|
|
(3 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML18198A217 | | | number = ML18198A217 |
| | issue date = 07/16/2018 | | | issue date = 07/16/2018 |
| | title = River Bend Station - NRC Initial Operator Licensing Examination Approval 05000458/2018301 | | | title = NRC Initial Operator Licensing Examination Approval 05000458/2018301 |
| | author name = Gaddy V G | | | author name = Gaddy V |
| | author affiliation = NRC/RGN-IV/DRS/OB | | | author affiliation = NRC/RGN-IV/DRS/OB |
| | addressee name = Maguire W F | | | addressee name = Maguire W |
| | addressee affiliation = Entergy Operations, Inc | | | addressee affiliation = Entergy Operations, Inc |
| | docket = 05000458 | | | docket = 05000458 |
| | license number = NPF-047 | | | license number = NPF-047 |
| | contact person = Gaddy V G | | | contact person = Gaddy V |
| | document report number = ER 2018301 | | | document report number = ER 2018301 |
| | document type = Letter, License-Operator, Part 55 Examination Related Material | | | document type = Letter, License-Operator, Part 55 Examination Related Material |
| | page count = 4 | | | page count = 4 |
| }} | | }} |
| See also: [[followed by::IR 05000458/2018301]] | | See also: [[see also::IR 05000458/2018301]] |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter: | | {{#Wiki_filter:July 16, 2018 |
| | William F. Maguire, Site Vice President |
| | Entergy Operations, Inc. |
| | River Bend Station |
| | 5485 US Highway 61N |
| | St. Francisville, LA 70775 |
| | SUBJECT: RIVER BEND STATION - NRC INITIAL OPERATOR LICENSING |
| | EXAMINATION APPROVAL 05000458/2018301 |
| | Dear Mr. Maguire, |
| | The purpose of this letter is to confirm the final arrangements for the upcoming operator |
| | licensing examinations at Arkansas Nuclear One, Unit 1. |
| | The U.S. Nuclear Regulatory Commission (NRC) has approved the subject examinations, and |
| | you may administer the written examination on August 3, 2018, in accordance with Revision 11 |
| | of NUREG-1021. The NRC staff will administer the operating tests during the week of July 23, |
| | 2018. The list of applicants approved to take the examination has been provided to Kevin |
| | Stupak, Manager - Training. The examination has undergone extensive review by my staff and |
| | representatives responsible for licensed operator training at your facility. Based on this review, I |
| | have concluded that the examination meets the guidelines of NUREG-1021 for content, |
| | operational, and discrimination validity. By administering this examination, you also agree that it |
| | meets NUREG-1021 guidelines and is appropriate for measuring the qualifications of licensed |
| | operator applicants at your facility. If you determine that this examination is not appropriate for |
| | licensing operators at your facility, do not administer the examination and contact me at |
| | 817-200-1159. |
| | |
| | W. Maguire 2 |
| | Please contact your Chief Examiner, Thomas Farina, at 817-200-1117, if you have any |
| | questions or identify any errors or changes in the license level (RO or SRO) or type of |
| | examination (partial or complete written examination and/or operating test) specified for each |
| | applicant. |
| | Sincerely, |
| | /RA/ |
| | Vincent G. Gaddy, Chief |
| | Operations Branch |
| | Division of Reactor Safety |
| | Docket No. 55-458 |
| | License No. NPF-47 |
| | Enclosure: |
| | ES-201-4 |
| | cc w/enclosure: |
| | G. Kimich, Initial Exam Lead |
| | Entergy Operations, Inc. |
| | River Bend Station |
| | 5485 US Highway 61N |
| | St. Francisville, LA 70775 |
| | cc w/o enclosure: |
| | Distribution via ListServ for River Bend Station |
| | |
| | W. Maguire 3 |
| | Letter to William F. Maguire from Vincent G. Gaddy, dated July 16, 2018 |
| | SUBJECT: RIVER BEND STATION - NRC INITIAL OPERATOR LICENSING EXAMINATION |
| | APPROVAL 05000458/2018301 |
| | DISTRIBUTION: |
| | Regional Administrator (Kriss.Kennedy@nrc.gov) |
| | Deputy Regional Administrator (Scott.Morris@nrc.gov) |
| | DRP Director (Anton.Vegel@nrc.gov) |
| | DRS Director (Mark.Shaffer@nrc.gov) |
| | DRS Deputy Director (Jeff.Clark@nrc.gov) |
| | DRP Deputy Director (Ryan.Lantz@nrc.gov) |
| | Regional Counsel (David.Cylkowski@nrc.gov) |
| | RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov) |
| | Public Affairs Officer (Victor.Dricks@nrc.gov) |
| | Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov) |
| | Project Manager (Lisa.Regner@nrc.gov) |
| | RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) |
| | RIV RSLO (Bill.Maier@nrc.gov) |
| | Acting Team Lead, DRS/IPAT (Gerond.George@nrc.gov) |
| | Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov) |
| | RITS Coordinator (Marisa.Herrera@nrc.gov) |
| | ACES (R4Enforcement.Resource@nrc.gov) |
| | Branch Chief, DRP/C (Jason.Kozal@nrc.gov) |
| | Senior Project Engineer (Cale.Young@nrc.gov) |
| | Project Engineer (Timothy.DeBey@nrc.gov) |
| | Senior Resident Inspector (Jeffrey.Sowa@nrc.gov) |
| | Resident Inspector (Brian.Parks@nrc.gov) |
| | RBS Administrative Assistant (Lisa.Day@nrc.gov) |
| | Branch Chief, DRS/OB (Vincent.Gaddy@nrc.gov) |
| | |
| | |
| | ML18198A217 |
| | SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: |
| | By: J. Bridges Yes No Publicly Available Sensitive NRR-079 |
| | OFFICE RIV:OB:LA SOE: OB C:OB |
| | NAME JBridges TFarina VGaddy |
| | SIGNATURE /RA/ /RA/ /RA/ |
| | DATE 7/13/2018 7/13/2018 7/16/2018 |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARIR 05000458/20240102024-10-31031 October 2024 Design Basis Assurance Inspection (Programs) Inspection Report 05000458/2024010 RBG-48315, Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 Supplement2024-09-24024 September 2024 Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 Supplement RBG-48306, Report of Changes and Errors to 10CFR50.462024-09-24024 September 2024 Report of Changes and Errors to 10CFR50.46 ML24263A2712024-09-19019 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24255A1192024-09-16016 September 2024 Notification of NRC Follow Up Inspection for One Severity Level (SL) III and Two SL IV or Three or More SL IV Violations and Request for Additional Information RBG-48311, Reply to a Notice of Violation, NRC Inspection Report 05000458/20240022024-08-28028 August 2024 Reply to a Notice of Violation, NRC Inspection Report 05000458/2024002 IR 05000458/20240052024-08-22022 August 2024 Updated Inspection Plan for River Bend Station (Report 05000458/2024005) ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 ML24214A2752024-08-0202 August 2024 Acknowledgement of Readiness for Supplemental Inspection RBG-48308, Notification of Readiness for Supplemental Inspection2024-07-31031 July 2024 Notification of Readiness for Supplemental Inspection ML24205A0392024-07-30030 July 2024 Integrated Inspection Report 05000458/2024002 and Notice of Violation IR 05000458/20240022024-07-30030 July 2024 Integrated Inspection Report 05000458/2024002 and Notice of Violation ML24164A0862024-06-12012 June 2024 Notification of Commercial Grade Dedication Inspection (05000458/2024010) and Request for Information 05000458/LER-2023-005-01, Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String2024-06-0404 June 2024 Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 ML24081A0072024-05-16016 May 2024 Issuance of Amendment No. 213 Revision to Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b ML24093A0892024-05-16016 May 2024 Issuance of Amendment No. 214 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors IR 05000458/20240012024-05-14014 May 2024 Integrated Inspection Report 05000458/2024001 ML24102A2842024-05-0707 May 2024 Summary of Regulatory Audit in Support of LARs to Revise Technical Specifications to Adopt Risk-Informed Completion Times and Implement the Provisions of 10 CFR 50.69 ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions RBG-48276, 2023 Annual Radioactive Effluent Release Report2024-04-23023 April 2024 2023 Annual Radioactive Effluent Release Report RBG-48288, Louisiana Pollutant Discharge Elimination System Permit Renewal2024-04-15015 April 2024 Louisiana Pollutant Discharge Elimination System Permit Renewal IR 05000458/20244022024-04-15015 April 2024 Security Baseline Inspection Report 05000458/2024402 (Full Report) ML24106A0432024-04-11011 April 2024 June 2024 Emergency Preparedness Exercise Inspection Request for Information RBG-48277, 2023 Annual Radiological Environmental Operating Report2024-04-10010 April 2024 2023 Annual Radiological Environmental Operating Report ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair IR 05000458/20243012024-04-0202 April 2024 Notification of NRC Initial Operator Licensing Examination 05000458/2024301 ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) IR 05000458/20240402024-03-15015 March 2024 – 95001 Supplemental Inspection Report 05000458/2024040 and Follow-Up Assessment ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24066A1802024-03-0707 March 2024 Notification of NRC Follow-Up Inspection for Any Severity Level I or II Traditional Enforcement Violation IR 05000458/20230062024-02-28028 February 2024 Annual Assessment Letter for River Bend Station - Report 05000458/2023006 RBG-48286, Revision to Owners Activity Report Form (OAR) for Cycle 222024-02-27027 February 2024 Revision to Owners Activity Report Form (OAR) for Cycle 22 RBG-48278, 2023 Spent Fuel Storage Radioactive Effluent Release Report2024-02-27027 February 2024 2023 Spent Fuel Storage Radioactive Effluent Release Report ML24031A0042024-02-21021 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0052 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) RBG-48274, Notification of Readiness for Supplemental Inspection2024-02-0505 February 2024 Notification of Readiness for Supplemental Inspection IR 05000458/20230042024-01-30030 January 2024 Integrated Inspection Report 05000458/2023004 IR 05000458/20230402024-01-18018 January 2024 – 95001 Supplemental Inspection Supplemental Report 05000458/2023040 and Follow-Up Assessment Letter RBG-48271, Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk2024-01-12012 January 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 – Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML24011A1742024-01-11011 January 2024 Security Baseline Inspection Report (Cover Letter) ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment IR 05000458/20230102023-12-12012 December 2023 Biennial Problem Identification and Resolution Inspection Report 05000458/2023010 RBG-48267, Reply to a Notice of Violation, NRC Inspection Report 05000458/20230032023-12-0707 December 2023 Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation 2024-09-24
[Table view] Category:License-Operator
MONTHYEARIR 05000458/20243012024-04-0202 April 2024 Notification of NRC Initial Operator Licensing Examination 05000458/2024301 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23031A0132023-02-14014 February 2023 Examination Confirmation Letter No. 50-186/OL-23-01, University of Missouri-Columbia ML22354A2582022-12-15015 December 2022 10_RBS-2022-12 Post-Exam Comments ML23004A1922022-12-14014 December 2022 11_RBS-2022-12 Public Forms ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21320A3692021-11-30030 November 2021 Notification of NRC Initial Operator Licensing Examination 05000458/2022301 2CAN042102, 10 AN2-2021-03 Post-Exam Comments2021-04-16016 April 2021 10_AN2-2021-03 Post-Exam Comments ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21096A0212021-02-19019 February 2021 RB-2021-02 Draft Operating Test Comments ML21111A1472021-02-19019 February 2021 RB-2021-02 Public Forms ML21096A0282021-02-19019 February 2021 RB-2021-02 Final Written Exam ML21096A0272021-02-19019 February 2021 RB-2021-02 Final Outlines ML21095A0532021-02-19019 February 2021 RB-2021-02 Final Op Test ML21096A0262021-02-19019 February 2021 RB-2021-02 Draft Written Exam ML21096A0322021-02-19019 February 2021 RB-2021-02 Post Exam Comments ML21096A0252021-02-19019 February 2021 RB-2021-02 Draft Written Exam Comments ML21096A0232021-02-19019 February 2021 RB-2021-02 Draft Outline Comments ML21096A0242021-02-19019 February 2021 RB-2021-02 Draft Outlines ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20015A4712019-11-26026 November 2019 2019-11-Public Forms ML20006C6592019-11-26026 November 2019 2019-11-Post Exam Comments ML19312B5852019-11-0808 November 2019 NRC Initial Operator Licensing Examination Approval 05000458/2019301 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML18340A0892018-12-0606 December 2018 Notification of NRC Initial Operator Licensing Examination 05000458/2019301 ML18198A2172018-07-16016 July 2018 NRC Initial Operator Licensing Examination Approval 05000458/2018301 ML18135A0672018-05-14014 May 2018 Response to Regulatory Issue Summary 2018-02 ML18086B0842018-02-16016 February 2018 Facility Cover Letter - Riv - March 2018 - GFE ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17361A0422017-12-26026 December 2017 Notification of NRC Initial Operator Licensing Examination 05000458/2018301 ML17048A3562017-02-17017 February 2017 Generic Fundamentals Examination Results ML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 ML16280A4602016-09-30030 September 2016 2016-09 Draft Outlines ML16285A0172016-09-30030 September 2016 2016-09 Public Forms ML16280A4652016-09-30030 September 2016 2016-09 Final Outlines ML16280A4642016-09-30030 September 2016 2016-09 Draft Written Exam ML16280A4492016-09-30030 September 2016 2016-09-Written Handouts Package ML16280A4352016-09-30030 September 2016 2016-09 Final Written Exam ML16280A4622016-09-30030 September 2016 2016-09 Draft Written Comments ML16280A4592016-09-30030 September 2016 2016-09 Draft Outline Comments ML16280A4562016-09-30030 September 2016 2016-09 Draft Op Test ML16280A4532016-09-30030 September 2016 2016-09 Draft Op Test Comments ML16280A4372016-09-12012 September 2016 2016-09 Final Op Test ML16246A0012016-09-0101 September 2016 NRC Initial Operator Licensing Examination Approval 05000458/2016301 ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML15180A0512015-06-29029 June 2015 Generic Fundamentals Examination Results June 2015 ML16043A0022015-06-19019 June 2015 May 2015 Draft Written Initial License Retake Exam, Reactor Operator ML16043A0012015-06-19019 June 2015 2015-05-DRAFT Outline ML16043A0002015-06-19019 June 2015 2015-05 - Draft Outline Comments 2024-04-02
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000458/20243012024-04-0202 April 2024 Notification of NRC Initial Operator Licensing Examination 05000458/2024301 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23031A0132023-02-14014 February 2023 Examination Confirmation Letter No. 50-186/OL-23-01, University of Missouri-Columbia ML22354A2582022-12-15015 December 2022 10_RBS-2022-12 Post-Exam Comments ML23004A1922022-12-14014 December 2022 11_RBS-2022-12 Public Forms ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21320A3692021-11-30030 November 2021 Notification of NRC Initial Operator Licensing Examination 05000458/2022301 ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations 2CAN042102, 10 AN2-2021-03 Post-Exam Comments2021-04-16016 April 2021 10_AN2-2021-03 Post-Exam Comments ML21095A0532021-02-19019 February 2021 RB-2021-02 Final Op Test ML21096A0232021-02-19019 February 2021 RB-2021-02 Draft Outline Comments ML21096A0282021-02-19019 February 2021 RB-2021-02 Final Written Exam ML21096A0272021-02-19019 February 2021 RB-2021-02 Final Outlines ML21111A1472021-02-19019 February 2021 RB-2021-02 Public Forms ML21096A0322021-02-19019 February 2021 RB-2021-02 Post Exam Comments ML21096A0252021-02-19019 February 2021 RB-2021-02 Draft Written Exam Comments ML21096A0262021-02-19019 February 2021 RB-2021-02 Draft Written Exam ML21096A0242021-02-19019 February 2021 RB-2021-02 Draft Outlines ML21096A0212021-02-19019 February 2021 RB-2021-02 Draft Operating Test Comments ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20015A4712019-11-26026 November 2019 2019-11-Public Forms ML20006C6592019-11-26026 November 2019 2019-11-Post Exam Comments ML19312B5852019-11-0808 November 2019 NRC Initial Operator Licensing Examination Approval 05000458/2019301 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML18340A0892018-12-0606 December 2018 Notification of NRC Initial Operator Licensing Examination 05000458/2019301 ML18198A2172018-07-16016 July 2018 NRC Initial Operator Licensing Examination Approval 05000458/2018301 ML18135A0672018-05-14014 May 2018 Response to Regulatory Issue Summary 2018-02 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17361A0422017-12-26026 December 2017 Notification of NRC Initial Operator Licensing Examination 05000458/2018301 ML17048A3562017-02-17017 February 2017 Generic Fundamentals Examination Results ML16280A4532016-09-30030 September 2016 2016-09 Draft Op Test Comments ML16280A4652016-09-30030 September 2016 2016-09 Final Outlines ML16285A0172016-09-30030 September 2016 2016-09 Public Forms ML16280A4492016-09-30030 September 2016 2016-09-Written Handouts Package ML16280A4352016-09-30030 September 2016 2016-09 Final Written Exam ML16280A4562016-09-30030 September 2016 2016-09 Draft Op Test ML16280A4592016-09-30030 September 2016 2016-09 Draft Outline Comments ML16280A4602016-09-30030 September 2016 2016-09 Draft Outlines ML16280A4642016-09-30030 September 2016 2016-09 Draft Written Exam ML16280A4622016-09-30030 September 2016 2016-09 Draft Written Comments ML16280A4372016-09-12012 September 2016 2016-09 Final Op Test ML16246A0012016-09-0101 September 2016 NRC Initial Operator Licensing Examination Approval 05000458/2016301 ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML15180A0512015-06-29029 June 2015 Generic Fundamentals Examination Results June 2015 ML15220A1382015-06-19019 June 2015 2015-05-POST-EXAM Comments Analysis ML15220A1392015-06-19019 June 2015 June 2015 Initial License Retake Exam, Reactor Operator, with Answer Key ML16043A0002015-06-19019 June 2015 2015-05 - Draft Outline Comments ML16043A0012015-06-19019 June 2015 2015-05-DRAFT Outline ML16043A0022015-06-19019 June 2015 May 2015 Draft Written Initial License Retake Exam, Reactor Operator ML16043A0032015-06-19019 June 2015 2015-05 - Final Outline 2024-04-02
[Table view] |
See also: IR 05000458/2018301
Text
July 16, 2018
William F. Maguire, Site Vice President
Entergy Operations, Inc.
River Bend Station
5485 US Highway 61N
St. Francisville, LA 70775
SUBJECT: RIVER BEND STATION - NRC INITIAL OPERATOR LICENSING
EXAMINATION APPROVAL 05000458/2018301
Dear Mr. Maguire,
The purpose of this letter is to confirm the final arrangements for the upcoming operator
licensing examinations at Arkansas Nuclear One, Unit 1.
The U.S. Nuclear Regulatory Commission (NRC) has approved the subject examinations, and
you may administer the written examination on August 3, 2018, in accordance with Revision 11
of NUREG-1021. The NRC staff will administer the operating tests during the week of July 23,
2018. The list of applicants approved to take the examination has been provided to Kevin
Stupak, Manager - Training. The examination has undergone extensive review by my staff and
representatives responsible for licensed operator training at your facility. Based on this review, I
have concluded that the examination meets the guidelines of NUREG-1021 for content,
operational, and discrimination validity. By administering this examination, you also agree that it
meets NUREG-1021 guidelines and is appropriate for measuring the qualifications of licensed
operator applicants at your facility. If you determine that this examination is not appropriate for
licensing operators at your facility, do not administer the examination and contact me at
817-200-1159.
W. Maguire 2
Please contact your Chief Examiner, Thomas Farina, at 817-200-1117, if you have any
questions or identify any errors or changes in the license level (RO or SRO) or type of
examination (partial or complete written examination and/or operating test) specified for each
applicant.
Sincerely,
/RA/
Vincent G. Gaddy, Chief
Operations Branch
Division of Reactor Safety
Docket No. 55-458
License No. NPF-47
Enclosure:
ES-201-4
cc w/enclosure:
G. Kimich, Initial Exam Lead
Entergy Operations, Inc.
River Bend Station
5485 US Highway 61N
St. Francisville, LA 70775
cc w/o enclosure:
Distribution via ListServ for River Bend Station
W. Maguire 3
Letter to William F. Maguire from Vincent G. Gaddy, dated July 16, 2018
SUBJECT: RIVER BEND STATION - NRC INITIAL OPERATOR LICENSING EXAMINATION
APPROVAL 05000458/2018301
DISTRIBUTION:
Regional Administrator (Kriss.Kennedy@nrc.gov)
Deputy Regional Administrator (Scott.Morris@nrc.gov)
DRP Director (Anton.Vegel@nrc.gov)
DRS Director (Mark.Shaffer@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
Regional Counsel (David.Cylkowski@nrc.gov)
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Project Manager (Lisa.Regner@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)
Acting Team Lead, DRS/IPAT (Gerond.George@nrc.gov)
Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Branch Chief, DRP/C (Jason.Kozal@nrc.gov)
Senior Project Engineer (Cale.Young@nrc.gov)
Project Engineer (Timothy.DeBey@nrc.gov)
Senior Resident Inspector (Jeffrey.Sowa@nrc.gov)
Resident Inspector (Brian.Parks@nrc.gov)
RBS Administrative Assistant (Lisa.Day@nrc.gov)
Branch Chief, DRS/OB (Vincent.Gaddy@nrc.gov)
ML18198A217
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: J. Bridges Yes No Publicly Available Sensitive NRR-079
OFFICE RIV:OB:LA SOE: OB C:OB
NAME JBridges TFarina VGaddy
SIGNATURE /RA/ /RA/ /RA/
DATE 7/13/2018 7/13/2018 7/16/2018