ML17188A311: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:OFFICIAL USE ONLY - PROPRIETARY INFORMATION OFFICIAL USE ONLY - PROPRIETARY INFORMATION December 22, 2017  
{{#Wiki_filter:OFFICIAL USE ONLY - PROPRIETARY INFORMATION December 22, 2017 Dr. Jae Yong Lee, Project Manager APR1400 Design Certification Advanced Reactors Development Laboratory Korea Hydro and Nuclear Power Co., Ltd.
 
70-1312-gil, Yuseong-daero Yuseong-Gu, Daejeon 305-343 Korea (Republic of)
Dr. Jae Yong Lee, Project Manager APR1400 Design Certification  
 
Advanced Reactors Development Laboratory Korea Hydro and Nuclear Power Co., Ltd. 70-1312-gil, Yuseong-daero Yuseong-Gu, Daejeon  
 
305-343 Korea (Republic of)  


==SUBJECT:==
==SUBJECT:==
ADVANCED POWER REACTOR 1400 DESIGN CERTIFICATION APPLICATION - SAFETY EVALUATION WITH NO OPEN ITEMS FOR CHAPTER 16, "TECHNICAL SPECIFICATIONS"
ADVANCED POWER REACTOR 1400 DESIGN CERTIFICATION APPLICATION - SAFETY EVALUATION WITH NO OPEN ITEMS FOR CHAPTER 16, TECHNICAL SPECIFICATIONS


==Dear Dr. Lee:==
==Dear Dr. Lee:==


The U.S. Nuclear Regulatory Commission (NRC) staff is preparing a safety evaluation (SE) with no open items (OIs) for each chapter of Revision 1 to the Advanced Power Reactor 1400 Design Certification Application, submitted by Korea Electric Power Corporation and Korea Hydro & Nuclear Power Co., Ltd. (KHNP) on March 10, 2017.
The U.S. Nuclear Regulatory Commission (NRC) staff is preparing a safety evaluation (SE) with no open items (OIs) for each chapter of Revision 1 to the Advanced Power Reactor 1400 Design Certification Application, submitted by Korea Electric Power Corporation and Korea Hydro & Nuclear Power Co., Ltd. (KHNP) on March 10, 2017.
 
The staffs SE with no OIs for Chapter 16, Technical Specifications, is being provided to the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee to support upcoming meetings of the ACRS Subcommittee, scheduled to be held on January 24 - 25, 2018.
The staff's SE with no OIs for Chapter 16, "Technical Specifications," is being provided to the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee to support upcoming meetings of the ACRS Subcommittee, scheduled to be held on January 24 - 25, 2018.  
The enclosed SE with no OIs is being provided to KHNP for review of proprietary information pursuant to the Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding. The staff concludes that the enclosed SE does not contain any information for which exemption from public disclosure has been sought or approved; however, the NRC will withhold the enclosed SE from public disclosure for ten business days from the date of this letter to allow you the opportunity to verify the staffs conclusion that the SE contains no exempt information or factual errors. If within that ten day period, you do not request that all or portions of the SE be withheld from public disclosure, the enclosure will be made available for public inspection through the Publicly Available Records component of NRCs Agencywide Documents Access and Management System and placed on the NRCs public web page for this application.
 
Document transmitted herewith contains sensitive unclassified information. When separated from the enclosure, this document is DECONTROLLED.
The enclosed SE with no OIs is being provided to KHNP for review of proprietary information pursuant to the Title 10 of the Code of Federal Regulations 2.390, "Public Inspections, Exemptions, Requests for Withholding.The staff concludes that the enclosed SE does not contain any information for which exemption from public disclosure has been sought or approved; however, the NRC will withhold the enclosed SE from public disclosure for ten business days from the date of this letter to allow you the opportunity to verify the staff's conclusion that the SE contains no exempt information or factual errors. If within that ten day period, you do not request that all or portions of the SE be withheld from public disclosure, the enclosure will be made available for public inspection through the Publicly Available Records component of NRC's Agencywide Documents Access and Management System and placed on the NRC's public web page for this application.  
OFFICIAL USE ONLY - PROPRIETARY INFORMATION
 
Document transmitted herewith contains sensitive unclassified information. When separated from the enclosure, this document is "DECONTROLLED."
 
OFFICIAL USE ONLY - PROPRIETARY INFORMATION OFFICIAL USE ONLY - PROPRIETARY INFORMATION Dr. Lee   


If you have any questions or comments concerning this matter, I can be reached at (301) 415-6391 or via e-mail address at William.Ward@nrc.gov. Sincerely, William R. Ward, Senior Project Manager  
OFFICIAL USE ONLY - PROPRIETARY INFORMATION Dr. Lee                                      If you have any questions or comments concerning this matter, I can be reached at (301) 415-6391 or via e-mail address at William.Ward@nrc.gov.
/RA/ Licensing Branch 2 Division of New Reactor Licensing Office of New Reactors Docket No. 52-046  
Sincerely, William R. Ward, Senior Project Manager /RA/
Licensing Branch 2 Division of New Reactor Licensing Office of New Reactors Docket No. 52-046


==Enclosure:==
==Enclosure:==


As stated cc w/o enclosure: See next page  
As stated cc w/o enclosure: See next page OFFICIAL USE ONLY - PROPRIETARY INFORMATION
 
Letter:  ML17188A311        NRO-002 OFFICE DNRL/LB2: PM DNRL/LB2: LA DNRL/LB2: PM NAME JUmana CSmith* WWard DATE 12/19/2017 12/19/2017 12/22/2017 KHNP Mailing List


03/03/2017 Daegeun Tony Ahn Director KHNP Washington DC Center 8100 Boone Blvd, Suite 620 Vienna, VA 22182
Letter: ML17188A311                                                    NRO-002 OFFICE    DNRL/LB2: PM              DNRL/LB2: LA        DNRL/LB2: PM NAME      JUmana                    CSmith*              WWard DATE      12/19/2017                12/19/2017          12/22/2017


Page 1 of 2 Email  kimhg1108@khnp.co.kr                    [Han-Gon Kim]
KHNP Mailing List 03/03/2017 Daegeun Tony Ahn Director KHNP Washington DC Center 8100 Boone Blvd, Suite 620 Vienna, VA 22182 Page 1 of 2
hansang.kim@khnp.co.kr                  [Hansang Kim]
dohwan.lee@khnp.co.kr                    [Do-Hwan Lee]
junghokim@khnp.co.kr                      [Jung-Ho Kim]  yunho.kim@khnp.co.kr                      [Yun Ho Kim]
jiyong.oh@khnp.co.kr jiyong.oh5@gmail.com                      [Jiyong Andy Oh] ahn.daegeun@khnp.co.kr , daegeun.ahn@gmail.com          [Daegeun Tony Ahn]  jksuh@khnp.co.kr                              [Jeong Kwan Suh]
hachewung@khnp.co.kr                    [Che Wung Ha]
kang.deogji@khnp.co.kr                    [Deog Ji Kang] sunguk.kwon@khnp.co.kr                  [Sun Guk Kwon] ptmaster300@kepco.co.kr                [Hyun Chul Park]


Email kimhg1108@khnp.co.kr            [Han-Gon Kim]
hansang.kim@khnp.co.kr          [Hansang Kim]
dohwan.lee@khnp.co.kr            [Do-Hwan Lee]
junghokim@khnp.co.kr            [Jung-Ho Kim]
yunho.kim@khnp.co.kr            [Yun Ho Kim]
jiyong.oh@khnp.co.kr jiyong.oh5@gmail.com          [Jiyong Andy Oh]
ahn.daegeun@khnp.co.kr, daegeun.ahn@gmail.com      [Daegeun Tony Ahn]
jksuh@khnp.co.kr                  [Jeong Kwan Suh]
hachewung@khnp.co.kr            [Che Wung Ha]
kang.deogji@khnp.co.kr            [Deog Ji Kang]
sunguk.kwon@khnp.co.kr            [Sun Guk Kwon]
ptmaster300@kepco.co.kr          [Hyun Chul Park]
Page 2 of 2}}
Page 2 of 2}}

Revision as of 02:18, 30 October 2019

APR1400 Chapter 16 Phase 4 SER Letter to KHNP
ML17188A311
Person / Time
Site: 05200046
Issue date: 12/22/2017
From: William Ward
NRC/NRO/DNRL/LB2
To: Jun Lee
Korea Hydro & Nuclear Power Co, Ltd
Umana J
Shared Package
ML17188A317 List:
References
Download: ML17188A311 (5)


Text

OFFICIAL USE ONLY - PROPRIETARY INFORMATION December 22, 2017 Dr. Jae Yong Lee, Project Manager APR1400 Design Certification Advanced Reactors Development Laboratory Korea Hydro and Nuclear Power Co., Ltd.

70-1312-gil, Yuseong-daero Yuseong-Gu, Daejeon 305-343 Korea (Republic of)

SUBJECT:

ADVANCED POWER REACTOR 1400 DESIGN CERTIFICATION APPLICATION - SAFETY EVALUATION WITH NO OPEN ITEMS FOR CHAPTER 16, TECHNICAL SPECIFICATIONS

Dear Dr. Lee:

The U.S. Nuclear Regulatory Commission (NRC) staff is preparing a safety evaluation (SE) with no open items (OIs) for each chapter of Revision 1 to the Advanced Power Reactor 1400 Design Certification Application, submitted by Korea Electric Power Corporation and Korea Hydro & Nuclear Power Co., Ltd. (KHNP) on March 10, 2017.

The staffs SE with no OIs for Chapter 16, Technical Specifications, is being provided to the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee to support upcoming meetings of the ACRS Subcommittee, scheduled to be held on January 24 - 25, 2018.

The enclosed SE with no OIs is being provided to KHNP for review of proprietary information pursuant to the Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding. The staff concludes that the enclosed SE does not contain any information for which exemption from public disclosure has been sought or approved; however, the NRC will withhold the enclosed SE from public disclosure for ten business days from the date of this letter to allow you the opportunity to verify the staffs conclusion that the SE contains no exempt information or factual errors. If within that ten day period, you do not request that all or portions of the SE be withheld from public disclosure, the enclosure will be made available for public inspection through the Publicly Available Records component of NRCs Agencywide Documents Access and Management System and placed on the NRCs public web page for this application.

Document transmitted herewith contains sensitive unclassified information. When separated from the enclosure, this document is DECONTROLLED.

OFFICIAL USE ONLY - PROPRIETARY INFORMATION

OFFICIAL USE ONLY - PROPRIETARY INFORMATION Dr. Lee If you have any questions or comments concerning this matter, I can be reached at (301) 415-6391 or via e-mail address at William.Ward@nrc.gov.

Sincerely, William R. Ward, Senior Project Manager /RA/

Licensing Branch 2 Division of New Reactor Licensing Office of New Reactors Docket No.52-046

Enclosure:

As stated cc w/o enclosure: See next page OFFICIAL USE ONLY - PROPRIETARY INFORMATION

Letter: ML17188A311 NRO-002 OFFICE DNRL/LB2: PM DNRL/LB2: LA DNRL/LB2: PM NAME JUmana CSmith* WWard DATE 12/19/2017 12/19/2017 12/22/2017

KHNP Mailing List 03/03/2017 Daegeun Tony Ahn Director KHNP Washington DC Center 8100 Boone Blvd, Suite 620 Vienna, VA 22182 Page 1 of 2

Email kimhg1108@khnp.co.kr [Han-Gon Kim]

hansang.kim@khnp.co.kr [Hansang Kim]

dohwan.lee@khnp.co.kr [Do-Hwan Lee]

junghokim@khnp.co.kr [Jung-Ho Kim]

yunho.kim@khnp.co.kr [Yun Ho Kim]

jiyong.oh@khnp.co.kr jiyong.oh5@gmail.com [Jiyong Andy Oh]

ahn.daegeun@khnp.co.kr, daegeun.ahn@gmail.com [Daegeun Tony Ahn]

jksuh@khnp.co.kr [Jeong Kwan Suh]

hachewung@khnp.co.kr [Che Wung Ha]

kang.deogji@khnp.co.kr [Deog Ji Kang]

sunguk.kwon@khnp.co.kr [Sun Guk Kwon]

ptmaster300@kepco.co.kr [Hyun Chul Park]

Page 2 of 2