ML18039A910: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 12/14/2017
| issue date = 12/14/2017
| title = 2017 Byron Station Initial License Examination Forms ES-301-5 Revision 0
| title = 2017 Byron Station Initial License Examination Forms ES-301-5 Revision 0
| author name = Seymour J L, Bielby M E
| author name = Seymour J, Bielby M
| author affiliation = NRC/RGN-III/DRS/OLB
| author affiliation = NRC/RGN-III/DRS/OLB
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 8
| page count = 8
}}
}}
=Text=
{{#Wiki_filter:ES-301                              Transient and Event Checklist                      Form ES-301-5 Facility: Byron (Crew A)                  Date of Exam: 12/04/17        Operating Test No.: 2017-301 A          E                                            Scenarios P          V 1                2                3              4          T      M P          E O      I L          N          CREW        CREW POSITION CREW POSITION CREW POSITION T      N I          T      POSITION I
C                                                                                      A S      A  B      S    A    B    S      A      B  S    A      B          M A            T                                                                          L R      T  O      R    T    O    R      T      O  R    T    O            U N          Y O      C  P      O    C    P    O      C      P  O    C      P          M(*)
T          P E    I-1    I-2 R-1    I-2  I-1  R-1  I-1    R-1    I-2                      R    I  U RO          RX      1                      2          4                                  3    1  1  0 NOR                                        1                                  1    1  1  1 SRO-I I-1      I/C    2,3,4                  5,7        2,6,7                              12    4  4  2 SRO-U              ,5.6                              ,8,9 MAJ    7                      8          10                                3    2  2  1 TS      2,6                                3,5,6                              5    0  2  2 RX            1        2                                                    2    1  1  0 RO NOR                      1                              1,4                  3    1  1  1 SRO-I      I/C            2,4      4,5,6                          6,8,9                9    4  4  2 I-2                              ,7 SRO-U MAJ            7        8                              10                    3    2  2  1 TS                      3,5                                                  2    0  2  2 RO          RX                                                4                          1    1  1  0 R-1      NOR                1              1                                        2    1  1  1 SRO-I I/C                3,5,            4,6          2,7                        7    4  4  2 SRO-U                          6, MAJ                7              8            10                          3    2  2  1 TS                                                                            0    0  2  2 RO          RX                                                                                  1  1  0 NOR                                                                                1  1  1 SRO-I I/C                                                                                4  4  2 SRO-U      MAJ                                                                                2  2  1 TS                                                                                  0  2  2
ES-301                                        Transient and Event Checklist                                  Form ES-301-5 Instructions:
: 1.        Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.        Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
: 3.        Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
: 4.        For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301                              Transient and Event Checklist                    Form ES-301-5 Facility: Byron (Crew B)                  Date of Exam: 12/04/17        Operating Test No.: 2017-301 A          E                                          Scenarios P          V 1              2                  3              4          T      M P          E O      I L          N          CREW        CREW POSITION CREW POSITION CREW POSITION T      N I          T      POSITION I
C                                                                                      A S      A  B    S  A      B    S      A    B  S    A      B          M A            T                                                                        L R      T  O    R  T      O    R      T    O  R    T    O            U N          Y O      C  P    O  C      P    O      C    P  O    C      P          M(*)
T          P E    U-1    R-2 R-3                    U-1    R-2  R-3                      R    I  U RO          RX      1                                4                                  2    1  1  0 NOR                                      1                                  1    1  1  1 SRO-I I/C    2,3,4                            2,6,7                              10    4  4  2 SRO-U              ,5.6                              ,8,9 U-1      MAJ    7                                10                                2    2  2  1 TS      2,6                              3,5,6                              5    0  2  2 RO          RX            1                                                            1    1  1  0 R-2      NOR                                                    1,4                  2    1  1  1 SRO-I I/C            2,4                                    6,8,9                5    4  4  2 SRO-U      MAJ            7                                      10                    2    2  2  1 TS                                                                          0    0  2  2 RO          RX                                              4                          1    1  1  0 R-3      NOR                1                                                        1    1  1  1 SRO-I I/C                3,5,                        2,7                        5    4  4  2 SRO-U                          6, MAJ                7                            10                          2    2  2  1 TS                                                                          0    0  2  2 RO          RX                                                                                1  1  0 NOR                                                                                1  1  1 SRO-I I/C                                                                                4  4  2 SRO-U      MAJ                                                                                2  2  1 TS                                                                                0  2  2
ES-301                                        Transient and Event Checklist                                  Form ES-301-5 Instructions:
: 1.        Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.        Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
: 3.        Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
: 4.        For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301                            Transient and Event Checklist                      Form ES-301-5 Facility: Byron (Crew C)                Date of Exam: 12/04/17        Operating Test No.: 2017-301 A          E                                        Scenarios P          V 1              2                3              4          T      M P          E O      I L          N        CREW      CREW POSITION CREW POSITION CREW POSITION T      N I          T      POSITION I
C                                                                                    A S    A    B    S  A      B    S    A    B  S    A      B          M A            T                                                                      L R    T    O    R    T    O    R    T    O  R    T      O          U N          Y O    C    P    O  C      P    O    C    P  O    C      P          M(*)
T          P E                    I-3 R-4  Surr                  Surr  I-3    R-4      R    I  U RO          RX                    2                                      7            2    1  1  0 NOR                  1                                                    1    1  1  1 SRO-I I-3      I/C                  4,5,6                                  2,5,9        7    4  4  2 SRO-U                            ,7 MAJ                  8                                      8            2    2  2  1 TS                    3,5                                                  2    0  2  2 RX                          2                                              1    1  1  0 RO R-4      NOR                                                                  1,7  2    1  1  1 SRO-I      I/C                        5,7                                      3,6,  5    4  4  2 10 SRO-U MAJ                        8                                        8    2    2  2  1 TS                                                                        0    0  2  2 RO          RX                                                      7                  NA    1  1  0 NOR                              1                      1                  NA    1  1  1 SRO-I I/C                              4,6                    2,3,5              NA    4  4  2 SRO-U                                                              ,6 MAJ                              8                      8                  NA    2  2  1 TS                                                      4                  NA    0  2  2 RO          RX                                                                              1  1  0 NOR                                                                              1  1  1 SRO-I I/C                                                                              4  4  2 SRO-U      MAJ                                                                              2  2  1 TS                                                                              0  2  2
ES-301                                        Transient and Event Checklist                                  Form ES-301-5 Instructions:
: 1.        Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.        Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
: 3.        Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
: 4.        For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301                              Transient and Event Checklist                      Form ES-301-5 Facility: Byron (Crew D)                  Date of Exam: 12/04/17        Operating Test No.: 2017-301 A          E                                          Scenarios P          V 1                2                3              4          T      M P          E O      I L          N          CREW        CREW POSITION CREW POSITION CREW POSITION T      N I          T      POSITION I
C                                                                                      A S      A  B      S    A    B    S    A    B  S    A      B          M A            T                                                                          L R      T  O      R    T    O    R    T    O  R    T      O          U N          Y O      C  P      O    C    P    O    C    P  O    C      P          M(*)
T          P E    I-4    I-5 R-5    I-5  I-4  R-5                  I-4  R-5    I-5      R    I  U RO          RX      1                      2                          7                  3    1  1  0 NOR                                                        1                  1    1  1  1 SRO-I I-4      I/C    2,3,4                  5,7                        2,3,5              11    4  4  2 SRO-U              ,5.6                                              ,6 MAJ    7                      8                          8                  3    2  2  1 TS      2,6                                                4                  3    0  2  2 RX            1        2                                                    2    1  1  0 RO NOR                      1                                              1,7  3    1  1  1 SRO-I      I/C            2,4      4,5,6                                          3,6,  9    4  4  2 I-5                              ,7                                            10 SRO-U MAJ            7        8                                              8    3    2  2  1 TS                      3,5                                                  2    0  2  2 RO          RX                                                              7            1    1  1  0 R-5      NOR                1              1                                        2    1  1  1 SRO-I I/C                3,5,            4,6                          2,5,9        8    4  4  2 SRO-U                          6, MAJ                7              8                            8            3    2  2  1 TS                                                                                  0  2  2 RO          RX                                                                                  1  1  0 NOR                                                                                1  1  1 SRO-I I/C                                                                                4  4  2 SRO-U      MAJ                                                                                2  2  1 TS                                                                                  0  2  2
ES-301                                        Transient and Event Checklist                                  Form ES-301-5 Instructions:
: 1.        Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.        Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
: 3.        Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
: 4.        For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.}}

Latest revision as of 23:00, 21 October 2019

2017 Byron Station Initial License Examination Forms ES-301-5 Revision 0
ML18039A910
Person / Time
Site: Byron  Constellation icon.png
Issue date: 12/14/2017
From: Jesse Seymour, Bielby M
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
Shared Package
ML17152A385 List:
References
Download: ML18039A910 (8)


Text

ES-301 Transient and Event Checklist Form ES-301-5 Facility: Byron (Crew A) Date of Exam: 12/04/17 Operating Test No.: 2017-301 A E Scenarios P V 1 2 3 4 T M P E O I L N CREW CREW POSITION CREW POSITION CREW POSITION T N I T POSITION I

C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)

T P E I-1 I-2 R-1 I-2 I-1 R-1 I-1 R-1 I-2 R I U RO RX 1 2 4 3 1 1 0 NOR 1 1 1 1 1 SRO-I I-1 I/C 2,3,4 5,7 2,6,7 12 4 4 2 SRO-U ,5.6 ,8,9 MAJ 7 8 10 3 2 2 1 TS 2,6 3,5,6 5 0 2 2 RX 1 2 2 1 1 0 RO NOR 1 1,4 3 1 1 1 SRO-I I/C 2,4 4,5,6 6,8,9 9 4 4 2 I-2 ,7 SRO-U MAJ 7 8 10 3 2 2 1 TS 3,5 2 0 2 2 RO RX 4 1 1 1 0 R-1 NOR 1 1 2 1 1 1 SRO-I I/C 3,5, 4,6 2,7 7 4 4 2 SRO-U 6, MAJ 7 8 10 3 2 2 1 TS 0 0 2 2 RO RX 1 1 0 NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2

ES-301 Transient and Event Checklist Form ES-301-5 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

ES-301 Transient and Event Checklist Form ES-301-5 Facility: Byron (Crew B) Date of Exam: 12/04/17 Operating Test No.: 2017-301 A E Scenarios P V 1 2 3 4 T M P E O I L N CREW CREW POSITION CREW POSITION CREW POSITION T N I T POSITION I

C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)

T P E U-1 R-2 R-3 U-1 R-2 R-3 R I U RO RX 1 4 2 1 1 0 NOR 1 1 1 1 1 SRO-I I/C 2,3,4 2,6,7 10 4 4 2 SRO-U ,5.6 ,8,9 U-1 MAJ 7 10 2 2 2 1 TS 2,6 3,5,6 5 0 2 2 RO RX 1 1 1 1 0 R-2 NOR 1,4 2 1 1 1 SRO-I I/C 2,4 6,8,9 5 4 4 2 SRO-U MAJ 7 10 2 2 2 1 TS 0 0 2 2 RO RX 4 1 1 1 0 R-3 NOR 1 1 1 1 1 SRO-I I/C 3,5, 2,7 5 4 4 2 SRO-U 6, MAJ 7 10 2 2 2 1 TS 0 0 2 2 RO RX 1 1 0 NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2

ES-301 Transient and Event Checklist Form ES-301-5 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

ES-301 Transient and Event Checklist Form ES-301-5 Facility: Byron (Crew C) Date of Exam: 12/04/17 Operating Test No.: 2017-301 A E Scenarios P V 1 2 3 4 T M P E O I L N CREW CREW POSITION CREW POSITION CREW POSITION T N I T POSITION I

C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)

T P E I-3 R-4 Surr Surr I-3 R-4 R I U RO RX 2 7 2 1 1 0 NOR 1 1 1 1 1 SRO-I I-3 I/C 4,5,6 2,5,9 7 4 4 2 SRO-U ,7 MAJ 8 8 2 2 2 1 TS 3,5 2 0 2 2 RX 2 1 1 1 0 RO R-4 NOR 1,7 2 1 1 1 SRO-I I/C 5,7 3,6, 5 4 4 2 10 SRO-U MAJ 8 8 2 2 2 1 TS 0 0 2 2 RO RX 7 NA 1 1 0 NOR 1 1 NA 1 1 1 SRO-I I/C 4,6 2,3,5 NA 4 4 2 SRO-U ,6 MAJ 8 8 NA 2 2 1 TS 4 NA 0 2 2 RO RX 1 1 0 NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2

ES-301 Transient and Event Checklist Form ES-301-5 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

ES-301 Transient and Event Checklist Form ES-301-5 Facility: Byron (Crew D) Date of Exam: 12/04/17 Operating Test No.: 2017-301 A E Scenarios P V 1 2 3 4 T M P E O I L N CREW CREW POSITION CREW POSITION CREW POSITION T N I T POSITION I

C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)

T P E I-4 I-5 R-5 I-5 I-4 R-5 I-4 R-5 I-5 R I U RO RX 1 2 7 3 1 1 0 NOR 1 1 1 1 1 SRO-I I-4 I/C 2,3,4 5,7 2,3,5 11 4 4 2 SRO-U ,5.6 ,6 MAJ 7 8 8 3 2 2 1 TS 2,6 4 3 0 2 2 RX 1 2 2 1 1 0 RO NOR 1 1,7 3 1 1 1 SRO-I I/C 2,4 4,5,6 3,6, 9 4 4 2 I-5 ,7 10 SRO-U MAJ 7 8 8 3 2 2 1 TS 3,5 2 0 2 2 RO RX 7 1 1 1 0 R-5 NOR 1 1 2 1 1 1 SRO-I I/C 3,5, 4,6 2,5,9 8 4 4 2 SRO-U 6, MAJ 7 8 8 3 2 2 1 TS 0 2 2 RO RX 1 1 0 NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2

ES-301 Transient and Event Checklist Form ES-301-5 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.