IR 05000255/2017302: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES | {{#Wiki_filter:UNITED STATES ust 16, 2017 | ||
==SUBJECT:== | |||
PALISADES NUCLEAR PLANT - NRC INITIAL LICENSE REEXAMINATION REPORT 05000255/2017302 | |||
==Dear Mr. Arnone:== | ==Dear Mr. Arnone:== | ||
On August 9, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed the initial operator licensing reexamination process for a license applicant employed at your Palisades Nuclear Plant. The enclosed report documents the results of the reexamination. An exit meeting was conducted on August 8, 2017, between Mr. Darrell Corbin, General Manager Plant Operations | On August 9, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed the initial operator licensing reexamination process for a license applicant employed at your Palisades Nuclear Plant. The enclosed report documents the results of the reexamination. An exit meeting was conducted on August 8, 2017, between Mr. Darrell Corbin, General Manager Plant Operations, other members of your staff and Mr. Michael Bielby, Chief Operator Licensing Examiner, to review observations noted during the examination process as well as the proposed final grading of the operating test reexamination. | ||
, other members of your staff and Mr. Michael Bielby, Chief Operator Licensing Examiner, to review observations noted during the examination process as well as the proposed final grading of the operating test | |||
The results of the reexamination were finalized on August 14, 2017. | The NRC examiner administered the initial license reexamination operating test on August 7, 2017. One Senior Reactor Operator-Instant (SRO-I) applicant was administered the reexamination. The results of the reexamination were finalized on August 14, 2017. The applicant passed all components of the administrative job performance measures portion of the operating test reexamination. In accordance with NRC policy, the SRO-I applicants license is being withheld pending medical certification by the facility that the applicant meets the medical requirements for licensed operators, the medical certification is approved by the NRCs physician, and the facility certifies the applicant has satisfactorily attended and participated in licensed SRO training after completion of the examination. | ||
. In accordance with NRC policy, the SRO-I | |||
The reexamination , as well as documents related to the development and review (outlines, proposed examinations, review comments and resolution, etc.) of the examination will be withheld from public disclosure for 24 months , until August 7, 2019. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, | The reexamination, as well as documents related to the development and review (outlines, proposed examinations, review comments and resolution, etc.) of the examination will be withheld from public disclosure for 24 months, until August 7, 2019. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding. | ||
Sincerely, | Sincerely, | ||
/RA/ | /RA/ | ||
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety | Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket No. 50-255 License No. DPR-20 | ||
Docket No. 50-255 License No. DPR-20 | |||
===Enclosures:=== | ===Enclosures:=== | ||
1. OL Examination Report | 1. OL Examination Report 05000255/2017302 2. Simulation Facility Report | ||
REGION III Docket No: 50-255 License No: DPR-20 Report No: | REGION III== | ||
Docket No: 50-255 License No: DPR-20 Report No: 05000255/2017302 Licensee: Entergy Nuclear Operations, Inc. | |||
Facility: Palisades Nuclear Plant Location: Covert, Michigan Dates: August 7 - 9 , 2017 Inspector: | Facility: Palisades Nuclear Plant Location: Covert, Michigan Dates: August 7 - 9, 2017 Inspector: M. Bielby, Senior Operations Engineer - Chief Examiner Approved by: R. Orlikowski, Chief Operations Branch Division of Reactor Safety Enclosure 1 | ||
M. Bielby , Senior Operations Engineer - Chief Examiner Approved by: R. Orlikowski, Chief Operations Branch Division of Reactor Safety | |||
=SUMMARY= | =SUMMARY= | ||
Examination Report | Examination Report 05000255/2017302; 08/07/2017 - 08/092017; Entergy Nuclear Operations, | ||
Inc.; Palisades Nuclear Plant; Initial License Reexamination Report. | |||
The announced initial operator licensing reexamination was conducted by regional U.S. Nuclear Regulatory Commission (NRC) examiners in accordance with the guidance of NUREG-1021, | |||
Operator Licensing Examination Standards for Power Reactors, Revision 10. | |||
Examination Summary The Senior Reactor Operator (SRO)-Instant applicant passed all components of the administrative job performance measures portion of the operating test reexamination. | |||
The applicants license is being withheld pending medical certification by the facility that the applicant meets the medical requirements for licensed operators, the medical certification is approved by the NRCs physician, and the facility certifies the applicant has satisfactorily attended and participated in licensed SRO training after completion of the examination. | |||
(Section 4OA5.1). | |||
=REPORT DETAILS= | =REPORT DETAILS= | ||
Line 68: | Line 64: | ||
===.1 Initial Licensing Examinations=== | ===.1 Initial Licensing Examinations=== | ||
a. Examination Scope The U.S. Nuclear Regulatory Commission (NRC) examiner and members of the facility | ====a. Examination Scope==== | ||
-1021, | The U.S. Nuclear Regulatory Commission (NRC) examiner and members of the facility licensees staff used the guidance prescribed in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 10, to develop, validate, administer, and grade the operating test reexamination. This reexamination consisted of only the administrative job performance measures (JPMs) portion of the operating test; the systems JPMs, simulator scenario portion of the operating test, as well as the written examination, were successfully completed during the initial license examination and were therefore waived for this reexamination. Members of the facility licensees staff prepared the outline and developed the administrative JPMs portion of the operating test reexamination. The NRC examiner validated the proposed examination during the morning of August 7, 2017, with the assistance of members of the facility licensees staff. The NRC examiner, with the assistance of members of the facility licensees staff, administered the operating test reexamination during the afternoon of August 7, 2017. | ||
The NRC examiner, with the assistance of members of the facility | |||
====b. Findings==== | ====b. Findings==== | ||
: (1) Operating Test The NRC examiner determined that the administrative | : (1) Operating Test The NRC examiner determined that the administrative JPMs portion of the operating test reexamination, as originally proposed by the licensee, was within the range of acceptability expected for a proposed examination. Changes made to the reexamination, documented in a document titled, Operating Test Comments, as well as the final as-administered administrative JPMs portion of the operating test, will be available, on August 7, 2019, electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Document Access and Management System. | ||
-administered administrative | |||
The NRC examiner completed grading of the operating test on August 14, 2017. | The NRC examiner completed grading of the operating test on August 14, 2017. | ||
: (2) Examination Results One Senior Reactor Operator | : (2) Examination Results One Senior Reactor Operator-Instant (SRO-I) applicant was administered the reexamination. The applicant passed all components of the administrative JPMs portion of the operating test reexamination. In accordance with NRC policy, the SRO-I applicants license is being withheld pending medical certification by the facility that the applicant meets the medical requirements for licensed operators, the medical certification is approved by the NRCs physician, and the facility certifies the applicant has satisfactorily attended and participated in licensed SRO training after completion of the examination. | ||
-Instant (SRO | |||
-I) applicant was administered the reexamination. | |||
-I | |||
===.2 Examination=== | ===.2 Examination Security=== | ||
====a. Scope==== | ====a. Scope==== | ||
The NRC examiner reviewed and observed the licensee's implementation of examination security requirements during the examination validation and administration to assure compliance with Title10 of the Code of Federal Regulations, Section 55.49, | The NRC examiner reviewed and observed the licensee's implementation of examination security requirements during the examination validation and administration to assure compliance with Title10 of the Code of Federal Regulations, Section 55.49, Integrity of Examinations and Tests. The examiners used the guidelines provided in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors, to determine acceptability of the licensees examination security activities. | ||
The examiners used the guidelines provided in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors, | |||
to determine acceptability of the | |||
====b. Findings==== | ====b. Findings==== | ||
Line 99: | Line 82: | ||
{{a|4OA6}} | {{a|4OA6}} | ||
==4OA6 Management== | ==4OA6 Management Meetings== | ||
===.1 Exit Meeting=== | |||
The chief examiner conducted an exit meeting on August 8, 2017, with Mr. D. Corbin, General Manager Plant Operations, and other members of the facilitys Regulator Assurance, Operations and Training organizations. Observations from the reexamination validation and administration were presented to the facility, and the facility verified that no post exam comments were identified for submission. The examiner presented the preliminary grading results, and asked the licensee whether any of the material used to develop or administer the examination should be considered proprietary. No proprietary or sensitive information was identified during the examination or exit meeting. | |||
Observations from the reexamination validation and administration were presented to the facility, and the facility verified that no post exam comments were identified for submission. The examiner presented the preliminary grading results, and asked the licensee whether any of the material used to develop or administer the examination should be considered proprietary. No proprietary or sensitive information was identified during the examination or exit meeting. | |||
ATTACHMENT: | ATTACHMENT: | ||
=SUPPLEMENTAL | =SUPPLEMENTAL INFORMATION= | ||
INFORMATION= | |||
SUPPLEMENTAL | SUPPLEMENTAL INFORMATION | ||
INFORMATION | KEY POINTS OF CONTACT | ||
KEY POINTS OF CONTACT Licensee | Licensee | ||
: [[contact::D. Corbin ]], General Manager Plant Operations | : [[contact::D. Corbin]], General Manager Plant Operations | ||
: [[contact::B. Baker]], Operations Manager | : [[contact::B. Baker]], Operations Manager | ||
: [[contact::B. Dotson]], Regulatory Assurance Specialist | : [[contact::B. Dotson]], Regulatory Assurance Specialist | ||
: [[contact::O. Gustafson ]], Director Regulatory and Performance Improvement | : [[contact::O. Gustafson]], Director Regulatory and Performance Improvement | ||
: [[contact::J. Hardy]], Regulatory Assurance Manager | : [[contact::J. Hardy]], Regulatory Assurance Manager | ||
: [[contact::W. Nelson]], Training Manager | : [[contact::W. Nelson]], Training Manager | ||
Line 126: | Line 107: | ||
: [[contact::B. Bartlett]], Acting Resident Inspector | : [[contact::B. Bartlett]], Acting Resident Inspector | ||
: [[contact::M. Bielby]], Chief Examiner | : [[contact::M. Bielby]], Chief Examiner | ||
ITEMS OPENED, CLOSED, AND DISCUSSED Opened, Closed, and Discussed None LIST OF ACRONYMS USED JPM Job Performance Measure | ITEMS OPENED, CLOSED, AND DISCUSSED | ||
NRC U.S. Nuclear Regulatory | Opened, Closed, and Discussed | ||
Commission | None | ||
SRO-I Senior Reactor Operator-Instant | LIST OF ACRONYMS USED | ||
SIMULATION | JPM Job Performance Measure | ||
FACILITY FIDELITY REPORT Facility Licensee: Palisades Nuclear Plant Facility Docket No: | NRC U.S. Nuclear Regulatory Commission | ||
50-255 Operating Tests Administered: | SRO-I Senior Reactor Operator-Instant | ||
August 7 , 2017 The following documents observations made | SIMULATION FACILITY FIDELITY REPORT | ||
by the U.S. Nuclear Regulatory Commission | Facility Licensee: Palisades Nuclear Plant | ||
Facility Docket No: 50-255 | |||
reexamination. These observations | Operating Tests Administered: August 7, 2017 | ||
do not constitute | The following documents observations made by the U.S. Nuclear Regulatory | ||
audit or inspection | Commission (NRC) examiner team during the initial operator license reexamination. | ||
and review, indicative | These observations do not constitute audit or inspection findings and are not, without further | ||
of non-compliance with Title 10 of the Code of Federal Regulations | verification and review, indicative of non-compliance with Title 10 of the Code of Federal | ||
55.45(b). These | Regulations 55.45(b). These observations do not affect NRC certification or approval of the | ||
observations | simulation facility other than to provide information, which may be, used in future evaluations. | ||
do not affect | No licensee action is required in response to these observations. | ||
NRC certification | During the conduct of the simulator portion of the operating tests, the following items were | ||
or approval of the simulation | observed: | ||
facility other than to | ITEM DESCRIPTION | ||
provide information, which may be, used in future evaluations. | None None | ||
No licensee action is | 2 | ||
required in | |||
response to these observations. | |||
During the conduct of the simulator portion of the operating tests, the following items were observed: ITEM DESCRIPTION | |||
None None | |||
}} | }} |
Revision as of 20:44, 29 October 2019
ML17229B134 | |
Person / Time | |
---|---|
Site: | Palisades |
Issue date: | 08/16/2017 |
From: | Robert Orlikowski Operations Branch III |
To: | Arnone C Entergy Nuclear Operations |
References | |
50-255/17-302 50-255/OL-17 | |
Download: ML17229B134 (9) | |
Text
UNITED STATES ust 16, 2017
SUBJECT:
PALISADES NUCLEAR PLANT - NRC INITIAL LICENSE REEXAMINATION REPORT 05000255/2017302
Dear Mr. Arnone:
On August 9, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed the initial operator licensing reexamination process for a license applicant employed at your Palisades Nuclear Plant. The enclosed report documents the results of the reexamination. An exit meeting was conducted on August 8, 2017, between Mr. Darrell Corbin, General Manager Plant Operations, other members of your staff and Mr. Michael Bielby, Chief Operator Licensing Examiner, to review observations noted during the examination process as well as the proposed final grading of the operating test reexamination.
The NRC examiner administered the initial license reexamination operating test on August 7, 2017. One Senior Reactor Operator-Instant (SRO-I) applicant was administered the reexamination. The results of the reexamination were finalized on August 14, 2017. The applicant passed all components of the administrative job performance measures portion of the operating test reexamination. In accordance with NRC policy, the SRO-I applicants license is being withheld pending medical certification by the facility that the applicant meets the medical requirements for licensed operators, the medical certification is approved by the NRCs physician, and the facility certifies the applicant has satisfactorily attended and participated in licensed SRO training after completion of the examination.
The reexamination, as well as documents related to the development and review (outlines, proposed examinations, review comments and resolution, etc.) of the examination will be withheld from public disclosure for 24 months, until August 7, 2019. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket No. 50-255 License No. DPR-20
Enclosures:
1. OL Examination Report 05000255/2017302 2. Simulation Facility Report
REGION III==
Docket No: 50-255 License No: DPR-20 Report No: 05000255/2017302 Licensee: Entergy Nuclear Operations, Inc.
Facility: Palisades Nuclear Plant Location: Covert, Michigan Dates: August 7 - 9, 2017 Inspector: M. Bielby, Senior Operations Engineer - Chief Examiner Approved by: R. Orlikowski, Chief Operations Branch Division of Reactor Safety Enclosure 1
SUMMARY
Examination Report 05000255/2017302; 08/07/2017 - 08/092017; Entergy Nuclear Operations,
Inc.; Palisades Nuclear Plant; Initial License Reexamination Report.
The announced initial operator licensing reexamination was conducted by regional U.S. Nuclear Regulatory Commission (NRC) examiners in accordance with the guidance of NUREG-1021,
Operator Licensing Examination Standards for Power Reactors, Revision 10.
Examination Summary The Senior Reactor Operator (SRO)-Instant applicant passed all components of the administrative job performance measures portion of the operating test reexamination.
The applicants license is being withheld pending medical certification by the facility that the applicant meets the medical requirements for licensed operators, the medical certification is approved by the NRCs physician, and the facility certifies the applicant has satisfactorily attended and participated in licensed SRO training after completion of the examination.
(Section 4OA5.1).
REPORT DETAILS
4OA5 Other Activities
.1 Initial Licensing Examinations
a. Examination Scope
The U.S. Nuclear Regulatory Commission (NRC) examiner and members of the facility licensees staff used the guidance prescribed in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 10, to develop, validate, administer, and grade the operating test reexamination. This reexamination consisted of only the administrative job performance measures (JPMs) portion of the operating test; the systems JPMs, simulator scenario portion of the operating test, as well as the written examination, were successfully completed during the initial license examination and were therefore waived for this reexamination. Members of the facility licensees staff prepared the outline and developed the administrative JPMs portion of the operating test reexamination. The NRC examiner validated the proposed examination during the morning of August 7, 2017, with the assistance of members of the facility licensees staff. The NRC examiner, with the assistance of members of the facility licensees staff, administered the operating test reexamination during the afternoon of August 7, 2017.
b. Findings
- (1) Operating Test The NRC examiner determined that the administrative JPMs portion of the operating test reexamination, as originally proposed by the licensee, was within the range of acceptability expected for a proposed examination. Changes made to the reexamination, documented in a document titled, Operating Test Comments, as well as the final as-administered administrative JPMs portion of the operating test, will be available, on August 7, 2019, electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Document Access and Management System.
The NRC examiner completed grading of the operating test on August 14, 2017.
- (2) Examination Results One Senior Reactor Operator-Instant (SRO-I) applicant was administered the reexamination. The applicant passed all components of the administrative JPMs portion of the operating test reexamination. In accordance with NRC policy, the SRO-I applicants license is being withheld pending medical certification by the facility that the applicant meets the medical requirements for licensed operators, the medical certification is approved by the NRCs physician, and the facility certifies the applicant has satisfactorily attended and participated in licensed SRO training after completion of the examination.
.2 Examination Security
a. Scope
The NRC examiner reviewed and observed the licensee's implementation of examination security requirements during the examination validation and administration to assure compliance with Title10 of the Code of Federal Regulations, Section 55.49, Integrity of Examinations and Tests. The examiners used the guidelines provided in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors, to determine acceptability of the licensees examination security activities.
b. Findings
No findings were identified.
4OA6 Management Meetings
.1 Exit Meeting
The chief examiner conducted an exit meeting on August 8, 2017, with Mr. D. Corbin, General Manager Plant Operations, and other members of the facilitys Regulator Assurance, Operations and Training organizations. Observations from the reexamination validation and administration were presented to the facility, and the facility verified that no post exam comments were identified for submission. The examiner presented the preliminary grading results, and asked the licensee whether any of the material used to develop or administer the examination should be considered proprietary. No proprietary or sensitive information was identified during the examination or exit meeting.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee
- D. Corbin, General Manager Plant Operations
- B. Baker, Operations Manager
- B. Dotson, Regulatory Assurance Specialist
- O. Gustafson, Director Regulatory and Performance Improvement
- J. Hardy, Regulatory Assurance Manager
- W. Nelson, Training Manager
- A. Smeckert, Operations Instructor
- P. Russell, Engineering Director
U.S. Nuclear Regulatory Commission
- J. Boettcher, Acting Senior Resident Inspector
- B. Bartlett, Acting Resident Inspector
- M. Bielby, Chief Examiner
ITEMS OPENED, CLOSED, AND DISCUSSED
Opened, Closed, and Discussed
None
LIST OF ACRONYMS USED
NRC U.S. Nuclear Regulatory Commission
SRO-I Senior Reactor Operator-Instant
SIMULATION FACILITY FIDELITY REPORT
Facility Licensee: Palisades Nuclear Plant
Facility Docket No: 50-255
Operating Tests Administered: August 7, 2017
The following documents observations made by the U.S. Nuclear Regulatory
Commission (NRC) examiner team during the initial operator license reexamination.
These observations do not constitute audit or inspection findings and are not, without further
verification and review, indicative of non-compliance with Title 10 of the Code of Federal
Regulations 55.45(b). These observations do not affect NRC certification or approval of the
simulation facility other than to provide information, which may be, used in future evaluations.
No licensee action is required in response to these observations.
During the conduct of the simulator portion of the operating tests, the following items were
observed:
ITEM DESCRIPTION
None None
2