE GSI
{{#Wiki_filter:VOGTLE GSI-191 RESOLUTION PLAN AND CURRENT STATUS NRC PUBLIC MEETING NOVEMBER 5, 2015
-191 RESOLUTION PLAN AND CURRENT STATUSNRC PUBLIC MEETING 2AGENDA8:30 -Introductions/Purpose of Meeting8:45 -High Level Overview of Vogtle Closure Strategy &What we have learned9:00 -Review of Inputs and Assumptions10:00 -Explanation of Modeling11:30 -Interface with PRA12:15 -Uncertainty Quantification12:45 -Lunch13:45 -Continued Discussion of Inputs and Assumptions14:30 -Continued Discussion of PRA and Uncertainty15:00 -Submittal Documentation15:45 -Closing Remarks 3PURPOSE OF MEETINGObtain staff feedback on the overall GSI
-191 resolution path for VogtleDiscuss proposed plant modificationsDiscuss use of design basis (vs. best estimate) inputs in the evaluation 4VOGTLE PLANT LAYOUTWestinghouse 4
-loop PWR (3,626 MWt per unit)Large dry containmentTwo redundant ECCS and CS trainsEach train has an RHR pump, a high head pump, an intermediate head SI pump, and a CS pumpSI and high head pumps piggyback off of the RHR pump discharge during recirculation.Maximum design flow rates:RHR 3,700 gpm/pumpCS 2,600 gpm/pumpTwo independent and redundant containment air cooling trains 5STRAINER ARRANGEMENTTwo RHR and CS pumps each with their own strainerEach GE strainer is similar with four stacks of disksRHR strainer: 18
-disk tall, 765 ft2, 5 fttallCS strainer: 14
-disk tall, 590 ft2, 4 fttallPerforated plate with 3/32" diameter holesRHR BCS BRHR ACS A 6PLANT RESPONSE TO LOCASPlant response includes the following general actions: Accumulators inject (breaks larger than 2 inches)ECCS injection is initiated from the RWST to the cold legs via RHR, SI, and High Head pumpsContainment spray is initiated from the RWST via CS pumps RHR pumps switched to cold leg recirculation at RWST lo-lo alarmCS pumps switched to recirculation at RWST empty alarmCS pumps secured no earlier than 1.5 hours after start of recirculation, and probably before 6 hours depending on pressure and dose rateRHR pumps switched to hot leg recirculation at 7.5 hours 7AGENDA8:30 -Introductions/Purpose of Meeting8:45 -High Level Overview of Vogtle Closure Strategy &What we have learned9:00 -Review of Inputs and Assumptions10:00 -Explanation of Modeling11:30 -Interface with PRA12:15 -Uncertainty Quantification12:45 -Lunch13:45 -Continued Discussion of Inputs and Assumptions14:30 -Continued Discussion of PRA and Uncertainty15:00 -Submittal Documentation15:45 -Closing Remarks 8SCHEDULE UPDATEMILESTONEEXPECTED COMPLETION DATECurrent StatusDevelop containment CAD model to include pipe weldsCompleteCompleteConduct meeting with NRC 3rdQuarter 2013CompleteModify probabilistic risk assessment (PRA) to include Strainer and Core Blockage events 4thQuarter 2013CompletePerform Chemical Effects testing 1stQuarter 2014CompletePerform thermal and hydraulic modeling of RCS, Core, and Containment conditions 1stQuarter 2014CompletePerform Strainer Head Loss and Bypass testing to establish correlation for range of break sizes 2ndQuarter 2014StrainerBypass Testing
-CompleteStrainer Headloss Testing
-Using 2009 Vogtle testAssemble base inputs for CASA Grande 2ndQuarter 2014Complete
-Using NARWHAL instead of CASAGrandeEvaluate Boric Acid Precipitation impacts 3rdQuarter 2015Plan on using PWROG WCAP
-17788Finalize inputs to CASA Grande 3rdQuarter 2015In Progress, Using NARWHAL instead of CASAGrandeComplete Sensitivity Analyses in/for CASA Grande4thQuarter 20152ndQuarter 2016Integrate CASA Grande results into PRA to 1stQuarter 20163rd Quarter 2016Licensing Submittal for VEGPTo be established through discussions with NRC -tentatively September 2016Projected 1 stQuarter 2017, require input from: SE on STP Pilot Project and SE on WCAP
-17788; which are not yet available.
9WHAT WE HAVE LEARNEDContainment sprays only actuate for the largest hot leg breaks under best estimate conditionsThis results in unsubmerged strainers for many breaks because RWST is left with unused waterWide variation in post
-LOCA water levels and sump chemistryAluminum corrosion is greater with sprays operatingPlanned modificationsReduce height of RHR strainers by ~6 inches (remove 2 disks)Change procedures to continue RWST drain down to just below empty level set point when CS does not actuateAllows reduction of Tech Spec min water level by 2% (~1 ft) (increased operating margin)Equivalent to ~2 inches in containment pool levelCombination of these three modifications results in submerged strainers and reduces risk 10RWST LEVELS AND ALARMS(ECCS to Recirculation)(CS to Recirculation)El. 220'-0" Bottom of TankEl. 274'98%93%29%8%(Proposed Change)51.45'(Existing) 11SUBMERGED STRAINER RESULTSBefore ModificationsAfter Modifications~4.97 ftSBLOCA RecircValves open = ~4.75 ftLBLOCA Best Estimate = ~6.6 ftLBLOCA Max = ~8.2 ft~4.425 ftSBLOCA RecircValves open = ~4.5 ftLBLOCA Best Estimate = ~7.9 ftLBLOCA Max = ~8.7 ftAll heights are measured from floorSBLOCA long term = ~5.3 ftSBLOCA long term = ~3.5 ft 12OVERVIEW OF METHODOLOGY Resolution plan modified based on South Texas Project (STP) pilot plant methodologyNo longer planning to perform head loss testing to develop a rule-based head loss model (as presented to the NRC in November 2014)2009 Vogtle head loss testing will be used to determine which breaks contribute to risk quantificationBreaks with debris quantities greater than tested (mass/SA)
*will "fail"Breaks with debris quantities less than tested (mass/SA) will "pass"Will continue to quantify risk by evaluating GSI
-191 failures for number of strainers in operationWill use consensus models/design basis inputs for parameters in the GSI
-191 Risk-Informed Software*Mass/SA = Mass of debris per unit strainer area 13PILOT PLANT COMPARISON (STPVS. VOGTLE)DifferencesPhysical ECCS trainsStrainer configurationContainment Spray SetpointStrainer designStrainer surface areaModeling SoftwareBreak size and orientation samplingStrainer head loss test protocolChemical effects Core blockageTime-dependent comparison to failure criteriaMethod for calculating CDF and LERFSimilaritiesPhysicalLarge dry containment4 Loop Westinghouse NSSSLow density fiberglass insulationTrisodiumphosphate bufferModelingBreak-specific ZOI debris generation Unqualified coatingsDebris transportPast head loss testing to establish debris limitsPenetration testingMass balance of debris on strainer and core 14SOFTWAREBADGER (Break Accident Debris Generation Evaluator)A computer program that automates break ZOI debris generation calculations using CAD softwareNARWHAL (
Nuclear Accident Risk Weighted Analysis)A computer program that evaluates the probability of GSI
-191 failures by holistically analyzing the break
-specific conditions in a time
-dependent manner 15ANALYSIS FLOWCHARTNARWHAL Break Analysis(Strainers)NARWHAL Break Analysis(Core)Strainer Head Loss TestAcceptable MitigationWCAP-17788Strainer PenetrationTestCDFLERFAcceptable Risk: Submit LARNot BoundedBoundedBoundedNot BoundedRG 1.174 Acceptance GuidelinesUnacceptable Risk: Implement Refinements or Modifications 16AGENDA8:30 -Introductions/Purpose of Meeting8:45 -High Level Overview of Vogtle Closure Strategy &What we have learned9:00 -Review of Inputs and Assumptions10:00 -Explanation of Modeling11:30 -Interface with PRA12:15 -Uncertainty Quantification12:45 -Lunch13:45 -Continued Discussion of Inputs and Assumptions14:30 -Continued Discussion of PRA and Uncertainty15:00 -Submittal Documentation15:45 -Closing Remarks 17DEBRIS GENERATIONInsulation and qualified coatingsAutomated analysis with containment CAD model using a tool called BADGERCalculate quantity and size distribution for each type of debrisPartial breaks from 1/2 inch to double-ended guillotine breaks (DEGBs) for all Class 1 welds in containmentZOIs consistent with deterministic approachUnqualified coatings and latent debris quantities are identical for all breaksNukon17DQualified Epoxy
& IOZ with Epoxy topcoat 4DInteram Fire Barrier Material11.7D 18INSULATION AND QUALIFIED COATINGS QUANTITIESBADGER database contains 28,434 breaks at 930 weld locationsBreaks evaluated at each Class 1 ISI weldPartial breaks evaluated in 2 inch increments for smaller break sizes, 1 inch increments for larger break sizes, and 1/2 inch increments for largest break sizesPartial breaks evaluated in 45
°increments around pipeDEGB evaluated at every weldDebris quantities vary significantly across the range of possible breaks, and are calculated for each breakNukon: 0 ft 3to 2,229 ft 3Qualified epoxy: 0 lb mto 219 lb mQualified IOZ: 0 lb mto 65 lbmInteramfire barrier: 0 lb mto 60 lbm 19NUKON DEBRIS GENERATED 20UNQUALIFIED COATINGSTypes of Unqualified Coatings at VogtleInorganic Zinc (IOZ)AlkydEpoxyIOZ, alkyd, and epoxy coatings are assumed to fail as 100% particulateSize distribution for degraded qualified coatings and failure timing no longer being utilized because of the reliance on 2009 head loss testing 21UNQUALIFIED COATINGS LOCATIONSCoatings that fail in upper containment would have a reduced transport fraction for breaks where containment sprays are not initiatedCoating Type Upper Containment Quantity (lbm)Lower Containment Quantity(lbm)Epoxy1,6021,127Alkyd059IOZ2431Total1,6261,217 22CONTAINMENT POOL WATER LEVELSump pool depth is evaluated on a break
-specific basis using conservative inputs to minimize water levelThe evaluation considers break location and size for the appropriate contribution of RWST, RCS and SI accumulators to pool levelPlanning to remove 2 disks from each RHR strainer to reduce overall heightModifying procedures for breaks that don't activate containment spray Continue RWST drain down to just below empty level set pointAllows reduction of Tech Spec RWST min water level by 2% (~1 ft) to increase operator marginStrainers are submerged for all scenarios 23DEBRIS TRANSPORTUsing logic tree approach defined in NEI 04
-07 consistent with industry developed methods for deterministic closureBlowdownWashdownPool fillRecirculationErosion 24TRANSPORT
-WASHDOWNContainment Sprays OnAll fines (fiber and particulate) washed to lower containmentRetention of small and large pieces caught on gratings estimated based on Drywell Debris Transport StudyWashdownto various areas proportional to flow splitContainment Sprays OffAssumed 10% washdown for fines due to condensation and 0% for small pieces 25CONTAINMENT PRESSURE COMPARISONCurves illustrate the basis for containment spray actuation logicFor analysis purposes (NPSH and gas voiding) containment pressure conservatively reduced to saturation pressure when pool temperature is >212 °F and atmospheric when pool temperature is 212
°F or lessAssumption to use for containment spray actuation is not obvious for most breaks/sizes 26FIBER TRANSPORT FRACTIONSTO ONE RHR STRAINER* This pump lineup was evaluated for different break locations. The transport fractions shown are the bounding values for an annulus break near the strainers.
Debris TypeSize1 Train w/
Spray2 Train w/
Spray1 Train w/o Spray2 Train w/o Spray*NukonFines58%29%23%12%Small48%24%5%2%Large6%3%7%4%Intact0%0%0%0%LatentFines58%29%28%14%Strainers in Operation 2412 27PARTICULATE TRANSPORT FRACTIONSTO ONE RHR STRAINERDebris TypeSize1 Train w/ Spray2 Train w/ Spray1 Train w/o Spray2 Train w/oSprayInteramFines, Smalls 58%29%47%23%UnqualifiedEpoxyParticulate 58%29%47%23%UnqualifiedIOZParticulate 58%29%16%8%Unqualified AlkydParticulate 58%29%100%50%Qualified EpoxyParticulate 58%29%23%12%Qualified IOZParticulate 58%29%23%12%Latent dirt/dustParticulate 58%29%28%14%
28CONTAINMENT SPRAY AND POOL pHCombining conditions in a non
-physical way to bound release and precipitationContainment spray from the RWST will use a maximum pH for acidic conditions associated with the minimum RWST boron concentration.The design basis maximum containment pool pH is used for the sprays during recirculation and the containment pool to calculate chemical release. Lower pH values/profiles are used for aluminum solubility to account for lower TSP concentrations, higher boric acid concentrations, and pH effects due to core release and radiolysis
.
29CHEMICAL EFFECTSOverviewChemical precipitate quantities are determined for each breakCorrosion/Dissolution ModelDissolution from insulation and concrete is determined using the WCAP-16530 equationsCorrosion, dissolution and passivation of aluminum metal is determined using the equations developed by Howe et al. (UNM)SolubilityNo credit will be taken for calcium solubilityANL solubility equation (ML091610696, Eq. 4) will be used to credit delayed aluminum precipitation Once temperature limit is reached, all aluminum will precipitate Aluminum is eventually "forced" to precipitate for all breaksPrecipitate SurrogatesWCAP-16530 Calcium PhosphateWCAP-16530 Sodium Aluminum Silicate 30MAXIMUM DEBRIS GENERATEDBounding quantities of Nukon, Interam and qualified coatings for DEGB in Loop 1&4 SG compartmentDebris typeQuantityNotesNukon2,229 ft3Including all size categoriesInteram40 lbm30% fiber and 70% particulateQualified coatings 249 lbmIOZ and epoxyUnqualified coatings2,843 lbmIOZ, alkyd, and epoxyLatent fiber 4 ft315% of total latent debris; 2.4 lbm/ft3Latent particulate 51 lbm85% of total latentdebrisMiscellaneous debris 2 ft2Total surface area of tape and labels 31DEBRIS QUANTITIES AT ONE RHR STRAINERDebris Type2009 Test QuantityBounding Hot Leg Break(two trains with CS)Bounding Cold Leg Break(2 trains,with CS)Bounding Cold Leg Break (single trainwith CS)Nukon106.1ft3337.3 ft3333.6ft3667.3ft3Latent fiber3.9 ft3*1.2 ft31.2 ft32.32 ft3Interam290.3 lbm*12.0 lbm17.4 lbm34.8 lbmQualified coatings696.8 lbm*27.3 lbm72.2 lbm144.4 lbmUnqualified coatings2874.1 lbm*824.5 lbm824.5 lbm1648.9 lb mLatent particulate52.7 lbm*14.8 lbm14.8 lbm29.6 lbmSodium aluminum silicate89.1 lbm~55 lbm~55 lbm~102 lbmCalcium phosphate52.8 lbm~53 lbm~53 lbm~108 lbm* These tested quantities exceed currently estimated values for all breaks under all equipment combinations at Vogtle 322009 STRAINER HEAD LOSS TESTINGTesting consistent with the NRC March 2008 GuidanceTank test with prototypical 7
-disk strainer moduleTotal area of 69 ft 2Walls and suction pipe arranged consistent with plant strainerBounding RHR strainer approach velocity for runout flow rate (4,500 gpm)1 inch submergence for vortex observationsAlionTest Facility 332009 TESTING DEBRIS LOADS Nukondebris quantity based on 7D ZOIChemical precipitates quantity from WCAP-16530The following debris surrogates usedNukon and latent fiber: NukonCoatings: Silicon carbide (4 to 20 micron
)Latent particulate: Silica sand w/ size distribution consistent with NEI 04
-07 Volume 2 (75 to 2000 microns
)Interam fire barrier: Interam E
-54A 342009 TEST PROCEDUREDebris introduction consistent with the NRC March 2008 GuidanceFor thin-bed testing, all particulate added first followed by small batches of fiber finesFor full-load testing, fiber and particulate mixture added in batches with constant particulate to fiber ratioChemical debris batched in lastHead loss allowed to stabilize after each chemical addition 352009 TEST RESULTSDebris LoadThin-bed test head loss (ft)Full-load test head loss (ft)Fiber + Particulate0.6315.462After calcium phosphate 31.656.57After sodium aluminum silicate32.6011.80Note:1.Equivalent bed thickness of 0.625 inches, added in 5 fiber only batches, each 1/8" equivalent thickness 2.Equivalent bed thickness of 1.913 inches, added in 4 batches, each 0.478" equivalent thickness 3.Each chemical separately added in 3 equal batches 36APPLICATION OF 2009 RESULTSTotal conventional debris plus calcium phosphate head loss will be applied at the start of recirculationTotal aluminum precipitate head loss will be applied when temperature decreases to solubility limitHead loss will be scaled as a function of the average approach velocity and temperature based on the results of the flow sweeps performed at the end of the thin-bed and full
-load testsResults will be extrapolated to 30 daysBreaks that exceed the maximum tested fiber quantity, particulate quantity, or chemical precipitate quantity will be assigned a failing head loss value 37STRAINER ACCEPTANCE CRITERIARHR and CS Pump NPSH MarginThe NPSH margin is calculated using break
-specific water level and flow ratesMinimum NPSH margin is 16.6 ft at 210.96F and acontainment pressure of
-0.3 psigStructuralStrainer stress analysis is based on a crush pressure of 24.0 ft for the RHR strainers and 23.0 ft for the CS strainersGas void2% void fraction at pump inlet 38FIBER PENETRATION TESTINGMultiple tank tests were performed at Alden in 2014 for various strainer approach velocities, number of strainer disks and boron / buffer concentrationsNukon prepared into fines per latest NEI GuidanceA curve fit of the test data will be used to evaluate maximum fiber penetration for a 16 disk strainer (RHR) and 14 disk strainer (CS).
3902004006008001000120014001600180005000100001500020000Cumulative Fiber Penetration (g)Cumulative Fiber Addition (g)FIBER PENETRATION RESULTS 40IN-VESSEL EFFECTS Transport/accumulation of fiber to the core that penetrates RHR strainers is dependent on break location and flow path and will be based on WCAP-17788Values for core blockage and boron precipitation acceptance criteria will be based on WCAP
-17788 41EX-VESSEL EFFECTSA bounding evaluation performed for all componentsExisting evaluations will be updated in accordance with WCAP
-16406-P-A,"Evaluation of Downstream Sump Debris Effects in Support of GSI
-191" Revision 1 and the accompanying NRC SER 42LOCADMA bounding calculation performed to cover all scenariosExisting evaluations will be updated in accordance with WCAP-16793-A,"Evaluation of Long-Term Cooling Considering Particulate, Fibrous, and Chemical Debris in the Recirculating Fluid" Revision


2 and the accompanying NRC SER 43AGENDA8:30 -Introductions/Purpose of Meeting8:45 -High Level Overview of Vogtle Closure Strategy &What we have learned9:00 -Review of Inputs and Assumptions10:00 -Explanation of Modeling11:30 -Interface with PRA12:15 -Uncertainty Quantification12:45 -Lunch13:45 -Continued Discussion of Inputs and Assumptions14:30 -Continued Discussion of PRA and Uncertainty15:00 -Submittal Documentation15:45 -Closing Remarks 44GSI-191 ACCEPTANCE CRITERIA Acceptance CriteriaMethod for AddressingDebris exceeds limits for upstream blockage,e.g. refueling canal drainBoundinganalysis
AGENDA
-part of transport calculationStrainer head loss exceeds pump NPSH margin or strainer structural marginBreak-specific analysis based on tested debris limits and maximum tested head lossesGas voids from degasification or flashingexceed strainer/pump limitsBreak-specific analysis based on head loss, pool temperature, etc.Pumps fail due to air intrusion from vortexingBounding analysisPenetrated debris exceeds ex
* 8:30 - Introductions/Purpose of Meeting
-vessel wear and blockage limitsBounding analysisPenetrated debris exceeds in
* 8:45 - High Level Overview of Vogtle Closure Strategy &
-vessel fuel blockage and boron precipitation limitsBreak-specific analysis based on penetration testing and flow splitsDebris accumulation on cladding prevents adequate heat transfer Bounding analysis 45OVERVIEW OF MODELINGGSI-191 phenomena evaluated in a holistic, time
What we have learned
-dependent manner with an evaluation tool called NARWHALDeveloped using object oriented designTracks movement of water and debrisEvaluates each break with incremental time steps up to 30 daysEvaluates range of breaks to determine which ones pass/fail the strainer and core acceptance criteria Uses top-down LOCA frequencies to calculate conditional failure probabilities for small, medium, and large breaks 46OVERVIEW OF MODELINGNARWHAL prototype has been used for preliminary risk-informed evaluations by several plantsVersion 1.0 is currently under development Software requirements, design, implementation, V&V, and user documentation prepared under ENERCON's Appendix B QA programNARWHAL's object oriented design allows users to model unique plant
* 9:00 - Review of Inputs and Assumptions
-specific geometry with a common executable fileSimplifies software maintenance Significantly reduces potential for software errors 47OVERVIEW OF MODELINGRWSTReactorVesselBreakCoreECCSCSSpray NozzlesContainmentCompartmentsSump PoolECCS Strainers 48OVERVIEW OF MODELING 49OVERVIEW OF MODELINGNARWHAL integrates models and inputs from design basis calculations and GSI
* 10:00 - Explanation of Modeling
-191 tests/analyses:Water volumes, temperature profiles, and pH from design basis calculationsDebris quantities from BADGER database Location-specific transport fractions from transport calculationChemical effects calculated using WCAP
* 11:30 - Interface with PRA
-16530 and Howe modelConventional and chemical head loss from 2009 strainer testing (scaled for temperature and flow)NPSH and structural margin from design basis calculationsDegasification calculated using standard physical modelsTime-dependent penetration using data fit from 2014 strainer testingCore failure calculated using WCAP
* 12:15 - Uncertainty Quantification
-17788 model and limits 50OVERVIEW OF MODELING1. Select unique break location, size, and orientation2. ZOI debris quantities from BADGER (insulation and qualified coatings)3. Debris quantities outside ZOI (unqualified coatings, latent, miscellaneous)4. Blowdown transport to containment compartments and sump pool5. Washdown transport from containment compartments to sump pool6. Pool fill transport from sump pool to strainers and inactive cavities7. Recirculation transport from sump pool to strainers8. Debris penetration through strainers9. Debris accumulation on core 51OVERVIEW OF MODELING2. Corrosion/ dissolution of metals, concrete, and debris in sump pool1. Corrosion/ dissolution of metals, concrete, and debris by CS4. Formation of chemical precipitates3. Precipitate solubility limit5. Recirculation transport from sump pool to strainers6. Debris penetration through strainers7. Debris accumulation on core 52OVERVIEW OF MODELING1. Strainer Head Loss (CSHL + Conventional HL + Chemical HL)2. Degasification gas void fraction3. Pump NPSH margin4. Strainer structural margin5a. Does HL Exceed NPSH or structural margin?Yes7a. Fail strainer criteriaNo6a. Pass strainer criteria5b. Does void fraction exceed strainer or pump limits?Yes7b. Fail strainer criteriaNo6b. Pass strainer criteria 53OVERVIEW OF MODELING
* 12:45 - Lunch
: 1. Core debris accumulation 2b. Does quantity exceed blockage limits?Yes3. Fail core criteriaNo4. Pass core criteria2a. Does quantity exceed boron limits?YesNo 54OVERVIEW OF MODELINGAnalytical results showing whether a given break passes or fails are highly dependent on the assumptions and models used to evaluate the breakFor example, if sprays are not initiated for a given break: A smaller fraction of debris is washed down to the containment pool Corrosion/dissolution is reduced (unsubmerged materials)A larger fraction of debris in the pool is transported to the RHR strainersIt is not always obvious what conditions are bounding 55INPUTSInputValuesSensitivityLOCA FrequencyBased on NUREG
* 13:45 - Continued Discussion of Inputs and Assumptions
-1829/PRANeedto address uncertaintyDebris GenerationBased on consensus modelsNoneDebris TransportBased on consensus modelsNoneContainment TempDesign basisNonePool TempDesign basisNoneContainment SprayActivation and DurationCompeting effects (e.g. washdown, strainer surface area, corrosion)
* 14:30 - Continued Discussion of PRA and Uncertainty
Needto run for activation and durationPool Volume/LevelBased on consensus modelsNonePoolpHDesign Basis maximum for corrosion, minimumfor precipitationNoneECCS FlowRatesDesign basis (same for all breaks)NoneAluminum and Calcium CorrosionWCAP-16530 and UNM equationsNoneAluminum PrecipitationANL equationNonePenetration2014 testing Needto address uncertaintyHead LossMaximums Extrapolated and scaled from 2009 tests final valuesNone 56DIFFERENCES (STPVS. VOGTLE)Physical ECCS trains (3 vs 2)Strainer configuration (3 combined vs 4 separate)Containment Spray SetpointStrainer design (flow control vs no flow control)Strainer surface area (~1800 ft 2vs 765 ft
* 15:00 - Submittal Documentation
: 2) 57DIFFERENCES (STPVS. VOGTLE)ModelingRisk Informed Software (CASA Grande/RUFF/FiDOEvs BADGER/NARWHAL)Break size and orientation sampling (Search algorithm vs uniform)Strainer head loss test protocol (flume vs tank)Aluminum and Calcium precipitate quantity (bounding test vs break-specific analysis)Aluminum passivation (not credited vs credited using Howe paper)Core blockage (RELAP5
* 15:45 - Closing Remarks 2
-3D vs WCAP
-17788)Failure criteria (bounding analysis vs time
-dependent comparison of head loss with NPSH
, gas void, and flashing
) GSI-191 risk quantification (critical break size frequency vs conditional failure probability entered into PRA) 58AGENDA8:30 -Introductions/Purpose of Meeting8:45 -High Level Overview of Vogtle Closure Strategy &What we have learned9:00 -Review of Inputs and Assumptions10:00 -Explanation of Modeling11:30 -Interface with PRA12:15 -Uncertainty Quantification12:45 -Lunch13:45 -Continued Discussion of Inputs and Assumptions14:30 -Continued Discussion of PRA and Uncertainty15:00 -Submittal Documentation15:45 -Closing Remarks 59INTERFACE WITH PRAThe change in core damage frequency (CDF) and change in large early release frequency (LERF) due to issues related to GSI
-191 will be determined using:LOCA frequencies from NUREG
-1829 or the Vogtle PRAEquipment configuration logic from PRA model of recordGSI-191 conditional failure probabilities from NARWHALFinal risk calculation will be performed using the Vogtle model of record with GSI
-191 conditional failure probabilities 60INTERFACE WITH PRA1. PRA identification of accident scenarios and equipment configurations that are risk-significant to GSI-1912. NARWHAL evaluation of GSI-191 phenomena for each risk-significant scenario/configuration to determine CFPs for each strainer/core failure basic event3. PRA quantification of CDF & LERF with GSI-191 failures4. PRA quantification of CDF & LERF with no GSI-191 failuresOutput to submittal documentation5. Calculate CDF & LERFYes6. Meets  RG 1.174 Criteria?7a. Identification of analytical refinements to analysisNo7b. Identification of potential plant modifications (physical or procedural) 61METHODOLOGY FOR USING LOCA FREQUENCY TO CALCULATE CONDITIONAL FAILURE PROBABILITYPartition PRA categories (
Catk) into size ranges (SRi)Calculate probability of a LOCA occurring in each size range for every PRA category (P(
SRilCatk))Calculate probability of a LOCA occurring at each weld (Weldj) within each size range (P(WeldjlSRi))Calculate probability estimate for success criteria failure (SCF) at each weld in each size range (P(SCFlWeldj,SRi))Calculate probability estimate for success criteria failure at every PRA category (P(SCFlCatk))
62METHODOLOGYFOR USING LOCA FREQUENCY TO CALCULATE CONDITIONAL FAILURE PROBABILITYPSCFCat=PSRlCatPWeldSRPSCFWeld,SRFrom NUREG-1829 (or Vogtle PRA)From NUREG
-1829 (or Vogtle PRA) using top
-down methodologyFrom NARWHAL 63ILLUSTRATION OF PRA CATEGORIES AND LOCA FREQUENCY SIZE RANGES 64EQUIVALENT DEGB  DIAMETERNUREG-1829,Section3.7:"ThecorrelationswhichrelateflowratesandLOCAsizecategoriestotheeffectivebreaksizesineachPWRandBWRsystemaresummarizedinTable3.8.Thebreaksizecorrespondstoapartialfractureforpipeswithlargerdiametersthanthebreaksize,acompletesingle-endedruptureinpipeswiththesameinsidediameter, oraDEGBinpipeshavinginsidediameters 12timesthebreaksize.AllpanelistsusedthesecorrelationstorelatetheirelicitationresponsesdeterminedfortheeffectivebreaksizestotheappropriateLOCAsizecategory.Itisimportant tostressthatbreakscanoccurineitherLOCAsensitivitypipingornon-pipingsystemsandcomponents
."
65METHOD FOR ADDRESSING DEGB FREQUENCIESNUREG-1829 provides LOCA frequencies vs. break flow rates, which are converted to equivalent diameter break sizesDouble ended guillotine breaks (DEGBs) have a flow rate (area) twice as large as the pipe cross
-sectional areaEquivalent diameter for DEBG is calculated using pipe inner diameter:
DDEGB,EqDpipeDpipeassumed to progress to DEGB for debris generation (bounding debris quantities)Frequency associated with DEGB "tail" assigned to Dpipebreak size to calculate conditional failure probability within each size rangeNUREG-1829 only provides frequencies up to 31" breaks, so frequencies corresponding to primary loop pipe DDEGB,Eqvalues is determined through log
-log extrapolation29" 41.0"31"43.8" 66METHOD FOR ADDRESSING DEGB FREQUENCIES 67EQUIPMENT CONFIGURATIONMost likely situation would be that all equipment is available and fully functionalEquipment failures due to non
-GSI-191 related issues can have a major effect on GSI
-191 phenomena (debris transport, flow splits, temperature and pressure profiles, etc.) There are many possible equipment failure combinations (RHR pumps, containment spray pumps, charging pumps, SI pumps, fan coolers, etc.)At Vogtle, GSI
-191 effects can be reasonably represented or bounded for most equipment failure combinations by the cases where all pumps are running or a single train failure 68EQUIPMENT CONFIGURATIONLBLOCAAll equipment available bounding or reasonably representative for: No pump failures: ~79%1 or 2 CS pump failures: ~18%1 RHR pump failure bounding or reasonably representative for other equipment failure configurations: ~3%The values above are being used to determine which configurations to investigate with NARWHALConditional failure probabilities for GSI
-191 basic events (strainer and core failure) will be manually entered into the PRA model of record to calculate CDF~97%
69CONDITIONAL FAILURE PROBABILITIESCoreconditional failure probability (CFP) higher when all pumps are operatingStrainerCFP higher with 1 train operatingAdditional scenarios will likely need to be evaluated (1 CS pump failure, 1 RHR pump failure, etc.)
70PRA MODEL CHANGESVogtle PRA model modified to incorporate conditional failure probabilities (CFPs) for GSI
-191 strainer failures and core failures with associated initiating events and equipment configurationsGSI-191 "failure" defined using PRA success criteriaStrainer failure defined as failure of RHR pump/strainerCS strainer failures are calculated in NARWHAL, but not used in PRAGSI-191 failures binned into following CFP groups (separate CFPs defined for each LOCA category and each pump state)Core failuresRHR Strainer A failures (without Strainer B or core failures)RHR Strainer B failures (without Strainer A or core failures)RHR Strainer A and B failures (without core failures)Each core and strainer CFP represented in PRA with a basic event that is combined with LOCA initiating event and pump failure logic to represent pump state associated with CFP 71PRA MODEL CHANGES 72AGENDA8:30 -Introductions/Purpose of Meeting8:45 -High Level Overview of Vogtle Closure Strategy &What we have learned9:00 -Review of Inputs and Assumptions10:00 -Explanation of Modeling11:30 -Interface with PRA12:15 -Uncertainty Quantification12:45 -Lunch13:45 -Continued Discussion of Inputs and Assumptions14:30 -Continued Discussion of PRA and Uncertainty15:00 -Submittal Documentation15:45 -Closing Remarks 73UNCERTAINTY QUANTIFICATIONDraft RegGuide 1.229 requires uncertainty quantification for risk-informed GSI-191 evaluationUncertainty quantification also required by RegGuide 1.174Two different approaches that could be used to quantify uncertaintySimplified approach using sensitivity analysisStatisticalsampling of input parameter distributions and propagating uncertainties Consensus inputsand models are considered to have no uncertaintyVogtle inputs that require uncertainty quantificationLOCA frequency valuesPenetration modelContainmentspray activation and durationPossibly others 74UNCERTAINTY QUANTIFICATION USING SENSITIVITY ANALYSIS 75UNCERTAINTY QUANTIFICATION USING STATISTICAL SAMPLING1. Select equipment failure configuration2. Sample all random input values3. Select break location, size, and orientation5. Compare to GSI
-191 acceptance criteria and PRA success criteria to identify strainer or core failures9. Output to PRA model4. Evaluate GSI
-191 phenomena at each time step for 30 days6. Sufficientbreaks evaluated to estimate CFP?No7. Sufficient random samples to estimate CFP PDF?YesNo8. All significant equipment configs. evaluated?YesNoYes 76AGENDA8:30 -Introductions/Purpose of Meeting8:45 -High Level Overview of Vogtle Closure Strategy &What we have learned9:00 -Review of Inputs and Assumptions10:00 -Explanation of Modeling11:30 -Interface with PRA12:15 -Uncertainty Quantification12:45 -Lunch13:45 -Continued Discussion of Inputs and Assumptions14:30 -Continued Discussion of PRA and Uncertainty15:00 -Submittal Documentation15:45 -Closing Remarks 77SUBMITTAL DOCUMENTATION DISCUSSIONPlanning to follow the format, content, and depth of the August 2015 STP LARGL 2004-02 Response following Staff Review Guidance (will have some pointers to risk informed summary)Risk Quantification and SummaryDefense in Depth and safety marginRequests for exemptions (if 10CFR50.46(c) rule is not finalized)10CFR50.46(d)GDC 19 (need being evaluated)GDC 35GDC 38GDC 41GDC 50.67 (need being evaluated)License amendment requestTech Spec markupsTech Spec BasesFSAR markupsList of commitments 78QUALITY ASSURANCEGSI-191 calculations are being revised to be safety related under vendor Appendix B QA programsHead loss testing in 2009 was conducted and documented as safety related under vendor Appendix B QA program Penetration testing was conducted and documented in 2014 as non-safety related following work practices established by vendor Appendix B QA programPRA has undergone an industry peer review per RG 1.200 and the ASME/ANS PRA Standard for CDF and LERF (RA-Sa-2009) 79CONCLUSIONSModels used to analyze GSI
-191 phenomena at Vogtle are consistent with methods accepted for design basis evaluationsPreliminary results indicate that risk associated with GSI-191 is very low 80SCHEDULE UPDATEMILESTONEEXPECTED COMPLETION DATECurrent StatusDevelop containment CAD model to include pipe weldsCompleteCompleteConduct meeting with NRC 3rdQuarter 2013CompleteModify probabilistic risk assessment (PRA) to include Strainer and Core Blockage events 4thQuarter 2013CompletePerform Chemical Effects testing 1stQuarter 2014CompletePerform thermal and hydraulic modeling of RCS, Core, and Containment conditions 1stQuarter 2014CompletePerform Strainer Head Loss and Bypass testing to establish correlation for range of break sizes 2ndQuarter 2014StrainerBypass Testing
-CompleteStrainer Headloss Testing
-Using 2009 Vogtle testAssemble base inputs for CASA Grande 2ndQuarter 2014Complete
-Using NARWHAL instead of CASAGrandeEvaluate Boric Acid Precipitation impacts 3rdQuarter 2015Plan on using PWROG WCAP
-17788Finalize inputs to CASA Grande 3rdQuarter 2015In Progress, Using NARWHAL instead of CASAGrandeComplete Sensitivity Analyses in/for CASA Grande4thQuarter 2015 2ndQuarter 2016Integrate CASA Grande results into PRA to 1stQuarter 2016 3rdQuarter 2016Licensing Submittal for VEGPTo be established through discussions with NRC -tentatively September 2016Projected 1 stQuarter 2017, require input from: SE on STP Pilot Project and SE on WCAP
-17788; which are not yet available.
81AGENDA8:30 -Introductions/Purpose of Meeting8:45 -High Level Overview of Vogtle Closure Strategy &What we have learned9:00 -Review of Inputs and Assumptions10:00 -Explanation of Modeling11:30 -Interface with PRA12:15 -Uncertainty Quantification12:45 -Lunch13:45 -Continued Discussion of Inputs and Assumptions14:30 -Continued Discussion of PRA and Uncertainty15:00 -Submittal Documentation15:45 -Closing Remarks 82BACKUP SLIDES 83EXAMPLE CALCULATIONDetailed physical calculationsBreak Location 11201
-049-16-RB (10.5" DEG hot leg side break in annulus near surge line)1 train operating with containment sprays activatedTransport fractions: MaximumRHR flow rate: 3,700 gpm(design flow)CS duration: 6 HoursDesign basis temperature profile
-Max Safeguards, with pool temperature drop to 90°F at Day 30Minimum water level profileSump pH used for corrosion: 8.1 Containment spray pH during Injection used for corrosion: 4.71pH used for solubility: 7.6Submerged Aluminum Area: 278.7 ft 2Unsubmerged Aluminum Area: 741.3 ft 2Submerged Concrete: 2,813 ft 2Aluminum Metal Release equations
-WCAP 16530 Aluminum Solubility Equation
-ANL Aluminum Solubility EquationAluminum Solubility: Timing Only 84BREAK LOCATION 85POOL LEVEL 86FIBER TRANSPORT TO ONE RHR STRAINER (1 TRAIN W/SPRAY)*Transport fraction takes into account time
-dependent transport (CS strainer active for 6 hours)**Combined fraction of fines due to erosion and intact pieces Debris Type SizeDG Quantity (ft3)Transport Fraction*
Quantity(ft3)NukonFines9.558%6.1Small32.77%**1.5**Large14.84%**0.6**Intact15.90%0.0Total72.98.2LatentFines12.558%7.8Total85.416.0 87PARTICULATE TRANSPORT TO ONE RHR STRAINER (1 TRAIN W/SPRAY)Debris TypeSizeDG Quantity (
lbm)TransportFractionQuantity(lbm)InteramFines, Smalls121.258%70.3UnqualifiedEpoxyParticulate2,602.058%1,509.2UnqualifiedIOZParticulate25.058%14.5Unqualified AlkydParticulate32.058%18.6Qualified EpoxyParticulate7.558%4.4Qualified IOZParticulate2.458%1.4Latent dirt/dustParticulate170.058%98.6Total2,960.11,717.0 88CHEMICAL PRECIPITATE QUANTITIES 89ALUMINUM CONCENTRATION AND SOLUBILITY 90HEAD LOSSClean strainer head loss: Bounding value of 0.162 ftat 4,500 gpmConventional head loss Head loss due to chemical precipitates* Values scaled to 16 disk RHR strainer area** Corrected to 3700 gpmand 90°F*** Applied at switchover to hot leg recirculationHead Loss TypeTransported QuantityMaxTested Quantity*Head LossCorresponding to Max Tested Quantity(Unadjusted)Head Losswith Flow and TemperatureCorrection**Fiber16.0ft3109.9ft35.46 ft4.41 ftParticulate1,717.0 lb m3,914.5 lb mCalcium Phosphate9.6 lbm52.8 lbm1.11 ft0.90ftSodium Aluminum Silicate74.5 lbm89.0 lbm5.24 ft4.23 ftExtrapolation to30 days2.13 ft***1.72 ft 91Short Term:                              Long Term: VOID FRACTION AT RHRPUMP 92DEBRIS TRACKING100% capture of particulate and precipitate at strainerPenetration modeled based on test data curve fitsAll fiber is treated as fines 93CORE ACCUMULATION 94SUMMARYCriteriaAcceptance CriteriaExample Results ExamplePass/FailNPSH Margin16.6 ft11.3 ftPassStrainer Structural Margin24.7 ft11.3 ftPassPartial SubmergenceHead loss lessthan 1/2 submerged heightFully submergedPassGas Void Fraction2% at the pump0.24% at the pumpPassDebris LimitExceeds what was testedNot exceededPassAssumed core limits (to be replaced with WCAP-17788 criteria)75 g/FA forHot Leg Breaks7.5 g/FA for Cold Leg Breaks32 g/FAN/APass NOVEMBER 5, 2015VOGTLE GSI
-191 RESOLUTION PLAN AND CURRENT STATUSNRC PUBLIC MEETING 2AGENDA8:30 -Introductions/Purpose of Meeting8:45 -High Level Overview of Vogtle Closure Strategy &What we have learned9:00 -Review of Inputs and Assumptions10:00 -Explanation of Modeling11:30 -Interface with PRA12:15 -Uncertainty Quantification12:45 -Lunch13:45 -Continued Discussion of Inputs and Assumptions14:30 -Continued Discussion of PRA and Uncertainty15:00 -Submittal Documentation15:45 -Closing Remarks 3PURPOSE OF MEETINGObtain staff feedback on the overall GSI
-191 resolution path for VogtleDiscuss proposed plant modificationsDiscuss use of design basis (vs. best estimate) inputs in the evaluation 4VOGTLE PLANT LAYOUTWestinghouse 4
-loop PWR (3,626 MWt per unit)Large dry containmentTwo redundant ECCS and CS trainsEach train has an RHR pump, a high head pump, an intermediate head SI pump, and a CS pumpSI and high head pumps piggyback off of the RHR pump discharge during recirculation.Maximum design flow rates:RHR 3,700 gpm/pumpCS 2,600 gpm/pumpTwo independent and redundant containment air cooling trains 5STRAINER ARRANGEMENTTwo RHR and CS pumps each with their own strainerEach GE strainer is similar with four stacks of disksRHR strainer: 18
-disk tall, 765 ft2, 5 fttallCS strainer: 14
-disk tall, 590 ft2, 4 fttallPerforated plate with 3/32" diameter holesRHR BCS BRHR ACS A 6PLANT RESPONSE TO LOCASPlant response includes the following general actions: Accumulators inject (breaks larger than 2 inches)ECCS injection is initiated from the RWST to the cold legs via RHR, SI, and High Head pumpsContainment spray is initiated from the RWST via CS pumps RHR pumps switched to cold leg recirculation at RWST lo-lo alarmCS pumps switched to recirculation at RWST empty alarmCS pumps secured no earlier than 1.5 hours after start of recirculation, and probably before 6 hours depending on pressure and dose rateRHR pumps switched to hot leg recirculation at 7.5 hours 7AGENDA8:30 -Introductions/Purpose of Meeting8:45 -High Level Overview of Vogtle Closure Strategy &What we have learned9:00 -Review of Inputs and Assumptions10:00 -Explanation of Modeling11:30 -Interface with PRA12:15 -Uncertainty Quantification12:45 -Lunch13:45 -Continued Discussion of Inputs and Assumptions14:30 -Continued Discussion of PRA and Uncertainty15:00 -Submittal Documentation15:45 -Closing Remarks 8SCHEDULE UPDATEMILESTONEEXPECTED COMPLETION DATECurrent StatusDevelop containment CAD model to include pipe weldsCompleteCompleteConduct meeting with NRC 3rdQuarter 2013CompleteModify probabilistic risk assessment (PRA) to include Strainer and Core Blockage events 4thQuarter 2013CompletePerform Chemical Effects testing 1stQuarter 2014CompletePerform thermal and hydraulic modeling of RCS, Core, and Containment conditions 1stQuarter 2014CompletePerform Strainer Head Loss and Bypass testing to establish correlation for range of break sizes 2ndQuarter 2014StrainerBypass Testing
-CompleteStrainer Headloss Testing
-Using 2009 Vogtle testAssemble base inputs for CASA Grande 2ndQuarter 2014Complete
-Using NARWHAL instead of CASAGrandeEvaluate Boric Acid Precipitation impacts 3rdQuarter 2015Plan on using PWROG WCAP
-17788Finalize inputs to CASA Grande 3rdQuarter 2015In Progress, Using NARWHAL instead of CASAGrandeComplete Sensitivity Analyses in/for CASA Grande4thQuarter 20152ndQuarter 2016Integrate CASA Grande results into PRA to 1stQuarter 20163rd Quarter 2016Licensing Submittal for VEGPTo be established through discussions with NRC -tentatively September 2016Projected 1 stQuarter 2017, require input from: SE on STP Pilot Project and SE on WCAP
-17788; which are not yet available.
9WHAT WE HAVE LEARNEDContainment sprays only actuate for the largest hot leg breaks under best estimate conditionsThis results in unsubmerged strainers for many breaks because RWST is left with unused waterWide variation in post
-LOCA water levels and sump chemistryAluminum corrosion is greater with sprays operatingPlanned modificationsReduce height of RHR strainers by ~6 inches (remove 2 disks)Change procedures to continue RWST drain down to just below empty level set point when CS does not actuateAllows reduction of Tech Spec min water level by 2% (~1 ft) (increased operating margin)Equivalent to ~2 inches in containment pool levelCombination of these three modifications results in submerged strainers and reduces risk 10RWST LEVELS AND ALARMS(ECCS to Recirculation)(CS to Recirculation)El. 220'-0" Bottom of TankEl. 274'98%93%29%8%(Proposed Change)51.45'(Existing) 11SUBMERGED STRAINER RESULTSBefore ModificationsAfter Modifications~4.97 ftSBLOCA RecircValves open = ~4.75 ftLBLOCA Best Estimate = ~6.6 ftLBLOCA Max = ~8.2 ft~4.425 ftSBLOCA RecircValves open = ~4.5 ftLBLOCA Best Estimate = ~7.9 ftLBLOCA Max = ~8.7 ftAll heights are measured from floorSBLOCA long term = ~5.3 ftSBLOCA long term = ~3.5 ft 12OVERVIEW OF METHODOLOGY Resolution plan modified based on South Texas Project (STP) pilot plant methodologyNo longer planning to perform head loss testing to develop a rule-based head loss model (as presented to the NRC in November 2014)2009 Vogtle head loss testing will be used to determine which breaks contribute to risk quantificationBreaks with debris quantities greater than tested (mass/SA)
*will "fail"Breaks with debris quantities less than tested (mass/SA) will "pass"Will continue to quantify risk by evaluating GSI
-191 failures for number of strainers in operationWill use consensus models/design basis inputs for parameters in the GSI
-191 Risk-Informed Software*Mass/SA = Mass of debris per unit strainer area 13PILOT PLANT COMPARISON (STPVS. VOGTLE)DifferencesPhysical ECCS trainsStrainer configurationContainment Spray SetpointStrainer designStrainer surface areaModeling SoftwareBreak size and orientation samplingStrainer head loss test protocolChemical effects Core blockageTime-dependent comparison to failure criteriaMethod for calculating CDF and LERFSimilaritiesPhysicalLarge dry containment4 Loop Westinghouse NSSSLow density fiberglass insulationTrisodiumphosphate bufferModelingBreak-specific ZOI debris generation Unqualified coatingsDebris transportPast head loss testing to establish debris limitsPenetration testingMass balance of debris on strainer and core 14SOFTWAREBADGER (Break Accident Debris Generation Evaluator)A computer program that automates break ZOI debris generation calculations using CAD softwareNARWHAL (
Nuclear Accident Risk Weighted Analysis)A computer program that evaluates the probability of GSI
-191 failures by holistically analyzing the break
-specific conditions in a time
-dependent manner 15ANALYSIS FLOWCHARTNARWHAL Break Analysis(Strainers)NARWHAL Break Analysis(Core)Strainer Head Loss TestAcceptable MitigationWCAP-17788Strainer PenetrationTestCDFLERFAcceptable Risk: Submit LARNot BoundedBoundedBoundedNot BoundedRG 1.174 Acceptance GuidelinesUnacceptable Risk: Implement Refinements or Modifications 16AGENDA8:30 -Introductions/Purpose of Meeting8:45 -High Level Overview of Vogtle Closure Strategy &What we have learned9:00 -Review of Inputs and Assumptions10:00 -Explanation of Modeling11:30 -Interface with PRA12:15 -Uncertainty Quantification12:45 -Lunch13:45 -Continued Discussion of Inputs and Assumptions14:30 -Continued Discussion of PRA and Uncertainty15:00 -Submittal Documentation15:45 -Closing Remarks 17DEBRIS GENERATIONInsulation and qualified coatingsAutomated analysis with containment CAD model using a tool called BADGERCalculate quantity and size distribution for each type of debrisPartial breaks from 1/2 inch to double-ended guillotine breaks (DEGBs) for all Class 1 welds in containmentZOIs consistent with deterministic approachUnqualified coatings and latent debris quantities are identical for all breaksNukon17DQualified Epoxy
& IOZ with Epoxy topcoat 4DInteram Fire Barrier Material11.7D 18INSULATION AND QUALIFIED COATINGS QUANTITIESBADGER database contains 28,434 breaks at 930 weld locationsBreaks evaluated at each Class 1 ISI weldPartial breaks evaluated in 2 inch increments for smaller break sizes, 1 inch increments for larger break sizes, and 1/2 inch increments for largest break sizesPartial breaks evaluated in 45
°increments around pipeDEGB evaluated at every weldDebris quantities vary significantly across the range of possible breaks, and are calculated for each breakNukon: 0 ft 3to 2,229 ft 3Qualified epoxy: 0 lb mto 219 lb mQualified IOZ: 0 lb mto 65 lbmInteramfire barrier: 0 lb mto 60 lbm 19NUKON DEBRIS GENERATED 20UNQUALIFIED COATINGSTypes of Unqualified Coatings at VogtleInorganic Zinc (IOZ)AlkydEpoxyIOZ, alkyd, and epoxy coatings are assumed to fail as 100% particulateSize distribution for degraded qualified coatings and failure timing no longer being utilized because of the reliance on 2009 head loss testing 21UNQUALIFIED COATINGS LOCATIONSCoatings that fail in upper containment would have a reduced transport fraction for breaks where containment sprays are not initiatedCoating Type Upper Containment Quantity (lbm)Lower Containment Quantity(lbm)Epoxy1,6021,127Alkyd059IOZ2431Total1,6261,217 22CONTAINMENT POOL WATER LEVELSump pool depth is evaluated on a break
-specific basis using conservative inputs to minimize water levelThe evaluation considers break location and size for the appropriate contribution of RWST, RCS and SI accumulators to pool levelPlanning to remove 2 disks from each RHR strainer to reduce overall heightModifying procedures for breaks that don't activate containment spray Continue RWST drain down to just below empty level set pointAllows reduction of Tech Spec RWST min water level by 2% (~1 ft) to increase operator marginStrainers are submerged for all scenarios 23DEBRIS TRANSPORTUsing logic tree approach defined in NEI 04
-07 consistent with industry developed methods for deterministic closureBlowdownWashdownPool fillRecirculationErosion 24TRANSPORT
-WASHDOWNContainment Sprays OnAll fines (fiber and particulate) washed to lower containmentRetention of small and large pieces caught on gratings estimated based on Drywell Debris Transport StudyWashdownto various areas proportional to flow splitContainment Sprays OffAssumed 10% washdown for fines due to condensation and 0% for small pieces 25CONTAINMENT PRESSURE COMPARISONCurves illustrate the basis for containment spray actuation logicFor analysis purposes (NPSH and gas voiding) containment pressure conservatively reduced to saturation pressure when pool temperature is >212 °F and atmospheric when pool temperature is 212
°F or lessAssumption to use for containment spray actuation is not obvious for most breaks/sizes 26FIBER TRANSPORT FRACTIONSTO ONE RHR STRAINER* This pump lineup was evaluated for different break locations. The transport fractions shown are the bounding values for an annulus break near the strainers.
Debris TypeSize1 Train w/
Spray2 Train w/
Spray1 Train w/o Spray2 Train w/o Spray*NukonFines58%29%23%12%Small48%24%5%2%Large6%3%7%4%Intact0%0%0%0%LatentFines58%29%28%14%Strainers in Operation 2412 27PARTICULATE TRANSPORT FRACTIONSTO ONE RHR STRAINERDebris TypeSize1 Train w/ Spray2 Train w/ Spray1 Train w/o Spray2 Train w/oSprayInteramFines, Smalls 58%29%47%23%UnqualifiedEpoxyParticulate 58%29%47%23%UnqualifiedIOZParticulate 58%29%16%8%Unqualified AlkydParticulate 58%29%100%50%Qualified EpoxyParticulate 58%29%23%12%Qualified IOZParticulate 58%29%23%12%Latent dirt/dustParticulate 58%29%28%14%
28CONTAINMENT SPRAY AND POOL pHCombining conditions in a non
-physical way to bound release and precipitationContainment spray from the RWST will use a maximum pH for acidic conditions associated with the minimum RWST boron concentration.The design basis maximum containment pool pH is used for the sprays during recirculation and the containment pool to calculate chemical release. Lower pH values/profiles are used for aluminum solubility to account for lower TSP concentrations, higher boric acid concentrations, and pH effects due to core release and radiolysis
.
29CHEMICAL EFFECTSOverviewChemical precipitate quantities are determined for each breakCorrosion/Dissolution ModelDissolution from insulation and concrete is determined using the WCAP-16530 equationsCorrosion, dissolution and passivation of aluminum metal is determined using the equations developed by Howe et al. (UNM)SolubilityNo credit will be taken for calcium solubilityANL solubility equation (ML091610696, Eq. 4) will be used to credit delayed aluminum precipitation Once temperature limit is reached, all aluminum will precipitate Aluminum is eventually "forced" to precipitate for all breaksPrecipitate SurrogatesWCAP-16530 Calcium PhosphateWCAP-16530 Sodium Aluminum Silicate 30MAXIMUM DEBRIS GENERATEDBounding quantities of Nukon, Interam and qualified coatings for DEGB in Loop 1&4 SG compartmentDebris typeQuantityNotesNukon2,229 ft3Including all size categoriesInteram40 lbm30% fiber and 70% particulateQualified coatings 249 lbmIOZ and epoxyUnqualified coatings2,843 lbmIOZ, alkyd, and epoxyLatent fiber 4 ft315% of total latent debris; 2.4 lbm/ft3Latent particulate 51 lbm85% of total latentdebrisMiscellaneous debris 2 ft2Total surface area of tape and labels 31DEBRIS QUANTITIES AT ONE RHR STRAINERDebris Type2009 Test QuantityBounding Hot Leg Break(two trains with CS)Bounding Cold Leg Break(2 trains,with CS)Bounding Cold Leg Break (single trainwith CS)Nukon106.1ft3337.3 ft3333.6ft3667.3ft3Latent fiber3.9 ft3*1.2 ft31.2 ft32.32 ft3Interam290.3 lbm*12.0 lbm17.4 lbm34.8 lbmQualified coatings696.8 lbm*27.3 lbm72.2 lbm144.4 lbmUnqualified coatings2874.1 lbm*824.5 lbm824.5 lbm1648.9 lb mLatent particulate52.7 lbm*14.8 lbm14.8 lbm29.6 lbmSodium aluminum silicate89.1 lbm~55 lbm~55 lbm~102 lbmCalcium phosphate52.8 lbm~53 lbm~53 lbm~108 lbm* These tested quantities exceed currently estimated values for all breaks under all equipment combinations at Vogtle 322009 STRAINER HEAD LOSS TESTINGTesting consistent with the NRC March 2008 GuidanceTank test with prototypical 7
-disk strainer moduleTotal area of 69 ft 2Walls and suction pipe arranged consistent with plant strainerBounding RHR strainer approach velocity for runout flow rate (4,500 gpm)1 inch submergence for vortex observationsAlionTest Facility 332009 TESTING DEBRIS LOADS Nukondebris quantity based on 7D ZOIChemical precipitates quantity from WCAP-16530The following debris surrogates usedNukon and latent fiber: NukonCoatings: Silicon carbide (4 to 20 micron
)Latent particulate: Silica sand w/ size distribution consistent with NEI 04
-07 Volume 2 (75 to 2000 microns
)Interam fire barrier: Interam E
-54A 342009 TEST PROCEDUREDebris introduction consistent with the NRC March 2008 GuidanceFor thin-bed testing, all particulate added first followed by small batches of fiber finesFor full-load testing, fiber and particulate mixture added in batches with constant particulate to fiber ratioChemical debris batched in lastHead loss allowed to stabilize after each chemical addition 352009 TEST RESULTSDebris LoadThin-bed test head loss (ft)Full-load test head loss (ft)Fiber + Particulate0.6315.462After calcium phosphate 31.656.57After sodium aluminum silicate32.6011.80Note:1.Equivalent bed thickness of 0.625 inches, added in 5 fiber only batches, each 1/8" equivalent thickness 2.Equivalent bed thickness of 1.913 inches, added in 4 batches, each 0.478" equivalent thickness 3.Each chemical separately added in 3 equal batches 36APPLICATION OF 2009 RESULTSTotal conventional debris plus calcium phosphate head loss will be applied at the start of recirculationTotal aluminum precipitate head loss will be applied when temperature decreases to solubility limitHead loss will be scaled as a function of the average approach velocity and temperature based on the results of the flow sweeps performed at the end of the thin-bed and full
-load testsResults will be extrapolated to 30 daysBreaks that exceed the maximum tested fiber quantity, particulate quantity, or chemical precipitate quantity will be assigned a failing head loss value 37STRAINER ACCEPTANCE CRITERIARHR and CS Pump NPSH MarginThe NPSH margin is calculated using break
-specific water level and flow ratesMinimum NPSH margin is 16.6 ft at 210.96F and acontainment pressure of
-0.3 psigStructuralStrainer stress analysis is based on a crush pressure of 24.0 ft for the RHR strainers and 23.0 ft for the CS strainersGas void2% void fraction at pump inlet 38FIBER PENETRATION TESTINGMultiple tank tests were performed at Alden in 2014 for various strainer approach velocities, number of strainer disks and boron / buffer concentrationsNukon prepared into fines per latest NEI GuidanceA curve fit of the test data will be used to evaluate maximum fiber penetration for a 16 disk strainer (RHR) and 14 disk strainer (CS).
3902004006008001000120014001600180005000100001500020000Cumulative Fiber Penetration (g)Cumulative Fiber Addition (g)FIBER PENETRATION RESULTS 40IN-VESSEL EFFECTS Transport/accumulation of fiber to the core that penetrates RHR strainers is dependent on break location and flow path and will be based on WCAP-17788Values for core blockage and boron precipitation acceptance criteria will be based on WCAP
-17788 41EX-VESSEL EFFECTSA bounding evaluation performed for all componentsExisting evaluations will be updated in accordance with WCAP
-16406-P-A,"Evaluation of Downstream Sump Debris Effects in Support of GSI
-191" Revision 1 and the accompanying NRC SER 42LOCADMA bounding calculation performed to cover all scenariosExisting evaluations will be updated in accordance with WCAP-16793-A,"Evaluation of Long-Term Cooling Considering Particulate, Fibrous, and Chemical Debris in the Recirculating Fluid" Revision


2 and the accompanying NRC SER 43AGENDA8:30 -Introductions/Purpose of Meeting8:45 -High Level Overview of Vogtle Closure Strategy &What we have learned9:00 -Review of Inputs and Assumptions10:00 -Explanation of Modeling11:30 -Interface with PRA12:15 -Uncertainty
PURPOSE OF MEETING
* Obtain staff feedback on the overall GSI-191 resolution path for Vogtle
* Discuss proposed plant modifications
* Discuss use of design basis (vs. best estimate) inputs in the evaluation 3
 
VOGTLE PLANT LAYOUT
* Westinghouse 4-loop PWR (3,626 MWt per unit)
* Large dry containment
* Two redundant ECCS and CS trains
* Each train has an RHR pump, a high head pump, an intermediate head SI pump, and a CS pump
* SI and high head pumps piggyback off of the RHR pump discharge during recirculation.
* Maximum design flow rates:
* RHR 3,700 gpm/pump
* CS 2,600 gpm/pump
* Two independent and redundant containment air cooling trains 4
 
STRAINER ARRANGEMENT
* Two RHR and CS pumps each with their own strainer
* Each GE strainer is similar with four stacks of disks
* RHR strainer: 18-disk tall, 765 ft2, 5 ft tall          RHR B
* CS strainer: 14-disk tall, 590 ft2, 4 ft tall            CS B
* Perforated plate with CS A 3/32 diameter holes                RHR A 5
 
PLANT RESPONSE TO LOCAS
* Plant response includes the following general actions:
* Accumulators inject (breaks larger than 2 inches)
* ECCS injection is initiated from the RWST to the cold legs via RHR, SI, and High Head pumps
* Containment spray is initiated from the RWST via CS pumps
* RHR pumps switched to cold leg recirculation at RWST lo-lo alarm
* CS pumps switched to recirculation at RWST empty alarm
* CS pumps secured no earlier than 1.5 hours after start of recirculation, and probably before 6 hours depending on pressure and dose rate
* RHR pumps switched to hot leg recirculation at 7.5 hours 6
 
AGENDA
* 8:30 - Introductions/Purpose of Meeting
* 8:45 - High Level Overview of Vogtle Closure Strategy &
What we have learned
* 9:00 - Review of Inputs and Assumptions
* 10:00 - Explanation of Modeling
* 11:30 - Interface with PRA
* 12:15 - Uncertainty Quantification
* 12:45 - Lunch
* 13:45 - Continued Discussion of Inputs and Assumptions
* 14:30 - Continued Discussion of PRA and Uncertainty
* 15:00 - Submittal Documentation
* 15:45 - Closing Remarks 7
 
SCHEDULE UPDATE      EXPECTED MILESTONE                                                          Current Status COMPLETION DATE Develop containment CAD model to include Complete                            Complete pipe welds Conduct meeting with NRC                          3rd Quarter 2013                        Complete Modify probabilistic risk assessment (PRA) to 4th Quarter 2013                        Complete include Strainer and Core Blockage events Perform Chemical Effects testing                  1st Quarter 2014                        Complete Perform thermal and hydraulic modeling of RCS, 1st Quarter 2014                        Complete Core, and Containment conditions Perform Strainer Head Loss and Bypass testing to                            Strainer Bypass Testing - Complete 2nd Quarter 2014 establish correlation for range of break sizes                        Strainer Headloss Testing - Using 2009 Vogtle test Assemble base inputs for CASA Grande              2nd Quarter 2014 Complete - Using NARWHAL instead of CASA Grande Evaluate Boric Acid Precipitation impacts        3rd Quarter 2015          Plan on using PWROG WCAP-17788 Finalize inputs to CASA Grande                    3rd Quarter 2015 In Progress, Using NARWHAL instead of CASA Grande Complete Sensitivity Analyses in/for CASA 4th Quarter 2015                    2nd Quarter 2016 Grande Integrate CASA Grande results into PRA to 1st Quarter 2016                    3rd Quarter 2016 determine CDF and LERF To be established through        Projected 1st Quarter 2017, require input from:
Licensing Submittal for VEGP                      discussions with    SE on STP Pilot Project and SE on WCAP-17788; NRC - tentatively              which are not yet available.
September 2016 8
 
WHAT WE HAVE LEARNED
* Containment sprays only actuate for the largest hot leg breaks under best estimate conditions
* This results in unsubmerged strainers for many breaks because RWST is left with unused water
* Wide variation in post-LOCA water levels and sump chemistry
* Aluminum corrosion is greater with sprays operating
* Planned modifications
* Reduce height of RHR strainers by ~6 inches (remove 2 disks)
* Change procedures to continue RWST drain down to just below empty level set point when CS does not actuate
* Allows reduction of Tech Spec min water level by 2% (~1 ft)
(increased operating margin)
* Equivalent to ~2 inches in containment pool level
* Combination of these three modifications results in submerged strainers and reduces risk 9
 
RWST LEVELS AND ALARMS El. 274 98%
93%
51.45 (Existing)
(Proposed Change)
(ECCS to Recirculation) 29%
(CS to Recirculation) 8%
El. 220-0 Bottom of Tank 10
 
SUBMERGED STRAINER RESULTS Before Modifications                                After Modifications LBLOCA Max =                                  LBLOCA Max =
                                ~8.2 ft                                        ~8.7 ft LBLOCA Best                                    LBLOCA Best Estimate = ~6.6 ft                            Estimate = ~7.9 ft SBLOCA Recirc                                      SBLOCA long Valves open =                                      term = ~5.3 ft
~4.97 ft
                                ~4.75 ft SBLOCA SBLOCA long Recirc Valves term = ~3.5 ft open = ~4.5 ft
                                              ~4.425 ft All heights are measured from floor 11
 
OVERVIEW OF METHODOLOGY
* Resolution plan modified based on South Texas Project (STP) pilot plant methodology
* No longer planning to perform head loss testing to develop a rule-based head loss model (as presented to the NRC in November 2014)
* 2009 Vogtle head loss testing will be used to determine which breaks contribute to risk quantification
* Breaks with debris quantities greater than tested (mass/SA)* will fail
* Breaks with debris quantities less than tested (mass/SA) will pass
* Will continue to quantify risk by evaluating GSI-191 failures for number of strainers in operation
* Will use consensus models/design basis inputs for parameters in the GSI-191 Risk-Informed Software
      *Mass/SA = Mass of debris per unit strainer area 12
 
PILOT PLANT COMPARISON (STP VS.
VOGTLE)
Differences                          Similarities
* Physical
* Physical
* ECCS trains
* Large dry containment
* Strainer configuration
* 4 Loop Westinghouse NSSS
* Containment Spray Setpoint
* Low density fiberglass insulation
* Strainer design
* Trisodium phosphate buffer
* Strainer surface area
* Modeling
* Modeling
* Software
* Break-specific ZOI debris
* Break size and orientation          generation sampling
* Unqualified coatings
* Strainer head loss test protocol
* Debris transport
* Chemical effects
* Past head loss testing to
* Core blockage                        establish debris limits
* Time-dependent comparison to
* Penetration testing failure criteria
* Mass balance of debris on
* Method for calculating CDF          strainer and core and LERF 13
 
SOFTWARE
* BADGER (Break Accident Debris Generation Evaluator)
* A computer program that automates break

Latest revision as of 04:25, 31 October 2019

GSI-191 Resolution Plan and Current Status, NRC Public Meeting, November 5, 2015, Revised Meeting Handouts
ML15320A087
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 11/05/2015
From:
Southern Nuclear Company
To:
Office of Nuclear Reactor Regulation
References
Download: ML15320A087 (94)


Text

VOGTLE GSI-191 RESOLUTION PLAN AND CURRENT STATUS NRC PUBLIC MEETING NOVEMBER 5, 2015

AGENDA

  • 8:30 - Introductions/Purpose of Meeting
  • 8:45 - High Level Overview of Vogtle Closure Strategy &

What we have learned

  • 9:00 - Review of Inputs and Assumptions
  • 10:00 - Explanation of Modeling
  • 11:30 - Interface with PRA
  • 12:15 - Uncertainty Quantification
  • 12:45 - Lunch
  • 13:45 - Continued Discussion of Inputs and Assumptions
  • 14:30 - Continued Discussion of PRA and Uncertainty
  • 15:00 - Submittal Documentation
  • 15:45 - Closing Remarks 2

PURPOSE OF MEETING

  • Obtain staff feedback on the overall GSI-191 resolution path for Vogtle
  • Discuss proposed plant modifications
  • Discuss use of design basis (vs. best estimate) inputs in the evaluation 3

VOGTLE PLANT LAYOUT

  • Large dry containment
  • Two redundant ECCS and CS trains
  • Each train has an RHR pump, a high head pump, an intermediate head SI pump, and a CS pump
  • SI and high head pumps piggyback off of the RHR pump discharge during recirculation.
  • Maximum design flow rates:
  • RHR 3,700 gpm/pump
  • CS 2,600 gpm/pump
  • Two independent and redundant containment air cooling trains 4

STRAINER ARRANGEMENT

  • Two RHR and CS pumps each with their own strainer
  • Each GE strainer is similar with four stacks of disks
  • RHR strainer: 18-disk tall, 765 ft2, 5 ft tall RHR B
  • CS strainer: 14-disk tall, 590 ft2, 4 ft tall CS B
  • Perforated plate with CS A 3/32 diameter holes RHR A 5

PLANT RESPONSE TO LOCAS

  • Plant response includes the following general actions:
  • ECCS injection is initiated from the RWST to the cold legs via RHR, SI, and High Head pumps
  • RHR pumps switched to cold leg recirculation at RWST lo-lo alarm
  • CS pumps switched to recirculation at RWST empty alarm
  • CS pumps secured no earlier than 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> after start of recirculation, and probably before 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> depending on pressure and dose rate
  • RHR pumps switched to hot leg recirculation at 7.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 6

AGENDA

  • 8:30 - Introductions/Purpose of Meeting
  • 8:45 - High Level Overview of Vogtle Closure Strategy &

What we have learned

  • 9:00 - Review of Inputs and Assumptions
  • 10:00 - Explanation of Modeling
  • 11:30 - Interface with PRA
  • 12:15 - Uncertainty Quantification
  • 12:45 - Lunch
  • 13:45 - Continued Discussion of Inputs and Assumptions
  • 14:30 - Continued Discussion of PRA and Uncertainty
  • 15:00 - Submittal Documentation
  • 15:45 - Closing Remarks 7

SCHEDULE UPDATE EXPECTED MILESTONE Current Status COMPLETION DATE Develop containment CAD model to include Complete Complete pipe welds Conduct meeting with NRC 3rd Quarter 2013 Complete Modify probabilistic risk assessment (PRA) to 4th Quarter 2013 Complete include Strainer and Core Blockage events Perform Chemical Effects testing 1st Quarter 2014 Complete Perform thermal and hydraulic modeling of RCS, 1st Quarter 2014 Complete Core, and Containment conditions Perform Strainer Head Loss and Bypass testing to Strainer Bypass Testing - Complete 2nd Quarter 2014 establish correlation for range of break sizes Strainer Headloss Testing - Using 2009 Vogtle test Assemble base inputs for CASA Grande 2nd Quarter 2014 Complete - Using NARWHAL instead of CASA Grande Evaluate Boric Acid Precipitation impacts 3rd Quarter 2015 Plan on using PWROG WCAP-17788 Finalize inputs to CASA Grande 3rd Quarter 2015 In Progress, Using NARWHAL instead of CASA Grande Complete Sensitivity Analyses in/for CASA 4th Quarter 2015 2nd Quarter 2016 Grande Integrate CASA Grande results into PRA to 1st Quarter 2016 3rd Quarter 2016 determine CDF and LERF To be established through Projected 1st Quarter 2017, require input from:

Licensing Submittal for VEGP discussions with SE on STP Pilot Project and SE on WCAP-17788; NRC - tentatively which are not yet available.

September 2016 8

WHAT WE HAVE LEARNED

  • Containment sprays only actuate for the largest hot leg breaks under best estimate conditions
  • This results in unsubmerged strainers for many breaks because RWST is left with unused water
  • Wide variation in post-LOCA water levels and sump chemistry
  • Aluminum corrosion is greater with sprays operating
  • Planned modifications
  • Reduce height of RHR strainers by ~6 inches (remove 2 disks)
  • Change procedures to continue RWST drain down to just below empty level set point when CS does not actuate
  • Allows reduction of Tech Spec min water level by 2% (~1 ft)

(increased operating margin)

  • Equivalent to ~2 inches in containment pool level
  • Combination of these three modifications results in submerged strainers and reduces risk 9

RWST LEVELS AND ALARMS El. 274 98%

93%

51.45 (Existing)

(Proposed Change)

(ECCS to Recirculation) 29%

(CS to Recirculation) 8%

El. 220-0 Bottom of Tank 10

SUBMERGED STRAINER RESULTS Before Modifications After Modifications LBLOCA Max = LBLOCA Max =

~8.2 ft ~8.7 ft LBLOCA Best LBLOCA Best Estimate = ~6.6 ft Estimate = ~7.9 ft SBLOCA Recirc SBLOCA long Valves open = term = ~5.3 ft

~4.97 ft

~4.75 ft SBLOCA SBLOCA long Recirc Valves term = ~3.5 ft open = ~4.5 ft

~4.425 ft All heights are measured from floor 11

OVERVIEW OF METHODOLOGY

  • Resolution plan modified based on South Texas Project (STP) pilot plant methodology
  • No longer planning to perform head loss testing to develop a rule-based head loss model (as presented to the NRC in November 2014)
  • 2009 Vogtle head loss testing will be used to determine which breaks contribute to risk quantification
  • Breaks with debris quantities greater than tested (mass/SA)* will fail
  • Breaks with debris quantities less than tested (mass/SA) will pass
  • Will continue to quantify risk by evaluating GSI-191 failures for number of strainers in operation
  • Will use consensus models/design basis inputs for parameters in the GSI-191 Risk-Informed Software
  • Mass/SA = Mass of debris per unit strainer area 12

PILOT PLANT COMPARISON (STP VS.

VOGTLE)

Differences Similarities

  • Physical
  • Physical
  • Large dry containment
  • Strainer configuration
  • Low density fiberglass insulation
  • Strainer design
  • Trisodium phosphate buffer
  • Strainer surface area
  • Modeling
  • Modeling
  • Software
  • Break-specific ZOI debris
  • Break size and orientation generation sampling
  • Strainer head loss test protocol
  • Debris transport
  • Chemical effects
  • Past head loss testing to
  • Core blockage establish debris limits
  • Time-dependent comparison to
  • Mass balance of debris on
  • Method for calculating CDF strainer and core and LERF 13

SOFTWARE

  • BADGER (Break Accident Debris Generation Evaluator)
  • A computer program that automates break ZOI debris generation calculations using CAD software
  • NARWHAL (Nuclear Accident Risk Weighted Analysis)
  • A computer program that evaluates the probability of GSI-191 failures by holistically analyzing the break-specific conditions in a time-dependent manner 14

ANALYSIS FLOWCHART Strainer Head Strainer WCAP-17788 Loss Test Penetration Test NARWHAL Bounded Bounded NARWHAL Acceptable Break Analysis Break Analysis Mitigation (Strainers) (Core)

Not Bounded Not Bounded Acceptable RG 1.174 CDF Risk: Submit Acceptance LERF LAR Guidelines Unacceptable Risk: Implement Refinements or Modifications 15

AGENDA

  • 8:30 - Introductions/Purpose of Meeting
  • 8:45 - High Level Overview of Vogtle Closure Strategy &

What we have learned

  • 9:00 - Review of Inputs and Assumptions
  • 10:00 - Explanation of Modeling
  • 11:30 - Interface with PRA
  • 12:15 - Uncertainty Quantification
  • 12:45 - Lunch
  • 13:45 - Continued Discussion of Inputs and Assumptions
  • 14:30 - Continued Discussion of PRA and Uncertainty
  • 15:00 - Submittal Documentation
  • 15:45 - Closing Remarks 16

DEBRIS GENERATION

  • Automated analysis with containment CAD model using a tool called BADGER
  • Calculate quantity and size distribution for each type of debris
  • Partial breaks from 1/2 inch to double-ended guillotine breaks (DEGBs) for all Class 1 welds in containment
  • ZOIs consistent with deterministic approach Nukon 17D Qualified Epoxy & IOZ with Epoxy topcoat 4D Interam Fire Barrier Material 11.7D
  • Unqualified coatings and latent debris quantities are identical for all breaks 17

INSULATION AND QUALIFIED COATINGS QUANTITIES

  • BADGER database contains 28,434 breaks at 930 weld locations
  • Breaks evaluated at each Class 1 ISI weld
  • Partial breaks evaluated in 2 inch increments for smaller break sizes, 1 inch increments for larger break sizes, and 1/2 inch increments for largest break sizes
  • Partial breaks evaluated in 45° increments around pipe
  • DEGB evaluated at every weld
  • Debris quantities vary significantly across the range of possible breaks, and are calculated for each break
  • Nukon: 0 ft3 to 2,229 ft3
  • Qualified epoxy: 0 lbm to 219 lbm
  • Qualified IOZ: 0 lbm to 65 lbm
  • Interam fire barrier: 0 lbm to 60 lbm 18

NUKON DEBRIS GENERATED 19

UNQUALIFIED COATINGS

  • Inorganic Zinc (IOZ)
  • Alkyd
  • Epoxy
  • IOZ, alkyd, and epoxy coatings are assumed to fail as 100% particulate
  • Size distribution for degraded qualified coatings and failure timing no longer being utilized because of the reliance on 2009 head loss testing 20

UNQUALIFIED COATINGS LOCATIONS Coating Type Upper Lower Containment Containment Quantity (lbm) Quantity (lbm)

Epoxy 1,602 1,127 Alkyd 0 59 IOZ 24 31 Total 1,626 1,217

  • Coatings that fail in upper containment would have a reduced transport fraction for breaks where containment sprays are not initiated 21

CONTAINMENT POOL WATER LEVEL

  • Sump pool depth is evaluated on a break-specific basis using conservative inputs to minimize water level
  • The evaluation considers break location and size for the appropriate contribution of RWST, RCS and SI accumulators to pool level
  • Planning to remove 2 disks from each RHR strainer to reduce overall height
  • Continue RWST drain down to just below empty level set point
  • Allows reduction of Tech Spec RWST min water level by 2% (~1 ft) to increase operator margin
  • Strainers are submerged for all scenarios 22

DEBRIS TRANSPORT

  • Using logic tree approach defined in NEI 04-07 consistent with industry developed methods for deterministic closure
  • Blowdown
  • Washdown
  • Pool fill
  • Recirculation
  • Erosion 23

TRANSPORT - WASHDOWN

  • All fines (fiber and particulate) washed to lower containment
  • Retention of small and large pieces caught on gratings estimated based on Drywell Debris Transport Study
  • Washdown to various areas proportional to flow split
  • Assumed 10% washdown for fines due to condensation and 0% for small pieces 24

CONTAINMENT PRESSURE COMPARISON

  • For analysis purposes (NPSH and gas voiding) containment pressure conservatively reduced to saturation pressure when pool temperature is >212 °F and atmospheric when pool temperature is 212 °F or less Assumption to use for containment spray actuation is not obvious for most breaks/sizes 25

FIBER TRANSPORT FRACTIONS TO ONE RHR STRAINER Debris 1 Train w/ 2 Train w/ 1 Train w/o 2 Train w/o Size Type Spray Spray Spray Spray*

Nukon Fines 58% 29% 23% 12%

Small 48% 24% 5% 2%

Large 6% 3% 7% 4%

Intact 0% 0% 0% 0%

Latent Fines 58% 29% 28% 14%

Strainers in 2 4 1 2 Operation

  • This pump lineup was evaluated for different break locations. The transport fractions shown are the bounding values for an annulus break near the strainers.

26

PARTICULATE TRANSPORT FRACTIONS TO ONE RHR STRAINER 1 Train w/ 2 Train w/ 1 Train w/o 2 Train w/o Debris Type Size Spray Spray Spray Spray Interam Fines, Smalls 58% 29% 47% 23%

Unqualified Epoxy Particulate 58% 29% 47% 23%

Unqualified IOZ Particulate 58% 29% 16% 8%

Unqualified Alkyd Particulate 58% 29% 100% 50%

Qualified Epoxy Particulate 58% 29% 23% 12%

Qualified IOZ Particulate 58% 29% 23% 12%

Latent dirt/dust Particulate 58% 29% 28% 14%

27

CONTAINMENT SPRAY AND POOL pH Combining conditions in a non-physical way to bound release and precipitation

  • The design basis maximum containment pool pH is used for the sprays during recirculation and the containment pool to calculate chemical release.
  • Lower pH values/profiles are used for aluminum solubility to account for lower TSP concentrations, higher boric acid concentrations, and pH effects due to core release and radiolysis.

28

CHEMICAL EFFECTS

  • Overview
  • Chemical precipitate quantities are determined for each break
  • Corrosion/Dissolution Model
  • Dissolution from insulation and concrete is determined using the WCAP-16530 equations
  • Corrosion, dissolution and passivation of aluminum metal is determined using the equations developed by Howe et al. (UNM)
  • Solubility
  • No credit will be taken for calcium solubility
  • ANL solubility equation (ML091610696, Eq. 4) will be used to credit delayed aluminum precipitation
  • Once temperature limit is reached, all aluminum will precipitate
  • Aluminum is eventually "forced" to precipitate for all breaks
  • Precipitate Surrogates

MAXIMUM DEBRIS GENERATED

  • Bounding quantities of Nukon, Interam and qualified coatings for DEGB in Loop 1&4 SG compartment Debris type Quantity Notes Nukon 2,229 ft3 Including all size categories Interam 40 lbm 30% fiber and 70% particulate Qualified coatings 249 lbm IOZ and epoxy Unqualified coatings 2,843 lbm IOZ, alkyd, and epoxy Latent fiber 4 ft3 15% of total latent debris; 2.4 lbm/ft3 Latent particulate 51 lbm 85% of total latent debris Miscellaneous debris 2 ft2 Total surface area of tape and labels 30

DEBRIS QUANTITIES AT ONE RHR STRAINER Bounding Bounding Bounding Hot Leg Cold Leg Cold Leg 2009 Test Debris Type Break Break Break Quantity (two trains (2 trains, (single train with CS) with CS) with CS)

Nukon 106.1 ft3 337.3 ft3 333.6 ft3 667.3 ft3 Latent fiber 3.9 ft3* 1.2 ft3 1.2 ft3 2.32 ft3 Interam 290.3 lbm* 12.0 lbm 17.4 lbm 34.8 lbm Qualified coatings 696.8 lbm* 27.3 lbm 72.2 lbm 144.4 lbm Unqualified coatings 2874.1 lbm* 824.5 lbm 824.5 lbm 1648.9 lbm Latent particulate 52.7 lbm* 14.8 lbm 14.8 lbm 29.6 lbm Sodium aluminum silicate 89.1 lbm ~55 lbm ~55 lbm ~102 lbm Calcium phosphate 52.8 lbm ~53 lbm ~53 lbm ~108 lbm

  • These tested quantities exceed currently estimated values for all breaks under all equipment combinations at Vogtle 31

2009 STRAINER HEAD LOSS TESTING

  • Testing consistent with the NRC March 2008 Guidance
  • Tank test with prototypical 7-disk strainer module
  • Total area of 69 ft2
  • Walls and suction pipe arranged consistent with plant strainer
  • Bounding RHR strainer approach velocity for runout flow rate (4,500 gpm)
  • 1 inch submergence for vortex observations Alion Test Facility 32

2009 TESTING DEBRIS LOADS

  • Nukon debris quantity based on 7D ZOI
  • The following debris surrogates used
  • Nukon and latent fiber: Nukon
  • Coatings: Silicon carbide (4 to 20 micron)
  • Latent particulate: Silica sand w/ size distribution consistent with NEI 04-07 Volume 2 (75 to 2000 microns)
  • Interam fire barrier: Interam E-54A 33

2009 TEST PROCEDURE

  • Debris introduction consistent with the NRC March 2008 Guidance
  • For thin-bed testing, all particulate added first followed by small batches of fiber fines
  • For full-load testing, fiber and particulate mixture added in batches with constant particulate to fiber ratio
  • Chemical debris batched in last
  • Head loss allowed to stabilize after each chemical addition 34

2009 TEST RESULTS Thin-bed test Full-load test Debris Load head loss (ft) head loss (ft)

Fiber + Particulate 0.631 5.462 After calcium phosphate3 1.65 6.57 After sodium aluminum silicate3 2.60 11.80 Note:

1. Equivalent bed thickness of 0.625 inches, added in 5 fiber only batches, each 1/8 equivalent thickness
2. Equivalent bed thickness of 1.913 inches, added in 4 batches, each 0.478 equivalent thickness
3. Each chemical separately added in 3 equal batches 35

APPLICATION OF 2009 RESULTS

  • Total conventional debris plus calcium phosphate head loss will be applied at the start of recirculation
  • Total aluminum precipitate head loss will be applied when temperature decreases to solubility limit
  • Head loss will be scaled as a function of the average approach velocity and temperature based on the results of the flow sweeps performed at the end of the thin-bed and full-load tests
  • Results will be extrapolated to 30 days
  • Breaks that exceed the maximum tested fiber quantity, particulate quantity, or chemical precipitate quantity will be assigned a failing head loss value 36

STRAINER ACCEPTANCE CRITERIA

  • The NPSH margin is calculated using break-specific water level and flow rates
  • Minimum NPSH margin is 16.6 ft at 210.96°F and a containment pressure of -0.3 psig
  • Structural
  • Strainer stress analysis is based on a crush pressure of 24.0 ft for the RHR strainers and 23.0 ft for the CS strainers
  • Gas void
  • 2% void fraction at pump inlet 37

FIBER PENETRATION TESTING

  • Multiple tank tests were performed at Alden in 2014 for various strainer approach velocities, number of strainer disks and boron / buffer concentrations
  • Nukon prepared into fines per latest NEI Guidance
  • A curve fit of the test data will be used to evaluate maximum fiber penetration for a 16 disk strainer (RHR) and 14 disk strainer (CS).

38

FIBER PENETRATION RESULTS 1800 1600 Cumulative Fiber Penetration (g) 1400 1200 1000 800 600 400 200 0

0 5000 10000 15000 20000 Cumulative Fiber Addition (g) 39

IN-VESSEL EFFECTS

  • Transport/accumulation of fiber to the core that penetrates RHR strainers is dependent on break location and flow path and will be based on WCAP-17788
  • Values for core blockage and boron precipitation acceptance criteria will be based on WCAP-17788 40

EX-VESSEL EFFECTS

  • A bounding evaluation performed for all components
  • Existing evaluations will be updated in accordance with WCAP-16406-P-A,Evaluation of Downstream Sump Debris Effects in Support of GSI-191 Revision 1 and the accompanying NRC SER 41

LOCADM

  • A bounding calculation performed to cover all scenarios
  • Existing evaluations will be updated in accordance with WCAP-16793-A,Evaluation of Long-Term Cooling Considering Particulate, Fibrous, and Chemical Debris in the Recirculating Fluid Revision 2 and the accompanying NRC SER 42

AGENDA

  • 8:30 - Introductions/Purpose of Meeting
  • 8:45 - High Level Overview of Vogtle Closure Strategy &

What we have learned

  • 9:00 - Review of Inputs and Assumptions
  • 10:00 - Explanation of Modeling
  • 11:30 - Interface with PRA
  • 12:15 - Uncertainty Quantification
  • 12:45 - Lunch
  • 13:45 - Continued Discussion of Inputs and Assumptions
  • 14:30 - Continued Discussion of PRA and Uncertainty
  • 15:00 - Submittal Documentation
  • 15:45 - Closing Remarks 43

GSI-191 ACCEPTANCE CRITERIA Acceptance Criteria Method for Addressing Debris exceeds limits for upstream Bounding analysis - part of transport blockage, e.g. refueling canal drain calculation Strainer head loss exceeds pump NPSH Break-specific analysis based on margin or strainer structural margin tested debris limits and maximum tested head losses Gas voids from degasification or flashing Break-specific analysis based on exceed strainer/pump limits head loss, pool temperature, etc.

Pumps fail due to air intrusion from Bounding analysis vortexing Penetrated debris exceeds ex-vessel Bounding analysis wear and blockage limits Penetrated debris exceeds in-vessel fuel Break-specific analysis based on blockage and boron precipitation limits penetration testing and flow splits Debris accumulation on cladding Bounding analysis prevents adequate heat transfer 44

OVERVIEW OF MODELING

  • GSI-191 phenomena evaluated in a holistic, time-dependent manner with an evaluation tool called NARWHAL
  • Developed using object oriented design
  • Tracks movement of water and debris
  • Evaluates each break with incremental time steps up to 30 days
  • Evaluates range of breaks to determine which ones pass/fail the strainer and core acceptance criteria
  • Uses top-down LOCA frequencies to calculate conditional failure probabilities for small, medium, and large breaks 45

OVERVIEW OF MODELING

  • NARWHAL prototype has been used for preliminary risk-informed evaluations by several plants
  • Version 1.0 is currently under development
  • Software requirements, design, implementation, V&V, and user documentation prepared under ENERCONs Appendix B QA program
  • NARWHALs object oriented design allows users to model unique plant-specific geometry with a common executable file
  • Simplifies software maintenance
  • Significantly reduces potential for software errors 46

OVERVIEW OF MODELING Spray Nozzles CS Core Reactor Break Vessel RWST ECCS Containment Compartments ECCS Sump Pool Strainers 47

OVERVIEW OF MODELING 48

OVERVIEW OF MODELING

  • NARWHAL integrates models and inputs from design basis calculations and GSI-191 tests/analyses:
  • Water volumes, temperature profiles, and pH from design basis calculations
  • Debris quantities from BADGER database
  • Location-specific transport fractions from transport calculation
  • Chemical effects calculated using WCAP-16530 and Howe model
  • Conventional and chemical head loss from 2009 strainer testing (scaled for temperature and flow)
  • NPSH and structural margin from design basis calculations
  • Degasification calculated using standard physical models
  • Time-dependent penetration using data fit from 2014 strainer testing
  • Core failure calculated using WCAP-17788 model and limits 49

OVERVIEW OF MODELING

3. Debris quantities outside ZOI (unqualified coatings, latent, miscellaneous)
2. ZOI debris 4. Blowdown 5. Washdown
1. Select unique quantities from transport to transport from break location, BADGER (insulation containment containment size, and and qualified compartments compartments to orientation coatings) and sump pool sump pool
6. Pool fill transport 7. Recirculation from sump pool to transport from strainers and sump pool to inactive cavities strainers
9. Debris 8. Debris accumulation on penetration core through strainers 50

OVERVIEW OF MODELING

1. Corrosion/

dissolution of 3. Precipitate metals, concrete, solubility limit and debris by CS

2. Corrosion/

dissolution of 4. Formation of metals, concrete, chemical and debris in precipitates sump pool

5. Recirculation transport from sump pool to strainers
6. Debris 7. Debris penetration accumulation on through strainers core 51

OVERVIEW OF MODELING 5b. Does

1. Strainer Head void fraction No 6b. Pass Loss (CSHL + 2. Degasification exceed strainer Conventional HL gas void fraction strainer or criteria

+ Chemical HL) pump limits?

Yes

3. Pump NPSH 7b. Fail strainer 5a. Does margin criteria 6a. Pass No HL Exceed strainer NPSH or criteria structural margin?
4. Strainer structural margin Yes 7a. Fail strainer criteria 52

OVERVIEW OF MODELING 2b. Does quantity No

1. Core debris exceed accumulation blockage limits?

2a. Yes Does quantity Yes 3. Fail core exceed criteria boron limits?

No 4. Pass core criteria 53

OVERVIEW OF MODELING

  • Analytical results showing whether a given break passes or fails are highly dependent on the assumptions and models used to evaluate the break
  • For example, if sprays are not initiated for a given break:
  • A smaller fraction of debris is washed down to the containment pool
  • Corrosion/dissolution is reduced (unsubmerged materials)
  • A larger fraction of debris in the pool is transported to the RHR strainers
  • It is not always obvious what conditions are bounding 54

INPUTS Input Values Sensitivity LOCA Frequency Based on NUREG-1829/PRA Need to address uncertainty Debris Generation Based on consensus models None Debris Transport Based on consensus models None Containment Temp Design basis None Pool Temp Design basis None Containment Spray Competing effects (e.g. washdown, strainer Need to run for activation and Activation and Duration surface area, corrosion) duration Pool Volume/Level Based on consensus models None Pool pH Design Basis maximum for corrosion, minimum None for precipitation ECCS Flow Rates Design basis (same for all breaks) None Aluminum and Calcium WCAP-16530 and UNM equations None Corrosion Aluminum Precipitation ANL equation None Penetration 2014 testing Need to address uncertainty Head Loss Maximums Extrapolated and scaled from 2009 None tests final values 55

DIFFERENCES (STP VS. VOGTLE)

  • Physical
  • ECCS trains (3 vs 2)
  • Strainer configuration (3 combined vs 4 separate)
  • Strainer design (flow control vs no flow control)
  • Strainer surface area (~1800 ft2 vs 765 ft2) 56

DIFFERENCES (STP VS. VOGTLE)

  • Modeling
  • Risk Informed Software (CASA Grande/RUFF/FiDOE vs BADGER/NARWHAL)
  • Break size and orientation sampling (Search algorithm vs uniform)
  • Strainer head loss test protocol (flume vs tank)
  • Aluminum and Calcium precipitate quantity (bounding test vs break-specific analysis)
  • Aluminum passivation (not credited vs credited using Howe paper)
  • Failure criteria (bounding analysis vs time-dependent comparison of head loss with NPSH, gas void, and flashing)
  • GSI-191 risk quantification (critical break size frequency vs conditional failure probability entered into PRA) 57

AGENDA

  • 8:30 - Introductions/Purpose of Meeting
  • 8:45 - High Level Overview of Vogtle Closure Strategy &

What we have learned

  • 9:00 - Review of Inputs and Assumptions
  • 10:00 - Explanation of Modeling
  • 11:30 - Interface with PRA
  • 12:15 - Uncertainty Quantification
  • 12:45 - Lunch
  • 13:45 - Continued Discussion of Inputs and Assumptions
  • 14:30 - Continued Discussion of PRA and Uncertainty
  • 15:00 - Submittal Documentation
  • 15:45 - Closing Remarks 58

INTERFACE WITH PRA

  • Equipment configuration logic from PRA model of record
  • GSI-191 conditional failure probabilities from NARWHAL
  • Final risk calculation will be performed using the Vogtle model of record with GSI-191 conditional failure probabilities 59

INTERFACE WITH PRA

4. PRA quantification of CDF & LERF with no GSI-191 failures
2. NARWHAL
1. PRA identification evaluation of GSI-191 of accident scenarios phenomena for each 3. PRA and equipment risk-significant quantification of 5. Calculate configurations that scenario/configuration CDF & LERF with CDF & LERF are risk-significant to to determine CFPs for GSI-191 failures GSI-191 each strainer/core failure basic event 6.

7a. Identification Meets No Yes Output to of analytical RG submittal refinements to 1.174 documentation analysis Criteria

?

7b. Identification of potential plant modifications (physical or procedural) 60

METHODOLOGY FOR USING LOCA FREQUENCY TO CALCULATE CONDITIONAL FAILURE PROBABILITY

  • Partition PRA categories (Catk) into size ranges (SRi)
  • Calculate probability of a LOCA occurring in each size range for every PRA category (P(SRilCatk))
  • Calculate probability of a LOCA occurring at each weld (Weldj) within each size range (P(WeldjlSRi))
  • Calculate probability estimate for success criteria failure (SCF) at each weld in each size range (SCFlWeldj,SRi))

(P

  • Calculate probability estimate for success criteria failure at every PRA category (P(SCFlCatk))

61

METHODOLOGY FOR USING LOCA FREQUENCY TO CALCULATE CONDITIONAL FAILURE PROBABILITY Nk Mi SCF Cat k = P SR i lCat k P Weldj SR i P P SCF Weldj , SR i i=1 j=1 From NUREG-1829 From NUREG-1829 From NARWHAL (or Vogtle PRA) (or Vogtle PRA) using top-down methodology 62

ILLUSTRATION OF PRA CATEGORIES AND LOCA FREQUENCY SIZE RANGES 63

EQUIVALENT DEGB DIAMETER

The correlations which relate flow rates and LOCA size categories to the effective break sizes in each PWR and BWR system are summarized in Table 3.8. The break size corresponds to a partial fracture for pipes with larger diameters than the break size, a complete single-ended rupture in pipes with the same inside diameter, or a DEGB in pipes having inside diameters 1/2 times the break size. All panelists used these correlations to relate their elicitation responses determined for the effective break sizes to the appropriate LOCA size category. It is important to stress that breaks can occur in either LOCA sensitivity piping or non-piping systems and components.

64

METHOD FOR ADDRESSING DEGB FREQUENCIES

  • NUREG-1829 provides LOCA frequencies vs. break flow rates, which are converted to equivalent diameter break sizes
  • Double ended guillotine breaks (DEGBs) have a flow rate (area) twice as large as the pipe cross-sectional area
  • Equivalent diameter for DEBG is calculated using pipe inner diameter: DDEGB,Eq = 2
  • Dpipe
  • Breaks Dpipe assumed to progress to DEGB for debris generation (bounding debris quantities)
  • Frequency associated with DEGB tail assigned to Dpipe break size to calculate conditional failure probability within each size range
  • NUREG-1829 only provides frequencies up to 31 breaks, so frequencies corresponding to primary loop pipe DDEGB,Eq values is determined through log-log extrapolation
  • 27.5 38.9
  • 29 41.0
  • 31 43.8 65

METHOD FOR ADDRESSING DEGB FREQUENCIES 66

EQUIPMENT CONFIGURATION

  • Most likely situation would be that all equipment is available and fully functional
  • Equipment failures due to non-GSI-191 related issues can have a major effect on GSI-191 phenomena (debris transport, flow splits, temperature and pressure profiles, etc.)
  • There are many possible equipment failure combinations (RHR pumps, containment spray pumps, charging pumps, SI pumps, fan coolers, etc.)
  • At Vogtle, GSI-191 effects can be reasonably represented or bounded for most equipment failure combinations by the cases where all pumps are running or a single train failure 67

EQUIPMENT CONFIGURATION

  • All equipment available bounding or reasonably representative for:
  • No pump failures: ~79%
  • 1 or 2 CS pump failures: ~18% ~97%
  • 1 RHR pump failure bounding or reasonably representative for other equipment failure configurations: ~3%
  • The values above are being used to determine which configurations to investigate with NARWHAL
  • Conditional failure probabilities for GSI-191 basic events (strainer and core failure) will be manually entered into the PRA model of record to calculate CDF 68

CONDITIONAL FAILURE PROBABILITIES

  • Core conditional failure probability (CFP) higher when all pumps are operating
  • Strainer CFP higher with 1 train operating
  • Additional scenarios will likely need to be evaluated (1 CS pump failure, 1 RHR pump failure, etc.)

69

PRA MODEL CHANGES

  • Vogtle PRA model modified to incorporate conditional failure probabilities (CFPs) for GSI-191 strainer failures and core failures with associated initiating events and equipment configurations
  • GSI-191 failure defined using PRA success criteria
  • Strainer failure defined as failure of RHR pump/strainer
  • CS strainer failures are calculated in NARWHAL, but not used in PRA
  • GSI-191 failures binned into following CFP groups (separate CFPs defined for each LOCA category and each pump state)
  • Core failures
  • RHR Strainer A failures (without Strainer B or core failures)
  • RHR Strainer B failures (without Strainer A or core failures)
  • RHR Strainer A and B failures (without core failures)
  • Each core and strainer CFP represented in PRA with a basic event that is combined with LOCA initiating event and pump failure logic to represent pump state associated with CFP 70

PRA MODEL CHANGES 71

AGENDA

  • 8:30 - Introductions/Purpose of Meeting
  • 8:45 - High Level Overview of Vogtle Closure Strategy &

What we have learned

  • 9:00 - Review of Inputs and Assumptions
  • 10:00 - Explanation of Modeling
  • 11:30 - Interface with PRA
  • 12:15 - Uncertainty Quantification
  • 12:45 - Lunch
  • 13:45 - Continued Discussion of Inputs and Assumptions
  • 14:30 - Continued Discussion of PRA and Uncertainty
  • 15:00 - Submittal Documentation
  • 15:45 - Closing Remarks 72

UNCERTAINTY QUANTIFICATION

  • Draft Reg Guide 1.229 requires uncertainty quantification for risk-informed GSI-191 evaluation
  • Two different approaches that could be used to quantify uncertainty
  • Simplified approach using sensitivity analysis
  • Statistical sampling of input parameter distributions and propagating uncertainties
  • Consensus inputs and models are considered to have no uncertainty
  • Vogtle inputs that require uncertainty quantification
  • LOCA frequency values
  • Possibly others 73

UNCERTAINTY QUANTIFICATION USING SENSITIVITY ANALYSIS 74

UNCERTAINTY QUANTIFICATION USING STATISTICAL SAMPLING

1. Select 4. Evaluate GSI- 5. Compare to GSI-191
2. Sample all 3. Select break equipment 191 phenomena acceptance criteria and PRA random input location, size, failure at each time step success criteria to identify values and orientation configuration for 30 days strainer or core failures 6.

Sufficient No breaks evaluated to estimate CFP?

Yes 7.

Sufficient No random samples to estimate CFP PDF?

Yes

8. All 9.

No significant Yes Output equipment to PRA configs.

model evaluated?

75

AGENDA

  • 8:30 - Introductions/Purpose of Meeting
  • 8:45 - High Level Overview of Vogtle Closure Strategy &

What we have learned

  • 9:00 - Review of Inputs and Assumptions
  • 10:00 - Explanation of Modeling
  • 11:30 - Interface with PRA
  • 12:15 - Uncertainty Quantification
  • 12:45 - Lunch
  • 13:45 - Continued Discussion of Inputs and Assumptions
  • 14:30 - Continued Discussion of PRA and Uncertainty
  • 15:00 - Submittal Documentation
  • 15:45 - Closing Remarks 76

SUBMITTAL DOCUMENTATION DISCUSSION Planning to follow the format, content, and depth of the August 2015 STP LAR

  • GL 2004-02 Response following Staff Review Guidance (will have some pointers to risk informed summary)
  • Risk Quantification and Summary
  • Defense in Depth and safety margin
  • GDC 50.67 (need being evaluated)
  • License amendment request
  • Tech Spec markups
  • Tech Spec Bases
  • List of commitments 77

QUALITY ASSURANCE

  • GSI-191 calculations are being revised to be safety related under vendor Appendix B QA programs
  • Head loss testing in 2009 was conducted and documented as safety related under vendor Appendix B QA program
  • Penetration testing was conducted and documented in 2014 as non-safety related following work practices established by vendor Appendix B QA program
  • PRA has undergone an industry peer review per RG 1.200 and the ASME/ANS PRA Standard for CDF and LERF (RA-Sa-2009) 78

CONCLUSIONS

  • Models used to analyze GSI-191 phenomena at Vogtle are consistent with methods accepted for design basis evaluations
  • Preliminary results indicate that risk associated with GSI-191 is very low 79

SCHEDULE UPDATE EXPECTED MILESTONE Current Status COMPLETION DATE Develop containment CAD model to include Complete Complete pipe welds Conduct meeting with NRC 3rd Quarter 2013 Complete Modify probabilistic risk assessment (PRA) to 4th Quarter 2013 Complete include Strainer and Core Blockage events Perform Chemical Effects testing 1st Quarter 2014 Complete Perform thermal and hydraulic modeling of RCS, 1st Quarter 2014 Complete Core, and Containment conditions Perform Strainer Head Loss and Bypass testing to Strainer Bypass Testing - Complete 2nd Quarter 2014 establish correlation for range of break sizes Strainer Headloss Testing - Using 2009 Vogtle test Assemble base inputs for CASA Grande 2nd Quarter 2014 Complete - Using NARWHAL instead of CASA Grande Evaluate Boric Acid Precipitation impacts 3rd Quarter 2015 Plan on using PWROG WCAP-17788 Finalize inputs to CASA Grande 3rd Quarter 2015 In Progress, Using NARWHAL instead of CASA Grande Complete Sensitivity Analyses in/for CASA 4th Quarter 2015 2nd Quarter 2016 Grande Integrate CASA Grande results into PRA to 1st Quarter 2016 3rd Quarter 2016 determine CDF and LERF To be established through Projected 1st Quarter 2017, require input from:

Licensing Submittal for VEGP discussions with SE on STP Pilot Project and SE on WCAP-17788; NRC - tentatively which are not yet available.

September 2016 80

AGENDA

  • 8:30 - Introductions/Purpose of Meeting
  • 8:45 - High Level Overview of Vogtle Closure Strategy &

What we have learned

  • 9:00 - Review of Inputs and Assumptions
  • 10:00 - Explanation of Modeling
  • 11:30 - Interface with PRA
  • 12:15 - Uncertainty Quantification
  • 12:45 - Lunch
  • 13:45 - Continued Discussion of Inputs and Assumptions
  • 14:30 - Continued Discussion of PRA and Uncertainty
  • 15:00 - Submittal Documentation
  • 15:45 - Closing Remarks 81

BACKUP SLIDES 82

EXAMPLE CALCULATION

  • Detailed physical calculations
  • Break Location 11201-049-16-RB (10.5 DEG hot leg side break in annulus near surge line)
  • Transport fractions: Maximum
  • RHR flow rate: 3,700 gpm (design flow)
  • CS duration: 6 Hours
  • Design basis temperature profile - Max Safeguards, with pool temperature drop to 90°F at Day 30
  • Minimum water level profile
  • Sump pH used for corrosion: 8.1
  • pH used for solubility: 7.6
  • Submerged Concrete: 2,813 ft2

BREAK LOCATION 84

POOL LEVEL 85

FIBER TRANSPORT TO ONE RHR STRAINER (1 TRAIN W/SPRAY)

Debris Type Size DG Quantity Transport Quantity (ft3) Fraction* (ft3)

Nukon Fines 9.5 58% 6.1 Small 32.7 7%** 1.5**

Large 14.8 4%** 0.6**

Intact 15.9 0% 0.0 Total 72.9 8.2 Latent Fines 12.5 58% 7.8 Total 85.4 16.0

  • Transport fraction takes into account time-dependent transport (CS strainer active for 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />)
    • Combined fraction of fines due to erosion and intact pieces 86

PARTICULATE TRANSPORT TO ONE RHR STRAINER (1 TRAIN W/SPRAY)

Debris Type Size DG Quantity (lbm) Transport Fraction Quantity (lbm)

Interam Fines, Smalls 121.2 58% 70.3 Unqualified Epoxy Particulate 2,602.0 58% 1,509.2 Unqualified IOZ Particulate 25.0 58% 14.5 Unqualified Alkyd Particulate 32.0 58% 18.6 Qualified Epoxy Particulate 7.5 58% 4.4 Qualified IOZ Particulate 2.4 58% 1.4 Latent dirt/dust Particulate 170.0 58% 98.6 Total 2,960.1 1,717.0 87

CHEMICAL PRECIPITATE QUANTITIES 88

ALUMINUM CONCENTRATION AND SOLUBILITY 89

HEAD LOSS

  • Clean strainer head loss: Bounding value of 0.162 ft at 4,500 gpm
  • Conventional head loss
  • Head loss due to chemical precipitates Max Head Loss Head Loss with Head Loss Transported Tested Corresponding to Flow and Type Quantity Quantity* Max Tested Quantity Temperature (Unadjusted) Correction**

Fiber 16.0 ft3 109.9 ft3 5.46 ft 4.41 ft Particulate 1,717.0 lbm 3,914.5 lbm Calcium 9.6 lbm 52.8 lbm 1.11 ft 0.90 ft Phosphate Sodium Aluminum 74.5 lbm 89.0 lbm 5.24 ft 4.23 ft Silicate Extrapolation 2.13 ft*** 1.72 ft to 30 days

  • Values scaled to 16 disk RHR strainer area
    • Corrected to 3700 gpm and 90°F
      • Applied at switchover to hot leg recirculation 90

VOID FRACTION AT RHR PUMP Short Term: Long Term:

91

DEBRIS TRACKING

  • 100% capture of particulate and precipitate at strainer
  • All fiber is treated as fines 92

CORE ACCUMULATION 93

SUMMARY

Criteria Acceptance Example Results Example Criteria Pass/Fail NPSH Margin 16.6 ft 11.3 ft Pass Strainer Structural 24.7 ft 11.3 ft Pass Margin Head loss less than Partial Fully 1/2 submerged Pass Submergence submerged height Gas Void Fraction 2% at the pump 0.24% at the pump Pass Exceeds what was Debris Limit Not exceeded Pass tested 75 g/FA for Hot Leg 32 g/FA Assumed core limits Breaks (to be replaced with Pass WCAP-17788 criteria) 7.5 g/FA for Cold Leg N/A Breaks 94

VOGTLE GSI-191 RESOLUTION PLAN AND CURRENT STATUS NRC PUBLIC MEETING NOVEMBER 5, 2015

AGENDA

  • 8:30 - Introductions/Purpose of Meeting
  • 8:45 - High Level Overview of Vogtle Closure Strategy &

What we have learned

  • 9:00 - Review of Inputs and Assumptions
  • 10:00 - Explanation of Modeling
  • 11:30 - Interface with PRA
  • 12:15 - Uncertainty Quantification
  • 12:45 - Lunch
  • 13:45 - Continued Discussion of Inputs and Assumptions
  • 14:30 - Continued Discussion of PRA and Uncertainty
  • 15:00 - Submittal Documentation
  • 15:45 - Closing Remarks 2

PURPOSE OF MEETING

  • Obtain staff feedback on the overall GSI-191 resolution path for Vogtle
  • Discuss proposed plant modifications
  • Discuss use of design basis (vs. best estimate) inputs in the evaluation 3

VOGTLE PLANT LAYOUT

  • Large dry containment
  • Two redundant ECCS and CS trains
  • Each train has an RHR pump, a high head pump, an intermediate head SI pump, and a CS pump
  • SI and high head pumps piggyback off of the RHR pump discharge during recirculation.
  • Maximum design flow rates:
  • RHR 3,700 gpm/pump
  • CS 2,600 gpm/pump
  • Two independent and redundant containment air cooling trains 4

STRAINER ARRANGEMENT

  • Two RHR and CS pumps each with their own strainer
  • Each GE strainer is similar with four stacks of disks
  • RHR strainer: 18-disk tall, 765 ft2, 5 ft tall RHR B
  • CS strainer: 14-disk tall, 590 ft2, 4 ft tall CS B
  • Perforated plate with CS A 3/32 diameter holes RHR A 5

PLANT RESPONSE TO LOCAS

  • Plant response includes the following general actions:
  • ECCS injection is initiated from the RWST to the cold legs via RHR, SI, and High Head pumps
  • RHR pumps switched to cold leg recirculation at RWST lo-lo alarm
  • CS pumps switched to recirculation at RWST empty alarm
  • CS pumps secured no earlier than 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> after start of recirculation, and probably before 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> depending on pressure and dose rate
  • RHR pumps switched to hot leg recirculation at 7.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 6

AGENDA

  • 8:30 - Introductions/Purpose of Meeting
  • 8:45 - High Level Overview of Vogtle Closure Strategy &

What we have learned

  • 9:00 - Review of Inputs and Assumptions
  • 10:00 - Explanation of Modeling
  • 11:30 - Interface with PRA
  • 12:15 - Uncertainty Quantification
  • 12:45 - Lunch
  • 13:45 - Continued Discussion of Inputs and Assumptions
  • 14:30 - Continued Discussion of PRA and Uncertainty
  • 15:00 - Submittal Documentation
  • 15:45 - Closing Remarks 7

SCHEDULE UPDATE EXPECTED MILESTONE Current Status COMPLETION DATE Develop containment CAD model to include Complete Complete pipe welds Conduct meeting with NRC 3rd Quarter 2013 Complete Modify probabilistic risk assessment (PRA) to 4th Quarter 2013 Complete include Strainer and Core Blockage events Perform Chemical Effects testing 1st Quarter 2014 Complete Perform thermal and hydraulic modeling of RCS, 1st Quarter 2014 Complete Core, and Containment conditions Perform Strainer Head Loss and Bypass testing to Strainer Bypass Testing - Complete 2nd Quarter 2014 establish correlation for range of break sizes Strainer Headloss Testing - Using 2009 Vogtle test Assemble base inputs for CASA Grande 2nd Quarter 2014 Complete - Using NARWHAL instead of CASA Grande Evaluate Boric Acid Precipitation impacts 3rd Quarter 2015 Plan on using PWROG WCAP-17788 Finalize inputs to CASA Grande 3rd Quarter 2015 In Progress, Using NARWHAL instead of CASA Grande Complete Sensitivity Analyses in/for CASA 4th Quarter 2015 2nd Quarter 2016 Grande Integrate CASA Grande results into PRA to 1st Quarter 2016 3rd Quarter 2016 determine CDF and LERF To be established through Projected 1st Quarter 2017, require input from:

Licensing Submittal for VEGP discussions with SE on STP Pilot Project and SE on WCAP-17788; NRC - tentatively which are not yet available.

September 2016 8

WHAT WE HAVE LEARNED

  • Containment sprays only actuate for the largest hot leg breaks under best estimate conditions
  • This results in unsubmerged strainers for many breaks because RWST is left with unused water
  • Wide variation in post-LOCA water levels and sump chemistry
  • Aluminum corrosion is greater with sprays operating
  • Planned modifications
  • Reduce height of RHR strainers by ~6 inches (remove 2 disks)
  • Change procedures to continue RWST drain down to just below empty level set point when CS does not actuate
  • Allows reduction of Tech Spec min water level by 2% (~1 ft)

(increased operating margin)

  • Equivalent to ~2 inches in containment pool level
  • Combination of these three modifications results in submerged strainers and reduces risk 9

RWST LEVELS AND ALARMS El. 274 98%

93%

51.45 (Existing)

(Proposed Change)

(ECCS to Recirculation) 29%

(CS to Recirculation) 8%

El. 220-0 Bottom of Tank 10

SUBMERGED STRAINER RESULTS Before Modifications After Modifications LBLOCA Max = LBLOCA Max =

~8.2 ft ~8.7 ft LBLOCA Best LBLOCA Best Estimate = ~6.6 ft Estimate = ~7.9 ft SBLOCA Recirc SBLOCA long Valves open = term = ~5.3 ft

~4.97 ft

~4.75 ft SBLOCA SBLOCA long Recirc Valves term = ~3.5 ft open = ~4.5 ft

~4.425 ft All heights are measured from floor 11

OVERVIEW OF METHODOLOGY

  • Resolution plan modified based on South Texas Project (STP) pilot plant methodology
  • No longer planning to perform head loss testing to develop a rule-based head loss model (as presented to the NRC in November 2014)
  • 2009 Vogtle head loss testing will be used to determine which breaks contribute to risk quantification
  • Breaks with debris quantities greater than tested (mass/SA)* will fail
  • Breaks with debris quantities less than tested (mass/SA) will pass
  • Will continue to quantify risk by evaluating GSI-191 failures for number of strainers in operation
  • Will use consensus models/design basis inputs for parameters in the GSI-191 Risk-Informed Software
  • Mass/SA = Mass of debris per unit strainer area 12

PILOT PLANT COMPARISON (STP VS.

VOGTLE)

Differences Similarities

  • Physical
  • Physical
  • Large dry containment
  • Strainer configuration
  • Low density fiberglass insulation
  • Strainer design
  • Trisodium phosphate buffer
  • Strainer surface area
  • Modeling
  • Modeling
  • Software
  • Break-specific ZOI debris
  • Break size and orientation generation sampling
  • Strainer head loss test protocol
  • Debris transport
  • Chemical effects
  • Past head loss testing to
  • Core blockage establish debris limits
  • Time-dependent comparison to
  • Mass balance of debris on
  • Method for calculating CDF strainer and core and LERF 13

SOFTWARE

  • BADGER (Break Accident Debris Generation Evaluator)
  • A computer program that automates break ZOI debris generation calculations using CAD software
  • NARWHAL (Nuclear Accident Risk Weighted Analysis)
  • A computer program that evaluates the probability of GSI-191 failures by holistically analyzing the break-specific conditions in a time-dependent manner 14

ANALYSIS FLOWCHART Strainer Head Strainer WCAP-17788 Loss Test Penetration Test NARWHAL Bounded Bounded NARWHAL Acceptable Break Analysis Break Analysis Mitigation (Strainers) (Core)

Not Bounded Not Bounded Acceptable RG 1.174 CDF Risk: Submit Acceptance LERF LAR Guidelines Unacceptable Risk: Implement Refinements or Modifications 15

AGENDA

  • 8:30 - Introductions/Purpose of Meeting
  • 8:45 - High Level Overview of Vogtle Closure Strategy &

What we have learned

  • 9:00 - Review of Inputs and Assumptions
  • 10:00 - Explanation of Modeling
  • 11:30 - Interface with PRA
  • 12:15 - Uncertainty Quantification
  • 12:45 - Lunch
  • 13:45 - Continued Discussion of Inputs and Assumptions
  • 14:30 - Continued Discussion of PRA and Uncertainty
  • 15:00 - Submittal Documentation
  • 15:45 - Closing Remarks 16

DEBRIS GENERATION

  • Automated analysis with containment CAD model using a tool called BADGER
  • Calculate quantity and size distribution for each type of debris
  • Partial breaks from 1/2 inch to double-ended guillotine breaks (DEGBs) for all Class 1 welds in containment
  • ZOIs consistent with deterministic approach Nukon 17D Qualified Epoxy & IOZ with Epoxy topcoat 4D Interam Fire Barrier Material 11.7D
  • Unqualified coatings and latent debris quantities are identical for all breaks 17

INSULATION AND QUALIFIED COATINGS QUANTITIES

  • BADGER database contains 28,434 breaks at 930 weld locations
  • Breaks evaluated at each Class 1 ISI weld
  • Partial breaks evaluated in 2 inch increments for smaller break sizes, 1 inch increments for larger break sizes, and 1/2 inch increments for largest break sizes
  • Partial breaks evaluated in 45° increments around pipe
  • DEGB evaluated at every weld
  • Debris quantities vary significantly across the range of possible breaks, and are calculated for each break
  • Nukon: 0 ft3 to 2,229 ft3
  • Qualified epoxy: 0 lbm to 219 lbm
  • Qualified IOZ: 0 lbm to 65 lbm
  • Interam fire barrier: 0 lbm to 60 lbm 18

NUKON DEBRIS GENERATED 19

UNQUALIFIED COATINGS

  • Inorganic Zinc (IOZ)
  • Alkyd
  • Epoxy
  • IOZ, alkyd, and epoxy coatings are assumed to fail as 100% particulate
  • Size distribution for degraded qualified coatings and failure timing no longer being utilized because of the reliance on 2009 head loss testing 20

UNQUALIFIED COATINGS LOCATIONS Coating Type Upper Lower Containment Containment Quantity (lbm) Quantity (lbm)

Epoxy 1,602 1,127 Alkyd 0 59 IOZ 24 31 Total 1,626 1,217

  • Coatings that fail in upper containment would have a reduced transport fraction for breaks where containment sprays are not initiated 21

CONTAINMENT POOL WATER LEVEL

  • Sump pool depth is evaluated on a break-specific basis using conservative inputs to minimize water level
  • The evaluation considers break location and size for the appropriate contribution of RWST, RCS and SI accumulators to pool level
  • Planning to remove 2 disks from each RHR strainer to reduce overall height
  • Continue RWST drain down to just below empty level set point
  • Allows reduction of Tech Spec RWST min water level by 2% (~1 ft) to increase operator margin
  • Strainers are submerged for all scenarios 22

DEBRIS TRANSPORT

  • Using logic tree approach defined in NEI 04-07 consistent with industry developed methods for deterministic closure
  • Blowdown
  • Washdown
  • Pool fill
  • Recirculation
  • Erosion 23

TRANSPORT - WASHDOWN

  • All fines (fiber and particulate) washed to lower containment
  • Retention of small and large pieces caught on gratings estimated based on Drywell Debris Transport Study
  • Washdown to various areas proportional to flow split
  • Assumed 10% washdown for fines due to condensation and 0% for small pieces 24

CONTAINMENT PRESSURE COMPARISON

  • For analysis purposes (NPSH and gas voiding) containment pressure conservatively reduced to saturation pressure when pool temperature is >212 °F and atmospheric when pool temperature is 212 °F or less Assumption to use for containment spray actuation is not obvious for most breaks/sizes 25

FIBER TRANSPORT FRACTIONS TO ONE RHR STRAINER Debris 1 Train w/ 2 Train w/ 1 Train w/o 2 Train w/o Size Type Spray Spray Spray Spray*

Nukon Fines 58% 29% 23% 12%

Small 48% 24% 5% 2%

Large 6% 3% 7% 4%

Intact 0% 0% 0% 0%

Latent Fines 58% 29% 28% 14%

Strainers in 2 4 1 2 Operation

  • This pump lineup was evaluated for different break locations. The transport fractions shown are the bounding values for an annulus break near the strainers.

26

PARTICULATE TRANSPORT FRACTIONS TO ONE RHR STRAINER 1 Train w/ 2 Train w/ 1 Train w/o 2 Train w/o Debris Type Size Spray Spray Spray Spray Interam Fines, Smalls 58% 29% 47% 23%

Unqualified Epoxy Particulate 58% 29% 47% 23%

Unqualified IOZ Particulate 58% 29% 16% 8%

Unqualified Alkyd Particulate 58% 29% 100% 50%

Qualified Epoxy Particulate 58% 29% 23% 12%

Qualified IOZ Particulate 58% 29% 23% 12%

Latent dirt/dust Particulate 58% 29% 28% 14%

27

CONTAINMENT SPRAY AND POOL pH Combining conditions in a non-physical way to bound release and precipitation

  • The design basis maximum containment pool pH is used for the sprays during recirculation and the containment pool to calculate chemical release.
  • Lower pH values/profiles are used for aluminum solubility to account for lower TSP concentrations, higher boric acid concentrations, and pH effects due to core release and radiolysis.

28

CHEMICAL EFFECTS

  • Overview
  • Chemical precipitate quantities are determined for each break
  • Corrosion/Dissolution Model
  • Dissolution from insulation and concrete is determined using the WCAP-16530 equations
  • Corrosion, dissolution and passivation of aluminum metal is determined using the equations developed by Howe et al. (UNM)
  • Solubility
  • No credit will be taken for calcium solubility
  • ANL solubility equation (ML091610696, Eq. 4) will be used to credit delayed aluminum precipitation
  • Once temperature limit is reached, all aluminum will precipitate
  • Aluminum is eventually "forced" to precipitate for all breaks
  • Precipitate Surrogates

MAXIMUM DEBRIS GENERATED

  • Bounding quantities of Nukon, Interam and qualified coatings for DEGB in Loop 1&4 SG compartment Debris type Quantity Notes Nukon 2,229 ft3 Including all size categories Interam 40 lbm 30% fiber and 70% particulate Qualified coatings 249 lbm IOZ and epoxy Unqualified coatings 2,843 lbm IOZ, alkyd, and epoxy Latent fiber 4 ft3 15% of total latent debris; 2.4 lbm/ft3 Latent particulate 51 lbm 85% of total latent debris Miscellaneous debris 2 ft2 Total surface area of tape and labels 30

DEBRIS QUANTITIES AT ONE RHR STRAINER Bounding Bounding Bounding Hot Leg Cold Leg Cold Leg 2009 Test Debris Type Break Break Break Quantity (two trains (2 trains, (single train with CS) with CS) with CS)

Nukon 106.1 ft3 337.3 ft3 333.6 ft3 667.3 ft3 Latent fiber 3.9 ft3* 1.2 ft3 1.2 ft3 2.32 ft3 Interam 290.3 lbm* 12.0 lbm 17.4 lbm 34.8 lbm Qualified coatings 696.8 lbm* 27.3 lbm 72.2 lbm 144.4 lbm Unqualified coatings 2874.1 lbm* 824.5 lbm 824.5 lbm 1648.9 lbm Latent particulate 52.7 lbm* 14.8 lbm 14.8 lbm 29.6 lbm Sodium aluminum silicate 89.1 lbm ~55 lbm ~55 lbm ~102 lbm Calcium phosphate 52.8 lbm ~53 lbm ~53 lbm ~108 lbm

  • These tested quantities exceed currently estimated values for all breaks under all equipment combinations at Vogtle 31

2009 STRAINER HEAD LOSS TESTING

  • Testing consistent with the NRC March 2008 Guidance
  • Tank test with prototypical 7-disk strainer module
  • Total area of 69 ft2
  • Walls and suction pipe arranged consistent with plant strainer
  • Bounding RHR strainer approach velocity for runout flow rate (4,500 gpm)
  • 1 inch submergence for vortex observations Alion Test Facility 32

2009 TESTING DEBRIS LOADS

  • Nukon debris quantity based on 7D ZOI
  • The following debris surrogates used
  • Nukon and latent fiber: Nukon
  • Coatings: Silicon carbide (4 to 20 micron)
  • Latent particulate: Silica sand w/ size distribution consistent with NEI 04-07 Volume 2 (75 to 2000 microns)
  • Interam fire barrier: Interam E-54A 33

2009 TEST PROCEDURE

  • Debris introduction consistent with the NRC March 2008 Guidance
  • For thin-bed testing, all particulate added first followed by small batches of fiber fines
  • For full-load testing, fiber and particulate mixture added in batches with constant particulate to fiber ratio
  • Chemical debris batched in last
  • Head loss allowed to stabilize after each chemical addition 34

2009 TEST RESULTS Thin-bed test Full-load test Debris Load head loss (ft) head loss (ft)

Fiber + Particulate 0.631 5.462 After calcium phosphate3 1.65 6.57 After sodium aluminum silicate3 2.60 11.80 Note:

1. Equivalent bed thickness of 0.625 inches, added in 5 fiber only batches, each 1/8 equivalent thickness
2. Equivalent bed thickness of 1.913 inches, added in 4 batches, each 0.478 equivalent thickness
3. Each chemical separately added in 3 equal batches 35

APPLICATION OF 2009 RESULTS

  • Total conventional debris plus calcium phosphate head loss will be applied at the start of recirculation
  • Total aluminum precipitate head loss will be applied when temperature decreases to solubility limit
  • Head loss will be scaled as a function of the average approach velocity and temperature based on the results of the flow sweeps performed at the end of the thin-bed and full-load tests
  • Results will be extrapolated to 30 days
  • Breaks that exceed the maximum tested fiber quantity, particulate quantity, or chemical precipitate quantity will be assigned a failing head loss value 36

STRAINER ACCEPTANCE CRITERIA

  • The NPSH margin is calculated using break-specific water level and flow rates
  • Minimum NPSH margin is 16.6 ft at 210.96°F and a containment pressure of -0.3 psig
  • Structural
  • Strainer stress analysis is based on a crush pressure of 24.0 ft for the RHR strainers and 23.0 ft for the CS strainers
  • Gas void
  • 2% void fraction at pump inlet 37

FIBER PENETRATION TESTING

  • Multiple tank tests were performed at Alden in 2014 for various strainer approach velocities, number of strainer disks and boron / buffer concentrations
  • Nukon prepared into fines per latest NEI Guidance
  • A curve fit of the test data will be used to evaluate maximum fiber penetration for a 16 disk strainer (RHR) and 14 disk strainer (CS).

38

FIBER PENETRATION RESULTS 1800 1600 Cumulative Fiber Penetration (g) 1400 1200 1000 800 600 400 200 0

0 5000 10000 15000 20000 Cumulative Fiber Addition (g) 39

IN-VESSEL EFFECTS

  • Transport/accumulation of fiber to the core that penetrates RHR strainers is dependent on break location and flow path and will be based on WCAP-17788
  • Values for core blockage and boron precipitation acceptance criteria will be based on WCAP-17788 40

EX-VESSEL EFFECTS

  • A bounding evaluation performed for all components
  • Existing evaluations will be updated in accordance with WCAP-16406-P-A,Evaluation of Downstream Sump Debris Effects in Support of GSI-191 Revision 1 and the accompanying NRC SER 41

LOCADM

  • A bounding calculation performed to cover all scenarios
  • Existing evaluations will be updated in accordance with WCAP-16793-A,Evaluation of Long-Term Cooling Considering Particulate, Fibrous, and Chemical Debris in the Recirculating Fluid Revision 2 and the accompanying NRC SER 42

AGENDA

  • 8:30 - Introductions/Purpose of Meeting
  • 8:45 - High Level Overview of Vogtle Closure Strategy &

What we have learned

  • 9:00 - Review of Inputs and Assumptions
  • 10:00 - Explanation of Modeling
  • 11:30 - Interface with PRA
  • 12:15 - Uncertainty Quantification
  • 12:45 - Lunch
  • 13:45 - Continued Discussion of Inputs and Assumptions
  • 14:30 - Continued Discussion of PRA and Uncertainty
  • 15:00 - Submittal Documentation
  • 15:45 - Closing Remarks 43

GSI-191 ACCEPTANCE CRITERIA Acceptance Criteria Method for Addressing Debris exceeds limits for upstream Bounding analysis - part of transport blockage, e.g. refueling canal drain calculation Strainer head loss exceeds pump NPSH Break-specific analysis based on margin or strainer structural margin tested debris limits and maximum tested head losses Gas voids from degasification or flashing Break-specific analysis based on exceed strainer/pump limits head loss, pool temperature, etc.

Pumps fail due to air intrusion from Bounding analysis vortexing Penetrated debris exceeds ex-vessel Bounding analysis wear and blockage limits Penetrated debris exceeds in-vessel fuel Break-specific analysis based on blockage and boron precipitation limits penetration testing and flow splits Debris accumulation on cladding Bounding analysis prevents adequate heat transfer 44

OVERVIEW OF MODELING

  • GSI-191 phenomena evaluated in a holistic, time-dependent manner with an evaluation tool called NARWHAL
  • Developed using object oriented design
  • Tracks movement of water and debris
  • Evaluates each break with incremental time steps up to 30 days
  • Evaluates range of breaks to determine which ones pass/fail the strainer and core acceptance criteria
  • Uses top-down LOCA frequencies to calculate conditional failure probabilities for small, medium, and large breaks 45

OVERVIEW OF MODELING

  • NARWHAL prototype has been used for preliminary risk-informed evaluations by several plants
  • Version 1.0 is currently under development
  • Software requirements, design, implementation, V&V, and user documentation prepared under ENERCONs Appendix B QA program
  • NARWHALs object oriented design allows users to model unique plant-specific geometry with a common executable file
  • Simplifies software maintenance
  • Significantly reduces potential for software errors 46

OVERVIEW OF MODELING Spray Nozzles CS Core Reactor Break Vessel RWST ECCS Containment Compartments ECCS Sump Pool Strainers 47

OVERVIEW OF MODELING 48

OVERVIEW OF MODELING

  • NARWHAL integrates models and inputs from design basis calculations and GSI-191 tests/analyses:
  • Water volumes, temperature profiles, and pH from design basis calculations
  • Debris quantities from BADGER database
  • Location-specific transport fractions from transport calculation
  • Chemical effects calculated using WCAP-16530 and Howe model
  • Conventional and chemical head loss from 2009 strainer testing (scaled for temperature and flow)
  • NPSH and structural margin from design basis calculations
  • Degasification calculated using standard physical models
  • Time-dependent penetration using data fit from 2014 strainer testing
  • Core failure calculated using WCAP-17788 model and limits 49

OVERVIEW OF MODELING

3. Debris quantities outside ZOI (unqualified coatings, latent, miscellaneous)
2. ZOI debris 4. Blowdown 5. Washdown
1. Select unique quantities from transport to transport from break location, BADGER (insulation containment containment size, and and qualified compartments compartments to orientation coatings) and sump pool sump pool
6. Pool fill transport 7. Recirculation from sump pool to transport from strainers and sump pool to inactive cavities strainers
9. Debris 8. Debris accumulation on penetration core through strainers 50

OVERVIEW OF MODELING

1. Corrosion/

dissolution of 3. Precipitate metals, concrete, solubility limit and debris by CS

2. Corrosion/

dissolution of 4. Formation of metals, concrete, chemical and debris in precipitates sump pool

5. Recirculation transport from sump pool to strainers
6. Debris 7. Debris penetration accumulation on through strainers core 51

OVERVIEW OF MODELING 5b. Does

1. Strainer Head void fraction No 6b. Pass Loss (CSHL + 2. Degasification exceed strainer Conventional HL gas void fraction strainer or criteria

+ Chemical HL) pump limits?

Yes

3. Pump NPSH 7b. Fail strainer 5a. Does margin criteria 6a. Pass No HL Exceed strainer NPSH or criteria structural margin?
4. Strainer structural margin Yes 7a. Fail strainer criteria 52

OVERVIEW OF MODELING 2b. Does quantity No

1. Core debris exceed accumulation blockage limits?

2a. Yes Does quantity Yes 3. Fail core exceed criteria boron limits?

No 4. Pass core criteria 53

OVERVIEW OF MODELING

  • Analytical results showing whether a given break passes or fails are highly dependent on the assumptions and models used to evaluate the break
  • For example, if sprays are not initiated for a given break:
  • A smaller fraction of debris is washed down to the containment pool
  • Corrosion/dissolution is reduced (unsubmerged materials)
  • A larger fraction of debris in the pool is transported to the RHR strainers
  • It is not always obvious what conditions are bounding 54

INPUTS Input Values Sensitivity LOCA Frequency Based on NUREG-1829/PRA Need to address uncertainty Debris Generation Based on consensus models None Debris Transport Based on consensus models None Containment Temp Design basis None Pool Temp Design basis None Containment Spray Competing effects (e.g. washdown, strainer Need to run for activation and Activation and Duration surface area, corrosion) duration Pool Volume/Level Based on consensus models None Pool pH Design Basis maximum for corrosion, minimum None for precipitation ECCS Flow Rates Design basis (same for all breaks) None Aluminum and Calcium WCAP-16530 and UNM equations None Corrosion Aluminum Precipitation ANL equation None Penetration 2014 testing Need to address uncertainty Head Loss Maximums Extrapolated and scaled from 2009 None tests final values 55

DIFFERENCES (STP VS. VOGTLE)

  • Physical
  • ECCS trains (3 vs 2)
  • Strainer configuration (3 combined vs 4 separate)
  • Strainer design (flow control vs no flow control)
  • Strainer surface area (~1800 ft2 vs 765 ft2) 56

DIFFERENCES (STP VS. VOGTLE)

  • Modeling
  • Risk Informed Software (CASA Grande/RUFF/FiDOE vs BADGER/NARWHAL)
  • Break size and orientation sampling (Search algorithm vs uniform)
  • Strainer head loss test protocol (flume vs tank)
  • Aluminum and Calcium precipitate quantity (bounding test vs break-specific analysis)
  • Aluminum passivation (not credited vs credited using Howe paper)
  • Failure criteria (bounding analysis vs time-dependent comparison of head loss with NPSH, gas void, and flashing)
  • GSI-191 risk quantification (critical break size frequency vs conditional failure probability entered into PRA) 57

AGENDA

  • 8:30 - Introductions/Purpose of Meeting
  • 8:45 - High Level Overview of Vogtle Closure Strategy &

What we have learned

  • 9:00 - Review of Inputs and Assumptions
  • 10:00 - Explanation of Modeling
  • 11:30 - Interface with PRA
  • 12:15 - Uncertainty Quantification
  • 12:45 - Lunch
  • 13:45 - Continued Discussion of Inputs and Assumptions
  • 14:30 - Continued Discussion of PRA and Uncertainty
  • 15:00 - Submittal Documentation
  • 15:45 - Closing Remarks 58

INTERFACE WITH PRA

  • Equipment configuration logic from PRA model of record
  • GSI-191 conditional failure probabilities from NARWHAL
  • Final risk calculation will be performed using the Vogtle model of record with GSI-191 conditional failure probabilities 59

INTERFACE WITH PRA

4. PRA quantification of CDF & LERF with no GSI-191 failures
2. NARWHAL
1. PRA identification evaluation of GSI-191 of accident scenarios phenomena for each 3. PRA and equipment risk-significant quantification of 5. Calculate configurations that scenario/configuration CDF & LERF with CDF & LERF are risk-significant to to determine CFPs for GSI-191 failures GSI-191 each strainer/core failure basic event 6.

7a. Identification Meets No Yes Output to of analytical RG submittal refinements to 1.174 documentation analysis Criteria

?

7b. Identification of potential plant modifications (physical or procedural) 60

METHODOLOGY FOR USING LOCA FREQUENCY TO CALCULATE CONDITIONAL FAILURE PROBABILITY

  • Partition PRA categories (Catk) into size ranges (SRi)
  • Calculate probability of a LOCA occurring in each size range for every PRA category (P(SRilCatk))
  • Calculate probability of a LOCA occurring at each weld (Weldj) within each size range (P(WeldjlSRi))
  • Calculate probability estimate for success criteria failure (SCF) at each weld in each size range (SCFlWeldj,SRi))

(P

  • Calculate probability estimate for success criteria failure at every PRA category (P(SCFlCatk))

61

METHODOLOGY FOR USING LOCA FREQUENCY TO CALCULATE CONDITIONAL FAILURE PROBABILITY Nk Mi SCF Cat k = P SR i lCat k P Weldj SR i P P SCF Weldj , SR i i=1 j=1 From NUREG-1829 From NUREG-1829 From NARWHAL (or Vogtle PRA) (or Vogtle PRA) using top-down methodology 62

ILLUSTRATION OF PRA CATEGORIES AND LOCA FREQUENCY SIZE RANGES 63

EQUIVALENT DEGB DIAMETER

The correlations which relate flow rates and LOCA size categories to the effective break sizes in each PWR and BWR system are summarized in Table 3.8. The break size corresponds to a partial fracture for pipes with larger diameters than the break size, a complete single-ended rupture in pipes with the same inside diameter, or a DEGB in pipes having inside diameters 1/2 times the break size. All panelists used these correlations to relate their elicitation responses determined for the effective break sizes to the appropriate LOCA size category. It is important to stress that breaks can occur in either LOCA sensitivity piping or non-piping systems and components.

64

METHOD FOR ADDRESSING DEGB FREQUENCIES

  • NUREG-1829 provides LOCA frequencies vs. break flow rates, which are converted to equivalent diameter break sizes
  • Double ended guillotine breaks (DEGBs) have a flow rate (area) twice as large as the pipe cross-sectional area
  • Equivalent diameter for DEBG is calculated using pipe inner diameter: DDEGB,Eq = 2
  • Dpipe
  • Breaks Dpipe assumed to progress to DEGB for debris generation (bounding debris quantities)
  • Frequency associated with DEGB tail assigned to Dpipe break size to calculate conditional failure probability within each size range
  • NUREG-1829 only provides frequencies up to 31 breaks, so frequencies corresponding to primary loop pipe DDEGB,Eq values is determined through log-log extrapolation
  • 27.5 38.9
  • 29 41.0
  • 31 43.8 65

METHOD FOR ADDRESSING DEGB FREQUENCIES 66

EQUIPMENT CONFIGURATION

  • Most likely situation would be that all equipment is available and fully functional
  • Equipment failures due to non-GSI-191 related issues can have a major effect on GSI-191 phenomena (debris transport, flow splits, temperature and pressure profiles, etc.)
  • There are many possible equipment failure combinations (RHR pumps, containment spray pumps, charging pumps, SI pumps, fan coolers, etc.)
  • At Vogtle, GSI-191 effects can be reasonably represented or bounded for most equipment failure combinations by the cases where all pumps are running or a single train failure 67

EQUIPMENT CONFIGURATION

  • All equipment available bounding or reasonably representative for:
  • No pump failures: ~79%
  • 1 or 2 CS pump failures: ~18% ~97%
  • 1 RHR pump failure bounding or reasonably representative for other equipment failure configurations: ~3%
  • The values above are being used to determine which configurations to investigate with NARWHAL
  • Conditional failure probabilities for GSI-191 basic events (strainer and core failure) will be manually entered into the PRA model of record to calculate CDF 68

CONDITIONAL FAILURE PROBABILITIES

  • Core conditional failure probability (CFP) higher when all pumps are operating
  • Strainer CFP higher with 1 train operating
  • Additional scenarios will likely need to be evaluated (1 CS pump failure, 1 RHR pump failure, etc.)

69

PRA MODEL CHANGES

  • Vogtle PRA model modified to incorporate conditional failure probabilities (CFPs) for GSI-191 strainer failures and core failures with associated initiating events and equipment configurations
  • GSI-191 failure defined using PRA success criteria
  • Strainer failure defined as failure of RHR pump/strainer
  • CS strainer failures are calculated in NARWHAL, but not used in PRA
  • GSI-191 failures binned into following CFP groups (separate CFPs defined for each LOCA category and each pump state)
  • Core failures
  • RHR Strainer A failures (without Strainer B or core failures)
  • RHR Strainer B failures (without Strainer A or core failures)
  • RHR Strainer A and B failures (without core failures)
  • Each core and strainer CFP represented in PRA with a basic event that is combined with LOCA initiating event and pump failure logic to represent pump state associated with CFP 70

PRA MODEL CHANGES 71

AGENDA

  • 8:30 - Introductions/Purpose of Meeting
  • 8:45 - High Level Overview of Vogtle Closure Strategy &

What we have learned

  • 9:00 - Review of Inputs and Assumptions
  • 10:00 - Explanation of Modeling
  • 11:30 - Interface with PRA
  • 12:15 - Uncertainty Quantification
  • 12:45 - Lunch
  • 13:45 - Continued Discussion of Inputs and Assumptions
  • 14:30 - Continued Discussion of PRA and Uncertainty
  • 15:00 - Submittal Documentation
  • 15:45 - Closing Remarks 72

UNCERTAINTY QUANTIFICATION

  • Draft Reg Guide 1.229 requires uncertainty quantification for risk-informed GSI-191 evaluation
  • Two different approaches that could be used to quantify uncertainty
  • Simplified approach using sensitivity analysis
  • Statistical sampling of input parameter distributions and propagating uncertainties
  • Consensus inputs and models are considered to have no uncertainty
  • Vogtle inputs that require uncertainty quantification
  • LOCA frequency values
  • Possibly others 73

UNCERTAINTY QUANTIFICATION USING SENSITIVITY ANALYSIS 74

UNCERTAINTY QUANTIFICATION USING STATISTICAL SAMPLING

1. Select 4. Evaluate GSI- 5. Compare to GSI-191
2. Sample all 3. Select break equipment 191 phenomena acceptance criteria and PRA random input location, size, failure at each time step success criteria to identify values and orientation configuration for 30 days strainer or core failures 6.

Sufficient No breaks evaluated to estimate CFP?

Yes 7.

Sufficient No random samples to estimate CFP PDF?

Yes

8. All 9.

No significant Yes Output equipment to PRA configs.

model evaluated?

75

AGENDA

  • 8:30 - Introductions/Purpose of Meeting
  • 8:45 - High Level Overview of Vogtle Closure Strategy &

What we have learned

  • 9:00 - Review of Inputs and Assumptions
  • 10:00 - Explanation of Modeling
  • 11:30 - Interface with PRA
  • 12:15 - Uncertainty Quantification
  • 12:45 - Lunch
  • 13:45 - Continued Discussion of Inputs and Assumptions
  • 14:30 - Continued Discussion of PRA and Uncertainty
  • 15:00 - Submittal Documentation
  • 15:45 - Closing Remarks 76

SUBMITTAL DOCUMENTATION DISCUSSION Planning to follow the format, content, and depth of the August 2015 STP LAR

  • GL 2004-02 Response following Staff Review Guidance (will have some pointers to risk informed summary)
  • Risk Quantification and Summary
  • Defense in Depth and safety margin
  • GDC 50.67 (need being evaluated)
  • License amendment request
  • Tech Spec markups
  • Tech Spec Bases
  • List of commitments 77

QUALITY ASSURANCE

  • GSI-191 calculations are being revised to be safety related under vendor Appendix B QA programs
  • Head loss testing in 2009 was conducted and documented as safety related under vendor Appendix B QA program
  • Penetration testing was conducted and documented in 2014 as non-safety related following work practices established by vendor Appendix B QA program
  • PRA has undergone an industry peer review per RG 1.200 and the ASME/ANS PRA Standard for CDF and LERF (RA-Sa-2009) 78

CONCLUSIONS

  • Models used to analyze GSI-191 phenomena at Vogtle are consistent with methods accepted for design basis evaluations
  • Preliminary results indicate that risk associated with GSI-191 is very low 79

SCHEDULE UPDATE EXPECTED MILESTONE Current Status COMPLETION DATE Develop containment CAD model to include Complete Complete pipe welds Conduct meeting with NRC 3rd Quarter 2013 Complete Modify probabilistic risk assessment (PRA) to 4th Quarter 2013 Complete include Strainer and Core Blockage events Perform Chemical Effects testing 1st Quarter 2014 Complete Perform thermal and hydraulic modeling of RCS, 1st Quarter 2014 Complete Core, and Containment conditions Perform Strainer Head Loss and Bypass testing to Strainer Bypass Testing - Complete 2nd Quarter 2014 establish correlation for range of break sizes Strainer Headloss Testing - Using 2009 Vogtle test Assemble base inputs for CASA Grande 2nd Quarter 2014 Complete - Using NARWHAL instead of CASA Grande Evaluate Boric Acid Precipitation impacts 3rd Quarter 2015 Plan on using PWROG WCAP-17788 Finalize inputs to CASA Grande 3rd Quarter 2015 In Progress, Using NARWHAL instead of CASA Grande Complete Sensitivity Analyses in/for CASA 4th Quarter 2015 2nd Quarter 2016 Grande Integrate CASA Grande results into PRA to 1st Quarter 2016 3rd Quarter 2016 determine CDF and LERF To be established through Projected 1st Quarter 2017, require input from:

Licensing Submittal for VEGP discussions with SE on STP Pilot Project and SE on WCAP-17788; NRC - tentatively which are not yet available.

September 2016 80

AGENDA

  • 8:30 - Introductions/Purpose of Meeting
  • 8:45 - High Level Overview of Vogtle Closure Strategy &

What we have learned

  • 9:00 - Review of Inputs and Assumptions
  • 10:00 - Explanation of Modeling
  • 11:30 - Interface with PRA
  • 12:15 - Uncertainty Quantification
  • 12:45 - Lunch
  • 13:45 - Continued Discussion of Inputs and Assumptions
  • 14:30 - Continued Discussion of PRA and Uncertainty
  • 15:00 - Submittal Documentation
  • 15:45 - Closing Remarks 81

BACKUP SLIDES 82

EXAMPLE CALCULATION

  • Detailed physical calculations
  • Break Location 11201-049-16-RB (10.5 DEG hot leg side break in annulus near surge line)
  • Transport fractions: Maximum
  • RHR flow rate: 3,700 gpm (design flow)
  • CS duration: 6 Hours
  • Design basis temperature profile - Max Safeguards, with pool temperature drop to 90°F at Day 30
  • Minimum water level profile
  • Sump pH used for corrosion: 8.1
  • pH used for solubility: 7.6
  • Submerged Concrete: 2,813 ft2

BREAK LOCATION 84

POOL LEVEL 85

FIBER TRANSPORT TO ONE RHR STRAINER (1 TRAIN W/SPRAY)

Debris Type Size DG Quantity Transport Quantity (ft3) Fraction* (ft3)

Nukon Fines 9.5 58% 6.1 Small 32.7 7%** 1.5**

Large 14.8 4%** 0.6**

Intact 15.9 0% 0.0 Total 72.9 8.2 Latent Fines 12.5 58% 7.8 Total 85.4 16.0

  • Transport fraction takes into account time-dependent transport (CS strainer active for 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />)
    • Combined fraction of fines due to erosion and intact pieces 86

PARTICULATE TRANSPORT TO ONE RHR STRAINER (1 TRAIN W/SPRAY)

Debris Type Size DG Quantity (lbm) Transport Fraction Quantity (lbm)

Interam Fines, Smalls 121.2 58% 70.3 Unqualified Epoxy Particulate 2,602.0 58% 1,509.2 Unqualified IOZ Particulate 25.0 58% 14.5 Unqualified Alkyd Particulate 32.0 58% 18.6 Qualified Epoxy Particulate 7.5 58% 4.4 Qualified IOZ Particulate 2.4 58% 1.4 Latent dirt/dust Particulate 170.0 58% 98.6 Total 2,960.1 1,717.0 87

CHEMICAL PRECIPITATE QUANTITIES 88

ALUMINUM CONCENTRATION AND SOLUBILITY 89

HEAD LOSS

  • Clean strainer head loss: Bounding value of 0.162 ft at 4,500 gpm
  • Conventional head loss
  • Head loss due to chemical precipitates Max Head Loss Head Loss with Head Loss Transported Tested Corresponding to Flow and Type Quantity Quantity* Max Tested Quantity Temperature (Unadjusted) Correction**

Fiber 16.0 ft3 109.9 ft3 5.46 ft 4.41 ft Particulate 1,717.0 lbm 3,914.5 lbm Calcium 9.6 lbm 52.8 lbm 1.11 ft 0.90 ft Phosphate Sodium Aluminum 74.5 lbm 89.0 lbm 5.24 ft 4.23 ft Silicate Extrapolation 2.13 ft*** 1.72 ft to 30 days

  • Values scaled to 16 disk RHR strainer area
    • Corrected to 3700 gpm and 90°F
      • Applied at switchover to hot leg recirculation 90

VOID FRACTION AT RHR PUMP Short Term: Long Term:

91

DEBRIS TRACKING

  • 100% capture of particulate and precipitate at strainer
  • All fiber is treated as fines 92

CORE ACCUMULATION 93

SUMMARY

Criteria Acceptance Example Results Example Criteria Pass/Fail NPSH Margin 16.6 ft 11.3 ft Pass Strainer Structural 24.7 ft 11.3 ft Pass Margin Head loss less than Partial Fully 1/2 submerged Pass Submergence submerged height Gas Void Fraction 2% at the pump 0.24% at the pump Pass Exceeds what was Debris Limit Not exceeded Pass tested 75 g/FA for Hot Leg 32 g/FA Assumed core limits Breaks (to be replaced with Pass WCAP-17788 criteria) 7.5 g/FA for Cold Leg N/A Breaks 94