ML18044A213

From kanterella
Jump to navigation Jump to search
2017 Byron Station Initial License Examination Forms ES-301-1 Revision 1
ML18044A213
Person / Time
Site: Byron  Constellation icon.png
Issue date: 12/14/2017
From: Jesse Seymour, Bielby M
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
Seymour J
Shared Package
ML17152A385 List:
References
Download: ML18044A213 (3)


Text

ES-301 Administrative Topics Outline Form ES-301-1 Facility: Byron Date of Examination: 12/04/17 Examination Level: RO SRO Operating Test Number: 2017-301 Administrative Topic (see Note) Type Describe activity to be performed Code*

Conduct of Operations M, R Evaluate License Holders Status K/A 2.1.4 Knowledge of individual licensed operator responsibilities related to shift staffing, such as medical requirements, no-solo operation, maintenance of active license status, 10CFR55, etc. 3.3 Modified from 2013 NRC Exam Conduct of Operations N, S Perform Offsite AC Power Availability Surveillance K/A 2.1.31 Ability to locate control room switches, controls, and indications, and to determine that they correctly reflect the desired plant lineup. 4.6 New JPM Equipment Control N, R Identify Leak Isolation Points from Mechanical and Electrical Drawings K/A 2.2.15 Ability to determine the expected plant configuration using design and configuration control documentation, such as drawings, line-ups, tag-outs, etc. 3.9 New JPM Radiation Control Emergency Plan M, S Activate Everbridge Notification K/A 2.4.43 Knowledge of emergency communications systems and techniques. 3.2 Modified from 2016 NRC Exam NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).

  • Type Codes and Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs and RO retakes) (0)

(N)ew or (M)odified from bank ( 1) (4)

(P)revious 2 exams ( 1, randomly selected) (0)

ES-301 Administrative Topics Outline Form ES-301-1 Facility: Byron Date of Examination: 12/04/17 Examination Level: RO SRO Operating Test Number: 2017-301 Administrative Topic (see Note) Type Describe activity to be performed Code*

Conduct of Operations N, R Ensure Minimum Shift Staffing K/A 2.1.5 Ability to use procedures related to shift staffing, such as minimum crew complement, overtime limitations, etc. 3.9 New JPM Conduct of Operations D, R Determine Venting time for Reactor Vessel Void K/A 2.1.25 Ability to interpret reference materials, such as graphs, curves, tables, etc.

4.2 Direct from 2012 NRC Exam Equipment Control M, R Determine Plant Barrier Impairment requirements K/A 2.2.14 Knowledge of the process for controlling equipment configuration or status.4.3 Modified from 2013 NRC Exam Radiation Control D, R Review Containment release package in preparation for a Unit 1 Containment Release K/A 2.3.5 Ability to use radiation monitoring systems, such as fixed radiation monitors and alarms, portable survey instruments, personnel monitoring equipment, etc. 2.9 Direct from 2012 NRC Exam Emergency Plan D, R Emergency Dose Authorization K/A 2.4.38 Ability to take actions called for in the facility emergency plan, including supporting or acting as emergency coordinator if required.

4.4 Direct from 2013 NRC Exam NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).

  • Type Codes and Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs and RO retakes) (3)

(N)ew or (M)odified from bank ( 1) (2)

(P)revious 2 exams ( 1, randomly selected) (0)

Attachment to Forms ES-301-1 RO and ES-301-1 SRO Byron 2017 ILT NRC Exam Summary of Changes Changes to Forms ES-301-1 since outline submittal Form ES-301-1 RO:

RA-2: Changed from Perform Offsite AC Power Availability Surveillance per NRC request following outline review. Created new JPM; Perform U-1, U-0 Component Cooling Heat Exchanger Essential Service Water Availability Monthly Surveillance RA-3: Changed from Identify Leak Isolation Points from Mechanical and Electrical Drawings per NRC request following outline review. Created new JPM; Determine the Expected Plant Configuration. K/A 2.2.15, Ability to determine the expected plant configuration using design and configuration control documentation, such as drawings, line-ups, tag-outs, etc. Importance 3.9 RA-4: Activate Everbridge Notification; changed from Direct from 2016 NRC Exam to Modified from 2016 NRC Exam.

(Details withheld due to proprietary content)

Form ES-301-1 SRO:

SA-1: Changed JPM from Evaluate License Holders Status to newly developed JPM; Ensure Minimum Shift Staffing, following outline review differentiating actions from Certification Exam. Changed from Modified from 2014 NRC Exam to New JPM.

SA-4: Changed from K/A 2.3.5 to K/A 2.3.6 Ability to approve release permits, importance 3.8, per NRC comment following outline review. Changed from Direct from 2013 NRC Exam to Direct from 2012 NRC Exam.