ML18142A703: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:REGULATORY INFORMATION DISTRIBUTION SYSTEM<RIDS)DISTRIBUTION FOR INCOMING MATERIAL 50-244 I REC: ZIEMANN D L ORG: WHITE L D | {{#Wiki_filter:REGULATORY INFORMATION DISTRIBUTION SYSTEM <RIDS) | ||
NO COPIES RECEIVED | DISTRIBUTION FOR INCOMING MATERIAL 50-244 I | ||
REC: ZIEMANN D L ORG: WHITE L D DOCDATE: 04/i8/78 NRC RQCHESTER GAS 8( ELEC DATE RCVD: 09/26/78 DOCTYPE: LETTER NOTARIZED: NO COPIES RECEIVED | |||
==SUBJECT:== | ==SUBJECT:== | ||
LTR i ENCL 1 FORWARDING RESPONSE TO NRC REQUEST CONSISTING QF INFO CONCERNING DATA TAKEN DURING THE STARTUP OF CYCLE 7 AT SUBJECT FACILITY... | LTR i ENCL 1 FORWARDING RESPONSE TO NRC REQUEST CONSISTING QF INFO CONCERNING DATA TAKEN DURING THE STARTUP OF CYCLE 7 AT SUBJECT FACILITY... W/ATT TABLE PRESENTING PREDICTED ROD WORTH AND THE MEASURED ROD WORTHS WITH AND WITHOUT CONTROL RODS L8 8. K7 SWAPPED. | ||
W/ATT TABLE PRESENTING PREDICTED ROD WORTH AND THE MEASURED ROD WORTHS WITH AND WITHOUT CONTROL RODS L8 8.K7 SWAPPED.PLANT NAME: RE GINNA | PLANT NAME: RE GINNA UNIT i REVIEWER DISTRIBUTQR INITIAL: X JM INITIAL'~ | ||
NY++W/ENCL TIC>~W/ENCL NS I C4 4~W/ENCL ACRS CAT B>+ | DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS ANNUAL ENVIRONMENTAL RPTS (OL STAGE>. | ||
LTR 20 ENCL 20 SIZE: iP+3P w THE END | <DISTRIBUTION CODE A007) | ||
FOR ACTION: | |||
INTERNAL: REG FILE+4W/ENCL NRC PDR++W/ENCL EEB++W/ENCL BALLARD~~~W/ENCL J. COLLINS+4 W/ENCL KREGER++W/ENCL KASTNER4 4 W/ENCL EXTERNAL: LPDR~S ROCHESTER> NY++W/ENCL TIC>~W/ENCL NS I C4 4~W/ENCL ACRS CAT B>+W/ENCL DISTRIBUTION: LTR 20 ENCL 20 CONTROL NBR: 78i i60i78 SIZE: iP+3P w | |||
THE END | |||
1 I' ~ | |||
'1 II W | |||
Also attached is a table which presents the predicted rod worth and the measured rod worths with and without control rods LS and K7 swapped.Very truly yours, L.D.White, Jr.,7Sl160i78 Aoo | IH | ||
'I | |||
/D | |||
0 | |||
~ >jg y | |||
r<rizzz zringjj~i( | |||
muzzy izzard' uzzsiltl jiiiiiiiiiiiiii ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649 LEON D. WHITE, JR. TELEPHONE VICE PRESIDENT AREA CODE Tle 546 2700 April 18, 1978 CU I "I En cnt.','I | |||
:i) U IXI Kl ~w Pi'I tPL-I | |||
>Ca MLJ | |||
>>B,Xg rTI~ | |||
Cl>~ | |||
XEO Director of Nuclear Reactor Regulation Attention: Mr. Dennis Ziemann, Chief C7 ITI ED Operating Reactors Branch o. 2 CA II.R. Nuclear Regulatory Commission .g]jiIIIIfgI Ma fbi Washington, DC 20555 Mg g | |||
==Dear Mr. Ziemann:== | |||
- | |||
During conversations with members of the NRC staff, a revue'st" was made for data taken during the startup of Cycle 7 at the R. E. Ginna Plant. This data reflects measurements taken with control rod LS operating as a D bank rod and rgd K7 operating as an A bank rod. Figure 1 illustrates the F obtained from the Incore reduction of Flux Map VII-3 which Rs take with the rods as described above. Figure 2 illustrates the F>HIs with the rod swap corrected. | |||
Also attached is a table which presents the predicted rod worth and the measured rod worths with and without control rods LS and K7 swapped. | |||
Very truly yours, L. D. White, Jr . | |||
,7Sl160i78 t Aoo | |||
Cycle 7 Flux Map VII-3 D bank = 136 steps, 28% power, Control Rod L8 and K7 interchanged ROCHESTER GAS ANO ELECTRIC CORPORATION CORE MAP N | |||
Measured F~H 2700 2 3 4 5 6 7 9 10 11 12 13 I I I I I I I I I I I I 0.546 0.552 0.56 | |||
-1.0 0.6 1.5 | |||
: 0. 636 - 009 l. 131 0. 824 1. 144 . 022 0. 647 | |||
-1. 1 -1. 0 -1. 0 -0.4 0.2 p.3 0.6 | |||
.471 1. 008 . 284 1. 117 0. 907 1.11 . 301 1. 025 0-479 | |||
-1.1 -1.1 -1. 1 -0. 2 -0. 5 -0. 0.3 0.6 0. 6 p.62g 0.998 0. 979 -130 1.244 0.980 1.24 .134 1- 006 1- 025 0. 646 | |||
-., 2.2 -2.2 2 2 ~ -0.3 0.3 0.5 0. 0.0 0.5 0.4 0.4 0'.gg7 1.270 l. 111 1- 255 1. 178 0. 978 l. 17 .266 1.141 1.305 1.024 | |||
-2. 2 -2. 2 2~2 -1.2 -0.3 -0.1 -0. -0.3 0.4 0.4 0.4 | |||
.556 1.152 1.095 l. 215 1-162 1.034 1-230 1.159 1.222 1.107 1.148 ~ 568 1.1 0 -2 ' 2~2 9 -1.4 2 -1.7 -1.1 0.7 3.3 | |||
.551 0.831 o.914 0. 969 0. 961 1. 224 1. 049 1.20 0.944 0.949 0.888 0.82 .563 0' 1.0 p 9 0 4 -0. 6 0 -1.8 6 -2. -3.8 -2.7 -2.4 | |||
~ 0.7 3.3 G | |||
.556 l. 152 l. 131 1.254 1.182 1 043 1.236 1.02 1-150 1.217 1.096 1.13 0.568 1.1 1.0 1.0 0.9 03 -06 07 -2. -2.9 -2.1 -2.1 -0. 3.3 | |||
: 1. 03 1. 315 l. 147 27g 1 185 0 980 1.19 1-268 1.118 1.269 0.99 Oi2 1.2 1.2 0.9 p 7 p,p 0. -0.2 -1.6 -2.3 -2. | |||
: 0. 692 1. 098 l. 050 1.173 1.242 p.g8p 1.25 1.139 0.993 1.004 0.62 | |||
: 3. 5 0.1 7.6 7.6 4.9 0.5 1. 0.5 -0.8 -1.6 -2. | |||
: 0. 517 1. 101 1.408 1-204 0.918 1.10 1.269 76 p 992 0 474~ | |||
8.4 8.0 85 08 -1. -2.2 -0.6 | |||
: 0. 703 1.110 1.140 0.827 1.10 0.963 0.605 9.4 8.9 -0.2 -0.0 -F 1 -5.5 -5.8 0.550 0.548 0. 54 | |||
-0.2 -0.2 -2. ~ | |||
~F~ | |||
% | |||
N Difference between measured and predicted I I I I I I I I I 1 2 3 4 5 6 7 9 10 11 12 13 90~ | |||
Meas-Pred Pred il l7 FIGURE 3, | |||
ycle 7 Flux Map VIZ-4 D bank = 119 steps, 25% power, Control Rod Swap Corrected ROCHESTER GAS ANO ELECTRIC CORPORATION CORE MAP N | |||
Measured F~ | |||
2704 1 2 3 4 8 7 8 9 10 11 12 13 I I I I I I i I I I I I I | |||
: 0. 0. 589 0. 578 5.6 3.8 2.6 | |||
: 0. 690 l. 051 1.171 0.852 .137 1.031 0 ~ | |||
5.6 5.6 5.7 3.2 2.6 3.6 6. | |||
s.s4 | |||
: 1. 081 1.334 1. 109 0. 875 1. 104 l. 329 1.087 .535 5.6 1.1 -0.7 . 0.7 5.2 6. 6.2 0.646 1.011 1.002 1.148 1. 207 0. 949 1. 229 1.162 1 03 ~ . 016 0.648 | |||
-1.3 -1.3 -1.3 1.2 -2.1 -4.1 -0.3 2.4 .. 1. -0. 9 -0.9 0.983 1.248 1.123 1. 270 1. 201 0.99 1.145 1.244 1.12 .253 0. 986 | |||
-1.3 -1.3 -1.3 -0.1 0.2 -2. -4.5 -0. -0.9 -0. 9 0.552 1.086 1.083 1.219 1.184 1. 068 | |||
-1.8 -1.8 1. 24 1. 038 1.152 1.20 . 087 1.087 0-547 | |||
-1.3 -1.3 -1.4 -1.5 -2. -4. 2 4.1 -2. -0. 9 -1.8 180 | |||
: 0. 554 0.808 p.864 0 974 0. 988 1.226 1.06 1.211 0 965 0.96 0. 871 p.8p8 0.549 | |||
-1.8 -1.8 -1.9 -1.6 -2.8 -3.9 -4. | |||
~ | |||
-5.1 -5. 1 -2. -1. 1 2 7 G | |||
0.551 1.086 1.077 1.222 1.181 | |||
-1.8 -1.8 -1.8 -1.0 -1.6 l.-'4.039 1.19 1.008 1.171 1.23 1.108 1.105 p.547 | |||
-6. -7.1 -2.S 1.0 -0.2 -2.7 2 0- | |||
: 0. 977 1. 241 1. 130 1.271 1.149 0.95 1.186 1.306 1.16 G299 1. 026 | |||
-1.8 -1.8 -0.6 0.1 -4.2 -6. -1.1 2.8 2.7 3.0 0'.517 0.674 1.055 1.034 1.149 1. 183 0.97 1.280 1.177 1 p3 1. 052 0. 674 30 30 18 1.3 -4 -1. 3.8 3 ' 2. 2.6 3.1 1.053 1. 300 1.13 0. 92 1. 164 1 330 1 06 0. 515 2.7 2.9 2 8 ~ 3. 5. 6.2 5.3 2.2 | |||
: 0. 670 1. 023 1. 08 l. 068 p,7p 2.6 2.8 2~ | |||
: 1. 3.7 149 7~3 7. | |||
: 0. 55 0 55 p 573 2~ | |||
+ F N | |||
1.7 | |||
%Difference between measured and predicted i I I I I I I I 2 3 4 5 7 9 10 11 12 90' FIGURE 2 47 ~ I T | |||
Startup Cycle 7 May 21, 1977 Core Condition Boron Worth Boron End oint Isotherm Temp. Coefficient** | |||
Predicted Measured* Predicted Measured* | |||
(ppm) (ppm) (pcm 'F) pcm 'F ARO -115 1382 1400 -3.4 3 ~ 23 D bank in -114 1296, 1321 -5. 0 -5.2 DSC bank in -114 1177 1207 -7.8 -8.25 Control Rod Bank Worth Bank Predicted Worth (%kg) Measured* (%Q) Measured (%hP) | |||
Bank Cumulative Bank Cumulative Bank Cumulative | |||
/ D 0. 754 0. 7'54 0.666 0.666 0. 711 0.711 DSC 1.047 1.801 0. 991 1.657 0.979 1.690 | |||
* indicates measurements done with control rod L8 operating as a D bank rod and rod K7 operating as an A bank rod. | |||
** Doppler Coefficient is +1.9 pcm/'F | |||
0 | |||
~ | |||
f t D ~ 'tl IL ,l ~ ~ | |||
IP}} |
Revision as of 01:30, 21 October 2019
ML18142A703 | |
Person / Time | |
---|---|
Site: | Ginna |
Issue date: | 04/18/1978 |
From: | White L Rochester Gas & Electric Corp |
To: | Ziemann D Office of Nuclear Reactor Regulation |
References | |
Download: ML18142A703 (7) | |
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM <RIDS)
DISTRIBUTION FOR INCOMING MATERIAL 50-244 I
REC: ZIEMANN D L ORG: WHITE L D DOCDATE: 04/i8/78 NRC RQCHESTER GAS 8( ELEC DATE RCVD: 09/26/78 DOCTYPE: LETTER NOTARIZED: NO COPIES RECEIVED
SUBJECT:
LTR i ENCL 1 FORWARDING RESPONSE TO NRC REQUEST CONSISTING QF INFO CONCERNING DATA TAKEN DURING THE STARTUP OF CYCLE 7 AT SUBJECT FACILITY... W/ATT TABLE PRESENTING PREDICTED ROD WORTH AND THE MEASURED ROD WORTHS WITH AND WITHOUT CONTROL RODS L8 8. K7 SWAPPED.
PLANT NAME: RE GINNA UNIT i REVIEWER DISTRIBUTQR INITIAL: X JM INITIAL'~
DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS ANNUAL ENVIRONMENTAL RPTS (OL STAGE>.
<DISTRIBUTION CODE A007)
FOR ACTION:
INTERNAL: REG FILE+4W/ENCL NRC PDR++W/ENCL EEB++W/ENCL BALLARD~~~W/ENCL J. COLLINS+4 W/ENCL KREGER++W/ENCL KASTNER4 4 W/ENCL EXTERNAL: LPDR~S ROCHESTER> NY++W/ENCL TIC>~W/ENCL NS I C4 4~W/ENCL ACRS CAT B>+W/ENCL DISTRIBUTION: LTR 20 ENCL 20 CONTROL NBR: 78i i60i78 SIZE: iP+3P w
THE END
1 I' ~
'1 II W
IH
'I
0
~ >jg y
r<rizzz zringjj~i(
muzzy izzard' uzzsiltl jiiiiiiiiiiiiii ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649 LEON D. WHITE, JR. TELEPHONE VICE PRESIDENT AREA CODE Tle 546 2700 April 18, 1978 CU I "I En cnt.','I
- i) U IXI Kl ~w Pi'I tPL-I
>Ca MLJ
>>B,Xg rTI~
Cl>~
XEO Director of Nuclear Reactor Regulation Attention: Mr. Dennis Ziemann, Chief C7 ITI ED Operating Reactors Branch o. 2 CA II.R. Nuclear Regulatory Commission .g]jiIIIIfgI Ma fbi Washington, DC 20555 Mg g
Dear Mr. Ziemann:
-
During conversations with members of the NRC staff, a revue'st" was made for data taken during the startup of Cycle 7 at the R. E. Ginna Plant. This data reflects measurements taken with control rod LS operating as a D bank rod and rgd K7 operating as an A bank rod. Figure 1 illustrates the F obtained from the Incore reduction of Flux Map VII-3 which Rs take with the rods as described above. Figure 2 illustrates the F>HIs with the rod swap corrected.
Also attached is a table which presents the predicted rod worth and the measured rod worths with and without control rods LS and K7 swapped.
Very truly yours, L. D. White, Jr .
,7Sl160i78 t Aoo
Cycle 7 Flux Map VII-3 D bank = 136 steps, 28% power, Control Rod L8 and K7 interchanged ROCHESTER GAS ANO ELECTRIC CORPORATION CORE MAP N
Measured F~H 2700 2 3 4 5 6 7 9 10 11 12 13 I I I I I I I I I I I I 0.546 0.552 0.56
-1.0 0.6 1.5
- 0. 636 - 009 l. 131 0. 824 1. 144 . 022 0. 647
-1. 1 -1. 0 -1. 0 -0.4 0.2 p.3 0.6
.471 1. 008 . 284 1. 117 0. 907 1.11 . 301 1. 025 0-479
-1.1 -1.1 -1. 1 -0. 2 -0. 5 -0. 0.3 0.6 0. 6 p.62g 0.998 0. 979 -130 1.244 0.980 1.24 .134 1- 006 1- 025 0. 646
-., 2.2 -2.2 2 2 ~ -0.3 0.3 0.5 0. 0.0 0.5 0.4 0.4 0'.gg7 1.270 l. 111 1- 255 1. 178 0. 978 l. 17 .266 1.141 1.305 1.024
-2. 2 -2. 2 2~2 -1.2 -0.3 -0.1 -0. -0.3 0.4 0.4 0.4
.556 1.152 1.095 l. 215 1-162 1.034 1-230 1.159 1.222 1.107 1.148 ~ 568 1.1 0 -2 ' 2~2 9 -1.4 2 -1.7 -1.1 0.7 3.3
.551 0.831 o.914 0. 969 0. 961 1. 224 1. 049 1.20 0.944 0.949 0.888 0.82 .563 0' 1.0 p 9 0 4 -0. 6 0 -1.8 6 -2. -3.8 -2.7 -2.4
~ 0.7 3.3 G
.556 l. 152 l. 131 1.254 1.182 1 043 1.236 1.02 1-150 1.217 1.096 1.13 0.568 1.1 1.0 1.0 0.9 03 -06 07 -2. -2.9 -2.1 -2.1 -0. 3.3
- 1. 03 1. 315 l. 147 27g 1 185 0 980 1.19 1-268 1.118 1.269 0.99 Oi2 1.2 1.2 0.9 p 7 p,p 0. -0.2 -1.6 -2.3 -2.
- 0. 692 1. 098 l. 050 1.173 1.242 p.g8p 1.25 1.139 0.993 1.004 0.62
- 3. 5 0.1 7.6 7.6 4.9 0.5 1. 0.5 -0.8 -1.6 -2.
- 0. 517 1. 101 1.408 1-204 0.918 1.10 1.269 76 p 992 0 474~
8.4 8.0 85 08 -1. -2.2 -0.6
- 0. 703 1.110 1.140 0.827 1.10 0.963 0.605 9.4 8.9 -0.2 -0.0 -F 1 -5.5 -5.8 0.550 0.548 0. 54
-0.2 -0.2 -2. ~
~F~
%
N Difference between measured and predicted I I I I I I I I I 1 2 3 4 5 6 7 9 10 11 12 13 90~
Meas-Pred Pred il l7 FIGURE 3,
ycle 7 Flux Map VIZ-4 D bank = 119 steps, 25% power, Control Rod Swap Corrected ROCHESTER GAS ANO ELECTRIC CORPORATION CORE MAP N
Measured F~
2704 1 2 3 4 8 7 8 9 10 11 12 13 I I I I I I i I I I I I I
- 0. 0. 589 0. 578 5.6 3.8 2.6
- 0. 690 l. 051 1.171 0.852 .137 1.031 0 ~
5.6 5.6 5.7 3.2 2.6 3.6 6.
s.s4
- 1. 081 1.334 1. 109 0. 875 1. 104 l. 329 1.087 .535 5.6 1.1 -0.7 . 0.7 5.2 6. 6.2 0.646 1.011 1.002 1.148 1. 207 0. 949 1. 229 1.162 1 03 ~ . 016 0.648
-1.3 -1.3 -1.3 1.2 -2.1 -4.1 -0.3 2.4 .. 1. -0. 9 -0.9 0.983 1.248 1.123 1. 270 1. 201 0.99 1.145 1.244 1.12 .253 0. 986
-1.3 -1.3 -1.3 -0.1 0.2 -2. -4.5 -0. -0.9 -0. 9 0.552 1.086 1.083 1.219 1.184 1. 068
-1.8 -1.8 1. 24 1. 038 1.152 1.20 . 087 1.087 0-547
-1.3 -1.3 -1.4 -1.5 -2. -4. 2 4.1 -2. -0. 9 -1.8 180
- 0. 554 0.808 p.864 0 974 0. 988 1.226 1.06 1.211 0 965 0.96 0. 871 p.8p8 0.549
-1.8 -1.8 -1.9 -1.6 -2.8 -3.9 -4.
~
-5.1 -5. 1 -2. -1. 1 2 7 G
0.551 1.086 1.077 1.222 1.181
-1.8 -1.8 -1.8 -1.0 -1.6 l.-'4.039 1.19 1.008 1.171 1.23 1.108 1.105 p.547
-6. -7.1 -2.S 1.0 -0.2 -2.7 2 0-
- 0. 977 1. 241 1. 130 1.271 1.149 0.95 1.186 1.306 1.16 G299 1. 026
-1.8 -1.8 -0.6 0.1 -4.2 -6. -1.1 2.8 2.7 3.0 0'.517 0.674 1.055 1.034 1.149 1. 183 0.97 1.280 1.177 1 p3 1. 052 0. 674 30 30 18 1.3 -4 -1. 3.8 3 ' 2. 2.6 3.1 1.053 1. 300 1.13 0. 92 1. 164 1 330 1 06 0. 515 2.7 2.9 2 8 ~ 3. 5. 6.2 5.3 2.2
- 0. 670 1. 023 1. 08 l. 068 p,7p 2.6 2.8 2~
- 1. 3.7 149 7~3 7.
- 0. 55 0 55 p 573 2~
+ F N
1.7
%Difference between measured and predicted i I I I I I I I 2 3 4 5 7 9 10 11 12 90' FIGURE 2 47 ~ I T
Startup Cycle 7 May 21, 1977 Core Condition Boron Worth Boron End oint Isotherm Temp. Coefficient**
Predicted Measured* Predicted Measured*
(ppm) (ppm) (pcm 'F) pcm 'F ARO -115 1382 1400 -3.4 3 ~ 23 D bank in -114 1296, 1321 -5. 0 -5.2 DSC bank in -114 1177 1207 -7.8 -8.25 Control Rod Bank Worth Bank Predicted Worth (%kg) Measured* (%Q) Measured (%hP)
Bank Cumulative Bank Cumulative Bank Cumulative
/ D 0. 754 0. 7'54 0.666 0.666 0. 711 0.711 DSC 1.047 1.801 0. 991 1.657 0.979 1.690
- indicates measurements done with control rod L8 operating as a D bank rod and rod K7 operating as an A bank rod.
- Doppler Coefficient is +1.9 pcm/'F
0
~
f t D ~ 'tl IL ,l ~ ~
IP