ML16201A223: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:*.' Andy T. Barbee Director, Nuclear Training 803.345.4034 A SCANA COMPANY U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001  
{{#Wiki_filter:*.'
Andy T. Barbee Director, Nuclear Training 803.345.4034 July 15, 2016 A SCANA COMPANY U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001


==Dear Sir I Madam:==
==Dear Sir I Madam:==


==Subject:==
==Subject:==
VIRGIL C. SUMMER NUCLEAR STATION, UNITS 1, 2 AND 3 DOCKET NO. 50-395 DOCKET NO. 52-027 AND 52-028 OPERATING LICENSE NO. NPF-12 COMBINED LICENSE NO. NPF-93 AND NPF-94 REGULA TORY ISSUE  
VIRGIL C. SUMMER NUCLEAR STATION, UNITS 1, 2 AND 3 DOCKET NO. 50-395 DOCKET NO. 52-027 AND 52-028 OPERATING LICENSE NO. NPF-12 COMBINED LICENSE NO. NPF-93 AND NPF-94 REGULATORY ISSUE  


==SUMMARY==
==SUMMARY==
, RIS 2016-09 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS July 15, 2016 Attached please find South Carolina Electric & Gas Company's anticipated schedule for operator licensing examinations for V. C. Summer Units 1, 2 and 3. As previously discussed with Region II, V. C. Summer Units 2 and 3 plan two examinations for calendar year 2017. The proposed dates are 01/17/17 (alternate 01/30/17) and 12/04/17 (alternate 12/11/17).
, RIS 2016-09 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS Attached please find South Carolina Electric & Gas Company's anticipated schedule for operator licensing examinations for V. C. Summer Units 1, 2 and 3.
Should you have any questions concerning Unit 1 exams, please call Mr. Neil E. Constance at (803) 345-4028.
As previously discussed with Region II, V. C. Summer Units 2 and 3 plan two examinations for calendar year 2017. The proposed dates are 01/17/17 (alternate 01/30/17) and 12/04/17 (alternate 12/11/17).
For questions concerning Units 2 and 3 exams, please call Mr. Paul A Mathena at (803) 345-4642.
Should you have any questions concerning Unit 1 exams, please call Mr. Neil E. Constance at (803) 345-4028. For questions concerning Units 2 and 3 exams, please call Mr. Paul A Mathena at (803) 345-4642.
TS/ATB/wm Attachments (2) c: K. B. Marsh S. A Byrne J.B. Archie N. S. Carns J. H. Hamilton J. W. Williams W. M. Cherry C. Haney G. J. McCoy E. F. Guthrie S. A Williams N. E. Constance P. A Mathena NRC Resident Inspector K. M. Sutton NSRC RTS (CR-16-03121)
TS/ATB/wm Attachments (2) c:   K. B. Marsh                                                                       S. A Williams S. A Byrne                                                                         N. E. Constance J.B. Archie                                                                       P. A Mathena N. S. Carns                                                                       NRC Resident Inspector J. H. Hamilton                                                                     K. M. Sutton J. W. Williams                                                                     NSRC W. M. Cherry                                                                       RTS (CR-16-03121)
File (814. 04, RR 1150) PRSF (RC-16-0114)
C. Haney                                                                          File         (814. 04, RR 1150)
DCRM V. C. Summer Nuclear Station* P. 0. Box 88
G. J. McCoy                                                                        PRSF (RC-16-0114)
E. F. Guthrie                                                                      DCRM V. C. Summer Nuclear Station* P. 0. Box 88
* Jenkinsville, SC* 29065
* Jenkinsville, SC* 29065
* F (803) 941-9776 f.' NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016) rJP" R<G"<., Estimated burden per response to comply with this voluntary information collection request: 1 hour. This >'\ OPERA TOR LICENSING information collection is used to plan budgets and resources for operator examinations.
* F(803) 941-9776
Send comments burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 c F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to t; " EXAMINATION DATA ,. . lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, \, . 0# NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means "1 ..... f.*"' used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
 
FACILITY NRC REGION Virgil C. Summer Nuclear Station, Unit 1 II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 ----ESTIMATED NUMBER OF LICENSEE-PREPARED l 1 .1 0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS  
f.'
-B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 ------..
NRC FORM536                         U.S. NUCLEAR REGULATORY COMMISSION       APPROVED BY OMB: NO. 3150-0131                                         EXPIRES: 10/31/2017 (05-2016) rJP" R<G"<.,                                               Estimated burden per response to comply with this voluntary information collection request: 1 hour. This
* NUMBER OF REACTOR 3 3 3 0 OPERATORS , NUMBER OF SENIOR REACTOR 3 3 3 0 OPERATORS
                    +~-            >'\                                           information collection is used to plan budgets and resources for operator examinations. Send OPERATOR LICENSING                    comments regardin~ burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 c
-INSTANT NUMBER OF SENIOR REACTOR' 3 3 3 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED c PROPOSED DATES PRIMARY DATE 05/28/2018 10/28/2019.
t;                  ,.~"    EXAMINATION DATA F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to
10/26/2020 ALTERNATE DATE 06/04/2018 11/04/2019 11/02/2020
                                                                                . lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs,
: c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2017 CY 2018 --* -NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF 0 0 6 0 CANDIDATES NRC FORM 536 (05-2016) 4 v
                  \, .           0#                                             NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means "1 ..... f.*"'                                             used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
* NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016) ... ",. Estimated burden per response to comply with this voluntary information collection request 1 hour. This OPERA TOR LICENSING information collection is used to plan budgets and resources for operator examinations.
FACILITY                                                                                                               NRC REGION Virgil C. Summer Nuclear Station, Unit 1                                                                               II A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY2018               CY2019                                   CY2020                                     CY2021 PROPOSED NUMBER
Send ti comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 :; ll F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to ; EXAMINATION DATA lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, ..
                                                      -                     -                                           -                                           -
NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means '*"'**&deg;'.
ESTIMATED NUMBER OF LICENSEE-PREPARED                           l                     1                                           .1                                           0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED                             0                     0                                           0                                           0 EXAMINATIONS                                                                                                                                                               -
used to impose an information collection does not display a currenijy valid OMB control number, the NRG may not conduct or sponsor, and a person is not required to respond to, the information collection.
B. INITIAL OPERATOR LICENSE EXAMINATIONS CY2018               CY2019                               CY2020                                     CY2021 PROPOSED NUMBER
FACILITY NRCREGION Virgil C. Summer Nuclear Station, Units 2 and 3 II ' A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 -----ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER . CY2018 CY2019 CY2020 CY2021 --------NUMBER OF REACTOR 0 0 0 0 OPERATORS NUMBER OF SENIOR REACTOR 24 24 24 24 OPERATORS
                                                                  ..      -                                     --                                         ---
-INSTANT NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 10/08/2018 09116/2019 09/14/2020 09/13/2021 ALTERNATE DATE 10/22/2018 09/30/2019 09/28/2020 09/27/2021
* NUMBER OF REACTOR OPERATORS                              3                     3                                           3                                           0
: c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2017 CY 2018 ---NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF 0 24 0 24 CANDIDATES NRG FORM 536 (05-2016)}}
, NUMBER OF SENIOR REACTOR OPERATORS - INSTANT                          3                     3                                           3                                         0 NUMBER OF SENIOR REACTOR' OPERATORS-UPGRADE                            3                     3                                           3                                           0 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED                          0                     0                                           0                                         0 c
PROPOSED DATES PRIMARY DATE                       05/28/2018           10/28/2019.                             10/26/2020 ALTERNATE DATE                       06/04/2018           11/04/2019                             11/02/2020
: c.       PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE 2017 PROPOSED NUMBER MARCH CY
                                                        --*
SEPTEMBER                           MARCH CY
                                                                                                                                -2018              SEPTEMBER ESTIMATED NUMBER OF                           0                       0                                   6                                                   0 CANDIDATES NRC FORM 536 (05-2016)
 
4       v
* NRC FORM536                       U.S. NUCLEAR REGULATORY COMMISSION   APPROVED BY OMB: NO. 3150-0131                                         EXPIRES: 10/31/2017 (05-2016)
                    ~*
                  +~*
                          ...",.~-
Estimated burden per response to comply with this voluntary information collection request 1 hour. This information collection is used to plan budgets and resources for operator examinations. Send ti
:;
                                  ~
ll  OPERA TOR LICENSING                comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to
              ~.                ;       EXAMINATION DATA                 lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs,
                ~..'>~      .-~o~                                          NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means
                      '*"'**&deg;'.                                           used to impose an information collection does not display a currenijy valid OMB control number, the NRG may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY                                                                                                           NRCREGION Virgil C. Summer Nuclear Station, Units 2 and 3                                                                     II
                                                      '
A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY2018             CY2019                                 CY2020                                     CY2021 PROPOSED NUMBER
                                                  -                   -                                         --                                         -
ESTIMATED NUMBER OF LICENSEE-PREPARED                           1                   1                                         1                                           1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED                             0                   0                                         0                                           0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS
                                              . CY2018             CY2019                             CY2020                                   CY2021 PROPOSED NUMBER
                                                  -                   --                                   --                                         ---
NUMBER OF REACTOR OPERATORS                            0                   0                                         0                                           0 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT                        24                   24                                       24                                         24 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE                            0                   0                                         0                                         0 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED                          0                   0                                         0                                         0 PROPOSED DATES PRIMARY DATE                     10/08/2018           09116/2019                           09/14/2020                                 09/13/2021 ALTERNATE DATE                       10/22/2018           09/30/2019                           09/28/2020                                 09/27/2021
: c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE 2017 PROPOSED NUMBER MARCH CY
                                                    --   SEPTEMBER                         MARCH CY
                                                                                                                          -2018              SEPTEMBER ESTIMATED NUMBER OF                         0                     24                                 0                                                 24 CANDIDATES NRG FORM 536 (05-2016)}}

Revision as of 17:39, 30 October 2019

Preparation and Scheduling of Operator Licensing Examinations
ML16201A223
Person / Time
Site: Summer  South Carolina Electric & Gas Company icon.png
Issue date: 07/15/2016
From: Barbee A
SCANA Corp, South Carolina Electric & Gas Co
To:
Document Control Desk, Office of New Reactors, Office of Nuclear Reactor Regulation
References
RIS 2016-09
Download: ML16201A223 (3)


Text

  • .'

Andy T. Barbee Director, Nuclear Training 803.345.4034 July 15, 2016 A SCANA COMPANY U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Dear Sir I Madam:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION, UNITS 1, 2 AND 3 DOCKET NO. 50-395 DOCKET NO.52-027 AND 52-028 OPERATING LICENSE NO. NPF-12 COMBINED LICENSE NO. NPF-93 AND NPF-94 REGULATORY ISSUE

SUMMARY

, RIS 2016-09 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS Attached please find South Carolina Electric & Gas Company's anticipated schedule for operator licensing examinations for V. C. Summer Units 1, 2 and 3.

As previously discussed with Region II, V. C. Summer Units 2 and 3 plan two examinations for calendar year 2017. The proposed dates are 01/17/17 (alternate 01/30/17) and 12/04/17 (alternate 12/11/17).

Should you have any questions concerning Unit 1 exams, please call Mr. Neil E. Constance at (803) 345-4028. For questions concerning Units 2 and 3 exams, please call Mr. Paul A Mathena at (803) 345-4642.

TS/ATB/wm Attachments (2) c: K. B. Marsh S. A Williams S. A Byrne N. E. Constance J.B. Archie P. A Mathena N. S. Carns NRC Resident Inspector J. H. Hamilton K. M. Sutton J. W. Williams NSRC W. M. Cherry RTS (CR-16-03121)

C. Haney File (814. 04, RR 1150)

G. J. McCoy PRSF (RC-16-0114)

E. F. Guthrie DCRM V. C. Summer Nuclear Station* P. 0. Box 88

  • Jenkinsville, SC* 29065
  • F(803) 941-9776

f.'

NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016) rJP" R<G"<., Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This

+~- >'\ information collection is used to plan budgets and resources for operator examinations. Send OPERATOR LICENSING comments regardin~ burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 c

t; ,.~" EXAMINATION DATA F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to

. lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs,

\, . 0# NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means "1 ..... f.*"' used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Virgil C. Summer Nuclear Station, Unit 1 II A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY2018 CY2019 CY2020 CY2021 PROPOSED NUMBER

- - - -

ESTIMATED NUMBER OF LICENSEE-PREPARED l 1 .1 0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS -

B. INITIAL OPERATOR LICENSE EXAMINATIONS CY2018 CY2019 CY2020 CY2021 PROPOSED NUMBER

.. - -- ---

  • NUMBER OF REACTOR OPERATORS 3 3 3 0

, NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 3 3 3 0 NUMBER OF SENIOR REACTOR' OPERATORS-UPGRADE 3 3 3 0 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 c

PROPOSED DATES PRIMARY DATE 05/28/2018 10/28/2019. 10/26/2020 ALTERNATE DATE 06/04/2018 11/04/2019 11/02/2020

c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE 2017 PROPOSED NUMBER MARCH CY

--*

SEPTEMBER MARCH CY

-2018 SEPTEMBER ESTIMATED NUMBER OF 0 0 6 0 CANDIDATES NRC FORM 536 (05-2016)

4 v

  • NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016)

~*

+~*

...",.~-

Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send ti

~

ll OPERA TOR LICENSING comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to

~.  ; EXAMINATION DATA lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs,

~..'>~ .-~o~ NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means

'*"'**°'. used to impose an information collection does not display a currenijy valid OMB control number, the NRG may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRCREGION Virgil C. Summer Nuclear Station, Units 2 and 3 II

'

A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY2018 CY2019 CY2020 CY2021 PROPOSED NUMBER

- - -- -

ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS

. CY2018 CY2019 CY2020 CY2021 PROPOSED NUMBER

- -- -- ---

NUMBER OF REACTOR OPERATORS 0 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 24 24 24 24 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 10/08/2018 09116/2019 09/14/2020 09/13/2021 ALTERNATE DATE 10/22/2018 09/30/2019 09/28/2020 09/27/2021

c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE 2017 PROPOSED NUMBER MARCH CY

-- SEPTEMBER MARCH CY

-2018 SEPTEMBER ESTIMATED NUMBER OF 0 24 0 24 CANDIDATES NRG FORM 536 (05-2016)