PNP 2017-046, ASME Section XI 90-Day Owner'S Activity Report

From kanterella
Jump to navigation Jump to search
ASME Section XI 90-Day Owner'S Activity Report
ML17195A326
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/14/2017
From: Hardy J
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PNP 2017-046
Download: ML17195A326 (4)


Text

Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530 Tel 269-764-2000 Jeffery A. Hardy Regulatory Assurance Manager PNP 2017-046 July 14, 2017 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

SUBJECT:

ASME Section XI gO-Day Owner's Activity Report Palisades Nuclear Plant Docket 50-255 Renewed Facility Operating License No. DPR-20

Dear Sir or Madam:

In accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, Code Case N-532-5, Repair/Replacement Activity Documentation Requirements and Inservice Inspection Summary Report Preparation and Submission,Section XI, Division 1, Entergy Nuclear Operations, Inc. (ENO) herein submits the Owner's Activity Report for the Palisades Nuclear Plant (PNP). The report contains a listing of one examination with indications that required evaluation for continued service, and an abstract of seven repair/replacement activities that were required for continued service. These activities were performed during the PNP twenty-fifth fuel cycle and the subsequent 2017 refueling outage (1 R25). The PNP refueling outage was completed on May 17, 2017.

This letter identifies no new commitments and no revisions to existing commitments.

Sincerely, 9A~~

JAH/jpm

Enclosure:

Palisades Nuclear Plant Form OAR-1 Owner's Activity Report cc: Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC

Enclosure to PNP 2017-046 Palisades Nuclear Plant Form OAR-1 Owner's Activity Report 2 pages follow

FORM OAR-l OWNERS ACTIVITY REPORT Report Number: PLP-IR25-0AR-l Page 1..0f2 Plant: Palisades Nuclear Plant Unit No: 1 Commercial Service Date: 12/31/1971 Refueling Outage No.: lR25 (if applicable)

Current Inspection Interval:

(15t, 2nd, 3rd, 4th, Other)

Current Inspection Period:

(I st, 2nd, 3rd)

Edition and Addenda of Section XI applicable to the Inspection Plans:

lSI related activities related to Pressure Testing (PT), and Nondestructive Examination (NDE) are to ASME BPV Code,Section XI 2001 Edition through the 2003 Addenda lSI program related activities related to class 1, 2, and 3 components and supports to the ASME BPV Code,Section XI, 2007 Edition with the 2008 Addenda Date and Revision of Inspection Plans: IWB, IWC, IWD, IWF: 12/8/2015 Revision 3 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the Inspection Plans:

ASME BPV Code,Section XI 2001 Edition through the 2003 Addenda Code Cases used for inspection and evaluation: N-532-5, N-716-1, N-722-1, N-729-1, N-770-1 (if applicable, including cases modified by Case N-532 and later revisions)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of lR25 conform to the requirements of Section XI.

Signed: 6~~~m~~L""1~~~" er or Owner's Designee, .

__- - - - - - Date: ~/Ol.' it?

.r~'I £"l\'".u.r b/"3o/,..,

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding !).vl~dtfRm6~8n ~i'Ltb:a13t~~t~wl~2.fJiiW Boiler and Pressure Vessel Inspectors and employed by AND UI.$,utU..... c.t: C.OMPAN y of HAA'r880. CT have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions: , "'IS-" L( tJr II Inspector's Signature (National Board Number and Endorsement)

Date: .., 1,0 I '\.01'.,

FORM OAR-! OWNERS ACTIVITY REPORT Report Number: PLP-IR25-0AR-l Page 2. of2.

Plant: Palisades Nuclear Plant Unit No: 1 Commercial Service Date: 12/31/1971 Refueling Outage No. : lR25 (if applicable)

TABLE 1:

ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Item Description Evaluation Description Category and Item Number ASMECode N-50 CR-PLP-2017-02260 - Indications of boron staining, Case N-729-1 Reactor Vessel Closure Head scaling, and general corrosion.

Code Item B4.1O Class 1 Evaluation determined the component was acceptable for continued service in accordance with N-729-1, Paragraph 3142.1.

TABLE 2:

ABSTRACT OF REPAIRIREPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Item Description Description of Work Date RepairlReplacement Class Completed Plan Number E-50A, "A" Steam Mechanically plug 25 tubes due to indications PLP52676055 Rev 5/8/17 1 Generator found during Eddy Current Testing. 1 E-50B, "B" Steam Mechanically plug 3 tubes due to indications PLP52676054 Rev 5/8/17 1 Generator found during Eddy Current Testing. 1 RV -0704, Main Replace valve disc due to minimum thickness PLP52676641 Rev 5/16/17 2 Steam Relief Valve not bein~ acce~table after lapping. 1 Replace valve nozzle due to cracking across 5/16/17 seating surfaces. Replacement of nozzle PLP52676642 Rev RV-0719, Main included performing seal weld of nozzle to 1 2 Steam Relief Valve valve body.

Replace valve nozzle due to cracking in 5/16/17 PLP52676639 Rev RV-0720, Main nozzle land. Replacement of nozzle included 1

2 Steam Relief Valve performing seal weld of nozzle to valve body.

3 HB-23 Service Replace section of pipe downstream of valve 5/4/17 PLP00427975 Rev Water Downstream due to pin hole leak. 1 of MV-SW264, Containment Building Fire Water Supply 3 K -6B, Emergency Replace broken turbocharger support bolt 12/22/16 PLP00462083 Diesel Generator 1-2