ML18030A439: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 07/21/1980
| issue date = 07/21/1980
| title = Interim Deficiency Rept Re Status of Anchor Darling Valve Yokes.Ae Has Advised Final Rept on Cracked Yokes on Anchor Darling Valves Will Be Available in Aug 1980.Final Rept Will Be Forwarded During Sept 1980
| title = Interim Deficiency Rept Re Status of Anchor Darling Valve Yokes.Ae Has Advised Final Rept on Cracked Yokes on Anchor Darling Valves Will Be Available in Aug 1980.Final Rept Will Be Forwarded During Sept 1980
| author name = CURTIS N W
| author name = Curtis N
| author affiliation = PENNSYLVANIA POWER & LIGHT CO.
| author affiliation = PENNSYLVANIA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:REGULATOINFORMATIONDISTRIBUTIONTEN(AIDS)ACCESSIONNBR:8007250487OOC~DATE:80/07/21NOTARIZED:NODOCKETFACIL:50-387SusquehannaSteamElectricStation~UnitiiPennsylva05000387SF8usquehannaSteamElectricStationiUnit2rPennsylva05000388AUTAUTHORAFFILIATIONCURISgiN~i'l~PennsylvaniaPower4LightCo~REIP~NAHERECIPIENTAFFIIIATION
{{#Wiki_filter:REGULATO      INFORMATION DISTRIBUTION                          TEN  (AIDS)
ACCESSION NBR:8007250487                  OOC    DATE:           80/07/21 NOTARIZED: NO                  DOCKET
                                                  ~
FACIL:50-387 Susquehanna Steam Electric Station~ Unit                                      ii  Pennsylva  05000387 SF8        usquehanna Steam Electric Stationi Unit 2r                            Pennsylva  05000388 AUT                          AUTHOR AFF IL I AT ION CUR IS g iN ~ i'l ~         Pennsylvania Power 4 Light Co ~
RE  IP ~ NAHE                RECIPIENT AFFII IATION


==SUBJECT:==
==SUBJECT:==
InterimdeficiencyreptrestatusofAnchorDarlingvalveyokes.AEnasadvisedfinalreptoncrackedyokesonAnchorDarlingvalveswillbeavailableinAug1980~Finalreptwillt>efo,rwardedduringSept1980.iDISTRIBUTIONCODE:8019SCOPIESRECEIVED:LTRENCLSIZE:,/TITLE:ConstructionDeficiencyReport(10CFR50~55E)NOTES:SendISE3copiesFSARttallamends'endICE3copiesFSAR8allamends.0500038705000388ACTION:HECIPIEuTIDCOOE/NA1EA/DLICENSiuG2.1RUSHt3ROOKiÃ~20STARKgR~14COPIESLTTRFN111RECIPIENTIDCODE/NAr4EYOUNGBLOOOgB15SFRVICEDM~20COPIESLTTRENI.INTERNAL:AD/RCI/IE0/DIRHUMFACSEDOIrSTAFF07FIELDCOOR/IE13LICQUALBRNRCPDR02PRg~SfREVBREGFIL017JGlRSDEV11AEOO0IRgHU14FACSFYEQUIPQUALBR16IFE05MPA08OELO23QABR10RUTHERFORD/u~IEEXTERNAL:ACRSNSIC240416111LPDR03JUL29)sK)pierTOTALNUMBEROFCOPIESREQUIRED:LTTR~ENCL TWONORTHNINTHSTREET,ALLEN'TOWN,PA.18101PHONEr(215)821~5151NORM*Ntv.CURTISVicePresident-Engineering8Construction-Nuclesr821.5381July21,1980Mr.BoyceH.CrierDirector,RegionIU.S.NuclearRegulatoryCommission631ParkAvenueKingofPrussia,Pennsylvania19406SUSQUEHANNASTEAMELECTRICSTATIONUPDATEINTHESTATUSOFADEFICIENCYONANCHORDARLINGVALVEYOKESER100450FILE840-4/900-10PLA-511
Interim deficiency rept re status of Anchor Darling valve yokes.     AE nas advised f inal rept on cracked yokes on Anchor Darling valves will be available in Aug 1980 Final rept will              ~
t>e    fo,rwarded during Sept 1980.
DISTRIBUTION CODE: 8019S                COPIES RECEIVED:LTR TITLE: Constr uction Def iciency Repor t (10CFR50 ~ 55E)
ENCL i
                                                                                                      ,/
SIZE:
NOTES:Send          ISE 3    copies  FSAR  tt  all                                                      05000387 ICE 3    copies  FSAR  8    all  amends.
amends'end 05000388 HEC  IPIE uT        COPIES                        RECIPIENT                COPIES ID COOE/NA 1E            LTTR FN                      ID CODE/NAr4E            LTTR EN I.
ACTION:       A/D L ICENSiuG 2.1            1                        YOUNGBLOOOgB 15 RUSHt3ROOKià ~ 20              1                        SF RV ICED M ~     20 STARKgR ~             14      1 INTERNAL: AD/RC I/IE                                                  AEOO 0/DIR        HUM FAC    S                              0 IR g HU14 FAC SFY EDO      Ir  STAFF    07                                EQUIP QUAL BR16 FIELD COOR/IE13                                        IFE                05 LIC QUAL BR                                            MPA                08 NRC PDR              02                                OELO                23 PR g      ~Sf  REV BR                                  QA BR              10 EG F IL            01                                RUTHERFORD/     u ~ IE 7JGlRS    DE V 1 1 EXTERNAL: ACRS                      24      16      1                LPDR                03 NSIC                  04      1        1 JUL 29 )sK) pier TOTAL NUMBER OF COPIES              REQUIRED: LTTR                 ~     ENCL
 
TWO NORTH NINTH STREET, ALLEN'TOWN, PA. 18101        PHONEr (215) 821 ~ 5151 NORM*N tv. CURTIS Vice President- Engineering 8 Construction-Nuclesr 821.5381 July 21, 1980 Mr. Boyce H. Crier Director, Region I U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia,             Pennsylvania      19406 SUSQUEHANNA STEAM ELECTRIC STATION UPDATE IN THE STATUS OF A DEFICIENCY ON ANCHOR DARLING VALVE YOKES ER 100450                          FILE 840-4/900-10 PLA-511


==Reference:==
==Reference:==
PLA-505datedJuly7,1980
PLA-505 dated      July 7, 1980
 
==Dear Mr.        Grier:==


==DearMr.Grier:==
This letter serves to supplement the above referenced correspondence                        which advised the Commission of the subject problem under provisions of 10CFR50.55(e).
ThisletterservestosupplementtheabovereferencedcorrespondencewhichadvisedtheCommissionofthesubjectproblemunderprovisionsof10CFR50.55(e).PP&Lhasbeenadvisedbyourarchitectengineer,BechtelPowerCorporation,thatafinal'eportonthesub)ectofcrackedyokesonAnchorDarlingvalveswillbeavailableinAugust,1980.Consequently,weexpecttoprovideourfinalreporttotheCommissioninSeptember,1980.Verytrulyyours,N.W.CurtisVicePresident-Engineering&Construction-NuclearFLW:mcbcc:Mr.VictorStello(15)Director-OfficeofInspection&EnforcementU.S.NuclearRegulatoryCommissionMr.RobertM.GalloWashington,D.C.20555U.S.NuclearRegulatoryCommissionP.O.Box52Mr.G.McDonald,Director-Shickshinny,Pennsylvania18655OfficeofManagementInformation&ProgramControlU.S.NuclearRegulatoryCommissionWashington,D.C.205558007250'/~7.PENNSYLVANIAPOWERErLIGHTCOMPANYQ(}}
PP&L has been            advised by our architect engineer, Bechtel Power Corporation, that    a  final'eport          on the sub) ect of cracked yokes on Anchor Darling valves will      be  available in August, 1980. Consequently, we expect to provide our final      report to the Commission in September, 1980.
Very truly yours, N. W.     Curtis Vice President-Engineering               & Construction-Nuclear FLW:mcb cc:     Mr. Victor Stello              (15)
Director-Office of Inspection            & Enforcement U. S. Nuclear Regulatory Commission                  Mr. Robert M. Gallo Washington, D.C.               20555                      U. S. Nuclear Regulatory Commission P. O. Box 52 Mr. G. McDonald, Director-                               Shickshinny, Pennsylvania      18655 Office of        Management    Information    & Program Control U. S. Nuclear Regulatory Commission Washington, D.C.               20555 PENNSYLVANIA POWER          LIGHT COMPANY Er Q      (
800 725 0'/~7.}}

Latest revision as of 00:40, 22 October 2019

Interim Deficiency Rept Re Status of Anchor Darling Valve Yokes.Ae Has Advised Final Rept on Cracked Yokes on Anchor Darling Valves Will Be Available in Aug 1980.Final Rept Will Be Forwarded During Sept 1980
ML18030A439
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 07/21/1980
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To:
References
PLA-511, NUDOCS 8007250487
Download: ML18030A439 (2)


Text

REGULATO INFORMATION DISTRIBUTION TEN (AIDS)

ACCESSION NBR:8007250487 OOC DATE: 80/07/21 NOTARIZED: NO DOCKET

~

FACIL:50-387 Susquehanna Steam Electric Station~ Unit ii Pennsylva 05000387 SF8 usquehanna Steam Electric Stationi Unit 2r Pennsylva 05000388 AUT AUTHOR AFF IL I AT ION CUR IS g iN ~ i'l ~ Pennsylvania Power 4 Light Co ~

RE IP ~ NAHE RECIPIENT AFFII IATION

SUBJECT:

Interim deficiency rept re status of Anchor Darling valve yokes. AE nas advised f inal rept on cracked yokes on Anchor Darling valves will be available in Aug 1980 Final rept will ~

t>e fo,rwarded during Sept 1980.

DISTRIBUTION CODE: 8019S COPIES RECEIVED:LTR TITLE: Constr uction Def iciency Repor t (10CFR50 ~ 55E)

ENCL i

,/

SIZE:

NOTES:Send ISE 3 copies FSAR tt all 05000387 ICE 3 copies FSAR 8 all amends.

amends'end 05000388 HEC IPIE uT COPIES RECIPIENT COPIES ID COOE/NA 1E LTTR FN ID CODE/NAr4E LTTR EN I.

ACTION: A/D L ICENSiuG 2.1 1 YOUNGBLOOOgB 15 RUSHt3ROOKià ~ 20 1 SF RV ICED M ~ 20 STARKgR ~ 14 1 INTERNAL: AD/RC I/IE AEOO 0/DIR HUM FAC S 0 IR g HU14 FAC SFY EDO Ir STAFF 07 EQUIP QUAL BR16 FIELD COOR/IE13 IFE 05 LIC QUAL BR MPA 08 NRC PDR 02 OELO 23 PR g ~Sf REV BR QA BR 10 EG F IL 01 RUTHERFORD/ u ~ IE 7JGlRS DE V 1 1 EXTERNAL: ACRS 24 16 1 LPDR 03 NSIC 04 1 1 JUL 29 )sK) pier TOTAL NUMBER OF COPIES REQUIRED: LTTR ~ ENCL

TWO NORTH NINTH STREET, ALLEN'TOWN, PA. 18101 PHONEr (215) 821 ~ 5151 NORM*N tv. CURTIS Vice President- Engineering 8 Construction-Nuclesr 821.5381 July 21, 1980 Mr. Boyce H. Crier Director, Region I U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 SUSQUEHANNA STEAM ELECTRIC STATION UPDATE IN THE STATUS OF A DEFICIENCY ON ANCHOR DARLING VALVE YOKES ER 100450 FILE 840-4/900-10 PLA-511

Reference:

PLA-505 dated July 7, 1980

Dear Mr. Grier:

This letter serves to supplement the above referenced correspondence which advised the Commission of the subject problem under provisions of 10CFR50.55(e).

PP&L has been advised by our architect engineer, Bechtel Power Corporation, that a final'eport on the sub) ect of cracked yokes on Anchor Darling valves will be available in August, 1980. Consequently, we expect to provide our final report to the Commission in September, 1980.

Very truly yours, N. W. Curtis Vice President-Engineering & Construction-Nuclear FLW:mcb cc: Mr. Victor Stello (15)

Director-Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Mr. Robert M. Gallo Washington, D.C. 20555 U. S. Nuclear Regulatory Commission P. O. Box 52 Mr. G. McDonald, Director- Shickshinny, Pennsylvania 18655 Office of Management Information & Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 PENNSYLVANIA POWER LIGHT COMPANY Er Q (

800 725 0'/~7.