ML18191A246: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML18191A246
| number = ML18191A246
| issue date = 09/26/1977
| issue date = 09/26/1977
| title = GE Report Nedo 24010-0 Technical Basis for the Use of the Square Root for the Sum of Squares (Srss) Method for Combining Dynamic Loads on Mark Ii Plants - July 1977
| title = GE Report Nedo 24010-0 Technical Basis for the Use of the Square Root for the Sum of Squares (Srss) Method for Combining Dynamic Loads on Mark II Plants - July 1977
| author name = Sobon L J
| author name = Sobon L
| author affiliation = General Electric Co
| author affiliation = General Electric Co
| addressee name = Parr O
| addressee name = Parr O
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:~M~STA.';Tii&D DISTRIBUTION FO COMING MATERIAL RELATING TO>XI CONTAINMENT NRC FORM 195 U~NUCLEAR REGULATORY COMMISSION I2 78)NRC DISTRIBUTION FoR PART 60 DOCKET MATERIAL COCKET NUM 8ER 3%8%ilNSKK TOP ICAL REPORT Mr.Olan Parr General Electric San Jose, California 95125 L.J.Sobon OATE OF OOCUMENT 09/26/7?OATE RECEIVEO 09/29/77 gK,ETTE R QORIGINAI gfCCP V GNOTORIZEO HVNCLASSIFIEO PROP INPUT FORM NUM8ER OF COPIES RECEIVEO OESCRIPTION 1p ENCLOSURE Consists of GE Report NEDO-24010 entitled: "Technical Basis For The Use Of The Square Root Of The Sum Of Squares (SRSS)IIetho For Combining Dyamic Loads On Nark II Plants"'td.July, 1977 , LETTERS OF INCORPORATXON WILL BE PLACED XN EACH DOCKET LISTED BELOWo NOTE CYS WILL BE PLACED IN'HE LPDR FOR THE FOLLOWING:
{{#Wiki_filter:~
ZIKKR 50 358 NINE MlLE POINT 50-410 LIMERICK 50-352 353 WPP S-2 BAILLY 50-367 SHORE HAM~$0-342 LA SALLE 50-373/374 5/BR jcm 09/30/77 FOR ACTION/INFORMATION CENTRAL FILES 2 W NRC PDR s o eac INTERNAL OISTRI BUTION LETTER ONLY Ro DEYOUNG LPDR~S 7)Se Note o e NSIC ACRS 6 Xo SIINELL 2 Go LAINAS 7 Jo KNIGHT 2 Co ANDERSON Io PELTIER Ro BIRKEL LYNCH MD Jo SNELL Ao BOURNIA Wo IGQIE S~MINER Do VASSALLO Ko KNIEL Oo PARR Jo Ro TEDESCO M RUSHBROOK Wo PIKE So VARGA EXTERNAL DISTRIBUTION CONTROL NUMBER~/Z  
M   ~
STA.';Tii&D DISTRIBUTION FO       COMING MATERIAL RELATING TO >             XI CONTAINMENT U~ NUCLEAR   REGULATORY   COMMISSION COCKET NUM8ER NRC FORM 195 I2 78) 3%8%ilNSKK NRC DISTRIBUTION FoR PART 60 DOCKET MATERIAL                                     TOP ICAL REPORT OATE OF OOCUMENT Mr. Olan Parr                                 General Electric                       09/26/7?
San Jose, California         95125 OATE RECEIVEO L. J. Sobon                           09/29/77 GNOTORIZEO           PROP                   INPUT FORM           NUM8ER OF COPIES RECEIVEO gK,ETTE R QORIGINAI              HVNCLASSIFIEO gfCCP V OESCRIPTION                                                   ENCLOSURE Consists of GE Report NEDO-24010 entitled: "Technical Basis For The Use Of The Square Root Of The Sum Of Squares (SRSS) IIetho For Combining Dyamic Loads On Nark II Plants" 1p
                                                                'td. July,   1977 ,
5/BR LETTERS OF INCORPORATXON WILL BE PLACED XN EACH DOCKET LISTED BELOWo NOTE     CYS WILL BE PLACED     IN'HE   LPDR FOR THE FOLLOWING:
ZIKKR         50 358   NINE MlLE POINT     50-410 LIMERICK 50-352 353                                         jcm 09/30/77 WPP S-2 BAILLY       50-367 SHORE HAM   ~
                      $ 0-342 LA SALLE     50-373/374 FOR ACTION/INFORMATION INTERNAL OISTRI BUTION CENTRAL FILES       2 W     s   o eac                     LETTER ONLY NRC PDR                                                        Ro DEYOUNG LPDR~S     7)   Se   Note   o e                               Do VASSALLO Ko KNIEL NSIC                                                           Oo PARR ACRS     6                                                     Jo Xo SIINELL       2                                           Ro TEDESCO Go LAINAS         7                                           M  RUSHBROOK Jo KNIGHT         2                                           Wo  PIKE Co ANDERSON                                                   So VARGA Io PELTIER Ro BIRKEL LYNCH MD Jo SNELL Ao BOURNIA Wo IGQIE S~ MINER EXTERNAL DISTRIBUTION                                         CONTROL NUMBER
                                                                                                              ~/Z


ggPPj[gj)t~,('I]
ggPPj[gj)t~,('I] ~~i~(gil II'IIIII'ENERAL
~~i~(gil II'IIIII'ENERAL
                                  '' ELECTRIC                               NUCLEAR ENERGY SYSTEMS DIVISION GENERAL ELECTRIC COMPANY, 175 CURTNER AVE. SAN JOSE, CALIFORNIA 95125
''ELECTRIC NUCLEAR ENERGY GENERAL ELECTRIC COMPANY, 175 CURTNER AVE.~SAN JOSE, CALIFORNIA 95125 MC 681, (408)925-3495 SYSTEMS DIVISION BWR PROJECTS DEPARTMENT Mar-,,364=.7$
                                          ~
September 26, 1977 Office of Nuclear Regulation U.S Nuclear Regulatory Commission Washington, D.C.20555 Attention:
BWR PROJECTS                DEPARTMENT MC   681, (408) 925-3495                                             Mar-,,364=.7$
Olan Parr, Chief Light Water Reactor Branch 3 Division of Project Management
September   26, 1977 Office of Nuclear Regulation U.S   Nuclear Regulatory Commission Washington, D.C.       20555 Attention:   Olan Parr, Chief Light Water Reactor Branch   3 Division of Project   Management


==SUBJECT:==
==SUBJECT:==
GE REPORT NEDO 24010-"TECHNICAL BASIS FOR THE USE OF THE SQUARE ROOT OF THE SUM OF SQUARES (SRSS)METHOD FOR COMBINING DYNAMIC LOADS ON MARK II PLANTS"-JULY, 1977  
GE REPORT NEDO 24010   - "TECHNICAL BASIS FOR THE USE OF THE SQUARE ROOT OF THE SUM OF SQUARES     (SRSS) METHOD FOR COMBINING DYNAMIC LOADS ON MARK   II PLANTS" - JULY, 1977


==Reference:==
==Reference:==
 
Letter, L. J. Sobon to   Olan Parr, dated August 1, 1977 transmitting GE report   NEDE 24010-P - TECHNICAL BASIS FOR USE OF THE SQUARE ROOT OF THE SUM OF SQUARES (SRSS) METHOD FOR COMBINING DYNAMIC LOADS ON MARK     II   PLANTS - JULY, 1977.
Letter, L.J.Sobon to Olan Parr, dated August 1, 1977 transmitting GE report NEDE 24010-P-TECHNICAL BASIS FOR USE OF THE SQUARE ROOT OF THE SUM OF SQUARES (SRSS)METHOD FOR COMBINING DYNAMIC LOADS ON MARK II PLANTS-JULY, 1977.Seventy copies of the subject report are being provided by general Electric for the Mark II Owners Group as part of the Mark II Containment Program.This is the non proprietary version of GE Report NEDE 24010-P transmitted by the above reference.
Seventy copies of the subject report are being provided by general Electric for the Mark II Owners Group as part of the Mark II Containment Program.
Any questions regarding this final report should be directed to K.G.Hazifotis, Containment Licensing Engineer, (408)925-2209.Sincerel L.J.Sobon, Manager BWR Containment Licensing Containment Improvement Programs LJS:KGH:bjd
This is the non proprietary version of GE Report NEDE 24010-P transmitted by the above   reference.
Any questions regarding this   final report   should be directed to K.G.                     Hazifotis, Containment Licensing Engineer,     (408) 925-2209.
Sincerel L. J. Sobon, Manager BWR Containment Licensing Containment Improvement Programs LJS:KGH:bjd


==Enclosures:==
==Enclosures:==
70 cc: R. S. Boyd      (NRC)                                  C.J. Anderson                    (NRC)
H. C. Brinkmann (Mark  II Owners  Group)          J.C. Guibert                    (NRC)
R. C. DeYoung (NRC)~
L. S. Gifford (GE-Bethesda)
F. Miner (NRC)
R. L. Tedesco (NRC)
J. P. Knight    (NRC)


70 cc: R.S.Boyd (NRC)H.C.Brinkmann (Mark II Owners Group)R.C.DeYoung (NRC)~L.S.Gifford (GE-Bethesda)
'I 0}}
F.Miner (NRC)R.L.Tedesco (NRC)J.P.Knight (NRC)C.J.Anderson (NRC)J.C.Guibert (NRC) 0'I}}

Latest revision as of 21:56, 20 October 2019

GE Report Nedo 24010-0 Technical Basis for the Use of the Square Root for the Sum of Squares (Srss) Method for Combining Dynamic Loads on Mark II Plants - July 1977
ML18191A246
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/26/1977
From: Sobon L
General Electric Co
To: Parr O
Office of Nuclear Reactor Regulation
References
MFN-364-77, NEDO 24010
Download: ML18191A246 (4)


Text

~

M ~

STA.';Tii&D DISTRIBUTION FO COMING MATERIAL RELATING TO > XI CONTAINMENT U~ NUCLEAR REGULATORY COMMISSION COCKET NUM8ER NRC FORM 195 I2 78) 3%8%ilNSKK NRC DISTRIBUTION FoR PART 60 DOCKET MATERIAL TOP ICAL REPORT OATE OF OOCUMENT Mr. Olan Parr General Electric 09/26/7?

San Jose, California 95125 OATE RECEIVEO L. J. Sobon 09/29/77 GNOTORIZEO PROP INPUT FORM NUM8ER OF COPIES RECEIVEO gK,ETTE R QORIGINAI HVNCLASSIFIEO gfCCP V OESCRIPTION ENCLOSURE Consists of GE Report NEDO-24010 entitled: "Technical Basis For The Use Of The Square Root Of The Sum Of Squares (SRSS) IIetho For Combining Dyamic Loads On Nark II Plants" 1p

'td. July, 1977 ,

5/BR LETTERS OF INCORPORATXON WILL BE PLACED XN EACH DOCKET LISTED BELOWo NOTE CYS WILL BE PLACED IN'HE LPDR FOR THE FOLLOWING:

ZIKKR 50 358 NINE MlLE POINT 50-410 LIMERICK 50-352 353 jcm 09/30/77 WPP S-2 BAILLY 50-367 SHORE HAM ~

$ 0-342 LA SALLE 50-373/374 FOR ACTION/INFORMATION INTERNAL OISTRI BUTION CENTRAL FILES 2 W s o eac LETTER ONLY NRC PDR Ro DEYOUNG LPDR~S 7) Se Note o e Do VASSALLO Ko KNIEL NSIC Oo PARR ACRS 6 Jo Xo SIINELL 2 Ro TEDESCO Go LAINAS 7 M RUSHBROOK Jo KNIGHT 2 Wo PIKE Co ANDERSON So VARGA Io PELTIER Ro BIRKEL LYNCH MD Jo SNELL Ao BOURNIA Wo IGQIE S~ MINER EXTERNAL DISTRIBUTION CONTROL NUMBER

~/Z

ggPPj[gj)t~,('I] ~~i~(gil II'IIIII'ENERAL

ELECTRIC NUCLEAR ENERGY SYSTEMS DIVISION GENERAL ELECTRIC COMPANY, 175 CURTNER AVE. SAN JOSE, CALIFORNIA 95125

~

BWR PROJECTS DEPARTMENT MC 681, (408) 925-3495 Mar-,,364=.7$

September 26, 1977 Office of Nuclear Regulation U.S Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Olan Parr, Chief Light Water Reactor Branch 3 Division of Project Management

SUBJECT:

GE REPORT NEDO 24010 - "TECHNICAL BASIS FOR THE USE OF THE SQUARE ROOT OF THE SUM OF SQUARES (SRSS) METHOD FOR COMBINING DYNAMIC LOADS ON MARK II PLANTS" - JULY, 1977

Reference:

Letter, L. J. Sobon to Olan Parr, dated August 1, 1977 transmitting GE report NEDE 24010-P - TECHNICAL BASIS FOR USE OF THE SQUARE ROOT OF THE SUM OF SQUARES (SRSS) METHOD FOR COMBINING DYNAMIC LOADS ON MARK II PLANTS - JULY, 1977.

Seventy copies of the subject report are being provided by general Electric for the Mark II Owners Group as part of the Mark II Containment Program.

This is the non proprietary version of GE Report NEDE 24010-P transmitted by the above reference.

Any questions regarding this final report should be directed to K.G. Hazifotis, Containment Licensing Engineer, (408) 925-2209.

Sincerel L. J. Sobon, Manager BWR Containment Licensing Containment Improvement Programs LJS:KGH:bjd

Enclosures:

70 cc: R. S. Boyd (NRC) C.J. Anderson (NRC)

H. C. Brinkmann (Mark II Owners Group) J.C. Guibert (NRC)

R. C. DeYoung (NRC)~

L. S. Gifford (GE-Bethesda)

F. Miner (NRC)

R. L. Tedesco (NRC)

J. P. Knight (NRC)

'I 0