=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:*
ADMINISTRATIVE CONTROLS 6.8 PROCEDURES (Contd)
: d. Site Security Plan implementation.
: e. Site Emergency Plan implementation.
: f. Site Fire Protection Program implementation.
6.8.2  PRC is responsible for the review of each procedure of 6.8.1 above, and changes thereto (except for Security Implementing Procedures which are reviewed and approved in accordance with the Site Security Plan).
Procedures and changes shall be approved prior to implementation by a member of plant management designated by the plant manager.
6.8.3  Temporary changes to procedures of Specification 6.8.1 above may be made provided:
: a. The intent of the original procedure is not altered.
: b. The change is approved by two members (or designated alternates) of the PRC, at least one of whom holds a Senior Reactor Operator's License.
: c. The change is documented, reviewed by the PRC at or by the next regularly scheduled meeting and approved by a member of plant management designated by the plant manager.
6-Hla Proposed TSP0885-0013B-NL02}}

Latest revision as of 20:45, 21 October 2019

Proposed Tech Spec 6.8,allowing Delegation of Plant Manager Procedure Approval Authority by Plant Manager,To Other Appropriate Members of Plant Mgt
ML18051B571
Person / Time
Site: Palisades Entergy icon.png
Issue date: 10/15/1985
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18051B569 List:
References
NUDOCS 8510220261
Download: ML18051B571 (1)


Text

ADMINISTRATIVE CONTROLS 6.8 PROCEDURES (Contd)

d. Site Security Plan implementation.
e. Site Emergency Plan implementation.
f. Site Fire Protection Program implementation.

6.8.2 PRC is responsible for the review of each procedure of 6.8.1 above, and changes thereto (except for Security Implementing Procedures which are reviewed and approved in accordance with the Site Security Plan).

Procedures and changes shall be approved prior to implementation by a member of plant management designated by the plant manager.

6.8.3 Temporary changes to procedures of Specification 6.8.1 above may be made provided:

a. The intent of the original procedure is not altered.
b. The change is approved by two members (or designated alternates) of the PRC, at least one of whom holds a Senior Reactor Operator's License.
c. The change is documented, reviewed by the PRC at or by the next regularly scheduled meeting and approved by a member of plant management designated by the plant manager.

6-Hla Proposed TSP0885-0013B-NL02