L-PI-16-089, Interim Report of a Deviation or Failure to Comply: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:1717 Wakonade Drive Welch, MN 55089 800.895.4999 xcelenergy.com NOV 0 4 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Prairie .Island Nuclear Generating Plant, Unit 1 Docket No. 50-282 Renewed Facility Operating License No. DPR-42 Interim Report of a Deviation or Failure to Comply (l Xcel Energy* RESPONSIBLE BY NATURE 11 L-PI-16-089 10 CFR 21.21(a)(2)
{{#Wiki_filter:1717 Wakonade Drive Welch, MN 55089 (l Xcel Energy*
Pursuant to 10 CFR 21.21(a)(2), Northern States Power Company, a Minnesota Corporation, (NSPM), doing business as Xcel Energy, hereby submits this interim report. The deviation to be evaluated is the failed bench test of a Clark Relay Modei4U3-130.
RESPONSIBLE  BY NATURE 11 800.895.4999 xcelenergy.com NOV 0 4 2016                                                                   L-PI-16-089 10 CFR 21.21(a)(2)
The relay has been sent to the vendor for evaluation.
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Prairie .Island Nuclear Generating Plant, Unit 1 Docket No. 50-282 Renewed Facility Operating License No. DPR-42 Interim Report of a Deviation or Failure to Comply Pursuant to 10 CFR 21.21(a)(2), Northern States Power Company, a Minnesota Corporation, (NSPM), doing business as Xcel Energy, hereby submits this interim report.
The deviation to be evaluated is the failed bench test of a Clark Relay Modei4U3-130. The relay has been sent to the vendor for evaluation.
If there is any question or if additional information is needed, please contact Frank Sienczak, at 651-267-1740.
If there is any question or if additional information is needed, please contact Frank Sienczak, at 651-267-1740.
Summary of Commitments This letter makes no new commitments and no revisions to existing commitments.
Summary of Commitments This letter makes no new commitments and no revisions to existing commitments.
Scott Northard Site Vice President, Prairie Island Nuclear Generating Plant Northern States Power Company -Minnesota cc: Administrator, Region Ill, USNRC Project Manager, Prairie Island, USNRC Resident Inspector, Prairie Island, USNRC}}
Scott Northard Site Vice President, Prairie Island Nuclear Generating Plant Northern States Power Company - Minnesota cc:     Administrator, Region Ill, USNRC Project Manager, Prairie Island, USNRC Resident Inspector, Prairie Island, USNRC}}

Latest revision as of 13:22, 30 October 2019

Interim Report of a Deviation or Failure to Comply
ML16309A597
Person / Time
Site: Prairie Island Xcel Energy icon.png
Issue date: 11/04/2016
From: Northard S
Northern States Power Company, Minnesota, Xcel Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-PI-16-089
Download: ML16309A597 (1)


Text

1717 Wakonade Drive Welch, MN 55089 (l Xcel Energy*

RESPONSIBLE BY NATURE 11 800.895.4999 xcelenergy.com NOV 0 4 2016 L-PI-16-089 10 CFR 21.21(a)(2)

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Prairie .Island Nuclear Generating Plant, Unit 1 Docket No. 50-282 Renewed Facility Operating License No. DPR-42 Interim Report of a Deviation or Failure to Comply Pursuant to 10 CFR 21.21(a)(2), Northern States Power Company, a Minnesota Corporation, (NSPM), doing business as Xcel Energy, hereby submits this interim report.

The deviation to be evaluated is the failed bench test of a Clark Relay Modei4U3-130. The relay has been sent to the vendor for evaluation.

If there is any question or if additional information is needed, please contact Frank Sienczak, at 651-267-1740.

Summary of Commitments This letter makes no new commitments and no revisions to existing commitments.

Scott Northard Site Vice President, Prairie Island Nuclear Generating Plant Northern States Power Company - Minnesota cc: Administrator, Region Ill, USNRC Project Manager, Prairie Island, USNRC Resident Inspector, Prairie Island, USNRC