ML17142A436: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 05/18/2017
| issue date = 05/18/2017
| title = 2016 Monticello Nuclear Generating Plant Initial License Examination Outline ES-301-1
| title = 2016 Monticello Nuclear Generating Plant Initial License Examination Outline ES-301-1
| author name = Reeser D W
| author name = Reeser D
| author affiliation = NRC/RGN-III/DRS/OLB
| author affiliation = NRC/RGN-III/DRS/OLB
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ES-301 Administrative Topics Outline Form ES-301-1   Facility:
{{#Wiki_filter:ES-301                               Administrative Topics Outline                         Form ES-301-1 Facility:   Monticello Nuclear Generating Plant                 Date of Examination:   November 2016 Examination Level:       RO         SRO                       Operating Test Number:     2016-301 Administrative Topic (see Note)           Type             Describe activity to be performed Code*
Monticello Nuclear Generating Plant Date of Examination:
Conduct of Operations                             D      Bulk Drywell Temperature Manual Calculation 2.1.45 Ability to identify and interpret                 (JPM-001) diverse indications to validate the response of another indication.
November 2016 Examination Level:
IMPORTANCE RO 4.3 SRO 4.3 Conduct of Operations                             N      Demonstrate Electrical Safety Practices for 2.1.26 Knowledge of industrial safety                     Racking Out a 4160 KV Breaker procedures (such as rotating equipment,                   (JPM- FP-MA-ES-01-001) electrical, high temperature, high pressure, caustic, chlorine, oxygen and hydrogen).
RO SRO Operating Test Number:
IMPORTANCE RO 3.4 SRO 3.6 Equipment Control                                 N      Independent Verification of RHR following 2.2.15 Ability to determine the expected                 shutdown of Torus Cooling.
2016-301 Administrative Topic (see Note) Type Code* Describe activity to be performed Conduct of Operations 2.1.45 Ability to identify and interpret diverse indications to validate the response of another indication.
plant configuration using design and                     (JPM-4 AWI-04.04.02-005) configuration control documentation, such as drawings, line-ups, tag-outs, etc.
IMPORTANCE RO 4.3 SRO 4.3 D Bulk Drywell Temperature Manual Calculation (JPM-001) Conduct of Operations 2.1.26 Knowledge of industrial safety procedures (such as rotating equipment, electrical, high temperature, high pressure, caustic, chlorine, oxygen and hydrogen). IMPORTANCE RO 3.4 SRO 3.6 N Demonstrate Elect rical Safety Practices for Racking Out a 4160 KV Breaker (JPM- FP-MA-ES-01-001) Equipment Control 2.2.15 Ability to determine the expected plant configuration using design and configuration control documentation, such as drawings, line
IMPORTANCE RO 3.9 SRO 4.3 Radiation Control                                  D      Expected Dose Determination to Inspect 2.3.4 Knowledge of radiation exposure                    Equipment (JPM-4 AWI-08.04.01-006) limits under normal or emergency conditions.
-ups, tag-outs, etc.
IMPORTANCE RO 3.2 SRO 3.7 Emergency Plan                                    N/A    N/A N/A NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).
IMPORTANCE RO 3.9 SRO 4.3 N Independent Verification of RHR following shutdown of Torus Cooling.
* Type Codes & Criteria:            (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs;  4 for SROs & RO retakes)
(JPM-4 AWI-04.04.02-005) Radiation Control
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1; randomly selected)


====2.3.4 Knowledge====
ES-301                               Administrative Topics Outline                           Form ES-301-1 Facility:   Monticello Nuclear Generating Plant                   Date of Examination:   November 2016 Examination Level:     RO         SRO                         Operating Test Number:     2016-301 Administrative Topic (see Note)           Type             Describe activity to be performed Code*
of radiation exposure limits under normal or emergency conditions.
Conduct of Operations                           D, P    SRO - NRC License Maintenance 2.1.4 Knowledge of individual licensed                   Responsibilities (JPM-OWI-01.08-002) operator responsibilities related to shift l staffing, such as medical requirements, no-solo operation, maintenance l of active license status, 10CFR55, etc.
IMPORTANCE RO 3.2 SRO 3.7 D Expected Dose Determination to Inspect Equipment (JPM-4 AWI-08.04.01-006) Emergency Plan N/A N/A N/A NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).
IMPORTANCE RO 3.3 SRO 3.8 Conduct of Operations                             N      Pre-Job Brief for APRM Heat Balance 2.1.1 Knowledge of Conduct of                             Calibration (JPM-FP-PA-HU-06-001)
* Type Codes & Criteria:
Operations Requirements IMPORTANCE RO 3.8 SRO 4.2 Equipment Control                                N       LCO 3.0.9 Application Determination - Blocked 2.2.40 Ability to apply Technical                        Open HELB Door (JPM-OWI-02.07-002)
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from (N)ew or (M)odified from bank ES-301 Administrative Topics Outline Form ES-301-1   Facility:
Specifications for a system.
Monticello Nuclear Generating Plant Date of Examination:
IMPORTANCE RO 3.4 SRO 4.7 Radiation Control                                N       Authorization to exceed Administrative Dose 2.3.4 Knowledge of radiation exposure                    Limit. (JPM-4-AWI-08.04.01-008) limits under normal or emergency conditions.
November 2016 Examination Level:
IMPORTANCE RO 3.2 SRO 3.7 Emergency Plan                                   D      EAL Classification (JPM A.2-101-002) 2.4.41 Knowledge of the emergency action level thresholds and classifications.
RO SRO Operating Test Number:
IMPORTANCE RO 2.9 SRO 4.6 NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).
2016-301 Administrative Topic (see Note) Type Code* Describe activity to be performed Conduct of Operations
* Type Codes & Criteria:           (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs;  4 for SROs & RO retakes)
 
(N)ew or (M)odified from bank ( 1)
====2.1.4 Knowledge====
(P)revious 2 exams ( 1; randomly selected)}}
of individual licensed operator responsibilities related to shift l staffing, such as medical requirements, "no-solo" operation, maintenance l of active license status, 10CFR55, etc.
IMPORTANCE RO 3.3 SRO 3.8 D, P SRO - NRC License Maintenance Responsibilities (JPM-OWI-01.08-002) Conduct of Operations
 
====2.1.1 Knowledge====
of Conduct of Operations Requirements IMPORTANCE RO 3.
8 SRO 4.2  N Pre-Job Brief for APRM Heat Balance Calibration (JPM-FP-PA-HU-06-001) Equipment Control 2.2.40 Ability to apply Technical Specifications for a system.
IMPORTANCE RO 3.4 SRO 4.7 N LCO 3.0.9 Application Determination
- Blocked Open HELB Door (JPM-OWI-02.07-002) Radiation Control
 
====2.3.4 Knowledge====
of radiation exposure limits under normal or emergency conditions.
IMPORTANCE RO 3.2 SRO 3.7 N Authorization to exceed Administrative Dose Limit. (JPM-4-AWI-08.04.01-008) Emergency Plan 2.4.41 Knowledge of the emergency action level thresholds and classifications.
IMPORTANCE RO 2.9 SRO 4.6 D EAL Classification (JPM A.2-101-002) NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).
* Type Codes & Criteria:
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from (N)ew or (M)odified from}}

Latest revision as of 03:55, 30 October 2019

2016 Monticello Nuclear Generating Plant Initial License Examination Outline ES-301-1
ML17142A436
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 05/18/2017
From: David Reeser
NRC/RGN-III/DRS/OLB
To:
Nuclear Management Co
Shared Package
ML15274A421 List:
References
Download: ML17142A436 (2)


Text

ES-301 Administrative Topics Outline Form ES-301-1 Facility: Monticello Nuclear Generating Plant Date of Examination: November 2016 Examination Level: RO SRO Operating Test Number: 2016-301 Administrative Topic (see Note) Type Describe activity to be performed Code*

Conduct of Operations D Bulk Drywell Temperature Manual Calculation 2.1.45 Ability to identify and interpret (JPM-001) diverse indications to validate the response of another indication.

IMPORTANCE RO 4.3 SRO 4.3 Conduct of Operations N Demonstrate Electrical Safety Practices for 2.1.26 Knowledge of industrial safety Racking Out a 4160 KV Breaker procedures (such as rotating equipment, (JPM- FP-MA-ES-01-001) electrical, high temperature, high pressure, caustic, chlorine, oxygen and hydrogen).

IMPORTANCE RO 3.4 SRO 3.6 Equipment Control N Independent Verification of RHR following 2.2.15 Ability to determine the expected shutdown of Torus Cooling.

plant configuration using design and (JPM-4 AWI-04.04.02-005) configuration control documentation, such as drawings, line-ups, tag-outs, etc.

IMPORTANCE RO 3.9 SRO 4.3 Radiation Control D Expected Dose Determination to Inspect 2.3.4 Knowledge of radiation exposure Equipment (JPM-4 AWI-08.04.01-006) limits under normal or emergency conditions.

IMPORTANCE RO 3.2 SRO 3.7 Emergency Plan N/A N/A N/A NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).

  • Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)

(N)ew or (M)odified from bank ( 1)

(P)revious 2 exams ( 1; randomly selected)

ES-301 Administrative Topics Outline Form ES-301-1 Facility: Monticello Nuclear Generating Plant Date of Examination: November 2016 Examination Level: RO SRO Operating Test Number: 2016-301 Administrative Topic (see Note) Type Describe activity to be performed Code*

Conduct of Operations D, P SRO - NRC License Maintenance 2.1.4 Knowledge of individual licensed Responsibilities (JPM-OWI-01.08-002) operator responsibilities related to shift l staffing, such as medical requirements, no-solo operation, maintenance l of active license status, 10CFR55, etc.

IMPORTANCE RO 3.3 SRO 3.8 Conduct of Operations N Pre-Job Brief for APRM Heat Balance 2.1.1 Knowledge of Conduct of Calibration (JPM-FP-PA-HU-06-001)

Operations Requirements IMPORTANCE RO 3.8 SRO 4.2 Equipment Control N LCO 3.0.9 Application Determination - Blocked 2.2.40 Ability to apply Technical Open HELB Door (JPM-OWI-02.07-002)

Specifications for a system.

IMPORTANCE RO 3.4 SRO 4.7 Radiation Control N Authorization to exceed Administrative Dose 2.3.4 Knowledge of radiation exposure Limit. (JPM-4-AWI-08.04.01-008) limits under normal or emergency conditions.

IMPORTANCE RO 3.2 SRO 3.7 Emergency Plan D EAL Classification (JPM A.2-101-002) 2.4.41 Knowledge of the emergency action level thresholds and classifications.

IMPORTANCE RO 2.9 SRO 4.6 NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).

  • Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)

(N)ew or (M)odified from bank ( 1)

(P)revious 2 exams ( 1; randomly selected)