ML062780341: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 10/06/2006
| issue date = 10/06/2006
| title = 10/24/2006 Beaver Valley - Licensee Meeting to Discuss an Apparent Violation Identified During a Routine Inspection
| title = 10/24/2006 Beaver Valley - Licensee Meeting to Discuss an Apparent Violation Identified During a Routine Inspection
| author name = Bellamy R R
| author name = Bellamy R
| author affiliation = NRC/RGN-I/DRP/PB7
| author affiliation = NRC/RGN-I/DRP/PB7
| addressee name =  
| addressee name =  

Revision as of 11:52, 13 July 2019

10/24/2006 Beaver Valley - Licensee Meeting to Discuss an Apparent Violation Identified During a Routine Inspection
ML062780341
Person / Time
Site: Beaver Valley
Issue date: 10/06/2006
From: Bellamy R
NRC/RGN-I/DRP/PB7
To:
bellamy r r
References
EA-06-215, MN 06-030
Download: ML062780341 (4)


Text

MN No. 06-030EA No. 06-215U.S. NUCLEAR REGULATORY COMMISSIONREGION INOTICE OF LICENSEE MEETINGOctober 6, 2006Licensee:First Energy Nuclear Operating Company (FENOC)

Facility:Beaver Valley Power Station, Units 1 & 2 Docket Nos.:50-334 & 50-412 Date/Time:October 24, 2006 at 10:00 a.m.

Location:U.S. Nuclear Regulatory CommissionPublic Meeting Room 475 Allendale Road King of Prussia, PA 19406Purpose:A regulatory conference will be held to discuss an apparent violation identified during a routine inspection conducted at the Beaver Valley Nuclear Power Station on June 27, 2006. The finding concerns the performance of the Beaver Valley Power Station dose assessment team.

This finding is similar to an NRC-identified weakness during a May 2004emergency exercise. NRC Attendees:Samuel J. Collins, Regional Administrator A. Randolph Blough, Director, Division of Reactor Safety Raymond K. Lorson, Chief, Plant Support Branch 1, Division of Reactor Safety Ronald R. Bellamy, Chief, Projects Branch 7, Division of Reactor Projects Stephen T. Barr, Senior Emergency Preparedness Inspector Karl L. Farrar, Regional Counsel Daniel J. Holody, Team Leader, Technical Program Staff Licensee Attendees: James H. Lash, Site Vice PresidentLarry Freeland, Director, Site Performance Improvement Susan Vicinie, Manager, Emergency Planning Brian, Tuite, Principal Consultant John Lebda, Staff Nuclear Engineer Vernon Higaki, Manager, Fleet Emergency PreparednessPublic Participation:This is a Category 1 Meeting. The public is invited to observe thismeeting and will have one or more opportunities to communicate with theNRC after the business portion, but before the meeting is adjour ned.

2NRC's inspection report can be found in ADAMS with an Accession Number of ML062620341.This meeting notice with the enclosed agenda can be located in ADAMS with an Accession Number of ML062780341. ADAMS is accessible for the NRC Web Site athttp://www.nrc.gov/reading-rm/adams.html. Meeting Contact:Ronald R. Bellamy, Chief, Projects Branch 7Division of Reactor Projects 610-337-5200 E-mail: RRB1@nrc.govHandicapped persons requiring assistance to attend or participate in the meeting shall maketheir requests known to the meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known byOctober 17, 2006, via telephone to the NRC meeting contact./RA/ Roy Fuhrmeister signed forApproved by:

____________________________Ronald R. Bellamy, ChiefProjects Branch 7 Division of Reactor Projects 3cc w/encl:G. Leidich, President and Chief Nuclear OfficerJ. Hagan, Senior Vice President of Operations and Chief Operating OfficerD. Pace, Senior Vice President, Fleet Engineering J. Rinckel, Vice President, Fleet Oversight L. Myers, Executive Vice President, Special Projects R. Anderson, Vice President, FirstEnergy Nuclear Operating Company Manager, Fleet Licensing, FirstEnergy Nuclear Operating Company R. Mende, Director, Site Operations T. Cosgrove, Director, Maintenance P. Sena, Director, Engineering L. Freeland, Director, Site Performance Improvement and Manager, Regulatory Compliance D. Jenkins, Attorney, FENOC B. Sepelak, Supervisor, Nuclear Compliance M. Clancy, Mayor, Shippingport, PA D. Allard, PADEP C. O'Claire, State Liaison to the NRC, State of Ohio Z. Clayton, EPA-DERR, State of Ohio Director, Utilities Department, Public Utilities Commission, State of OhioD. Hill, Chief, Radiological Health Program, State of West Virginia J. Lewis, Commissioner, Division of Labor, State of West Virginia W. Hill, Beaver County Emergency Management AgencyJ. Johnsrud, National Energy Committee, Sierra Club Distribution: (Via E-Mail):Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

Director, Office of Enforcement (RIDSEDOMAILCENTER)

Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)

RI EDO Coordinator, OEDO Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)Deputy Director, Office of Nuclear Reactor Regulation, NRR/ADPR (RIDSNRROD)Director, Division of Regulatory Improvement Programs, NRR (RIDSNRRDRIP)

Director, Division of Inspection Program Management, NRR (RIDSNRRDIPM)Director, Division of Licensing Project Management, NRR (RIDSNRRDLPM)Project Directorate I-1 (PD1/2), NRR (RIDSNRRDIPMLPDI)

Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)

OEMAIL B. Holian, DRP D. Lew, DRP R. Blough, DRSM. Gamberoni, DRSR. Bellamy, DRP R. Fuhrmeister, DRP B. Sosa, RI OEDO R. Laufer, NRR T. Colburn, PM, NRR R. Guzman, NRR K. Farrar, Regional Counsel D. Screnci, Senior Public Affairs, RI N. Sheehan, Field Public Affairs Officer, RI J. Wray, ORA N. McNamara, State Liaison Officer M. McLaughlin, State Liaison Officer P. Cataldo, SRI, Beaver Valley D. Werkheiser, RI - Beaver Valley P. Garrett, Resident OA R. Barkley, RI Technical Communications Assistant G. Matakas, ORA R. Marziale, DRP Division Secretary, RI K. Gallagher, DRS Division Secretary, RI S. Barr, Senior Emergency Preparedness Inspector N. Mamish, NSIR A. McMurtray, NSIR R. Kahler, NSIR PMNSAccession Number ML062780431SUNSI Review Complete: FMH (Reviewer's Initials)DOCUMENT NAME: E:\FileNET\ML062780341.wpdAfter declaring this document "An Official Agency Record" it will be released to the Public.To receive a copy of this document, indicate in the box:

" C" = Copy withoutattachment/enclosure " E" = Copy with attachment/enclosure " N" = No copyOFFICERI/DRSRI/ORA RI/DRP NAMERLorson/FMHRSummers/JRWRBellamy/RLFDATE10/05/0610/05/0610/06/06OFFICIAL RECORD COPY