MONTHYEARPNP 2021-003, 2020 Steam Generator Tube Inspection Report2021-03-25025 March 2021 2020 Steam Generator Tube Inspection Report PNP 2021-001, ASME Section XI 90-Day Owner'S Activity Report2021-01-12012 January 2021 ASME Section XI 90-Day Owner'S Activity Report ML18347A4982019-12-13013 December 2019 Palisades Nuclear Power Plant, Third Interval Inservice Inspection Program for Class 1, 2 & 3 Components and Their Supports. PNP 2019-011, ASME Section XI 90-Day Owner'S Activity Report2019-03-22022 March 2019 ASME Section XI 90-Day Owner'S Activity Report PNP 2017-062, Submittal of 2017 Refueling Outage, 1R25, 180-Day Steam Generator Tube Inspection Report2017-10-18018 October 2017 Submittal of 2017 Refueling Outage, 1R25, 180-Day Steam Generator Tube Inspection Report PNP 2017-046, ASME Section XI 90-Day Owner'S Activity Report2017-07-14014 July 2017 ASME Section XI 90-Day Owner'S Activity Report ML16144A7892016-05-18018 May 2016 Biennial Report of MRP-227-A Reactor Internals Inspection Results PNP 2016-006, Inservice Testing Program Plan Fifth 10-Year Interval2016-04-28028 April 2016 Inservice Testing Program Plan Fifth 10-Year Interval ML16092A0902016-03-16016 March 2016 51-9252894-001, 180-Day Steam Generator Tube Inspection Report, 2015 Refueling Outage, 1R24. PNP 2016-002, ASME Section XI 90-Day Owner'S Activity Report2016-01-15015 January 2016 ASME Section XI 90-Day Owner'S Activity Report PNP 2015-089, Inservice Inspection Master Program Fifth 10-Year Interval2015-12-0909 December 2015 Inservice Inspection Master Program Fifth 10-Year Interval PNP 2015-043, Relief Request Number RR 4-22 - Proposed Alternative, Use of Alternate ASME Code Case N-770-1 Baseline Examination2015-07-0707 July 2015 Relief Request Number RR 4-22 - Proposed Alternative, Use of Alternate ASME Code Case N-770-1 Baseline Examination PNP 2015-022, Relief Request Number RR 5-1, Proposed Alternative, Extend the Current ASME Code of Record Into the Fifth 10-year ISI Interval for ISI Related Activities2015-04-29029 April 2015 Relief Request Number RR 5-1, Proposed Alternative, Extend the Current ASME Code of Record Into the Fifth 10-year ISI Interval for ISI Related Activities PNP 2014-072, 2014 Steam Generator Tube Inspection Report2014-08-0505 August 2014 2014 Steam Generator Tube Inspection Report PNP 2014-055, ASME Section XI 90-Day Inservice Inspection Summary Report2014-06-12012 June 2014 ASME Section XI 90-Day Inservice Inspection Summary Report ML14066A4092014-03-0606 March 2014 Supplemental Response to Request for Additional Information Dated February 26, 2014, for Relief Request Number RR 4-18 - Proposed Alternative, Use of Alternate ASME Code Case N-70-1 Baseline Examination PNP 2014-009, 40-Year Containment Tendon Surveillance Report2014-01-31031 January 2014 40-Year Containment Tendon Surveillance Report PNP 2012-069, ASME Section XI 90-Day Inservice Inspection Summary Report2012-08-0303 August 2012 ASME Section XI 90-Day Inservice Inspection Summary Report PNP 2011-033, Generator Tube Inspection Report2011-04-25025 April 2011 Generator Tube Inspection Report PNP 2011-006, ASME Section XI 90-Day Inservice Inspection Summary Report2011-01-25025 January 2011 ASME Section XI 90-Day Inservice Inspection Summary Report ML0920903162009-07-27027 July 2009 ASME Section XI 90-Day Inservice Inspection Summary Report 2009 ML0907606852009-03-12012 March 2009 Request for Information for IP 71111.08, Inservice Inspection ML0823209822008-08-19019 August 2008 Transmittal of Ventilated Storage Cask Inspection Summary Report ML0825400532008-08-14014 August 2008 Response to Request for Additional Information Concerning Authorization to Extend the Third 10-Year Inservice Inspection Interval for Reactor Vessel Weld Examination ML0802205642008-01-21021 January 2008 ASME Section XI 90-Day Inservice Inspection Summary Report ML0708500572007-03-21021 March 2007 Supplement to Request for Relief from ASME Section XI Code Requirements for Repair of Reactor Pressure Vessel Head Penetrations ML0704401872007-02-12012 February 2007 Response to Request for Additional Information Related to 4th Interval Inservice Inspection Plan Relief Requests 4-1 Through 4-12 (TAC Nos. MD2404 - MD2415) ML0626502552006-09-15015 September 2006 Request for Authorization to Extend the Third 10-Year ISI Interval for Reactor Vessel Weld Examination ML0622302752006-08-0202 August 2006 ASME Section XI Inservice Inspection 90-Day Report ML0608904512006-03-24024 March 2006 Inservice Testing Program: Fourth Ten-Year Interval Update ML0603705272006-02-0303 February 2006 Ltr. 02/03/06 Palisades Nuclear Power Plant Request of Information ML0509703192005-03-31031 March 2005 Plant. Request for Authorization to Extend the Third 10-Year IST Interval for Certain Relief Valves ML0509702672005-03-31031 March 2005 Plant. Request for Authorization to Extend the Third 10-Year ISI Interval for Reactor Vessel Weld Examination ML0509702632005-03-31031 March 2005 Request for Authorization to Extend the Third 10-Year ISI Interval for Reactor Vessel Visual Examination ML0505406882005-02-15015 February 2005 ASME Section XI Inservice Inspection 90-Day Report ML0327314002003-09-18018 September 2003 Request for Relief from ASME Section XI, Appendix Viii, Supplement 11 Code Requirements ML0319707292003-07-10010 July 2003 ASME Section XI Inservice Inspection 90-Day Report ML0307005342003-02-28028 February 2003 Supplement to Palisades Risk-Informed Inservice Inspection Piping Program ML0223302592002-08-0808 August 2002 Risk Informed Inservice Inspection Program - Response to Request for Additional Information ML0209203632002-03-21021 March 2002 Part 2 of 2, Palisades Nuclear Plant, ASME Section XI Inservice Inspection 90-Day Reports, Form N-2 or Npt Certificate Holders' Report ML0209203552002-03-21021 March 2002 Part 1 of 2, Palisades Nuclear Plant, ASME Section XI Inservice Inspection 90-Day Reports ML18347A5011995-09-18018 September 1995 Inservice Testing of Selected Safety-Related Pumps Relief Request for Containment Spray and Low Pressure Safety Injection Pumps. ML18348A8951978-06-13013 June 1978 Submittal of Update of Inservice Inspection Program ML18348A8541977-05-0303 May 1977 Inservice Inspection Program 2021-03-25
[Table view] Category:Letter
MONTHYEARML24312A2262024-11-0606 November 2024 Letter from C. Nelson, Michigan SHPO Regarding Palisades Nuclear Plant Architectural Survey ML24292A1572024-11-0505 November 2024 Ape Notification to Burt Lake Band Palisades ML24310A0142024-11-0505 November 2024 Ape Notification to Mackinac Bands of Chippewa Palisades ML24310A0132024-11-0505 November 2024 Ape Notification to Grand River Bands of Ottawa Indians Palisades ML24309A2032024-11-0404 November 2024 Ape Notification to Ottawa Tribe of Oklahoma Palisades ML24309A1972024-11-0404 November 2024 Ape Notification to Little Traverse Bay Bands of Odawa Indians Palisades ML24309A1982024-11-0404 November 2024 Ape Notification to Match E Be Nash She Wish Band of Pottawatomi Indians Palisades ML24309A1872024-11-0404 November 2024 Ape Notification to Grand Portage Band of Lake Superior Chippewa Palisades ML24309A2072024-11-0404 November 2024 Ape Notification to Quechan Tribe of the Fort Yuma Indian Reservation Palisades ML24309A1832024-11-0404 November 2024 Ape Notification to Bois Forte Band of the Minnesota Chippewa Tribe Palisades ML24309A2122024-11-0404 November 2024 Ape Notification to Sault Ste. Marie Tribe of Chippewa Indians Palisades ML24309A2042024-11-0404 November 2024 Ape Notification to Pokagon Band of Potawatomi Indians Palisades ML24292A0492024-11-0404 November 2024 Ape Notification to Bad River Band of the Lake Superior Tribe of Chippewa Indians Palisades ML24309A1932024-11-0404 November 2024 Ape Notification to Leech Lake Band of Ojibwe Palisades ML24309A2012024-11-0404 November 2024 Ape Notification to Mille Lacs Band of Ojibwe Palisades ML24309A1922024-11-0404 November 2024 Ape Notification to Lac Vieux Desert Band of Lk Superior Chippewa Indians Palisades ML24309A1892024-11-0404 November 2024 Ape Notification to Hannahville Indian Community Palisades ML24309A2002024-11-0404 November 2024 Ape Notification to Miami Tribe of Oklahoma Palisades ML24309A1952024-11-0404 November 2024 Ape Notification to Little River Band of Ottawa Indians Palisades ML24309A2112024-11-0404 November 2024 Ape Notification to Saint Croix Chippewa Indians of Wisconsin Palisades ML24309A1902024-11-0404 November 2024 Ape Notification to Lac Courte Oreilles Band of Lake Superior Chippewa Palisades ML24309A2022024-11-0404 November 2024 Ape Notification to Nottawaseppi Huron Band of the Potawatomi Palisades ML24309A1852024-11-0404 November 2024 Ape Notification to Citizen Potawatomi Nation Palisades ML24309A2142024-11-0404 November 2024 Ape Notification to White Earth Band of Minnesota Chippewa Tribe Palisades ML24309A2092024-11-0404 November 2024 Ape Notification to Red Lake Band of Chippewa Indians Palisades ML24309A1862024-11-0404 November 2024 Ape Notification to Forest County Potawatomi Community Palisades ML24309A1822024-11-0404 November 2024 Ape Notification to Bay Mills Indian Community Palisades ML24309A2052024-11-0404 November 2024 Ape Notification to Prairie Band Potawatomi Nation Palisades ML24309A2102024-11-0404 November 2024 Ape Notification to Saginaw Chippewa Indian Tribe of Michigan Palisades ML24309A2082024-11-0404 November 2024 Ape Notification to Red Cliff Band of Lake Superior Chippewa Indians Palisades ML24309A1992024-11-0404 November 2024 Ape Notification to Menominee Indian Tribe of Wisconsin Palisades ML24292A0072024-11-0404 November 2024 Ape Notification to Achp Palisades ML24309A1882024-11-0404 November 2024 Ape Notification to Grand Traverse Band of Ottawa and Chippewa Indians Palisades ML24309A1842024-11-0404 November 2024 Ape Notification to Chippewa Cree Indians of the Rocky Boys Reservation of Montana Palisades ML24309A1912024-11-0404 November 2024 Ape Notification to Lac Du Flambeau Band of Lake Superior Chippewa Indians Palisades ML24309A2132024-11-0404 November 2024 Ape Notification to Turtle Mountain Band of Chippewa Indians Palisades ML24309A2062024-11-0404 November 2024 Ape Notification to Prairie Island Indian Community Palisades PNP 2024-014, Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances2024-10-0909 October 2024 Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances PNP 2024-037, Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-0202024-10-0404 October 2024 Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-020 ML24267A2962024-10-0101 October 2024 Summary of Conference Call Regarding Steam Generator Tube Inspections ML24263A1712024-09-20020 September 2024 Environmental Request for Additional Information ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24219A4202024-09-12012 September 2024 Change in Estimated Hours and Review Schedule for Licensing Actions Submitted to Support Resumption of Power Operations (Epids L-2023-LLE-0025, L-2023-LLM-0005, L-2023-LLA-0174, L-2024-LLA-0013, L-2024-LLA-0060, L-2024-LLA-0071) IR 05000255/20244022024-09-0606 September 2024 Public: Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2024402 PNP 2024-029, Notice of Payroll Transition at Palisades Nuclear Plant2024-08-15015 August 2024 Notice of Payroll Transition at Palisades Nuclear Plant IR 05000255/20240022024-08-0909 August 2024 NRC Inspection Report No. 05000255/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 PNP 2024-032, Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-07-31031 July 2024 Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations ML24206A0572024-07-25025 July 2024 PRM-50-125 - Letter to Alan Blind; Docketing of Petition for Rulemaking and Sufficiency Review Status (10 CFR Part 50) PNP 2024-033, Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations2024-07-24024 July 2024 Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations 2024-09-06
[Table view] |
Text
NM C Committed to Nuclear Excel ene Palisades Nuclear Plant Operated by Nuclear Management Company, LLC March 31, 2005 10 CFR 50.55a U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Request for Authorization to Extend the Third 10-Year ISI Interval for Reactor Vessel Visual Examination
References:
- 1) Letter from NMC to NRC, "Request for Authorization to Extend the Third 10-Year ISI Interval for Reactor Vessel Weld Examination, dated March 31, 2005
- 2) Letter from NMC to NRC, "Request for Authorization to Extend the Third 10-Year IST Interval for Certain Relief Valves, " dated March 31, 2005 Pursuant to 10 CFR 50.55a(a)(3)(ii), Nuclear Management Company, LLC (NMC) is requesting Nuclear Regulatory Commission (NRC) approval to extend the third ten-year inservice inspection (ISI) interval for the examination of the reactor vessel interior attachments (Category B-N-2) and the core support structure (Category B-N-3) for one cycle at the Palisades Nuclear Power Plant. The one-cycle extension is being requested on the basis that compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
Palisades is currently in the third inspection interval. The third inspection interval began on May 12,1995, and considering the ASME Code-allowed extensions, will end on or before December 12, 2006. The examination of the reactor vessel interior attachments (Category B-N-2) and the core support structure (Category B-N-3) for the third interval is currently scheduled during the spring 2006 refueling outage. NMC is requesting authorization to defer the subject exams until the 2007 refueling outage.
This request is associated with two other requests, both by letter dated March 31, 2005 (Reference 1, Reference 2). Both Reference 1 and Reference 2 were to align with the full core off load during the fall 2007 refueling outage. Approval of this request is contingent upon the approval of Reference 1 and Reference 2.
kW7 27780 Blue Star Memorial Highway
- Covert, Michigan 49043-9530 Telephone: 269.764.2000
Document Control Desk Page 2 NMC requests approval by March 1, 2006, however, NMC would like approval sooner to accommodate outage planning.
Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.
Daniel J. Malone Site Vice President, Palisades Nuclear Plant Nuclear Management Company, LLC CC Administrator, Region 111, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC a 1
ENCLOSURE I REQUEST FOR APPROVAL TO EXTEND THE THIRD 10-YEAR ISI INTERVAL FOR REACTOR VESSEL VISUAL EXAMINATION PALISADES NUCLEAR PLANT 1.0 ASME Code Component(s) Affected The affected component is the Palisades Nuclear Plant reactor vessel (RV), N-50, specifically, the following American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (BPV) Code, Section Xi, examination categories and item numbers covering examinations of the RV. These examination categories and item numbers are from IWB-2500 and Table IWB-2500-1 of the ASME BPV Code, Section Xl.
Examination Categorv Item No. Description B-N-2 B13.50 Interior Attachments Within BeItline Region B-N-2 B13.60 Interior Attachments Beyond BeItline Region B-N-3 B1 3.70 Core Support Structure 2.0 Applicable Code Edition and Addenda The Palisades Nuclear Plant third interval Inservice Inspection (ISI) Program Plan is prepared to the 1989 Edition of the Code.
3.0 Applicable Code Requirement IWB-2412, Inspection Program B, requires visual examination of the reactor pressure vessel interior attachments and the core support structure identified in Table IWB-2500-1, once each ten-year interval. In accordance with IWA-2430(d) and IWA-2430(e), Palisades third inspection interval is currently scheduled to conclude on or before December 12, 2006.
4.0 Reason for Request An alternative is requested from the requirements of IWA-2432, Inspection Program B, that requires visual examination, of the reactor pressure vessel interior attachments and the core support structure, to be performed once each ten-year interval. Extension of the inspection interval for examination category B-N-2 and B-N-3 by one refueling cycle beyond the currently scheduled inspection is requested.
ASME Section Xi requires that the visual exams of the reactor pressure vessel interior attachments and the core support structure, required by examination categories B-N-2 and B-N-3, be performed once every inspection interval. These exams are typically performed at the end of the interval during the same refueling outage as the reactor Page 1 of 3
vessel mechanized exam. By letter dated March 31, 2005, NMC requested a one-cycle extension of the reactor vessel mechanized examination at Palisades Nuclear Plant.
Both of these exams require that the fuel and the core barrel be removed from the reactor vessel.
NMC is currently planning a full core offload in 2007, to allow for replacement of the reactor vessel head at Palisades Nuclear Plant. Replacement of the reactor vessel head will require a hole to be cut in the containment building, which would require all of the fuel to be removed from the vessel. The deferral of these examinations will allow them to be performed during a planned full core offload, which would reduce the dose and risk of having to perform the full core offload twice.
5.0 Proposed Alternative and Basis for Use The third inspection interval for Palisades started on May 12, 1995, and will end on December 12, 2006. This inspection interval includes credit for the IWA-2430(d) allowed one-year extension and an IWA-2430(e) allowed 215-day extension. The subject examinations are scheduled to be performed in the spring 2006 refueling outage. The proposed inspection date is one refueling cycle beyond the Code-allowed inspection interval. In accordance with 10 CFR 50.55a(a)(3)(ii), this interval extension is requested on the basis that compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
Examinations required by categories B-N-2 and B-N-3 involves removing all of the fuel and the core barrel from the reactor. Records indicate that when this was performed during the 1995 refueling outage, approximately 5.0 Rem of exposure was required for this exam. These visual exams of the reactor pressure vessel interior attachments and the core support structure have been performed several times at Palisades with no relevant indications noted during the examinations. These exams were last performed during the 1995 refueling outage with acceptable results. Additionally, review of industry surveys indicate that these exams have been performed many times by the industry without any reportable findings.
During the 2006 refueling outage, Palisades will be performing the ASME category B-N-1 visual examination. This includes the space above and below the reactor core that is made accessible for examination by the removal of components during normal refueling outages. This examination is required once each period and will provide reasonable assurance of structural integrity.
Therefore, in accordance with 10 CFR 50.55a(a)(3)(ii), this one-cycle interval extension is requested on the basis that compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
Page 2 of 3
6.0 Duration of Proposed Alternative The alternative is requested to extend the third ISI interval by one refueling cycle beyond the ASME Code required 10-year inspection interval, the Code-allowed twelve month extension, and the Code-allowed 215-day extension for the subject examinations. This request is applicable to the third inspection interval only. Ifthis relief request is approved, the third ISI interval will end at the conclusion of the fall 2007 refueling outage for the subject exams.
Page 3 of 3