{{#Wiki_filter:August 16, 2018 ATTN: Document Control Desk Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards U.S Nuclear Regulatory Commission Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-026, 50-301 and 72-005 License Nos. DPR-24 and DPR-27 Registration of NUHOMS-32PT Casks WNHOMS-32-045, WNHOMS-32-047, and WNHOMS-32-049 NEXT era POINT BEACH NRC 2018-0039 10 CFR 72.212 In accordance with the requirements of 10 CFR 72.212(b)(2), NextEra Energy Point Beach, LLC, is providing the enclosed information to register the use of three approved spent fuel storage casks at the Point Beach Nuclear Plant (PBNP) Independent Spent Fuel Storage Installation (ISFSI). This letter contains no new commitments and no rev i sions to existing commitments.
{{#Wiki_filter:NEXTera ENERGY ~
Sincerely, NextEra Energy Point Beach , LLC Eric Schultz Licensing Manager Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant , USNRC Resident Inspector , Point Beach Nuclear Plant, USNRC PSCW NextEra Energy Point Beach , LLC 6610 Nuclear Roa d, Two Rivers , WI 54241 ENCLOSURE REGISTRATION OF NUHOMS-32PT CASKS WNHOMS-32-045, WNHOMS-32-047, and WNHOMS-32-049 Licensee's Name: Licensee's Address: Reactor License Nos.: Reactor Docket Nos.: ISFSI Docket No.: Cask Certificate No.: Cask Model No.: Contact: Cask Identification Number WNHOMS-32-045 WNHOMS-32-047 WNHOMS-32-049 CASK REGISTRATION INFORMATION NextEra Energy Point Beach , LLC 6610 Nuclear Road Two Rivers, WI 54241 DPR-24 and DPR-27 50-266 and 50-301 72-005 1004 , Amendment 14 NUHOMS-32PT Mr. Brian Smith Project Manager 920/755-7344 Horizontal Dry Shielded Storage Canister Module Number Number WHSM-029 WDSC-32-032 WHSM-031 WDSC-32-033 WHSM-033 WDSC-32-034 Dry Shielded Canister Heat Load 17.263 kW 18.677 kW 19.65 kW Date Placed in Service July 18 , 2018 July 25 , 2018 August 0 1, 2 018}}
POINT BEACH August 16, 2018                                                                   NRC 2018-0039 10 CFR 72.212 ATTN: Document Control Desk Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards U.S Nuclear Regulatory Commission Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-026, 50-301 and 72-005 License Nos. DPR-24 and DPR-27 Registration of NUHOMS-32PT Casks WNHOMS-32-045, WNHOMS-32-047, and WNHOMS-32-049 In accordance with the requirements of 10 CFR 72.212(b)(2), NextEra Energy Point Beach, LLC, is providing the enclosed information to register the use of three approved spent fuel storage casks at the Point Beach Nuclear Plant (PBNP) Independent Spent Fuel Storage Installation (ISFSI) .
This letter contains no new commitments and no revisions to existing commitments.
Sincerely, NextEra Energy Point Beach , LLC Eric Schultz Licensing Manager Enclosure cc:     Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW NextEra Energy Point Beach, LLC 6610 Nuclear Road, Two Rivers , WI 54241
 
ENCLOSURE REGISTRATION OF NUHOMS-32PT CASKS WNHOMS-32-045, WNHOMS-32-047, and WNHOMS-32-049 CASK REGISTRATION INFORMATION Licensee's Name:               NextEra Energy Point Beach, LLC Licensee's Address:            6610 Nuclear Road Two Rivers, WI 54241 Reactor License Nos.:          DPR-24 and DPR-27 Reactor Docket Nos.:          50-266 and 50-301 ISFSI Docket No.:              72-005 Cask Certificate No.:          1004, Amendment 14 Cask Model No. :              NUHOMS-32PT Contact:                      Mr. Brian Smith Project Manager 920/755-7344 Cask          Horizontal       Dry Shielded     Dry Shielded        Date Identification      Storage           Canister      Canister Heat    Placed in Number          Module             Number             Load        Service Number WNHOMS-32-045        WHSM-029         WDSC-32-032         17.263 kW    July 18, 2018 WNHOMS-32-047        WHSM-031         WDSC-32-033         18.677 kW    July 25, 2018 WNHOMS-32-049        WHSM-033         WDSC-32-034         19.65 kW   August 01, 2018}}

Revision as of 17:34, 20 October 2019

Registration of Nuhoms -32PT Casks WNHOMS-32-045, WNHOMS-32-047, and WNHOMS-32-049
ML18228A718
Person / Time
Site: Point Beach, 07201004  NextEra Energy icon.png
Issue date: 08/16/2018
From: Schultz E
Point Beach
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
NRC 2018-0039
Download: ML18228A718 (2)


Text

NEXTera ENERGY ~

POINT BEACH August 16, 2018 NRC 2018-0039 10 CFR 72.212 ATTN: Document Control Desk Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards U.S Nuclear Regulatory Commission Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets50-026, 50-301 and 72-005 License Nos. DPR-24 and DPR-27 Registration of NUHOMS-32PT Casks WNHOMS-32-045, WNHOMS-32-047, and WNHOMS-32-049 In accordance with the requirements of 10 CFR 72.212(b)(2), NextEra Energy Point Beach, LLC, is providing the enclosed information to register the use of three approved spent fuel storage casks at the Point Beach Nuclear Plant (PBNP) Independent Spent Fuel Storage Installation (ISFSI) .

This letter contains no new commitments and no revisions to existing commitments.

Sincerely, NextEra Energy Point Beach , LLC Eric Schultz Licensing Manager Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW NextEra Energy Point Beach, LLC 6610 Nuclear Road, Two Rivers , WI 54241

ENCLOSURE REGISTRATION OF NUHOMS-32PT CASKS WNHOMS-32-045, WNHOMS-32-047, and WNHOMS-32-049 CASK REGISTRATION INFORMATION Licensee's Name: NextEra Energy Point Beach, LLC Licensee's Address: 6610 Nuclear Road Two Rivers, WI 54241 Reactor License Nos.: DPR-24 and DPR-27 Reactor Docket Nos.: 50-266 and 50-301 ISFSI Docket No.: 72-005 Cask Certificate No.: 1004, Amendment 14 Cask Model No. : NUHOMS-32PT Contact: Mr. Brian Smith Project Manager 920/755-7344 Cask Horizontal Dry Shielded Dry Shielded Date Identification Storage Canister Canister Heat Placed in Number Module Number Load Service Number WNHOMS-32-045 WHSM-029 WDSC-32-032 17.263 kW July 18, 2018 WNHOMS-32-047 WHSM-031 WDSC-32-033 18.677 kW July 25, 2018 WNHOMS-32-049 WHSM-033 WDSC-32-034 19.65 kW August 01, 2018