Line 3: Line 3:
| issue date = 03/26/2007
| issue date = 03/26/2007
| title = Information Request for NRC Biennial Baseline Component Design Bases Inspection 05000373-07-009 (Drs); 05000374-07-009 (DRS)
| title = Information Request for NRC Biennial Baseline Component Design Bases Inspection 05000373-07-009 (Drs); 05000374-07-009 (DRS)
| author name = Stone A M
| author name = Stone A
| author affiliation = NRC/RGN-III/DRS/EB2
| author affiliation = NRC/RGN-III/DRS/EB2
| addressee name = Crane C M
| addressee name = Crane C
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| docket = 05000373, 05000374
| docket = 05000373, 05000374
Line 15: Line 15:
| page count = 9
| page count = 9
}}
}}
See also: [[followed by::IR 05000373/2007009]]
See also: [[see also::IR 05000373/2007009]]


=Text=
=Text=

Revision as of 04:12, 13 July 2019

Information Request for NRC Biennial Baseline Component Design Bases Inspection 05000373-07-009 (Drs); 05000374-07-009 (DRS)
ML070851385
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 03/26/2007
From: Ann Marie Stone
NRC/RGN-III/DRS/EB2
To: Crane C
Exelon Generation Co, Exelon Nuclear
References
IR-07-009 IR-07-009
Download: ML070851385 (9)


See also: IR 05000373/2007009

Text

March 26,2007Mr. Christopher M. CranePresident and Chief Nuclear Officer

Exelon Nuclear

Exelon Generation Company, LLC

4300 Winfield Road

Warrenville, IL 60555SUBJECT:LASALLE COUNTY STATION, UNITS 1 AND 2 - INFORMATION REQUESTFOR AN NRC BIENNIAL BASELINE COMPONENT DESIGN BASES

INSPECTION 05000373/2007009(DRS); 05000374/2007009(DRS)Dear Mr. Crane:

On August 27, 2007, the NRC will begin a biennial baseline Component Design BasesInspection (CDBI) at the LaSalle County Station, Units 1 and 2. This inspection will be

performed in accordance with revised NRC Baseline Inspection Procedure (IP) 71111.21 and

replaces the biennial Safety System Design and Performance Capability Inspection. The CDBI inspection focuses on components which have high risk and low design margins. The components to be reviewed during this baseline inspection will be identified during an

in-office preparation week prior to the first week of the on-site inspection. In addition, a number

of risk significant operator actions and operating experience issues, associated with the

component samples, will also be selected for review. The inspection will include 3 weeks on-site, including the information gathering during the firston-site week. The inspection team will consist of six NRC inspectors, of whom five will focus on

engineering and one on operations. The current inspection schedule is as follows: *August 27 through August 31, 2007;*September 10 through September 14, 2007; and

  • September 24 through September 28, 2007.The team will be preparing for the inspection, mainly during the week of August 20, 2007, asdiscussed in the attached enclosure. A Region III Senior Reactor Analyst may accompany theinspection team during the week of August 27, 2007, to review probabilistic risk assessment

data and assist in identifying risk significant components, which will be reviewed during the

inspection.Experience with previous baseline design inspections of similar depth and length has shownthat these type of inspections are extremely resource intensive, both for the NRC inspectors

and the licensee staff. In order to minimize the inspection impact on the site and to ensure a

productive inspection for both parties, we have enclosed a request for information needed for

the inspection.

C. Crane-2-It is important that all of these documents are up to date and complete in order to minimize thenumber of additional documents requested during the preparation and/or the on-site portions of

the inspection. Insofar as possible, this information should be provided electronically to the

lead inspector. The information request has been divided into three groups:*The first group lists information necessary for our initial inspection scoping activities. This information should be available to the lead inspector no later than July 30, 2007.

By August 10, 2007, the lead inspector will communicate the initial selected set of

approximately 30 high risk components. *The second group of documents requested are those items needed to support ourin-office preparation activities. This set of documents, including the calculations

associated with the initial selected components, should be available at the Regional

Office no later than August 17, 2007. During the in-office preparation activities, the

team may identify additional information needed to support the inspection. *The last group includes the additional information above as well as plant specificreference material. This information should be available to the team on the first day of

the inspection. It is also requested that corrective action documents and questions

developed during the inspection be provided to the inspectors throughout the inspection.The lead inspector for this inspection is Ms. Patricia Lougheed. We understand that ourlicensing contact for this inspection is Mr. P. Holland of your organization. If there are any

questions about the inspection or the material requested in the enclosure, please contact the

lead inspector at (630) 829-9760 or via e-mail at VPL@nrc.gov.In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter andits enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (thePublic Electronic Reading Room).Sincerely,/RA/Ann Marie Stone, ChiefEngineering Branch 2

Division of Reactor Safety Docket No. 50-373; 50-374License No. NPF-11; NPF-18Enclosure:Component Design Bases Inspection Document Request

See Attached Distribution

C. Crane-3-cc w/encl:Site Vice President - LaSalle County StationLaSalle County Station Plant Manager

Regulatory Assurance Manager - LaSalle County Station

Chief Operating Officer

Senior Vice President - Nuclear Services

Senior Vice President - Mid-West Regional

Operating Group

Vice President - Mid-West Operations Support

Vice President - Licensing and Regulatory Affairs

Director Licensing - Mid-West Regional

Operating Group

Manager Licensing - Clinton and LaSalle

Senior Counsel, Nuclear, Mid-West Regional

Operating Group

Document Control Desk - Licensing

Assistant Attorney General

Illinois Emergency Management Agency

State Liaison Officer

Chairman, Illinois Commerce Commission

C. Crane-2-It is important that all of these documents are up to date and complete in order to minimize thenumber of additional documents requested during the preparation and/or the on-site portions of

the inspection. Insofar as possible, this information should be provided electronically to the

lead inspector. The information request has been divided into three groups:*The first group lists information necessary for our initial inspection scoping activities. This information should be available to the lead inspector no later than July 30, 2007.

By August 10, 2007, the lead inspector will communicate the initial selected set of

approximately 30 high risk components. *The second group of documents requested are those items needed to support ourin-office preparation activities. This set of documents, including the calculations

associated with the initial selected components, should be available at the Regional

Office no later than August 17, 2007. During the in-office preparation activities, the

team may identify additional information needed to support the inspection. *The last group includes the additional information above as well as plant specificreference material. This information should be available to the team on the first day of

the inspection. It is also requested that corrective action documents and questions

developed during the inspection be provided to the inspectors throughout the inspection.The lead inspector for this inspection is Ms. Patricia Lougheed. We understand that ourlicensing contact for this inspection is Mr. P. Holland of your organization. If there are any

questions about the inspection or the material requested in the enclosure, please contact the

lead inspector at (630) 829-9760 or via e-mail at VPL@nrc.gov.In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter andits enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (thePublic Electronic Reading Room).Sincerely,/RA/Ann Marie Stone, ChiefEngineering Branch 2

Division of Reactor Safety Docket No. 50-373; 50-374License No. NPF-11; NPF-18Enclosure:Component Design Bases Inspection Document Request

See Attached DistributionDOCUMENT NAME:C:\FileNet\ML070851385.wpd

G Publicly Available

G Non-Publicly Available

G Sensitive

G Non-SensitiveTo receive a copy of this document, indicate in the concurrence box " C" = Copy without attach/encl " E" = Copy with attach/encl " N = No copyOFFICERIIIRIIIRIIIRIIINAMEP. LougheedS. BurgessAM StoneDATE03/22/0703/23/0703/26/07OFFICIAL RECORD COPY

C. Crane-4-cc w/encl:Site Vice President - LaSalle County StationLaSalle County Station Plant Manager

Regulatory Assurance Manager - LaSalle County Station

Chief Operating Officer

Senior Vice President - Nuclear Services

Senior Vice President - Mid-West Regional

Operating Group

Vice President - Mid-West Operations Support

Vice President - Licensing and Regulatory Affairs

Director Licensing - Mid-West Regional

Operating Group

Manager Licensing - Clinton and LaSalle

Senior Counsel, Nuclear, Mid-West Regional

Operating Group

Document Control Desk - Licensing

Assistant Attorney General

Illinois Emergency Management Agency

State Liaison Officer

Chairman, Illinois Commerce CommissionDISTRIBUTION

DXC1

TEB

DMS6

RidsNrrDirsIrib

GEG

KGO

GLS

DEK

CAA1

DRPIII

DRSIII

PLB1

TXN

ROPreports@nrc.gov

COMPONENT DESIGN BASES INSPECTION

INFORMATION REQUESTEnclosure 1Site:LaSalle County Station, Units 1 and 2Inspection Report

05000373/2007009(DRS); 05000374/2007009(DRS)Inspection Dates
August 27 through August 31, September 10 throughSeptember 14; and September 24 through September 28, 2007Inspection Procedure
IP 71111.21, "Component Design Bases Inspection"Lead Inspector
Patricia Lougheed, (630) 829-9760, (VPL@nrc.gov

)I. Information Requested Prior to the On-site Information Gathering/Inspection

WeekThe following information is requested by July 30, 2007, or sooner, to facilitateinspection preparation. If you have any questions regarding this information, please call

the lead inspector as soon as possible. (Please provide the information electronically in"pdf" files, Excel, or other searchable formats, preferably either through electronic mail

or on CDROM. The CDROM should contain descriptive names, and be indexed and

hyperlinked to facilitate ease of use. Information in "lists" should contain enough

information to be easily understood by someone who has a knowledge of light water

reactor technology).1.Provide the risk ranking of top 150 components from your site specificprobabilistic safety analysis (PSA) sorted by Risk Achievement Worth (RAW).

Include values for Birnbaum Importance, Risk Reduction Worth (RRW), and

Fussell-Veseley (FV) (as applicable). If possible, list the system, train and PSA

failure mode for each component.2.Provide a list of the top 200 cut-sets from your PSA.

3.If you have an External Events or Fire PSA Model, provide the informationrequested in Items 1 and 2 for external events and fire. Provide narrative

description of each coded event (including fire, flood zone description.;4.Provide a risk ranking of operator actions from your site specific PSA sorted byRAW. Provide copies of your human reliability worksheets for these items.5Provide a list of PSA assumptions regarding operator actions.

6.Provide any pre-existing evaluation or list of components and associatedcalculations with low design margins, (i.e., pumps closest to the design limit for

flow or pressure, diesel generator close to design required output, heat

exchangers close to rated design heat removal etc.).

COMPONENT DESIGN BASES INSPECTION

INFORMATION REQUESTEnclosure 27.Provide a list of available design (setup) margins for valves in themotor-operated valve (MOV) and air-operated valve (AOV) programs.8.Provide a list of high risk Maintenance Rule systems/components based onengineering or expert panel judgement.9.Provide a list of structures, systems, or components (SSCs) in the MaintenanceRule (a)(1) category.10.Provide the site top ten issues list (if applicable).

11.Provide information on any common cause failure of components experienced inthe last five years at your facility.12.Provide a list of Root Cause Evaluations associated with component failures ordesign issues initiated or completed in the last five years.II.Information requested (for the approximately 30 selected components) to beavailable by August 17, 2007. This information should be separated for each

selected component, especially if provided electronically (e.g., folder with

component name that includes calculations, condition reports, maintenance

history, etc).1.Provide a list and copies of condition reports (corrective action documents)associated with each of the selected components for the last four years.2.Provide the completed corrective maintenance history associated with each ofthe selected components for the last four years. Please ensure this list only

includes completed activities and does not include routine surveillances.3.Provide copies of calculations associated with each of the selected components(if not previously provided), excluding data files. Please review the calculations

and provide copies of referenced material (such as drawings, engineering

requests, or vendor letters).4.Provide a list of modifications associated with each of the selected components. This list should include a descriptive paragraph on the purpose of the

modification. Please ensure this list only includes design completed (not

canceled) modifications.5.Provide copies of electrical single-lines and mechanical piping andinstrumentation drawings.6.Provide copies of operability evaluations associated with each of the selectedcomponents and plans for restoring operability, if applicable.

COMPONENT DESIGN BASES INSPECTION

INFORMATION REQUESTEnclosure 37.Provide copies of any operator work-around evaluations associated with each ofthe selected components and plans for resolution, if applicable.8.Provide copies of any open temporary modifications associated with each of theselected components, if applicable.9.Provide trend data on the selected electrical/mechanical components'performance for last three years (For example, pumps' performance including in-

service testing, other vibration monitoring, oil sample results, etc., as applicable).10.Provide System Health Reports, System Descriptions, and/or Design BasisDocuments that are associated with each of the selected components.11.Provide copies of operating experience evaluations associated with the selectedcomponents for the last three years.12.Provide copies of any simulator scenarios, lesson plans, or job performancemeasures for the selected operator actions.13.Provide copies of the emergency operating procedures, normal and abnormaloperating procedures and any alarm response procedures for the selected

operator actions.14.Provide a copy of any engineering or operations related audits completed in thelast two years which addressed the selected components.15.Provide a copy of the current management and engineering organizational chart. Highlight or otherwise provide the names of any inspection contacts or inspector

shadows.16.Provide electronic copies of Updated Final Safety Analysis Report, TechnicalSpecifications, Technical Specifications Bases, and Technical RequirementsManual; if available.17.Provide a copy of any internal/external self-assessments and associatedcorrective action documents generated in preparation for the inspection.III.Additional Information to be Provided on August 27, 2007 On-site (for final 15 - 20selected components)1.A request for any additional information needed will be provided during the weekof August 20, 2007. The lead inspector will provide a list of added information.

The lead inspectors may request hard copies of information provided

electronically, especially drawings and calculations.

Enclosusre

42.One complete set of piping and instrumentation drawings (P&IDs) and one-lineelectrical drawings (paper copies)3.The following background materials may be requested. It is recommended thatthese materials be identified and located prior to the inspection:*IPE/PRA report;*Procurement documents for components selected;

  • Plant procedures (normal, abnormal, emergency, surveillance, etc.); and
  • Vendor manuals.4.Please arrange for an overview walkdown of the selected components. Thisshould include any required radiological briefings. For any components not

normally accessible, please arrange for a briefing on what conditions prevent

access to the components.5.If plant information, such as corrective action documents or procedures, isavailable electronically onsite, please consider providing access for the

inspectors, along with simple instructions.IV.Information Requested to be provided throughout the inspection1Provide copies of any corrective action documents generated as a result ofthe team's questions or queries during this inspection. This includes and

licensee-identified corrective action documents generated while answering an

inspector question. Please provide two copies: one to the inspector and one to

the lead inspector. At the end of the inspection, please provide the lead

inspector with a complete list of all corrective action documents generated as a

result of the inspection.2Provide copies of the list of questions submitted by the team members and thestatus/resolution of the information requested. Each inspector should receive at

least a copy of his/her open questions, while the lead inspector should receive a

complete list. At the end of the inspection, please provide the lead inspector

with a complete electronic copy of the database.If you have questions regarding any of the information requested, please contact the leadinspector.