{{#Wiki_filter: | {{#Wiki_filter:OFFICIAL USE ONLY - PROPRIETARY INFORMATION May 8, 2018 Dr. Han-Gon Kim, Project Manager APR1400 Design Certification Advanced Reactors Development Laboratory Korea Hydro and Nuclear Power Co., Ltd. | ||
70-1312-gil, Yuseong-daero Yuseong-Gu, Daejeon 305-343 Korea (Republic of) | |||
==SUBJECT:== | |||
ADVANCED POWER REACTOR 1400 DESIGN CERTIFICATION APPLICATION - SAFETY EVALUATION WITH NO OPEN ITEMS FOR CHAPTER 19, SECTION 19.2, SEVERE ACCIDENT EVALUATION | |||
==Dear Dr. Kim:== | |||
The U.S. Nuclear Regulatory Commission (NRC) staff is preparing a safety evaluation (SE) with no open items (OIs) for each chapter of Revision 2 to the Advanced Power Reactor 1400 Design Certification Application, submitted by Korea Electric Power Corporation and Korea Hydro & Nuclear Power Co., Ltd. (KHNP) on March 8, 2018. | |||
The staffs SE with no OIs for Chapter 19, Section 19.2, Severe Accident Evaluation, is being provided to the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee to support upcoming meetings of the ACRS Subcommittee, scheduled to be held on June 5, 2018. | |||
The enclosed SE with no OIs is being provided to KHNP for review of proprietary information pursuant to Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding. The staff concludes that the enclosed SE does contain information for which exemption from public disclosure has been sought or approved; however, the NRC will withhold the enclosed SE from public disclosure for ten business days from the date of this letter to allow you the opportunity to verify the staffs conclusion that the SE contains exempt information but no factual errors. If within that ten day period, you do not request that all or portions of the SE be withheld from public disclosure, the enclosure will be made available for public inspection through the Publicly Available Records component of NRCs Agencywide Documents Access and Management System and placed on the NRCs public web page for this application. | |||
Document transmitted herewith contains sensitive unclassified information. When separated from the enclosure, this document is DECONTROLLED. | |||
OFFICIAL USE ONLY - PROPRIETARY INFORMATION | |||
OFFICIAL USE ONLY - PROPRIETARY INFORMATION H. Kim If you have any questions or comments concerning this matter, I can be reached at (301) 415-7038 or via e-mail address at William.Ward@nrc.gov. | |||
Sincerely, | |||
/RA/ | |||
William R. Ward, Senior Project Manager Licensing Branch 2 Division of New Reactor Licensing Office of New Reactors Docket No.: 52-046 | |||
==Enclosure:== | |||
As stated cc w/encl.: See Next Page OFFICIAL USE ONLY - PROPRIETARY INFORMATION | |||
ML18122A223 (letter) *via email NRO-002 OFFICE NRO/DNRL/LB2: PM NRO/DNRL/LB2: LA NRO/DNRL/LB2: PM NAME JSteckel RButler* (for C. Smith) WWard DATE 05/02/2018 05/02/2018 05/07/2018 | |||
KHNP Mailing List Daegeun (Tony) Ahn Director KHNP Washington DC Center 8100 Boone Blvd, Suite 620 Vienna, VA 22182 Page 1 of 2 | |||
Email kimhg1108@khnp.co.kr [Han-Gon Kim] | |||
hansang.kim@khnp.co.kr [Hansang Kim] | |||
dohwan.lee@khnp.co.kr [Do-Hwan Lee] | |||
junghokim@khnp.co.kr [Jung-Ho Kim] | |||
yunho.kim@khnp.co.kr [Yun Ho Kim] | |||
jiyong.oh@khnp.co.kr [Jiyong Andy Oh] | |||
ahn.daegeun@khnp.co.kr [Daegeun Tony Ahn] | |||
jksuh@khnp.co.kr [Jeong Kwan Suh] | |||
hachewung@khnp.co.kr [Che Wung Ha] | |||
kang.deogji@khnp.co.kr [Deog Ji Kang] | |||
sunguk.kwon@khnp.co.kr [Sun Guk Kwon] | |||
ptmaster300@kepco.co.kr [Hyun Chul Park] | |||
sisk1rb@westinghouse.com [Rob Sisk] | |||
david.wagner@aecom.com [David Wagner] | |||
robert.sweeney@consultant.aecom.com [Robert Sweeney]}} |
Revision as of 07:03, 21 October 2019
ML18122A223 | |
Person / Time | |
---|---|
Site: | 05200046 |
Issue date: | 05/08/2018 |
From: | William Ward NRC/NRO/DNRL/LB2 |
To: | Grace Kim Korea Hydro & Nuclear Power Co, Ltd |
Steckel J / 415 1026 | |
Shared Package | |
ML18122A222 | List: |
References | |
Download: ML18122A223 (5) | |
Text
OFFICIAL USE ONLY - PROPRIETARY INFORMATION May 8, 2018 Dr. Han-Gon Kim, Project Manager APR1400 Design Certification Advanced Reactors Development Laboratory Korea Hydro and Nuclear Power Co., Ltd.
70-1312-gil, Yuseong-daero Yuseong-Gu, Daejeon 305-343 Korea (Republic of)
SUBJECT:
ADVANCED POWER REACTOR 1400 DESIGN CERTIFICATION APPLICATION - SAFETY EVALUATION WITH NO OPEN ITEMS FOR CHAPTER 19, SECTION 19.2, SEVERE ACCIDENT EVALUATION
Dear Dr. Kim:
The U.S. Nuclear Regulatory Commission (NRC) staff is preparing a safety evaluation (SE) with no open items (OIs) for each chapter of Revision 2 to the Advanced Power Reactor 1400 Design Certification Application, submitted by Korea Electric Power Corporation and Korea Hydro & Nuclear Power Co., Ltd. (KHNP) on March 8, 2018.
The staffs SE with no OIs for Chapter 19, Section 19.2, Severe Accident Evaluation, is being provided to the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee to support upcoming meetings of the ACRS Subcommittee, scheduled to be held on June 5, 2018.
The enclosed SE with no OIs is being provided to KHNP for review of proprietary information pursuant to Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding. The staff concludes that the enclosed SE does contain information for which exemption from public disclosure has been sought or approved; however, the NRC will withhold the enclosed SE from public disclosure for ten business days from the date of this letter to allow you the opportunity to verify the staffs conclusion that the SE contains exempt information but no factual errors. If within that ten day period, you do not request that all or portions of the SE be withheld from public disclosure, the enclosure will be made available for public inspection through the Publicly Available Records component of NRCs Agencywide Documents Access and Management System and placed on the NRCs public web page for this application.
Document transmitted herewith contains sensitive unclassified information. When separated from the enclosure, this document is DECONTROLLED.
OFFICIAL USE ONLY - PROPRIETARY INFORMATION
OFFICIAL USE ONLY - PROPRIETARY INFORMATION H. Kim If you have any questions or comments concerning this matter, I can be reached at (301) 415-7038 or via e-mail address at William.Ward@nrc.gov.
Sincerely,
/RA/
William R. Ward, Senior Project Manager Licensing Branch 2 Division of New Reactor Licensing Office of New Reactors Docket No.: 52-046
Enclosure:
As stated cc w/encl.: See Next Page OFFICIAL USE ONLY - PROPRIETARY INFORMATION
ML18122A223 (letter) *via email NRO-002 OFFICE NRO/DNRL/LB2: PM NRO/DNRL/LB2: LA NRO/DNRL/LB2: PM NAME JSteckel RButler* (for C. Smith) WWard DATE 05/02/2018 05/02/2018 05/07/2018
KHNP Mailing List Daegeun (Tony) Ahn Director KHNP Washington DC Center 8100 Boone Blvd, Suite 620 Vienna, VA 22182 Page 1 of 2
Email kimhg1108@khnp.co.kr [Han-Gon Kim]
hansang.kim@khnp.co.kr [Hansang Kim]
dohwan.lee@khnp.co.kr [Do-Hwan Lee]
junghokim@khnp.co.kr [Jung-Ho Kim]
yunho.kim@khnp.co.kr [Yun Ho Kim]
jiyong.oh@khnp.co.kr [Jiyong Andy Oh]
ahn.daegeun@khnp.co.kr [Daegeun Tony Ahn]
jksuh@khnp.co.kr [Jeong Kwan Suh]
hachewung@khnp.co.kr [Che Wung Ha]
kang.deogji@khnp.co.kr [Deog Ji Kang]
sunguk.kwon@khnp.co.kr [Sun Guk Kwon]
ptmaster300@kepco.co.kr [Hyun Chul Park]
sisk1rb@westinghouse.com [Rob Sisk]
david.wagner@aecom.com [David Wagner]
robert.sweeney@consultant.aecom.com [Robert Sweeney]