|
|
Line 2: |
Line 2: |
| | number = ML060940515 | | | number = ML060940515 |
| | issue date = 03/30/2006 | | | issue date = 03/30/2006 |
| | title = Beaver Valley Nuclear Power Station, Units 1 and 2 Issuance of Safety Evaluation by the Technical Specification Branch for the Conversion to the Improved Technical Specifications (TAC Nos. MC6285 and MC6286) | | | title = Issuance of Safety Evaluation by the Technical Specification Branch for the Conversion to the Improved Technical Specifications (TAC Nos. MC6285 and MC6286) |
| | author name = Boyce T H | | | author name = Boyce T |
| | author affiliation = NRC/NRR/ADRO/DIRS/ITSB | | | author affiliation = NRC/NRR/ADRO/DIRS/ITSB |
| | addressee name = Lash J H | | | addressee name = Lash J |
| | addressee affiliation = FirstEnergy Nuclear Operating Co | | | addressee affiliation = FirstEnergy Nuclear Operating Co |
| | docket = 05000334, 05000412 | | | docket = 05000334, 05000412 |
Revision as of 20:44, 13 July 2019
Letter Sequence Approval |
---|
TAC:MC6285, Increase Flexibility in Mode Restraints, Steam Generator Tube Integrity, Addition of New Tech Spec on RCS Boron Limits and Revisions to Tech Spec 3.3.1 to Address Rwfs, Implement 10 CFR 50, Appendix J, Option B, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable, Changes to Reflect Revision of 10 CFR 50.55A, Elimination of Hydrogen Recombiners and Change to Hydrogen and Oxygen Monitors, TSTF-1, Allow Time for Stabilization After Reducing Power Due to Qptr Out of Limit, Correct Bases Change Made by TSTF-283, TSTF-21, TSTF-38 (Approved, Closed) TAC:MC6286, Increase Flexibility in Mode Restraints, Steam Generator Tube Integrity, Addition of New Tech Spec on RCS Boron Limits and Revisions to Tech Spec 3.3.1 to Address Rwfs, Implement 10 CFR 50, Appendix J, Option B, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable, Changes to Reflect Revision of 10 CFR 50.55A, Elimination of Hydrogen Recombiners and Change to Hydrogen and Oxygen Monitors, TSTF-1, Allow Time for Stabilization After Reducing Power Due to Qptr Out of Limit, Correct Bases Change Made by TSTF-283, TSTF-21, TSTF-38 (Approved, Closed) |
Results
Other: L-07-086, Implementation of Beaver Valley, Units 1 & 2, Improved Technical Specification Amendment Nos. 278 (Unit 1) and 161 (Unit 2), ML060940413, ML060940429, ML061220200, ML070240291, ML070390057, ML070390061, ML070390530
|
MONTHYEARML0609404132006-03-0303 March 2006 ITS Conversion SE - BVPS Doc. Table M Project stage: Other ML0609404162006-03-0303 March 2006 ITS Conversion SE - BVPS Doc Table L Project stage: Acceptance Review ML0609404102006-03-30030 March 2006 Improved TS Conversion Safety Evaluation Project stage: Approval ML0609404112006-03-30030 March 2006 ITS Conversion SE - BVPS Doc Table a Project stage: Acceptance Review ML0609404222006-03-30030 March 2006 ITS Conversion SE - BVPS Doc Table La Project stage: Acceptance Review ML0609404292006-03-30030 March 2006 ITS Conversion SE - BVPS Doc Table R Project stage: Other ML0609405152006-03-30030 March 2006 Issuance of Safety Evaluation by the Technical Specification Branch for the Conversion to the Improved Technical Specifications Project stage: Approval L-05-027, Supplement to License Amendment Request Nos. 296 and 169, Improved Standard Technical Specification Conversion2006-04-19019 April 2006 Supplement to License Amendment Request Nos. 296 and 169, Improved Standard Technical Specification Conversion Project stage: Supplement ML0612202002006-05-0909 May 2006 Beyond Scope Item No. 38 (TAC No'S. MC6791 and MC6792) Project stage: Other L-06-112, Supplement to License Amendment Request Nos. 296 and 169, Improved Standard Technical Specification Conversion2006-07-10010 July 2006 Supplement to License Amendment Request Nos. 296 and 169, Improved Standard Technical Specification Conversion Project stage: Supplement ML0630000862006-10-24024 October 2006 Supplement to License Amendment Request Nos. 296 and 169, Improved Standard Technical Specification Conversion Project stage: Supplement L-06-149, Improved Technical Specification (ITS) Conversion License Amendment Request2006-10-24024 October 2006 Improved Technical Specification (ITS) Conversion License Amendment Request Project stage: Request L-06-162, Supplement to License Amendment Request Nos. 296 and 169, Improved Standard Technical Specification Conversion2006-12-0707 December 2006 Supplement to License Amendment Request Nos. 296 and 169, Improved Standard Technical Specification Conversion Project stage: Supplement ML0636203822007-01-0404 January 2007 (BVPS-1 and 2) - Draft Safety Evaluation for the Conversion to the Improved Technical Specifications with Beyond-Scope Issues Project stage: Draft Approval ML0636204052007-01-0404 January 2007 (BVPS-1 and 2), Draft Safety Evaluation Project stage: Draft Approval L-07-010, License Amendment Request Nos. 296 and 169, Improved Standard Technical Specification Conversion, Draft Amendment and Safety Evaluation Comments2007-02-0101 February 2007 License Amendment Request Nos. 296 and 169, Improved Standard Technical Specification Conversion, Draft Amendment and Safety Evaluation Comments Project stage: Draft Request ML0702402912007-02-0505 February 2007 Environmental Assessment and Finding of No Significant Impact for the Proposed Conversion to the Improved Technical Specifications (TAC Nos. MC6285, MC6286, MC6579-MC6612, MC6614-MC6626, MC6783-MC6792) Project stage: Other ML0701605932007-02-21021 February 2007 ITS Conversion Amendment and Safety Evaluation Project stage: Approval ML0703900192007-02-21021 February 2007 BVPS Doc Table a Project stage: Acceptance Review ML0703900242007-02-21021 February 2007 BVPS Doc Table L Project stage: Acceptance Review ML0703900512007-02-21021 February 2007 BVPS Doc Table La Project stage: Acceptance Review ML0703900572007-02-21021 February 2007 BVPS Doc Table M Project stage: Other ML0703900612007-02-21021 February 2007 BVPS Doc Table R Project stage: Other ML0703902842007-02-21021 February 2007 Improved Technical Specifications Project stage: Acceptance Review ML0703905302007-02-21021 February 2007 BVPS Operating License Project stage: Other L-07-086, Implementation of Beaver Valley, Units 1 & 2, Improved Technical Specification Amendment Nos. 278 (Unit 1) and 161 (Unit 2)2007-06-28028 June 2007 Implementation of Beaver Valley, Units 1 & 2, Improved Technical Specification Amendment Nos. 278 (Unit 1) and 161 (Unit 2) Project stage: Other 2006-05-09
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000334/20240112024-10-17017 October 2024 License Renewal Phase IV Inspection Report 05000334/2024011 L-24-038, License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References2024-09-17017 September 2024 License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter L-24-015, Twenty-Ninth Refueling Outage Inservice Inspection Summary Report2024-09-17017 September 2024 Twenty-Ninth Refueling Outage Inservice Inspection Summary Report ML24260A1912024-09-16016 September 2024 Operator Licensing Examination Approval IR 05000334/20240052024-08-29029 August 2024 Updated Inspection Plan for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2024005 and 05000412/2024005) L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 IR 05000334/20244022024-08-22022 August 2024 Security Baseline Inspection Report 05000334/2024402 and 05000412/2024402 (Cover Letter Only) L-24-199, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-08-22022 August 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 IR 05000334/20240102024-08-20020 August 2024 Comprehensive Engineering Team Inspection - Inspection Report 05000334/2024010 and 05000412/2024010 L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000334/20240022024-08-0505 August 2024 Integrated Inspection Report 05000334/2024002 and 05000412/2024002 ML24208A0462024-07-26026 July 2024 NRC Office of Investigations Case No. 1-2023-005 L-24-182, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-07-23023 July 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-24-161, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-07-19019 July 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 05000334/LER-2024-004, Reactor Trip Due to Bypass Feedwater Regulating Valve Failure to Control2024-07-17017 July 2024 Reactor Trip Due to Bypass Feedwater Regulating Valve Failure to Control L-24-014, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling Svstem Evaluation Models2024-07-16016 July 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling Svstem Evaluation Models ML24193A2912024-07-16016 July 2024 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule IR 05000334/20245012024-07-0808 July 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000334/2024501 and 05000412/2024501 05000334/LER-2024-003, Unanalyzed Containment Bypass Condition Due to Degraded River Water Piping2024-07-0202 July 2024 Unanalyzed Containment Bypass Condition Due to Degraded River Water Piping L-24-164, BV-2, Post Accident Monitor Report2024-06-27027 June 2024 BV-2, Post Accident Monitor Report IR 05000334/20244012024-06-26026 June 2024 Material Control and Accounting Program Inspection Report 05000334/2024401 and 05000412/2024401 (Cover Letter Only) L-24-094, Reactor Vessel Surveillance Capsule Withdrawal Schedule2024-06-24024 June 2024 Reactor Vessel Surveillance Capsule Withdrawal Schedule L-24-152, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-06-17017 June 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations L-24-114, Automatic Reactor Trip Due to Low Reactor Coolant Flow Caused by Transformer Overexcitation Protection Relay Actuation2024-06-11011 June 2024 Automatic Reactor Trip Due to Low Reactor Coolant Flow Caused by Transformer Overexcitation Protection Relay Actuation L-24-115, Offsite AC Power Source Inoperable Due to Breaker Failure Resulting in Condition Prohibited by Technical Specification2024-06-0606 June 2024 Offsite AC Power Source Inoperable Due to Breaker Failure Resulting in Condition Prohibited by Technical Specification ML24135A2282024-05-29029 May 2024 Review of the Spring 2023 Outage Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F Star Reports ML24135A1702024-05-29029 May 2024 – Steam Generator Tube Inspection - Review of the Spring 2023 Tube Inspection Reports L-24-121, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-05-23023 May 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-24-021, Cycle 30 Core Operating Limits Report2024-05-23023 May 2024 Cycle 30 Core Operating Limits Report ML24141A1052024-05-20020 May 2024 Senior Reactor and Reactor Operator Initial License Examinations L-24-107, CFR 50.55a Request 1-TYP-5-RRP-l, for Alternative Method of Nondestructive Examination for River Water Outlet Piping Weld Repair2024-05-13013 May 2024 CFR 50.55a Request 1-TYP-5-RRP-l, for Alternative Method of Nondestructive Examination for River Water Outlet Piping Weld Repair IR 05000334/20240012024-05-0808 May 2024 Integrated Inspection Report 05000334/2024001 and 05000412/2024001 L-23-269, Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions2024-05-0707 May 2024 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions L-24-054, Submittal of 2023 Annual Radioactive Effluent Release Report 2023 Annual Radiological Environmental Operating Report and 2023 Annual Environmental Operating Report (Non-Radiological)2024-04-29029 April 2024 Submittal of 2023 Annual Radioactive Effluent Release Report 2023 Annual Radiological Environmental Operating Report and 2023 Annual Environmental Operating Report (Non-Radiological) L-24-089, Emergency Preparedness Plan2024-04-23023 April 2024 Emergency Preparedness Plan L-24-088, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for March 20242024-04-22022 April 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for March 2024 ML24101A2752024-04-10010 April 2024 Response to Request for Additional Information Regarding Spring 2023 180-Day Steam Generator Tube Inspection Report L-24-082, Withdrawal of Exemption Request2024-04-0303 April 2024 Withdrawal of Exemption Request L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage L-24-064, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152024-03-13013 March 2024 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML24044A0662024-03-0404 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0083 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24057A0752024-03-0101 March 2024 the Associated Independent Spent Fuel Storage Installations IR 05000334/20230062024-02-28028 February 2024 Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2023006 and 05000412/2023006) L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee IR 05000334/20230042024-02-12012 February 2024 Integrated Inspection Report 05000334/2023004 and 05000412/2023004 ML24025A0922024-01-25025 January 2024 Requalification Program Inspection L-23-267, Submittal of Discharge Monitoring Report (Npdes), Permit No. PA00256152023-12-18018 December 2023 Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615 2024-09-17
[Table view] |
Text
March 30, 2006Mr. James H. LashVice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station
P. O. Box 4 Shippingport, PA 15077
SUBJECT:
BEAVER VALLEY NUCLEAR POWER STATION, UNITS 1 AND 2 ISSUANCE OF SAFETY EVALUATION BY THE TECHNICAL SPECIFICATIONBRANCH FOR THE CONVERSION TO THE IMPROVED TECHNICAL SPECIFICATIONS (TAC NOS. MC6285 AND MC6286)
Dear Mr. Lash:
By application dated February 25, 2005, as supplemented by letter dated November 11, 2005,First Energy Nuclear Operating Company (FENOC) requested a full conversion from the current Technical Specifications (CTS) to a set of Improved Technical Specifications (ITS) based on NUREG-1431, "Standard Technical Specifications - Westinghouse Plants,"Revision 2, for the Beaver Valley Nuclear Power Station (BVPS). In addition, Technical Specification Task Force changes were also incorporated to make the resulting BVPS ITS more consistent with Revision 3 of NUREG-1431. The proposed amendment would also consolidatethe BVPS-1 and 2 technical specifications into a single set of ITS applicable to both units.This letter is to inform you that the Technical Specification Branch (TSB) in the Division ofInspection and Regional Support has completed its review of the items within the scope of the ITS conversion. This review is contained in a Safety Evaluation (SE) dated March 30, 2006, (ADAMS Accession No. ML060890360) and was provided to the Division of Operating Reactor Licensing (DORL) in support of the above licensing amendment. The SE input to DORL evaluated ITS changes only and is based on the draft BVPS ITS Revision 2.5 and the draft ITS Bases Revision 2.0. Beyond Scope Items and technical specification changes due to outstanding licensing amendment requests will be resolved by the technical branches in thefinal SE. DORL will issue the final SE and license amendment when these reviews arecompleted. Please contact Robert Clark of TSB should you have any comments on the SE input.
Sincerely, /RA/Thomas H. Boyce, ChiefTechnical Specification Branch Division of Inspection & Regional Support Office of Nuclear Reactor RegulationDocket Nos. 50-334 and 50-412 cc: see next page
ML060890360) and was provided to the Division of Operating Reactor Licensing (DORL) in support of the above licensing amendment. The SE input to DORL evaluated ITS changes only and is based on the draft BVPS ITS Revision 2.5 and the draft ITS Bases Revision 2.0. Beyond Scope Items and technical specification changes due to outstanding licensing amendment requests will be resolved by the technical branches in thefinal SE. DORL will issue the final SE and license amendment when these reviews arecompleted. Please contact Robert Clark of TSB should you have any comments on the SE input.Sincerely, /RA/Thomas H. Boyce, Chief Technical Specification Branch Division of Inspection & Regional Support Office of Nuclear Reactor RegulationDocket Nos. 50-334 and 50-412 cc: see next pageDISTRIBUTION:ITSB R/FT. ColburnADAMS: ML060940515NAME:E:\Filenet\ML060940515.wpdOFFICEITSB/DIRS/PMITSB/DIRS/BCNAMERClarkTBoyceDATE3/30/063/30/06 Beaver Valley Power Station, Unit Nos. 1 and 2 cc:
Gary R. LeidichPresident and Chief Nuclear Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-19 76 South Main Street Akron, OH 44308Joseph J. HaganSenior Vice Presdient of Operations and Chief Operating Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308Danny L. PaceSenior Vice President, Fleet Engineering FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308Jeannie M. RinckelVice President, Fleet Oversight FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308David W. Jenkins, AttorneyFirstEnergy Corporation Mail Stop A-GO-18 76 South Main Street Akron, OH 44308Manager, Fleet LicensingFirstEnergy Nuclear Operating Company Mail Stop A-GHE-107 395 Ghent Road Akron, OH 44333Lew W. MyersExecutive Vice President, Special Projects FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SGRP P.O. Box 4, Route 168 Shippingport, PA 15077Manager, Site Regulatory ComplianceFirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-A P.O. Box 4, Route 168 Shippingport, PA 15077Commissioner James R. LewisWest Virginia Division of Labor 749-B, Building No. 6 Capitol Complex Charleston, WV 25305Director, Utilities DepartmentPublic Utilities Commission 180 East Broad Street Columbus, OH 43266-0573Director, Pennsylvania Emergency Management Agency 2605 Interstate Dr.
Harrisburg, PA 17110-9364Ohio EPA-DERRATTN: Zack A. Clayton P.O. Box 1049 Columbus, OH 43266-0149 Beaver Valley Power Station, Unit Nos. 1 and 2 (continued) cc:
Dr. Judith JohnsrudEnvironmental Coalition on Nuclear Power Sierra Club 433 Orlando Avenue State College, PA 16803DirectorBureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469Mayor of the Borough of Shippingport P.O. Box 3 Shippingport, PA 15077Regional Administrator, Region IU.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406Resident InspectorU.S. Nuclear Regulatory Commission
P.O. Box 298 Shippingport, PA 15077