| number = ML16272A189
| number = ML16272A189
| issue date = 10/03/2016
| issue date = 10/03/2016
| title = Joseph M. Farley Nuclear Plant, Units 1 and 2 - Correction to Amendment Nos. 203 (Unit 1) and 199 (Unit 2)
| title = Correction to Amendment Nos. 203 (Unit 1) and 199 (Unit 2)
| author name = Williams S A
| author name = Williams S
| author affiliation = NRC/NRR/DORL/LPLII-1
| author affiliation = NRC/NRR/DORL/LPLII-1
| addressee name = Pierce C R
| addressee name = Pierce C
| addressee affiliation = Southern Nuclear Operating Co, Inc
| addressee affiliation = Southern Nuclear Operating Co, Inc
| docket = 05000348, 05000364
| docket = 05000348, 05000364
| license number = NPF-002, NPF-008
| license number = NPF-002, NPF-008
| contact person = Williams S A, DORL/LPLII-1, 415-1009
| contact person = Williams S, DORL/LPLII-1, 415-1009
| document type = Letter, Technical Specifications
| document type = Letter, Technical Specifications
| page count = 4
| page count = 4
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 3, 2016 Mr. C. R. Pierce Regulatory Affairs Director Southern Nuclear Operating Company, Inc. P.O. Box 1295 Bin 038 Birmingham, AL 35201-1295  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 3, 2016 Mr. C. R. Pierce Regulatory Affairs Director Southern Nuclear Operating Company, Inc.
P.O. Box 1295 Bin 038 Birmingham, AL 35201-1295


==SUBJECT:==
==SUBJECT:==
JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 -CORRECTION TO AMENDMENT NOS. 203 (UNIT 1) AND 199 (UNIT 2)  
JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 - CORRECTION TO AMENDMENT NOS. 203 (UNIT 1) AND 199 (UNIT 2)


==Dear Mr. Pierce:==
==Dear Mr. Pierce:==
In a letter dated August 3, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15233A448), the U.S. Nuclear Regulatory Commission issued Amendment No. 203 to Renewed Facility Operating License No. NPF-2 and Amendment No. 199 to Renewed Facility Operating License No. NPF-8 for the Joseph M. Farley Nuclear Plant, Units 1 and 2, respectively.
The amendments included changes to 63 technical specifications (TSs) pages. TS pages 3.5.5-1 and 3.5.5-2 were inadvertently included to be replaced.
However, as stated in the safety evaluation, the request related to these TS pages was withdrawn in the Southern Nuclear Company, Inc., letter dated September 28, 2015 (ADAMS Accession No. ML 15271 A223). The correct TS page 3.5.5-1 corresponds to Amendment No. 146 (Unit 1) and Amendment No. 137 (Unit 2) that can be found in ADAMS Package Accession No. ML993500022 and attached.
The correct TS page 3.5.5-2 corresponds to Amendment No. 185, (Unit 1 ), and Amendment No. 180, (Unit 2), that can be found in ADAMS Accession No. ML 11167 A226 and attached.
Docket Nos. 50-348 and 50-364 Distribution via Listserv Sincerely, Shawn A. Williams, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Seal Injection Flow 3.5.5 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.5 Seal Injection Flow LCO 3.5.5 Reactor coolant pump seal injection flow shall be within limits. APPLICABILITY:
MODES 1, 2, and 3. ACTIONS CONDITION A. Seal injection flow not A.1 within limit. B. Required Action and B.1 associated Completion Time not met. AND B.2 Farley Units 1 and 2 REQUIRED ACTION COMPLETION TIME Adjust manual seal 4 hours injection throttle valves in accordance with SR 3.5.5.1. Be in MODE3. Be in MODE4. 3.5.5-1 6 hours 12 hours Amendment No. 146 (Unit 1) Amendment No. 137 (Unit 2)
SURVEILLANCE REQUIREMENTS SR 3.5.2.1 SR 3.5.2.2 SR 3.52.3 SR 3.5.2.4 SURVEILLANCE Only required to be performed for valves 8132A and 81328 when Centrifugal Charging Pump A is Inoperable.
Verify the following valves are in the listed position with power to the valve operator removed. Number Position 8884, 8886 Closed 8132A, 81320 Open 8689 Closed Function Centrifugal Charging Pump to RCS Hot Leg Centrifugal Charging Pump discharge isolation RHR to RCS Hot Leg Injection Verify each ECCS manual, power operated, and automatic valve in the flow path. that is not locked, sealed, or otherwise secured in position, is in the correct position.
Verify each ECCS pump's developed head at the test flow point is greater than or equal to the required developed head. Verify each ECCS automatic valve in the flow path that is not locked. sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.
* ECCS-Operating


====3.5.2 FREQUENCY====
In a letter dated August 3, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15233A448), the U.S. Nuclear Regulatory Commission issued Amendment No. 203 to Renewed Facility Operating License No. NPF-2 and Amendment No.
199 to Renewed Facility Operating License No. NPF-8 for the Joseph M. Farley Nuclear Plant, Units 1 and 2, respectively. The amendments included changes to 63 technical specifications (TSs) pages. TS pages 3.5.5-1 and 3.5.5-2 were inadvertently included to be replaced.
However, as stated in the safety evaluation, the request related to these TS pages was withdrawn in the Southern Nuclear Company, Inc., letter dated September 28, 2015 (ADAMS Accession No. ML15271A223).
The correct TS page 3.5.5-1 corresponds to Amendment No. 146 (Unit 1) and Amendment No. 137 (Unit 2) that can be found in ADAMS Package Accession No. ML993500022 and attached. The correct TS page 3.5.5-2 corresponds to Amendment No. 185, (Unit 1), and Amendment No. 180, (Unit 2), that can be found in ADAMS Accession No. ML11167A226 and attached.
Sincerely, Shawn A. Williams, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364 Distribution via Listserv


In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the lnservice Testing Program In accordance with the Surveillance Frequency Control Program Farley Units 1 and 2 3.5.2-2 Amendment No. 185 (Unit 1) Amendment No. 180 (Unit 2)
Seal Injection Flow 3.5.5 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.5 Seal Injection Flow LCO 3.5.5          Reactor coolant pump seal injection flow shall be within limits.
Mr. C. R. Pierce Regulatory Affairs Director October 3, 2016 Southern Nuclear Operating Company, Inc. P.O. Box 1295 Bin 038 Birmingham, AL 35201-1295
APPLICABILITY:        MODES 1, 2, and 3.
ACTIONS CONDITION                      REQUIRED ACTION                  COMPLETION TIME A. Seal injection flow not      A.1      Adjust manual seal              4 hours within limit.                        injection throttle valves in accordance with SR 3.5.5.1.
B. Required Action and        B.1      Be in MODE3.                    6 hours associated Completion Time not met.                AND B.2      Be in MODE4.                    12 hours Farley Units 1 and 2                       3.5.5-1                  Amendment No. 146 (Unit 1)
Amendment No. 137 (Unit 2)


==SUBJECT:==
ECCS-Operating 3.5.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                      FREQUENCY SR 3.5.2.1        --~*~-~~~-~NOTE~~~~----*~*~
JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 -CORRECTION TO AMENDMENT NOS. 203, (UNIT 1 ), AND 199, (UNIT 2)  
Only required to be performed for valves 8132A and 81328 when Centrifugal Charging Pump A is Inoperable.
Verify the following valves are in the listed position  In accordance with with power to the valve operator removed.                the Surveillance Frequency Control Number              Position          Function          Program 8884, 8886          Closed            Centrifugal Charging Pump to RCS Hot Leg 8132A, 81320        Open              Centrifugal Charging Pump discharge isolation 8689                Closed            RHR to RCS Hot Leg Injection SR 3.5.2.2        Verify each ECCS manual, power operated, and            In accordance with automatic valve in the flow path. that is not locked,    the Surveillance sealed, or otherwise secured in position, is in the      Frequency Control correct position.                                        Program SR 3.52.3          Verify each ECCS pump's developed head at the test      In accordance with flow point is greater than or equal to the required      the lnservice developed head.                                          Testing Program SR 3.5.2.4        Verify each ECCS automatic valve in the flow path        In accordance with that is not locked. sealed, or otherwise secured in      the Surveillance position, actuates to the correct position on an actual  Frequency Control or simulated actuation signal.
* Program Farley Units 1 and 2                          3.5.2-2              Amendment No. 185 (Unit 1)
Amendment No. 180 (Unit 2)


==Dear Mr. Pierce:==
ML11167A226 and attached.
In a letter dated August 3, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15233A448), the U.S. Nuclear Regulatory Commission issued Amendment No. 203 to Renewed Facility Operating License No. NPF-2 and Amendment No. 199 to Renewed Facility Operating License No. NPF-8 for the Joseph M. Farley Nuclear Plant, Units 1 and 2, respectively.
Sincerely, IRA/
The amendments included changes to 63 technical specifications (TSs) pages. TS pages 3.5.5-1 and 3.5.5-2 were inadvertently included to be replaced.
Shawn A. Williams, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364 Distribution via Listserv DISTRIBUTION:
However, as stated in the safety evaluation, the request related to these TS pages was withdrawn in the Southern Nuclear Company, Inc., letter dated September 28, 2015 (ADAMS Accession No. ML 15271A223).
PUBLIC                           LPL2-1 R/F                   RidsACRS_MailCTR Resource RidsNrrLALRonewicz Resource      RidsNrrDorlDpr Resource       RidsRgn2MailCenter Resource RidsNrrPMFarley Resource          RidsNrrDssStsb Resource       RecordsAmend RidssNrrDorllpl2-1 Resource ADAMS Accession No.: ML16272A189 OFFICE     DORL/LPL2-1/PM       DORL/LPL2-1 /LA       DORL/LPL2-1 /BC     DORL/LPL2-1 /PM NAME       SWilliams             LRonewicz             MMarkley           SWilliams DATE       9/29/2016             9/28/2016             10/03/2016         10/03/2016}}
The correct TS page 3.5.5-1 corresponds to Amendment No. 146 (Unit 1) and Amendment No. 137 (Unit 2) that can be found in ADAMS Package Accession No. ML993500022 and attached.
The correct TS page 3.5.5-2 corresponds to Amendment No. 185, (Unit 1), and Amendment No. 180, (Unit 2), that can be found in ADAMS Accession No. ML 11167 A226 and attached.
Docket Nos. 50-348 and 50-364 Distribution via Listserv DISTRIBUTION:
PUBLIC RidsNrrLALRonewicz Resource RidsNrrPMFarley Resource LPL2-1 R/F Sincerely, IRA/ Shawn A. Williams, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation RidsNrrDorlDpr Resource RidsNrrDssStsb Resource RidssNrrDorllpl2-1 Resource RidsACRS_MailCTR Resource RidsRgn2MailCenter Resource RecordsAmend ADAMS Accession No.: ML 16272A189 OFFICE DORL/LPL2-1/PM DORL/LPL2-1  
/LA DORL/LPL2-1  
/BC DORL/LPL2-1  
/PM NAME SWilliams LRonewicz MMarkley SWilliams DATE 9/29/2016 9/28/2016 10/03/2016 10/03/2016 OFFICIAL RECORD COPY}}

Latest revision as of 14:48, 30 October 2019

Correction to Amendment Nos. 203 (Unit 1) and 199 (Unit 2)
ML16272A189
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 10/03/2016
From: Shawn Williams
Plant Licensing Branch II
To: Pierce C
Southern Nuclear Operating Co
Williams S, DORL/LPLII-1, 415-1009
References
Download: ML16272A189 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 3, 2016 Mr. C. R. Pierce Regulatory Affairs Director Southern Nuclear Operating Company, Inc.

P.O. Box 1295 Bin 038 Birmingham, AL 35201-1295

SUBJECT:

JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 - CORRECTION TO AMENDMENT NOS. 203 (UNIT 1) AND 199 (UNIT 2)

Dear Mr. Pierce:

In a letter dated August 3, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15233A448), the U.S. Nuclear Regulatory Commission issued Amendment No. 203 to Renewed Facility Operating License No. NPF-2 and Amendment No.

199 to Renewed Facility Operating License No. NPF-8 for the Joseph M. Farley Nuclear Plant, Units 1 and 2, respectively. The amendments included changes to 63 technical specifications (TSs) pages. TS pages 3.5.5-1 and 3.5.5-2 were inadvertently included to be replaced.

However, as stated in the safety evaluation, the request related to these TS pages was withdrawn in the Southern Nuclear Company, Inc., letter dated September 28, 2015 (ADAMS Accession No. ML15271A223).

The correct TS page 3.5.5-1 corresponds to Amendment No. 146 (Unit 1) and Amendment No. 137 (Unit 2) that can be found in ADAMS Package Accession No. ML993500022 and attached. The correct TS page 3.5.5-2 corresponds to Amendment No. 185, (Unit 1), and Amendment No. 180, (Unit 2), that can be found in ADAMS Accession No. ML11167A226 and attached.

Sincerely, Shawn A. Williams, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364 Distribution via Listserv

Seal Injection Flow 3.5.5 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.5 Seal Injection Flow LCO 3.5.5 Reactor coolant pump seal injection flow shall be within limits.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Seal injection flow not A.1 Adjust manual seal 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> within limit. injection throttle valves in accordance with SR 3.5.5.1.

B. Required Action and B.1 Be in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND B.2 Be in MODE4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Farley Units 1 and 2 3.5.5-1 Amendment No. 146 (Unit 1)

Amendment No. 137 (Unit 2)

ECCS-Operating 3.5.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.2.1 --~*~-~~~-~NOTE~~~~----*~*~

Only required to be performed for valves 8132A and 81328 when Centrifugal Charging Pump A is Inoperable.

Verify the following valves are in the listed position In accordance with with power to the valve operator removed. the Surveillance Frequency Control Number Position Function Program 8884, 8886 Closed Centrifugal Charging Pump to RCS Hot Leg 8132A, 81320 Open Centrifugal Charging Pump discharge isolation 8689 Closed RHR to RCS Hot Leg Injection SR 3.5.2.2 Verify each ECCS manual, power operated, and In accordance with automatic valve in the flow path. that is not locked, the Surveillance sealed, or otherwise secured in position, is in the Frequency Control correct position. Program SR 3.52.3 Verify each ECCS pump's developed head at the test In accordance with flow point is greater than or equal to the required the lnservice developed head. Testing Program SR 3.5.2.4 Verify each ECCS automatic valve in the flow path In accordance with that is not locked. sealed, or otherwise secured in the Surveillance position, actuates to the correct position on an actual Frequency Control or simulated actuation signal.

  • Program Farley Units 1 and 2 3.5.2-2 Amendment No. 185 (Unit 1)

Amendment No. 180 (Unit 2)

ML11167A226 and attached.

Sincerely, IRA/

Shawn A. Williams, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364 Distribution via Listserv DISTRIBUTION:

PUBLIC LPL2-1 R/F RidsACRS_MailCTR Resource RidsNrrLALRonewicz Resource RidsNrrDorlDpr Resource RidsRgn2MailCenter Resource RidsNrrPMFarley Resource RidsNrrDssStsb Resource RecordsAmend RidssNrrDorllpl2-1 Resource ADAMS Accession No.: ML16272A189 OFFICE DORL/LPL2-1/PM DORL/LPL2-1 /LA DORL/LPL2-1 /BC DORL/LPL2-1 /PM NAME SWilliams LRonewicz MMarkley SWilliams DATE 9/29/2016 9/28/2016 10/03/2016 10/03/2016