| title = Responds to NRC 930304 Ltr Re Violations Noted in Insp Repts 50-315/93-10 & 50-316/93-10.Corrective Actions:Training for Selected Radiation Protection Personnel on Event & Use of Optimal Equipment for Surveys Will Be Completed by 930331
| title = Responds to NRC 930304 Ltr Re Violations Noted in Insp Repts 50-315/93-10 & 50-316/93-10.Corrective Actions:Training for Selected Radiation Protection Personnel on Event & Use of Optimal Equipment for Surveys Will Be Completed by 930331
| author name = FITZPATRICK E
| author name = Fitzpatrick E
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| addressee name = MARTIN A B
| addressee name = Martin A
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000315, 05000316
| docket = 05000315, 05000316
Line 14: Line 14:
| page count = 18
| page count = 18
}}
}}
See also: [[followed by::IR 05000315/1993010]]


=Text=
=Text=
{{#Wiki_filter:l'indianaMichiganPowerCompanyP.O.8ox16631Columbus,
{{#Wiki_filter:l' indiana Michigan Power Company P.O. 8ox 16631 Columbus, OH 43216 Z
OH43216ZINDIANANICHIGANPOWERAEP:NRC:1184A
INDIANA NICHIGAN POWER AEP:NRC:1184A Donald C. Cook Nuclear Plant Units 1 and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 NRC INSPECTION REPORT NOS. 50-315/930010 (DRSS)
DonaldC.CookNuclearPlantUnits1and2DocketNos.50-315and50-316LicenseNos.DPR-58andDPR-74NRCINSPECTION
AND 50-316/930010 (DRSS); REPLY TO A NOTICE OF VIOLATION U.S. Nuclear Regulatory Commission Attn:     Document  Control Desk Washington, D.C.       20005 ATTN:       A. BE Martin March 29, 1993
REPORTNOS.50-315/930010
 
(DRSS)AND50-316/930010
==Dear Mr. Martin:==
(DRSS);REPLYTOANOTICEOFVIOLATION
 
U.S.NuclearRegulatory
This letter is in response to Mr. Charles E. Norelius'etter dated March 4, 1993, which forwarded a Notice of Violation that resulted from the enforcement conference           conducted           on March 2, 1993. The Notice of Violation attached to Mr.
Commission
identified two severity level IV violations for the Norelius'etter shipment of an empty box that exceeded            Department            of Transportation (DOT)- contact dose rate limits and failure to ensure the limits were met prior to shipment. Our response to the Notice of Violation is provided in the attachment to this letter.
Attn:DocumentControlDeskWashington,
Sincerely, I
D.C.20005ATTN:A.BEMartinMarch29,1993DearMr.Martin:ThisletterisinresponsetoMr.CharlesE.Norelius'etter
E. E. Fi.tzp rick Vice President eg Attachment CC:       A. A. Blind - Bridgman J. R. Padgett G. Charnoff NRC  Resident Inspector - Bridgman NFEM Section Chief A. B. Davis = Region--III APR 1 g3
datedMarch4,1993,whichforwarded
 
aNoticeofViolation
Attachment to AEP:NRC:1184A Response to Notice of Violation
thatresultedfromtheenforcement
 
conference
Attachment to AEP:NRC:1184A                                           Page 1 NRC Violation:
conducted
A.   "10  CFR 71.5(a) requires that licensees,     who transport licensed material outside the confines of their plants or deliver licensed material to a carrier for transport, comply with the applicable requirements of the regulations appropriate to the mode of transport of the Department of Transportation (DOT) in 49 CFR Part 170-189.
onMarch2,1993.TheNoticeofViolation
49 CFR 173.427(e)   requires that an empty package that previously contained radioactive materials and has been emptied comply with the requirements of 49 CFR 173.421(b) that states that radiation levels at any point on the external surface of the package do not exceed 0.5 millirem per hour.
attachedtoMr.Norelius'etter
Contrary to the above, on January 26, 1993, an empty package was delivered to a vendor in Oak Ridge, Tennessee with external radiation levels of 180 millirem per hour over a small area of the package.
identified
This is a Severity Level IV problem (Supplement V).
twoseveritylevelIVviolations
(1)   Reason  for Violation The  licensee has concluded that the pre-shipping dose rate survey of container QG-27 was inadequate.     The contributing causes of this violation were that the dose rate meter used for the survey was not optimally suited for surveying an empty container and the location of the small, localized source increased the difficulty of detection.
fortheshipmentofanemptyboxthatexceededDepartment
(2)   Corrective Actions Taken  and Results Achieved On  January  27, 1993, the licensee informed the NRC of notification  from a vendor in Oak Ridge, Tennessee, that a sea van, manifested as Radioactive Material Excepted Package Empty Packaging, UN2910, had been received with dose rate surveys indicating external radiation levels that exceeded the 0.5 millirem per hour allowable limit.
ofTransportation
On January 29, 1993, a representative of the licensee arrived at  the vendor's facility to investigate the apparent violation. The vendor had removed, measured, and disposed of the particle the previous day. Consequently, the licensee was unable to verify the dose rates on the sea van.
(DOT)-contactdoseratelimitsandfailuretoensurethelimitsweremetpriortoshipment.
 
OurresponsetotheNoticeofViolation
Attachment to AEP:NRC:1184A                                             Page  2 (3)   Preventive Actions Taken    To  Avoid Further Violations Preventive actions taken to prevent recurrence of a similar event include independent surveys of all outgoing shipments of radioactive material and enhancement of procedures pertaining to shipment of radioactive material.
isprovidedintheattachment
The  policy of independent surveys for all outgoing shipments of radioactive material was initiated on February 1, 1993. On February 18, 1993, a policy memorandum was distributed to all radiation protection department personnel outlining standards for shipment of radioactive material.
tothisletter.Sincerely,
The procedure,   Preparation of Radioactive Shipments, 12 THP 3150.RMC.202,   was  revised to include independent surveys of all outgoing radioactive material shipments, utilization of optimal instrumentation for surveys, and a checklist for "empty package" shipments.         This procedure revision was completed on March 1, 1993.
IE.E.Fi.tzprickVicePresident
Training for selected radiation protection personnel on the description of the event, selection and use of optimal equipment for surveys, and proper survey methodologies    will be completed by March 31, 1993.
egAttachment
(4)   Date When  Full  Com  liance Will Be Achieved Full compliance  will be  achieved on March 31, 1993, with the completion  of scheduled      training for selected    radiation protection personnel.
CC:A.A.Blind-BridgmanJ.R.PadgettG.CharnoffNRCResidentInspector
B. 49 CFR 173.475  requires, in part, that before each shipment of any radioactive material package, the shipper ensure by examination or appropriate tests, that the external radiation levels are within allowable  limits.
-BridgmanNFEMSectionChiefA.B.Davis=Region--III
Contrary to the above, on January 26, 1993, an empty package was shipped without the shipper ensuring by appropriate surveys that external radiation levels were within applicable limits.
APR1g3
Specifically, the departure survey failed to detect a radiation level of 180 millirem per hour, which exceeded the 0.5 millirem per hour allowable limit.
This is a Severity Level    XV problem (Supplement   V)."
Attachment
 
toAEP:NRC:1184A
Attachment to AEP:NRC:1184A                                             Page 3 (1)   Reason    for Violation The  licensee has concluded that the pre-shipping dose rate survey of container QG-27 was inadequate.         The contributing causes of this violation were that the dose rate meter used for the survey was not optimally suited for surveying an empty container and the location of the small, localized source increased the difficulty of detection.
ResponsetoNoticeofViolation
(2)   Corrective Actions Taken      and  Results Achieved On  January  27, 1993, the licensee informed the NRC of notification    from a vendor in Oak Ridge, Tennessee, that a sea van, manifested as Radioactive Material Excepted Package Empty Packaging, UN2910, had been received with dose rate surveys indicating external radiation levels that exceeded the 0.5 millirem per hour allowable      limit.
On  January 29, 1993, a representative of the licensee arrived at the vendor's facility to investigate the apparent violation. The vendor had removed, measured, and disposed of the particle the prevt.ous day. Consequently, the licensee was unable to    verify the  dose rates on the sea van.
Attachment
(3)   Preventive Actions Taken      To  Avoid Further Violations Preventive actions taken to prevent recurrence of a similar event include independent surveys of all outgoing shipments of radioactive material and enhancement of procedures pertaining to shipment of radioactive material.
toAEP:NRC:1184A
The  policy of independent surveys for all outgoing shipments of radioactive material was initiated on February 1, 1993. On February 18, 1993, a policy memorandum was distributed to all radiation protection department personnel outlining standards for shipment of radioactive material.
Page1NRCViolation:
The procedure,     Preparation of Radioactive Shipments, 12 THP 3150.RMC.202,     was revised to include independent surveys of all outgoing radioactive material shipments, utilization of optimal instrumentati.on for surveys, and a checklist for "empty package" shipments.         This procedure revision was completed on March 1, 1993.
A."10CFR71.5(a)requiresthatlicensees,
 
whotransport
Attachment to AEP:NRC:1184A                                         Page 4 Training for selected radiation protection personnel on the description of the event, selection and use of optimal equipment for surveys, and proper survey methodologies will be completed by March 31, 1993.
licensedmaterialoutsidetheconfinesoftheirplantsordeliverlicensedmaterialtoacarrierfortransport,
(4) Date When  Full Com lienee Will Be Achieved Full compliance  will be  acnieved on March 31, 1993, with tne completion of scheduled      training for selected  radiation protection personnel.
complywiththeapplicable
 
requirements
'I ACCELERATED DOCUMENT DISTRIBUTION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM             (RIDS)
oftheregulations
ACCESSION NBR:9304020176               DOC.DATE:     93/03/29    NOTARIZED: NO        DOCKET FACIL:5G-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTH. NAME              AUTHOR AFFILIATION FITZPATRICK,E.         Indiana Michigan Power Co. (formerly Indiana & Michigan Ele RECIP.NAME             'ECiPIENT AFFILIATION MARTIN,A.B.               Document Control Branch (Document Control Desk)
appropriate
 
tothemodeoftransport
==SUBJECT:==
oftheDepartment
Responds        to  NRC  930304 ltr re violations noted in insp repts 50-315/93-10       & 50-316/93-10.Corrective actions:training for selected radiation protection personnel on event & use of optimal equipment for surveys will be completed by 930331.
ofTransportation
DISTRIBUTION CODE: IE06D            COPIES RECEIVED:LTR           ENCL      SIZE:
(DOT)in49CFRPart170-189.49CFR173.427(e)
TITLE: Environ       & Radiological (50 DKT)-Insp Rept/Notice of Violation Respons NOTES:
requiresthatanemptypackagethatpreviously
RECIPIENT             COPIES              RECIPIENT          COPIES ID CODE/NAME              LTTR ENCL        ID CODE/NAME       LTTR ENCL PD3-1 LA                      1      0    PD3-1 PD                1    1 DEANiW                        1-    1 INTERNAL: AEOD/ANDERSON,R                 1      1    AEOD/DSP                1    1 NMSS/SGTB           4E4        1      1      NRR/DREP/PRPB10        2    2 NRR/DRIL/RPEB10               1      1    NRR/PMAS/ILRB12        1    1 NUDOCS-ABSTRACT               1      1    OE D                    1    1 OGC/HDS2                      1      1      REG    LE      02    1,    1 RES'GN3 1      1      RGN3      SS/RPB      1    1 FILE    01        1      1    RGN4 MURRAY,B          1    1 EXTERNAL: EG&G SIMPSON,F                 2      2    NRC PDR                1    1 NSIC                          1      1 NOTE TO ALL"RIDS" RECIPIENTS:
contained
PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR                  22  ENCL    21
radioactive
 
materials
indiana Michigan Power Company P.O. Box 16631'oinmbos OH 4321F
andhasbeenemptiedcomplywiththerequirements
                                                                                    ~R-INDIANA NICHIGAM POWM AEP'NRO'1184A Donald C. Cook Nuclear Plant Units 1 and                  2 Docket,.Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 NRC INSPECTION REPORT NOS. 50-315/930010 (DRSS)
of49CFR173.421(b)
AND 50-316/930010 (DRSS); REPLY TO A NOTICE OF                    VIOLATION U.S. Nuclear Regulatory Commission Attn:               Document    Control Desk Washington, D.C.                   20005 ATTN:                 A. B. Martin March 29, 1993
thatstatesthatradiation
 
levelsatanypointontheexternalsurfaceofthepackagedonotexceed0.5milliremperhour.Contrarytotheabove,onJanuary26,1993,anemptypackagewasdelivered
==Dear Mr. Martin:==
toavendorinOakRidge,Tennessee
 
withexternalradiation
This letter is in response to Mr. Charles E. Norelius'etter dated March 4, 1993, which forwarded a Notice of Violation that resulted from the enforcement                        conference,   conducted   on shipment Transportation
levelsof180milliremperhouroverasmallareaofthepackage.ThisisaSeverityLevelIVproblem(Supplement
                                    'f March 2, 1993. The Notice of Violation attached to Mr. Norelius' letter identified two severity level IV violations for the an (DOT) empty  box  that  exceeded    Department contact dose rate limits and failure to of ensure the limits were met prior to shipment. Our response to the Notice of Violation is provided in the attachment to this letter.
V).(1)ReasonforViolation
Sincerely, E. E.             Fitzp rick Vice President eg Attachment CC:               A. A. Blind - Bridgman J. R. Padgett G. Charnoff NRC Resident Inspector - Bridgman NFEM Section Chief A. B. Davis - Region    III 020034                                                                            >py<
Thelicenseehasconcluded
9304020176 930329                                                              I
thatthepre-shipping
                                                                                        ]
doseratesurveyofcontainer
PDR        ADQCK                050003l5 6                                    PDR
QG-27wasinadequate.
 
Thecontributing
Attachment to AEP:NRC:1184A Response to Notice of Violation
causesofthisviolation
 
werethatthedoseratemeterusedforthesurveywasnotoptimally
Attachment to AEP:NRC:1184A                                             Page 1 NRC Violation:
suitedforsurveying
      "10  CFR 71.5(a) requires that licensees,       who transport licensed material outside the confines of their plants or deliver licensed material to a carrier for transport, comply with the applicable requirements of the regulations appropriate to the mode of transport of the Department of Transportation (DOT) in 49 CFR Part 170-189.
anemptycontainer
49 CFR 173.427(e)     requires that an empty package that previously contained radioactive materials and has been emptied comply with the requirements of 49 CFR 173.421(b) that states that radiation levels at any point on the external surface of the package do not exceed 0.5 millirem per hour.
andthelocationofthesmall,localized
Contrary to the above, on January 26, 1993, an empty package was delivered to a vendor in Oak Ridge, Tennessee with external radiation levels of 180 millirem per hour over a small area of the package.
sourceincreased
This is a Severity Level IV problem (Supplement V).
thedifficulty
(1)   Reason    for Violation The  licensee has concluded that the pre-shipping dose rate survey of container QG-27 was inadequate.       The contributing causes of this violation were that the dose rate meter used for the survey was not optimally suited for surveying an empty container and the location of the small,, localized source increased the difficulty of detection.
ofdetection.
(2)   Corrective Actions Taken and Results Achieved On  January    27, 1993, the licensee informed the NRC of notification  from a vendor in Oak Ridge, Tennessee, that a sea van, manifested as Radioactive Material Excepted Package Empty Packaging, UN2910, had been received with dose rate surveys indicating external radiation levels that exceeded the 0.5 millirem per hour allowable limit.
(2)Corrective
On January 29, 1993, a representative of the licensee arrived at  the vendor's facility to investigate the apparent violation. The vendor had removed, measured, and disposed of the particle the previous day. Consequently, the licensee was unable to verify the dose rates on the sea van.
ActionsTakenandResultsAchievedOnJanuary27,1993,thelicenseeinformedtheNRCofnotification
 
fromavendorinOakRidge,Tennessee,
Attachment to AEP:NRC:1184A                                             Page 2 (3)   Preventive Actions Taken    To Avoid Further Violations Preventive actions taken to prevent recurrence of a similar event include independent surveys of all outgoing shipments of radioactive material and enhancement of procedures pertaining to shiprpent of radioactive material.
thataseavan,manifested
The  policy of independent surveys for all outgoing shipments of radioactive material was initiated on February 1, 1993. On February 18, 1993, a policy memorandum was distributed to all radiation protection department personnel outlining standards for shipment of radioactive material.
asRadioactive
The procedure,     Preparation of Radioactive Shipments, 12 THP 3150.RMC.202,   was  revised to include independent surveys of all outgoing radioactive material shipments, utilization of optimal instrumentation for surveys, and a checklist for "empty package" shipments.         This procedure revision was completed on March 1, 1993.
MaterialExceptedPackageEmptyPackaging,
Training for selected radiation protection personnel on the description of the event, selection and use of optimal equipment for surveys, and proper survey methodologies    will be completed by March 31, 1993.
UN2910,hadbeenreceivedwithdoseratesurveysindicating
(4)   Date When  Full  Com  liance Will Be Achieved Full compliance will be achieved on March 31, 1993, with the completion of scheduled training for selected radiation protection personnel.
externalradiation
49 CFR 173.475    requires, in part, that before each shipment of any radioactive material package, the shipper ensure by examination or appropriate tests, that the external radiation levels are within allowable limits.
levelsthatexceededthe0.5milliremperhourallowable
Contrary to the above, on January 26, 1993,, an empty package was shipped without the shipper ensuring by appropriate surveys that external    radiation levels were within applicable limits.
limit.OnJanuary29,1993,arepresentative
Specifically, the departure survey failed to detect a radiation level of 180 millirem per hour, which exceeded the 0.5 millirem per hour allowable  limit.
ofthelicenseearrivedatthevendor'sfacilitytoinvestigate
This is  a Severity Level IV problem (Supplement V)."
theapparentviolation.
 
Thevendorhadremoved,measured,
Attachment to AEP:NRC:1184A                                           Page 3 (1)   Reason    for Violation The  licensee has concluded that the pre-shipping dose rate survey of container QG-27 was inadequate.       The contributing causes of this violation were that the dose rate meter used for the survey was not optimally suited for surveying an empty container and the location of the small, localized source increased the difficulty of detection.
anddisposedoftheparticlethepreviousday.Consequently,
(2)   Corrective Actions Taken and Results Achieved On  January    27,   1993, the licensee informed the NRC of notification  from a vendor in Oak Ridge, Tennessee, that a sea van, manifested as Radioactive Material Excepted Package Empty Packaging, UN2910, had been received with dose rate surveys indicating external radiation levels that exceeded the 0.5 millirem per hour allowable limit.
thelicenseewasunabletoverifythedoseratesontheseavan.  
          't On  January 29, 1993, a representative of the licensee arrived the vendor's facility to investigate the apparent violation. The vendor had removed, measured, and disposed of the particle the previous day. Consequently, the licensee was unable to verify the dose rates on the sea van.
(3)   Preventive Actions Taken      To Avoid Further Violations Preventive actions taken to prevent recurrence of a similar event include independent surveys of all outgoing shipments of radioactive material and enhancement of procedures pertaining to shipment of radioactive material.
Attachment
The  policy of independent surveys for all outgoing shipments of radioactive material was initiated on February 1, 1993. On February 18, 1993, a policy memorandum was distributed to all radiation protection department personnel outlining standards for shipment of radioactive material.
toAEP:NRC:1184A
The  procedure,   Preparation of Radioactive Shipments, 12 THP 3150,RMC.202,   was  revised to include independent surveys of all outgoing radioactive material shipments, utilization of optimal instrumentation for surveys, and a checklist for "empty package" shipments.         This procedure revision was completed on March 1, 1993.
Page2(3)Preventive
 
ActionsTakenToAvoidFurtherViolations
Attachment to AEP:NRC:1184A                                       Page 4 Training for selected radiation protection personnel on the description of the event, selection and use of optimal equipment for surveys, and proper survey methodologies will be completed by March <<31, 1993.
Preventive
(4)   Date Vhen  Full Com liance Vill Be Achieved Full compliance will be achieved on March 31, 1993, with the completion  of scheduled training for selected radiation protection personnel.}}
actionstakentopreventrecurrence
ofasimilareventincludeindependent
surveysofalloutgoingshipments
ofradioactive
materialandenhancement
ofprocedures
pertaining
toshipmentofradioactive
material.
Thepolicyofindependent
surveysforalloutgoingshipments
ofradioactive
materialwasinitiated
onFebruary1,1993.OnFebruary18,1993,apolicymemorandum
wasdistributed
toallradiation
protection
department
personnel
outlining
standards
forshipmentofradioactive
material.
Theprocedure,
Preparation
ofRadioactive
Shipments,
12THP3150.RMC.202,
wasrevisedtoincludeindependent
surveysofalloutgoingradioactive
materialshipments,
utilization
ofoptimalinstrumentation
forsurveys,andachecklist
for"emptypackage"shipments.
Thisprocedure
revisionwascompleted
onMarch1,1993.Trainingforselectedradiation
protection
personnel
onthedescription
oftheevent,selection
anduseofoptimalequipment
forsurveys,andpropersurveymethodologies
willbecompleted
byMarch31,1993.(4)DateWhenFullComlianceWillBeAchievedFullcompliance
willbeachievedonMarch31,1993,withthecompletion
ofscheduled
trainingforselectedradiation
protection
personnel.
B.49CFR173.475requires,
inpart,thatbeforeeachshipmentofanyradioactive
materialpackage,theshipperensurebyexamination
orappropriate
tests,thattheexternalradiation
levelsarewithinallowable
limits.Contrarytotheabove,onJanuary26,1993,anemptypackagewasshippedwithouttheshipperensuringbyappropriate
surveysthatexternalradiation
levelswerewithinapplicable
limits.Specifically,
thedeparture
surveyfailedtodetectaradiation
levelof180milliremperhour,whichexceededthe0.5milliremperhourallowable
limit.ThisisaSeverityLevelXVproblem(Supplement
V)."  
Attachment
toAEP:NRC:1184A
Page3(1)ReasonforViolation
Thelicenseehasconcluded
thatthepre-shipping
doseratesurveyofcontainer
QG-27wasinadequate.
Thecontributing
causesofthisviolation
werethatthedoseratemeterusedforthesurveywasnotoptimally
suitedforsurveying
anemptycontainer
andthelocationofthesmall,localized
sourceincreased
thedifficulty
ofdetection.
(2)Corrective
ActionsTakenandResultsAchievedOnJanuary27,1993,thelicenseeinformedtheNRCofnotification
fromavendorinOakRidge,Tennessee,
thataseavan,manifested
asRadioactive
MaterialExceptedPackageEmptyPackaging,
UN2910,hadbeenreceivedwithdoseratesurveysindicating
externalradiation
levelsthatexceededthe0.5milliremperhourallowable
limit.OnJanuary29,1993,arepresentative
ofthelicenseearrivedatthevendor'sfacilitytoinvestigate
theapparentviolation.
Thevendorhadremoved,measured,
anddisposedoftheparticletheprevt.ous
day.Consequently,
thelicenseewasunabletoverifythedoseratesontheseavan.(3)Preventive
ActionsTakenToAvoidFurtherViolations
Preventive
actionstakentopreventrecurrence
ofasimilareventincludeindependent
surveysofalloutgoingshipments
ofradioactive
materialandenhancement
ofprocedures
pertaining
toshipmentofradioactive
material.
Thepolicyofindependent
surveysforalloutgoingshipments
ofradioactive
materialwasinitiated
onFebruary1,1993.OnFebruary18,1993,apolicymemorandum
wasdistributed
toallradiation
protection
department
personnel
outlining
standards
forshipmentofradioactive
material.
Theprocedure,
Preparation
ofRadioactive
Shipments,
12THP3150.RMC.202,
wasrevisedtoincludeindependent
surveysofalloutgoingradioactive
materialshipments,
utilization
ofoptimalinstrumentati.on
forsurveys,andachecklist
for"emptypackage"shipments.
Thisprocedure
revisionwascompleted
onMarch1,1993.  
Attachment
toAEP:NRC:1184A
Page4Trainingforselectedradiation
protection
personnel
onthedescription
oftheevent,selection
anduseofoptimalequipment
forsurveys,andpropersurveymethodologies
willbecompleted
byMarch31,1993.(4)DateWhenFullComlieneeWillBeAchievedFullcompliance
willbeacnievedonMarch31,1993,withtnecompletion
ofscheduled
trainingforselectedradiation
protection
personnel.  
'I  
ACCELERATED
DOCUMENTDISTRIBUTION
SYSTEMREGULATORY
INFORMATION
DISTRIBUTION
SYSTEM(RIDS)ACCESSION
NBR:9304020176
DOC.DATE:
93/03/29NOTARIZED:
NODOCKETFACIL:5G-315
DonaldC.CookNuclearPowerPlant,Unit1,IndianaM0500031550-316DonaldC.CookNuclearPowerPlant,Unit2,IndianaM05000316AUTH.NAMEAUTHORAFFILIATION
FITZPATRICK,E.
IndianaMichiganPowerCo.(formerly
Indiana&MichiganEleRECIP.NAME
'ECiPIENT
AFFILIATION
MARTIN,A.B.
DocumentControlBranch(Document
ControlDesk)SUBJECT:RespondstoNRC930304ltrreviolations
notedininsprepts50-315/93-10
&50-316/93-10.Corrective
actions:training
forselectedradiation
protection
personnel
onevent&useofoptimalequipment
forsurveyswillbecompleted
by930331.DISTRIBUTION
CODE:IE06DCOPIESRECEIVED:LTR
ENCLSIZE:TITLE:Environ&Radiological
(50DKT)-Insp
Rept/Notice
ofViolation
ResponsNOTES:RECIPIENT
IDCODE/NAME
PD3-1LADEANiWINTERNAL:
AEOD/ANDERSON,R
NMSS/SGTB
4E4NRR/DRIL/RPEB10
NUDOCS-ABSTRACT
OGC/HDS2RES'GN3FILE01EXTERNAL:
EG&GSIMPSON,F
NSICCOPIESLTTRENCL101-1111111111111112211RECIPIENT
IDCODE/NAME
PD3-1PDAEOD/DSPNRR/DREP/PRPB10
NRR/PMAS/ILRB12
OEDREGLE02RGN3SS/RPBRGN4MURRAY,BNRCPDRCOPIESLTTRENCL11112211111,1111111NOTETOALL"RIDS"RECIPIENTS:
PLEASEHELPUSTOREDUCEWASTEICONTACTTHEDOCUMENTCONTROLDESK,ROOMPl-37(EXT.504-2065)
TOELIMINATE
YOURNAMEFROMDISTRIBUTION
LISTSFORDOCUMENTS
YOUDON'TNEEDlTOTALNUMBEROFCOPIESREQUIRED:
LTTR22ENCL21
indianaMichiganPowerCompanyP.O.Box16631'oinmbos
OH4321F~R-INDIANANICHIGAMPOWMAEP'NRO'1184A
DonaldC.CookNuclearPlantUnits1and2Docket,.Nos.
50-315and50-316LicenseNos.DPR-58andDPR-74NRCINSPECTION
REPORTNOS.50-315/930010
(DRSS)AND50-316/930010
(DRSS);REPLYTOANOTICEOFVIOLATION
U.S.NuclearRegulatory
Commission
Attn:DocumentControlDeskWashington,
D.C.20005ATTN:A.B.MartinMarch29,1993DearMr.Martin:ThisletterisinresponsetoMr.CharlesE.Norelius'etter
datedMarch4,1993,whichforwarded
aNoticeofViolation
thatresultedfromtheenforcement
conference,
conducted
onMarch2,1993.TheNoticeofViolation
attachedtoMr.Norelius'
letteridentified
twoseveritylevelIVviolations
fortheshipment'fanemptyboxthatexceededDepartment
ofTransportation
(DOT)contactdoseratelimitsandfailuretoensurethelimitsweremetpriortoshipment.
OurresponsetotheNoticeofViolation
isprovidedintheattachment
tothisletter.Sincerely,
E.E.FitzprickVicePresident
egAttachment
CC:A.A.Blind-BridgmanJ.R.PadgettG.CharnoffNRCResidentInspector
-BridgmanNFEMSectionChiefA.B.Davis-RegionIII0200349304020176
930329PDRADQCK050003l56PDR>py<I]  
Attachment
toAEP:NRC:1184A
ResponsetoNoticeofViolation
Attachment
toAEP:NRC:1184A
Page1NRCViolation:
"10CFR71.5(a)requiresthatlicensees,
whotransport
licensedmaterialoutsidetheconfinesoftheirplantsordeliverlicensedmaterialtoacarrierfortransport,
complywiththeapplicable
requirements
oftheregulations
appropriate
tothemodeoftransport
oftheDepartment
ofTransportation
(DOT)in49CFRPart170-189.49CFR173.427(e)
requiresthatanemptypackagethatpreviously
contained
radioactive
materials
andhasbeenemptiedcomplywiththerequirements
of49CFR173.421(b)
thatstatesthatradiation
levelsatanypointontheexternalsurfaceofthepackagedonotexceed0.5milliremperhour.Contrarytotheabove,onJanuary26,1993,anemptypackagewasdelivered
toavendorinOakRidge,Tennessee
withexternalradiation
levelsof180milliremperhouroverasmallareaofthepackage.ThisisaSeverityLevelIVproblem(Supplement
V).(1)ReasonforViolation
Thelicenseehasconcluded
thatthepre-shipping
doseratesurveyofcontainer
QG-27wasinadequate.
Thecontributing
causesofthisviolation
werethatthedoseratemeterusedforthesurveywasnotoptimally
suitedforsurveying
anemptycontainer
andthelocationofthesmall,,localized
sourceincreased
thedifficulty
ofdetection.
(2)Corrective
ActionsTakenandResultsAchievedOnJanuary27,1993,thelicenseeinformedtheNRCofnotification
fromavendorinOakRidge,Tennessee,
thataseavan,manifested
asRadioactive
MaterialExceptedPackageEmptyPackaging,
UN2910,hadbeenreceivedwithdoseratesurveysindicating
externalradiation
levelsthatexceededthe0.5milliremperhourallowable
limit.OnJanuary29,1993,arepresentative
ofthelicenseearrivedatthevendor'sfacilitytoinvestigate
theapparentviolation.
Thevendorhadremoved,measured,
anddisposedoftheparticlethepreviousday.Consequently,
thelicenseewasunabletoverifythedoseratesontheseavan.
Attachment
toAEP:NRC:1184A
Page2(3)Preventive
ActionsTakenToAvoidFurtherViolations
Preventive
actionstakentopreventrecurrence
ofasimilareventincludeindependent
surveysofalloutgoingshipments
ofradioactive
materialandenhancement
ofprocedures
pertaining
toshiprpent
ofradioactive
material.
Thepolicyofindependent
surveysforalloutgoingshipments
ofradioactive
materialwasinitiated
onFebruary1,1993.OnFebruary18,1993,apolicymemorandum
wasdistributed
toallradiation
protection
department
personnel
outlining
standards
forshipmentofradioactive
material.
Theprocedure,
Preparation
ofRadioactive
Shipments,
12THP3150.RMC.202,
wasrevisedtoincludeindependent
surveysofalloutgoingradioactive
materialshipments,
utilization
ofoptimalinstrumentation
forsurveys,andachecklist
for"emptypackage"shipments.
Thisprocedure
revisionwascompleted
onMarch1,1993.Trainingforselectedradiation
protection
personnel
onthedescription
oftheevent,selection
anduseofoptimalequipment
forsurveys,andpropersurveymethodologies
willbecompleted
byMarch31,1993.(4)DateWhenFullComlianceWillBeAchievedFullcompliance
willbeachievedonMarch31,1993,withthecompletion
ofscheduled
trainingforselectedradiation
protection
personnel.
49CFR173.475requires,
inpart,thatbeforeeachshipmentofanyradioactive
materialpackage,theshipperensurebyexamination
orappropriate
tests,thattheexternalradiation
levelsarewithinallowable
limits.Contrarytotheabove,onJanuary26,1993,,anemptypackagewasshippedwithouttheshipperensuringbyappropriate
surveysthatexternalradiation
levelswerewithinapplicable
limits.Specifically,
thedeparture
surveyfailedtodetectaradiation
levelof180milliremperhour,whichexceededthe0.5milliremperhourallowable
limit.ThisisaSeverityLevelIVproblem(Supplement
V)."  
Attachment
toAEP:NRC:1184A
Page3(1)ReasonforViolation
Thelicenseehasconcluded
thatthepre-shipping
doseratesurveyofcontainer
QG-27wasinadequate.
Thecontributing
causesofthisviolation
werethatthedoseratemeterusedforthesurveywasnotoptimally
suitedforsurveying
anemptycontainer
andthelocationofthesmall,localized
sourceincreased
thedifficulty
ofdetection.
(2)Corrective
ActionsTakenandResultsAchievedOnJanuary27,1993,thelicenseeinformedtheNRCofnotification
fromavendorinOakRidge,Tennessee,
thataseavan,manifested
asRadioactive
MaterialExceptedPackageEmptyPackaging,
UN2910,hadbeenreceivedwithdoseratesurveysindicating
externalradiation
levelsthatexceededthe0.5milliremperhourallowable
limit.OnJanuary29,1993,arepresentative
ofthelicenseearrived'tthevendor'sfacilitytoinvestigate
theapparentviolation.
Thevendorhadremoved,measured,
anddisposedoftheparticlethepreviousday.Consequently,
thelicenseewasunabletoverifythedoseratesontheseavan.(3)Preventive
ActionsTakenToAvoidFurtherViolations
Preventive
actionstakentopreventrecurrence
ofasimilareventincludeindependent
surveysofalloutgoingshipments
ofradioactive
materialandenhancement
ofprocedures
pertaining
toshipmentofradioactive
material.
Thepolicyofindependent
surveysforalloutgoingshipments
ofradioactive
materialwasinitiated
onFebruary1,1993.OnFebruary18,1993,apolicymemorandum
wasdistributed
toallradiation
protection
department
personnel
outlining
standards
forshipmentofradioactive
material.
Theprocedure,
Preparation
ofRadioactive
Shipments,
12THP3150,RMC.202,
wasrevisedtoincludeindependent
surveysofalloutgoingradioactive
materialshipments,
utilization
ofoptimalinstrumentation
forsurveys,andachecklist
for"emptypackage"shipments.
Thisprocedure
revisionwascompleted
onMarch1,1993.  
Attachment
toAEP:NRC:1184A
Page4Trainingforselectedradiation
protection
personnel
onthedescription
oftheevent,selection
anduseofoptimalequipment
forsurveys,andpropersurveymethodologies
willbecompleted
byMarch<<31,1993.(4)DateVhenFullComlianceVillBeAchievedFullcompliance
willbeachievedonMarch31,1993,withthecompletion
ofscheduled
trainingforselectedradiation
protection
personnel.
}}

Latest revision as of 05:44, 29 October 2019

Responds to NRC 930304 Ltr Re Violations Noted in Insp Repts 50-315/93-10 & 50-316/93-10.Corrective Actions:Training for Selected Radiation Protection Personnel on Event & Use of Optimal Equipment for Surveys Will Be Completed by 930331
ML17331A117
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 03/29/1993
From: Fitzpatrick E
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Martin A
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
AEP:NRC:1184A, NUDOCS 9304020176
Download: ML17331A117 (18)


Text

l' indiana Michigan Power Company P.O. 8ox 16631 Columbus, OH 43216 Z

INDIANA NICHIGAN POWER AEP:NRC:1184A Donald C. Cook Nuclear Plant Units 1 and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 NRC INSPECTION REPORT NOS. 50-315/930010 (DRSS)

AND 50-316/930010 (DRSS); REPLY TO A NOTICE OF VIOLATION U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20005 ATTN: A. BE Martin March 29, 1993

Dear Mr. Martin:

This letter is in response to Mr. Charles E. Norelius'etter dated March 4, 1993, which forwarded a Notice of Violation that resulted from the enforcement conference conducted on March 2, 1993. The Notice of Violation attached to Mr.

identified two severity level IV violations for the Norelius'etter shipment of an empty box that exceeded Department of Transportation (DOT)- contact dose rate limits and failure to ensure the limits were met prior to shipment. Our response to the Notice of Violation is provided in the attachment to this letter.

Sincerely, I

E. E. Fi.tzp rick Vice President eg Attachment CC: A. A. Blind - Bridgman J. R. Padgett G. Charnoff NRC Resident Inspector - Bridgman NFEM Section Chief A. B. Davis = Region--III APR 1 g3

Attachment to AEP:NRC:1184A Response to Notice of Violation

Attachment to AEP:NRC:1184A Page 1 NRC Violation:

A. "10 CFR 71.5(a) requires that licensees, who transport licensed material outside the confines of their plants or deliver licensed material to a carrier for transport, comply with the applicable requirements of the regulations appropriate to the mode of transport of the Department of Transportation (DOT) in 49 CFR Part 170-189.

49 CFR 173.427(e) requires that an empty package that previously contained radioactive materials and has been emptied comply with the requirements of 49 CFR 173.421(b) that states that radiation levels at any point on the external surface of the package do not exceed 0.5 millirem per hour.

Contrary to the above, on January 26, 1993, an empty package was delivered to a vendor in Oak Ridge, Tennessee with external radiation levels of 180 millirem per hour over a small area of the package.

This is a Severity Level IV problem (Supplement V).

(1) Reason for Violation The licensee has concluded that the pre-shipping dose rate survey of container QG-27 was inadequate. The contributing causes of this violation were that the dose rate meter used for the survey was not optimally suited for surveying an empty container and the location of the small, localized source increased the difficulty of detection.

(2) Corrective Actions Taken and Results Achieved On January 27, 1993, the licensee informed the NRC of notification from a vendor in Oak Ridge, Tennessee, that a sea van, manifested as Radioactive Material Excepted Package Empty Packaging, UN2910, had been received with dose rate surveys indicating external radiation levels that exceeded the 0.5 millirem per hour allowable limit.

On January 29, 1993, a representative of the licensee arrived at the vendor's facility to investigate the apparent violation. The vendor had removed, measured, and disposed of the particle the previous day. Consequently, the licensee was unable to verify the dose rates on the sea van.

Attachment to AEP:NRC:1184A Page 2 (3) Preventive Actions Taken To Avoid Further Violations Preventive actions taken to prevent recurrence of a similar event include independent surveys of all outgoing shipments of radioactive material and enhancement of procedures pertaining to shipment of radioactive material.

The policy of independent surveys for all outgoing shipments of radioactive material was initiated on February 1, 1993. On February 18, 1993, a policy memorandum was distributed to all radiation protection department personnel outlining standards for shipment of radioactive material.

The procedure, Preparation of Radioactive Shipments, 12 THP 3150.RMC.202, was revised to include independent surveys of all outgoing radioactive material shipments, utilization of optimal instrumentation for surveys, and a checklist for "empty package" shipments. This procedure revision was completed on March 1, 1993.

Training for selected radiation protection personnel on the description of the event, selection and use of optimal equipment for surveys, and proper survey methodologies will be completed by March 31, 1993.

(4) Date When Full Com liance Will Be Achieved Full compliance will be achieved on March 31, 1993, with the completion of scheduled training for selected radiation protection personnel.

B. 49 CFR 173.475 requires, in part, that before each shipment of any radioactive material package, the shipper ensure by examination or appropriate tests, that the external radiation levels are within allowable limits.

Contrary to the above, on January 26, 1993, an empty package was shipped without the shipper ensuring by appropriate surveys that external radiation levels were within applicable limits.

Specifically, the departure survey failed to detect a radiation level of 180 millirem per hour, which exceeded the 0.5 millirem per hour allowable limit.

This is a Severity Level XV problem (Supplement V)."

Attachment to AEP:NRC:1184A Page 3 (1) Reason for Violation The licensee has concluded that the pre-shipping dose rate survey of container QG-27 was inadequate. The contributing causes of this violation were that the dose rate meter used for the survey was not optimally suited for surveying an empty container and the location of the small, localized source increased the difficulty of detection.

(2) Corrective Actions Taken and Results Achieved On January 27, 1993, the licensee informed the NRC of notification from a vendor in Oak Ridge, Tennessee, that a sea van, manifested as Radioactive Material Excepted Package Empty Packaging, UN2910, had been received with dose rate surveys indicating external radiation levels that exceeded the 0.5 millirem per hour allowable limit.

On January 29, 1993, a representative of the licensee arrived at the vendor's facility to investigate the apparent violation. The vendor had removed, measured, and disposed of the particle the prevt.ous day. Consequently, the licensee was unable to verify the dose rates on the sea van.

(3) Preventive Actions Taken To Avoid Further Violations Preventive actions taken to prevent recurrence of a similar event include independent surveys of all outgoing shipments of radioactive material and enhancement of procedures pertaining to shipment of radioactive material.

The policy of independent surveys for all outgoing shipments of radioactive material was initiated on February 1, 1993. On February 18, 1993, a policy memorandum was distributed to all radiation protection department personnel outlining standards for shipment of radioactive material.

The procedure, Preparation of Radioactive Shipments, 12 THP 3150.RMC.202, was revised to include independent surveys of all outgoing radioactive material shipments, utilization of optimal instrumentati.on for surveys, and a checklist for "empty package" shipments. This procedure revision was completed on March 1, 1993.

Attachment to AEP:NRC:1184A Page 4 Training for selected radiation protection personnel on the description of the event, selection and use of optimal equipment for surveys, and proper survey methodologies will be completed by March 31, 1993.

(4) Date When Full Com lienee Will Be Achieved Full compliance will be acnieved on March 31, 1993, with tne completion of scheduled training for selected radiation protection personnel.

'I ACCELERATED DOCUMENT DISTRIBUTION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9304020176 DOC.DATE: 93/03/29 NOTARIZED: NO DOCKET FACIL:5G-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTH. NAME AUTHOR AFFILIATION FITZPATRICK,E. Indiana Michigan Power Co. (formerly Indiana & Michigan Ele RECIP.NAME 'ECiPIENT AFFILIATION MARTIN,A.B. Document Control Branch (Document Control Desk)

SUBJECT:

Responds to NRC 930304 ltr re violations noted in insp repts 50-315/93-10 & 50-316/93-10.Corrective actions:training for selected radiation protection personnel on event & use of optimal equipment for surveys will be completed by 930331.

DISTRIBUTION CODE: IE06D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Environ & Radiological (50 DKT)-Insp Rept/Notice of Violation Respons NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-1 LA 1 0 PD3-1 PD 1 1 DEANiW 1- 1 INTERNAL: AEOD/ANDERSON,R 1 1 AEOD/DSP 1 1 NMSS/SGTB 4E4 1 1 NRR/DREP/PRPB10 2 2 NRR/DRIL/RPEB10 1 1 NRR/PMAS/ILRB12 1 1 NUDOCS-ABSTRACT 1 1 OE D 1 1 OGC/HDS2 1 1 REG LE 02 1, 1 RES'GN3 1 1 RGN3 SS/RPB 1 1 FILE 01 1 1 RGN4 MURRAY,B 1 1 EXTERNAL: EG&G SIMPSON,F 2 2 NRC PDR 1 1 NSIC 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR 22 ENCL 21

indiana Michigan Power Company P.O. Box 16631'oinmbos OH 4321F

~R-INDIANA NICHIGAM POWM AEP'NRO'1184A Donald C. Cook Nuclear Plant Units 1 and 2 Docket,.Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 NRC INSPECTION REPORT NOS. 50-315/930010 (DRSS)

AND 50-316/930010 (DRSS); REPLY TO A NOTICE OF VIOLATION U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20005 ATTN: A. B. Martin March 29, 1993

Dear Mr. Martin:

This letter is in response to Mr. Charles E. Norelius'etter dated March 4, 1993, which forwarded a Notice of Violation that resulted from the enforcement conference, conducted on shipment Transportation

'f March 2, 1993. The Notice of Violation attached to Mr. Norelius' letter identified two severity level IV violations for the an (DOT) empty box that exceeded Department contact dose rate limits and failure to of ensure the limits were met prior to shipment. Our response to the Notice of Violation is provided in the attachment to this letter.

Sincerely, E. E. Fitzp rick Vice President eg Attachment CC: A. A. Blind - Bridgman J. R. Padgett G. Charnoff NRC Resident Inspector - Bridgman NFEM Section Chief A. B. Davis - Region III 020034 >py<

9304020176 930329 I

]

PDR ADQCK 050003l5 6 PDR

Attachment to AEP:NRC:1184A Response to Notice of Violation

Attachment to AEP:NRC:1184A Page 1 NRC Violation:

"10 CFR 71.5(a) requires that licensees, who transport licensed material outside the confines of their plants or deliver licensed material to a carrier for transport, comply with the applicable requirements of the regulations appropriate to the mode of transport of the Department of Transportation (DOT) in 49 CFR Part 170-189.

49 CFR 173.427(e) requires that an empty package that previously contained radioactive materials and has been emptied comply with the requirements of 49 CFR 173.421(b) that states that radiation levels at any point on the external surface of the package do not exceed 0.5 millirem per hour.

Contrary to the above, on January 26, 1993, an empty package was delivered to a vendor in Oak Ridge, Tennessee with external radiation levels of 180 millirem per hour over a small area of the package.

This is a Severity Level IV problem (Supplement V).

(1) Reason for Violation The licensee has concluded that the pre-shipping dose rate survey of container QG-27 was inadequate. The contributing causes of this violation were that the dose rate meter used for the survey was not optimally suited for surveying an empty container and the location of the small,, localized source increased the difficulty of detection.

(2) Corrective Actions Taken and Results Achieved On January 27, 1993, the licensee informed the NRC of notification from a vendor in Oak Ridge, Tennessee, that a sea van, manifested as Radioactive Material Excepted Package Empty Packaging, UN2910, had been received with dose rate surveys indicating external radiation levels that exceeded the 0.5 millirem per hour allowable limit.

On January 29, 1993, a representative of the licensee arrived at the vendor's facility to investigate the apparent violation. The vendor had removed, measured, and disposed of the particle the previous day. Consequently, the licensee was unable to verify the dose rates on the sea van.

Attachment to AEP:NRC:1184A Page 2 (3) Preventive Actions Taken To Avoid Further Violations Preventive actions taken to prevent recurrence of a similar event include independent surveys of all outgoing shipments of radioactive material and enhancement of procedures pertaining to shiprpent of radioactive material.

The policy of independent surveys for all outgoing shipments of radioactive material was initiated on February 1, 1993. On February 18, 1993, a policy memorandum was distributed to all radiation protection department personnel outlining standards for shipment of radioactive material.

The procedure, Preparation of Radioactive Shipments, 12 THP 3150.RMC.202, was revised to include independent surveys of all outgoing radioactive material shipments, utilization of optimal instrumentation for surveys, and a checklist for "empty package" shipments. This procedure revision was completed on March 1, 1993.

Training for selected radiation protection personnel on the description of the event, selection and use of optimal equipment for surveys, and proper survey methodologies will be completed by March 31, 1993.

(4) Date When Full Com liance Will Be Achieved Full compliance will be achieved on March 31, 1993, with the completion of scheduled training for selected radiation protection personnel.

49 CFR 173.475 requires, in part, that before each shipment of any radioactive material package, the shipper ensure by examination or appropriate tests, that the external radiation levels are within allowable limits.

Contrary to the above, on January 26, 1993,, an empty package was shipped without the shipper ensuring by appropriate surveys that external radiation levels were within applicable limits.

Specifically, the departure survey failed to detect a radiation level of 180 millirem per hour, which exceeded the 0.5 millirem per hour allowable limit.

This is a Severity Level IV problem (Supplement V)."

Attachment to AEP:NRC:1184A Page 3 (1) Reason for Violation The licensee has concluded that the pre-shipping dose rate survey of container QG-27 was inadequate. The contributing causes of this violation were that the dose rate meter used for the survey was not optimally suited for surveying an empty container and the location of the small, localized source increased the difficulty of detection.

(2) Corrective Actions Taken and Results Achieved On January 27, 1993, the licensee informed the NRC of notification from a vendor in Oak Ridge, Tennessee, that a sea van, manifested as Radioactive Material Excepted Package Empty Packaging, UN2910, had been received with dose rate surveys indicating external radiation levels that exceeded the 0.5 millirem per hour allowable limit.

't On January 29, 1993, a representative of the licensee arrived the vendor's facility to investigate the apparent violation. The vendor had removed, measured, and disposed of the particle the previous day. Consequently, the licensee was unable to verify the dose rates on the sea van.

(3) Preventive Actions Taken To Avoid Further Violations Preventive actions taken to prevent recurrence of a similar event include independent surveys of all outgoing shipments of radioactive material and enhancement of procedures pertaining to shipment of radioactive material.

The policy of independent surveys for all outgoing shipments of radioactive material was initiated on February 1, 1993. On February 18, 1993, a policy memorandum was distributed to all radiation protection department personnel outlining standards for shipment of radioactive material.

The procedure, Preparation of Radioactive Shipments, 12 THP 3150,RMC.202, was revised to include independent surveys of all outgoing radioactive material shipments, utilization of optimal instrumentation for surveys, and a checklist for "empty package" shipments. This procedure revision was completed on March 1, 1993.

Attachment to AEP:NRC:1184A Page 4 Training for selected radiation protection personnel on the description of the event, selection and use of optimal equipment for surveys, and proper survey methodologies will be completed by March <<31, 1993.

(4) Date Vhen Full Com liance Vill Be Achieved Full compliance will be achieved on March 31, 1993, with the completion of scheduled training for selected radiation protection personnel.