L-PI-16-089, Interim Report of a Deviation or Failure to Comply
| ML16309A597 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 11/04/2016 |
| From: | Northard S Northern States Power Company, Minnesota, Xcel Energy |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| L-PI-16-089 | |
| Download: ML16309A597 (1) | |
Text
1717 Wakonade Drive Welch, MN 55089 800.895.4999 xcelenergy.com NOV 0 4 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Prairie.Island Nuclear Generating Plant, Unit 1 Docket No. 50-282 Renewed Facility Operating License No. DPR-42 Interim Report of a Deviation or Failure to Comply (l Xcel Energy*
RESPONSIBLE BY NATURE 11 L-PI-16-089 10 CFR 21.21(a)(2)
Pursuant to 10 CFR 21.21(a)(2), Northern States Power Company, a Minnesota Corporation, (NSPM), doing business as Xcel Energy, hereby submits this interim report.
The deviation to be evaluated is the failed bench test of a Clark Relay Modei4U3-130. The relay has been sent to the vendor for evaluation.
If there is any question or if additional information is needed, please contact Frank Sienczak, at 651-267-1740.
Summary of Commitments This letter makes no new commitments and no revisions to existing commitments.
Scott Northard Site Vice President, Prairie Island Nuclear Generating Plant Northern States Power Company - Minnesota cc: