ML062230275: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML062230275
| number = ML062230275
| issue date = 08/02/2006
| issue date = 08/02/2006
| title = ASME Section Xi Inservice Inspection 90-Day Report
| title = ASME Section XI Inservice Inspection 90-Day Report
| author name = Harden P A
| author name = Harden P
| author affiliation = Nuclear Management Co, LLC
| author affiliation = Nuclear Management Co, LLC
| addressee name =  
| addressee name =  
Line 76: Line 76:
Acceptable ESS-24-SIS-SH1-209PR1(H 169) Acceptable VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 Page 23 of 33 Category System Component ID Disposition ESS-6-SIS-2B1-16PR(R-770.1)
Acceptable ESS-24-SIS-SH1-209PR1(H 169) Acceptable VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 Page 23 of 33 Category System Component ID Disposition ESS-6-SIS-2B1-16PR(R-770.1)
Acceptable ESS-6-SIS-2B 1-20PR(H-767)
Acceptable ESS-6-SIS-2B 1-20PR(H-767)
Acceptable ESS-8-SIS-HPB-207PR(H1  
Acceptable ESS-8-SIS-HPB-207PR(H1
: 79) Acceptable Exam Comments Vr-3 VT-3 VT-3 77777-=FWS FWS-18-FWL-1Si  
: 79) Acceptable Exam Comments Vr-3 VT-3 VT-3 77777-=FWS FWS-18-FWL-1Si  
-Acceptable 256APR(R32.1)
-Acceptable 256APR(R32.1)
Line 92: Line 92:
SWS-6-CRS-2S1-PSS(H297)
SWS-6-CRS-2S1-PSS(H297)
Acceptable V'-3 SWS-6-CRS-2S2-PSSI(H28)
Acceptable V'-3 SWS-6-CRS-2S2-PSSI(H28)
Acceptable V'-3 SWS-6-CRS-3S1-PSS 1(H27) Acceptable VT-3 SWS-6-CRS-4R2-PSS3(H  
Acceptable V'-3 SWS-6-CRS-3S1-PSS 1(H27) Acceptable VT-3 SWS-6-CRS-4R2-PSS3(H
: 18) Acceptable VT-3 SWS-6-CRS-4S1-PSS1(HI1)
: 18) Acceptable VT-3 SWS-6-CRS-4S1-PSS1(HI1)
Acceptable VT-3 SWS-6-CRS-4S2-PSSI(H1O)
Acceptable VT-3 SWS-6-CRS-4S2-PSSI(H1O)
Line 107: Line 107:
_ __ Commissions M1 300762 Inspector's Signature National Board, Province and Endorsements Date , aw&
_ __ Commissions M1 300762 Inspector's Signature National Board, Province and Endorsements Date , aw&
I rPALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 511/2006 1.2.Owner Plant Consumers Energy Company Name Palisades Nuclear Power Plant Date Sheet 1 of 2 Name 27780 Blue Star Highway, Covert, MI 49043 WO# 26320 Address Repair Organization P.O. No., Job No., etc 3. Work Performed by Owner Name Typo Code Symbol Stamp N/A Same Authorization N/A Address Expiration Date N/A 4. Identification of System ESS Code Class Class 2 5. (a) Applicable Construction Code B31.1 1989 Edition Edition Addenda n/a Code Case n/a (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section XI Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)Snubber Anchor Darling ADH-1000-2487 n/a PO#GO284322 1999 Installed No 4 4. 4. 4. 4.~t~ I 4 4. 4 4. 4 4. I 1 4. 4 4 4 4.* 4. 4. t 4. 4. 1____ ____ 1 ____ 1 ___ 1 ____ 11 ____ ____7. Description of Work 8. Tests conducted:
I rPALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 511/2006 1.2.Owner Plant Consumers Energy Company Name Palisades Nuclear Power Plant Date Sheet 1 of 2 Name 27780 Blue Star Highway, Covert, MI 49043 WO# 26320 Address Repair Organization P.O. No., Job No., etc 3. Work Performed by Owner Name Typo Code Symbol Stamp N/A Same Authorization N/A Address Expiration Date N/A 4. Identification of System ESS Code Class Class 2 5. (a) Applicable Construction Code B31.1 1989 Edition Edition Addenda n/a Code Case n/a (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section XI Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)Snubber Anchor Darling ADH-1000-2487 n/a PO#GO284322 1999 Installed No 4 4. 4. 4. 4.~t~ I 4 4. 4 4. 4 4. I 1 4. 4 4 4 4.* 4. 4. t 4. 4. 1____ ____ 1 ____ 1 ___ 1 ____ 11 ____ ____7. Description of Work 8. Tests conducted:
Replaced Snubber SNB-38 per Snubber Program Hydrostatic  
Replaced Snubber SNB-38 per Snubber Program Hydrostatic
[]Other F1 Pneumatic  
[]Other F1 Pneumatic
[]Pressure Nominal Operating Pressure [] Exempt E]psi Test Temp. 0 F Other: n/a NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
[]Pressure Nominal Operating Pressure [] Exempt E]psi Test Temp. 0 F Other: n/a NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
Ems I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY I 9. Remarks n/a CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section XI.Type Code Symbol Stamp N/A Certificate of Aut izationl.o.
Ems I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY I 9. Remarks n/a CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section XI.Type Code Symbol Stamp N/A Certificate of Aut izationl.o.
N/A Expiration Date N/A Signed /,$J , ASME Program Engineer Date 14'" ... 2J , ZOO-CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michigan and employed by HSB-CT of Connecticut have inspected the components described in this Owners Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.
N/A Expiration Date N/A Signed /,$J , ASME Program Engineer Date 14'" ... 2J , ZOO-CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michigan and employed by HSB-CT of Connecticut have inspected the components described in this Owners Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.
t , Commissions M1 300762 Inspector's Signature National Board, Province and Endorsements Date.obo(o IPALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 612612006 1.2.Owner Consumers Energy Company Date Name Palisades Nuclear Power Plant Plant Sheet 1 Of 2 Name 27780 Blue Star Highway, Covert, MI 49043 WO# 16739 Address Repair Organization P.O. No., Job No., etc 3. Work Performed by Owner Name Type Code Symbol Stamp N/A Same Authorization N/A Address Expiration Date N/A 4. Identification of System SWS Code Class Class 3 5. (a) Applicable Construction Code ASME B31.1 1955 Edition Addenda n/a Code Case n/a (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section Xl Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)MV-SW136 Crane Nuclear Model 143 1/2 XU n/a PO#G0309185 2006 Installed No Flanges Energy Steel n/a n/a PO#P807305 2006 Installed No 4" 300# Supply No Studs 5/8" -11 Muskon Inc n/a n/a PO#P805467 2006 Installed No UNC X4" Long Hex Nuts 5/8"- Muskon Inc n/a n/a PO#P805467 2006 Installed No 11 7. Description of Work 8. Tests conducted:
t , Commissions M1 300762 Inspector's Signature National Board, Province and Endorsements Date.obo(o IPALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 612612006 1.2.Owner Consumers Energy Company Date Name Palisades Nuclear Power Plant Plant Sheet 1 Of 2 Name 27780 Blue Star Highway, Covert, MI 49043 WO# 16739 Address Repair Organization P.O. No., Job No., etc 3. Work Performed by Owner Name Type Code Symbol Stamp N/A Same Authorization N/A Address Expiration Date N/A 4. Identification of System SWS Code Class Class 3 5. (a) Applicable Construction Code ASME B31.1 1955 Edition Addenda n/a Code Case n/a (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section Xl Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)MV-SW136 Crane Nuclear Model 143 1/2 XU n/a PO#G0309185 2006 Installed No Flanges Energy Steel n/a n/a PO#P807305 2006 Installed No 4" 300# Supply No Studs 5/8" -11 Muskon Inc n/a n/a PO#P805467 2006 Installed No UNC X4" Long Hex Nuts 5/8"- Muskon Inc n/a n/a PO#P805467 2006 Installed No 11 7. Description of Work 8. Tests conducted:
Replace Valve MV-SW136 Hydrostatic  
Replace Valve MV-SW136 Hydrostatic
[]Other 0]Pneumatic[]
[]Other 0]Pneumatic[]
Pressure Nominal Operating Pressure Exempt []psi Test Temp. a F Other: NOTE: Supplemental sheets in form of lists, sketches, or drawings maybe used, provided (1) size is 8 1 /2 in. x 1I in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
Pressure Nominal Operating Pressure Exempt []psi Test Temp. a F Other: NOTE: Supplemental sheets in form of lists, sketches, or drawings maybe used, provided (1) size is 8 1 /2 in. x 1I in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
Line 119: Line 119:
N/A Expiration Date N/A Signed ASMEProgram Engineer Date , .( .CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michigan and employed by HSR-CT of Connecticut have inspected the components described in this Owner's Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.
N/A Expiration Date N/A Signed ASMEProgram Engineer Date , .( .CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michigan and employed by HSR-CT of Connecticut have inspected the components described in this Owner's Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.
Commissions Inspector's Signature M1 300762 National Board, Province and Endorsements Date Date E.oc PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 1. Owner Consumers Energy Company Name 2. Plant Palisades Nuclear Power Plant Date Sheet 6/26/2006 1 of 2 Name 27780 Blue Star Highway, Covert, MI 49043 WO#21496 3. Work Performed by Address Owner Name Same Repair Organization P.O. No., Job No., etc Type Code Symbol Stamp Authorization Expiration Date Address 4. Identification of System Code Class Class 2 5. (a) Applicable Construction Code ASME B31.1 1955 Addenda n/a Code C.(b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity Edition ase n/a 1989 With No Addenda (c) Applicable Section Xl Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)P-74 SIRW Chesterton 3247GS n/a PO#G0195946-1996 Installed No Recirc Pump CQ No 4"xl 1/2" Conc Energy & n/a n/a PO# 2006 Installed No Reducer Process Corp P00002253 No 4" Flange Energy & n/a n/a PO# 2006 Installed No Process Corp P00002253 7. Description of Work 8. Tests conducted:
Commissions Inspector's Signature M1 300762 National Board, Province and Endorsements Date Date E.oc PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 1. Owner Consumers Energy Company Name 2. Plant Palisades Nuclear Power Plant Date Sheet 6/26/2006 1 of 2 Name 27780 Blue Star Highway, Covert, MI 49043 WO#21496 3. Work Performed by Address Owner Name Same Repair Organization P.O. No., Job No., etc Type Code Symbol Stamp Authorization Expiration Date Address 4. Identification of System Code Class Class 2 5. (a) Applicable Construction Code ASME B31.1 1955 Addenda n/a Code C.(b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity Edition ase n/a 1989 With No Addenda (c) Applicable Section Xl Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)P-74 SIRW Chesterton 3247GS n/a PO#G0195946-1996 Installed No Recirc Pump CQ No 4"xl 1/2" Conc Energy & n/a n/a PO# 2006 Installed No Reducer Process Corp P00002253 No 4" Flange Energy & n/a n/a PO# 2006 Installed No Process Corp P00002253 7. Description of Work 8. Tests conducted:
Replaced SIRW Tank Recirculation Pump P-74 per EAR-2003-0270 Hydrostatic  
Replaced SIRW Tank Recirculation Pump P-74 per EAR-2003-0270 Hydrostatic
[]PneumaticE]
[]PneumaticE]
Nominal Operating Pressure R]Exempt E]Other []Pressure psi Test Temp.Other: NIA NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
Nominal Operating Pressure R]Exempt E]Other []Pressure psi Test Temp.Other: NIA NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
Line 128: Line 128:
I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY I ITEM 9. Remarks CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section XI.Type Code Symbol Stamp N/A Certificate of Authori ation No. N/A Expiration Date N/A Signed 6, X/ , ASME Program Engineer Date " 6 2k 2cor CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michigan and employed by HSB-CT of Connecticut have inspected the components described in this Owner's Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section Xl.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.
I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY I ITEM 9. Remarks CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section XI.Type Code Symbol Stamp N/A Certificate of Authori ation No. N/A Expiration Date N/A Signed 6, X/ , ASME Program Engineer Date " 6 2k 2cor CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michigan and employed by HSB-CT of Connecticut have inspected the components described in this Owner's Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section Xl.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.
Commissions MI 300762 Inspector's Signature National Board, Province and Endorsements Date D ae?004 I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 6/26/2006 1.2.Owner Plant Consumers Energy Company Name Palisades Nuclear Power Plant Date Sheet of I 2 Name 27780 Blue Star Highway, Covert, MI 49043 WO#27405 Address Repair Organization P.O. No., Job No., etc 3. Work Performed by Owner Name Type Code Symbol Stamp N/A Same Authorization N/A Address Expiration Date N/A 4. Identification of System CCW Code Class Class 3 5. (a) Applicable Construction Code ANSI B16.4 1981 Edition Addenda n/a Code Case n/a (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section Xl Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)CV-0823 CCW Enertech S/N 11524 n/a PO#P808270 2006 Installed No Heat No Exchanger Control Valve 7. Description of Work 8. Tests conducted:
Commissions MI 300762 Inspector's Signature National Board, Province and Endorsements Date D ae?004 I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 6/26/2006 1.2.Owner Plant Consumers Energy Company Name Palisades Nuclear Power Plant Date Sheet of I 2 Name 27780 Blue Star Highway, Covert, MI 49043 WO#27405 Address Repair Organization P.O. No., Job No., etc 3. Work Performed by Owner Name Type Code Symbol Stamp N/A Same Authorization N/A Address Expiration Date N/A 4. Identification of System CCW Code Class Class 3 5. (a) Applicable Construction Code ANSI B16.4 1981 Edition Addenda n/a Code Case n/a (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section Xl Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)CV-0823 CCW Enertech S/N 11524 n/a PO#P808270 2006 Installed No Heat No Exchanger Control Valve 7. Description of Work 8. Tests conducted:
Installed hard stop and repaired areas of Erosion/Cavitation on ID of Valve Body Hydrostatic  
Installed hard stop and repaired areas of Erosion/Cavitation on ID of Valve Body Hydrostatic
[]Other n Pneumatic--]
[]Other n Pneumatic--]
Pressure Nominal Operating Pressure Exempt Ej psi Test Temp. 0 F Other: n/a NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
Pressure Nominal Operating Pressure Exempt Ej psi Test Temp. 0 F Other: n/a NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY 9. Remarks None CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section XI.Type Code Symbol Stamp N/A Certificate of Auth w'ation No. .. EExpiration Date N/A Signed , ASME Program Engineer Date , V. , " CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michigan and employed by HSR-CT of Connecticut have inspected the components described in this Owner's Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.
PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY 9. Remarks None CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section XI.Type Code Symbol Stamp N/A Certificate of Auth w'ation No. .. EExpiration Date N/A Signed , ASME Program Engineer Date , V. , " CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michigan and employed by HSR-CT of Connecticut have inspected the components described in this Owner's Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.
_ _ _ _ _ Commissions MI 300762 Inspector's Signature National Board, Province and Endorsements Date Dat ,J 0 S.. s I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 1. Owner Consumers Energy Company Name 2. Plant Palisades Nuclear Power Plant Date Sheet 6/26/2006 1 of 2 Name 27780 Blue Star Highway, Covert, MI 49043 WO# 25184 Repair Organization P.O. No., Job No., etc Type Code Symbol Stamp N/A Address Nuclear Management Company, LIC 3. Work Performed by Name 27780 Blue Star Hwy, Covert, MI 49043 Address 4. Identification of System SWS 6. (a) Applicable Construction Code ASME B31.1 Addenda 1974 Addend Authorization Expiration Date Code Class N/A N/A Class 3 1973 Edition Edition Code Case n/a (b) Applicable Edition of Section Xi Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section Xi Code Cases n/a 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)CV-0821 Fisher S/N17545158 n/a PO#P806452 2006 Installed No MV-SW769 Velan S/N6615405-02 n/a OP#P806519 2006 Installed No 7. Description of Work 8. Tests conducted:
_ _ _ _ _ Commissions MI 300762 Inspector's Signature National Board, Province and Endorsements Date Dat ,J 0 S.. s I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 1. Owner Consumers Energy Company Name 2. Plant Palisades Nuclear Power Plant Date Sheet 6/26/2006 1 of 2 Name 27780 Blue Star Highway, Covert, MI 49043 WO# 25184 Repair Organization P.O. No., Job No., etc Type Code Symbol Stamp N/A Address Nuclear Management Company, LIC 3. Work Performed by Name 27780 Blue Star Hwy, Covert, MI 49043 Address 4. Identification of System SWS 6. (a) Applicable Construction Code ASME B31.1 Addenda 1974 Addend Authorization Expiration Date Code Class N/A N/A Class 3 1973 Edition Edition Code Case n/a (b) Applicable Edition of Section Xi Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section Xi Code Cases n/a 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)CV-0821 Fisher S/N17545158 n/a PO#P806452 2006 Installed No MV-SW769 Velan S/N6615405-02 n/a OP#P806519 2006 Installed No 7. Description of Work 8. Tests conducted:
Replaced Valve CV-0821 and Installed new Isolation Valve MV-SW769 Hydrostatic  
Replaced Valve CV-0821 and Installed new Isolation Valve MV-SW769 Hydrostatic
[]Pneumatic[]
[]Pneumatic[]
Nominal Operating Pressure S6 Exempt E]Other LI Pressure psi Test Temp.Other: n/a NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1 /2 in. x 11 in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.  
Nominal Operating Pressure S6 Exempt E]Other LI Pressure psi Test Temp.Other: n/a NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1 /2 in. x 11 in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.  
Line 140: Line 140:
____ Roo(.
____ Roo(.
I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 6/26/2006 1.2.Owner Plant Consumers Energy Company Name Palisades Nuclear Power Plant Date Sheet 1 Of 2 Name 27780 Blue Star Highway, Covert, MI 49043 WO# 25693 Address Repair Organization P.O. No., Job No., etc 3. Work Performed by Nuclear Management Company, LLC Name Type Code Symbol Stamp N/A 27780 Blue Star Hwy, Covert, MI 49043 Authorization N/A Address Expiration Date N/A 4. Identification of System SWS Code Class Class 3 5. (a) Applicable Construction Code ASME B31.1 1973 Edition Edition Addenda 1974 Addend Code Case n/a (b) Applicable Edition of Section Xl Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section XI Code Cases n/a 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)CV-0822 Fisher S/N17545159 n/a PO#P806452 2006 Installed No MV-SW770 Velan Model F12-11X13-n/a PO#P806519 2006 Installed BC2A No 7. Description of Work 8. Tests conducted:
I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 6/26/2006 1.2.Owner Plant Consumers Energy Company Name Palisades Nuclear Power Plant Date Sheet 1 Of 2 Name 27780 Blue Star Highway, Covert, MI 49043 WO# 25693 Address Repair Organization P.O. No., Job No., etc 3. Work Performed by Nuclear Management Company, LLC Name Type Code Symbol Stamp N/A 27780 Blue Star Hwy, Covert, MI 49043 Authorization N/A Address Expiration Date N/A 4. Identification of System SWS Code Class Class 3 5. (a) Applicable Construction Code ASME B31.1 1973 Edition Edition Addenda 1974 Addend Code Case n/a (b) Applicable Edition of Section Xl Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section XI Code Cases n/a 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)CV-0822 Fisher S/N17545159 n/a PO#P806452 2006 Installed No MV-SW770 Velan Model F12-11X13-n/a PO#P806519 2006 Installed BC2A No 7. Description of Work 8. Tests conducted:
Replaced Valve CV-0822 and Installed new Isolation Valve MV-SW770 Hydrostatic  
Replaced Valve CV-0822 and Installed new Isolation Valve MV-SW770 Hydrostatic
[]Other []Pneumatic[]
[]Other []Pneumatic[]
Pressure Nominal Operating Pressure 66 psi Test Temp.Exempt []0 F Other: n/a NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 1I in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
Pressure Nominal Operating Pressure 66 psi Test Temp.Exempt []0 F Other: n/a NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 1I in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY I I ITEM 9. Remarks n/a CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section XI.Type Code Symbol Stamp N/A Certificate of Authorizati No N/A Expiration Date NWA Signed ASME Program Engineer Date ., CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michi-gan and employed by HSB-CT of Connecticut have inspected the components described in this Owner's Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.
I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY I I ITEM 9. Remarks n/a CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section XI.Type Code Symbol Stamp N/A Certificate of Authorizati No N/A Expiration Date NWA Signed ASME Program Engineer Date ., CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michi-gan and employed by HSB-CT of Connecticut have inspected the components described in this Owner's Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.
-60" Commissions MI300762 Inspector's Signature National Board, Province and Endorsements Date IPALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 6/26/2006 1.2.Owner Plant Consumers Energy Company Name Palisades Nuclear Power Plant Name 27780 Blue Star Highway, Covert, MI 49043 Date Sheet I of 2 WO#2981 9 Address Repair Organization P.O. No., Job No., etc 3. Work Performed by Owner bner Type Code Symbol Stamp N/A Same Authorization N/A Address Expiration Date N/A 4. Identification of System VAS Code Class Class 3 6. (a) Applicable Construction Code ASME B31.1 1955 Edition Addenda n/a Code Case n/a (b) Applicable Edition of Section Xl Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section Xl Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)Tube Plugs Heat Exchanger n/a n/a PO#663 2005 Installed No Prod Corp No 7.8.Description of Work Tests conducted:
-60" Commissions MI300762 Inspector's Signature National Board, Province and Endorsements Date IPALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 6/26/2006 1.2.Owner Plant Consumers Energy Company Name Palisades Nuclear Power Plant Name 27780 Blue Star Highway, Covert, MI 49043 Date Sheet I of 2 WO#2981 9 Address Repair Organization P.O. No., Job No., etc 3. Work Performed by Owner bner Type Code Symbol Stamp N/A Same Authorization N/A Address Expiration Date N/A 4. Identification of System VAS Code Class Class 3 6. (a) Applicable Construction Code ASME B31.1 1955 Edition Addenda n/a Code Case n/a (b) Applicable Edition of Section Xl Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section Xl Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)Tube Plugs Heat Exchanger n/a n/a PO#663 2005 Installed No Prod Corp No 7.8.Description of Work Tests conducted:
Plugged tube in VHX-4 Heat Exacanger Hydrostatic  
Plugged tube in VHX-4 Heat Exacanger Hydrostatic
[]Other []Pneumatic[o Pressure Nominal Operating Pressure psi Test Temp.Exempt D1 aF Other: n/a NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1 /2 in. x 11 in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
[]Other []Pneumatic[o Pressure Nominal Operating Pressure psi Test Temp.Exempt D1 aF Other: n/a NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1 /2 in. x 11 in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY I ITEM 9. Remarks None CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section XI.Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed '$,*d '/A 6 , ASME Program Engineer Date T -4'-- , z-1 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michigan and employed by HSB-CT of Connecticut have inspected the components described in this Owner's Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.,I* , .Commissions M1 300762 Inspector's Signature..'" s, National Board, Province and Endorsements Date U v IPALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 612612006 1.2.Owner Plant Consumers Energy Company Name Palisades Nuclear Power Plant Name 27780 Blue Star Highway, Covert, MI 49043 Date Sheet of 1 2 WO#26963 Address Repair Organization P.O. No., Job No., etc 3. Work Performed by Owner Name Type Code Symbol Stamp N/A Same Authorization N/A Address Expiration Date NIA 4. Identification of System PCS Code Class Class 1 5. (a) Applicable Construction Code ASME Section I11 1977 Edition Addenda n/a Code Case n/a (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section XI Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)Tube Plugs Westinghouse n/a n/a PO#1281 2005 Installed Electric Company No 7. Description of Work 8. Tests conducted:-Plugged 22 tubes in the "A" Steam Generator Hydrostatic  
I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY I ITEM 9. Remarks None CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section XI.Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed '$,*d '/A 6 , ASME Program Engineer Date T -4'-- , z-1 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michigan and employed by HSB-CT of Connecticut have inspected the components described in this Owner's Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.,I* , .Commissions M1 300762 Inspector's Signature..'" s, National Board, Province and Endorsements Date U v IPALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 612612006 1.2.Owner Plant Consumers Energy Company Name Palisades Nuclear Power Plant Name 27780 Blue Star Highway, Covert, MI 49043 Date Sheet of 1 2 WO#26963 Address Repair Organization P.O. No., Job No., etc 3. Work Performed by Owner Name Type Code Symbol Stamp N/A Same Authorization N/A Address Expiration Date NIA 4. Identification of System PCS Code Class Class 1 5. (a) Applicable Construction Code ASME Section I11 1977 Edition Addenda n/a Code Case n/a (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section XI Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)Tube Plugs Westinghouse n/a n/a PO#1281 2005 Installed Electric Company No 7. Description of Work 8. Tests conducted:-Plugged 22 tubes in the "A" Steam Generator Hydrostatic
[]Other LI Pneumatic[]
[]Other LI Pneumatic[]
Pressure Nominal Operating Pressure R] Exempt[]psi Test Temp.
Pressure Nominal Operating Pressure R] Exempt[]psi Test Temp.
Line 153: Line 153:
PALISADES NUCLEAR POWER PLANT EFOR:MV NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 9. Remarks None CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section XI.Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed ASME Program Engineer Date ,l Zfo , _" _____CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michi-gan and employed by HSR-CT of Connecticut have inspected the components described in this Owners Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.-e o'" Commissions Ml 100762 Inspector's Signature National Board, Province and Endorsements Date 0&44 .2 &V 1%
PALISADES NUCLEAR POWER PLANT EFOR:MV NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 9. Remarks None CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section XI.Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed ASME Program Engineer Date ,l Zfo , _" _____CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michi-gan and employed by HSR-CT of Connecticut have inspected the components described in this Owners Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.-e o'" Commissions Ml 100762 Inspector's Signature National Board, Province and Endorsements Date 0&44 .2 &V 1%
PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 6/26/2006 1.2.Owner Plant Consumers Energy Company Name Palisades Nuclear Power Plant Name 27780 Blue Star Highway, Covert, MI 49043 Date Sheet I Of 2 WO#26964 Address Repair Organization P.O. No., Job No., etc 3. Work Performed by Owner Name Type Code Symbol Stamp NIA Same Authorization NIA Address Expiration Date N/A 4. Identification of System PCS Code Class Class 1 5. (a) Applicable Construction Code ASME Section III 1977 Edition Addenda n/a Code Case n/a (b) Applicable Edition of Section Xl Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section XI Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)Tube Plugs Westinghouse n/a n/a PO#1281 2005 Installed No Electric Company No 7. Description of Work 8. Tests conducted:
PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 6/26/2006 1.2.Owner Plant Consumers Energy Company Name Palisades Nuclear Power Plant Name 27780 Blue Star Highway, Covert, MI 49043 Date Sheet I Of 2 WO#26964 Address Repair Organization P.O. No., Job No., etc 3. Work Performed by Owner Name Type Code Symbol Stamp NIA Same Authorization NIA Address Expiration Date N/A 4. Identification of System PCS Code Class Class 1 5. (a) Applicable Construction Code ASME Section III 1977 Edition Addenda n/a Code Case n/a (b) Applicable Edition of Section Xl Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section XI Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)Tube Plugs Westinghouse n/a n/a PO#1281 2005 Installed No Electric Company No 7. Description of Work 8. Tests conducted:
Plugged 10 tubes in the "B" Steam Generator Hydrostatic  
Plugged 10 tubes in the "B" Steam Generator Hydrostatic
[]Other []Pneumatic[]
[]Other []Pneumatic[]
Pressure Nominal Operating Pressure Sd Exempt[]psi Test Temp.
Pressure Nominal Operating Pressure Sd Exempt[]psi Test Temp.
Line 159: Line 159:
PALISADES NUCLEAR POWER PLANT FRM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 9. Remarks None CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section XI.Type Code Symbol Stamp N/A Certificate of Authoyation No. N/A Expiration Date N/A Signed 144--& ASME Pro(g ram Engineer Date it,- 2. , '2,06 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michigan and employed by HSS-CT of Connecticut have inspected the components described in this Owner's Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.
PALISADES NUCLEAR POWER PLANT FRM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 9. Remarks None CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section XI.Type Code Symbol Stamp N/A Certificate of Authoyation No. N/A Expiration Date N/A Signed 144--& ASME Pro(g ram Engineer Date it,- 2. , '2,06 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michigan and employed by HSS-CT of Connecticut have inspected the components described in this Owner's Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.
____ _ __ Commissions M1 300762 Inspectors Signature National Board, Province and Endorsements Date " V(X , Id V I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 1. Owner Consumers Energy Company Name 2. Plant Palisades Nuclear Power Plant Date Sheet 6/26/2006 1 of 2 Name 27780 Blue Star Highway, Covert, MI 49043 WO#20457 Address Owner Repair Organization P.O. No., Job No., etc 3. Work Performed by Name Same Address 4. Identification of System ESS Type Code Symbol Stamp Authorization Expiration Date Code Class N/A N/A Class 2 5. (a) Applicable Construction Code ASME B31.1 1955 Ed Addenda n/a Code Ca (b) Applicable Edition of Section Xi Utilized for Repair/Replacement Activity ition Edition ase n/a 1989 With No Addenda (c) Applicable Section Xl Code Cases N-416-1 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)CV-3070 Aloyco Inc 68-Mi 13-1 n/a PO#4838 2006 Installed No 7. Description of Work 8. Tests conducted:
____ _ __ Commissions M1 300762 Inspectors Signature National Board, Province and Endorsements Date " V(X , Id V I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 1. Owner Consumers Energy Company Name 2. Plant Palisades Nuclear Power Plant Date Sheet 6/26/2006 1 of 2 Name 27780 Blue Star Highway, Covert, MI 49043 WO#20457 Address Owner Repair Organization P.O. No., Job No., etc 3. Work Performed by Name Same Address 4. Identification of System ESS Type Code Symbol Stamp Authorization Expiration Date Code Class N/A N/A Class 2 5. (a) Applicable Construction Code ASME B31.1 1955 Ed Addenda n/a Code Ca (b) Applicable Edition of Section Xi Utilized for Repair/Replacement Activity ition Edition ase n/a 1989 With No Addenda (c) Applicable Section Xl Code Cases N-416-1 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)CV-3070 Aloyco Inc 68-Mi 13-1 n/a PO#4838 2006 Installed No 7. Description of Work 8. Tests conducted:
Replaced HPSI Pump P-66B subcooling valve CV-3070 Hydrostatic  
Replaced HPSI Pump P-66B subcooling valve CV-3070 Hydrostatic
[]Pneumatic[]
[]Pneumatic[]
Nominal Operating Pressure W Exempt []Other Rl Pressure psi Test Temp.Other: n/a NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1 /2 in. x 11 in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
Nominal Operating Pressure W Exempt []Other Rl Pressure psi Test Temp.Other: n/a NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1 /2 in. x 11 in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY I ITEM 9. Remarks None CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section XI.Type Code Symbol Stamp NIA Certificate of Authorztion No. N/A Expiration Date N/A Signed , ASME Program Engineer Date 2:1 , W--CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michigan and employed by HS4-CT of Connecticut have inspected the components described in this Owners Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection." Commissions MI 300762 Inspector's Signature National Board, Province and Endorsements Date Ja4J-" o-, .2:F I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 6/2612006 1.2.Owner Plant Consumers Energy Company Name Palisades Nuclear Power Plant Name 27780 Blue Star Highway, Covert, MI 49043 Date Sheet 1 of 2 WO#270650 Address Repair Organization P.O. No., Job No., etc 3. Work Performed by Owner Name Type Code Symbol Stamp N/A Same Authorization N/A Address Expiration Date N/A 4. Identification of System CSW Code Class Class 3 5. (a) Applicable Construction Code ASME B31.1 1955 Edition Edition Addenda nra Code Case n/a (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section XI Code Cases N-416-1 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)3" Weldolet Dubose n/a n/a PO#5457 2006 Installed No 3" Pipe Cap Dubose n/a n/a PO#5457 2006 Installed No I INI 7. Description of Work 8. Tests conducted:
I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY I ITEM 9. Remarks None CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section XI.Type Code Symbol Stamp NIA Certificate of Authorztion No. N/A Expiration Date N/A Signed , ASME Program Engineer Date 2:1 , W--CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michigan and employed by HS4-CT of Connecticut have inspected the components described in this Owners Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection." Commissions MI 300762 Inspector's Signature National Board, Province and Endorsements Date Ja4J-" o-, .2:F I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 6/2612006 1.2.Owner Plant Consumers Energy Company Name Palisades Nuclear Power Plant Name 27780 Blue Star Highway, Covert, MI 49043 Date Sheet 1 of 2 WO#270650 Address Repair Organization P.O. No., Job No., etc 3. Work Performed by Owner Name Type Code Symbol Stamp N/A Same Authorization N/A Address Expiration Date N/A 4. Identification of System CSW Code Class Class 3 5. (a) Applicable Construction Code ASME B31.1 1955 Edition Edition Addenda nra Code Case n/a (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section XI Code Cases N-416-1 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)3" Weldolet Dubose n/a n/a PO#5457 2006 Installed No 3" Pipe Cap Dubose n/a n/a PO#5457 2006 Installed No I INI 7. Description of Work 8. Tests conducted:
Installed weldolet and cap on servive water pipe Hydrostatic  
Installed weldolet and cap on servive water pipe Hydrostatic
[]Other R]Pneumatic[]
[]Other R]Pneumatic[]
Pressure Nominal Operating Pressure 6d Exempt []psi Test Temp. 0 F Other: n/a NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1 /2 in. x 11 in., (2)information In items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
Pressure Nominal Operating Pressure 6d Exempt []psi Test Temp. 0 F Other: n/a NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1 /2 in. x 11 in., (2)information In items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
Line 173: Line 173:
I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 1. Owner Consumers Energy Company Name 2. Plant Palisades Nuclear Power Plant Date 6/2612006 Sheet 1 of 2 Name 27780 Blue Star Highway, Covert, Ml 49043 WO#269848 Address NWS TechnologiesLLC
I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 1. Owner Consumers Energy Company Name 2. Plant Palisades Nuclear Power Plant Date 6/2612006 Sheet 1 of 2 Name 27780 Blue Star Highway, Covert, Ml 49043 WO#269848 Address NWS TechnologiesLLC
: 3. Work Performed by Repair Organization P.O. No., Job No., etc Type Code Symbol Stamp VR I NR Name 131 Venture Bivd, SpartanburgSC 29301 Address 4. Identification of System MSS 5. (a) Applicable Construction Code ASME Section III Addenda n/a Authorization Expiration Date Code Class 632 /81 4/312009 4/9/2009 1968 Edition Code Case n/a (b) Applicable Edition of Section Xl Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section Xl Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)RV-0703 See Attached Form NVR-1 7. Description of Work 8. Tests conducted:
: 3. Work Performed by Repair Organization P.O. No., Job No., etc Type Code Symbol Stamp VR I NR Name 131 Venture Bivd, SpartanburgSC 29301 Address 4. Identification of System MSS 5. (a) Applicable Construction Code ASME Section III Addenda n/a Authorization Expiration Date Code Class 632 /81 4/312009 4/9/2009 1968 Edition Code Case n/a (b) Applicable Edition of Section Xl Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section Xl Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)RV-0703 See Attached Form NVR-1 7. Description of Work 8. Tests conducted:
Repaired Relief Valve Hydrostatic E]Pneumatic  
Repaired Relief Valve Hydrostatic E]Pneumatic
[-Nominal Operating Pressure 0 Exempt E]Other LI Pressure psi Test Temp.Other: NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1 /2 in. x 11 in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
[-Nominal Operating Pressure 0 Exempt E]Other LI Pressure psi Test Temp.Other: NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1 /2 in. x 11 in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY I ITEM 9. Remarks See Attached Form NVR-1 for RV-0703 CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section XI.Type Code Symbol Stamp N/A Certificate of AuthorizonNo.
I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY I ITEM 9. Remarks See Attached Form NVR-1 for RV-0703 CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section XI.Type Code Symbol Stamp N/A Certificate of AuthorizonNo.
Line 188: Line 188:
no.)
no.)
I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 6/26/2006 1.2.Owner Plant Consumers Energy Company Name Palisades Nuclear Power Plant Name 27780 Blue Star Highway, Covert, MI 49043 Date Sheet 1 of 2 WO#269853 Address Repair Organization P.O. No., Job No., etc 3. Work Performed by NWS Technologies,LLC Type Code Symbol Stamp VR I NR Name 131 Venture Blvd, Spartanburg,SC 29301 Authorization 632/81 Address Expiration Date 4/3/2009 4/9/2009 4. Identification of System MSS Code Class 6. (a) Applicable Construction Code ASME Section 1II 1968 Edition Addenda n/a Code Case n/a (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section XI Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)RV-0705 See Attached Form NVR-1 7. Description of Work 8. Tests conducted:
I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 6/26/2006 1.2.Owner Plant Consumers Energy Company Name Palisades Nuclear Power Plant Name 27780 Blue Star Highway, Covert, MI 49043 Date Sheet 1 of 2 WO#269853 Address Repair Organization P.O. No., Job No., etc 3. Work Performed by NWS Technologies,LLC Type Code Symbol Stamp VR I NR Name 131 Venture Blvd, Spartanburg,SC 29301 Authorization 632/81 Address Expiration Date 4/3/2009 4/9/2009 4. Identification of System MSS Code Class 6. (a) Applicable Construction Code ASME Section 1II 1968 Edition Addenda n/a Code Case n/a (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section XI Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)RV-0705 See Attached Form NVR-1 7. Description of Work 8. Tests conducted:
Repaired Relief Valve Hydrostatic  
Repaired Relief Valve Hydrostatic
[]Other R Pneumatic[]
[]Other R Pneumatic[]
Pressure Nominal Operating Pressure Exempt i]psi Test Temp. a F Other: NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1 /2 in. x 11 in., (2)information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
Pressure Nominal Operating Pressure Exempt i]psi Test Temp. a F Other: NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1 /2 in. x 11 in., (2)information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
Line 204: Line 204:
no.)
no.)
m I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY I ITEM 1. Owner Consumers Energy Company Name 2. Plant Palisades Nuclear Power Plant Name 27780 Blue Star Highway, Covert, MI 49043 Date 6/26/2006 Sheet 1 of 2 3. Work Performed by Address NWS Technologies,LLC WO#267581 Repair Organization P.O. No., Job No., etc Type Code Symbol Stamp VR / NR Name 131 Venture Blvd, Spartanburg,SC 29301 Address 4. Identification of System MSS Authorization Expiration Date Code Class 632 /81 4/312009 4/912009 S. (a) Applicable Construction Code ASME Section III 1968 Addenda n/a Code Ca (b) Applicable Edition of Section Xl Utilized for Repair/Replacement Activity Edition se n/a 1989 With No Addenda (c) Applicable Section Xl Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)RV-0706 See Attached Form NVR-1 7. Description of Work 8. Tests conducted:
m I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY I ITEM 1. Owner Consumers Energy Company Name 2. Plant Palisades Nuclear Power Plant Name 27780 Blue Star Highway, Covert, MI 49043 Date 6/26/2006 Sheet 1 of 2 3. Work Performed by Address NWS Technologies,LLC WO#267581 Repair Organization P.O. No., Job No., etc Type Code Symbol Stamp VR / NR Name 131 Venture Blvd, Spartanburg,SC 29301 Address 4. Identification of System MSS Authorization Expiration Date Code Class 632 /81 4/312009 4/912009 S. (a) Applicable Construction Code ASME Section III 1968 Addenda n/a Code Ca (b) Applicable Edition of Section Xl Utilized for Repair/Replacement Activity Edition se n/a 1989 With No Addenda (c) Applicable Section Xl Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)RV-0706 See Attached Form NVR-1 7. Description of Work 8. Tests conducted:
Repaired Relief Valve Hydrostatic  
Repaired Relief Valve Hydrostatic
[]PneumaticE]
[]PneumaticE]
Nominal Operating Pressure W Exempt I]Other []Pressure psi Test Temp.Other: NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1 /2 in. x 11 in., (2)information In items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
Nominal Operating Pressure W Exempt I]Other []Pressure psi Test Temp.Other: NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1 /2 in. x 11 in., (2)information In items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY I ITEM 9. Remarks See Attached Form NVR-1 for RV-0706 CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section XI.Type Code Symbol Stamp N/A Certificate of Auth ization No. NIA Expiration Date N/A Signed /'"/'I ,, , ASME Program Engineer Date ____ zrJ 200(a CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michigan and employed by HSR-rT of Connecticut have inspected the components described in this Owners Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.
I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY I ITEM 9. Remarks See Attached Form NVR-1 for RV-0706 CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section XI.Type Code Symbol Stamp N/A Certificate of Auth ization No. NIA Expiration Date N/A Signed /'"/'I ,, , ASME Program Engineer Date ____ zrJ 200(a CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michigan and employed by HSR-rT of Connecticut have inspected the components described in this Owners Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.
Commissions M1 300762 Inspectors Signature'4 OrT National Board, Province and Endorsements Date FORM NVR-1 REPORT OF REPAIR [] REPLACEMENT  
Commissions M1 300762 Inspectors Signature'4 OrT National Board, Province and Endorsements Date FORM NVR-1 REPORT OF REPAIR [] REPLACEMENT
[3 OF NUCLEAR PRESSURE RELIEF DEVICES 1. Work performed by: NWS Technologies, LLC Purchase Order# 00004610 131 Venture Boulevard, Spartanburg, SC 29306 2. Work performed for: Nuclear Management Company -Palisades Nuclear Plant 314. Owner -name, address and identification of nuclear power plant Nuclear Management Company -Palisades Nuclear Plant, 27780 Blue Star Memorial Hwy, Covert, MI 49043 5. a: Repaired pressure relief device: Main Steam Safety Valve b: Name of manufacturer.
[3 OF NUCLEAR PRESSURE RELIEF DEVICES 1. Work performed by: NWS Technologies, LLC Purchase Order# 00004610 131 Venture Boulevard, Spartanburg, SC 29306 2. Work performed for: Nuclear Management Company -Palisades Nuclear Plant 314. Owner -name, address and identification of nuclear power plant Nuclear Management Company -Palisades Nuclear Plant, 27780 Blue Star Memorial Hwy, Covert, MI 49043 5. a: Repaired pressure relief device: Main Steam Safety Valve b: Name of manufacturer.
Anderson Greenwood I Crosby c: Identifying nos.HA 55 RV-0706 r (type) (m"s S) (N d: Construction Code: ASME Sec. III 1968 (name/sectlonldivision) (edition)6. ASME Code Section XI applicable for inservice inspection:
Anderson Greenwood I Crosby c: Identifying nos.HA 55 RV-0706 r (type) (m"s S) (N d: Construction Code: ASME Sec. III 1968 (name/sectlonldivision) (edition)6. ASME Code Section XI applicable for inservice inspection:
Line 220: Line 220:
PALISADES NUCLEAR POWER PLANT E ORM NIS-2 OWNER'S REPORT FOR REPAIR/TREPLACEMENT ACTIVITY ITEM 1. Owner Consumers Energy Company Name 2. Plant Palisades Nuclear Power Plant Date 6/26/2006 Sheet 1 Of 2 Name 27780 Blue Star Highway, Covert, MI 49043 WO#269856 Address NWS Technologies,LLC
PALISADES NUCLEAR POWER PLANT E ORM NIS-2 OWNER'S REPORT FOR REPAIR/TREPLACEMENT ACTIVITY ITEM 1. Owner Consumers Energy Company Name 2. Plant Palisades Nuclear Power Plant Date 6/26/2006 Sheet 1 Of 2 Name 27780 Blue Star Highway, Covert, MI 49043 WO#269856 Address NWS Technologies,LLC
: 3. Work Performed by Repair Organization P.O. No., Job No., etc Type Code Symbol Stamp VR I NR Authorization 632/81 Name 131 Venture Blvd, Spartanburg,SC 29301 Address 4. Identification of System MSS Expiration Date Code Class 4/3/2009 4/912009 5. (a) Applicable Construction Code ASME Section III 1968 Edition Addenda nla Code Case n/a (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section XI Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)RV-0707 See Attached Form NVR-1 7. Description of Work 8. Tests conducted:
: 3. Work Performed by Repair Organization P.O. No., Job No., etc Type Code Symbol Stamp VR I NR Authorization 632/81 Name 131 Venture Blvd, Spartanburg,SC 29301 Address 4. Identification of System MSS Expiration Date Code Class 4/3/2009 4/912009 5. (a) Applicable Construction Code ASME Section III 1968 Edition Addenda nla Code Case n/a (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section XI Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)RV-0707 See Attached Form NVR-1 7. Description of Work 8. Tests conducted:
Repaired Relief Valve Hydrostatic  
Repaired Relief Valve Hydrostatic
[]Pneumatic[]
[]Pneumatic[]
Nominal Operating Pressure W Exempt []Other 0 Pressure psi Test Temp.Other: NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
Nominal Operating Pressure W Exempt []Other 0 Pressure psi Test Temp.Other: NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 9. Remarks See Attached Form NVR-1 for RV-0707 CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section XI.Type Code Symbol Stamp N/A Certificate of Au.rization No. NIA Expiration Date N/A Signe /AS,/ iMi 7 E Program Engineer Date wo W- 7,- 5 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michigan and employed by HSB-CT of Connecticut have inspected the components described in this Owner's Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.
PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 9. Remarks See Attached Form NVR-1 for RV-0707 CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section XI.Type Code Symbol Stamp N/A Certificate of Au.rization No. NIA Expiration Date N/A Signe /AS,/ iMi 7 E Program Engineer Date wo W- 7,- 5 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michigan and employed by HSB-CT of Connecticut have inspected the components described in this Owner's Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.
_ _60 " Commissions M1 300762 Inspector's Signature National Board, Province and Endorsements Date _ ___ __O___V V FORM NVR-1 REPORT OF REPAIR Da REPLACEMENT  
_ _60 " Commissions M1 300762 Inspector's Signature National Board, Province and Endorsements Date _ ___ __O___V V FORM NVR-1 REPORT OF REPAIR Da REPLACEMENT
[3 OF NUCLEAR PRESSURE RELIEF DEVICES§ 1. Work performed by: NWS Technologies, LLC Purchase Order# 00004610 131 Venture Boulevard, Spartanburg, SC 29306 2. Work performed for Nuclear Management Company -Palisades Nuclear Plant 3/4. Owner -name, address and identification of nuclear power plant: Nuclear Management Company -Palisades Nuclear Plant, 27780 Blue Star Memorial Hwy, Covert, MI 49043 5. a: Repaired pressure relief device: Main Steam Safety Valve b: Name of manufacturer Anderson Greenwood I Crosby c: Identifying nos.HA 55 RV-0707 n/a steam 6Q8 n/a (type) (mfe's SIN) (NB#) (service). (size) (yr.buil)d: Construction Code: ASME Sec. I1I 1968 n/a n/a 1 (namelsectionldivision) (edition) (addenda) (Code Cases(s)) (Code Class)6. ASME Code Section XI applicable for Inservice inspection:
[3 OF NUCLEAR PRESSURE RELIEF DEVICES§ 1. Work performed by: NWS Technologies, LLC Purchase Order# 00004610 131 Venture Boulevard, Spartanburg, SC 29306 2. Work performed for Nuclear Management Company -Palisades Nuclear Plant 3/4. Owner -name, address and identification of nuclear power plant: Nuclear Management Company -Palisades Nuclear Plant, 27780 Blue Star Memorial Hwy, Covert, MI 49043 5. a: Repaired pressure relief device: Main Steam Safety Valve b: Name of manufacturer Anderson Greenwood I Crosby c: Identifying nos.HA 55 RV-0707 n/a steam 6Q8 n/a (type) (mfe's SIN) (NB#) (service). (size) (yr.buil)d: Construction Code: ASME Sec. I1I 1968 n/a n/a 1 (namelsectionldivision) (edition) (addenda) (Code Cases(s)) (Code Class)6. ASME Code Section XI applicable for Inservice inspection:
1989 n/a n/a (edition) (addenda) (Code Case(s))7. ASME Code Section XI used for repairs, replacements:
1989 n/a n/a (edition) (addenda) (Code Case(s))7. ASME Code Section XI used for repairs, replacements:
Line 252: Line 252:
I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 1. Owner Consumers Energy Company Name 2. Plant Palisades Nuclear Power Plant Name 27780 Blue Star Highway, Covert, MI 49043 Date Sheet 6/26/2006 1 of 2 WO#26379 Address NWS Technologies,LLC
I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 1. Owner Consumers Energy Company Name 2. Plant Palisades Nuclear Power Plant Name 27780 Blue Star Highway, Covert, MI 49043 Date Sheet 6/26/2006 1 of 2 WO#26379 Address NWS Technologies,LLC
: 3. Work Performed by Repair Organization P.O. No., Job No., etc Type Code Symbol Stamp VR / NR Name 131 Venture Blvd, Spartanburg,SC 29301 Address 4. Identification of System MSS Authorization Expiration Date Code Class 632/81 4/3/2009 4/9/2009 5. (a) Applicable Construction Code ASME Section eII Addenda nIa 1968 Edition Code Case nla (b) Applicable Edition of Section Xl Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section Xl Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)RV-0716 See Attached I Form NVR-1 I 4. 4 I I 4 4 4 4 4 I I 4 4 4 4. 4 I I 4 4 4 4. 4 I I 4-4 4 4. 4 1 I 1 .1 7. Description of Work 8. Tests conducted:
: 3. Work Performed by Repair Organization P.O. No., Job No., etc Type Code Symbol Stamp VR / NR Name 131 Venture Blvd, Spartanburg,SC 29301 Address 4. Identification of System MSS Authorization Expiration Date Code Class 632/81 4/3/2009 4/9/2009 5. (a) Applicable Construction Code ASME Section eII Addenda nIa 1968 Edition Code Case nla (b) Applicable Edition of Section Xl Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section Xl Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)RV-0716 See Attached I Form NVR-1 I 4. 4 I I 4 4 4 4 4 I I 4 4 4 4. 4 I I 4 4 4 4. 4 I I 4-4 4 4. 4 1 I 1 .1 7. Description of Work 8. Tests conducted:
Repaired Relief Valve Hydrostatic  
Repaired Relief Valve Hydrostatic
[]Pneumatic[]
[]Pneumatic[]
Nominal Operating Pressure Rj Exempt E]Other El Pressure psi Test Temp.Other: NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 In. x 11 in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
Nominal Operating Pressure Rj Exempt E]Other El Pressure psi Test Temp.Other: NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 In. x 11 in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
Line 269: Line 269:
no.)
no.)
PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 6/2612006 1.2.Owner Plant Consumers Energy Company Name Palisades Nuclear Power Plant Name 27780 Blue Star Highway, Covert, MI 49043 Date Sheet I Of 2 WO#269863 Address Repair Organization P.O. No., Job No., etc 3. Work Performed by NWS Technologies,LLC Type Code Symbol Stamp yR / NR Name 131 Venture Blvd, Spartanburg,SC 29301 Authorization 632/81 Address Expiration Date 4/3/2009 4/9/2009 4. Identification of System MSS Code Class Class 2 5. (a) Applicable Construction Code ASME Section III 1968 Edition Addenda n/a Code Case n/a (b) Applicable Edition of Section Xl Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section Xl Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)RV-0721 See Attached Form NVR-1 7.8.Description of Work Tests conducted:
PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 6/2612006 1.2.Owner Plant Consumers Energy Company Name Palisades Nuclear Power Plant Name 27780 Blue Star Highway, Covert, MI 49043 Date Sheet I Of 2 WO#269863 Address Repair Organization P.O. No., Job No., etc 3. Work Performed by NWS Technologies,LLC Type Code Symbol Stamp yR / NR Name 131 Venture Blvd, Spartanburg,SC 29301 Authorization 632/81 Address Expiration Date 4/3/2009 4/9/2009 4. Identification of System MSS Code Class Class 2 5. (a) Applicable Construction Code ASME Section III 1968 Edition Addenda n/a Code Case n/a (b) Applicable Edition of Section Xl Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section Xl Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)RV-0721 See Attached Form NVR-1 7.8.Description of Work Tests conducted:
Repaired Relief Valve Hydrostatic  
Repaired Relief Valve Hydrostatic
[]Other ED Pneumatic--
[]Other ED Pneumatic--
Pressure Nominal Operating Pressure psi Test Temp.Exempt [D 0 F Other: NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in., (2)information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
Pressure Nominal Operating Pressure psi Test Temp.Exempt [D 0 F Other: NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in., (2)information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY I ITEM 9. Remarks See Attached Form NVR-1 for RV-0721 CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section X1.Type Code Symbol Stamp N/A Certificate of Authoriwtion No. N/A Expiration Date N/A Signed ,2.( ASME Program Engineer Date ,24-w -CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michi-gan and employed by HSR-QT of Connecticut have inspected the components described in this Owners Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.t44 Commissions MI 300762 Inspector's Signatuire National Board, Province and Endorsements Date " 0 , oOO 6 V V FORM NVR-1 REPORT OF REPAIR Ea REPLACEMENT 10 OF NUCLEAR PRESSURE RELIEF DEVICES 1. Work performed by: (NWS Technologies, LLC Purchase Order # 00004610 131 Venture Boulevard, Spartanburg, SC 29306 2. Work performed for: Nuclear Management Company -Palisades Nuclear Plant 314. Owner -name, address and identification of nuclear power plant Nuclear Management Company -Nuclear Plant, 27780 Blue Star Memorial Hwy, Covert, MI 49043 5. a: Repaired pressure relief device: Main Steam SafetY Valve b: Name of manufacturer:.
I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY I ITEM 9. Remarks See Attached Form NVR-1 for RV-0721 CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section X1.Type Code Symbol Stamp N/A Certificate of Authoriwtion No. N/A Expiration Date N/A Signed ,2.( ASME Program Engineer Date ,24-w -CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michi-gan and employed by HSR-QT of Connecticut have inspected the components described in this Owners Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.t44 Commissions MI 300762 Inspector's Signatuire National Board, Province and Endorsements Date " 0 , oOO 6 V V FORM NVR-1 REPORT OF REPAIR Ea REPLACEMENT 10 OF NUCLEAR PRESSURE RELIEF DEVICES 1. Work performed by: (NWS Technologies, LLC Purchase Order # 00004610 131 Venture Boulevard, Spartanburg, SC 29306 2. Work performed for: Nuclear Management Company -Palisades Nuclear Plant 314. Owner -name, address and identification of nuclear power plant Nuclear Management Company -Nuclear Plant, 27780 Blue Star Memorial Hwy, Covert, MI 49043 5. a: Repaired pressure relief device: Main Steam SafetY Valve b: Name of manufacturer:.
Anderson Greenwood I Crosby c: Identifying nos.HA 55 RV-C (type) (rfns d: Construction Code: ASME Sec. Ill (namelsection/divislon) 721 S/N)1968 (edition)n/a steam 608 (NB#) (service). (size)n/a- n/a (addenda) (Code Cases(s))  
Anderson Greenwood I Crosby c: Identifying nos.HA 55 RV-C (type) (rfns d: Construction Code: ASME Sec. Ill (namelsection/divislon) 721 S/N)1968 (edition)n/a steam 608 (NB#) (service). (size)n/a- n/a (addenda) (Code Cases(s))
(n/1 (yr.b 1'ode Clas 6. ASME Code Section XI applicable for inservice inspection:
(n/1 (yr.b 1'ode Clas 6. ASME Code Section XI applicable for inservice inspection:
: 7. ASME Code Section XI used for repairs, replacements:
: 7. ASME Code Section XI used for repairs, replacements:
Line 283: Line 283:
nor my employer shall be liable In any manner for any personal injury, property damage or loss of any kind arising from or connected it this Inspe ion.--,I 7n ,,-,,r-- NS omissons8462, A, N, I NCd 1073 I eI n s o~ ( I sna, r re Commissions (NB (mci endorsements).
nor my employer shall be liable In any manner for any personal injury, property damage or loss of any kind arising from or connected it this Inspe ion.--,I 7n ,,-,,r-- NS omissons8462, A, N, I NCd 1073 I eI n s o~ ( I sna, r re Commissions (NB (mci endorsements).
jurisdiction.&
jurisdiction.&
no I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 1. Owner Consumers Energy Company Name 2. Plant Palisades Nuclear Power Plant Date 6/26/2006 Sheet 1 of 2 Name 27780 Blue Star Highway, Covert, MI 49043 Address NWS TechnologiesLLC WO#269864 Repair Organization P.O. No., Job No., etc Type Code Symbol Stamp VR / NR Authorization 632/81 3. Work Performed by Name 131 Venture Blvd, Spartanburg,SC 29301 Address 4. Identification of System MSS 5. (a) Applicable Construction Code ASME Section III Addenda n/a Expiration Date Code Class 1968 4/3/2009 4/9/2009 Edition Code Case n/a (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section Xl Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)RV-0722 See Attached Form NVR-1 7. Description of Work 8. Tests conducted:-Repaired Relief Valve Hydrostatic  
no I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 1. Owner Consumers Energy Company Name 2. Plant Palisades Nuclear Power Plant Date 6/26/2006 Sheet 1 of 2 Name 27780 Blue Star Highway, Covert, MI 49043 Address NWS TechnologiesLLC WO#269864 Repair Organization P.O. No., Job No., etc Type Code Symbol Stamp VR / NR Authorization 632/81 3. Work Performed by Name 131 Venture Blvd, Spartanburg,SC 29301 Address 4. Identification of System MSS 5. (a) Applicable Construction Code ASME Section III Addenda n/a Expiration Date Code Class 1968 4/3/2009 4/9/2009 Edition Code Case n/a (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section Xl Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)RV-0722 See Attached Form NVR-1 7. Description of Work 8. Tests conducted:-Repaired Relief Valve Hydrostatic
[]Pneumatic-Nominal Operating Pressure &6 Exempt (D Other 0 Pressure psi Test Temp.Other: NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1 /2 in. x 11 in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
[]Pneumatic-Nominal Operating Pressure &6 Exempt (D Other 0 Pressure psi Test Temp.Other: NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1 /2 in. x 11 in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY I ITEM 9. Remarks See Attached Form NVR-1 for RV-0722 CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section XI.Type Code Symbol Stamp N/A Certificate of Autoization No. NIA Expiration Date N/A Signed --(. , ASME Program Engineer Date Mj.e-"O  CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michi-gan and employed by HSR-CT of Connecticut have inspected the components described in this Owner's Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section Xl.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.
I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY I ITEM 9. Remarks See Attached Form NVR-1 for RV-0722 CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section XI.Type Code Symbol Stamp N/A Certificate of Autoization No. NIA Expiration Date N/A Signed --(. , ASME Program Engineer Date Mj.e-"O  CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michi-gan and employed by HSR-CT of Connecticut have inspected the components described in this Owner's Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section Xl.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.
Line 302: Line 302:
I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM M 1. Owner Consumers Energy Company Name 2. Plant Palisades Nuclear Power Plant Date Sheet 6/26/2006 1Of 2 Name 27780 Blue Star Highway, Covert, MI 49043 WO#26226 Address NWS Technologies,LLC
I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM M 1. Owner Consumers Energy Company Name 2. Plant Palisades Nuclear Power Plant Date Sheet 6/26/2006 1Of 2 Name 27780 Blue Star Highway, Covert, MI 49043 WO#26226 Address NWS Technologies,LLC
: 3. Work Performed by Repair Organization P.O. No., Job No., etc Type Code Symbol Stamp VR I NR Name 131 Venture Blvd, Spartanburg,SC 29301 Address 4. Identification of System PCs 6. (a) Applicable Construction Code ASME Section IlII Addenda Winter 1965 Authorization Expiration Date Code Class 632/81 4/3/2009 4/9/2009 Class 1 1965 Edition Code Case n/a (b) Applicable Edition of Section Xl Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section XI Code Cases None'6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)RV-1041 See Attached Form NVR-1 7. Description of Work 8. Tests conducted:
: 3. Work Performed by Repair Organization P.O. No., Job No., etc Type Code Symbol Stamp VR I NR Name 131 Venture Blvd, Spartanburg,SC 29301 Address 4. Identification of System PCs 6. (a) Applicable Construction Code ASME Section IlII Addenda Winter 1965 Authorization Expiration Date Code Class 632/81 4/3/2009 4/9/2009 Class 1 1965 Edition Code Case n/a (b) Applicable Edition of Section Xl Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section XI Code Cases None'6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)RV-1041 See Attached Form NVR-1 7. Description of Work 8. Tests conducted:
Repaired Pressurizer Relief Valve Hydrostatic  
Repaired Pressurizer Relief Valve Hydrostatic
[]Pneumatic[]
[]Pneumatic[]
Nominal Operating Pressure R Exempt []Other []Pressure psi TestTemp.Other: NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
Nominal Operating Pressure R Exempt []Other []Pressure psi TestTemp.Other: NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
Line 320: Line 320:
no.)
no.)
SECTION 3 ASME SECTION XI ANALYSIS OF WELD NSW-010A23 QF-0549 (FP-E-CAL-01), Rev. 0 rM Calculation Signature Sheet Document Information NMC Calculation (Doc) No: EC-7950 T Revision:
SECTION 3 ASME SECTION XI ANALYSIS OF WELD NSW-010A23 QF-0549 (FP-E-CAL-01), Rev. 0 rM Calculation Signature Sheet Document Information NMC Calculation (Doc) No: EC-7950 T Revision:
0 Title: Flaw Evaluation of Palisades CSW Piping Weld NSW-010A23 Facility:  
0 Title: Flaw Evaluation of Palisades CSW Piping Weld NSW-010A23 Facility:
[I DA E-1 MT I-7 PB -I PI Z PL El HU/FT Unit: -] [1-2 Safety Class: [K] SR El Aug Q El Non SR Special Codes: [] Safeguards El Proprietary Calc Type (PassPort DOC-DESC-CODE):
[I DA E-1 MT I-7 PB -I PI Z PL El HU/FT Unit: -] [1-2 Safety Class: [K] SR El Aug Q El Non SR Special Codes: [] Safeguards El Proprietary Calc Type (PassPort DOC-DESC-CODE):
DOC (if applicable)
DOC (if applicable)
Line 357: Line 357:
The rounded indications measured 0.140 and 0.125 inches.The piping is a 3-inch NPS assumed to be fabricated from ASTM A106 Grade B carbon steel. An evaluation performed by NMC personnel indicates that the observed flaws do not meet the ASME Code, Section XI acceptance standards of Table IWB-3514-4.
The rounded indications measured 0.140 and 0.125 inches.The piping is a 3-inch NPS assumed to be fabricated from ASTM A106 Grade B carbon steel. An evaluation performed by NMC personnel indicates that the observed flaws do not meet the ASME Code, Section XI acceptance standards of Table IWB-3514-4.
Consequently, per IWA-3300, the indications were combined into a single subsurface flaw and evaluated per the guidelines of ASME B&PV Code, Section Xl, IWB-3650, which include acceptance criteria based on the failure mode. A conservative fatigue crack growth evaluation is then performed to determine the adequacy of continued operation of the piping system with the observed indications.
Consequently, per IWA-3300, the indications were combined into a single subsurface flaw and evaluated per the guidelines of ASME B&PV Code, Section Xl, IWB-3650, which include acceptance criteria based on the failure mode. A conservative fatigue crack growth evaluation is then performed to determine the adequacy of continued operation of the piping system with the observed indications.
2 TECHNICAL APPROACH The flaw evaluation consists of the following tasks: " Perform a flaw evaluation based on the guidelines of ASME B&PV Code, Section XI, IWB-3650 to calculate the allowable flaw size for the CSW pipe weld. Applied stresses due to the moment loading from the piping design analysis are used. Given that the material of the pipe elbow is carbon steel, the flaw acceptance criteria of Paragraph IWB-3650 of Reference 1 are used. This paragraph requires the use Appendix H of ASME Code, Section XI, which has screening criteria for determining the failure mode (linear elastic fracture mechanics (LEFM), elastic-plastic fracture mechanics (EPFM) or limit load).* Determine the stress intensity factors at the flaw and perform a fatigue crack growth analysis to compare end-of-evaluation period flaw size to the allowable flaw size computed above." The ASME Section XI Code of record at Palisades is the 1989 Edition. However, for this evaluation the Addenda through 1990 will be used since prior to this Addenda, there were no provisions in the Code for performing flaw evaluation for ferritic piping and alternate means had to be used to meet the safety margins in the Code.3 DESIGN INPUT 3.1 Design and Operating Conditions The design and operating conditions of the CSW system are provided by Reference  
2 TECHNICAL APPROACH The flaw evaluation consists of the following tasks: " Perform a flaw evaluation based on the guidelines of ASME B&PV Code, Section XI, IWB-3650 to calculate the allowable flaw size for the CSW pipe weld. Applied stresses due to the moment loading from the piping design analysis are used. Given that the material of the pipe elbow is carbon steel, the flaw acceptance criteria of Paragraph IWB-3650 of Reference 1 are used. This paragraph requires the use Appendix H of ASME Code, Section XI, which has screening criteria for determining the failure mode (linear elastic fracture mechanics (LEFM), elastic-plastic fracture mechanics (EPFM) or limit load).* Determine the stress intensity factors at the flaw and perform a fatigue crack growth analysis to compare end-of-evaluation period flaw size to the allowable flaw size computed above." The ASME Section XI Code of record at Palisades is the 1989 Edition. However, for this evaluation the Addenda through 1990 will be used since prior to this Addenda, there were no provisions in the Code for performing flaw evaluation for ferritic piping and alternate means had to be used to meet the safety margins in the Code.3 DESIGN INPUT 3.1 Design and Operating Conditions The design and operating conditions of the CSW system are provided by Reference
: 2. The pressure and temperature data for CSW Line HB-23 is as follows: Structural Integrity File No.: PAL-09Q-301 Revision:
: 2. The pressure and temperature data for CSW Line HB-23 is as follows: Structural Integrity File No.: PAL-09Q-301 Revision:
I Associates, Inc. Page 3 of 10  
I Associates, Inc. Page 3 of 10  
Line 364: Line 364:
= 170'F" Maximum Operating Pressure = 125 psig* Normal Operating Temperature  
= 170'F" Maximum Operating Pressure = 125 psig* Normal Operating Temperature  
= 114°F" Normal Operating Pressure = 65 psig 3.2 Pipe Dimensions The CSW pipe where the indication was discovered is an 3-inch Schedule 40 pipe [3]. The nominal dimensions of the pipe are:* Nominal Outer Diameter = 3.5 in.* Nominal Wall Thickness  
= 114°F" Normal Operating Pressure = 65 psig 3.2 Pipe Dimensions The CSW pipe where the indication was discovered is an 3-inch Schedule 40 pipe [3]. The nominal dimensions of the pipe are:* Nominal Outer Diameter = 3.5 in.* Nominal Wall Thickness  
= 0.216 in.3.3 Material Properties The CSW system pipe containing the indication is assumed to be fabricated from ASTM A106 Grade B carbon steel per Reference  
= 0.216 in.3.3 Material Properties The CSW system pipe containing the indication is assumed to be fabricated from ASTM A106 Grade B carbon steel per Reference
: 3. The design allowable stress, Sm, of the weld metal is taken to be the same as that of the base metal of the pipe. At the normal operating temperature of 65°F [2], Sm is equal to 20,000 psi [5]. Therefore, the flow stress, o"f, defined as 2.4 S., is equal to 48,000 psi. However, conservative default values derived from Appendix H of ASME Code, Section XI (Sm = 18,100 psi) are used in the evaluation.
: 3. The design allowable stress, Sm, of the weld metal is taken to be the same as that of the base metal of the pipe. At the normal operating temperature of 65°F [2], Sm is equal to 20,000 psi [5]. Therefore, the flow stress, o"f, defined as 2.4 S., is equal to 48,000 psi. However, conservative default values derived from Appendix H of ASME Code, Section XI (Sm = 18,100 psi) are used in the evaluation.
3.4 Flaw Characterization The indications are rounded indications located in the lower vertical elbow weld NSW-010A23 on Line HB-23 of the CSW system [4]. The inspection results summarized in References 4 and 6 show that the largest indication is 0.14 inches diameter rounded, centered near the neutral axis, 0.1 inches from the outer surface of the weld. The other indication is 0.125 inches in diameter.
3.4 Flaw Characterization The indications are rounded indications located in the lower vertical elbow weld NSW-010A23 on Line HB-23 of the CSW system [4]. The inspection results summarized in References 4 and 6 show that the largest indication is 0.14 inches diameter rounded, centered near the neutral axis, 0.1 inches from the outer surface of the weld. The other indication is 0.125 inches in diameter.
Line 379: Line 379:
+ Seismic + Thermal) which correspond to 40 years of original plant life plus 20 years of license extension.
+ Seismic + Thermal) which correspond to 40 years of original plant life plus 20 years of license extension.
: 3. The piping material per the piping specification can be ASTM A-106 Grade B or A53 Grade B or SA-106 Grade B. While the mechanical properties of these materials are identical, ASTM A-106 Grade B will be assumed for this evaluation.
: 3. The piping material per the piping specification can be ASTM A-106 Grade B or A53 Grade B or SA-106 Grade B. While the mechanical properties of these materials are identical, ASTM A-106 Grade B will be assumed for this evaluation.
5 CALCULATIONS
5 CALCULATIONS 5.1 Allowable Flaw Size Calculation The material of the flaw is assumed to be ferritic steel SA-106 Grade and the maximum operating temperature of the CSW line is 170'F. Therefore, as determined from the screening criteria, the LEFM methodology described in ASME Code, Section XI, Appendix H [1] is used in this evaluation in lieu of the other two failure modes (EPFM and limit load). The technical approach consists of determining the critical flaw size in the pipe which corresponds to a stress intensity factor equal to the material fracture toughness.
 
===5.1 Allowable===
 
Flaw Size Calculation The material of the flaw is assumed to be ferritic steel SA-106 Grade and the maximum operating temperature of the CSW line is 170'F. Therefore, as determined from the screening criteria, the LEFM methodology described in ASME Code, Section XI, Appendix H [1] is used in this evaluation in lieu of the other two failure modes (EPFM and limit load). The technical approach consists of determining the critical flaw size in the pipe which corresponds to a stress intensity factor equal to the material fracture toughness.
The allowable flaw size is derived from the critical flaw by applying the code specified safety factors.In this evaluation, default ASME Code Section XI, Appendix H material properties at lower shelf temperature are conservatively used. The evaluation was performed using SI's computer program pc-CRACKTm [8].The pc-CRACK" output file for the analysis is presented in Appendix A. It shows that for the observed flaw length, the allowable flaw depth is 75% of wall thickness, which is greater than the depth of the observed flaw of 65% of wall thickness.
The allowable flaw size is derived from the critical flaw by applying the code specified safety factors.In this evaluation, default ASME Code Section XI, Appendix H material properties at lower shelf temperature are conservatively used. The evaluation was performed using SI's computer program pc-CRACKTm [8].The pc-CRACK" output file for the analysis is presented in Appendix A. It shows that for the observed flaw length, the allowable flaw depth is 75% of wall thickness, which is greater than the depth of the observed flaw of 65% of wall thickness.
 
5.2 Stress Intensity Factors Calculation A linear elastic fracture mechanics and fatigue crack growth evaluation is performed for the observed indication using pc-CRACKTm.
===5.2 Stress===
Intensity Factors Calculation A linear elastic fracture mechanics and fatigue crack growth evaluation is performed for the observed indication using pc-CRACKTm.
The fracture mechanics model of an elliptical surface flaw in an infinite plate, as illustrated in Figure 2, is conservatively used in this evaluation.
The fracture mechanics model of an elliptical surface flaw in an infinite plate, as illustrated in Figure 2, is conservatively used in this evaluation.
The model with a flaw aspect ratio of 0.5 is used in the evaluation since the actual ratio is 0.53 for the pipe weld indication under evaluation.
The model with a flaw aspect ratio of 0.5 is used in the evaluation since the actual ratio is 0.53 for the pipe weld indication under evaluation.

Revision as of 13:19, 13 July 2019

ASME Section XI Inservice Inspection 90-Day Report
ML062230275
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/02/2006
From: Harden P
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
IWA-6000
Download: ML062230275 (125)


Text

NMC Committed to Nuclear Ex ce >2~Palisades Nuclear Plant Operated by Nuclear Management Company, LLC August 2, 2006 ASME, Section Xl, Article IWA-6000 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 ASME Section XI Inservice Inspection 90-Day Report Nuclear Management Company, LLC (NMC) is enclosing the 90-day report for the Palisades Nuclear Plant (PNP) Inservice Testing Program. The American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, Article IWA-6000, requires that inservice inspection reports be submitted within 90 days following the completion of the most recent refueling outage. PNP completed a refueling outage on May 10, 2006.Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.

Paul A. Harden Site Vice President, Palisades Nuclear Plant Nuclear Management Company, LLC Enclosure CC Administrator, Region Ill, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC 27780 Blue Star Memorial Highway a Covert, Michigan 49043-9530 Telephone:

269.764.2000 01 ENCLOSURE 1 NUCLEAR MANAGEMENT COMPANY PALISADES NUCLEAR PLANT DOCKET 50-255 August 2, 2006 INSERVICE INSPECTION (ISI) OF CLASS 1, 2 AND 3 SYSTEMS ISI Report 3-9 123 Pages Follow PALISADES NUCLEAR PLANT ENGINEERING PROGRAMS DEPARTMENT Review and Approval Summary TITLE: ISI REPORT 3-9 ISI Engineer / MWAcker Date ASME Programs d V es Supervisor

/ B fanW gner Date Engineering Progr6s Manager / THFouty Date PALISADES NUCLEAR PLANT 2006 INSERVICE INSPECTION REPORT Submitted in accordance with the American Society of Mechanical Engineers (ASME)Boiler and Pressure Vessel (B&PV) Code, Section Xl, Article IWA-6000, 1989 Edition.1. Date: August 2, 2006 2. Plant Owner: Consumers Energy 212 West Michigan Avenue Jackson, Michigan 49201 3. Plant: Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Michigan 49043 4.5.6.Unit No: Commercial Service Date: Major Components Inspected:

1 December 31, 1971 Component Steam Generator RPV Head Manufacturer Combustion Eng Combustion Eng Mfci Serial No. State No.CE-70277-1 M358176M CE-66110 M96725M May 10, 2006 Kenneth L Blake Hartford Steam Boiler See ISI Report National Board No.NB22864 NB20827 7. Completion Date for Inspections:

8. Code Inspector:
9. Authorized Inspection Agency: 10. Abstract:

2006 INSERVICE INSPECTION 3-9 PALISADES NUCLEAR PLANT Summary Inservice Inspection 3-9 was conducted during the period of November 18, 2004, through May 10, 2006, in accordance with Section 5.5.7 of the Palisades Nuclear Plant Technical Specifications.

The American Society of Mechanical Engineers (ASME)Boiler and Pressure Vessel (B&PV) Code,Section XI, 1989 Edition controlled the inspections and provided the acceptance criteria for these examinations.

Included in this report are three sections.

Section 1 details the examinations that were performed and provides the final inspection results. Section 2 provides a listing of the repairs and replacements that have been performed over the last operating cycle and during the refueling outage. The attached NIS-2 forms document these repairs and replacements.

Section 3 contains the documentation for acceptance, by analysis, for porosity which was found in a three-inch service water system weld.Inspection Activities This was the second examination of the third period of the third inspection interval.Areas examined during this inspection included A"N steam generator and regenerative heat exchanger welds. Various components of the primary coolant system, engineered safeguards system, main steam system, main feedwater system and support systems, as identified in the attached Non-destructive Examination (NDE) Results Summary Report, were also examined.The examinations were performed using ultrasonic (UT), liquid penetrant (PT), radiographic (RT), and visual techniques.

The examinations were conducted by the Consumers Energy non-destructive testing (NDT) services department, Westdyne, and Lambert MacGill Thomas examination personnel, using site-approved procedures.

Examinations were performed by personnel qualified in the NDT process used, in accordance with the requirements of ASME Section XI, IWA-2300.

SECTION 1 EXAMINATION DETAILS AND FINAL INSPECTION RESULTS FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules 1. Owner CON-iw~e~r-3's

\-et-AA SA 2 \4k , 4~~I~ 17-01 v (Name aM Address of Owner)J ]U a 2. PlantPlAnalg5 T7180 Bite- 1AW3'CW--rk 41OR3% 4KI (Namrn and Address of Plant)S., 3. Plant Unit 4. Owner Certificate of Authorization (if required)___

5. Commercial Service Date 1 41 L 6. National Board Number for Unit NB elnl,.a 1 7. Components Inspected Manufacturer Component or Manufacturer or Installer State or National Appurtenance or Installer Serial No. Province No. Board No.Sv.E "N~sr- Re'sI3iL"!

VsyrvsP _____4 4 4. 4.4. 4. I..1.

  • __________

Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8Y in. x I I in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.(12/82)This Form (E00029) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, N.Y. 10017 FORM NIS-1 (Back)8. Examination Dates 2IhsIzM4Zo

.to 5.kZfz9. Inspection Interval from S71)~Sto 12- 1Z Iac.V 10. Abstract of Examinations.

Include a list of examinations and a statement concerning status of work required for current interval.

_. ,. a ."3 sIt 11. Abstract of Conditions Noted 12. Abstract of Corrective Measures Recommended and Taken We certify that the statements made in this report are correct and the examinations and corrective mea-sures taken conform to the rules of the ASME Code,Section XI.Certificate of Authorization No. (if applicable) rt K Expiration Date " Date ilM 2 fi 1v ZOc.- Signed COrnSVIi'KPg-t 3 B y 4 ~ ASL V%Owner CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the Nlational Board of Boiler and Pressure Vessel Inspectors and the State or Province of

  • and employed by H- -C.-! of CCovCC.k %C¢.O*c- have inspected the components described in this Owner's Report during the period W1_w&C,- 1-94 !Ito Mwhl Ws 20-, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personaltinjury or property damage or a loss of any kind arising from or connected with this inspection.

~4~4 Commissions -lff 3cc "4 Inspector's Signature National Board, State, Province, and Endorsements Date -- L.Y 7 V' 2oo(P.(12/82)

PALISADES NDE RESULTS

SUMMARY

NIS I Category System Component ID Disposition Exam Comments Aug ESS ESS-24-SIS-SH1-207 Acceptable UT/PT ESS-24-SIS-SH2-207 Acceptable UT/PT ESS-6-SIS-2A1-21 Acceptable UT/PT ESS-6-SIS-2B1-27 Acceptable UT/PT FWS FWS-18-FWL-1SI-245 Acceptable UT/PT FWS-18-FWL-1SI-257 Acceptable UT/PT FWS-18-FWL-1SI-258 Acceptable UT/PT FWS-18-FWL-1S1-261 Acceptable UT/PT FWS-18-FWL-2S1-262 Acceptable UT/PT MSS MSS-36-MSL-1Si-216 Acceptable UT/PT MSS-36-MSL-1S1-216LDI Acceptable UT/PT MSS-36-MSL-1S1-216LDO Acceptable UT/PT MSS-36-MSL-1S1-216LU Acceptable UT/PT MSS-36-MSL-1S1-217 Acceptable UT/PT MSS-36-MSL-1S1-2117LD Acceptable UT/PT MSS-36-MSL-1S1-217LUI Acceptable UT/PT Page 1 of 33 Category System Component ID Disposition Exam Comments MSS-36-MSL-1 Sl-217LUO Acceptable UT/PT MSS-36-MSL-2S1-218 Acceptable UT/PT MSS-36-MSL-2S1-218LDI Acceptable UT/PT MSS-36-MSL-2S1-218LDI Acceptable UT/PT MSS-36-MSL-2S1-218LU Acceptable UT/PT MSS-36-MSL-2S1-219 Acceptable UT/PT MSS-36-MSL-2S1-219LD Acceptable UT/PT MSS-36-MSL-2S1-219LUD Acceptable UT/PT MSS-36-MSL-2S1-219LUO Acceptable UT/PT MSS-6-RVR-2 S4-203 Acceptable UT/PT MSS-6-RVR-2S4-203 Acceptable UT/PT MSS-6-RVR-2S4-203 Acceptable UT/PT MSS-6-RVR-2S6-203 Acceptable UT/PT MSS-8-MSV-1S1-212 Acceptable UT/PT PCS Bowl Plug SGA-1 Acceptable BM Visual Bowl Plug SGA-2 Acceptable BM Visual Bowl Plug SGB-1 Acceptable BM Visual Bowl Plug SGB-2 Acceptable BM Visual Cold Leg Charging A #1 Acceptable BM Visual Page 2 of 33 Category System Component ID Cold Leg Charging B #2 Cold Leg Spray CV-1057 #1 Cold Leg Spray CV-1057 #2 Cold Leg Spray CV-1059 #1 Cold Leg Spray CV-1059 #2 DPT-01a12A DPT-01 12A/C DPT-01 12A/C DPT-01 12B DPT-01 12BID DPT-01 12BID DPT-01 12C DPT-01 12D DPT-0122A DPT-0122A/C DPT-0122A/C DPT-0122B DPT-0122B/D DPT-0122B/D DPT-0122C Disposition Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Exam Comments BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual Page 3 of 33 Category System Component ID Disposition Exam Comments DPT-0122D Acceptable BM Visual PCS-011 Weld 1 (DPT-O112A/C)

Acceptable BM Visual PCS-011 Weld 15 (DPT-0112A)

Acceptable BM Visual PCS-01 1 Weld 22 (DPT-01 12AJC) Acceptable BM Visual PCS-01 1 Weld 8 (DPT-01 12C) Acceptable BM Visual PCS-012 Weld i (DPT-0112B)

Acceptable BM Visual PCS-012 Weld 15 (DPT-0112D)

Acceptable BM Visual PCS-012 Weld 22 (DPT-01 12BID) Acceptable BM Visual PCS-012 Weld 8 (DPT-O112B1/)

Acceptable BM Visual PCS-013 Weld 1 (DPT-0122A/C)

Acceptable BM Visual PCS-013 Weld 15 (DPT-0122C)

Acceptable BM Visual PCS-01 3 Weld 22 (DPT-01 22A/C) Acceptable BM Visual PCS-013 Weld 8 (DPT-0122A)

Acceptable BM Visual PCS-014 Weld I (DPT-0122B/D)

Acceptable BM Visual PCS-014 Weld 13 (DPT-01 22B1/) Acceptable BM Visual PCS-014 Weld 20 (DPT-0122B)

Acceptable BM Visual PCS-014 Weld 6 (DPT-0122D)

Acceptable BM Visual PCS-015 Weld I Drain Acceptable BM Visual PCS-015 Weld 1 Drain Acceptable BM Visual PCS-01 6 Weld I Drain Acceptable BM Visual Page 4 of 33 Category System Component ID PCS-016 Weld 1 Drain PCS-017 Weld 1 Drain PCS-017 Weld 1 Drain PCS-018 Weld 1 Drain PCS-018 Weld 1 Drain PCS-023 Weld 1 PCS-023 Weld 1 PCS-026 Weld 1 (SX-01 12)PCS-027 Weld I (SX-1023A)

PCS-035 Weld 11 PCS-035 Weld 12 PCS-036 Weld 14 PCS-036 Weld 15 PCS-037 Weld 15 PCS-037 Weld 16 PCS-038 Weld 14 PCS-038 Weld 15 PCS-040 Weld 17 PCS-041 Weld 48 PCS-042 Weld 1 Disposition Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Exam Comments BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual Page 5 of 33 Category System Component ID PCS-042 Weld 10 PCS-042 Weld 2 PCS-042 Weld 3 PCS-042 Weld 4 PCS-042 Weld 5 PCS-042 Weld 6 PCS-042 Weld 7 PCS-042 Weld 8 PCS-042 Weld 9 PCS-043 Weld 1 PCS-043 Weld 10 PCS-043 Weld 11 PCS-043 Weld 12 PCS-043 Weld 2 PCS-043 Weld 3 PCS-043 Weld 4 PCS-043 Weld 5 PCS-043 Weld 6 PCS-043 Weld 7 PCS-043 Weld 8 Disposition Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Exam Comments BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual BM Visual Page 6 of 33 Category System Component ID PCS-043 Weld 9 PCS-12-PSL-1H1-7 PCS-12-PSL-1H1-7 PCS-12-PSL-iH1-8 PCS-12-PSL-iH1-8 PCS-12-SCS-2H1-l PCS-12-SCS-2H1-2 SX-0112 SX-1023A Disposition Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Exam Comments BM Visual UT BM Visual BM Visual UT BM Visual BM Visual BM Visual BM Visual PZR PCS-12-PSL-IH1-1 PCS-12-PSL-1Hi-i PCS-12-PSL-1H1-2 PCS-12-PSL-1Hi-2 PCS-4-PSS-1 P1-20 PCS-4-PSS-1P1-21 Pressurizer Heater Sleeves 119-01-A 119-01-A 119-01-B Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable UT BM Visual BM Visual UT BM Visual BM Visual BM Visual RVH Acceptable Acceptable Acceptable BM Visual UT BM Visual Page 7 of 33 Category System Component ID 119-02-A 119-02-A 119-02-B 119-03-A 119-03-A 119-03-B 119-04-A 119-04-A 119-04-B 119-05-A 119-05-A 119-05-B 119-06-A 119-06-A 119-06-B 119-07-A 119-07-A 119-07-B 119-08-A 119-08-A Disposition Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Exam Comments BM Visual UT BM Visual BM Visual UT BM Visual BM Visual UT BM Visual UT BM Visual BM Visual UT BM Visual BM Visual UT BM Visual BM Visual BM Visual UT Page 8 of 33 Category System Component ID 119-08-B 119-09-A 119-09-A 119-09-B 119-1 0-A 119-10-A 119-10-B 119-11-A 119-11-A 119-11-B 119-12-A 119-12-A 119-12-B 119-13-A 119-13-A 119-13-B 119-14-A 119-14-A 119-14-B 119-15-A Disposition Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Exam Comments BM Visual BM Visual UT BM Visual BM Visual UT BM Visual BM Visual UT BM Visual BM Visual UT BM Visual BM Visual UT BM Visual BM Visual UT BM Visual UT Page 9 of 33 Category System Component ID 119-15-A 119-15-B 119-16-A 119-16-A 119-16-B 119-17-A 119-17-A 119-17-B 119-18-A 119-18-A 119-18-B 119-19-A 119-19-A 119-19-B 119-20-A 119-20-A 119-20-B 119-21-A 119-21-A 119-21-B Disposition Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Exam Comments BM Visual BM Visual BM Visual UT BM Visual UT BM Visual BM Visual UT BM Visual BM Visual BM Visual UT BM Visual UT BM Visual BM Visual UT BM Visual BM Visual Page 10 of 33 Category System Component ID 119-22-A 119-22-A 119-22-B 119-23-A 119-23-A 119-23-B 119-24-A 119-24-A 119-24-B 119-25-A 119-25-A 119-25-B 119-26-A 119-26-A 119-26-B 119-27-A 119-27-A 119-27-B 119-28-A 119-28-A II I Disposition Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable mile Exam Comments UT BM Visual BM Visual UT BM Visual BM Visual UT BM Visual BM Visual BM Visual UT BM Visual BM Visual UT BM Visual BM Visual UT BM Visual BM Visual UT Page 11 of 33 Category System Component ID 119-28-B 119-29-AR 119-29-AR 119-29-B 119-30-AR 119-30-AR 119-30-B 119-31-A 119-31-A 119-31-B 119-32-A 119-32-A 119-32-B 119-33-A 119-33-A 119-33-B 119-34-A 119-34-A 119-34-B 119-35-A Disposition Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Exam Comments BM Visual UT BM Visual BM Visual UT BM Visual BM Visual UT BM Visual BM Visual UT BM Visual BM Visual UT BM Visual BM Visual UT BM Visual BM Visual UT Page 12 of 33 Category System Component ID 119-35-A 119-35-B 119-36-A 119-36-A 119-36-B 119-37-A 119-37-A 119-37-B 119-38-A 119-38-A 119-38-B 119-39-A 119-39-A 119-39-B 119-40-A 119-40-A 119-40-B 119-41-A 119-41-A 119-41-B Disposition Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Exam Comments BM Visual BM Visual UT BM Visual BM Visual UT BM Visual BM Visual UT BM Visual BM Visual UT BM Visual BM Visual UT BM Visual BM Visual BM Visual UT BM Visual Page 13 of 33 Category System Component ID 1 19-42-A 119-42-A 119-42-8 119-43-A 119-43-A 119-43-B 119-44-A 119-44-A 119-44-B 119-45-A 119-45-A 119-45-B 119-46 119-46 119-46-A 119-47 119-47 119-47-A 119-48 119-48 Disposition Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Exam Comments BM Visual UT BM Visual UT BM Visual BM Visual BM Visual UT BM Visual BM Visual UT BM Visual BM Visual UT BM Visual BM Visual UT BM Visual BM Visual UT Page 14 of 33 Category System Component ID 119-48-A 119-49 119-49 119-49-A 119-50 119-50 119-50-A 119-51 119-51 119-51-A 119-52 119-52 119-52-A 119-53 119-53 119-53-A PCS-034A Weld 1 RPV Vent Line RPV Vent Line Disposition Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Exam Comments BM Visual UT BM Visual BM Visual UT BM Visual BM Visual BM Visual UT BM Visual BM Visual UT BM Visual UT BM Visual BM Visual BM Visual UT BM Visual B-B Page 15 of 33 Category System Component ID Disposition Exam Comments PZR Pressurizer T-72 Weld 2-982A Acceptable UT RGA Regen Heat Exchanger Weld E- Acceptable UT 56A-03 Regen Heat Exchanger Weld E- Acceptable UT 56A-04 SGI SG No.1 E-50A Weld 1-101-251 Acceptable UT SG No.1 E-50A Weld 1-1402-271 Acceptable UT SG No.1 E-50A Weld 1-1404-271 Acceptable UT B-D RGA Regen Heat Exchanger Weld E- Acceptable UT 56A-05 Regen Heat Exchanger Weld E- Acceptable UT 56A-05-IRS Regen Heat Exchanger Weld E- Acceptable UT 56A-07 RGB Regen Heat Exchanger Weld E- Acceptable UT 56B-05 Regen Heat Exchanger Weld E- Acceptable UT 56B-05-IRS Regen Heat Exchanger Weld E- Acceptable UT 56B-07 SGI SG No.1 E-50A Weld 1-102-251A Acceptable UT SG No. 1 E-50A Weld 1-102-251A-Acceptable UT IRS SG No.1 E-50A Weld 1-102-251B Acceptable UT SG No.1 E-50A Weld 1-102-251B-Acceptable UT IRS Page 16 of 33 Category System Component ID Disposition Exam Comments SG No.1 E-50A Weld 1-104-251 Acceptable UT SG No.1 E-50A Weld 1-104-251-Acceptable UT IRS B-G-1 RPV RPV-Ligaments Acceptable UT RVH RPVCH SIN 37 Nut Acceptable MT RPVCH S/N 37 Stud Acceptable UT/MT RPVCH S/N 37 Washer Acceptable VT7-1 RPVCH S/N 38 Nut Acceptable MT RPVCH SIN 38 Stud Acceptable UT/MT RPVCH SIN 38 Washer Acceptable VT7-I RPVCH S/N 39 Nut Acceptable MT RPVCH SIN 39 Stud Acceptable UT/MT RPVCH S/N 39 Washer Acceptable VTI-I RPVCH SIN 40 Nut Acceptable MT RPVCH SIN 40 Stud Acceptable UT/MT RPVCH SIN 40 Washer Acceptable VT-1 RPVCH S/N 41 Nut Acceptable MT RPVCH S/N 41 Stud Acceptable UT/MT RPVCH SIN 41 Washer Acceptable VT-1 Page 17 of 33 Category System Component ID RPVCH S/N 42 Nut RPVCH SIN 42 Stud RPVCH SIN 42 Washer RPVCH S/N 43 Nut RPVCH S/N 43 Stud RPVCH S/N 43 Washer RPVCH SIN 44 Nut RPVCH SIN 44 Stud RPVCH SIN 44 Washer RPVCH SIN 45 Nut RPVCH SIN 45 Stud RPVCH SIN 45 Washer RPVCH SIN 46 Nut RPVCH SIN 46 Stud RPVCH SIN 46 Washer RPVCH SIN 47 Nut RPVCH SIN 47 Stud RPVCH SIN 47 Washer RPVCH SIN 48 Nut RPVCH SIN 48 Stud Disposition Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Exam Comments MT UT/MT VT-1 MT UT/MT VT-I MT UT/MT VT-1 MT UT/MT VT-I MT UT/MT VT-1 MT UT/MT VT-1 MT UT/MT Page 18 of 33 Category System Component ID RPVCH SIN 48 Washer RPVCH S/N 49 Nut RPVCH S/N 49 Stud RPVCH SIN 49 Washer RPVCH SIN 50 Nut RPVCH SIN 50 Stud RPVCH SIN 50 Washer RPVCH SIN 51 Nut RPVCH SIN 51 Stud RPVCH SIN 51 Washer RPVCH S/N 52 Nut RPVCH SIN 52 Stud RPVCH SIN 52 Washer RPVCH S/N 53 Nut RPVCH S/N 53 Stud RPVCH SIN 53 Washer RPVCH SIN 54 Nut RPVCH SIN 54 Stud RPVCH S/N 54 Washer Disposition Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Exam Comments VT-1 MT UT/MT VT-1 MT UT/MT VT-1 MT UT/MT VT-1 MT UT/MT VT-1 MT UT/MT VT-1 MT UT/MT VT-1 B-G-2 Page 19 of 33 Category System Component ID Disposition Exam Comments ESS PIA CK3118-BT Primary Coolant Pump P-50A 1A-2BT-B-1-16 Primary Coolant Pump P-50A 1A-2BT-W-1-16 Acceptable VT-1 Acceptable VT-I Acceptable VT-1 PIB PCs 1B-2BT-B-1-16 I B-2BT-W-I

-16 M03016-BT PCS-4-PRS-1P2-3BT PCS-4-PRS-1 P3-8BT Acceptable Acceptable VT-1 VT-1 Acceptable Acceptable Acceptable VT-1 VT-1 VT-1 SGI SG No.2 E-50B Primary Manway#1 Studs SG No.2 E-50B Primary Manway#2 Studs SG No.1 E-50A Primary Manway#1 SG No.1 E-50A Primary Manway#2 Acceptable Acceptable VT-1 VT-i SG2 Acceptable Acceptable VT-1 VT-i B-N-1 RPV RPV-Vessel Interior Acceptable VT-3 C-A SGI 1-101-241 Acceptable UT Page 20 of 33 Category System Component ID 1-102-221 1-201-246 Disposition Exam Comments Acceptable UT Acceptable UT C-B SGI 1-104-221 1-105-201-IRS 1-1510-271 Acceptable Acceptable Acceptable UT MT PT C-C ESS ESS-1 2-SIS-1A1-3PL1-4(H739)

Acceptable ESS-1 2-SIS-1 BI-7PL1-4(H728)

Acceptable ESS-6-LTC-1A-203PL1

-4(H726) Acceptable ESS-6-LTC-1A-218PL1-4(H722)

Acceptable FWS-18-FWL-2S1-257PL1-Acceptable 4(H32A)PT PT PT PT FWS PT MSS SGI MSS-36-MSL-1S1-210PL MSS-36-MSL-2S1-212PL 1-A 1-B 1-C 1-D Acceptable Acceptable MT MT Acceptable Acceptable Acceptable Acceptable MT MT MT MT Page 21 of 33 Category System Component ID 1-E 1-F Disposition Exam Comments Acceptable MT Acceptable MT D-B CCS CCS-10-RWS-1P1-PR1-DB(H8)

Acceptable VT-3 CCS-16-CPU-1 PA-PS(H323)

CCS-20-CPU-1PA-PS(H303.2)

FWS-6-AWS-SLC-PS Acceptable VT-3 Acceptable VT-3 FWS Acceptable VT-3 SwS SWS-10-CRS-RLI-PS(H302)

SWS-10-CRS-RL1 -PS1 SWS-10-CRS-RL3-PS5 SWS-10-CRS-RL4-PR1-DB SWS-10-CRS-SL3-PS4 SWS-10-CRS-SL3-PS5 SWS-16-CRS-SH1-PR-DB SWS-16-SWP-OLA-PS(H9)

SWS-24-CSW-SH1-PSA1 SWS-6-CRS-2S1-PS(H297)

SWS-6-CRS-2S2-PS1 (H28)Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Vr-3 VT-3 VT-3 VT-3 vr-3 VT-3 VT-3 Vr-3 VT-3 vr-3 VT-3 Page 22 of 33 Category System Component ID SWS-6-CRS-3S1 -PSI (H27)SWS-6-CRS-4R2-PS3(HI8)

SWS-6-CRS-4S1-PSI(Hi 1)SWS-6-CRS-4S2-PS1 (HI 0)SWS-6-EPS-SLB-PR3B-DB(H67.1)SWS-8-CRS-RL2-PS2(H39)

Disposition Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Exam Comments VT-3 VT-3 VT-3 Vr-3 VT-3 VT-3 F-A CCS CCS-1O-RWS-1P1-PR1 (H8) Acceptable CCS-16-CPU-I PA-PSS(H323)

Acceptable CCS-20-CPU-1PA-PSS(H303.2)

Acceptable Vr-3 VT-3 Vr-3 CSA P-54A-02 Acceptable V'-3 ESS ESS-10-SDC-XIA-202PR(H 120.1) Acceptable ESS-12-SIS-1B1-7PR(H728)

Acceptable ESS-12-SIS-1LP-219PR(R143.1)

Acceptable ESS-14-SIS-HPA-207PR1 Acceptable ESS-14-SIS-HPA-207PR2 Acceptable ESS-24-SIS-SH1-203PR(H169.1)

Acceptable ESS-24-SIS-SH1-209PR1(H 169) Acceptable VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 Page 23 of 33 Category System Component ID Disposition ESS-6-SIS-2B1-16PR(R-770.1)

Acceptable ESS-6-SIS-2B 1-20PR(H-767)

Acceptable ESS-8-SIS-HPB-207PR(H1

79) Acceptable Exam Comments Vr-3 VT-3 VT-3 77777-=FWS FWS-18-FWL-1Si

-Acceptable 256APR(R32.1)

FWS-6-AWS-OLC-PR2 (H4) Acceptable FWS-6-AWS-SLC-PSS (H4) Acceptable VT-3 Vr-3 Vr-3 HSB P-66B-02 Acceptable VT-3 LSB P-67B-02 Acceptable VT-3 PCs PZR PCS-4-PSS-1PI-5PR(H-22A)

Acceptable Pressurizer T-72 Weld 4-984/5- Acceptable 984-SS Regen Heat Exchanger Weld E- Acceptable 56A-S-01 VT-3 VIT-3 RGA VT-3 SGI I -A-SS 1-B-SS 1-c-SS 1-D-SS I-E-SS Acceptable Acceptable Acceptable Acceptable Acceptable V17-3 Vr-3 Vr-3 VT-3 VT-3 Page 24 of 33 Category System Component ID Disposition Exam Comments 1-F-SS Acceptable VT-3 SG No.1 E-50A 1-SK-SS Acceptable VT-3 SiS ESS-6-SIS-2HP-216PRA(R203.1)

Acceptable Vr-3 SwS SWS-10-CRS-RL1-PSS(H302)

Acceptable VT-3 SWS-10-CRS-RL1-PSS1(H48)

Acceptable VT-3 SWS-10-CRS-RL3-PSS5(H264)

Acceptable VT-3 SWS-10-CRS-RL4-PRi(H275)

Acceptable VT-3 SWS-10-CRS-SL3-PSS4(H254)

Acceptable VT-3 SWS-10-CRS-SL3-PSS5(H256)

Acceptable VT-3 SWS-16-CRS-SH 1-PR(H284)

Acceptable Vr-3 SWS-16-SWP-OLA-PSS(H9)

Acceptable Vr-3 SWS-24-CSW-SH1-Acceptable VT-3 PSSA1(H281.1)

SWS-6-CRS-2S1-PSS(H297)

Acceptable V'-3 SWS-6-CRS-2S2-PSSI(H28)

Acceptable V'-3 SWS-6-CRS-3S1-PSS 1(H27) Acceptable VT-3 SWS-6-CRS-4R2-PSS3(H

18) Acceptable VT-3 SWS-6-CRS-4S1-PSS1(HI1)

Acceptable VT-3 SWS-6-CRS-4S2-PSSI(H1O)

Acceptable Vr-3 SWS-6-EPS-SLB-PR3B(H67.1)

Acceptable VT-3 Page 25 of 33 Category System Component ID Disposition Exam Comments SWS-8-CRS-RL2-PSS2(H39)

Acceptable VT-3 VAS VAS-8-CPU-RL1-205PR(H1)

Acceptable VT-3 R-A AFW Segment AFW-010 Acceptable VT-2 Segment AFW-01 1 Acceptable VT-2 Segment AFW-012 Acceptable VT-2 Segment AFW-016 Acceptable VT-2 Segment AFW-018 Acceptable VT-2 BLD Segment BLD-003 Acceptable VT-2 Segment BLD-004 Acceptable VT-2 Segment BLD-005A Acceptable VT-2 Segment BLD-006A Acceptable VT-2 CBA Segment CBA-012 Acceptable VT-2 CDS CDS-014 Weld 12 Acceptable UT CSW CSW-006B Weld 4 Acceptable UT CSW-007 Weld 7 Acceptable UT CSW-008 Weld 5 Acceptable UT Page 26 of 33 Category System Component ID CSW-009 Weld 1 CSW-016 Weld 2 CSW-017 Weld 2 Disposition Acceptable Acceptable Acceptable Exam Comments UT UT UT CwS Segment CWS-01 1 Segment CWS-012 AFW-010 Weld 4 AFW-012 Weld 9 Acceptable Acceptable V17-2 VT-2 FWS Acceptable Acceptable UT UT HED LPI HED-001 Weld 5 HED-002 Weld 3 HED-005 Weld 20 LPI-002 Weld 12 LPI-002 Weld 13 LPI-002A Weld 19 LPI-002A Weld 21 LPI-004 Weld 12 LPI-004 Weld 13 LPI-004A Weld 26 Acceptable Acceptable Acceptable UT UT UT Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable UT UT UT UT UT UT UT Page 27 of 33 Category System Component ID LPI-004A Weld 27 Segment LPI-001A Segment LPI-002A Segment LPI-003A Segment LPI-004A Disposition Acceptable Acceptable Acceptable Acceptable Acceptable Exam Comments UT VT-2 VT-2 VT-2 VT-2 MSS MSS-027 Weld 3 MSS-041 Weld 2 MSS-047 Weld 25 MSS-048 Weld 5 MSS-049 Weld 8 MSS-059 Weld 41 MSS-060 Weld 36 MSS-067 Weld 2 MSS-069 Weld 2 MSS-071 Weld 5 MSS-076 Weld 3 Segment MSS-048 Segment MSS-049 Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable UT UT UT UT UT UT UT UT UT UT UT VT-2 VT-2 NSW NSW-001 Weld 38 Acceptable UT Page 28 of 33 Category System Component ID NSW-004 Weld 6 NSW-005 Weld 45 NSW-01 OA Weld 23 NSW-01 OC Weld 6 Segment NSW-005 Disposition Acceptable Acceptable Acceptable by Analysis Acceptable Acceptable Exam Comments UT UT RT See Section EC-7950 UT VT-2 3 PCs PCS-036 Weld 14 PCS-036 Weld 15 Segment PCS-01 1 Segment PCS-012 Segment PCS-013 Segment PCS-014 Segment PCS-015 Segment PCS-016 Segment PCS-017 Segment PCS-018 Segment PCS-019A Segment PCS-019B Segment PCS-020A Segment PCS-020B Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable UT UT Vr-2 Vr-2 VT-2 Vr-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 Vr-2 Page 29 of 33 Category System Component ID Segment PCS-021A Segment PCS-021 B Segment PCS-022A Segment PCS-022B Segment PCS-023 Segment PCS-026 Segment PCS-027 Segment PCS-034A Segment PCS-040 Segment PCS-041 Segment PCS-042 Segment PCS-043 Disposition Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Exam Comments VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 PZR PZR-001 Weld I PZR-001 Weld 2 PZR-001 Weld 7 PZR-001 Weld 8 PZR-016 Weld 14 PZR-017 Weld 22 Segment PZR-002 Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable UT UT UT UT UT UT Vr-2 Page 30 of 33 Category System Component ID Segment PZR-003 Segment PZR-004 Segment PZR-005 Segment PZR-006 Segment PZR-007 Segment PZR-008 Segment PZR-009 Segment PZR-010 Segment PZR-014A Segment PZR-015 Segment PZR-018 Segment PZR-019 Segment PZR-020 Disposition Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Exam Comments VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 SDC SDC-002B1 Weld 26 SDC-002B1 Weld 26LDI SDC-002B1 Weld 26LDO SDC-002B1 Weld 26LU SDC-002B2 Weld 9 SDC-002B2 Weld 9LD Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable UT UT UT UT UT UT Page 31 of 33 Category System Component ID SDC-002B2 Weld 9LUI SDC-002B2 Weld 9LUO SDC-005 Weld 3 SDC-005 Weld 3LDI SDC-005 Weld 3LDI SDC-005 Weld 3LU SDC-011A1 Weld 2 SDC-011A1 Weld 2LD SDC-01 1A2 Weld 5 SDC-012A1 Weld 2 Segment SDC-002B1 Segment SDC-005 Segment SDC-006 Segment SDC-009 Segment SDC-011A2 Segment SDC-012A2 Segment SDC-021 B Disposition Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Exam Comments UT UT UT UT UT UT UT UT UT UT VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 SSS Segment SSS-001A Segment SSS-001 B Acceptable Acceptable VT-2 V17-2 Page 32 of 33 Category System Component ID Segment SSS-002A Segment SSS-002B Segment SSS-005A Segment SSS-006A Segment SSS-007 Segment SSS-008A Segment SSS-009 SSS-007 Weld 2 SSS-007 Weld 22 SSS-007 Weld 3 SSS-007 Weld 32 SSS-007 Weld 66 SSS-007 Weld 69 Disposition Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Exam Comments VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 RT RT RT RT RT RT Page 33 of 33 SECTION 2 ASME SECTION XI REPAIRS AND REPLACEMENTS ASME Section XI Repairs and Replacements The following is a list of the repairs or replacements which have been performed through the restart from the 2006 refueling outage for which NIS-2 forms are attached.1.2.3.4.5.6.7.8.9.10.11.12.13.14.15.16.17.18.19.20.21.22.23.Work Order 19400 26320 16739 21496 27257 27405 25184 25693 29819 26963 26964 20457 270650 25456 269848 269853 267581 269856 269857 26379 269863 269864 26226 Description of Work Rebuilt Service Water Pump P-7C Replaced Snubber SNB-38 Replaced Valve MV-SW1 36 Replaced SIRW Tank Recirc Pump P-74 Replaced Valve CV-0826 Replaced Valve CV-0823 Replaced Valves CV-0821/MV-SW769 Replaced Valves CV-0822/MV-SW770 Repaired VHX-4 Plugged 22 tubes in the "A" Steam Generator Plugged 10 tubes in the "B" Steam Generator Replaced Valve CV-3070 Installed Weldolet and Cap on CSW Line Replaced Steam Generator Studs Repaired RV-0703 Repaired RV-0705 Repaired RV-0706 Repaired RV-0707 Repaired RV-0715 Repaired RV-0716 Repaired RV-0721 Repaired RV-0722 Repaired RV-1041 PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM C 1. Owner Consumers Energy Company Date 6126/2006 Name 2. Plant Palisades Nuclear Power Plant Sheet 1 of 2 Name 27780 Blue Star Highway, Covert, MI 49043 WO# 19400 Address Repair Organization P.O. No., Job No., etc 3. Work Performed by Nuclear Management Company, LLC Name Type Code Symbol Stamp N/A 27780 Blue Star Hwy, Covert, M! 49043 Authorization N/A Address Expiration Date N/A 4. Identification of System SWS Code Class Class 3 5. (a) Applicable Construction Code B31.1 1955 Edition Addenda n/a Code Case n/a (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section XI Code Cases None 6. Identification of Components

7. Description of Work 8. Tests conducted:

Rebuild Service Water Pump P-7C Using Rebuilt Bowl Assembly per EAR-2001-0542 Hydrostatic

-- Pneumatic[]

Nominal Operating Pressure Exempt[]Other [] Pressure psi Test Temp. 0 F Other: N/A NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 112 in. x 11 in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.

PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 9. Remarks None CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code,Section XI.Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed ASME Program Engineer Date _____ ___ , ' _____CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michigan and employed by HS13-CT of Connecticut have inspected the components described in this Owner's Report during the period November 18,2004 to May 10,2006 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.

_-_______

_ __ Commissions M1 300762 Inspector's Signature National Board, Province and Endorsements Date , aw&

I rPALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 511/2006 1.2.Owner Plant Consumers Energy Company Name Palisades Nuclear Power Plant Date Sheet 1 of 2 Name 27780 Blue Star Highway, Covert, MI 49043 WO# 26320 Address Repair Organization P.O. No., Job No., etc 3. Work Performed by Owner Name Typo Code Symbol Stamp N/A Same Authorization N/A Address Expiration Date N/A 4. Identification of System ESS Code Class Class 2 5. (a) Applicable Construction Code B31.1 1989 Edition Edition Addenda n/a Code Case n/a (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section XI Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)Snubber Anchor Darling ADH-1000-2487 n/a PO#GO284322 1999 Installed No 4 4. 4. 4. 4.~t~ I 4 4. 4 4. 4 4. I 1 4. 4 4 4 4.* 4. 4. t 4. 4. 1____ ____ 1 ____ 1 ___ 1 ____ 11 ____ ____7. Description of Work 8. Tests conducted:

Replaced Snubber SNB-38 per Snubber Program Hydrostatic

[]Other F1 Pneumatic

[]Pressure Nominal Operating Pressure [] Exempt E]psi Test Temp. 0 F Other: n/a NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.

Ems I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY I 9. Remarks n/a CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code,Section XI.Type Code Symbol Stamp N/A Certificate of Aut izationl.o.

N/A Expiration Date N/A Signed /,$J , ASME Program Engineer Date 14'" ... 2J , ZOO-CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michigan and employed by HSB-CT of Connecticut have inspected the components described in this Owners Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.

t , Commissions M1 300762 Inspector's Signature National Board, Province and Endorsements Date.obo(o IPALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 612612006 1.2.Owner Consumers Energy Company Date Name Palisades Nuclear Power Plant Plant Sheet 1 Of 2 Name 27780 Blue Star Highway, Covert, MI 49043 WO# 16739 Address Repair Organization P.O. No., Job No., etc 3. Work Performed by Owner Name Type Code Symbol Stamp N/A Same Authorization N/A Address Expiration Date N/A 4. Identification of System SWS Code Class Class 3 5. (a) Applicable Construction Code ASME B31.1 1955 Edition Addenda n/a Code Case n/a (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section Xl Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)MV-SW136 Crane Nuclear Model 143 1/2 XU n/a PO#G0309185 2006 Installed No Flanges Energy Steel n/a n/a PO#P807305 2006 Installed No 4" 300# Supply No Studs 5/8" -11 Muskon Inc n/a n/a PO#P805467 2006 Installed No UNC X4" Long Hex Nuts 5/8"- Muskon Inc n/a n/a PO#P805467 2006 Installed No 11 7. Description of Work 8. Tests conducted:

Replace Valve MV-SW136 Hydrostatic

[]Other 0]Pneumatic[]

Pressure Nominal Operating Pressure Exempt []psi Test Temp. a F Other: NOTE: Supplemental sheets in form of lists, sketches, or drawings maybe used, provided (1) size is 8 1 /2 in. x 1I in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.

I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY I ITEM 9. Remarks None CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code,Section XI.Type Code Symbol Stamp N/A Certificate of AuthorizatioDNo.

N/A Expiration Date N/A Signed ASMEProgram Engineer Date , .( .CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michigan and employed by HSR-CT of Connecticut have inspected the components described in this Owner's Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.

Commissions Inspector's Signature M1 300762 National Board, Province and Endorsements Date Date E.oc PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 1. Owner Consumers Energy Company Name 2. Plant Palisades Nuclear Power Plant Date Sheet 6/26/2006 1 of 2 Name 27780 Blue Star Highway, Covert, MI 49043 WO#21496 3. Work Performed by Address Owner Name Same Repair Organization P.O. No., Job No., etc Type Code Symbol Stamp Authorization Expiration Date Address 4. Identification of System Code Class Class 2 5. (a) Applicable Construction Code ASME B31.1 1955 Addenda n/a Code C.(b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity Edition ase n/a 1989 With No Addenda (c) Applicable Section Xl Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)P-74 SIRW Chesterton 3247GS n/a PO#G0195946-1996 Installed No Recirc Pump CQ No 4"xl 1/2" Conc Energy & n/a n/a PO# 2006 Installed No Reducer Process Corp P00002253 No 4" Flange Energy & n/a n/a PO# 2006 Installed No Process Corp P00002253 7. Description of Work 8. Tests conducted:

Replaced SIRW Tank Recirculation Pump P-74 per EAR-2003-0270 Hydrostatic

[]PneumaticE]

Nominal Operating Pressure R]Exempt E]Other []Pressure psi Test Temp.Other: NIA NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.

PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 9. Remarks None CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code,Section XI.Type Code Symbol Stamp N/A Certificate of AuthorizatioD.

N/A Expiration Date N/A Signed ASMEProgram Engineer Date Z4 __,_____ ____ ____ ___ ________ ____ Za3 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michigan and employed by HSR-CT of Connecticut have inspected the components described in this Owners Report during the period November 18,2004 to May 10,2006 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.

____ Commissions Ma 300762 Inspectors Signature National Board, Province and Endorsements Date t, oe I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 1. Owner Consumers Energy Company Name 2. Plant Palisades Nuclear Power Plant Name 27780 Blue Star Highway, Covert, MI 49043 Address Date Sheet 6/2612006 1 of 2 WO#27257 Repair Organization P.O. No., Job No., etc 3. Work Performed by Enertech Name 2950 Birtch Street,Brea,CA 92821 Address 4. Identification of System CCW 5. (a) Applicable Construction Code ANSI B16.4 Addenda n/a Type Code Symbol Stamp N/A Authorization N/A Expiration Date Code Class N/A Class 3 1981 Edition Code Case n/a (b) Applicable Edition of Section Xl Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section Xl Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)CV-0826 CCW Enertech SIN 10315 n/a PO#2276 2006 Corrected N Heat N Exchanger Control Valve 7. Description of Work 8. Tests conducted:

Installed hard stop and repaired areas of Erosion/Cavitation on ID of Valve Body Hydrostatic Li Pneumatic-Nominal Operating Pressure 0 Exempt El Other [l Pressure NOP psi Test Temp.NOT 0 F Other: n/a NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1 /2 in. x 11 in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.

I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY I ITEM 9. Remarks CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code,Section XI.Type Code Symbol Stamp N/A Certificate of Authori ation No. N/A Expiration Date N/A Signed 6, X/ , ASME Program Engineer Date " 6 2k 2cor CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michigan and employed by HSB-CT of Connecticut have inspected the components described in this Owner's Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section Xl.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.

Commissions MI 300762 Inspector's Signature National Board, Province and Endorsements Date D ae?004 I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 6/26/2006 1.2.Owner Plant Consumers Energy Company Name Palisades Nuclear Power Plant Date Sheet of I 2 Name 27780 Blue Star Highway, Covert, MI 49043 WO#27405 Address Repair Organization P.O. No., Job No., etc 3. Work Performed by Owner Name Type Code Symbol Stamp N/A Same Authorization N/A Address Expiration Date N/A 4. Identification of System CCW Code Class Class 3 5. (a) Applicable Construction Code ANSI B16.4 1981 Edition Addenda n/a Code Case n/a (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section Xl Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)CV-0823 CCW Enertech S/N 11524 n/a PO#P808270 2006 Installed No Heat No Exchanger Control Valve 7. Description of Work 8. Tests conducted:

Installed hard stop and repaired areas of Erosion/Cavitation on ID of Valve Body Hydrostatic

[]Other n Pneumatic--]

Pressure Nominal Operating Pressure Exempt Ej psi Test Temp. 0 F Other: n/a NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.

PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY 9. Remarks None CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code,Section XI.Type Code Symbol Stamp N/A Certificate of Auth w'ation No. .. EExpiration Date N/A Signed , ASME Program Engineer Date , V. , " CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michigan and employed by HSR-CT of Connecticut have inspected the components described in this Owner's Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.

_ _ _ _ _ Commissions MI 300762 Inspector's Signature National Board, Province and Endorsements Date Dat ,J 0 S.. s I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 1. Owner Consumers Energy Company Name 2. Plant Palisades Nuclear Power Plant Date Sheet 6/26/2006 1 of 2 Name 27780 Blue Star Highway, Covert, MI 49043 WO# 25184 Repair Organization P.O. No., Job No., etc Type Code Symbol Stamp N/A Address Nuclear Management Company, LIC 3. Work Performed by Name 27780 Blue Star Hwy, Covert, MI 49043 Address 4. Identification of System SWS 6. (a) Applicable Construction Code ASME B31.1 Addenda 1974 Addend Authorization Expiration Date Code Class N/A N/A Class 3 1973 Edition Edition Code Case n/a (b) Applicable Edition of Section Xi Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section Xi Code Cases n/a 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)CV-0821 Fisher S/N17545158 n/a PO#P806452 2006 Installed No MV-SW769 Velan S/N6615405-02 n/a OP#P806519 2006 Installed No 7. Description of Work 8. Tests conducted:

Replaced Valve CV-0821 and Installed new Isolation Valve MV-SW769 Hydrostatic

[]Pneumatic[]

Nominal Operating Pressure S6 Exempt E]Other LI Pressure psi Test Temp.Other: n/a NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1 /2 in. x 11 in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.

ý111 I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY I ITEM 9. Remarks n/a CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code,Section XI.Type Code Symbol Stamp N/A Certificate of Autho 'ation No. N/A Expiration Date N/A Signed ASMEProgram Engineer Date __U_ _ _" _ , ZOO~, CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michigan and employed by HSB-CT of Connecticut have inspected the components described in this Owner's Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.

Commissions Inspector's Signature M1300762 National Board, Province and Endorsements Date_____L__V___

____ Roo(.

I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 6/26/2006 1.2.Owner Plant Consumers Energy Company Name Palisades Nuclear Power Plant Date Sheet 1 Of 2 Name 27780 Blue Star Highway, Covert, MI 49043 WO# 25693 Address Repair Organization P.O. No., Job No., etc 3. Work Performed by Nuclear Management Company, LLC Name Type Code Symbol Stamp N/A 27780 Blue Star Hwy, Covert, MI 49043 Authorization N/A Address Expiration Date N/A 4. Identification of System SWS Code Class Class 3 5. (a) Applicable Construction Code ASME B31.1 1973 Edition Edition Addenda 1974 Addend Code Case n/a (b) Applicable Edition of Section Xl Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section XI Code Cases n/a 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)CV-0822 Fisher S/N17545159 n/a PO#P806452 2006 Installed No MV-SW770 Velan Model F12-11X13-n/a PO#P806519 2006 Installed BC2A No 7. Description of Work 8. Tests conducted:

Replaced Valve CV-0822 and Installed new Isolation Valve MV-SW770 Hydrostatic

[]Other []Pneumatic[]

Pressure Nominal Operating Pressure 66 psi Test Temp.Exempt []0 F Other: n/a NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 1I in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.

I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY I I ITEM 9. Remarks n/a CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code,Section XI.Type Code Symbol Stamp N/A Certificate of Authorizati No N/A Expiration Date NWA Signed ASME Program Engineer Date ., CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michi-gan and employed by HSB-CT of Connecticut have inspected the components described in this Owner's Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.

-60" Commissions MI300762 Inspector's Signature National Board, Province and Endorsements Date IPALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 6/26/2006 1.2.Owner Plant Consumers Energy Company Name Palisades Nuclear Power Plant Name 27780 Blue Star Highway, Covert, MI 49043 Date Sheet I of 2 WO#2981 9 Address Repair Organization P.O. No., Job No., etc 3. Work Performed by Owner bner Type Code Symbol Stamp N/A Same Authorization N/A Address Expiration Date N/A 4. Identification of System VAS Code Class Class 3 6. (a) Applicable Construction Code ASME B31.1 1955 Edition Addenda n/a Code Case n/a (b) Applicable Edition of Section Xl Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section Xl Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)Tube Plugs Heat Exchanger n/a n/a PO#663 2005 Installed No Prod Corp No 7.8.Description of Work Tests conducted:

Plugged tube in VHX-4 Heat Exacanger Hydrostatic

[]Other []Pneumatic[o Pressure Nominal Operating Pressure psi Test Temp.Exempt D1 aF Other: n/a NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1 /2 in. x 11 in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.

I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY I ITEM 9. Remarks None CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code,Section XI.Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed '$,*d '/A 6 , ASME Program Engineer Date T -4'-- , z-1 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michigan and employed by HSB-CT of Connecticut have inspected the components described in this Owner's Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.,I* , .Commissions M1 300762 Inspector's Signature..'" s, National Board, Province and Endorsements Date U v IPALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 612612006 1.2.Owner Plant Consumers Energy Company Name Palisades Nuclear Power Plant Name 27780 Blue Star Highway, Covert, MI 49043 Date Sheet of 1 2 WO#26963 Address Repair Organization P.O. No., Job No., etc 3. Work Performed by Owner Name Type Code Symbol Stamp N/A Same Authorization N/A Address Expiration Date NIA 4. Identification of System PCS Code Class Class 1 5. (a) Applicable Construction Code ASME Section I11 1977 Edition Addenda n/a Code Case n/a (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section XI Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)Tube Plugs Westinghouse n/a n/a PO#1281 2005 Installed Electric Company No 7. Description of Work 8. Tests conducted:-Plugged 22 tubes in the "A" Steam Generator Hydrostatic

[]Other LI Pneumatic[]

Pressure Nominal Operating Pressure R] Exempt[]psi Test Temp.

  • F Other: NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.

PALISADES NUCLEAR POWER PLANT EFOR:MV NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 9. Remarks None CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code,Section XI.Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed ASME Program Engineer Date ,l Zfo , _" _____CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michi-gan and employed by HSR-CT of Connecticut have inspected the components described in this Owners Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.-e o'" Commissions Ml 100762 Inspector's Signature National Board, Province and Endorsements Date 0&44 .2 &V 1%

PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 6/26/2006 1.2.Owner Plant Consumers Energy Company Name Palisades Nuclear Power Plant Name 27780 Blue Star Highway, Covert, MI 49043 Date Sheet I Of 2 WO#26964 Address Repair Organization P.O. No., Job No., etc 3. Work Performed by Owner Name Type Code Symbol Stamp NIA Same Authorization NIA Address Expiration Date N/A 4. Identification of System PCS Code Class Class 1 5. (a) Applicable Construction Code ASME Section III 1977 Edition Addenda n/a Code Case n/a (b) Applicable Edition of Section Xl Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section XI Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)Tube Plugs Westinghouse n/a n/a PO#1281 2005 Installed No Electric Company No 7. Description of Work 8. Tests conducted:

Plugged 10 tubes in the "B" Steam Generator Hydrostatic

[]Other []Pneumatic[]

Pressure Nominal Operating Pressure Sd Exempt[]psi Test Temp.

  • F Other: NOTE: Supplemental sheets in form of lists, sketches, or drawings maybe used, provided (1) size is 8 1 /2 in. x 11 in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.

PALISADES NUCLEAR POWER PLANT FRM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 9. Remarks None CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code,Section XI.Type Code Symbol Stamp N/A Certificate of Authoyation No. N/A Expiration Date N/A Signed 144--& ASME Pro(g ram Engineer Date it,- 2. , '2,06 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michigan and employed by HSS-CT of Connecticut have inspected the components described in this Owner's Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.

____ _ __ Commissions M1 300762 Inspectors Signature National Board, Province and Endorsements Date " V(X , Id V I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 1. Owner Consumers Energy Company Name 2. Plant Palisades Nuclear Power Plant Date Sheet 6/26/2006 1 of 2 Name 27780 Blue Star Highway, Covert, MI 49043 WO#20457 Address Owner Repair Organization P.O. No., Job No., etc 3. Work Performed by Name Same Address 4. Identification of System ESS Type Code Symbol Stamp Authorization Expiration Date Code Class N/A N/A Class 2 5. (a) Applicable Construction Code ASME B31.1 1955 Ed Addenda n/a Code Ca (b) Applicable Edition of Section Xi Utilized for Repair/Replacement Activity ition Edition ase n/a 1989 With No Addenda (c) Applicable Section Xl Code Cases N-416-1 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)CV-3070 Aloyco Inc 68-Mi 13-1 n/a PO#4838 2006 Installed No 7. Description of Work 8. Tests conducted:

Replaced HPSI Pump P-66B subcooling valve CV-3070 Hydrostatic

[]Pneumatic[]

Nominal Operating Pressure W Exempt []Other Rl Pressure psi Test Temp.Other: n/a NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1 /2 in. x 11 in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.

I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY I ITEM 9. Remarks None CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code,Section XI.Type Code Symbol Stamp NIA Certificate of Authorztion No. N/A Expiration Date N/A Signed , ASME Program Engineer Date 2:1 , W--CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michigan and employed by HS4-CT of Connecticut have inspected the components described in this Owners Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection." Commissions MI 300762 Inspector's Signature National Board, Province and Endorsements Date Ja4J-" o-, .2:F I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 6/2612006 1.2.Owner Plant Consumers Energy Company Name Palisades Nuclear Power Plant Name 27780 Blue Star Highway, Covert, MI 49043 Date Sheet 1 of 2 WO#270650 Address Repair Organization P.O. No., Job No., etc 3. Work Performed by Owner Name Type Code Symbol Stamp N/A Same Authorization N/A Address Expiration Date N/A 4. Identification of System CSW Code Class Class 3 5. (a) Applicable Construction Code ASME B31.1 1955 Edition Edition Addenda nra Code Case n/a (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section XI Code Cases N-416-1 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)3" Weldolet Dubose n/a n/a PO#5457 2006 Installed No 3" Pipe Cap Dubose n/a n/a PO#5457 2006 Installed No I INI 7. Description of Work 8. Tests conducted:

Installed weldolet and cap on servive water pipe Hydrostatic

[]Other R]Pneumatic[]

Pressure Nominal Operating Pressure 6d Exempt []psi Test Temp. 0 F Other: n/a NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1 /2 in. x 11 in., (2)information In items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.

I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY I ITEM i-ý' a"Wov 9. Remarks None CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code,Section XI.Type Code Symbol Stamp N/A Certificate of Authoriz n No. N/A Expiration Date N/A Signed ,'ý ASMEIVI Program Engineer Date "Q46 ..1," CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michigan and employed by HSB-.T of Connecticut have inspected the components described in this Owner's Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection."KM_ k Commissions MI 300762 Inspectors Signature National Board, Province and Endorsements Date PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 6/26/2006 1. Owner Consumers Energy Company Name 2. Plant Palisades Nuclear Power Plant Date Sheet 1 Of 2 Name 27780 Blue Star Highway, Covert, MI 49043 WO#25456 Address Repair Organization P.O. No., Job No., etc 3. Work Performed by Owner Name Type Code Symbol Stamp N/A Same Authorization N/A Address Expiration Date N/A 4. Identification of System PCS Code Class Class 1 5. (a) Applicable Construction Code ASME Serction ll 1989 Edition Edition Addenda n/a Code Case n/a (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section Xl Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)Studs Westinghouse n/a n/a PO# n/a Installed No G0201602 No Nuts Westinghouse n/a n/a PO# n/a Installed G78219 No Helicoil Westinghouse n/a n/a PO# n/a Installed No G0318552 7. Description of Work 8. Tests conducted:

Replace stuck stud & studs #1008B and Stud #14 lB3 Hydrostatic 0 PneumaticE]

Nominal Pressure NOP Operating Pressure g Exempt f]0 F Other F]psi Test Temp.NOT Other: n/a NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 112 in. x 11 in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.

PALISADES NUCLEAR POWER PLANT:FOR:MV NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 9. Remarks None CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section Xl.Type Code Symbol Stamp N/A Certificate of Autization-No.

N/A Expiration Date N/A Signed ASMEProgram Engineer Date " -c .-, CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michigan and employed by HSR-CT of Connecticut have inspected the components described in this Owners Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.4 Commissions M1 300762 Inspector's Signature National Board, Province and Endorsements Date ___._ _ _ , _o__, U -,

I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 1. Owner Consumers Energy Company Name 2. Plant Palisades Nuclear Power Plant Date 6/2612006 Sheet 1 of 2 Name 27780 Blue Star Highway, Covert, Ml 49043 WO#269848 Address NWS TechnologiesLLC

3. Work Performed by Repair Organization P.O. No., Job No., etc Type Code Symbol Stamp VR I NR Name 131 Venture Bivd, SpartanburgSC 29301 Address 4. Identification of System MSS 5. (a) Applicable Construction Code ASME Section III Addenda n/a Authorization Expiration Date Code Class 632 /81 4/312009 4/9/2009 1968 Edition Code Case n/a (b) Applicable Edition of Section Xl Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section Xl Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)RV-0703 See Attached Form NVR-1 7. Description of Work 8. Tests conducted:

Repaired Relief Valve Hydrostatic E]Pneumatic

[-Nominal Operating Pressure 0 Exempt E]Other LI Pressure psi Test Temp.Other: NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1 /2 in. x 11 in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.

I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY I ITEM 9. Remarks See Attached Form NVR-1 for RV-0703 CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code,Section XI.Type Code Symbol Stamp N/A Certificate of AuthorizonNo.

N/A Expiration Date NIA Signed iQ- ASME Program Engineer Date 7'T M 7--C- , Z. 004C CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michigan and en nployed by HSR-CT of Connecticut have inspected the components described in this Owner's Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.

Commissions M1 300762 Inspector's Signature ,Aor National Board, Province and Endorsements Date W V' FORM NVR-1 REPORT OF REPAIR I] REPLACEMENT El OF NUCLEAR PRESSURE RELIEF DEVICES C 1. Work performed by: NWS Technologies, LLC Purchase Order# 00004610 131 Venture Boulevard, Spartanburg, SC 29306 2. Work performed for. Nuclear Management Company -Palisades Nuclear Plant 3/4. Owner -name, address and identification of nuclear power plant Nuclear Management Company -Palisades Nuclear Plant, 27780 Blue Star Memorial Hwy, Covert, MI 49043 5. a: Repaired pressure relief device: Main Steam Safety Valve b: Name of manufacturer.

Anderson Greenwood I Crosby c: Identifying nos.HA 55 RV-0703 n/a steam 6Q8 n/a (type) (mfes S"N) (NB#) (service) (size) (yr.built) d: Construction Code: ASME Sec. III 1968 n/a n/a 1 (name/section/division) (edition) (addenda) (Code Cases(s)) (Code Class)6. ASME Code Section Xl. applicable for inservice Inspection:

1989 n/a n/a (edition) (addenda) (Code Case(s))7. ASME Code Section Xi used for repairs, replacements:

1989 n/a n/a (edition) (addenda) (Code Case(s))8. Construction Code used for repairs, replacements:

1968 n/a n/a (edition) (addenda) (Code Case(s))9. Design responsibilities:

n/a____10.Qpenng pressure:

1025 psig Set-pressure a djustnent-m-en -a ." -- -NWS Technoogies LLC- -using..,steani_

C I11. Description of work (include name and identifying number of replacement parts): As-found steam test. Disassembled, inspected, modified guide and upper spring washer per Palisades Modification EAR-2005-0043, replaced spindle, lapped seats. Certified set-pressure using steam. Jacked & Lapped. Certified seat tightness using steam.12. Remarks: NWS Traveler #: 06-127. Replaced spindle.CERTIFICATE OF COMPLIANCE I, Cesar V. Sierra certify that to the best of my knowledge and belief the statements made in this report are correct and the repair, modification or replacement of the pressure relief devices described above conforms to Section X! of the ASME Code and the National Board Inspection Code "VR and "NR" rules.National Board Certificate of Authorization No. 632 to use the "'VR" stamp expires April 3, 2009.Nati/nal Board Certificate of Authorization No. 81 /to use t "NR" sta expires April 9, 2009.NWS Technologies, LLC Manager, QA Date Repair Organization Aforized r entative Title CERTIFICATE OFINSPECTION I, Charles F. Toegel Jr. holding a valid commission issued by The National Board of Boiler and Pressure Vessel Inspectors and certificate of competency issued by the jurisdiction of North Carolina and employed by Hartford Steam Boiler of CT of Hartford, CT have inspected the repair, modification or replacement described In this report on v/)HT40 and state that to the best of my knowledge and belief, this repair, modification or replacement has t3eenkompleted in accordance with Section XI of the of the ASME Code and the National Board Inspection Code "VR" and "NR" rules.By signing this certificate, neither the undersigned nor my employer makes any warranty, expressed or implied, concerning this repair, modification or replacement described in this report. Furthermore, neither the undersigned nor my employer shall be liable in any manner for any personal injury, property damage or loss of any kind arising from or connected Is *sp n.Y,.,e .,, in o t -C oNB#8462, A,(N,I NC# 1073 1ae_" lnspdtol 5 natuy I Commissions (NB (min endorsemen'ts).

Iurisdiction,&

no.)

I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 6/26/2006 1.2.Owner Plant Consumers Energy Company Name Palisades Nuclear Power Plant Name 27780 Blue Star Highway, Covert, MI 49043 Date Sheet 1 of 2 WO#269853 Address Repair Organization P.O. No., Job No., etc 3. Work Performed by NWS Technologies,LLC Type Code Symbol Stamp VR I NR Name 131 Venture Blvd, Spartanburg,SC 29301 Authorization 632/81 Address Expiration Date 4/3/2009 4/9/2009 4. Identification of System MSS Code Class 6. (a) Applicable Construction Code ASME Section 1II 1968 Edition Addenda n/a Code Case n/a (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section XI Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)RV-0705 See Attached Form NVR-1 7. Description of Work 8. Tests conducted:

Repaired Relief Valve Hydrostatic

[]Other R Pneumatic[]

Pressure Nominal Operating Pressure Exempt i]psi Test Temp. a F Other: NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1 /2 in. x 11 in., (2)information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.

PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 9. Remarks See Attached Form NVR-1 for RV-0705 CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code,Section XI.Type Code Symbol Stamp N/A Certificate of Aut 9 zation NO. N/A Expiration Date N/A Signed-, ASME Program Engineer Date , , CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michigan and employed by H,4R-rT of Connecticut have inspected the components described in this Owners Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.

_ _ _ _ _ _ Commissions M1 300762 Inspector's Signature National Board, Province and Endorsements Date " o , e9OO&,

FORM NVR-1 REPORT OF REPAIR EN REPLACEMENT I0 OF NUCLEAR PRESSURE RELIEF DEVICES C 1. Work performed by: NWS Technologies, LLC Purchase Order# 00004610 131 Venture Boulevard, Spartanburg, SC 29306 2. Work performed for: Nuclear Management Company -Palisades Nuclear Plant 3/4. Owner -name, address and Identification of nuclear power plant Nuclear Management Company -Palisades Nuclear Plant, 27780 Blue Star Memorial Hwy, Covert, MI 49043 5. a: Repaired pressure relief device: Main Steam Safety Valve b: Name of manufacturer Anderson Greenwood I Crosby c: Identifying nos.HA 55 RV-0705 n/a steam 6Q8 nra (type) (mrfs S/N) (NB#) (service). (size) (yr.built) d: Construction Code: ASME Sec. 1II 1968 n/a n/a 1 (namelsectionrddvisfon) (edition) (addenda) (Code Cases(s)) (Code Class)6. ASME Code Section XI applicable for Inservice Inspection:

1989 nra nra (edition) (addenda) (Code Case(s))7. ASME Code Section XI used for repairs, replacements:

1989 nra n/a (edition) (addenda) (Code Case(s))8. Construction Code used for repairs, replacements:

1968 n/a na (edition) (addenda) (Code Case(s))9. Design responsibilities:

n/a 10- Openlng-pressure:--

-1025-pslg

............

Set-pressure adjustment made at NWS Technologies, LLC using steam (3 11. Description of work (Include name and Identifying number of replacement parts): As-found steam test Disassembled, Inspected, modified guide and upper spring washer per Palisades Modification EAR-2005-0043, replaced spindle, lapped seats. Certified set-pressure using steam. Jacked & Lapped. Certified seat tightness using steam.12. Remarks: NWS Traveler#:

06-128. Replaced spindle.CERTIFICATE OF COMPLIANCE I, Cesar V. Sierra certify that to the best of my knowledge and belief the statements made In this report are correct and the repair, modification or replacement of the pressure relief devices described above conforms to Section XI of the ASME Code and the National Board Inspection Code "VR" and "NR" rules.Iiational Board Certificate of Authorization No. 632 to use the 'VR" stamp expires April 3, 2009.Naional Board Certificate of Authorization No. 81 to use th NR" stami expires April 9, 2009.______ NWS Technologies, LLC gW Manager, QA Date Repair Organization A. horized repry ntative Tit'e CERTIFICATE OF INSPECTION I, Charles F. Toegel Jr. holding a valid commission issued by The National Board of Boiler and Pressure Vessel Inspectors and certificate of competency Issued by the jurisdiction of North Carolina and employed by Hartford Steam Boiler of CT of Hartford, CT have Inspected the repair, modification or replacement described in this report on Y/11/od_, and state that to the best of my knowledge and belief, this repair, modification or replacement has lden 4ompleted In accordance with Section XI of the of the ASME Code and the National Board Inspection Code WVR" and "NRn rules.By signing this certificate, neither the undersigned nor my employer makes any warranty, expressed or implied, concerning this repair, modification or replacement described In this report. Furthermore, neither the undersigned nor my employer shall be liable In any manner for any personal injury, property damage or loss of any kind arising from or connected-th thil Insp tioq.A Ze -NB n8462, ANl NC#1073-7Dite -ins%:~o~s~ignattrr I Commissions (NB (mIn endorsements), jurisdiction,&

no.)

m I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY I ITEM 1. Owner Consumers Energy Company Name 2. Plant Palisades Nuclear Power Plant Name 27780 Blue Star Highway, Covert, MI 49043 Date 6/26/2006 Sheet 1 of 2 3. Work Performed by Address NWS Technologies,LLC WO#267581 Repair Organization P.O. No., Job No., etc Type Code Symbol Stamp VR / NR Name 131 Venture Blvd, Spartanburg,SC 29301 Address 4. Identification of System MSS Authorization Expiration Date Code Class 632 /81 4/312009 4/912009 S. (a) Applicable Construction Code ASME Section III 1968 Addenda n/a Code Ca (b) Applicable Edition of Section Xl Utilized for Repair/Replacement Activity Edition se n/a 1989 With No Addenda (c) Applicable Section Xl Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)RV-0706 See Attached Form NVR-1 7. Description of Work 8. Tests conducted:

Repaired Relief Valve Hydrostatic

[]PneumaticE]

Nominal Operating Pressure W Exempt I]Other []Pressure psi Test Temp.Other: NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1 /2 in. x 11 in., (2)information In items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.

I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY I ITEM 9. Remarks See Attached Form NVR-1 for RV-0706 CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code,Section XI.Type Code Symbol Stamp N/A Certificate of Auth ization No. NIA Expiration Date N/A Signed /'"/'I ,, , ASME Program Engineer Date ____ zrJ 200(a CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michigan and employed by HSR-rT of Connecticut have inspected the components described in this Owners Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.

Commissions M1 300762 Inspectors Signature'4 OrT National Board, Province and Endorsements Date FORM NVR-1 REPORT OF REPAIR [] REPLACEMENT

[3 OF NUCLEAR PRESSURE RELIEF DEVICES 1. Work performed by: NWS Technologies, LLC Purchase Order# 00004610 131 Venture Boulevard, Spartanburg, SC 29306 2. Work performed for: Nuclear Management Company -Palisades Nuclear Plant 314. Owner -name, address and identification of nuclear power plant Nuclear Management Company -Palisades Nuclear Plant, 27780 Blue Star Memorial Hwy, Covert, MI 49043 5. a: Repaired pressure relief device: Main Steam Safety Valve b: Name of manufacturer.

Anderson Greenwood I Crosby c: Identifying nos.HA 55 RV-0706 r (type) (m"s S) (N d: Construction Code: ASME Sec. III 1968 (name/sectlonldivision) (edition)6. ASME Code Section XI applicable for inservice inspection:

7. ASME Code Section XI used for repairs, replacements:
8. Construction Code used for repairs, replacements:

i/a steam 6C 13#) (servioe)- (S, n/a n/a (addenda) (Code Cases(s))X)1989 (edition)1989 (edition)1968 (edition)n/a (addenda)n/a (addenda)rna (addenda)n/a (yr.bullt)

I (Code Class)n/a (Code Case(s))n/a (Code Case(s))n/a (Code Case(s))9. Design responsibilities:

n/a 10. opening pressure:

1025 psig Set-pressure adjustment made at: NWS Technologies, LLC using steam 11. Description of work (Include name and ldentii4ng number of replacement parts): As-found steam test Disassembled, inspected, modified guide and upper spring washer per Palisades Modification EAR-2005-0043, lapped seats. Certified set-pressure and seat tightness using steam.12. Remarks: NWS Traveler #: 06-129.CERTIFICATE OF COMPLIANCE I, Cesar V. Sierra certify that to the best of my knowledge and belief the statements made in this report are correct and the repair, modification or replacement of the pressure relief devices described above conforms to Section XI of the ASME Code and the National Board Inspection Code "VRn and "NR" rules.National Board Certificate of Authorization No. 632 to use the "VR" stamp expires Apnrl 3, 2009.Nat'nal Board Certificate of Authorization No. 81 7J, se the wNsXtgmp e ires April 9, 2009.7RZ; NWS Technalogies, LItC &vTManager, 7 Date Repair Organization Autiirjfted mepreserndWie Title i I, Charles F. Toegel Jr. holding a valid commission Issued by The National Board of Boiler and Pressure Vessel Inspectors and certificate of competency issued by the jurisdiction of North Carolina and employed by Hartford Steam Boiler of CT -.of Hartford, CT have Inspected the repair, modification or replacement described in this report on ,and state that to the best of my knowledge and belief, this repair, modification or replacement has be~n ýhmpleted in accordance with Section XI of the of the ASME Code and the National Board Inspection Code wVR" and NR" rules.By signing this certificate, neither the undersigned nor my employer makes any warranty, expressed or implied, concerning this repair, modification or replacement described in this report. Furthermore, neither the undersigned nor my employer shall be liable in any manner for any personal injury, property damage or loss of any kind arising from or connected thisspe n-P/ D a ,, -&- / t C ,n(NB #8462, A, N,I NCO 1073 Dfiv Ins& cte fgnar rY Commissions (NS (inci endorsements), jurisdiction.&

no.)

PALISADES NUCLEAR POWER PLANT E ORM NIS-2 OWNER'S REPORT FOR REPAIR/TREPLACEMENT ACTIVITY ITEM 1. Owner Consumers Energy Company Name 2. Plant Palisades Nuclear Power Plant Date 6/26/2006 Sheet 1 Of 2 Name 27780 Blue Star Highway, Covert, MI 49043 WO#269856 Address NWS Technologies,LLC

3. Work Performed by Repair Organization P.O. No., Job No., etc Type Code Symbol Stamp VR I NR Authorization 632/81 Name 131 Venture Blvd, Spartanburg,SC 29301 Address 4. Identification of System MSS Expiration Date Code Class 4/3/2009 4/912009 5. (a) Applicable Construction Code ASME Section III 1968 Edition Addenda nla Code Case n/a (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section XI Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)RV-0707 See Attached Form NVR-1 7. Description of Work 8. Tests conducted:

Repaired Relief Valve Hydrostatic

[]Pneumatic[]

Nominal Operating Pressure W Exempt []Other 0 Pressure psi Test Temp.Other: NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.

PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 9. Remarks See Attached Form NVR-1 for RV-0707 CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code,Section XI.Type Code Symbol Stamp N/A Certificate of Au.rization No. NIA Expiration Date N/A Signe /AS,/ iMi 7 E Program Engineer Date wo W- 7,- 5 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michigan and employed by HSB-CT of Connecticut have inspected the components described in this Owner's Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.

_ _60 " Commissions M1 300762 Inspector's Signature National Board, Province and Endorsements Date _ ___ __O___V V FORM NVR-1 REPORT OF REPAIR Da REPLACEMENT

[3 OF NUCLEAR PRESSURE RELIEF DEVICES§ 1. Work performed by: NWS Technologies, LLC Purchase Order# 00004610 131 Venture Boulevard, Spartanburg, SC 29306 2. Work performed for Nuclear Management Company -Palisades Nuclear Plant 3/4. Owner -name, address and identification of nuclear power plant: Nuclear Management Company -Palisades Nuclear Plant, 27780 Blue Star Memorial Hwy, Covert, MI 49043 5. a: Repaired pressure relief device: Main Steam Safety Valve b: Name of manufacturer Anderson Greenwood I Crosby c: Identifying nos.HA 55 RV-0707 n/a steam 6Q8 n/a (type) (mfe's SIN) (NB#) (service). (size) (yr.buil)d: Construction Code: ASME Sec. I1I 1968 n/a n/a 1 (namelsectionldivision) (edition) (addenda) (Code Cases(s)) (Code Class)6. ASME Code Section XI applicable for Inservice inspection:

1989 n/a n/a (edition) (addenda) (Code Case(s))7. ASME Code Section XI used for repairs, replacements:

1989 nra n/a (edition) (addenda) (Code Case(s))8. Construction Code used for repairs, replacements:

1968 n/a nra (edition) (addenda) (Code Case(s))9. Design responsibilities:

n/a i--lOW.Open1ng pressure s te25psi_Set-pressure adjustment made at NWS Technologies, LLC using steam 11. Description of work (nclude name and identifying number of replacement parts): Disassembled, Inspected, modified guide and upper spring washer per Palisades Modification EAR-2005-0043, lapped seats. Certified set-pressure using steam. Jacked & Lapped. Certified seat tightness using steam.12. Remarks: NWS Traveler#:

06-130.CERTIFICATE OF COMPLIANCE I, Cesar V. Sierra certify that to the best of my knowledge and belief the statements made In this report are correct and the repair, modification or replacement of the pressure relief devices described above conforms to Section XI of the ASME Code and the National Board Inspection Code "aR" and "NR" rules.National Board Certificate of Authorization No. 632 to use the "stamp expires April 3, 2009.Nalynal Board Certificate of Authorization No. 81 touse the "stamp eypires April 9, 2009.'q/I /,*I, NWS Technologies, LIC _______________

Manager, QA Date Repair Organization Autho=ed represe tive TWie CERTIFICATE OF INSPECTION I, Charles F. Toegel Jr. holding a valid commission issued by The National Board of Boiler and Pressure Vessel Inspectors and certificate of competency Issued by the jurisdiction of North Carolina and employed by Hartford Steam Boiler of CT of Hartford, CT have Inspected the repair, modification or replacement described in this report on j////OA, and state that to the best of my knowledge and belief, this repair, modification or replacement has bain cdmpleted in accordance with Section XI of the of the ASME Code and the National Board Inspection Code "VR" and "NR" rules.By signing this certificate, neither the undersigned nor my employer makes any warranty, expressed or Implied, concerning this repair, modification or replacement described in this report. Furthermore, neither the undersigned nor my employer shall be liable In any manner for any personal injury, property damage or loss of any kind arising om or connected wifthis I specon,-A,7?

  • oN1398462, A,N,I NC# 1073 o te Insm = = IaV Commissions (N9 find endorsements).

jurlsdkcton.&

no.)

I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 1. Owner Consumers Energy Company Name 2. Plant Palisades Nuclear Power Plant Name 27780 Blue Star Highway, Covert, MI 49043 Date Sheet 6/26/2006 I of 2 WO#269857 Repair Organization P.O. No., Job No., etc Type Code Symbol Stamp VR / NR 3. Work Performed by Address NWS Technologies,LLC Name 131 Venture Blvd, Spartanburg,SC 29301 Address 4. Identification of System MSS 6. (a) Applicable Construction Code ASME Section III Addenda n/a Authorization Expiration Date Code Class 632/81 4/3/2009 4/9/2009 1968 Edition Code Case n/a (b) Applicable Edition of Section Xl Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section XI Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)RV-0715 See Attached Form NVR-1 7. Description of Work 8. Tests conducted:

Repaired Relief Valve Hydrostatic LI Pneumatic--

Nominal Operating Pressure 0 Exempt 1]Other f-1 Pressure psi Test Temp.Other: NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x II in., (2)Information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets Is recorded at the top of this form.

I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY I ITEM 9. Remarks See Attached Form NVR-1 for RV-0715 CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code,Section XI.Type Code Symbol Stamp N/A Certificate of Auth*ation No. N/A Expiration Date N/A Signed /A 6 , ASME Program Engineer Date ,, ., CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michigan and employed by HSB-CT of Connecticut have inspected the components described in this Owner's Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.

_ _"____ Commissions MI 300762 Inspector's Signature National Board, Province and Endorsements Date Date .02006 FORM NVR-1 REPORT OF REPAIR M REPLACEMENT I3-OF NUCLEAR PRESSURE RELIEF DEVICES 1. Work performed by: NWS Technologies, LLC Purchase Order # 00004610 131 Venture Boulevard, Spartanburg, SC 29306 2. Work performed for Nuclear Management Company -Palisades Nuclear Plant 3/4. Owner -name, address and identification of nuclear power plant Nuclear Management Company -Palisades Nuclear Plant. 27780 Blue Star Memorial Hwy, Covert, MI 49043 5. a: Repaired pressure relief device: Main Steam Safety Valve b: Name of manufacturer Anderson Greenwood

/ Crosby c: Identifying nos.HA 55 RV-0715 (type) (mfs S" ()d: Construction Code: ASME Sec. Ill 1968 (namelsectlon/dlvislon) (edition)6. ASME Code Section XI applicable for inservice Inspection:

7. ASME Code Section Xl used for repairs, replacements:
8. Construction Code used for repairs, replacements:

1/a steam 6Q8 n/a 139) (service). (size) (yr.bullt) n/a n/a I (addenda) (Code Cases(s)) (Code Class)1989 (edition)1989 (edition)1968 (edition)n/a (addenda)n/a (addenda)n/a (addenda)n/a (Code Case(s))n/a (Code Case(s))n/a (Code Case(s))9. Design responsibilities:

n/a Mae* -.

  • W, *
  • r , -, t -. ,. W Set-pressure adjustment made at NWS Technologies, LLC using steam 11. Description of work (Indude name and identifying number of replacement parts): As-found steam test. Disassembled, Inspected, modified guide and upper spring washer per Palisades Modification EAR-2005-0043, lapped seats. Certified set-pressure using steam. Jacked & Lapped. Certified seat tightness using steam.12. Remarks: NWS Traveler#:

06-131.CERTIFICATE OF COMPLIANCE I, Cesar V. Sierra certify that to the best of my knowledge and belief the statements made In this report are correct and the repair, modification or replacement of the pressure relief devices described above conforms to Section XI of the ASME Code and the National Board Inspection Code "VR" and "NR" rules.National Board Certificate of Authorization No. 632 to use the "VRO stamp expires April3, 2009.N~jnlBoard Certificate of Authorization No. 81 jo use theVANR" stam' expires April 9, 2009.1 , NWS Technologies, LLC Manager, QA Date Repair Organization Auyodzed reprentative TItle I. Charles F. Toegel Jr. holding a valid commission Issued by The National Board of Boiler and Pressure Vessel Inspectors and certificate of competency Issued by the jurisdiction of North Carolina and employed by Hartford Steam Boiler of CT of Hartford, CT have inspected the repair, modification or replacement described in this report on state that to the best of my knowledge and belief, this repair, modification or replacement has Ien inbmpleted In accordance with Section XI of the of the ASME Code and the National Board Inspection Code 'VR" and "NR" rules.By signing this certificate, neither the undersigned nor my employer makes any warranty, expressed or implied, concerning this repair, modification or replacement described In this report. Furthermore, neither the undersigned nor my employer shall be liable in any manner for any persona! injury, property damage or loss of any kind ani g fom or connecte.plth-n, , Ins.A iae N 13 -8462, A .N , I N C# 1073-7oake 3 gnatire Commissions (NB Ond endorsements).

jurisdiction.&

no.)

I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 1. Owner Consumers Energy Company Name 2. Plant Palisades Nuclear Power Plant Name 27780 Blue Star Highway, Covert, MI 49043 Date Sheet 6/26/2006 1 of 2 WO#26379 Address NWS Technologies,LLC

3. Work Performed by Repair Organization P.O. No., Job No., etc Type Code Symbol Stamp VR / NR Name 131 Venture Blvd, Spartanburg,SC 29301 Address 4. Identification of System MSS Authorization Expiration Date Code Class 632/81 4/3/2009 4/9/2009 5. (a) Applicable Construction Code ASME Section eII Addenda nIa 1968 Edition Code Case nla (b) Applicable Edition of Section Xl Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section Xl Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)RV-0716 See Attached I Form NVR-1 I 4. 4 I I 4 4 4 4 4 I I 4 4 4 4. 4 I I 4 4 4 4. 4 I I 4-4 4 4. 4 1 I 1 .1 7. Description of Work 8. Tests conducted:

Repaired Relief Valve Hydrostatic

[]Pneumatic[]

Nominal Operating Pressure Rj Exempt E]Other El Pressure psi Test Temp.Other: NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 In. x 11 in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.

I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY I ITEM 9. Remarks See Attached Form NVR-1 for RV-0716 CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section X1.Type Code Symbol Stamp N/A Certificate of Authoriation No. N/A Expiration Date NIA Signed ASME Program Engineer Date z., , _ _____CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michigan and employed by HSR-CT of Connecticut have inspected the components described in this Owner's Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.

Commissions M1300762 Inspector's Signature Date ". 05" National Board, Province and Endorsements FORM NVR-1 REPORT OF REPAIR 0 REPLACEMENT El OF NUCLEAR PRESSURE RELIEF DEVICES 1. Work performed by: NWS Technologies, LLC Purchase Order # 00004610 131 Venture Boulevard.

Spartanbur-, SC 29306 2. Work performed for: Nuclear Management Company -Palisades Nuclear Plant 3/4. Owner -name, address and identification of nuclear power plant: Nuclear Management Company -Palisades Nuclear Plant, 27780 Blue Star Memorial Hwy, Covert, MI 49043 5. a: Repaired pressure relief device: Main Steam Safety Valve b: Name of manufacturer:

Anderson Greenwood

/ Crosby c: Identifying nos.HA 55 RV-((type) (mfrs d: Construction Code: ASME Sec. III (name/sectlonldlvision)

)71 SIN1 6 n/a steam 6Q8 n/a 1) (NB#) (service) (size) (yr.built) 1968 n/a n/a 1 (edition) (addenda) (Code Cases(s)) (Code Class)6. ASME Code Section XI applicable for inservice inspection:

7. ASME Code Section Xl used for repairs, replacements:
8. Construction Code used for repairs, replacements:

1989 (edition)1989 (edition)1968 (edition)n/a (addenda)n/a (addenda)n/a (addenda)n/a (Code Case(s))n/a (Code Case(s))n/a (Code Case(s))9. Design responsibilities:

n/a 0. e tpenngpreadjuste nt. sg made a -Set-pressure adjustment made at: NWS Technologies, LLC using steam 11. Description of work (include name and Identifying number of replacement parts): Disassembled, inspected, modified guide and upper spring washer per Palisades Modification EAR-2005-0043, replaced disc, lapped seats.Certified set-pressure and seat tightness steam.12. Remarks: NWS Traveler#:

06-132. Replaced disc.CERTIFICATE OF COMPLIANCE I, Cesar V. Sierra certify that to the best of my knowledge and belief the statements made in this report are correct and the repair, modification or replacemtn of the pressure relief devices described above conforms to Section XI of the ASME Code and the National Board Inspection Code 'R/R" and "NR" rules.National Board Certificate of Authorization No. 632 to use the 'R'R" stamp expires April 3, 2009.Nati nal Board Certificate of Authorization No. 81 tuse the "NR" tamp expires April 9, 2009./7 NWS Technologies, LLC _ /_ ,______ Manager, QA Date Repair Organization AuthorizecAepresentatlvYf Title CERTIFICATE OF INSPEr'IION I, Carl R. Enos holding a valid commission issued by The National Board of Boiler and Pressure Vessel Inspectors and certificate of competency issued by the jurisdiction of Tennessee and employed by Hartford Steam Boiler of CT of Hartford, CT have inspected the repair, modification or replacement described in this report on l/'zo/ld and state that to the best of my knowledge and belief, this repair, modification or replacement has been completed In accordance with Section XI of the of the ASME Code and the National Board Inspection Code '"VR" and "NR" rules.By signing this certificate, neither the undersigned nor my employer makes any warranty, expressed or implied, concerning this repair, modification or replacement described in this report. Futhermore, neither the undersigned nor my employer shall be liable in any manner for any personal injury, property damage or loss of any kind arising from or connected with this inspection.

Date Inspectors Sig NBC#8460, ANI TN# 2236 Date Inspector's Signature Commissions (NB (mnci endorsements), jurisdiction,&

no.)

PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 6/2612006 1.2.Owner Plant Consumers Energy Company Name Palisades Nuclear Power Plant Name 27780 Blue Star Highway, Covert, MI 49043 Date Sheet I Of 2 WO#269863 Address Repair Organization P.O. No., Job No., etc 3. Work Performed by NWS Technologies,LLC Type Code Symbol Stamp yR / NR Name 131 Venture Blvd, Spartanburg,SC 29301 Authorization 632/81 Address Expiration Date 4/3/2009 4/9/2009 4. Identification of System MSS Code Class Class 2 5. (a) Applicable Construction Code ASME Section III 1968 Edition Addenda n/a Code Case n/a (b) Applicable Edition of Section Xl Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section Xl Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)RV-0721 See Attached Form NVR-1 7.8.Description of Work Tests conducted:

Repaired Relief Valve Hydrostatic

[]Other ED Pneumatic--

Pressure Nominal Operating Pressure psi Test Temp.Exempt [D 0 F Other: NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in., (2)information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.

I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY I ITEM 9. Remarks See Attached Form NVR-1 for RV-0721 CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code, Section X1.Type Code Symbol Stamp N/A Certificate of Authoriwtion No. N/A Expiration Date N/A Signed ,2.( ASME Program Engineer Date ,24-w -CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michi-gan and employed by HSR-QT of Connecticut have inspected the components described in this Owners Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.t44 Commissions MI 300762 Inspector's Signatuire National Board, Province and Endorsements Date " 0 , oOO 6 V V FORM NVR-1 REPORT OF REPAIR Ea REPLACEMENT 10 OF NUCLEAR PRESSURE RELIEF DEVICES 1. Work performed by: (NWS Technologies, LLC Purchase Order # 00004610 131 Venture Boulevard, Spartanburg, SC 29306 2. Work performed for: Nuclear Management Company -Palisades Nuclear Plant 314. Owner -name, address and identification of nuclear power plant Nuclear Management Company -Nuclear Plant, 27780 Blue Star Memorial Hwy, Covert, MI 49043 5. a: Repaired pressure relief device: Main Steam SafetY Valve b: Name of manufacturer:.

Anderson Greenwood I Crosby c: Identifying nos.HA 55 RV-C (type) (rfns d: Construction Code: ASME Sec. Ill (namelsection/divislon) 721 S/N)1968 (edition)n/a steam 608 (NB#) (service). (size)n/a- n/a (addenda) (Code Cases(s))

(n/1 (yr.b 1'ode Clas 6. ASME Code Section XI applicable for inservice inspection:

7. ASME Code Section XI used for repairs, replacements:
8. Construction Code used for repairs, replacements:

1989 (edition)1989 (edition)1968 (edition)n/a (addenda)n/a (addenda)n/a (addenda)n/a (Code Case(n/a (Code Casef n/a (Code Case;9. Design responsibilities:

n/a 10. Opening pressure:

985 psig Set-pressure adjustment made at NWS Technologies, LLC using steam 11. Description of work (Include name and Identifying number of replacement parts): As-found steam test Dis--sse-dm-b1-d,. Inspected, modified oulde and upper sring washer per Palisades Modification EAR-2005-0043.

replaced (..spindle, lapped seats. Certified set-pressure using steam. Jacked & Lapped. Certified seat tightness using'steam.12. Remarks: NWS Traveler #: 06-133. Replaced spindle.CERTIFICATE OF COMPLIANCE I, Cesar V. Sierra certify that to the best of my knowledge and belief the statements made In this report are correct and the repair, modification or replacement of the pressure relief devices described above conforms to Section XI of the ASME Code and the National Board Inspection Code "VR" and "NR" rules.National Board Certificate of Authorization No. 632 to use the 'VR" stamp expires April 3, 2009.Nayonai Board Certificate of Authorization No. 81 to use the "Ne='stamp expires April 9, 2009.NWS Technologies, LLC -.Manager, QA Date Repair Omanizatlon Authorized representaPe Title-- I7 I CERTIFICATE OF INSPECTION I, Charles F. Toegel Jr. holding a valid commission Issued by The National Board of Boiler and Pressuri Vessel Inspectors and certificate of competency issued by the jurisdiction of North Carolina and employed by Hartford Steam Boiler of CT of Hartford, CT have Inspected the repair, modifica or replacement described In this report on #/4'4, and state that to the best of my knowledge and belie this repair, modification or replacement has len 6ompleted in accordance with Section XI of the of the ASME Code and the National Board Inspection Code "vR" and "NR" rules.By signing this certificate, neither the undersigned nor my employer makes any warranty, expressed or Implied concerning this repair, modification or replacement described in this report. Furthermore, neither the undersign.

nor my employer shall be liable In any manner for any personal injury, property damage or loss of any kind arising from or connected it this Inspe ion.--,I 7n ,,-,,r-- NS omissons8462, A, N, I NCd 1073 I eI n s o~ ( I sna, r re Commissions (NB (mci endorsements).

jurisdiction.&

no I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 1. Owner Consumers Energy Company Name 2. Plant Palisades Nuclear Power Plant Date 6/26/2006 Sheet 1 of 2 Name 27780 Blue Star Highway, Covert, MI 49043 Address NWS TechnologiesLLC WO#269864 Repair Organization P.O. No., Job No., etc Type Code Symbol Stamp VR / NR Authorization 632/81 3. Work Performed by Name 131 Venture Blvd, Spartanburg,SC 29301 Address 4. Identification of System MSS 5. (a) Applicable Construction Code ASME Section III Addenda n/a Expiration Date Code Class 1968 4/3/2009 4/9/2009 Edition Code Case n/a (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section Xl Code Cases None 6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)RV-0722 See Attached Form NVR-1 7. Description of Work 8. Tests conducted:-Repaired Relief Valve Hydrostatic

[]Pneumatic-Nominal Operating Pressure &6 Exempt (D Other 0 Pressure psi Test Temp.Other: NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1 /2 in. x 11 in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.

I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY I ITEM 9. Remarks See Attached Form NVR-1 for RV-0722 CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code,Section XI.Type Code Symbol Stamp N/A Certificate of Autoization No. NIA Expiration Date N/A Signed --(. , ASME Program Engineer Date Mj.e-"O CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michi-gan and employed by HSR-CT of Connecticut have inspected the components described in this Owner's Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section Xl.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.

-560'd-'l Commissions M1300762 Inspector's Signature ,Z4 cia National Board, Province and Endorsements Date V1 N FORM NVR-1 REPORT OF REPAIR tM REPLACEMENT 03 OF NUCLEAR PRESSURE RELIEF DEVICES 1. Work performed by: NWS Technologies, LLC Purchase Order# 00004610 131 Venture Boulevard.

SDartanburo.

SC 29306 2. Work performed for Nuclear Management Company -Palisades Nuclear Plant 314. Owner -name, address and identification of nuclear power plant Nuclear Management Company -Palisades Nuclear Plant. 27780 Blue Star Memorial Hwy, Covert. Mi 49043 5. a: Repaired pressure relief device: Main Steam Safety Valve b: Name of manufacturer Anderson Greenwood

/ Crosby c: Identifying nos.HA 55 RV-0722 (type) (rns S/N) (P d: Construction Code: ASME Sec. III 1968 (namelsectlon/division) (edition)6. ASME Code Section XI applicable for inservice Inspection:

7. ASME Code Section Xi used for repairs, replacements:
8. Construction Code used for repairs, replacements:

1/a (B#)(adder steam 60 (servlceý (siz.n/a nda) (Code Cases(s))8:e)n/a (yr.buift) 1989 (edition)1989 (edition)1968 (edition)n/a (addenda)n/a (addenda)n/a (addenda)1 (Code Class)n/a (Code Case(s))n/a (Code Case(s))n/a (Code Case(s))9. Design responsibilities:

n/a 10. Opening pressure:

985 psig Set-pressure adjustment made at NWS Technologies, LLC using steam-1`-.l3-s-cption of work oncude name ard men-awn-g-erua w rotiptacementparts.

--As-foundstearn-test-Dlsassembled--

-..Inspected, modified guide and upper spring washer per Palisades Modification EAR-2005-0043, lapped seats. Certified set-pressure and seat tightness using steam.12. Remarks: NWS Traveler#:

06-134.CERTIFICATE OF COMPLIANCE I, Cesar V. Sierra certify that to the best of my knowledge and belief the statements made In this report are correct and the repair, modification or replacement of the pressure relief devices described above conforms to Section XI of the ASME Code and the National Board Inspection Code 'VR" and "NR" rules.National Board Certificate of Authorization No. 632 to use the "VRW stamp expires April 3, 2009.Nati!nal Board Certificate of Authorization No. 81 to use theI"R"stamp expires April 9, 2009.,,,NWS Technologies, LLC ,,,, o Manager, QA Date Repair Organization Authorized WTe/ "7, CERTIFICATE OO1NSPECTION I, Charles F. Toegel Jr. holding a valid commission Issued by The National Board of Boiler and Pressure Vessel Inspectors and certificate of competency Issued by the Jurisdiction of North Carolina and employed by Hartford Steam Boiler of CT of Hartford.

CT have inspected the repair, modification or replaement described In this report on and state that to the best of my knowledge and belief, this repair, modification or replacement has I~entompleted in accordance with Section XI of the of the ASME Code and the National Board Inspection Code "VR" and "NR" rules.By signing this certificate, neither the undersigned nor my employer makes any warranty, expressed or Implied, concerning this repair, modification or replacement described in this report. Furthermore, neither the undersigned nor my employer shall be liable In any manner for any personal injury, property damage or loss of any kind arising from or conne this.A I , " " NB # 8462, A, N, I NC# 1073 IOetspectlsiafr j Commissions (N8 (mIn endorsements), Jurisdiction.&

no.)

I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM M 1. Owner Consumers Energy Company Name 2. Plant Palisades Nuclear Power Plant Date Sheet 6/26/2006 1Of 2 Name 27780 Blue Star Highway, Covert, MI 49043 WO#26226 Address NWS Technologies,LLC

3. Work Performed by Repair Organization P.O. No., Job No., etc Type Code Symbol Stamp VR I NR Name 131 Venture Blvd, Spartanburg,SC 29301 Address 4. Identification of System PCs 6. (a) Applicable Construction Code ASME Section IlII Addenda Winter 1965 Authorization Expiration Date Code Class 632/81 4/3/2009 4/9/2009 Class 1 1965 Edition Code Case n/a (b) Applicable Edition of Section Xl Utilized for Repair/Replacement Activity 1989 With No Addenda (c) Applicable Section XI Code Cases None'6. Identification of Components ASME National Corrected, Code Name of Name of Manufacturer Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)RV-1041 See Attached Form NVR-1 7. Description of Work 8. Tests conducted:

Repaired Pressurizer Relief Valve Hydrostatic

[]Pneumatic[]

Nominal Operating Pressure R Exempt []Other []Pressure psi TestTemp.Other: NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.

I PALISADES NUCLEAR POWER PLANT FORM NIS-2 OWNER'S REPORT FOR REPAIR/ REPLACEMENT ACTIVITY ITEM 9. Remarks See Attached Form NVR-1 for RV-1 041 CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the requirements of the ASME Code,Section XI.Type Code Symbol Stamp N/A Certificate of Authorion No. N/A Expiration Date N/A Signed ASME Program Engineer Date _______o CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Michigan and employed by HS13-CT of Connecticut have inspected the components described in this Owner's Report during the period November 18,2004 to May 10,2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure described in the Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury of property damage or a loss of any kind arising from or connected with this inspection.

1&?0_---" Commissions M1 300762 Inspector's Signature National Board, Province and Endorsements Date Tc7.L ( ? &

FORM NVR-1 REPORT OF REPAIR 0. REPLACEMENT 99 OF NUCLEAR PRESSURE RELIEF DEVICES 1. Work performed by: NWS Technologies, LLC Purchase Order # 00002497 131 Venture Boulevard, Spartanburg, SC 29306 2. Work performed for Consumers Energy -Palisades Nuclear Plant 3/4. Owner -name, address and identification of nuclear power plant Consumers Energy -Palisades Nuclear Plant, 27780 Blue Star Memorial Hwy, Covert, Mi 49043 5. a: Repaired pressure relief device: Pressurizer Safety Valve b: Name of manufacturer.

Consolidated

-Dresser c: Identifying nos.31739A-1 BL01 (type) (mfes d: Construction Code: ASME Sec. III (namelsection/dlvision) 1390 S/N)1965 (edition)n/a steam 3'(NB#) (service) (slZ W'65a n/a (addenda) (Code Cases(s))I e)6. ASME Code Section XI applicable for Inservice inspection:

7. ASME Code Section Xl used for repairs, replacements:
8. Construction Code used for repairs, replacements:

1989 (edition)1989 (edition)1965 (edition)n/a (addenda)n/a (addenda)W '65a (addenda)n/a (yr.built) 1 (Code Class)n/a (Code Case(s))nra (Code Case(s))n/a (Code Case(s))9. Design responsibilities:

n/a 10. Opening pressure:

2485 psig... Set-pressure adjustment made at NWS Technologies, LLC using steam 11. Description of work (Include name and Identifying number of replacement parts): As-found test, disassembled,*j inspected, replaced disc, lapped, assembled, certified set-pressure and seat tightness.

-12. Remareks:

NWS Traveer# 06-118. Replaced disc and 4 body gaskets CERTIFICATE OF COMPLIANCE I, Cesar V. Sierra certify that to the best of my knowledge and belief the statements made In this report are correct and the repair, modification or replacement of the pressure relief devices described above conforms to Section XI of the ASME Code and the National Board Inspection Code 'VR" and "NR" rules.National Board Certificate of Authorization No. 632 to use the 'VR" stamp expires April 3, 2009.Nationaloard Certificate of Authorization No. 81 tA use the " mp expires April 9, 2009.itl'91 NWS Technologies, LLC _ _ _ _ _Manager, QA Date Repair Organization Authtiz.ed reprel.ntative Title CERTIFICATE OF INV.ECTION I, Charles F. Toegel Jr. holding a valid commission issued by The National Board of Boiler and Pressure Vessel Inspectors and certificate of competency Issued by the jurisdiction of North Carolina and employed by Hartford Steam Boiler of CT of Hartford, CT have inspected the repair, modification or replacement described in this report on -1111142&

and state that to the best of my knowledge and belief, this repair, modification or replacement has Ibencompleted in accordance with Section XI of the of the ASME Code and the National Board Inspection Code "VR" and "NR" rules.By signing this certificate, neither the undersigned nor my employer makes any warranty, expressed or Implied, concerning this repair, modification or replacement described in this report. Furthermore, neither the undersigned nor my employer shall be liable in any manner for any personal Injury, property damage or loss of any kind arising from or connected ith thi ins /17'a .uJTIA, NB#8462, A,N,I NC#1073-/"date -~re-"/ " Commissions (NB (ind endorsements), Jurisdiction,&

no.)

SECTION 3 ASME SECTION XI ANALYSIS OF WELD NSW-010A23 QF-0549 (FP-E-CAL-01), Rev. 0 rM Calculation Signature Sheet Document Information NMC Calculation (Doc) No: EC-7950 T Revision:

0 Title: Flaw Evaluation of Palisades CSW Piping Weld NSW-010A23 Facility:

[I DA E-1 MT I-7 PB -I PI Z PL El HU/FT Unit: -] [1-2 Safety Class: [K] SR El Aug Q El Non SR Special Codes: [] Safeguards El Proprietary Calc Type (PassPort DOC-DESC-CODE):

DOC (if applicable)

Major Revisions EC Number: 7950 Calc Vendor Name or Code:SIA Vendor Doc No: PAL-090-301 Description of Revision:

Initial issue Prepared by: s$-.-(_, c&,3-- A: " Date: t/o co Reviewed by: 0 & Date: z Type of Review: El Design Verification El Tech Review EY~endor Acceptance Method Used (For DV Only): El] Review El Alternate Calc El Test Approved by: -Date: s, ( Minor Revisions EC No: El Vendor Calc: Minor Rev. No: Description of Change: Pages Affected: Prepared by: Date: Reviewed by: Date: Type of Review: El Design Verification El Tech Review El Vendor Acceptance Method Used (For DVDOnly):E Review El1 Alternate Calc El Test IApproved by: IDate: (continued on next page)Page 1 of )

Structural Integrity CALCULATION File No.: PAL-09Q-301 Associates, Inc. PACKAGE Project No.: PAL-09Q PROJECT NAME: Flaw Evaluation of Palisades CSW Piping Weld NSW-010A23 Contract No: N/A CLIENT: Nuclear Management Company PLANT: Palisades CALCULATION TITLE: ASME Code Section XI Flaw Evaluation of Indications in CSW Piping Weld NSW-010A23 Project Mgr. Preparer(s)

Document Affected Pages Revision Description Approval & Checker(s)

Revision Signature

& Signatures

&Date Date 0 1 -10 Original Issue Al -A15 Computer Files PH 5/04/06 GAM 5/02/06 NGC 5102/06 1 -10 Revised ASME Code At -A15 Section XI used for the A l evaluation PH 5/04/06 Computer Files GAM 5/02/06 NGC 5/02/06 Page 1 of 10 SI Form F200 IR2a Table of Contents 1 INTRODU CTIO N ............................................................................................................

3 2 TECHN ICAL A PPROACH .................................................................................................

3 3 D ESIGN INPUT .......................................................................................................................

3 3.1 D esign and Operating Conditions

.........................................................................................

3 3.2 Pipe D im ensions .......................................................................................................................

4 3.3 M aterial Properties

............................................................................................................

4 3.4 Flaw Characterization

........................................................................................................

4 3.5 Applied Stresses ........................................................................................................................

4 4 A SSUM PTIO N S .......................................................................................................................

5 5 CA LCU LA TIO NS ............................................................................................................

5 5.1 Allowable Flaw Size Calculation

..........................................................................................

5 5.2 Stress Intensity Factors Calculation

.....................................................................................

5 5.3 End of Life Fatigue Crack G rowth Analysis .......................................................................

6 6 CO N CLU SIO N S A ND D ISCU SSION S ..............................................................................

7 7 REFEREN CES ..........................................................................................................................

8 A PPEND IX A pc-CRA CK OUTPUT FILES .....................................................................................

A l List of Figures Figure 2: Circum ferential Crack in Cylinder M odel ............................................................................

9 Figure 3: Applied Stress Intensity Factor ............................................................................................

10 Structural Integrity File No.: PAL-09Q-301 Revision:

1 Associates, Inc. Page 2 of 10 I INTRODUCTION During routine inservice inspection in the 2006 refueling outage, two rounded indications were identified in Weld NSW-010A23 of the critical service water (CSW) system Line HB-23 at Palisades Nuclear Plant (Palisades).

These indications were identified using radiographic examinations.

The rounded indications measured 0.140 and 0.125 inches.The piping is a 3-inch NPS assumed to be fabricated from ASTM A106 Grade B carbon steel. An evaluation performed by NMC personnel indicates that the observed flaws do not meet the ASME Code,Section XI acceptance standards of Table IWB-3514-4.

Consequently, per IWA-3300, the indications were combined into a single subsurface flaw and evaluated per the guidelines of ASME B&PV Code, Section Xl, IWB-3650, which include acceptance criteria based on the failure mode. A conservative fatigue crack growth evaluation is then performed to determine the adequacy of continued operation of the piping system with the observed indications.

2 TECHNICAL APPROACH The flaw evaluation consists of the following tasks: " Perform a flaw evaluation based on the guidelines of ASME B&PV Code,Section XI, IWB-3650 to calculate the allowable flaw size for the CSW pipe weld. Applied stresses due to the moment loading from the piping design analysis are used. Given that the material of the pipe elbow is carbon steel, the flaw acceptance criteria of Paragraph IWB-3650 of Reference 1 are used. This paragraph requires the use Appendix H of ASME Code,Section XI, which has screening criteria for determining the failure mode (linear elastic fracture mechanics (LEFM), elastic-plastic fracture mechanics (EPFM) or limit load).* Determine the stress intensity factors at the flaw and perform a fatigue crack growth analysis to compare end-of-evaluation period flaw size to the allowable flaw size computed above." The ASME Section XI Code of record at Palisades is the 1989 Edition. However, for this evaluation the Addenda through 1990 will be used since prior to this Addenda, there were no provisions in the Code for performing flaw evaluation for ferritic piping and alternate means had to be used to meet the safety margins in the Code.3 DESIGN INPUT 3.1 Design and Operating Conditions The design and operating conditions of the CSW system are provided by Reference

2. The pressure and temperature data for CSW Line HB-23 is as follows: Structural Integrity File No.: PAL-09Q-301 Revision:

I Associates, Inc. Page 3 of 10

" Design Temperature

= 300'F* Design Pressure = 100 psig* Maximum Operating Temperature

= 170'F" Maximum Operating Pressure = 125 psig* Normal Operating Temperature

= 114°F" Normal Operating Pressure = 65 psig 3.2 Pipe Dimensions The CSW pipe where the indication was discovered is an 3-inch Schedule 40 pipe [3]. The nominal dimensions of the pipe are:* Nominal Outer Diameter = 3.5 in.* Nominal Wall Thickness

= 0.216 in.3.3 Material Properties The CSW system pipe containing the indication is assumed to be fabricated from ASTM A106 Grade B carbon steel per Reference

3. The design allowable stress, Sm, of the weld metal is taken to be the same as that of the base metal of the pipe. At the normal operating temperature of 65°F [2], Sm is equal to 20,000 psi [5]. Therefore, the flow stress, o"f, defined as 2.4 S., is equal to 48,000 psi. However, conservative default values derived from Appendix H of ASME Code,Section XI (Sm = 18,100 psi) are used in the evaluation.

3.4 Flaw Characterization The indications are rounded indications located in the lower vertical elbow weld NSW-010A23 on Line HB-23 of the CSW system [4]. The inspection results summarized in References 4 and 6 show that the largest indication is 0.14 inches diameter rounded, centered near the neutral axis, 0.1 inches from the outer surface of the weld. The other indication is 0.125 inches in diameter.

Using the flaw characterization rules of ASME Section XI, IWA-3300, this flaw is classified as a subsurface flaw. Per ASME Code,Section XI, IWA-3370, indications detected by radiographic examinations shall be considered to be linear indications.

Hence, the lengths of the flaws are combined to give a total length of 0.265 inches. The depth of the combined flaw is the maximum diameter of the two indications, which is 0.14 inches. If the flaw is conservatively considered a surface flaw, the flaw depth to thickness ration is 0.65.3.5 Applied Stresses The applicable stresses at the location of the indication are provided by Reference 7 which contains stress results from a piping analysis of the CSW piping system. Maximum stresses due to pressure, deadweight, seismic loadings and thermal expansion are extracted from the piping analysis at the node representing the weld (Node 115) for use in this evaluation.

The following maximum stress values at Node 115 (beginning of elbow) are used herein:-Pressure + Deadweight, P + DW = 0.517 ksi Structural Integrity File No.: PAL-09Q-301 Revision:

1 Associates, Inc. Page 4 of 10

-Pressure + Deadweight

+ Seismic, P+DW+SEIS

= 0.965 ksi-Thermal Expansion, T = 0.002 ksi 4 ASSUMPTIONS

1. The service life is assumed to be 40 years from the date of this evaluation (40 years + 20 years license extension).
2. For this evaluation is assumed that the location of the flaw will experience 400 cycles of the combined maximum load (Pressure

+ Deadweight

+ Seismic + Thermal) which correspond to 40 years of original plant life plus 20 years of license extension.

3. The piping material per the piping specification can be ASTM A-106 Grade B or A53 Grade B or SA-106 Grade B. While the mechanical properties of these materials are identical, ASTM A-106 Grade B will be assumed for this evaluation.

5 CALCULATIONS 5.1 Allowable Flaw Size Calculation The material of the flaw is assumed to be ferritic steel SA-106 Grade and the maximum operating temperature of the CSW line is 170'F. Therefore, as determined from the screening criteria, the LEFM methodology described in ASME Code,Section XI, Appendix H [1] is used in this evaluation in lieu of the other two failure modes (EPFM and limit load). The technical approach consists of determining the critical flaw size in the pipe which corresponds to a stress intensity factor equal to the material fracture toughness.

The allowable flaw size is derived from the critical flaw by applying the code specified safety factors.In this evaluation, default ASME Code Section XI, Appendix H material properties at lower shelf temperature are conservatively used. The evaluation was performed using SI's computer program pc-CRACKTm [8].The pc-CRACK" output file for the analysis is presented in Appendix A. It shows that for the observed flaw length, the allowable flaw depth is 75% of wall thickness, which is greater than the depth of the observed flaw of 65% of wall thickness.

5.2 Stress Intensity Factors Calculation A linear elastic fracture mechanics and fatigue crack growth evaluation is performed for the observed indication using pc-CRACKTm.

The fracture mechanics model of an elliptical surface flaw in an infinite plate, as illustrated in Figure 2, is conservatively used in this evaluation.

The model with a flaw aspect ratio of 0.5 is used in the evaluation since the actual ratio is 0.53 for the pipe weld indication under evaluation.

Structural Integrity File No.: PAL-09Q-301 Revision:

1 Associates, Inc. Page 5 of 10 Using the applied stresses presented in Section 3.5, the stress intensity factors due to the different load combinations are determined.

In the calculation of stress intensity factors, the pressure stress is taken as the membrane stress, which is constant across the wall thickness.

The stresses from the deadweight, seismic and thermal expansion moment loads are taken as linearly varying through-wall bending stresses.The calculated stress intensity factors are presented in Figure 3.5.3 End of Life Fatigue Crack Growth Analysis Since the indication is assumed to be surface connected, the end of life flaw size due to fatigue crack growth is calculated using the fatigue crack growth rate for ferritic steels exposed to water environments.

The fatigue crack growth rate for carbon and low alloy steel in water environment is given by Appendix A of ASME Code,Section XI as: da/dN = CL

  • dKA5.95 for dK < dKtran da/dN = CU
  • SU
  • dKA1.95 for dK >= dKtran where, dK = Kmax -Kmin R = Kmin /Kmax for R <= 0.25: SL = 1.0 SU = 1.0 dKtran = 17.74 for 0.25 < R <= 0.65: SL = 26.9* R -5.725 SU = 3.75
  • R + 0.06 dKtran = 17.74*{(3.75
  • R + 0.06)/(26.9
  • R -5.725))AO.25 for 0.65 < R: SL = 11.76 SU = 2.5 dKtran = 12.04 where, CL = 1.0200e-012 CU = 1.01OOe-007 for the selected units of force, kip, and length, inch.The fatigue crack growth is performed for the assumed number of 400 cycles of the maximum combined loading. The initial flaw depth of 0.14 inches is used.The results of the fatigue crack growth evaluation show that the flaw in the CSW pipe weld does not grow after 400 cycles of the maximum combined loading range. This is because the stress range and, therefore, the corresponding stress intensity factor range are relatively small.The pc-CRACK T h output file for the crack growth analysis is presented in Appendix A.Structural Integrity File No.: PAL-09Q-301 Revision:

I Associates, Inc. Page 6 of 10 6 CONCLUSIONS AND DISCUSSIONS Based on the results of the evaluation presented in this calculation package, the indications found during the inservice inspection of the CSW system Line are acceptable for continued operation based on the requirements of ASME Code,Section XI, IWB-3650.

The allowable flaw depth for the observed combined flaw length is 75% of pipe wall thickness.

A fatigue crack growth analysis performed using a conservative fracture mechanics model and 400 cycles of the maximum combined loading shows that crack propagation by fatigue is not a concern as the flaw growth did not grow. This indicates that the allowable flaw depth will not be reached during plant operation including 20 years of life extension.

Structural Integrity File No.: PAL-09Q-301 Revision:

I Associates, Inc. Page 7 of 10 7 REFERENCES

1. ASME Boiler and Pressure Vessel Code,Section XI, 1989 Edition with Addenda through 1990.2. Nuclear Management Company (NMC), Palisades Nuclear Plant Piping Class Summary, SI File No.PAL-09Q-201.
3. Consumers Energy, Palisades Plant Stress Isometric 03316, Drawing No. VEN-M-101, Sheet No.2746, Rev. 6, "Service Water From Engineered Safeguards Cooler V-27 C &D West," SI File No.PAL-09Q-202.
4. NMC Radiographic Examination Report, Sheet Number P-6-8001, dated 4/5/06, SI File No. PAL-09Q-203.5. ASME Boiler and Pressure Vessel Code,Section III, Division 1, Appendices, 1989 Edition.6. NMC Ultrasonic Thickness Examination Report, Sheet Number MAO-01, dated 4/27/06, SI File No.PAL-09Q-204.
7. Partial ADLPIPE Stress Analysis Output for CSW System Piping Analysis, EA-03316, 1/9/1995, SI File No. PAL-09Q-205.
8. pc-CRACKTM for Windows, Version 3.1-98348, Structural Integrity Associates, 1998.Structural Integrity File No.: PAL-09Q-301 Revision:

1 Associates, Inc. Page 8 of 10 C 0 C = C 0+ C1X+C 2 X 2+C X 3 CO: surface stress (I=O)--* x A Section A-A Calculated K is the maximum of K at points 1 and 2 at each crack depth (a)Ref:, REQUIRED INPUTS: ASME Section t: plate thickness XI, 95SEd.ci a: nrximum crack depth (ax < O. 8t)(flaw shape parameter without plastic zone correction factor)Figure 1: Elliptical Crack in Infinite Plate Model Structural Integrity File No.: PAL-09Q-301 Revision:

1 Associates, Inc. Page 9 of 10 Stress Intensity Factors 0.8 C 0.50.2 0.1o 0 0 0.02 0.04 0.06 0.08 0.1 0.12 0.04 0.16 0.18 0.2 Crack Depth (in.)Figure 2: Applied Stress Intensity Factor Structural Integriy [File No.: PAL-09Q-301 Revision:

I 9 Associates, Inc. Page 10 of 10 C il APPENDIX A pc-CRACK OUTPUT FILES Filename Description Pages PALALW.OUT Allowable Flaw Size Calculation A2 -A3 PALFCG1.OUT Fatigue Crack Growth Analysis A4 -A15 Structural Integrity File No.: PAL-09Q-301 Revision:

1 Associates, Inc. Page Al of A15 pc-CRACK Output File for Allowable Flaw Evaluation tm pc-CRACK for Windows Version 3.1-98348 (C) Copyright

'84 -'98 Structural Integrity Associates, Inc.3315 Almaden Expressway, Suite 24 San Jose, CA 95118-1557 Voice: 408-978-8200 Fax: 408-978-8964 E-mail: pccrack@structint.com Allowable Flaw Size Evaluation Using ASME Section XI, IWB-3640/50 Procedures and Criteria For Circumferential Crack in Carbon Steel Piping Date: Mon May 01 12:29:13 2006 Input Data and Results File: PAL_ALW.CNS Title: PALISADES, ESW PIPE, CRITICAL FLAW EVALUATION Material:

Seamless/Welded Wrought CS Pipe and Pipe Fitting, YS<=40ksi (Category 1)Material properties:

Design stress = 18.1000 Flow stress = 43.4400 Elastic modulus = 26000.0000 Poisson ratio = 0.3000 Yield stress = 27.1000 JIc: Lower shelf = 45.0000 Upper shelf = 600.0000 The evaluation assumes default material properties for a lower shelf temperature Pipe geometry: Outer diameter = 3.5000 Wall thickness

= 0.2160 Crack geometry: Crack depth = 0.1400 Crack length = 0.2650 Kr' = 0.0256 Sr' = 0.0134 Sc = 1.9077 The flawed pipe is assumed to fail by brittle fracture(LEFM).

The allowable flaw size is determined using code formulas.Default safety factors for normal operating (incl. upset and test) condition.

Membrane stress (Pm) 0.5710 (safety factor = 2.7700)Bending stress (Pb) = 0.4480 (safety factor = 2.7700)Expansion stress (Pe) = 0.0020 (safety factor = 1.0000)Structural Integrity File No.: PAL-09Q-301 Revision:

I Associates, Inc.Page A2 of A15 Design stress -(Pm + Pb) / Sm= 0.0563 KIr (residual stress) =Nominal pipe size= 3.001 a/t = 0.648: l/circumference

= 0.024: allowable a/t = 0.7504 18.1000 0.0000 (safety factor =00 1 1 0 1.0000)End of pc-CRACK Output Structural Integrity File No.: PAL-09Q-301 Revision:

1 Associates, Inc. Page A3 of A15 pc-CRACK Output File for Fatigue Crack Growth Analysis tm pc-CRACK for Windows Version 3.1-98348 (C) Copyright

'84 -'98 Structural Integrity Associates, Inc.3315 Almaden Expressway, Suite 24 San Jose, CA 95118-1557 Voice: 408-978-8200 Fax: 408-978-8964 E-mail: pccrack@structint.com Linear Elastic Fracture Mechanics Date: Mon May 01 12:30:50 2006 Input Data and Results File: PAL_FCG1.LFM Title: PALISADES, ESW PIPE, FATIGUE CRACK GROWTH ANALYSIS Load Cases: Stress Coefficients Case ID CO C1 C2 C3 Type Total 0.965-4.148 0 0 Coeff------ Through Wall Wall Case Depth Total Stresses for Load Cases With Stress Coeff -------0.0000 0.0173 0.0346 0.0518 0.0691 0.0864 0.1037 0.1210 0.1382 0.1555 0.1728 Crack Model:

Reference:

0.965 0.893323 0.821645 0.749968 0.67829 0.606613 0.534935 0.463258 0.39158 0.319903 0.248226 Elliptical Surface Crack in an Infinite Plate (a/1=0.5)ASME Boiler and Pressure Vessel Code,Section XI, '95 Ed.Flaw shape parameter is without plastic zone correction.

WARNING: The stress intensity factor (K) is the maximum of K at the surface and K at the deepest point at each crack depth.Crack Parameters:

Structural Integrity File No.: PAL-09Q-301 Revision:

1 Associates, Inc. Page A4 of A15 Plate width: Max. crack size: 0.2160 0.1728--------------------

Stress Intensity Factor .......Crack Case Size Total 0.0035 0.0069 0.0104 0.0138 0.0173 0.0207 0.0242 0.0276 0.0311 0.0346 0.0380 0.0415 0.0449 0.0484 0.0518 0.0553 0.0588 0.0622 0.0657 0.0691 0.0726 0.0760 0.0795 0.0829 0.0864 0.0899 0.0933 0.0968 0.1002 0.1037 0.1071 0.1106 0.1140 0.1175 0.1210 0.1244 0.1279 0.1313 0.1348 0.1382 0.1417 0.1452 0.1486 0.1521 0.1555 0.1590 0.1624 0.1659 0.0730043 0.1031 0.126088 0.145373 0.162275 0.177471 0.191585 0.204768 0.217127 0.228793 0.239861 0.250408 0.260663 0.270693 0.280372 0.289731 0.298798 0.307594 0.316243 0.324987 0.333532 0.34189 0.35007 0.358083 0.365936 0.374191 0.382319 0.390326 0.398215 0.405992 0.413659 0.421651 0.4297 0.437667 0.445556 0.453367 0.461103 0.469093 0.477352 0.485553 0.493699 0.50179 0.509825 0.517955 0.526485 0.534972 0.543417 0.551819 Structural Integrity File No.: PAL-09Q-301 Revision:

1 Associates, Inc. Page A5 of A15 0.1693 0.1728 0.560177 0.568493 Crack Growth Laws: Law ID: Model: da/dN =da/dN =where CSteelinWater ASME Section XI -ferritic steel in water environment CL

  • dK^5.95 for dK < dKtran CU
  • SU
  • dK-1.95 for dK >= dKtran Kmax -Kmin Kmin / Kmax.25: SU = 1.0 dKtran = 17.74 dK=R=for R <= 0 SL = 1.0 for 0.25 < R <= 0.65: SL = 26.9
  • R -5.725 dKtran = 17.74*{(3.75 for 0.6.5 < R: SL = 11.76 SU = 3.75
  • R + 0.06* R + 0.06)/(26.9
  • R -5.725) }^0.25 SU = 2.5 dKtran = 12.04 where: CL = 1.0200e-012 CU = 1.01OOe-007 are for the selected units of: force: kip length: inch Material Fracture Toughness KIc: Material ID: Carbon Steel Depth KIc 0.0000 0.2160 36.2000 36.2000 Initial crack size= 0.1400 Max. crack size= 0.1728 Number of blocks= 40 Print increment of block= 1 Cycles/Time Calc. Print Crk. Grw.incre. incre. Law Mat.Klc Subblock Total 10 1 1 CSteelinWater Carbon Steel Kmax Kmin Subblock Case ID Scale Factor Case ID Scale Factor Total Total 1.0000 Structural Integrity File No.: PAL-09Q-301 Revision:

1 Associates, Inc. Page A6 of A15 Crack growth results: Total Cycles/Time Subblock Cycles/Time DaDn Kmin DeltaK R /DaDt Kmax Da a a/thk Block: 1 2 3 4 5 6 7 8 9 10 Block: 11 12 13 14 15 16 17 18 19 20 Block: 21 22 23 24 25 26 27 28 29 30 Block: 31 32 33 34 35 36 37 38 39 40 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 4.90e-001 4.90e-001 4.90e-001 4. 90e-001 4. 90e-001 4.90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4.90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 0.OOe+000 0. OOe+000 0. 00e+000 0. OOe+000 0. OOe+000 0. 00e+000 0. 00e+000 0. 00e+000 0. 00e+000 0. 00e+000 0. 00e+000 0.00e+000 0.00e+000 0. 00e+000 0. 00e+000 0. 00e+000 0.00e+000 0.00e+000 0. 00e+000 0. 00e+000 0. 00e+000 0. 00e+000 0. 00e+000 0. 00e+000 0.OOe+000 0.OOe+000 0. OOe+000 0.OOe+000 0. OOe+000 0.OOe+000 0. 00e+000 0. OOe+000 0. OOe+000 0. OOe+000 0.OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0.OOe+000 0.OOe+000 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4. 90e-001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1.46e-014 1. 46e-014 1.46e-014 1. 46e-014 1.46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1. 46e-014 1.46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1.46e-014 1. 46e-014 1. 46e-014 1.46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1.46e-014 1.46e-014 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 4 Structural Integrity File No.: PAL-09Q-301 Revision:

1 Associates, Inc. Page A7 of A15 Block: 5 41 42 43 44 45 46 47 48 49 50 Block: 51 52 53 54 55 56 57 58 59 60 Block: 6 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 7 61 62 63 64 65 66 67 68 69 70 4. 90e-001 4.90e-001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4. 90e- 001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4.90e-001 4.90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4. 90e- 001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4. 90e-001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 0. 00e+000 0. 00e+000 0. 00e+000 0. 00e+000 0.00e+000 0.OOe+000 0. 00e+000 0. 00e+000 0. 00e+000 0.00e+000 0.00e+000 0. 00e+000 0.OOe+000 0. OOe+000 0.OOe+000 0. OOe+000 0. OOe+000 0.OOe+000 0.OOe+000 0.OOe+000 0. OOe+000 0.OOe+000 0. OOe+000 0.OOe+000 0.OOe+000 0.OOe+000 0. OOe+000 0. 00e+000 0. 00e+000 0. 00e+000 0. 00e+000 0.00e+000 0. 00e+000 0.00e+000 0.00e+000 0.OOe+000 0.OOe+000 0.OOe+000 0. OOe+000 0. OOe+O00 0.00e+000 0.00e+000 0. 00e+000 0. 00e+000 0.00e+000 0.00e+000 0.00e+000 0.00e+000 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4. 90e-001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 Block: 71 72 73 74 75 76 77 78 79 80 Block: 81 82 83 84 85 86 87 88 8 9 1 2 3 4 5 6 7 8 Structural Integrity File No.: PAL-09Q-301 Revision: Associates, Inc. Page A8 of A15 89 90 9 4.90e-001 0.00e+000 4.90e-001 0.00 1.46e-014 1.46e-014 10 4.90e-001 0.00e+000 4.90e-001 0.00 1.46e-014 1.46e-014 0.14 0.65 0.14 0.65 Block: 10 91 92 93 94 95 96 97 98 99 100 Block: 101 102 103 104 105 106 107 108 109 110 11 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Block: 111 112 113 114 115 116 117 118 119 120 Block: 121 122 123 124 125 126 127 128 129 130 Block: 131 132 133 134 135 12 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 0.00e+000 0.00e+000 0. 00e+000 0. 00e+000 0. 00e+000 0.OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0.OOe+000 0. OOe+000 0.OOe+000 0.OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0.OOe+000 0.OOe+000 0. OOe+000 0.OOe+000 0.OOe+000 0.OOe+000 0.OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0.OOe+000 0.OOe+000 0.OOe+000 0.OOe+000 0.OOe+600 0.OOe+000 0. OOe+000 0. OOe+000 0.OOe+000 0.OOe+000 0.OOe+000 0.OOe+000 0.OOe+000 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4. 90e-001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1. 46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1. 46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1.46e-014 1. 46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 13 14 1 2 3 4 5 Structural Integrity File No.: PAL-09Q-301 Revision:

1 Associates, Inc. Page A9 of A15 136 137 138 139 140 Block: 141 142 143 144 145 146 147 148 149 150 Block: 151 152 153 154 155 156 157 158 159 160 Block: 161 162 163 164 165 166 167 168 169 170 15 16 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 4. 90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4. 90e-001 4.90e-001 4.90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 0.00e+000 0.00e+000 0.00e+000 0. 00e+000 0.00e+000 0.00e+000 0.OOe+000 0.00e+000 0.00e+000 0.00e+000 0.00e+000 0.00e+000 0.OOe+000 0.00e+000 0.OOe+000 0.OOe+000 0.00e+000 0.00e+000 0.OOe+000 0.OOe+000 0.00e+000 0.00e+000 0. 00e+000 0.00e+000 0.00e+000 0. 00e+000 0.00e+000 0. 00e+000 0. 00e+000 0.00e+000 0. 00e+000 0. 00e+000 0. 00e+000 0. 00e+000 0.00e+000 0.00e+000 0. 00e+000 0.00e+000 0.00e+000 0.00e+000 0.00e+000 0.00e+000 0.00e+000 0.00e+000 0.00e+000 4.90e-001 4.90e-001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4. 90e-001 4.90e-001 4.90e-001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4. 90e-001 4.90e-001 4.90e-001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1.46e-014 1. 46e-014 1.46e-014 1.46e-014 1. 46e-014 1. 46e-014 1.46e-014 1. 46e-014 1. 46e-014 1.46e-014 1.46e-014 1. 46e-014 1. 46e-014 1. 46e-014 1. 46e-014 1. 46e-014 1. 46e-014 1. 46e-014 1.46e-014 1. 46e-014 1. 46e-014 1. 46e-014 1. 46e-014 1. 46e-014 1.46e-014 1.46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1. 46e-014 1.46e-014 1.46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 17 Block: 171 172 173 174 175 176 177 178 179 180 Block: 181 182 18 1 2 3 4 5 6 7 8 9 10 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 19 1 4.90e-001 0.00e+000 4.90e-001 0.00 1.46e-014 1.46e-014 2 4.90e-001 0.00e+000 4.90e-001 0.00 1.46e-014 1.46e-014 0.14 0.65 0.14 0.65 Structural Integrity File No.: PAL-09Q-301 Revision:

1 Associates, Inc. Page AlO of A15 183 184 185 186 187 188 189 190 Block: 191 192 193 194 195 196 197 198 199 200 Block: 201 202 203 204 205 206 207 208 209 210 Block: 211 212 213 214 215 216 217 218 219 220 Block: 221 222 223 224 225 226 227 228 229 230 20 21 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 4.90e-001 4. 90e-001 4. 90e-001 4.90e-001 4.90e-001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4. 90e-001 4. 90e-001 4.90e-001 4.90e-001 4. 90e-001 4.90e-001 4.90e-001 4. 90e-001 4.90e-001 4. 90e-001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 0.OOe+000 0.OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0.OOe+000 0. OOe+O00 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. 00e+000 0. 00e+000 0.00e+000 0. 00e+000 0. OOe+000 0.OOe+000 0.OOe+000 0.OOe+000 0.OOe+000 0. OOe+000 0.OOe+000 0.OOe+000 0. OOe+000 0.OOe+000 0.00e+000 0.OOe+000 0.OOe+000 0.OOe+000 0.OOe+000 0.OOe+000 0.OOe+000 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.46e-014 1.46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1. 46e-014 1.46e-014 1.46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1.46e-014 1.46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 22 23 Structural Integrity File No.: PAL-09Q-301 Revision:

1 Associates, Inc. Page All of A15 Block: 231 232 233 234 235 236 237 238 239 240 Block: 241 242 243 244 245 246 247 248 249 250 24 25 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Block: 251 252 253 254 255 256 257 258 259 260 Block: 261 262 263 264 265 266 267 268 269 270 26 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4. 90e-001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 0.OOe+000 0.OOe+000 0.OOe+000 0.OOe+000 0. OOe+000 0. OOe+000 0.OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0.OOe+000 0.OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0.OOe+000 0. OOe+000 0. OOe+000 0.OOe+000 0. OOe+000 0.OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0.OOe+000 0. OOe+O00 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0.OOe+000 0.OOe+000 0. OOe+000 O. OOe+O00 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4. 90e-001 4.90e-001 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.46e-014 1. 46e-014 1. 46e-014 1. 46e-014 1. 46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1.46e-014 1.46e-014 1. 46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1.46e-014 1. 46e-014 1.46e-014 1.46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 27 Block: 271 272 273 274 275 276 277 278 28 1 2 3 4 5 6 7 8 Structural Integrity File No.: PAL-09Q-301 Revision:

1 Associates, Inc. Page A12 of A15 279 280 9 4.90e-001 10 4.90e-001 0.00e+000 4.90e-001 0.00 1.46e-014 1.46e-014 0.00e+000 4.90e-001 0.00 1.46e-014 1.46e-014 0.14 0.65 0.14 0.65 Block: 281 282 283 284 285 286 287 288 289 290 Block: 291 292 293 294 295 296 297 298 299 300 29 30 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Block: 301 302 303 304 305 306 307 308 309 310 Block: 311 312 313 314 315 316 317 318 319 320 Block: 321 322 323 324 325 31 4. 90e-001 4. 90e-001 4. 90e-001 4.90e-001 4. 90e-001 4.90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4. 90e-001 4.90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 0. 00e+000 0. 00e+000 0. 00e+000 0. 00e+000 0.00e+000 0. 00e+000 0. 00e+000 0. 00e+000 0. 00e+000 0. 00e+000 0.00e+000 0.00e+000 0. 00e+000 0. 00e+000 0.00e+000 0.00e+000 0. 00e+000 0. 00e+000 0. 00e+000 0.00e+000 0. 00e+000 0. 00e+000 0.00e+000 0.00e+000 0. 00e+000 0.00e+000 0. 00e+000 0. 00e+000 0.00e+000 0. 00e+000 0. 00e+000 0.OOe+000 0.OOe+000 0. OOe+000 0.OOe+000 0.OOe+000 0. OOe+000 0. OOe+000 0.OOe+000 0. OOe+000 0.OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4. 90e-001 4.90e-001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4. 90e-001 4.90e-001 4.90e-001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1.46e-014 1. 46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 32 33 1 2 3 4 5 Structural Integrity File No.: PAL-09Q-301 Revision:

1 Associates, Inc. Page A13 of A15 326 327 328 329 330 Block: 331 332 333 334 335 336 337 338 339 340 34 Block: 341 342 343 344 345 346 347 348 349 350 Block: 351 352 353 354 355 356 357 358 359 360 Block: 361 362 363 364 365 366 367 368 369 370 Block: 371 372 35 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 4.90e-001 4.90e-001 4. 90e-001 4.90e-001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4. 90e-001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4. 90e-001 4.90e-001 4.90e-001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 0. 00e+000 0.OOe+000 0. OOe+000 0.OOe+000 0. OOe+000 0. OOeO00 0. OOe+000 0.OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0.OOe+O000 0.OOe+000 0. OOe+000 0. OOe+000 0.OOe+000 0. OOe+000 0.OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. 00e+000 0. OOe+000 0. 00e+000 0. 00e+000 0.00e+000 0.OOe+000 0.OOe+000 0. OOe+000 0.OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0.OOe+000 0.OOe+000 0. OOe+000 0.OOe+000 0. OOe+000 0. OOe+000 4. 90e-001 4.90e-001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1.46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1.46e-014 1. 46e-014 1. 46e-014 1.46e-014 1. 46e-014 1. 46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1.46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1. 46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1. 46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 36 37 38 1 4.90e-001 0.00e+000 4.90e-001 0.00 1.46e-014 1.46e-014 2 4.90e-001 0.00e+000 4.90e-001 0.00 1.46e-014 1.46e-014 0.14 0.65 0.14 0.65 Structural Integrity File No.: PAL-09Q-301 Revision:

1 Associates, Inc. Page A14 of A15 373 374 375 376 377 378 379 380 Block: 381 382 383 384 385 386 387 388 389 390 39 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. 00e+000 0.OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 0. OOe+000 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4. 90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 4.90e-001 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.46e-014 1. 46e-014 1.46e-014 1. 46e-014 1.46e-014 1. 46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1. 46e-014 1.46e-014 1. 46e-014 1. 46e-014 1. 46e-014 1. 46e-014 1.46e-014 1.46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1.46e-014 1.46e-014 1. 46e-014 1. 46e-014 1.46e-014 1.46e-014 1.46e-014 1.46e-014 1. 46e-014 1.46e-014 1. 46e-014 1. 46e-014 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 Block: 391 392 393 394 395 396 397 398 399 400 40 End of pc-CRACK Output Structural Integrity File No.: PAL-09Q-301 Revision:

1 Associates, Inc. Page A15 of A15