Letter Sequence Approval |
---|
TAC:MC6285, Increase Flexibility in Mode Restraints, Steam Generator Tube Integrity, Addition of New Tech Spec on RCS Boron Limits and Revisions to Tech Spec 3.3.1 to Address Rwfs, Implement 10 CFR 50, Appendix J, Option B, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable, Changes to Reflect Revision of 10 CFR 50.55A, Elimination of Hydrogen Recombiners and Change to Hydrogen and Oxygen Monitors, TSTF-1, Allow Time for Stabilization After Reducing Power Due to Qptr Out of Limit, Correct Bases Change Made by TSTF-283, TSTF-21, TSTF-38 (Approved, Closed) TAC:MC6286, Increase Flexibility in Mode Restraints, Steam Generator Tube Integrity, Addition of New Tech Spec on RCS Boron Limits and Revisions to Tech Spec 3.3.1 to Address Rwfs, Implement 10 CFR 50, Appendix J, Option B, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable, Changes to Reflect Revision of 10 CFR 50.55A, Elimination of Hydrogen Recombiners and Change to Hydrogen and Oxygen Monitors, TSTF-1, Allow Time for Stabilization After Reducing Power Due to Qptr Out of Limit, Correct Bases Change Made by TSTF-283, TSTF-21, TSTF-38 (Approved, Closed) |
Results
Other: L-07-086, Implementation of Beaver Valley, Units 1 & 2, Improved Technical Specification Amendment Nos. 278 (Unit 1) and 161 (Unit 2), ML060940413, ML060940429, ML061220200, ML070240291, ML070390057, ML070390061, ML070390530
|
MONTHYEARML0609404132006-03-0303 March 2006 ITS Conversion SE - BVPS Doc. Table M Project stage: Other ML0609404162006-03-0303 March 2006 ITS Conversion SE - BVPS Doc Table L Project stage: Acceptance Review ML0609404102006-03-30030 March 2006 Improved TS Conversion Safety Evaluation Project stage: Approval ML0609404112006-03-30030 March 2006 ITS Conversion SE - BVPS Doc Table a Project stage: Acceptance Review ML0609404222006-03-30030 March 2006 ITS Conversion SE - BVPS Doc Table La Project stage: Acceptance Review ML0609404292006-03-30030 March 2006 ITS Conversion SE - BVPS Doc Table R Project stage: Other ML0609405152006-03-30030 March 2006 Issuance of Safety Evaluation by the Technical Specification Branch for the Conversion to the Improved Technical Specifications Project stage: Approval L-05-027, Supplement to License Amendment Request Nos. 296 and 169, Improved Standard Technical Specification Conversion2006-04-19019 April 2006 Supplement to License Amendment Request Nos. 296 and 169, Improved Standard Technical Specification Conversion Project stage: Supplement ML0612202002006-05-0909 May 2006 Beyond Scope Item No. 38 (TAC No'S. MC6791 and MC6792) Project stage: Other L-06-112, Supplement to License Amendment Request Nos. 296 and 169, Improved Standard Technical Specification Conversion2006-07-10010 July 2006 Supplement to License Amendment Request Nos. 296 and 169, Improved Standard Technical Specification Conversion Project stage: Supplement ML0630000862006-10-24024 October 2006 Supplement to License Amendment Request Nos. 296 and 169, Improved Standard Technical Specification Conversion Project stage: Supplement L-06-149, Improved Technical Specification (ITS) Conversion License Amendment Request2006-10-24024 October 2006 Improved Technical Specification (ITS) Conversion License Amendment Request Project stage: Request L-06-162, Supplement to License Amendment Request Nos. 296 and 169, Improved Standard Technical Specification Conversion2006-12-0707 December 2006 Supplement to License Amendment Request Nos. 296 and 169, Improved Standard Technical Specification Conversion Project stage: Supplement ML0636203822007-01-0404 January 2007 (BVPS-1 and 2) - Draft Safety Evaluation for the Conversion to the Improved Technical Specifications with Beyond-Scope Issues Project stage: Draft Approval ML0636204052007-01-0404 January 2007 (BVPS-1 and 2), Draft Safety Evaluation Project stage: Draft Approval L-07-010, License Amendment Request Nos. 296 and 169, Improved Standard Technical Specification Conversion, Draft Amendment and Safety Evaluation Comments2007-02-0101 February 2007 License Amendment Request Nos. 296 and 169, Improved Standard Technical Specification Conversion, Draft Amendment and Safety Evaluation Comments Project stage: Draft Request ML0702402912007-02-0505 February 2007 Environmental Assessment and Finding of No Significant Impact for the Proposed Conversion to the Improved Technical Specifications (TAC Nos. MC6285, MC6286, MC6579-MC6612, MC6614-MC6626, MC6783-MC6792) Project stage: Other ML0701605932007-02-21021 February 2007 ITS Conversion Amendment and Safety Evaluation Project stage: Approval ML0703900192007-02-21021 February 2007 BVPS Doc Table a Project stage: Acceptance Review ML0703900242007-02-21021 February 2007 BVPS Doc Table L Project stage: Acceptance Review ML0703900512007-02-21021 February 2007 BVPS Doc Table La Project stage: Acceptance Review ML0703900572007-02-21021 February 2007 BVPS Doc Table M Project stage: Other ML0703900612007-02-21021 February 2007 BVPS Doc Table R Project stage: Other ML0703902842007-02-21021 February 2007 Improved Technical Specifications Project stage: Acceptance Review ML0703905302007-02-21021 February 2007 BVPS Operating License Project stage: Other L-07-086, Implementation of Beaver Valley, Units 1 & 2, Improved Technical Specification Amendment Nos. 278 (Unit 1) and 161 (Unit 2)2007-06-28028 June 2007 Implementation of Beaver Valley, Units 1 & 2, Improved Technical Specification Amendment Nos. 278 (Unit 1) and 161 (Unit 2) Project stage: Other 2006-05-09
[Table View] |
|
---|
Category:Letter
MONTHYEARML24025A0922024-01-25025 January 2024 Requalification Program Inspection L-23-267, Submittal of Discharge Monitoring Report (Npdes), Permit No. PA00256152023-12-18018 December 2023 Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615 IR 05000334/20230112023-12-0404 December 2023 Age-Related Degradation Inspection Report 05000334/2023011 and 05000412/2023011 L-23-229, Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports2023-11-29029 November 2023 Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports IR 05000334/20233012023-11-27027 November 2023 Initial Operator Licensing Examination Report 05000334/2023301 L-23-247, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-11-17017 November 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 IR 05000334/20230032023-11-0606 November 2023 Integrated Inspection Report 05000334/2023003 and 05000412/2023003 L-23-227, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 20232023-10-20020 October 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 2023 ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23198A3592023-10-0202 October 2023 Issuance of Amendment Nos. 322 and 212 Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident (EPID L-2022-LLA-0129) - Nonproprietary IR 05000334/20234022023-09-29029 September 2023 Security Baseline Inspection Report 05000334/2023402 and 05000412/2023402 (Cover Letter Only) ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000334/20234012023-09-21021 September 2023 Cybersecurity Inspection Report 05000334/2023401 and 05000412/2023401 (Cover Letter Only) ML23263A0192023-09-20020 September 2023 Operator Licensing Examination Approval ML23243A9272023-09-19019 September 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23249A1842023-09-18018 September 2023 Authorization and Safety Evaluation for Alternative Request No. 2-TYP-4-RV-06 L-23-208, Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA00256152023-09-14014 September 2023 Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA0025615 L-23-167, Twenty-Third Refueling Outage Inservice Inspection Summary Report2023-09-13013 September 2023 Twenty-Third Refueling Outage Inservice Inspection Summary Report L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments IR 05000334/20230052023-08-31031 August 2023 Updated Inspection Plan for Beaver Valley Power Station Units 1 and 2 (Report 05000334/2023005 and 05000412/2023005) L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000334/20230022023-08-0909 August 2023 Integrated Inspection Report 05000334/2023002 and 05000412/2023002 ML23219A0592023-08-0707 August 2023 Steam Generator Inspection Reports - Spring 2023 Spring Refueling Outrage L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-179, Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA00256152023-07-18018 July 2023 Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA0025615 ML23188A0982023-07-17017 July 2023 Correction to the Safety Evaluation Issued Related to Amendment Nos. 321 and 211 Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time ML23188A0672023-07-10010 July 2023 Project Manager Assignment L-23-165, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-06-26026 June 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-139, Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report2023-06-13013 June 2023 Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report ML23157A1072023-06-0707 June 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000334/2023011 and 05000412/2023011 ML23143A0272023-05-23023 May 2023 Licensed Operator Positive Fitness-For-Duty Test L-23-055, Submittal of the Updated Final Safety Analysis Report, Revision 342023-05-23023 May 2023 Submittal of the Updated Final Safety Analysis Report, Revision 34 ML23102A1472023-05-22022 May 2023 Issuance of Amendment Nos. 321 and 211 Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23135A7872023-05-19019 May 2023 Summary of Conference Calls Regarding the Spring 2023 Steam Generator Tube Inspections L-23-137, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-05-18018 May 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 L-23-125, Cycle 24 Core Operating Limits Report2023-05-17017 May 2023 Cycle 24 Core Operating Limits Report ML23124A3882023-05-16016 May 2023 Summary of Regulatory Audit in Support of License Amendment Request to Revise Technical Specification 5.6.3, Core Operating Limits Reports (COLR) and TS 4.2.1 Fuel Assemblies ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) L-23-132, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-10010 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000334/20230012023-05-0808 May 2023 Integrated Inspection Report 05000334/2023001 and 05000412/2023001 L-23-129, Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations2023-05-0505 May 2023 Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations ML23118A3812023-04-28028 April 2023 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations L-23-115, Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological2023-04-27027 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological L-23-126, Discharge Monitoring Report (Npdes), Permit No. PA00256152023-04-22022 April 2023 Discharge Monitoring Report (Npdes), Permit No. PA0025615 CP-202300181, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-20020 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments ML23107A2502023-04-18018 April 2023 Requalification Program Inspection 2024-01-25
[Table view] |
Text
March 30, 2006 Mr. James H. Lash Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station P. O. Box 4 Shippingport, PA 15077
SUBJECT:
BEAVER VALLEY NUCLEAR POWER STATION, UNITS 1 AND 2 ISSUANCE OF SAFETY EVALUATION BY THE TECHNICAL SPECIFICATION BRANCH FOR THE CONVERSION TO THE IMPROVED TECHNICAL SPECIFICATIONS (TAC NOS. MC6285 AND MC6286)
Dear Mr. Lash:
By application dated February 25, 2005, as supplemented by letter dated November 11, 2005, First Energy Nuclear Operating Company (FENOC) requested a full conversion from the current Technical Specifications (CTS) to a set of Improved Technical Specifications (ITS) based on NUREG-1431, "Standard Technical Specifications - Westinghouse Plants,"
Revision 2, for the Beaver Valley Nuclear Power Station (BVPS). In addition, Technical Specification Task Force changes were also incorporated to make the resulting BVPS ITS more consistent with Revision 3 of NUREG-1431. The proposed amendment would also consolidate the BVPS-1 and 2 technical specifications into a single set of ITS applicable to both units.
This letter is to inform you that the Technical Specification Branch (TSB) in the Division of Inspection and Regional Support has completed its review of the items within the scope of the ITS conversion. This review is contained in a Safety Evaluation (SE) dated March 30, 2006, (ADAMS Accession No. ML060890360) and was provided to the Division of Operating Reactor Licensing (DORL) in support of the above licensing amendment. The SE input to DORL evaluated ITS changes only and is based on the draft BVPS ITS Revision 2.5 and the draft ITS Bases Revision 2.0. Beyond Scope Items and technical specification changes due to outstanding licensing amendment requests will be resolved by the technical branches in the final SE. DORL will issue the final SE and license amendment when these reviews are completed. Please contact Robert Clark of TSB should you have any comments on the SE input.
Sincerely,
/RA/
Thomas H. Boyce, Chief Technical Specification Branch Division of Inspection & Regional Support Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412 cc: see next page
ML060890360) and was provided to the Division of Operating Reactor Licensing (DORL) in support of the above licensing amendment. The SE input to DORL evaluated ITS changes only and is based on the draft BVPS ITS Revision 2.5 and the draft ITS Bases Revision 2.0. Beyond Scope Items and technical specification changes due to outstanding licensing amendment requests will be resolved by the technical branches in the final SE. DORL will issue the final SE and license amendment when these reviews are completed. Please contact Robert Clark of TSB should you have any comments on the SE input.
Sincerely,
/RA/
Thomas H. Boyce, Chief Technical Specification Branch Division of Inspection & Regional Support Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412 cc: see next page DISTRIBUTION:
ITSB R/F T. Colburn ADAMS: ML060940515 NAME:E:\Filenet\ML060940515.wpd OFFICE ITSB/DIRS/PM ITSB/DIRS/BC NAME RClark TBoyce DATE 3/30/06 3/30/06 Beaver Valley Power Station, Unit Nos. 1 and 2 cc:
Gary R. Leidich Lew W. Myers President and Chief Nuclear Officer Executive Vice President, Special Projects FirstEnergy Nuclear Operating Company FirstEnergy Nuclear Operating Company Mail Stop A-GO-19 Beaver Valley Power Station 76 South Main Street Mail Stop A-BV-SGRP Akron, OH 44308 P.O. Box 4, Route 168 Shippingport, PA 15077 Joseph J. Hagan Senior Vice Presdient of Operations Manager, Site Regulatory Compliance and Chief Operating Officer FirstEnergy Nuclear Operating Company FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-GO-14 Mail Stop A-BV-A 76 South Main Street P.O. Box 4, Route 168 Akron, OH 44308 Shippingport, PA 15077 Danny L. Pace Commissioner James R. Lewis Senior Vice President, Fleet Engineering West Virginia Division of Labor FirstEnergy Nuclear Operating Company 749-B, Building No. 6 Mail Stop A-GO-14 Capitol Complex 76 South Main Street Charleston, WV 25305 Akron, OH 44308 Director, Utilities Department Jeannie M. Rinckel Public Utilities Commission Vice President, Fleet Oversight 180 East Broad Street FirstEnergy Nuclear Operating Company Columbus, OH 43266-0573 Mail Stop A-GO-14 76 South Main Street Director, Pennsylvania Emergency Akron, OH 44308 Management Agency 2605 Interstate Dr.
David W. Jenkins, Attorney Harrisburg, PA 17110-9364 FirstEnergy Corporation Mail Stop A-GO-18 Ohio EPA-DERR 76 South Main Street ATTN: Zack A. Clayton Akron, OH 44308 P.O. Box 1049 Columbus, OH 43266-0149 Manager, Fleet Licensing FirstEnergy Nuclear Operating Company Mail Stop A-GHE-107 395 Ghent Road Akron, OH 44333
Beaver Valley Power Station, Unit Nos. 1 and 2 (continued) cc:
Dr. Judith Johnsrud Environmental Coalition on Nuclear Power Sierra Club 433 Orlando Avenue State College, PA 16803 Director Bureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Mayor of the Borough of Shippingport P.O. Box 3 Shippingport, PA 15077 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 298 Shippingport, PA 15077