=Text= | =Text= | ||
{{#Wiki_filter:'.OPERATING DATA REPORT DOCKET NO. | {{#Wiki_filter:' | ||
50-333 DATE Julv 1979 COMPLETED BY E.2ufelt TELEPHONE I3131342.-3840 OPERATING STATUS | . | ||
'Fit: Patrick Notes 1. Unit Name: | OPERATING DATA REPORT DOCKET NO. 50-333 DATE Julv 1979 COMPLETED BY E. 2ufelt TELEPHONE I3131342.-3840 OPERATING STATUS | ||
' | |||
: 2. Reporting Period: | Fit: Patrick Notes | ||
: 1. Unit Name: | |||
: 4. Nameplate Rating (Gross MWe): | : 2. Reporting Period: 790601 - 790630 | ||
: 3. Licensed Thermal Power (MWt): | |||
2436 | |||
: 7. Maximum Dependable Capacity (Net MWe): | : 4. Nameplate Rating (Gross MWe): 883 | ||
: 5. Design Electrical Rating (Net MWe): 821 | |||
None | : 6. Maximum Dependable Capacity (Gross MWe): 830 | ||
: 10. Reasons For Restrictions,1f Any: | : 7. Maximum Dependable Capacity (Net MWe): 800 | ||
Plant in cold shutdown in acco' 'arje with NRC"Show Cause" order of March 13, 1979. | : 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: | ||
None | |||
: 12. Numbe: Of Hours Reactor Was Critical 0 1767.3 23829.5 13. Reactor Rescrve Shutdown Hours 0 0 0 14. Hours Generator On.Line 0 1767.3 23054.4 15. Unit Reserve Shutdown Hours 0 0 0 16. Gross Thermal Energy Generated (MWH) 0 3,626,1rg 45,840,308 | : 9. Power Level To Which Restricted,if Any (Net MWe): None | ||
: 17. Gross Electrical Energy Generated (MWH) 0 1.235,720 15,530,590 | : 10. Reasons For Restrictions,1f Any: Plant in cold shutdown in acco' 'arje with NRC "Show Cause" order of March 13, 1979. __ | ||
: 18. Net E'ectrical Energy Generated (MWH) | - | ||
: 19. Unit Service Factor 0 40. ' %67. 0 $20. Unit Availability Factor 0 40.7 %67.0 %0 34.3 *i 61.1 *; | This Month Yr..to-Date Cumulative i1. Hours In Reporting Period 720 4343 34416 | ||
: 23. Unit Forced Outage Rate 100*, 59.3*s 18,2%24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each): | : 12. Numbe: Of Hours Reactor Was Critical 0 1767.3 23829.5 | ||
: 13. Reactor Rescrve Shutdown Hours 0 0 0 | |||
: 14. Hours Generator On.Line 0 1767.3 23054.4 | |||
: 15. Unit Reserve Shutdown Hours 0 0 0 | |||
: 16. Gross Thermal Energy Generated (MWH) 0 3,626,1rg 45,840,308 | |||
: 17. Gross Electrical Energy Generated (MWH) 0 1.235,720 15,530,590 | |||
: 18. Net E'ectrical Energy Generated (MWH) 0 1.198,435 15,024,420 | |||
: 19. Unit Service Factor 0 40. ' % 67. 0 $ | |||
: 20. Unit Availability Factor 0 40.7 % 67.0 % | |||
: 21. Unit Capacity Factor (Using MDC Net) 0 34.3 *i 61.1 *; | |||
: 22. Unit Capacity Factor (Using DER Net) . 0 33.6's 53.2% | |||
: 23. Unit Forced Outage Rate 100*, 59.3*s 18,2% | |||
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each): | |||
Vene Unknown - pending completion of | Vene Unknown - pending completion of | ||
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup: pipe stress reanalysis | : 25. If Shut Down At End Of Report Period. Estimated Date of Startup: pipe stress reanalysis | ||
: 26. Units in Test Status (Prior to Commercial Operation): | : 26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 790710060'i 323 123 | ||
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 790710060'i 323 123 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-333 UNIT JAFNPP DATE July 1979 CONfPLETED BY E. Zufelt TELEPHONE (3151342-3840 SiONTH June 1979 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (51We Net)(SIWE-Net i 1 0 g7 0 2 0 g3 0 3 0 39 0 4 0 20 0 5 0 21 | |||
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-333 UNIT JAFNPP DATE July 1979 CONfPLETED BY E. Zufelt TELEPHONE (3151342-3840 SiONTH June 1979 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (51We Net) (SIWE-Net i 1 0 g7 0 2 0 g3 0 3 0 39 0 4 0 20 0 5 0 0 21 6 0 22 0 7 0 D 0 8 0 28 0 9 0 25 0 10 0 26 0 II O 27 0 12 0 0 23 | |||
50-333 UNIT SilUIDOWNS AND POWER REDUCllONS | ' 0 13 29 14 0 30 0 15 0 3, | ||
- | |||
16 0 SLNMARY: | |||
W TN.)vs i 2 3 4 I l 'oi s c J Reason Method: lixinbit G - Inst r uctions | Unit continues to remain in cold shutdown condition in accordance with the NRC "Show Cause" order of Sfarch 13, 1979. | ||
323 l2; | |||
1;nti> Sn:ets tor 1.nensee | |||
s DOCKET NO. 50-333 UNIT SilUIDOWNS AND POWER REDUCllONS .I A FNPI UNIT N AME DATE IulY 1979 COMPLETED fly li Zu fel t HLPORT MON 111 ,Iu l y 1979 1ELEP ONE (315)342-3840 n. | |||
1.sent Itepor t (l I It) I ile (Ntilti G- | = - | ||
=_ ri 3w E 2e E ,eW l s.tensee c,-* vt Cause & Couettive | |||
I sliibit ! S.nne Souite ll ()the r (1: spiano | % lbic | ||
, | |||
Malfunction Malfunction Preclude Time Recurrence (flours)1584 b/12/79 27 27-R-101 OPS No recording Broken pen Replaced pen 4.0 6017 Maint. repair Valve needs 6/18/79 27 27-PC-101A OPS of valve stroking Stroked 6.0 6018 6/18/79 27 27-PC-122A OPS""" 6.0-1873 (/23/79 27 27-PC-10lli Itic Out of cal . | g 3m j jgy 1:sent a? g? | ||
Out of cal . | ct Atison in | ||
Calibration 4. | * | ||
Improper control Calibration 4.0 34 6/22/79 27-2 7- A0V- 12711 OPS Valve rebuilt Out of cal. | $E c2 559 liepin, u iR G $' | ||
Stroked 8.0 1579 6/12/79 76 76-Pl-103 OPS Gaue out of cal . | u Prevent itecuuente e | ||
--Replaced / cal. | { | ||
4.0 753 6/18/79 93 93-AM-C I f.C Age No indicatioc Replaced / cal. | Q | ||
6.0 (d 1695 bJ Replaced 5/29/79 99 Camera #1 Sec.Lightning No picture Balanced amp. | . | ||
40.0 | 5 790315 1: 720 11 | ||
POWER AUTl!ORITY OF TiiE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical F. Mechanical Maintenance Summary W0ltK REQUEST s REPAIR DNI.E SYSTEFI 110W DliTliCTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURPENCE TIME | , 4 79-014 ZZ ZZZZZZ Continuing re-evaluation of stress calculation and to make modifica-tions if required (cumulative hours to date - 2575.7) | ||
l'0URS 24 Jun 71 71 OPS Replace two cells of the Iteplaced with NCX-2250 cells 48 SB-1,Sil-2 wrong type. | W TN.) | ||
During initial | vs i 2 3 4 I l 'oi s c J Reason Method: lixinbit G - Inst r uctions | ||
Also replaced cell which Installed new cell in jumpered had been jumpered. Jumpered position cell had experienced | _. S SilicJ ule d A Iijuipnient I ailuse (! xplain) 1 -Man ual for Pre [ ution of Dat. | ||
-cracked case in 1977. | .s li-Maintenance or lest 2-Manual Scrain. 1;nti> Sn:ets tor 1.nensee l I ,' | ||
1212 PM N/A Disconnected, cleaned, regreased, and | '' ' | ||
C-Refuchng 3. Autonutic Scrain. 1.sent Itepor t (l I It) I ile (Ntilti G-I) Regulatory itesisitisoin 4-Otlier (lixplatii) 0161) | |||
I ()pelaltel If Jllililg A I accilse I:xalnlilJIitnl 1 AdinliliallJlikC .i G ()perational I o er (I aplain) I sliibit ! S.nne Souite ll ()the r (1: spiano | |||
_ | |||
r ) | |||
0 i s 0 0 0 0 0 0 0 0 0 0 0 aer . | |||
pmu 8 1 1 4 2 6 4 0 0 8 3 3 eio l 9 6 1 1 0 8 RTl ( | |||
4 d | |||
o r e e t e n r e p . e n n u n c o n t . i n n d een C r n h s l a o o e kd e / . p o gr a g c i c aur Tl n c i o C t o tl r a oo t t / ep d a r cu dC - ti d d d / c d nm e r p nec e/ - t e e e d e e i a n b e | |||
ore np eo hi c a | |||
c a | |||
r en c m-r e e i c | |||
IPR cs i nn a t l n | |||
t t o t o l l p | |||
a ao l p | |||
er h a a | |||
c sL i p p p ec t p c c A a w e e e l e e i h F S d R R C R D T C | |||
* y a t l c n p a f o s t s n oi i n n t m o t d m o o na i sc s r c i er t t n t g t a t t c a T 3 l u cn - n l r ra t s c A n S 8 uf ei - pe a e ec i - i / u 0 sl rd i r p pi mf d N n d - | |||
ea ra rr t o od rl n n e 9 RM oe t u f r rn ea i a l 7 cr c i p pi t h i - | |||
n o r m m n o o a R O | |||
T I N D I I I N N F N | |||
A L | |||
P h r r c r o t o R r o f r E n n t | |||
o r t | |||
c r W o o 8 i | |||
w t t | |||
s o e i | |||
r e O t f i 8 sn c i t nr d P r ot Cn - o e s c ne e a c / o 9 ri n p n e A od r r R m # | |||
f en Ti 7 et n i a n t / cr e u A m I su t - pi o l r w e N o d d F u uf ec R os c c T o d ec r e I S al sa O ro n s e o c Ca os pp or c o C_ | |||
U e M o d d d k d r N c 9 | |||
7 m a a a n a o e P L I B B B U B L R n 9 K a 1 C n 1 I e e R t n T n u d A i l e P a t Z M c T e I t S C C S F e S C S C C S S C P G G P P G P 6 S P P i D O I I O O I O I I O O H A w o | |||
S l | |||
l E | |||
M A | |||
J | |||
# | |||
y y t | |||
s # | |||
a a l l " 8B e 0 p p 0 A 25 l t | |||
u t 5 0 I s s , | |||
0 55 ? | |||
t c n 6 2 A P i i | |||
'( 0 44 0 e e 1 - 8 R D D , 1 - | |||
1 R n - C 7 "D "A t | |||
- S - | |||
o p | |||
R I 2 5 d d " " "I S. I T k | |||
r m T T - 1 o o 1 R P | |||
- - U 1 - 5 R R M M M - - - | |||
o 2 6 2 2 T 8 4 8 1 3 R R 8 R 7 0 4 7 9 7 L 5 0 6 0 2 A 2 3 2 4 7 4 0 I 8 S 6 S 3 1 2 1 3 7 1 6 6 2 1 8 7 2 5 6 6 6 4 1 1 1 1 1 1 7 1 1 1 1 m | |||
e 3 t - | |||
s 3 2 2 3 3 3 7 7 7 0 7 7 y 0 0 0 0 0 0 0 0 0 1 1 2 S | |||
9 9 9 9 9 9 9 9 9 e 7 7 7 7 7 | |||
' | |||
7 9 7 7 9 7 9 t / / / / / 7 / / 7 / 7 2 3 0 0 6 / | |||
l u 1 1 2 2 | |||
' | |||
2 2 | |||
/ | |||
6 8 | |||
1 8 | |||
1 | |||
/ | |||
4 1 | |||
1 4 | |||
/ / / / / / / / / / / / | |||
6 6 6 6 6 6 6 6 6 6 6 6 | |||
, 'C UNu | |||
JAMES A. FITZPATRICK NUCLEAR POWER PLANT Maintenance Summary | |||
. lune 1979 IfC Date System | |||
# N''l"'S' # | |||
llow Detected Cause of Results of Action taken to Repair Component # Malfunction Malfunction Preclude Time Recurrence (flours) 1584 b/12/79 27 27-R-101 OPS No recording Broken pen Replaced pen 4.0 6017 Maint. repair Valve needs 6/18/79 27 27-PC-101A OPS of valve stroking Stroked 6.0 6018 6/18/79 27 27-PC-122A OPS " " " | |||
6.0 | |||
- | |||
1873 | |||
(/23/79 27 27-PC-10lli Itic Out of cal . Out of cal . Calibration 4.0 | |||
_ | |||
11736 6/23/79 27 27-PCV-122B OPS Out of cal. Improper control Calibration 4.0 34 6/22/79 27 -2 7- A0V- 12711 OPS Valve rebuilt Out of cal. Stroked 8.0 1579 6/12/79 76 76-Pl-103 OPS Gaue out of cal . -- Replaced / cal. 4.0 753 6/18/79 93 93-AM-C I f.C Age No indicatioc Replaced / cal. 6.0 (d 1695 bJ Replaced | |||
' ..q 5/29/79 99 Camera #1 Sec. Lightning No picture Balanced amp. 40.0 1604 | |||
, 6/4/79 99 Camera #1 Sec. Unknown No picture Adjusted 20.0 | |||
- s 852 6/4/79 99 Security printei Sec. Bad Diodes Will not print Repaired 40.0 860 6/9/79 99 55cu r i t y tei _ er 9ec Brol en Will not type G . li repair 1.0 | |||
r ) | |||
i s 0 aer . | |||
pmu 6 eio i RTl ( | |||
o t | |||
e n c een kd e aur tl r cu d e | |||
nec ore c IPR a l | |||
t c p A e R | |||
n m r | |||
f o a oi l t | |||
sc a t n t l u n uf a sl ea t s | |||
RM n o | |||
T C N | |||
A. | |||
l P | |||
R E n W | |||
y o | |||
O f i P r ot a c R m C en A m E su n E u I uf e L S al k C C a o U e 9 M r N c 7 B n 9 K a 1 6 C n I e e R t n T n u d A i J e P a t Z M c T e I t F e c D | |||
e S | |||
A w o | |||
S | |||
! | |||
l l | |||
l M | |||
A J | |||
# | |||
t s # r e e u t d q n a e e e R n R o | |||
p d r m r o 8 :a C 4 ( | |||
9 1 | |||
m e | |||
t s 9 y 9 S | |||
9 e 7 t / | |||
u 9 l 2 | |||
/ | |||
6 | |||
- | |||
*g, CrN0 T ~ - | |||
( | |||
POWER AUTl!ORITY OF TiiE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical F. Mechanical Maintenance Summary W0ltK REQUEST s REPAIR DNI.E SYSTEFI 110W DliTliCTED CAUSE OF MALFUNCTION COMPONENT # ACTION TAKEN TO PRECLUDE RECURPENCE TIME l'0URS 24 Jun 71 71 OPS Replace two cells of the Iteplaced with NCX-2250 cells 48 SB-1,Sil-2 wrong type. During initial construction two (2) Type b NCX-2550 cells were installt d instead of NCX-2250. | |||
Also replaced cell which Installed new cell in jumpered had been jumpered. Jumpered position cell had experienced | |||
- | |||
cracked case in 1977. | |||
24 Jun 71 1212 PM N/A Disconnected, cleaned, regreased, and | |||
_Sil- 1, S B- 2 retorqued all battery connections. | |||
Rechecked torque valves following equalize charge. | Rechecked torque valves following equalize charge. | ||
27 Jun 17 1522 Audible Lower particulate pump Replaced motor bearings 10 04-2 noisy 26 Jun 02 1782 N/A Requested to clean anchor Completed retorque 6 SS- Atill- 14 bolt threads fi retorque | 27 Jun 17 1522 Audible Lower particulate pump Replaced motor bearings 10 04-2 noisy 26 Jun 02 1782 N/A Requested to clean anchor Completed retorque 6 | ||
, | |||
PONER Alril10RITY OF TifE STATE OF NEW YORK JAbtES A. FITZPATRICK NUCL. EAR POWER PLANT Safety Related Electrical 6 F:echanical Flaintenance Summary WORK REQUEST # | SS- Atill- 14 bolt threads fi retorque b ) | ||
REPAIR DATE SYSTEF1 C0biPONENT # | G 18 Jun 10 It>85 OPS Check valve noisy . Replaced disc holder 300 | ||
110W DETECTED CAUSE OF b!ALFUNCTION | -- ItllR- 4 2C p .s s. | ||
.\CTION TAKEN TO PkECLUDE RECURRENCE TIbiE 110URS 20 Jun 46 1649 N/A Unabic to inspect anchor Installed new fasteners 40 11-46-41 bolts 21 Jun | 20 Jun 4 t3 167: N/A Unable to test anchor bolts Installed new anchors 51! 2 11-46-34 | ||
Replaced right bank solenoid valve. | . | ||
19 Jun 46 1506 OPS Strainer cover gasket leak Tightened cover 2 VJ S-5B b.sY ljl Jun 1640 OPS llCU Valves - air leaks Rebuild solenoid valves 24 | |||
PONER Alril10RITY OF TifE STATE OF NEW YORK JAbtES A. FITZPATRICK NUCL. EAR POWER PLANT Safety Related Electrical 6 F:echanical Flaintenance Summary WORK REQUEST # REPAIR DATE SYSTEF1 C0biPONENT # 110W DETECTED CAUSE OF b!ALFUNCTION .\CTION TAKEN TO PkECLUDE RECURRENCE TIbiE 110URS 20 Jun 46 1649 N/A Unabic to inspect anchor Installed new fasteners 40 11-46-41 bolts 21 Jun 46 _1919 N/A Anchors loose 6 broken Installed new fasteners 114 11-46-42 21 Jun 71 1457 N/A N/A Performed electrical preventative 80 Bus 1i500 maintenance on llus 11500 23 Jun 46 1674 N/A NRC-79-02 Inspection Repaired IAW F1PT-15 190 11-46-39 19 Jun 93 1654 N/A Preventive maintenance Cleaned left G right air bank 8 EDG-A solenoid valves 19 Jun 93 1655 N/A Preventive maintenance Cleaned left 6 right air bank 12 EDG-C solenoid valves. Replaced right bank solenoid valve. | |||
110W DETECTED CAUSE OF btALFUNCTION ACTION TAKEN TO PRECLUDE RECURIWNCE TIbtE Il0URS 20 Jun 93 1563 Visual Air Access fasteners spot Rewelded door latches 1 EDG-B wolds failed 2'1 Jun 93 1656 N/A Preventive blaintenance Cleaned left 6 right air bank 12 EDG-D solenoid valves 15 Jun 27 930 OPS blotor will not start Replaced two drive sub-assemblies 24 RFI,102A and new cover plate 15 Jun 27 929 OPS Excessive noise from pump Replaced pump 28 RF1-101A 16 Jun 27 693 OPS Solenoid coil is contin-Disassembled, cleaned, and rebuild 12 SOV-123B ually failing valve 16 Jun 71 1120 N/A N/A Performed electrical preventive 45 Bus 12600 maintenance on Bus 12600 Lt.- 18 Jun 70 1409 OPS liigh D/P during operation Changed filters 2 | 19 Jun 46 1506 OPS Strainer cover gasket leak Tightened cover 2 VJ S-5B b | ||
REPAIR DNI E SYSTEM liOW DIiTECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME | .sY ljl Jun .,s 1640 OPS llCU Valves - air leaks Rebuild solenoid valves 24 | ||
liOURS 12 Jun 71 1458 N/A N/A Electrical PM's of switchgear, 50 Bus 12500 breakers, and motor loads 13 Jun 29 813 Visual Packing leak Ground seat, replaced pilot valve, 600 A0V-80A and repacked 14 . inn 27 11737 OPS Seat leakage Remachined seat f plug 12 CNSsl415-14 Jun 01-125 1175 Visual Fan belts need replacing Replaced fan belts 2 FN-Ill 6 Jun 46 1691 OPS Requested to clean Cleaned strainers 3 S-5ATB strainers 6 Jun 02 1130 N/A N/A Preventive maintenance of valve 48 MOV's motor operators | , | ||
'o J u n 27 1682 ST Position switches out of Adjusted and tested valve position 6 A0V-131A,132A adjustment swit c he s | _,il('u Valves D | ||
Completed items to clear DCAR 4 ilangers 12 Jun 93 1574 OPS Air start motors remained Replace starters, cleaned air start 32 EJG -B engaged with diesel running valves, installed new right bank start magnet valve 1Jun 11 1119 Maint.Broke squib valve connector Replaced coth squibs and tested 16 EV-14A,Il pin while performing per ST-6E, MP 11.2 Modification FI-78-02 (ref. WR #11/1125) 1Jun 11 1628 OPS Breaker operator misaligned Realigned operator 1/3 P-2B with breaker switch 5 Jun 23 141 Visual Weld leak Repaired weld 10 10" SilP 902- 19 5 Jun 14 12889 Visual Leak on gland leak-off Replaced bushing f3 pipe nipple 5 tra P-1B rG L4 2 Jun 14 1421 Visual 11 14-1 needs minor Regrouted baseplate 14/1420*11 41-1 grouting rework t-i (a*Previously reported (Fliy 1979) | |||
POWER AIRil0RITY OF Ti!E STATE OF NEW YORK JAF1ES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical G Flechanical Flaintenance Summary DATE WORK REQUEST 8 REPAIR SYSTEh! 110W DETECTED CAUSE OF btALFUNCTION COFIPONENT # ACTION TAKEN TO PRECLUDE RECURIWNCE TIbtE Il0URS 20 Jun 93 1563 Visual Air Access fasteners spot Rewelded door latches 1 EDG-B wolds failed 2'1 Jun 93 1656 N/A Preventive blaintenance Cleaned left 6 right air bank 12 EDG-D solenoid valves 15 Jun 27 930 OPS blotor will not start Replaced two drive sub-assemblies 24 RFI,102A and new cover plate 15 Jun 27 929 OPS Excessive noise from pump Replaced pump 28 RF1-101A 16 Jun 27 693 OPS Solenoid coil is contin- Disassembled, cleaned, and rebuild 12 SOV-123B ually failing valve 16 Jun 71 1120 N/A N/A Performed electrical preventive 45 Bus 12600 maintenance on Bus 12600 Lt . | |||
'' | |||
- 18 Jun 70 1409 OPS liigh D/P during operation Changed filters 2 F-11B | |||
- . | |||
t | |||
.2 Jun 27 11039 OPS Valve sticks shut Freed brass bushing in manual 9 A0V-126B handwheel assembly 2 Jun 27 34 OPS Position indicator broken Replaced broken indicator 40 A0V-127B | |||
POWEll AUTil0RITY OF TiiE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical f Mechanical Maintenance Summary WORK REQll;iST # REPAIR DNI E SYSTEM liOW DIiTECTED COMPONENT # CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME liOURS 12 Jun 71 1458 N/A N/A Electrical PM's of switchgear, 50 Bus 12500 breakers, and motor loads 13 Jun 29 813 Visual Packing leak Ground seat, replaced pilot valve, 600 A0V-80A and repacked 14 . inn 27 11737 OPS Seat leakage Remachined seat f plug 12 CNSsl415 - | |||
14 Jun 01-125 1175 Visual Fan belts need replacing Replaced fan belts 2 FN-Ill 6 Jun 46 1691 OPS Requested to clean Cleaned strainers 3 S-5ATB strainers 6 Jun 02 1130 N/A N/A Preventive maintenance of valve 48 MOV's motor operators | |||
'o J u n 27 1682 ST Position switches out of Adjusted and tested valve position 6 A0V-131A,132A adjustment swit c he s | |||
< | |||
8 Jun 46 .,1310 Visual MPT-15 repair Replaced angle 9 i' 1146-336 9 Jun o7 1595 OPS Dirty filters Replaced filters 4 s 'C - l b A T. ll | |||
POWER AUT110RITY OF Ti!E STATE OF NEW YORK JAMES A. FIT 2 PATRICK NUCLEAR POWER PLANT Safety Related Electrical f, Machanical Maintenance Summary WORK REQUEST 4 REPAIR DNI.E SYSTEM !!OW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME COMPONENT 110URS | |||
. | |||
11 Jun 10 102 DCAR-001-79 Incompleta installatior. Completed items to clear DCAR 4 ilangers 12 Jun 93 1574 OPS Air start motors remained Replace starters, cleaned air start 32 EJG -B engaged with diesel running valves, installed new right bank start magnet valve 1Jun 11 1119 Maint. Broke squib valve connector Replaced coth squibs and tested 16 EV-14A,Il pin while performing per ST-6E, MP 11.2 Modification FI-78-02 (ref. WR #11/1125) 1Jun 11 1628 OPS Breaker operator misaligned Realigned operator 1/3 P-2B with breaker switch 5 Jun 23 141 Visual Weld leak Repaired weld 10 10" SilP 902- 19 5 Jun 14 12889 Visual Leak on gland leak-off Replaced bushing f3 pipe nipple 5 tra P-1B rG L4 2 Jun 14 1421 Visual 11 14-1 needs minor Regrouted baseplate 14/1420* | |||
11 41-1 grouting rework t-i (a | |||
*Previously reported (Fliy 1979) | |||
POWER AllTii0RITY OF TIIE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical f. Mechanical Maintenance Summary | POWER AllTii0RITY OF TIIE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical f. Mechanical Maintenance Summary | ||
.REPAIR WORK REQUEST s | . | ||
liOURS 26 Jun 71 1121 N/A N/A Performed electrical preventat ive 72 Ilus llo00 maintenance on Bux 11600 21 Jun 10 1914 N/A NRC 79-02 Inspection Modified existing support 299'2 11-10-50 26 Jun 13 1917 | REPAIR DAl,E WORK REQUEST s SYSTEM 110W DETEC' LED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME COMPONENT # | ||
liOURS 26 Jun 71 1121 N/A N/A Performed electrical preventat ive 72 Ilus llo00 maintenance on Bux 11600 21 Jun 10 1914 N/A NRC 79-02 Inspection Modified existing support 299'2 11-10-50 26 Jun 13 1917 _ N/A Snubber test for NRC 79-02 Removed, tested f. reinstalled 18 PFSK--1051 snubber 26 Jun 13 1915 N/A Snubber test for NRC 79-02 Removed, tested fa reinstalled 6 PFSK-1050 snubber 28 .lun 10 1851 Si Valve operator torque Replaced torque switch and adjusted 10 MOV-258 switch binding prevented valve position rotors valve from opening 20 Jun 71 _1019 OPS Cell #6 had cracked case Replaced cell 6 SB-2 causing leak and resulting U battery ground IV v4 | |||
___i el | |||
,}} |
Revision as of 11:50, 19 October 2019
ML19224D081 | |
Person / Time | |
---|---|
Site: | FitzPatrick |
Issue date: | 06/30/1979 |
From: | Zufelt E POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
To: | |
Shared Package | |
ML19224D079 | List: |
References | |
MOR-790630, NUDOCS 7907100609 | |
Download: ML19224D081 (12) | |
Text
'
.
OPERATING DATA REPORT DOCKET NO. 50-333 DATE Julv 1979 COMPLETED BY E. 2ufelt TELEPHONE I3131342.-3840 OPERATING STATUS
'
Fit: Patrick Notes
- 1. Unit Name:
- 2. Reporting Period: 790601 - 790630
- 3. Licensed Thermal Power (MWt):
2436
- 4. Nameplate Rating (Gross MWe): 883
- 5. Design Electrical Rating (Net MWe): 821
- 6. Maximum Dependable Capacity (Gross MWe): 830
- 7. Maximum Dependable Capacity (Net MWe): 800
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
None
- 9. Power Level To Which Restricted,if Any (Net MWe): None
- 10. Reasons For Restrictions,1f Any: Plant in cold shutdown in acco' 'arje with NRC "Show Cause" order of March 13, 1979. __
-
This Month Yr..to-Date Cumulative i1. Hours In Reporting Period 720 4343 34416
- 12. Numbe: Of Hours Reactor Was Critical 0 1767.3 23829.5
- 13. Reactor Rescrve Shutdown Hours 0 0 0
- 14. Hours Generator On.Line 0 1767.3 23054.4
- 15. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross Thermal Energy Generated (MWH) 0 3,626,1rg 45,840,308
- 17. Gross Electrical Energy Generated (MWH) 0 1.235,720 15,530,590
- 18. Net E'ectrical Energy Generated (MWH) 0 1.198,435 15,024,420
- 19. Unit Service Factor 0 40. ' % 67. 0 $
- 20. Unit Availability Factor 0 40.7 % 67.0 %
- 21. Unit Capacity Factor (Using MDC Net) 0 34.3 *i 61.1 *;
- 22. Unit Capacity Factor (Using DER Net) . 0 33.6's 53.2%
- 23. Unit Forced Outage Rate 100*, 59.3*s 18,2%
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
Vene Unknown - pending completion of
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: pipe stress reanalysis
- 26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 790710060'i 323 123
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-333 UNIT JAFNPP DATE July 1979 CONfPLETED BY E. Zufelt TELEPHONE (3151342-3840 SiONTH June 1979 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (51We Net) (SIWE-Net i 1 0 g7 0 2 0 g3 0 3 0 39 0 4 0 20 0 5 0 0 21 6 0 22 0 7 0 D 0 8 0 28 0 9 0 25 0 10 0 26 0 II O 27 0 12 0 0 23
' 0 13 29 14 0 30 0 15 0 3,
-
16 0 SLNMARY:
Unit continues to remain in cold shutdown condition in accordance with the NRC "Show Cause" order of Sfarch 13, 1979.
323 l2;
s DOCKET NO. 50-333 UNIT SilUIDOWNS AND POWER REDUCllONS .I A FNPI UNIT N AME DATE IulY 1979 COMPLETED fly li Zu fel t HLPORT MON 111 ,Iu l y 1979 1ELEP ONE (315)342-3840 n.
= -
=_ ri 3w E 2e E ,eW l s.tensee c,-* vt Cause & Couettive
% lbic
,
g 3m j jgy 1:sent a? g?
ct Atison in
$E c2 559 liepin, u iR G $'
u Prevent itecuuente e
{
Q
.
5 790315 1: 720 11
, 4 79-014 ZZ ZZZZZZ Continuing re-evaluation of stress calculation and to make modifica-tions if required (cumulative hours to date - 2575.7)
W TN.)
vs i 2 3 4 I l 'oi s c J Reason Method: lixinbit G - Inst r uctions
_. S SilicJ ule d A Iijuipnient I ailuse (! xplain) 1 -Man ual for Pre [ ution of Dat.
.s li-Maintenance or lest 2-Manual Scrain. 1;nti> Sn:ets tor 1.nensee l I ,'
'
C-Refuchng 3. Autonutic Scrain. 1.sent Itepor t (l I It) I ile (Ntilti G-I) Regulatory itesisitisoin 4-Otlier (lixplatii) 0161)
I ()pelaltel If Jllililg A I accilse I:xalnlilJIitnl 1 AdinliliallJlikC .i G ()perational I o er (I aplain) I sliibit ! S.nne Souite ll ()the r (1: spiano
_
r )
0 i s 0 0 0 0 0 0 0 0 0 0 0 aer .
pmu 8 1 1 4 2 6 4 0 0 8 3 3 eio l 9 6 1 1 0 8 RTl (
4 d
o r e e t e n r e p . e n n u n c o n t . i n n d een C r n h s l a o o e kd e / . p o gr a g c i c aur Tl n c i o C t o tl r a oo t t / ep d a r cu dC - ti d d d / c d nm e r p nec e/ - t e e e d e e i a n b e
ore np eo hi c a
c a
r en c m-r e e i c
IPR cs i nn a t l n
t t o t o l l p
a ao l p
er h a a
c sL i p p p ec t p c c A a w e e e l e e i h F S d R R C R D T C
- y a t l c n p a f o s t s n oi i n n t m o t d m o o na i sc s r c i er t t n t g t a t t c a T 3 l u cn - n l r ra t s c A n S 8 uf ei - pe a e ec i - i / u 0 sl rd i r p pi mf d N n d -
ea ra rr t o od rl n n e 9 RM oe t u f r rn ea i a l 7 cr c i p pi t h i -
n o r m m n o o a R O
T I N D I I I N N F N
A L
P h r r c r o t o R r o f r E n n t
o r t
c r W o o 8 i
w t t
s o e i
r e O t f i 8 sn c i t nr d P r ot Cn - o e s c ne e a c / o 9 ri n p n e A od r r R m #
f en Ti 7 et n i a n t / cr e u A m I su t - pi o l r w e N o d d F u uf ec R os c c T o d ec r e I S al sa O ro n s e o c Ca os pp or c o C_
U e M o d d d k d r N c 9
7 m a a a n a o e P L I B B B U B L R n 9 K a 1 C n 1 I e e R t n T n u d A i l e P a t Z M c T e I t S C C S F e S C S C C S S C P G G P P G P 6 S P P i D O I I O O I O I I O O H A w o
S l
l E
M A
J
y y t
s #
a a l l " 8B e 0 p p 0 A 25 l t
u t 5 0 I s s ,
0 55 ?
t c n 6 2 A P i i
'( 0 44 0 e e 1 - 8 R D D , 1 -
1 R n - C 7 "D "A t
- S -
o p
R I 2 5 d d " " "I S. I T k
r m T T - 1 o o 1 R P
- - U 1 - 5 R R M M M - - -
o 2 6 2 2 T 8 4 8 1 3 R R 8 R 7 0 4 7 9 7 L 5 0 6 0 2 A 2 3 2 4 7 4 0 I 8 S 6 S 3 1 2 1 3 7 1 6 6 2 1 8 7 2 5 6 6 6 4 1 1 1 1 1 1 7 1 1 1 1 m
e 3 t -
s 3 2 2 3 3 3 7 7 7 0 7 7 y 0 0 0 0 0 0 0 0 0 1 1 2 S
9 9 9 9 9 9 9 9 9 e 7 7 7 7 7
'
7 9 7 7 9 7 9 t / / / / / 7 / / 7 / 7 2 3 0 0 6 /
l u 1 1 2 2
'
2 2
/
6 8
1 8
1
/
4 1
1 4
/ / / / / / / / / / / /
6 6 6 6 6 6 6 6 6 6 6 6
, 'C UNu
JAMES A. FITZPATRICK NUCLEAR POWER PLANT Maintenance Summary
. lune 1979 IfC Date System
- Nl"'S' #
llow Detected Cause of Results of Action taken to Repair Component # Malfunction Malfunction Preclude Time Recurrence (flours) 1584 b/12/79 27 27-R-101 OPS No recording Broken pen Replaced pen 4.0 6017 Maint. repair Valve needs 6/18/79 27 27-PC-101A OPS of valve stroking Stroked 6.0 6018 6/18/79 27 27-PC-122A OPS " " "
6.0
-
1873
(/23/79 27 27-PC-10lli Itic Out of cal . Out of cal . Calibration 4.0
_
11736 6/23/79 27 27-PCV-122B OPS Out of cal. Improper control Calibration 4.0 34 6/22/79 27 -2 7- A0V- 12711 OPS Valve rebuilt Out of cal. Stroked 8.0 1579 6/12/79 76 76-Pl-103 OPS Gaue out of cal . -- Replaced / cal. 4.0 753 6/18/79 93 93-AM-C I f.C Age No indicatioc Replaced / cal. 6.0 (d 1695 bJ Replaced
' ..q 5/29/79 99 Camera #1 Sec. Lightning No picture Balanced amp. 40.0 1604
, 6/4/79 99 Camera #1 Sec. Unknown No picture Adjusted 20.0
- s 852 6/4/79 99 Security printei Sec. Bad Diodes Will not print Repaired 40.0 860 6/9/79 99 55cu r i t y tei _ er 9ec Brol en Will not type G . li repair 1.0
r )
i s 0 aer .
pmu 6 eio i RTl (
o t
e n c een kd e aur tl r cu d e
nec ore c IPR a l
t c p A e R
n m r
f o a oi l t
sc a t n t l u n uf a sl ea t s
RM n o
T C N
A.
l P
R E n W
y o
O f i P r ot a c R m C en A m E su n E u I uf e L S al k C C a o U e 9 M r N c 7 B n 9 K a 1 6 C n I e e R t n T n u d A i J e P a t Z M c T e I t F e c D
e S
A w o
S
!
l l
l M
A J
t s # r e e u t d q n a e e e R n R o
p d r m r o 8 :a C 4 (
9 1
m e
t s 9 y 9 S
9 e 7 t /
u 9 l 2
/
6
-
- g, CrN0 T ~ -
(
POWER AUTl!ORITY OF TiiE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical F. Mechanical Maintenance Summary W0ltK REQUEST s REPAIR DNI.E SYSTEFI 110W DliTliCTED CAUSE OF MALFUNCTION COMPONENT # ACTION TAKEN TO PRECLUDE RECURPENCE TIME l'0URS 24 Jun 71 71 OPS Replace two cells of the Iteplaced with NCX-2250 cells 48 SB-1,Sil-2 wrong type. During initial construction two (2) Type b NCX-2550 cells were installt d instead of NCX-2250.
Also replaced cell which Installed new cell in jumpered had been jumpered. Jumpered position cell had experienced
-
cracked case in 1977.
24 Jun 71 1212 PM N/A Disconnected, cleaned, regreased, and
_Sil- 1, S B- 2 retorqued all battery connections.
Rechecked torque valves following equalize charge.
27 Jun 17 1522 Audible Lower particulate pump Replaced motor bearings 10 04-2 noisy 26 Jun 02 1782 N/A Requested to clean anchor Completed retorque 6
,
SS- Atill- 14 bolt threads fi retorque b )
G 18 Jun 10 It>85 OPS Check valve noisy . Replaced disc holder 300
-- ItllR- 4 2C p .s s.
20 Jun 4 t3 167: N/A Unable to test anchor bolts Installed new anchors 51! 2 11-46-34
.
PONER Alril10RITY OF TifE STATE OF NEW YORK JAbtES A. FITZPATRICK NUCL. EAR POWER PLANT Safety Related Electrical 6 F:echanical Flaintenance Summary WORK REQUEST # REPAIR DATE SYSTEF1 C0biPONENT # 110W DETECTED CAUSE OF b!ALFUNCTION .\CTION TAKEN TO PkECLUDE RECURRENCE TIbiE 110URS 20 Jun 46 1649 N/A Unabic to inspect anchor Installed new fasteners 40 11-46-41 bolts 21 Jun 46 _1919 N/A Anchors loose 6 broken Installed new fasteners 114 11-46-42 21 Jun 71 1457 N/A N/A Performed electrical preventative 80 Bus 1i500 maintenance on llus 11500 23 Jun 46 1674 N/A NRC-79-02 Inspection Repaired IAW F1PT-15 190 11-46-39 19 Jun 93 1654 N/A Preventive maintenance Cleaned left G right air bank 8 EDG-A solenoid valves 19 Jun 93 1655 N/A Preventive maintenance Cleaned left 6 right air bank 12 EDG-C solenoid valves. Replaced right bank solenoid valve.
19 Jun 46 1506 OPS Strainer cover gasket leak Tightened cover 2 VJ S-5B b
.sY ljl Jun .,s 1640 OPS llCU Valves - air leaks Rebuild solenoid valves 24
,
_,il('u Valves D
POWER AIRil0RITY OF Ti!E STATE OF NEW YORK JAF1ES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical G Flechanical Flaintenance Summary DATE WORK REQUEST 8 REPAIR SYSTEh! 110W DETECTED CAUSE OF btALFUNCTION COFIPONENT # ACTION TAKEN TO PRECLUDE RECURIWNCE TIbtE Il0URS 20 Jun 93 1563 Visual Air Access fasteners spot Rewelded door latches 1 EDG-B wolds failed 2'1 Jun 93 1656 N/A Preventive blaintenance Cleaned left 6 right air bank 12 EDG-D solenoid valves 15 Jun 27 930 OPS blotor will not start Replaced two drive sub-assemblies 24 RFI,102A and new cover plate 15 Jun 27 929 OPS Excessive noise from pump Replaced pump 28 RF1-101A 16 Jun 27 693 OPS Solenoid coil is contin- Disassembled, cleaned, and rebuild 12 SOV-123B ually failing valve 16 Jun 71 1120 N/A N/A Performed electrical preventive 45 Bus 12600 maintenance on Bus 12600 Lt .
- 18 Jun 70 1409 OPS liigh D/P during operation Changed filters 2 F-11B
- .
t
.2 Jun 27 11039 OPS Valve sticks shut Freed brass bushing in manual 9 A0V-126B handwheel assembly 2 Jun 27 34 OPS Position indicator broken Replaced broken indicator 40 A0V-127B
POWEll AUTil0RITY OF TiiE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical f Mechanical Maintenance Summary WORK REQll;iST # REPAIR DNI E SYSTEM liOW DIiTECTED COMPONENT # CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME liOURS 12 Jun 71 1458 N/A N/A Electrical PM's of switchgear, 50 Bus 12500 breakers, and motor loads 13 Jun 29 813 Visual Packing leak Ground seat, replaced pilot valve, 600 A0V-80A and repacked 14 . inn 27 11737 OPS Seat leakage Remachined seat f plug 12 CNSsl415 -
14 Jun 01-125 1175 Visual Fan belts need replacing Replaced fan belts 2 FN-Ill 6 Jun 46 1691 OPS Requested to clean Cleaned strainers 3 S-5ATB strainers 6 Jun 02 1130 N/A N/A Preventive maintenance of valve 48 MOV's motor operators
'o J u n 27 1682 ST Position switches out of Adjusted and tested valve position 6 A0V-131A,132A adjustment swit c he s
<
8 Jun 46 .,1310 Visual MPT-15 repair Replaced angle 9 i' 1146-336 9 Jun o7 1595 OPS Dirty filters Replaced filters 4 s 'C - l b A T. ll
POWER AUT110RITY OF Ti!E STATE OF NEW YORK JAMES A. FIT 2 PATRICK NUCLEAR POWER PLANT Safety Related Electrical f, Machanical Maintenance Summary WORK REQUEST 4 REPAIR DNI.E SYSTEM !!OW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME COMPONENT 110URS
.
11 Jun 10 102 DCAR-001-79 Incompleta installatior. Completed items to clear DCAR 4 ilangers 12 Jun 93 1574 OPS Air start motors remained Replace starters, cleaned air start 32 EJG -B engaged with diesel running valves, installed new right bank start magnet valve 1Jun 11 1119 Maint. Broke squib valve connector Replaced coth squibs and tested 16 EV-14A,Il pin while performing per ST-6E, MP 11.2 Modification FI-78-02 (ref. WR #11/1125) 1Jun 11 1628 OPS Breaker operator misaligned Realigned operator 1/3 P-2B with breaker switch 5 Jun 23 141 Visual Weld leak Repaired weld 10 10" SilP 902- 19 5 Jun 14 12889 Visual Leak on gland leak-off Replaced bushing f3 pipe nipple 5 tra P-1B rG L4 2 Jun 14 1421 Visual 11 14-1 needs minor Regrouted baseplate 14/1420*
11 41-1 grouting rework t-i (a
- Previously reported (Fliy 1979)
POWER AllTii0RITY OF TIIE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical f. Mechanical Maintenance Summary
.
REPAIR DAl,E WORK REQUEST s SYSTEM 110W DETEC' LED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME COMPONENT #
liOURS 26 Jun 71 1121 N/A N/A Performed electrical preventat ive 72 Ilus llo00 maintenance on Bux 11600 21 Jun 10 1914 N/A NRC 79-02 Inspection Modified existing support 299'2 11-10-50 26 Jun 13 1917 _ N/A Snubber test for NRC 79-02 Removed, tested f. reinstalled 18 PFSK--1051 snubber 26 Jun 13 1915 N/A Snubber test for NRC 79-02 Removed, tested fa reinstalled 6 PFSK-1050 snubber 28 .lun 10 1851 Si Valve operator torque Replaced torque switch and adjusted 10 MOV-258 switch binding prevented valve position rotors valve from opening 20 Jun 71 _1019 OPS Cell #6 had cracked case Replaced cell 6 SB-2 causing leak and resulting U battery ground IV v4
___i el
,