| number = ML16153A423
| number = ML16153A423
| issue date = 06/01/2016
| issue date = 06/01/2016
| title = Virgil C. Summer Nuclear Station Unit 1 - Notification of a Triennial Fire Protection Baseline Inspection (NRC Inspection Report No. 05000395/2016010)
| title = Notification of a Triennial Fire Protection Baseline Inspection (NRC Inspection Report No. 05000395/2016010)
| author name = Shaeffer S M
| author name = Shaeffer S
| author affiliation = NRC/RGN-II/DRS/EB2
| author affiliation = NRC/RGN-II/DRS/EB2
| addressee name = Lippard G
| addressee name = Lippard G
Line 14: Line 14:
| page count = 13
| page count = 13
}}
}}
See also: [[followed by::IR 05000395/2016010]]
See also: [[see also::IR 05000395/2016010]]


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION  
{{#Wiki_filter:UNITED STATES
REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257
                                    NUCLEAR REGULATORY COMMISSION
  June 1, 2016  
                                                  REGION II
                                245 PEACHTREE CENTER AVENUE NE, SUITE 1200
Mr. George Lippard III  
                                        ATLANTA, GEORGIA 30303-1257
Vice President - Nuclear Operations  
                                              June 1, 2016
South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station P.O. Box 88  
Mr. George Lippard III
Jenkinsville, SC 29065  
Vice President - Nuclear Operations
South Carolina Electric & Gas Company
Virgil C. Summer Nuclear Station
P.O. Box 88
Jenkinsville, SC 29065
SUBJECT: VIRGIL C. SUMMER NUCLEAR STATION UNIT 1 - NOTIFICATION OF A
                TRIENNIAL FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION
                REPORT NO. 05000395/2016010)
Dear Mr. Lippard:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
staff will conduct a triennial fire protection baseline inspection at V.C Summer Nuclear Station,
Unit 1. The inspection team will be led by Rodney Fanner, a Senior Reactor Inspector from the
NRC Region II Office. The team will be composed of personnel from the NRC Region II Office
and NRC Headquarters staff. The inspection will be conducted in accordance with IP
71111.05XT, the NRC's baseline fire protection for licensees licensed to the NFPA 805
requirements, dated January 31, 2013.
On May 19, 2016, during a telephone conversation between Mr. Renard Perry (V.C. Summer
Licensing) and Mr. R. Fanner of USNRC our respective staffs discussed arrangements for an
information gathering onsite visit and a two-week onsite inspection were confirmed. The
schedule for the inspection is as follows:
                  *  Information Gathering Visit:      August 23 - 25, 2016
                  *  Week 1 of onsite inspection:      October 03 - 07, 2016
                  *  Week 2 of onsite inspection:      October 17 - 21, 2016
The purposes of the information gathering visit are to obtain information and documentation
needed to support the inspection, to become familiar with the fire protection program, fire
protection features, post-fire safe shutdown capabilities, plant layout, mitigating strategies to
address Title 10 of the Code of Federal Regulations (10 CFR) 50.54(hh)(2); and, as necessary,
obtain plant specific site access training and badging for unescorted site access.
An initial list of the documents the team will review during the conduct of the inspection is listed
in Enclosures 1 and 2. The team leader will contact you with any additional specific document
requests prior to the information gathering visit.
During the information gathering visit, the team will also discuss the following inspection support
administrative details: office space size and location; specific documents requested to be made
available to the team in their office spaces; arrangements for reactor site access (including
radiation protection training, security, safety and fitness for duty requirements); and the
availability of knowledgeable plant staff and licensing organization personnel to serve as points
of contact during the inspection.


G. Lippard                                     2
SUBJECT: VIRGIL C. SUMMER NUCLEAR STATION UNIT 1 - NOTIFICATION OF A TRIENNIAL FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION
We request that during the on-site inspection weeks that you ensure that information be readily
 
accessible to the team for their review copies of analyses, evaluations or documentation
REPORT NO. 05000395/2016010)
regarding the implementation and maintenance of the station fire protection program, including
post-fire safe shutdown capability. Of specific interest for the fire protection portion of the
Dear Mr. Lippard:
inspection are documents which establish that your fire protection program satisfies NRC
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
regulatory requirements and conforms to applicable NRC and industry fire protection guidance
staff will conduct a triennial fire protection baseline inspection at V.C Summer Nuclear Station, Unit 1. The inspection team will be led by Rodney Fanner, a Senior Reactor Inspector from the NRC Region II Office.  The team will be composed of personnel from the NRC Region II Office and NRC Headquarters staff. The inspection will be conducted in accordance with IP 71111.05XT, the NRC's baseline fire protection for licensee's licensed to the NFPA 805 requirements, dated January 31, 2013.  
(i.e., fire protection compliance assessment documents). For the 10 CFR 50.54(hh)(2) portion of
On May 19, 2016, during a telephone conversation between Mr. Renard Perry (V.C. Summer Licensing) and
the inspection, those documents implementing your mitigating strategies and demonstrating the
Mr. R. Fanner of USNRC our respective staffs discussed arrangements for an information gathering
management of your commitments for the strategies are of specific interest. Also, personnel
onsite visit and a two-week onsite inspection were confirmed.  The schedule for the inspection is as follows:
should be available at the site during the inspection that are knowledgeable regarding plant
 
systems required to achieve and maintain safe shutdown conditions from inside and outside the
* Information Gathering Visit: August 23 - 25, 2016
control room; including the electrical aspects of the relevant post-fire safe shutdown analyses,
* Week 1 of onsite inspection: October 03 - 07, 2016
reactor plant fire protection systems and features, and the station fire protection program and its
* Week 2 of onsite inspection: October 17 - 21, 2016
implementation.
The purposes of the information gathering visit are to obtain information and documentation
This letter does not contain new or amended information collection requirements subject to the
needed to support the inspection, to become familiar with the fire
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
protection program, fire protection features, post-fire safe shutdown capabilities, plant layout, mitigating strategies to address Title 10 of the Code of Federal Regulations (10 CFR) 50.54(hh)(2); and, as necessary, obtain plant specific site access training and badging
requirements were approved by the Office of Management and Budget (OMB), under control
for unescorted site
number 3150 0011. The NRC may not conduct or sponsor, and a person is not required to
access. An initial list of the documents the team will review during the conduct of the inspection is listed
respond to, a request for information or an information collection requirement unless the
in Enclosures 1 and 2. The team leader will contact you with any additional specific document
requesting document displays a currently valid Office of Management and Budget control
requests prior to the information gathering visit.
number.
In accordance with 10 CFR 2.390 of the NRC Rules and Practices, a copy of this letter and its
enclosures will be available electronically for public inspection in the NRC Public Document
Room or from the Publically Available Records (PARS) component of NRCs document
system(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.hmtl (the Public Electronic Reading Room).
Your cooperation and support during this inspection will be appreciated. If you have questions
concerning this inspection, or the inspection team's information or logistical needs, please
contact Rodney Fanner, the team leader, in the Region II Office at 404-997-4638 or me at
404-997-4521.
                                                Sincerely,
                                                /RA/
                                                Scott M. Shaeffer, Chief
                                                Engineering Branch 2
                                                Division of Reactor Safety
Docket Nos.: 50-395;
License Nos.: NPF-12
Enclosures:
1. Triennial Fire Protection Inspection Supporting Documentation
2. Mitigating Strategies Supporting Documentation
cc: Distribution via Listserv


During the information gathering visit, the team will also discuss the following inspection support
administrative details: office space size and location; specific documents requested to be made
available to the team in their office spaces; arrangements for reactor site access (including
radiation protection training, security, safety and fitness for duty requirements); and the
availability of knowledgeable plant staff and licensing organization personnel to serve as points
of contact during the inspection.
G. Lippard 2
We request that during the on-site inspection weeks that you ensure that information be readily accessible to the
team for their review copies of analyses,
evaluations or documentation regarding the implementation and maintenance of the station fire
protection program, including post-fire safe shutdown capability.  Of specific interest for the fire protection portion of the inspection are documents which establish that your fire protection program satisfies NRC
regulatory
requirements and conforms to applicable NRC and industry fire protection guidance (i.e., fire
protection compliance assessment documents).  For the 10 CFR 50.54(hh)(2) portion of
the inspection, those documents implementing your mitigating strategies and demonstrating the
management of your commitments for the strategies are of specific interest.  Also, personnel
should be available at the site during the inspection that are knowledgeable regarding plant
systems required to achieve and maintain safe shutdown conditions from inside and outside the
control room; including the electrical aspects of the relevant post-fire safe shutdown analyses,
reactor plant fire protection systems and features, and the station fire protection program and its
implementation.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection
requirements were approved by the Office of Management and Budget (OMB), under control
number 3150 0011.  The NRC may not conduct or sponsor, and a person is not required to respond to, a
request for information or an information collection requirement unless the requesting document
displays a currently valid Office of Management and Budget control number.  In accordance with 10 CFR 2.390 of the NRC Rules and Practices, a copy of this letter and its
enclosures will be available electronically for public inspection in the NRC Public Document
Room or from the Publically Available Records (PARS) component of NRCs document system(ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.hmtl (the Public Electronic Reading Room).
Your cooperation and support during this inspection will be appreciated. If you have questions
concerning this inspection, or the inspection team's information or logistical needs, please
contact Rodney Fanner, the team leader, in the Region II Office at 404-997-4638 or me at 
404-997-4521.


  Sincerely,
_________________________                SUNSI REVIEW COMPLETE    FORM 665 ATTACHED
      /RA/  Scott M. Shaeffer, Chief Engineering Branch 2
OFFICE              RII:DRS        RII:DRS
Division of Reactor Safety
SIGNATURE          RJF2            SMS
  NAME                RFANNER        SSHAEFFER
Docket Nos.: 50-395; 
DATE                    .5/31/2016    .6/1/2016  6/ /2016      6/ /2016      6/ /2016    6/ /2016      6/ /2016
E-MAIL COPY?          YES      NO   YES      NO YES    NO    YES    NO    YES    NO    YES    NO    YES    NO
       
Letter to George Lippard III, from Scott M Shaeffer dated June 1, 2016
SUBJECT: VIRGIL C. SUMMER NUCLEAR STATION UNIT 1 - NOTIFICATION OF A
            TRIENNIAL FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION
            REPORT NO. 05000395/2016010)
DISTRIBUTION:
RIDSNRRDIRS PUBLIC
RidsNrrPMV.C.Summer


License Nos.: NPF-12
                        Fire Protection Program Supporting Documentation
The documents and information requested below should generally be made available to the
inspection team during the on-site information gathering visit for the team's use both on-site and
off-site during the inspection. Electronic format is the preferred media, except where specifically
noted. If electronic media is made available via an internet based remote document
management system, then the remote document access must allow inspectors to download,
save, and print the documents in the NRC's regional office. Electronic media on compact disc
or paper records (hard copy) are acceptable. At the end of the inspection, the documents in the
team's possession will not be retained.
Approximately three weeks before the on-site information gathering visit, the following
documents should be made available to the team leader for review in the regional office:
    *  Post-fire Nuclear Safety Capability, Systems, and Separation Analysis (request A.1)
    *  Fire Hazards Analysis and/or NFPA 805 Design Basis Document (request A.2)
    *  Fire Probabilistic Risk Assessment (PRA) Summary Document or full PRA Document
        (request A.3)
    *  NFPA 805 Transition Report, developed in accordance with NEI 04-02 (request A.4)
    *  Fire Risk Evaluations (i.e., NFPA 805 Section 2.4.3) (request A.5)
    *  Plant Change Evaluations (i.e., NFPA 805 Section 2.4.4) (request A.6)
    *  Analysis that demonstrates nuclear safety performance criteria can be achieved and
        maintained for those areas that require recovery actions (request A.7)
Based on review of the above seven documents, team leader should identify a preliminary list of
fire areas being considered for inspection prior to the on-site information gathering visit. During
the information gathering visit, or shortly thereafter, the fire areas selected for inspection will be
determined.
This document request is based on typical documents that a generic plant might have. As such,
this generic document request is not meant to imply that any specific plant is required to have all
of the listed documents. It is recognized that some documents listed below may not be
available for your plant. In addition, the document titles listed below are based on typical
industry document names; your plant specific document titles may vary.
                                                                                          Enclosure 1


  Enclosures: 1Triennial Fire Protection Inspection Supporting Documentation
                                              2
2.  Mitigating Strategies Supporting Documentation
A. DESIGN AND LICENSING BASIS DOCUMENTS
   cc: Distribution via Listserv 
  A.1 Post-fire Nuclear Safety Capability, Systems, and Separation Analysis.
  A.2  Fire Hazards Analysis and/or NFPA 805 Design Basis Document.
  A.3  Fire PRA Summary Document or full PRA Document (if summary document not
        available).
  A.4  NFPA 805 Transition Report, developed in accordance with NEI 04-02.
  A.5 Fire Risk Evaluations (i.e., NFPA 805 Section 2.4.3).
  A.6  Plant Change Evaluations (i.e., NFPA 805 Section 2.4.4).
  A.7  Analysis that demonstrates nuclear safety performance criteria can be achieved and
        maintained for those areas that require recovery actions.
  A.8 Fire Protection Program and/or Fire Protection Plan.
   A.9  LIST of post-fire safe shutdown components (i.e., safe shutdown equipment list).
  A.10 Fire Protection System Design Basis Document.
  A.11 LIST of applicable NFPA codes and standards and issuance dates (i.e., codes of
        record).
  A.12 LIST of deviations from (a) NFPA codes of record, or (b) NFPA 805 fundamental fire
        protection program and design elements (i.e., NFPA 805, Chapter 3).
  A.13 NFPA Compliance Review Report.
  A.14 Report or evaluation that compares the fire protection program to the NRC Branch
        Technical Position (BTP) 9.5-1 Appendix A.
  A.15 COPY of licensee submittals and NRC safety evaluation reports that are specifically
        listed in the facility operating license for the approved fire protection program.
  A.16 COPY of NRC Safety Evaluation Reports that form the licensing basis for:
        * Fire Protection Program; and
        * Post-fire Nuclear Safety Capability.
  A.17 COPY of NRC approved exemptions for plant fire protection and post-fire nuclear
        safety capability features.
  A.18 COPY of exemption requests submitted but not yet approved for plant fire protection
        and post-fire nuclear safety capability features.
  A.19 LIST of nuclear safety capability design changes completed in the last three years
        (including their associated 10 CFR 50.59 and NFPA 805 plant change evaluations).
  A.20 Facility Operating License.


_________________________  SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS      SIGNATURE RJF2 SMS      NAME RFANNER SSHAEFFER      DATE .5/31/2016 .6/1/2016 6/   /2016 6/   /2016 6/   /2016 6/   /2016 6/   /2016 E-MAIL COPY?    YES NO      YES NO      YES NO      YES NO      YES NO      YES NO      YES NO     
                                            3
  Letter to George Lippard III, from Scott M Shaeffer dated June 1, 2016
  A.21 Technical Specifications (electronic format only).
  SUBJECT: VIRGIL C. SUMMER NUCLEAR STATION UNIT 1 - NOTIFICATION OF A TRIENNIAL FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION
  A.22 Technical Requirements Manual (electronic format only).
  A.23 Updated Final Safety Analysis Report (electronic format only).
B. GENERAL PLANT DESIGN DOCUMENTS
  B.1 Piping and instrumentation diagrams (P&IDs) and legend list for components used to
        achieve and maintain nuclear safety performance criteria for: (C-size paper
        drawings)
        * Fires outside the main control room; and
        * Fires in areas requiring recovery actions at other than primary control stations.
  B.2  P&IDs and legend list for fire protection systems, including fire water supply, water
        suppression sprinklers & deluge, and CO2 and Halon systems (C-size paper
        drawings).
   B.3  Yard layout drawings for underground fire protection buried piping (C-size paper
        drawings).
   B.4  AC and DC electrical system single line diagrams, from off-site power down to the
        highest safety-related bus level (typically 4kV, EDG bus) (C-size paper drawings).
   B.5  Single line diagrams for motor control centers (MCCs) that supply post-fire nuclear
        safety component loads (only for selected fire areas) (C-size paper drawings).
   B.6 Equipment location drawings which identify the physical plant locations of post-fire
        nuclear safety capability equipment (C-size paper drawings).
   B.7  Plant layout drawings which identify: (C-size paper drawings)
        *  Plant fire area boundaries;
        *  Combustible control zone drawings;
        *  Areas protected by automatic fire suppression and detection; and
        *  Locations of fire protection equipment.
C. CLASSIC FIRE PROTECTION
  C.1  COPY of fire protection program implementing procedures (e.g., administrative
        controls, surveillance testing, and fire brigade).
  C.2  LIST of calculations and engineering analyses, studies, or evaluations for the fire
        protection system, including the fire water system.
  C.3 Hydraulic calculation or analysis for fire protection water system.
  C.4  Last two completed surveillance's of fire protection features in the selected fire areas
        (detection, suppression, damper inspections, damper tests, penetration inspections,
        barrier inspections, etc.).


REPORT NO. 05000395/2016010)
                                              4
  DISTRIBUTION
C.5  LIST of routine tests, surveillances, and preventive maintenance on fire pumps,
: RIDSNRRDIRS
    including pump controllers and batteries.
  PUBLIC RidsNrrPMV.C.Summer
C.6  Last two completed annual fire pump pressure and flow tests.
  Enclosure 1 Fire Protection Program Supporting Documentation
C.7 Last two completed monthly and/or quarterly fire pump tests.
The documents and information requested below should generally be made available to the inspection team during the on-site information gathering visit for the team's use both on-site and off-site during the inspection.  Electronic format
C.8  Last two completed fire loop flow tests and loop flushes.
is the preferred media, except where specifically noted.  If electronic media is made available via an internet based remote document
C.9 CO2 and Halon initial discharge testing or calculation that determined appropriate
management system, then the remote document access must allow inspectors to download, save, and print the documents in the NRC's regional office. Electronic media on compact disc
    concentrations and soak or hold times can be achieved (only for selected fire areas).
or paper records (hard copy) are acceptable. At the end of the inspection, the documents in the team's possession will not be retained.  
C.10 Last five hot work permits (at power).
C.11 Last five transient combustible permits (at power).
Approximately three weeks before the on-site information gathering visit, the following
C.12 For Fire Brigade Drills, provide the following:
documents should be made available to the team leader for review in the regional office:
    *  Last five fire brigade drill critiques;
    *  Last drill critique for a drill with off-site fire department support;
    *  Last unannounced drill critique;
    *  Last back-shift drill critique;
    *  Dates, shifts, and locations of unannounced drills for last three years;
    *  Summary of any unsatisfactory drill performance items for last three years; and
    *  Last unannounced drill critique by a qualified individual independent of the
        licensee's staff.
C.13 For fire brigade equipment, provide the following:
    * Procedure for inventory and inspection; and
    * Most recent inspection and inventory results.
C.14 Fire Brigade Qualifications, including self-contained breathing apparatus (SCBA) and
    training lesson plans.
C.15 COPY of the mutual aid agreement for the first-due local fire department that is
    currently in effect.


* Post-fire Nuclear Safety Capability, Systems, and Separation Analysis (request A.1)
                                          5
* Fire Hazards Analysis and/or NFPA 805 Design Basis Document (request A.2)
C.16 COPY of the evaluation or analysis of the effects of fire suppression activities on the
* Fire Probabilistic Risk Assessment (PRA) Summary Document or full PRA Document 
    ability to achieve the nuclear safety performance criteria (only for selected fire areas),
(request A.3)
    including:
* NFPA 805 Transition Report, developed in accordance with NEI 04-02 (request A.4)
    * An automatic or manually actuated suppression system, due to a fire in a single
* Fire Risk Evaluations (i.e., NFPA 805 Section 2.4.3) (request A.5)
        location, will not indirectly cause damage to the success path; and
* Plant Change Evaluations (i.e., NFPA 805 Section 2.4.4) (request A.6)
    * inadvertent actuation or rupture of a suppression system will not indirectly cause
* Analysis that demonstrates nuclear safe
        damage to the success path; and
ty performance criteria can be achieved and maintained for those areas that require recovery actions (request A.7)
    * demonstration of adequate drainage for areas protected by water suppression
        systems;
Based on review of the above seven documents, team leader should identify a preliminary list of
    * hydrostatic rating of any floor penetration seals installed within the fire areas that
fire areas being considered for inspection prior to the on-site information gathering visit. During
        are credited with keeping water from leaking into fire areas below.
the information gathering visit, or shortly thereafter, the fire areas selected for inspection will be
C.17 Pre-fire plans for all fire areas.
determined.  
C.18 For Emergency Lighting Units (ELU), provide the following:
    * COPY of performance based emergency light assessments;
This document request is based on typical documents that a generic plant might have. As such, this generic document request is not meant to imply that any specific plant is required to have all of the listed documents.  It is recognized that some documents listed below may not be
    * LIST of Preventive Maintenance tasks, frequencies, and bases;
available for your plant. In addition, the document titles listed below are based on typical industry document names; your plant specific document titles may vary.
    * Most recently performed monthly or quarterly functional test;
   
    * Most recently performed battery discharge performance test;
    * ELU battery loading analysis;
 
    * vendor manual(s) for on-site inspector use;
2  A. DESIGN AND LICENSING BASIS DOCUMENTS
    * results of black-out testing (if performed);
A.1 Post-fire Nuclear Safety Capability, Systems, and Separation Analysis.
    * Maintenance Rule program information related to the ELU; and
  A.2 Fire Hazards Analysis and/or NFPA 805 Design Basis Document.
    * Compensatory measures taken when ELU are out of service
  A.3 Fire PRA Summary Document or full PRA Document (if summary document not
C.19 Impairment Log (at start of inspection), for fire protection features that are out of
available).
    service.
  A.4 NFPA 805 Transition Report, developed in accordance with NEI 04-02.
C.20 Three Fire Protection screening reviews for recent design changes, modifications, or
  A.5 Fire Risk Evaluations (i.e., NFPA 805 Section 2.4.3).
    temporary modifications (i.e., an NFPA 805 plant change evaluation that screened
  A.6 Plant Change Evaluations (i.e., NFPA 805 Section 2.4.4).
    out).
  A.7 Analysis that demonstrates nuclear sa
C.21 LIST of penetration seal work, re-work, or installation activities, in the last three years.
fety performance criteria can be achieved and maintained for those areas that require recovery actions.
C.22 LIST of fire wrap work, re-work, or installation activities, in the last three years.
  A.8 Fire Protection Program and/or Fire Protection Plan.
C.23 Fire protection system health reports for the two most recent quarters.
A.9 LIST of post-fire safe shutdown components (i.e., safe shutdown equipment list).  
C.24 Fire protection program health report for the two most recent quarters.
A.10 Fire Protection System Design Basis Document.
C.25 Emergency lighting system health reports for the two most recent quarters.
A.11 LIST of applicable NFPA codes and standards and issuance dates (i.e., codes of
C.26 LIST of fire protection system design changes completed in the last three years
record).  
    (including their associated 10 CFR 50.59 and NFPA 805 plant change evaluations).
A.12 LIST of deviations from (a) NFPA codes of record, or (b) NFPA 805 fundamental fire protection program and design elements (i.e., NFPA 805, Chapter 3).
A.13 NFPA Compliance Review Report.
A.14 Report or evaluation that compares the fire protection program to the NRC Branch Technical Position (BTP) 9.5-1 Appendix A.  
A.15 COPY of licensee submittals and NRC safety evaluation reports that are specifically listed in the facility operating license for the approved fire protection program.  
A.16 COPY of NRC Safety Evaluation Reports that form the licensing basis for:
* Fire Protection Program; and
* Post-fire Nuclear Safety Capability.  
A.17 COPY of NRC approved exemptions for plant fire protection and post-fire nuclear safety capability features.  
A.18 COPY of exemption requests submitted but not yet approved for plant fire protection and post-fire nuclear safety capability features.
A.19 LIST of nuclear safety capability design changes completed in the last three years (including their associated 10 CFR 50.59 and NFPA 805 plant change evaluations).  
A.20 Facility Operating License. 
3    A.21 Technical Specifications (electronic format only).
A.22 Technical Requirements Manual (electronic format only).
A.23 Updated Final Safety Analysis Report (electronic format only).
B. GENERAL PLANT DESIGN DOCUMENTS
B.1 Piping and instrumentation diagrams (P&IDs) and legend list for components used to achieve and maintain nuclear safety performance criteria for:  (C-size paper


drawings)  
                                            6
  * Fires outside the main control room; and  
  C.27 LIST of fire protection system NFPA 805 engineering equivalency evaluations
* Fires in areas requiring recovery actions at other than primary control stations.  
        completed in the last three years.
  B.2 P&IDs and legend list for fire protection systems, including fire water supply, water suppression sprinklers & deluge, and CO2 and Halon systems (C-size paper
  C.28 Licensee evaluation of industry operating experience, such as:
        (specific items to be selected by the inspector)
        * NRC IN 2005-03, Inadequate Design and Installation of Seismic-Gap Fire Barriers;
        * NRC IN 2006-22, Ultra-Low Sulfur Diesel Fuel Oil Usage, for diesel fire pump;
        *  NRC IN 2009-02, Bio-Diesel Fuel Oil Usage, for diesel fire pump; and
        * NRC IN 2009-29, Fire Pumps Fail to Start due to a Fire.
  C.29 COPY of any test, surveillance, or maintenance procedure (current revision),
        including any associated data forms, for any requested "last performed" test,
        surveillance, or maintenance.
D. ELECTRICAL
  D.1  Identify whether the cables in the selected fire areas are predominantly Thermoset or
        Thermoplastic. Specifically identify any Thermoplastic cable in the selected fire
        areas.
  D.2  Nuclear safety circuit coordination analysis for fuse and breaker coordination of
        nuclear safety capability components (only for selected fire areas).
  D.3  Administrative or configuration control procedures that govern fuse replacement (e.g.,
        fuse control procedures).
  D.4  Maintenance procedures that verify breaker over-current trip settings to ensure
        coordination remains functional, for post-fire nuclear safety capability components.
  D.5  Electrical system health reports for the two most recent quarters.
  D.6  Last surveillance demonstrating operability of those components operated from the
        primary control stations.
  D.7 Schematic or elementary diagrams for circuits to be reviewed (C-size paper
        drawings).
  D.8  Cable routing for components and equipment credited for post-fire nuclear safety
        capability systems and components (only for selected fire areas).
  D.9  LIST of post-fire nuclear safety capability system and component design changes
        completed, in the last three years.
  D.10 LIST of identified fire induced circuit failure configurations (only for selected fire
        areas).
E. OPERATIONS
  E.1  LIST of calculations and engineering analyses, studies, or evaluations for the nuclear
        safety capability methodology.


drawings).  
                                          7
  B.3 Yard layout drawings for underground fire protection buried piping (C-size paper
E.2 LIST of licensed operator Job Performance Measures (JPMs) for operator actions
drawings).
    required to achieve and maintain post-fire nuclear safety performance criteria.
B.4 AC and DC electrical system single line di
E.3  LIST of non-licensed operator training associated with non-licensed operator actions
agrams, from off-site power down to the highest safety-related bus level (typically 4kV, EDG bus) (C-size paper drawings).
    to achieve and maintain post-fire nuclear safety performance criteria (including JPMs,
B.5 Single line diagrams for motor control centers (MCCs) that supply post-fire nuclear safety component loads (only for selected fire areas) (C-size paper drawings).
    in-field training walkdowns, simulations, or initial qualification).
  B.6 Equipment location drawings which identify the physical plant locations of post-fire nuclear safety capability equipment (C-size paper drawings).  
E.4 Lesson plans for post-fire nuclear safety capability training for licensed and non-
  B.7 Plant layout drawings which identify: (C-size paper drawings)
    licensed operators.
* Plant fire area boundaries;  
E.5 For recovery actions, provide the following:
* Combustible control zone drawings;  
    *   Manual Action Feasibility Study;
* Areas protected by automatic fire suppression and detection; and  
    *   Operator Time Critical Action Program;
* Locations of fire protection equipment.  
    *   Time lines for time-critical recovery actions; and
  C. CLASSIC FIRE PROTECTION
    *   Time line validations.
  C.1 COPY of fire protection program implementing procedures (e.g., administrative controls, surveillance testing, and fire brigade).
E.6 Thermal hydraulic calculation or analysis that determines the time requirements for
C.2 LIST of calculations and engineering analyses, studies, or evaluations for the fire protection system, including the fire water system.
    time-critical manual operator actions.
C.3 Hydraulic calculation or analysis for fire protection water system.
E.7 Operating procedures to achieve and maintain nuclear safety performance criteria
C.4 Last two completed surveillance's of fire protection features in the selected fire areas (detection, suppression, damper inspections, damper tests, penetration inspections, barrier inspections, etc.).
    from the control room, with a postulated fire in the selected fire areas.
 
E.8  Operating procedures to achieve and maintain nuclear safety performance criteria
4  C.5 LIST of routine tests, surveillances, and preventive maintenance on fire pumps, including pump controllers and batteries.
    from outside the control room, with a postulated fire in the control room, cable
C.6 Last two completed annual fire pump pressure and flow tests.
    spreading room, or any area requiring recovery actions (other than recovery actions
C.7 Last two completed monthly and/or quarterly fire pump tests.  
    performed in the control room or primary control stations).
C.8 Last two completed fire loop flow tests and loop flushes.
E.9 For safe shutdown equipment and tools, provide the following:
  C.9 CO2 and Halon initial discharge testing or calculation that determined appropriate concentrations and soak or hold times can be achieved (only for selected fire areas).
        * Procedure for inventory and inspection; and
C.10 Last five hot work permits (at power).
        * Most recent inspection and inventory results.
C.11 Last five transient combustible permits (at power).
E.10 LIST of procedures that implement Cold Shutdown Repairs.
C.12 For Fire Brigade Drills, provide the following:
E.11 For Cold Shutdown Repairs, provide the following:
* Last five fire brigade drill critiques;
    * Procedure for inventory and inspection (i.e., needed tools, material, etc.); and
* Last drill critique for a drill with off-site fire department support;
    * Most recent inspection and inventory results.
* Last unannounced drill critique;
E.12 For Radio communications, provide the following:
* Last back-shift drill critique;
    *   Communications Plan for firefighting and post-fire safe shutdown manual actions;
* Dates, shifts, and locations of unannounced drills for last three years;
    *   Repeater locations;
* Summary of any unsatisfactory drill performance items for last three years; and
    *   Cable routing for repeater power supply cables;
* Last unannounced drill critique by a qualified individual independent of the licensee's staff.  
    *   Radio coverage test results; and
  C.13 For fire brigade equipment, provide the following:  
    *   Radio Dead Spot locations in the plant.
* Procedure for inventory and inspection; and  
E.13 Environmental and habitability evaluations for post-fire operator actions (temperature,
* Most recent inspection and inventory results.  
    smoke, humidity, SCBAs, etc.).
C.14 Fire Brigade Qualifications, including self-contained breathing apparatus (SCBA) and training lesson plans.
C.15 COPY of the mutual aid agreement for the "first-due" local fire department that is currently in effect.
5  C.16 COPY of the evaluation or analysis of the effects of fire suppression activities on the ability to achieve the nuclear safety performance criteria (only for selected fire areas),
including:  
* An automatic or manually actuated suppression system, due to a fire in a single location, will not indirectly cause damage to the success path; and  
* inadvertent actuation or rupture of a suppression system will not indirectly cause damage to the success path; and  
* demonstration of adequate drainage for areas protected by water suppression systems;
* hydrostatic rating of any floor penetration seals installed within the fire areas that are credited with keeping water from leaking into fire areas below.  
C.17 Pre-fire plans for all fire areas.
C.18 For Emergency Lighting Units (ELU), provide the following:  
* COPY of performance based emergency light assessments;
* LIST of Preventive Maintenance tasks, frequencies, and bases;  
* Most recently performed monthly or quarterly functional test;  
* Most recently performed battery discharge performance test;
* ELU battery loading analysis;
* vendor manual(s) for on-site inspector use;
* results of black-out testing (if performed);
* Maintenance Rule program information related to the ELU; and  
* Compensatory measures taken when ELU are out of service
C.19 Impairment Log (at start of inspection), for fire protection features that are out of service.
C.20 Three Fire Protection screening reviews for recent design changes, modifications, or temporary modifications (i.e., an NFPA 805 plant change evaluation that screened
out).  C.21 LIST of penetration seal work, re-work, or installation activities, in the last three years.  
C.22 LIST of fire wrap work, re-work, or installation activities, in the last three years.
C.23 Fire protection system health reports for the two most recent quarters.
C.24 Fire protection program health report for the two most recent quarters.
C.25 Emergency lighting system health reports for the two most recent quarters.
C.26 LIST of fire protection system design changes completed in the last three years (including their associated 10 CFR 50.59 and NFPA 805 plant change evaluations). 
6  C.27 LIST of fire protection system NFPA 805 engineering equivalency evaluations completed in the last three years.
C.28 Licensee evaluation of industry operating experience, such as:
(specific items to be selected by the inspector)
* NRC IN 2005-03, Inadequate Design and Installation of Seismic-Gap Fire Barriers;
* NRC IN 2006-22, Ultra-Low Sulfur Diesel Fuel Oil Usage, for diesel fire pump;
* NRC IN 2009-02, Bio-Diesel Fuel Oil Usage, for diesel fire pump; and
* NRC IN 2009-29, Fire Pumps Fail to Start due to a Fire.  
C.29 COPY of any test, surveillance, or maintenance procedure (current revision), including any associated data forms, for any requested "last performed" test,
surveillance, or maintenance.
D. ELECTRICAL
D.1 Identify whether the cables in the selected fire areas are predominantly Thermoset or Thermoplastic. Specifically identify any Thermoplastic cable in the selected fire


areas.  D.2 Nuclear safety circuit coordination analysis for fuse and breaker coordination of nuclear safety capability components (only for selected fire areas).
                                          8
D.3 Administrative or configuration control procedures that govern fuse replacement (e.g., fuse control procedures).
F. ADMINISTRATIVE CONTROL, OVERSIGHT, AND CORRECTIVE ACTION PROGRAMS
D.4 Maintenance procedures that verify breaker over-current trip settings to ensure coordination remains functional, for post-fire nuclear safety capability components.
  F.1 Corrective actions for fire-induced circuit failures (including but not limited to NRC
D.5 Electrical system health reports for the two most recent quarters.
      IN 92-18), both single and multiple spurious actuations (only for selected fire areas).
D.6 Last surveillance demonstrating operability of those components operated from the primary control stations.
  F.2 Corrective actions associated with operator actions to achieve and maintain post-fire
D.7 Schematic or elementary diagrams for circuits to be reviewed (C-size paper
      nuclear safety performance criteria.
drawings).
  F.3 Self-assessments, peer assessments, and audits of fire protection activities for the
D.8 Cable routing for components and equipment credited for post-fire nuclear safety capability systems and components (only for selected fire areas).
      last three years.
D.9 LIST of post-fire nuclear safety capability system and component design changes completed, in the last three years.
  F.4 Self-assessments, peer assessments, and audits of post-fire nuclear safety capability
D.10 LIST of identified fire induced circuit failure configurations (only for selected fire
      methodology for the last three years.
areas).  E. OPERATIONS
  F.5 LIST of open and closed condition reports for the fire protection system for the last
E.1 LIST of calculations and engineering analyses, studies, or evaluations for the nuclear
      three years.
safety capability methodology.
  F.6 LIST of fire event analysis reports for the last three years.
 
  F.7 LIST of open and closed condition reports for emergency lighting units for the last
7  E.2 LIST of licensed operator Job Performance Measures (JPMs) for operator actions required to achieve and maintain post-fire nuclear safety performance criteria.
      three years.
E.3 LIST of non-licensed operator training associated with non-licensed operator actions
  F.8 LIST of open and closed condition reports for post-fire nuclear safety capability issues
to achieve and maintain post-fire nuclear safety performance criteria (including JPMs, in-field training walkdowns, simulations, or initial qualification).
      for the last three years. This includes issues affecting the nuclear safety capability
E.4 Lesson plans for post-fire nuclear safety capability training for licensed and non-licensed operators.
      analysis, fire hazards analysis, NFPA 805 design basis, fire risk evaluations, plant
E.5 For recovery actions, provide the following:
      change evaluations, post-fire operating procedures and/or training, timeline
* Manual Action Feasibility Study;
      evaluations for operator actions, and supporting engineering evaluations, analysis, or
* Operator Time Critical Action Program;
      calculations.
* Time lines for time-critical recovery actions; and
  F.9 LIST of procedures that control the configuration of the fire protection program,
* Time line validations.
      features, and post-fire nuclear safety capability methodology and system design.
E.6 Thermal hydraulic calculation or analysis that determines the time requirements for time-critical manual operator actions.
E.7 Operating procedures to achieve and maintain nuclear safety performance criteria from the control room, with a postulated fire in the selected fire areas.
E.8 Operating procedures to achieve and maintain nuclear safety performance criteria from outside the control room, with a postulated fire in the control room, cable spreading room, or any area requiring recovery actions (other than recovery actions performed in the control room or primary control stations).
E.9 For safe shutdown equipment and tools, provide the following:
* Procedure for inventory and inspection; and
* Most recent inspection and inventory results.
E.10 LIST of procedures that implement Cold Shutdown Repairs.
E.11 For Cold Shutdown Repairs, provide the following:
* Procedure for inventory and inspection (i.e., needed tools, material, etc.); and
* Most recent inspection and inventory results.
E.12 For Radio communications, provide the following:
* Communications Plan for firefighting and post-fire safe shutdown manual actions;
* Repeater locations;
* Cable routing for repeater power supply cables;
* Radio coverage test results; and
* Radio Dead Spot locations in the plant.
E.13 Environmental and habitability evaluations for post-fire operator actions (temperature, smoke, humidity, SCBAs, etc.).
 
F. ADMINISTRATIVE CONTROL, OVERSIGHT, AND CORRECTIVE ACTION PROGRAMS  
F.1 Corrective actions for fire-induced circui
t failures (including but not limited to NRC IN 92-18), both single and multiple spurious actuations (only for selected fire areas).  
F.2 Corrective actions associated with operator actions to achieve and maintain post-fire nuclear safety performance criteria.  
F.3 Self-assessments, peer assessments, and audits of fire protection activities for the  
last three years.  
F.4 Self-assessments, peer assessments, and audits of post-fire nuclear safety capability  
methodology for the last three years.  
F.5 LIST of open and closed condition reports for the fire protection system for the last  
three years.  
F.6 LIST of fire event analysis reports for the last three years.  
F.7 LIST of open and closed condition reports for emergency lighting units for the last  
three years.  
F.8 LIST of open and closed condition reports for post-fire nuclear safety capability issues for the last three years. This includes issues affecting the nuclear safety capability  
analysis, fire hazards analysis, NFPA 805 design basis, fire risk evaluations, plant change evaluations, post-fire operating procedures and/or training, timeline  
evaluations for operator actions, and supporting engineering evaluations, analysis, or  
calculations.  
    F.9 LIST of procedures that control the configuration of the fire protection program, features, and post-fire nuclear safety capability methodology and system design.
  Enclosure 2 Mitigating Strategies Supporting Documentation
G. 10 CFR 50.54(hh)(2) MITIGATING STRATEGIES DOCUMENTS
G.1 LIST of all changes to regulatory commitments made to meet the requirements of Title 10 of the Code of Federal Regulations (10 CFR) 50.54(hh)(2).
G.2 LIST of procedures and guidelines that were revised or generated to implement the mitigating strategies.  These could be extensive damage mitigation guidelines (EDMGs), severe accident management guidelines (SAMGs), emergency operating procedures (EOPs), abnormal operating procedures (AOPs), etc.
G.3 A matrix that shows the correlation between the mitigation strategies identified in Nuclear Energy Institute 06-12, Revision 2, "B.5.b Phase 2 & 3 Submittal Guideline," issued December 2006, and the site-specific procedures or guidelines that are used to implement each strategy.
G.4 LIST of engineering evaluations or calculations that were used to verify the engineering bases for the mitigating strategies.
G.5 Piping and instrumentation diagrams (P&ID) and legend list or simplified flow diagrams for systems relied upon in the mitigating strategies.  These could be the
type used for training (C-size paper drawings).
G.6 LIST of modification packages or summary descriptions of modifications with simplified drawings, for necessary facility changes to implement the mitigating


strategies.  
                      Mitigating Strategies Supporting Documentation
  G.7 LIST of routine tests, surveillances, and preventive maintenance for equipment and tools needed to implement 10 CFR 50.54(hh)(2) strategies.  
G. 10 CFR 50.54(hh)(2) MITIGATING STRATEGIES DOCUMENTS
G.8 For equipment and tools needed to implement 10 CFR 50.54(hh)(2) strategies, provide the following:  
  G.1  LIST of all changes to regulatory commitments made to meet the requirements of
* Procedures for inventory and inspection; and  
        Title 10 of the Code of Federal Regulations (10 CFR) 50.54(hh)(2).
* Most recent inspection and inventory results.  
  G.2  LIST of procedures and guidelines that were revised or generated to implement the
G.9 LIST of 10 CFR 50.54(hh)(2) strategies, if any, which have implementing details that  
        mitigating strategies. These could be extensive damage mitigation guidelines
differ from that documented in the submittals or the safety evaluation report.  
        (EDMGs), severe accident management guidelines (SAMGs), emergency operating
G.10 Site general arrangement drawings that show the majority of buildings and areas referenced in 10 CFR 50.54(hh)(2) documents (C-size paper drawings).  
        procedures (EOPs), abnormal operating procedures (AOPs), etc.
G.11 Training records, training matrix, and lesson plans related to 10 CFR 50.54(hh)(2).  
  G.3 A matrix that shows the correlation between the mitigation strategies identified in
   G.12 Copies of memoranda of understanding (MOU) (e.g., with local fire departments) required to implement any mitigating strategies.
        Nuclear Energy Institute 06-12, Revision 2, "B.5.b Phase 2 & 3 Submittal Guideline,"
        issued December 2006, and the site-specific procedures or guidelines that are used
        to implement each strategy.
  G.4  LIST of engineering evaluations or calculations that were used to verify the
        engineering bases for the mitigating strategies.
  G.5  Piping and instrumentation diagrams (P&ID) and legend list or simplified flow
        diagrams for systems relied upon in the mitigating strategies. These could be the
        type used for training (C-size paper drawings).
  G.6  LIST of modification packages or summary descriptions of modifications with
        simplified drawings, for necessary facility changes to implement the mitigating
        strategies.
  G.7 LIST of routine tests, surveillances, and preventive maintenance for equipment and
        tools needed to implement 10 CFR 50.54(hh)(2) strategies.
  G.8 For equipment and tools needed to implement 10 CFR 50.54(hh)(2) strategies,
        provide the following:
        * Procedures for inventory and inspection; and
        * Most recent inspection and inventory results.
  G.9 LIST of 10 CFR 50.54(hh)(2) strategies, if any, which have implementing details that
        differ from that documented in the submittals or the safety evaluation report.
  G.10 Site general arrangement drawings that show the majority of buildings and areas
        referenced in 10 CFR 50.54(hh)(2) documents (C-size paper drawings).
  G.11 Training records, training matrix, and lesson plans related to 10 CFR 50.54(hh)(2).
   G.12 Copies of memoranda of understanding (MOU) (e.g., with local fire departments)
        required to implement any mitigating strategies.
                                                                                  Enclosure 2
}}
}}

Latest revision as of 19:22, 30 October 2019

Notification of a Triennial Fire Protection Baseline Inspection (NRC Inspection Report No. 05000395/2016010)
ML16153A423
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 06/01/2016
From: Scott Shaeffer
NRC/RGN-II/DRS/EB2
To: Lippard G
South Carolina Electric & Gas Co
References
IR 2016010
Download: ML16153A423 (13)


See also: IR 05000395/2016010

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

June 1, 2016

Mr. George Lippard III

Vice President - Nuclear Operations

South Carolina Electric & Gas Company

Virgil C. Summer Nuclear Station

P.O. Box 88

Jenkinsville, SC 29065

SUBJECT: VIRGIL C. SUMMER NUCLEAR STATION UNIT 1 - NOTIFICATION OF A

TRIENNIAL FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION

REPORT NO. 05000395/2016010)

Dear Mr. Lippard:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

staff will conduct a triennial fire protection baseline inspection at V.C Summer Nuclear Station,

Unit 1. The inspection team will be led by Rodney Fanner, a Senior Reactor Inspector from the

NRC Region II Office. The team will be composed of personnel from the NRC Region II Office

and NRC Headquarters staff. The inspection will be conducted in accordance with IP 71111.05XT, the NRC's baseline fire protection for licensees licensed to the NFPA 805

requirements, dated January 31, 2013.

On May 19, 2016, during a telephone conversation between Mr. Renard Perry (V.C. Summer

Licensing) and Mr. R. Fanner of USNRC our respective staffs discussed arrangements for an

information gathering onsite visit and a two-week onsite inspection were confirmed. The

schedule for the inspection is as follows:

  • Information Gathering Visit: August 23 - 25, 2016
  • Week 1 of onsite inspection: October 03 - 07, 2016
  • Week 2 of onsite inspection: October 17 - 21, 2016

The purposes of the information gathering visit are to obtain information and documentation

needed to support the inspection, to become familiar with the fire protection program, fire

protection features, post-fire safe shutdown capabilities, plant layout, mitigating strategies to

address Title 10 of the Code of Federal Regulations (10 CFR) 50.54(hh)(2); and, as necessary,

obtain plant specific site access training and badging for unescorted site access.

An initial list of the documents the team will review during the conduct of the inspection is listed

in Enclosures 1 and 2. The team leader will contact you with any additional specific document

requests prior to the information gathering visit.

During the information gathering visit, the team will also discuss the following inspection support

administrative details: office space size and location; specific documents requested to be made

available to the team in their office spaces; arrangements for reactor site access (including

radiation protection training, security, safety and fitness for duty requirements); and the

availability of knowledgeable plant staff and licensing organization personnel to serve as points

of contact during the inspection.

G. Lippard 2

We request that during the on-site inspection weeks that you ensure that information be readily

accessible to the team for their review copies of analyses, evaluations or documentation

regarding the implementation and maintenance of the station fire protection program, including

post-fire safe shutdown capability. Of specific interest for the fire protection portion of the

inspection are documents which establish that your fire protection program satisfies NRC

regulatory requirements and conforms to applicable NRC and industry fire protection guidance

(i.e., fire protection compliance assessment documents). For the 10 CFR 50.54(hh)(2) portion of

the inspection, those documents implementing your mitigating strategies and demonstrating the

management of your commitments for the strategies are of specific interest. Also, personnel

should be available at the site during the inspection that are knowledgeable regarding plant

systems required to achieve and maintain safe shutdown conditions from inside and outside the

control room; including the electrical aspects of the relevant post-fire safe shutdown analyses,

reactor plant fire protection systems and features, and the station fire protection program and its

implementation.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget (OMB), under control

number 3150 0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

In accordance with 10 CFR 2.390 of the NRC Rules and Practices, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC Public Document

Room or from the Publically Available Records (PARS) component of NRCs document

system(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.hmtl (the Public Electronic Reading Room).

Your cooperation and support during this inspection will be appreciated. If you have questions

concerning this inspection, or the inspection team's information or logistical needs, please

contact Rodney Fanner, the team leader, in the Region II Office at 404-997-4638 or me at

404-997-4521.

Sincerely,

/RA/

Scott M. Shaeffer, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos.: 50-395;

License Nos.: NPF-12

Enclosures:

1. Triennial Fire Protection Inspection Supporting Documentation

2. Mitigating Strategies Supporting Documentation

cc: Distribution via Listserv

_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED

OFFICE RII:DRS RII:DRS

SIGNATURE RJF2 SMS

NAME RFANNER SSHAEFFER

DATE .5/31/2016 .6/1/2016 6/ /2016 6/ /2016 6/ /2016 6/ /2016 6/ /2016

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

Letter to George Lippard III, from Scott M Shaeffer dated June 1, 2016

SUBJECT: VIRGIL C. SUMMER NUCLEAR STATION UNIT 1 - NOTIFICATION OF A

TRIENNIAL FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION

REPORT NO. 05000395/2016010)

DISTRIBUTION:

RIDSNRRDIRS PUBLIC

RidsNrrPMV.C.Summer

Fire Protection Program Supporting Documentation

The documents and information requested below should generally be made available to the

inspection team during the on-site information gathering visit for the team's use both on-site and

off-site during the inspection. Electronic format is the preferred media, except where specifically

noted. If electronic media is made available via an internet based remote document

management system, then the remote document access must allow inspectors to download,

save, and print the documents in the NRC's regional office. Electronic media on compact disc

or paper records (hard copy) are acceptable. At the end of the inspection, the documents in the

team's possession will not be retained.

Approximately three weeks before the on-site information gathering visit, the following

documents should be made available to the team leader for review in the regional office:

  • Post-fire Nuclear Safety Capability, Systems, and Separation Analysis (request A.1)
  • Fire Hazards Analysis and/or NFPA 805 Design Basis Document (request A.2)

(request A.3)

  • Fire Risk Evaluations (i.e., NFPA 805 Section 2.4.3) (request A.5)
  • Plant Change Evaluations (i.e., NFPA 805 Section 2.4.4) (request A.6)
  • Analysis that demonstrates nuclear safety performance criteria can be achieved and

maintained for those areas that require recovery actions (request A.7)

Based on review of the above seven documents, team leader should identify a preliminary list of

fire areas being considered for inspection prior to the on-site information gathering visit. During

the information gathering visit, or shortly thereafter, the fire areas selected for inspection will be

determined.

This document request is based on typical documents that a generic plant might have. As such,

this generic document request is not meant to imply that any specific plant is required to have all

of the listed documents. It is recognized that some documents listed below may not be

available for your plant. In addition, the document titles listed below are based on typical

industry document names; your plant specific document titles may vary.

Enclosure 1

2

A. DESIGN AND LICENSING BASIS DOCUMENTS

A.1 Post-fire Nuclear Safety Capability, Systems, and Separation Analysis.

A.2 Fire Hazards Analysis and/or NFPA 805 Design Basis Document.

A.3 Fire PRA Summary Document or full PRA Document (if summary document not

available).

A.4 NFPA 805 Transition Report, developed in accordance with NEI 04-02.

A.5 Fire Risk Evaluations (i.e., NFPA 805 Section 2.4.3).

A.6 Plant Change Evaluations (i.e., NFPA 805 Section 2.4.4).

A.7 Analysis that demonstrates nuclear safety performance criteria can be achieved and

maintained for those areas that require recovery actions.

A.8 Fire Protection Program and/or Fire Protection Plan.

A.9 LIST of post-fire safe shutdown components (i.e., safe shutdown equipment list).

A.10 Fire Protection System Design Basis Document.

A.11 LIST of applicable NFPA codes and standards and issuance dates (i.e., codes of

record).

A.12 LIST of deviations from (a) NFPA codes of record, or (b) NFPA 805 fundamental fire

protection program and design elements (i.e., NFPA 805, Chapter 3).

A.13 NFPA Compliance Review Report.

A.14 Report or evaluation that compares the fire protection program to the NRC Branch

Technical Position (BTP) 9.5-1 Appendix A.

A.15 COPY of licensee submittals and NRC safety evaluation reports that are specifically

listed in the facility operating license for the approved fire protection program.

A.16 COPY of NRC Safety Evaluation Reports that form the licensing basis for:

  • Post-fire Nuclear Safety Capability.

A.17 COPY of NRC approved exemptions for plant fire protection and post-fire nuclear

safety capability features.

A.18 COPY of exemption requests submitted but not yet approved for plant fire protection

and post-fire nuclear safety capability features.

A.19 LIST of nuclear safety capability design changes completed in the last three years

(including their associated 10 CFR 50.59 and NFPA 805 plant change evaluations).

A.20 Facility Operating License.

3

A.21 Technical Specifications (electronic format only).

A.22 Technical Requirements Manual (electronic format only).

A.23 Updated Final Safety Analysis Report (electronic format only).

B. GENERAL PLANT DESIGN DOCUMENTS

B.1 Piping and instrumentation diagrams (P&IDs) and legend list for components used to

achieve and maintain nuclear safety performance criteria for: (C-size paper

drawings)

  • Fires outside the main control room; and
  • Fires in areas requiring recovery actions at other than primary control stations.

B.2 P&IDs and legend list for fire protection systems, including fire water supply, water

suppression sprinklers & deluge, and CO2 and Halon systems (C-size paper

drawings).

B.3 Yard layout drawings for underground fire protection buried piping (C-size paper

drawings).

B.4 AC and DC electrical system single line diagrams, from off-site power down to the

highest safety-related bus level (typically 4kV, EDG bus) (C-size paper drawings).

B.5 Single line diagrams for motor control centers (MCCs) that supply post-fire nuclear

safety component loads (only for selected fire areas) (C-size paper drawings).

B.6 Equipment location drawings which identify the physical plant locations of post-fire

nuclear safety capability equipment (C-size paper drawings).

B.7 Plant layout drawings which identify: (C-size paper drawings)

  • Plant fire area boundaries;
  • Combustible control zone drawings;
  • Areas protected by automatic fire suppression and detection; and
  • Locations of fire protection equipment.

C. CLASSIC FIRE PROTECTION

C.1 COPY of fire protection program implementing procedures (e.g., administrative

controls, surveillance testing, and fire brigade).

C.2 LIST of calculations and engineering analyses, studies, or evaluations for the fire

protection system, including the fire water system.

C.3 Hydraulic calculation or analysis for fire protection water system.

C.4 Last two completed surveillance's of fire protection features in the selected fire areas

(detection, suppression, damper inspections, damper tests, penetration inspections,

barrier inspections, etc.).

4

C.5 LIST of routine tests, surveillances, and preventive maintenance on fire pumps,

including pump controllers and batteries.

C.6 Last two completed annual fire pump pressure and flow tests.

C.7 Last two completed monthly and/or quarterly fire pump tests.

C.8 Last two completed fire loop flow tests and loop flushes.

C.9 CO2 and Halon initial discharge testing or calculation that determined appropriate

concentrations and soak or hold times can be achieved (only for selected fire areas).

C.10 Last five hot work permits (at power).

C.11 Last five transient combustible permits (at power).

C.12 For Fire Brigade Drills, provide the following:

  • Last five fire brigade drill critiques;
  • Last drill critique for a drill with off-site fire department support;
  • Last unannounced drill critique;
  • Last back-shift drill critique;
  • Dates, shifts, and locations of unannounced drills for last three years;
  • Summary of any unsatisfactory drill performance items for last three years; and
  • Last unannounced drill critique by a qualified individual independent of the

licensee's staff.

C.13 For fire brigade equipment, provide the following:

  • Procedure for inventory and inspection; and
  • Most recent inspection and inventory results.

C.14 Fire Brigade Qualifications, including self-contained breathing apparatus (SCBA) and

training lesson plans.

C.15 COPY of the mutual aid agreement for the first-due local fire department that is

currently in effect.

5

C.16 COPY of the evaluation or analysis of the effects of fire suppression activities on the

ability to achieve the nuclear safety performance criteria (only for selected fire areas),

including:

  • An automatic or manually actuated suppression system, due to a fire in a single

location, will not indirectly cause damage to the success path; and

  • inadvertent actuation or rupture of a suppression system will not indirectly cause

damage to the success path; and

  • demonstration of adequate drainage for areas protected by water suppression

systems;

are credited with keeping water from leaking into fire areas below.

C.17 Pre-fire plans for all fire areas.

C.18 For Emergency Lighting Units (ELU), provide the following:

  • COPY of performance based emergency light assessments;
  • LIST of Preventive Maintenance tasks, frequencies, and bases;
  • Most recently performed monthly or quarterly functional test;
  • Most recently performed battery discharge performance test;
  • ELU battery loading analysis;
  • vendor manual(s) for on-site inspector use;
  • results of black-out testing (if performed);
  • Compensatory measures taken when ELU are out of service

C.19 Impairment Log (at start of inspection), for fire protection features that are out of

service.

C.20 Three Fire Protection screening reviews for recent design changes, modifications, or

temporary modifications (i.e., an NFPA 805 plant change evaluation that screened

out).

C.21 LIST of penetration seal work, re-work, or installation activities, in the last three years.

C.22 LIST of fire wrap work, re-work, or installation activities, in the last three years.

C.23 Fire protection system health reports for the two most recent quarters.

C.24 Fire protection program health report for the two most recent quarters.

C.25 Emergency lighting system health reports for the two most recent quarters.

C.26 LIST of fire protection system design changes completed in the last three years

(including their associated 10 CFR 50.59 and NFPA 805 plant change evaluations).

6

C.27 LIST of fire protection system NFPA 805 engineering equivalency evaluations

completed in the last three years.

C.28 Licensee evaluation of industry operating experience, such as:

(specific items to be selected by the inspector)

  • NRC IN 2009-02, Bio-Diesel Fuel Oil Usage, for diesel fire pump; and
  • NRC IN 2009-29, Fire Pumps Fail to Start due to a Fire.

C.29 COPY of any test, surveillance, or maintenance procedure (current revision),

including any associated data forms, for any requested "last performed" test,

surveillance, or maintenance.

D. ELECTRICAL

D.1 Identify whether the cables in the selected fire areas are predominantly Thermoset or

Thermoplastic. Specifically identify any Thermoplastic cable in the selected fire

areas.

D.2 Nuclear safety circuit coordination analysis for fuse and breaker coordination of

nuclear safety capability components (only for selected fire areas).

D.3 Administrative or configuration control procedures that govern fuse replacement (e.g.,

fuse control procedures).

D.4 Maintenance procedures that verify breaker over-current trip settings to ensure

coordination remains functional, for post-fire nuclear safety capability components.

D.5 Electrical system health reports for the two most recent quarters.

D.6 Last surveillance demonstrating operability of those components operated from the

primary control stations.

D.7 Schematic or elementary diagrams for circuits to be reviewed (C-size paper

drawings).

D.8 Cable routing for components and equipment credited for post-fire nuclear safety

capability systems and components (only for selected fire areas).

D.9 LIST of post-fire nuclear safety capability system and component design changes

completed, in the last three years.

D.10 LIST of identified fire induced circuit failure configurations (only for selected fire

areas).

E. OPERATIONS

E.1 LIST of calculations and engineering analyses, studies, or evaluations for the nuclear

safety capability methodology.

7

E.2 LIST of licensed operator Job Performance Measures (JPMs) for operator actions

required to achieve and maintain post-fire nuclear safety performance criteria.

E.3 LIST of non-licensed operator training associated with non-licensed operator actions

to achieve and maintain post-fire nuclear safety performance criteria (including JPMs,

in-field training walkdowns, simulations, or initial qualification).

E.4 Lesson plans for post-fire nuclear safety capability training for licensed and non-

licensed operators.

E.5 For recovery actions, provide the following:

  • Manual Action Feasibility Study;
  • Operator Time Critical Action Program;
  • Time lines for time-critical recovery actions; and
  • Time line validations.

E.6 Thermal hydraulic calculation or analysis that determines the time requirements for

time-critical manual operator actions.

E.7 Operating procedures to achieve and maintain nuclear safety performance criteria

from the control room, with a postulated fire in the selected fire areas.

E.8 Operating procedures to achieve and maintain nuclear safety performance criteria

from outside the control room, with a postulated fire in the control room, cable

spreading room, or any area requiring recovery actions (other than recovery actions

performed in the control room or primary control stations).

E.9 For safe shutdown equipment and tools, provide the following:

  • Procedure for inventory and inspection; and
  • Most recent inspection and inventory results.

E.10 LIST of procedures that implement Cold Shutdown Repairs.

E.11 For Cold Shutdown Repairs, provide the following:

  • Procedure for inventory and inspection (i.e., needed tools, material, etc.); and
  • Most recent inspection and inventory results.

E.12 For Radio communications, provide the following:

  • Communications Plan for firefighting and post-fire safe shutdown manual actions;
  • Repeater locations;
  • Cable routing for repeater power supply cables;
  • Radio coverage test results; and
  • Radio Dead Spot locations in the plant.

E.13 Environmental and habitability evaluations for post-fire operator actions (temperature,

smoke, humidity, SCBAs, etc.).

8

F. ADMINISTRATIVE CONTROL, OVERSIGHT, AND CORRECTIVE ACTION PROGRAMS

F.1 Corrective actions for fire-induced circuit failures (including but not limited to NRC

IN 92-18), both single and multiple spurious actuations (only for selected fire areas).

F.2 Corrective actions associated with operator actions to achieve and maintain post-fire

nuclear safety performance criteria.

F.3 Self-assessments, peer assessments, and audits of fire protection activities for the

last three years.

F.4 Self-assessments, peer assessments, and audits of post-fire nuclear safety capability

methodology for the last three years.

F.5 LIST of open and closed condition reports for the fire protection system for the last

three years.

F.6 LIST of fire event analysis reports for the last three years.

F.7 LIST of open and closed condition reports for emergency lighting units for the last

three years.

F.8 LIST of open and closed condition reports for post-fire nuclear safety capability issues

for the last three years. This includes issues affecting the nuclear safety capability

analysis, fire hazards analysis, NFPA 805 design basis, fire risk evaluations, plant

change evaluations, post-fire operating procedures and/or training, timeline

evaluations for operator actions, and supporting engineering evaluations, analysis, or

calculations.

F.9 LIST of procedures that control the configuration of the fire protection program,

features, and post-fire nuclear safety capability methodology and system design.

Mitigating Strategies Supporting Documentation

G. 10 CFR 50.54(hh)(2) MITIGATING STRATEGIES DOCUMENTS

G.1 LIST of all changes to regulatory commitments made to meet the requirements of

Title 10 of the Code of Federal Regulations (10 CFR) 50.54(hh)(2).

G.2 LIST of procedures and guidelines that were revised or generated to implement the

mitigating strategies. These could be extensive damage mitigation guidelines

(EDMGs), severe accident management guidelines (SAMGs), emergency operating

procedures (EOPs), abnormal operating procedures (AOPs), etc.

G.3 A matrix that shows the correlation between the mitigation strategies identified in

Nuclear Energy Institute 06-12, Revision 2, "B.5.b Phase 2 & 3 Submittal Guideline,"

issued December 2006, and the site-specific procedures or guidelines that are used

to implement each strategy.

G.4 LIST of engineering evaluations or calculations that were used to verify the

engineering bases for the mitigating strategies.

G.5 Piping and instrumentation diagrams (P&ID) and legend list or simplified flow

diagrams for systems relied upon in the mitigating strategies. These could be the

type used for training (C-size paper drawings).

G.6 LIST of modification packages or summary descriptions of modifications with

simplified drawings, for necessary facility changes to implement the mitigating

strategies.

G.7 LIST of routine tests, surveillances, and preventive maintenance for equipment and

tools needed to implement 10 CFR 50.54(hh)(2) strategies.

G.8 For equipment and tools needed to implement 10 CFR 50.54(hh)(2) strategies,

provide the following:

  • Procedures for inventory and inspection; and
  • Most recent inspection and inventory results.

G.9 LIST of 10 CFR 50.54(hh)(2) strategies, if any, which have implementing details that

differ from that documented in the submittals or the safety evaluation report.

G.10 Site general arrangement drawings that show the majority of buildings and areas

referenced in 10 CFR 50.54(hh)(2) documents (C-size paper drawings).

G.11 Training records, training matrix, and lesson plans related to 10 CFR 50.54(hh)(2).

G.12 Copies of memoranda of understanding (MOU) (e.g., with local fire departments)

required to implement any mitigating strategies.