ML18051B571: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:* ADMINISTRATIVE CONTROLS 6.8 PROCEDURES (Contd) d. Site Security Plan implementation. | {{#Wiki_filter:* | ||
ADMINISTRATIVE CONTROLS 6.8 PROCEDURES (Contd) | |||
: d. Site Security Plan implementation. | |||
: e. Site Emergency Plan implementation. | : e. Site Emergency Plan implementation. | ||
: f. Site Fire Protection Program implementation. | : f. Site Fire Protection Program implementation. | ||
6.8.2 PRC is responsible for the review of each procedure of 6.8.1 above, and changes thereto (except for Security Implementing Procedures which are reviewed and approved in accordance with the Site Security Plan). Procedures and changes shall be approved prior to implementation by a member of plant management designated by the plant manager. 6.8.3 Temporary changes to procedures of Specification | 6.8.2 PRC is responsible for the review of each procedure of 6.8.1 above, and changes thereto (except for Security Implementing Procedures which are reviewed and approved in accordance with the Site Security Plan). | ||
Procedures and changes shall be approved prior to implementation by a member of plant management designated by the plant manager. | |||
6.8.3 Temporary changes to procedures of Specification 6.8.1 above may be made provided: | |||
may be made provided: | : a. The intent of the original procedure is not altered. | ||
: a. The intent of the original procedure is not altered. b. The change is approved by two members (or designated alternates) of the PRC, at least one of whom holds a Senior Reactor Operator's License. c. The change is documented, reviewed by the PRC at or by the next regularly scheduled meeting and approved by a member of plant management designated by the plant manager. 6-Hla Proposed TSP0885-0013B-NL02}} | : b. The change is approved by two members (or designated alternates) of the PRC, at least one of whom holds a Senior Reactor Operator's License. | ||
: c. The change is documented, reviewed by the PRC at or by the next regularly scheduled meeting and approved by a member of plant management designated by the plant manager. | |||
6-Hla Proposed TSP0885-0013B-NL02}} |
Latest revision as of 20:45, 21 October 2019
ML18051B571 | |
Person / Time | |
---|---|
Site: | Palisades |
Issue date: | 10/15/1985 |
From: | CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
To: | |
Shared Package | |
ML18051B569 | List: |
References | |
NUDOCS 8510220261 | |
Download: ML18051B571 (1) | |
Text
ADMINISTRATIVE CONTROLS 6.8 PROCEDURES (Contd)
- d. Site Security Plan implementation.
- e. Site Emergency Plan implementation.
- f. Site Fire Protection Program implementation.
6.8.2 PRC is responsible for the review of each procedure of 6.8.1 above, and changes thereto (except for Security Implementing Procedures which are reviewed and approved in accordance with the Site Security Plan).
Procedures and changes shall be approved prior to implementation by a member of plant management designated by the plant manager.
6.8.3 Temporary changes to procedures of Specification 6.8.1 above may be made provided:
- a. The intent of the original procedure is not altered.
- b. The change is approved by two members (or designated alternates) of the PRC, at least one of whom holds a Senior Reactor Operator's License.
- c. The change is documented, reviewed by the PRC at or by the next regularly scheduled meeting and approved by a member of plant management designated by the plant manager.
6-Hla Proposed TSP0885-0013B-NL02