{{#Wiki_filter:AmROLLED eV dhZR REACTOR COOLANT SYSTEM 3/4.4.10 REACTOR COOLANT SYSTEM VENTS LIMITING CONDITION FOR OPERATION 3.4.10 Both reactor coolant system vent paths shall be OPERABLE and closed at each of the following locations:
{{#Wiki_filter:AmROLLED eV dhZR REACTOR COOLANT SYSTEM 3/4.4. 10   REACTOR COOLANT SYSTEM VENTS LIMITING CONDITION       FOR OPERATION 3.4. 10   Both reactor coolant system vent paths shall       be OPERABLE and   closed at each of the following locations:
a.Reactor vessel head, and b.Pressurizer steam space.APPLICABILITY:
: a. Reactor vessel head, and
MODES 1, 2, 3 and 4.ACTION: With only one of the above required reactor coolant system vent paths OPERABLE, from either location restore both paths at that location to OPERABLE status within 72 hours or be in at least HOT STANDBY within the next 6 hours and in HOT SHUTDOWN within the following 6 hours.With none of the above required reactor coolant system vent paths OPERABLE, from either location restore at least one path at that location to OPERABLE status within the next 6 hours or be in at least HOT STANDBY within the next 6 nours and in HOT SHUTDOWN within the following 6 hours.SURVEILLANCE REOUIREMENTS 4.4.10 Each reactor coolant system vent path shalJ be demonstrated OPERABLE at least once per 18 months, when in MODES 5 or 6~by: a.Verifying all manual isolation valves in each vent path are locked in the open position.b..Cycling each vent through at least one complete cycle from the control room.c.Verifying flow through the reactor coolant system vent paths during venting.gC8-HV-l05'a~I e feSkc8.one+In,e.6Xc,e,pkii<oIPp~c'(c."QggTROLL(Q h'f USEIR F or one, 4 1 me only>yn4e.~hi ie in Nope~~T4 5 only Jv~<ng NI,e, 6rs4 cp~fe of ope~a,+jon 8801200457 880114 PDR ADOCK Q5000529 P PDR T}}
: b. Pressurizer steam space.
APPLICABILITY:       MODES   1, 2, 3 and 4.
ACTION:
With only one of the above required reactor       coolant system vent paths OPERABLE, from either location restore both       paths at that location to OPERABLE status within 72 hours or be in at       least HOT STANDBY within the next 6 hours and in HOT SHUTDOWN within       the following 6 hours.
With none of the above required reactor coolant system vent paths OPERABLE, from either location restore at least one path at that location to OPERABLE status within the next 6 hours or be in at least HOT STANDBY within the next 6 nours and in HOT SHUTDOWN within the following 6 hours.
SURVEILLANCE REOUIREMENTS 4.4. 10   Each   reactor coolant system vent path shalJ be demonstrated     OPERABLE at least once per 18 months, when in MODES 5 or 6~by:
: a. Verifying all manual isolation valves in       each vent path are locked in the open position.
b.. Cycling each vent through at least one complete cycle from the control   room.
: c. Verifying flow through the reactor coolant system vent paths during venting.
F or    one,    4 me 1        only >
yn4e. gC8- HV- l05'a~       I e feSkc8.
        ~hi ie    in  Nope    ~    ~
T4 5    one +In,e. 6Xc,e,pki    i< oIPp ~ c'(c.
only   Jv~<ng     NI,e,   6rs4   cp~fe   of ope~a,+jon 8801200457 880114 PDR   ADOCK Q5000529 P                     PDR "QggTROLL(Q h'f                        USEIR
 
T}}

Latest revision as of 11:03, 29 October 2019

Proposed Tech Spec 4.4.10,allowing one-time Only Exception for RCS Vent Valve RCB-HV-105 to Be Tested During Mode 3
ML17303A750
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 01/14/1988
From:
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17303A749 List:
References
NUDOCS 8801200457
Download: ML17303A750 (2)


Text

AmROLLED eV dhZR REACTOR COOLANT SYSTEM 3/4.4. 10 REACTOR COOLANT SYSTEM VENTS LIMITING CONDITION FOR OPERATION 3.4. 10 Both reactor coolant system vent paths shall be OPERABLE and closed at each of the following locations:

a. Reactor vessel head, and
b. Pressurizer steam space.

APPLICABILITY: MODES 1, 2, 3 and 4.

ACTION:

With only one of the above required reactor coolant system vent paths OPERABLE, from either location restore both paths at that location to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

With none of the above required reactor coolant system vent paths OPERABLE, from either location restore at least one path at that location to OPERABLE status within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> or be in at least HOT STANDBY within the next 6 nours and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REOUIREMENTS 4.4. 10 Each reactor coolant system vent path shalJ be demonstrated OPERABLE at least once per 18 months, when in MODES 5 or 6~by:

a. Verifying all manual isolation valves in each vent path are locked in the open position.

b.. Cycling each vent through at least one complete cycle from the control room.

c. Verifying flow through the reactor coolant system vent paths during venting.

F or one, 4 me 1 only >

yn4e. gC8- HV- l05'a~ I e feSkc8.

~hi ie in Nope ~ ~

T4 5 one +In,e. 6Xc,e,pki i< oIPp ~ c'(c.

only Jv~<ng NI,e, 6rs4 cp~fe of ope~a,+jon 8801200457 880114 PDR ADOCK Q5000529 P PDR "QggTROLL(Q h'f USEIR